N° DESCRIPCION Y/O GRAFICO UND CANT # VECES LARGO ANCHO ALTO AREA VOLUMEN PARCIAL TOTAL

01 MOVIMIENTO DE TIERRAS

01.01 CORTE EN TALUD CON MAQUINARIA M3 1,305.00

- TRAMO I

AREA DE CORTE 1 = 4.76 m2 m3 1.00 1.00 - - - 4.7600 - -

AREA DE CORTE 2 = 4.76 m2 m3 1.00 1.00 200.00 - - 4.7600 952.00 952.00

- TRAMO II

AREA DE CORTE 1 = 3.53 m2 m3 1.00 1.00 - - - 3.5300 - -

AREA DE CORTE 2 = 3.53 m2 m3 1.00 1.00 100.00 - - 3.5300 353.00 353.00

01.02 EXCAVACION DE ZANJA EN TERRENO SATURADO M3 922.00

- TRAMO I

m3 1.00 1.00 200.00 2.50 1.30 650.00 650.00

- TRAMO II

m3 1.00 1.00 100.00 2.20 1.20 264.00 264.00

m3 1.00 1.00 100.00 0.20 0.40 8.00 8.00

01.03 RELLENO COMPACTADO CON MATERIAL PROPIO M3 1,568.80

- TRAMO I

AREA DE RELLENO 1 = 5.36 m2 m3 1.00 1.00 - - - 5.3600 - -

AREA DE RELLENO 2 = 5.36 m2 m3 1.00 1.00 200.00 - - 5.3600 1,072.00 1,072.00

- TRAMO II

AREA DE RELLENO 1 = 4.32 m2 m3 1.00 1.00 - - - 4.3200 - -

AREA DE RELLENO 2 = 4.32 m2 m3 1.00 1.00 100.00 - - 4.3200 432.00 496.80

01.04 ELIMINACION DE MATERIAL EXCEDENTE M3 822.75


- CORTE
CORTE EN TALUD CON MAQUINARIA m3 1.00 - - - - 1,305.0000 - -
- EXCAVACION
EXCAVACION DE ZANJA EN TERRENO SATURADO m3 1.00 - - - - 922.0000 - -
- RELLENO
RELLENO COMPACTADO CON MATERIAL PROPIO m3 1.00 - - - - 1,568.8000 Factor esponjamiento 25%
- ELIMINACION
VE=((VC+VE)-VR)X1.28 m3 1.00 - - - - 658.2000 658.20 822.75

02 MURO DE CONCRETO ARMADO

02.01 SOLADO DE CONCRETO F´C=140KG/CM2 M2 500.00

- TRAMO I
DEL 0+000 AL 0+200 M2 1.00 1.00 200.00 2.50 500.0000 - -

02.02 MURO - CONCRETO F´C=280 KG/CM2 M3 407.50

- TRAMO I
DEL 0+000 AL 0+200 m3 1.00 1.00 200.00 2.50 0.50 - 250.00 250.00
DEL 0+000 AL 0+200 m3 1.00 1.00 200.00 0.25 3.15 - 157.50 157.50

02.03 MURO - ACERO FY= 4200 KG/CM2 KG FACTOR PESO 8,774.17


25 3.74 40 0.99 3702.6 3702.6
25 2.79 40 0.99 2762.1 2762.1
12 4.86 40 0.99 2309.472 2309.472

02.04 MURO - ENCOFRADO Y DESENCOFRADO CON PANELES M2 1,343.54

- TRAMO I
DEL 0+000 AL 0+200 M2 1.00 2.00 200.00 3.15 1,260.0000 1,260.00
TAPAS M2
1.00 41.00 0.25 3.15 32.2875 32.29
1.00 41.00 2.50 0.50 51.2500 51.25

02.05 JUNTA CON WATTER STOP E=1/2" EN MUROS ML 1,081.08


- TRAMO I
TAREA ACADEMICA N°01 - COSTOS Y PRESUPUESTOS - 2022 I

N° DESCRIPCION Y/O GRAFICO UND CANT # VECES LARGO ANCHO ALTO AREA VOLUMEN PARCIAL TOTAL

DEL 0+000 AL 0+200 ml 1.00 39.00 8.80 3.15 1,081.0800 1,081.08

03 MURO DE CONCRETO CICLOPEO


03.01 SOLADO DE CONCRETO F´C=140KG/CM2 M2 200.00
- TRAMO II
DEL 0+200 AL 0+300 m3 1.00 1.00 100.00 2.00 200.0000 - -
03.02 MURO DE CONCRETO CICLOPEO 1:8 + 25% PM M3 301.00
- TRAMO II
DEL 0+200 AL 0+300 m3 1.00 1.00 100.00 0.20 0.40 - 8.00 8.00
DEL 0+200 AL 0+300 m3 1.00 1.00 100.00 2.20 0.80 - 176.00 176.00
DEL 0+200 AL 0+300 m3 1.00 1.00 100.00 0.30 1.80 - 54.00 54.00
DEL 0+200 AL 0+300 m3 1.00 1.00 100.00 0.30 2.10 - 63.00 63.00

03.03 MURO - ENCOFRADO Y DESENCOFRADO CON PANELES M2 903.21

- TRAMO II
DEL 0+200AL 0+300 M2 1.00 2.00 100.00 2.10 420.0000 420.00
DEL 0+200AL 0+300 M2 1.00 2.00 100.00 1.80 360.0000 360.00
DEL 0+200AL 0+300 M2 1.00 2.00 100.00 0.30 60.0000 60.00
TAPAS M2
1.00 21.00 0.20 0.40 1.6800 1.68
1.00 21.00 2.20 0.80 36.9600 36.96
1.00 21.00 0.30 2.10 13.2300 13.23
1.00 21.00 0.30 1.80 11.3400 11.34

03.04 JUNTA CON WATTER STOP E=1/2" EN MUROS ML 121.60


- TRAMO II
DEL 0+200AL 0+300 ml 1.00 19.00 6.40 121.6000 121.60

04 CANAL DE RIEGO
04.01 CONCRETO F´C= 175 KG/CM2 EN CANALES M3 55.20
- TRAMO I
DEL 0+000 AL 0+200 m3 1.00 1.00 200.00 0.64 0.10 - 12.80 12.80
1.00 2.00 200.00 0.12 0.50 - 24.00 24.00
- TRAMO II
DEL 0+200 AL 0+300 m3 1.00 1.00 100.00 0.64 0.10 - 6.40 6.40
1.00 2.00 100.00 0.12 0.50 12.00 12.00

04.02 CANAL - ENCOFRADO Y DESENCOFRADO CON PANELES M2 674.75

- TRAMO I
DEL 0+000 AL 0+200 M2 1.00 2.00 200.00 0.60 240.0000 240.00
M2 1.00 2.00 200.00 0.50 200.0000 200.00
TAPAS M2
2.00 68.00 0.12 0.50 8.1600 8.16
1.00 68.00 0.64 0.10 4.3520 4.35
- TRAMO II
DEL 0+200 AL 0+300 M2 1.00 2.00 100.00 0.60 120.0000 120.00
M2 1.00 2.00 100.00 0.50 100.0000 100.00
TAPAS M2 -
2.00 35.00 0.12 0.50 4.2000
1.00 35.00 0.64 0.10 2.2400 2.24

03.03 SELLADO DE JUNTA CON ASFALTO E=1/2" ML 168.92


- TRAMO I
DEL 0+000AL 0+200 ml 1.00 68.00 1.64 111.5200 111.52
- TRAMO II
DEL 0+200AL 0+300 ml 1.00 35.00 1.64 57.4000 57.40
ITEM DESCRIPCION UNIDAD METRADO
01 MOVIMIENTO DE TIERRAS
01.01 CORTE EN TALUD CON MAQUINARIA M3 1,305.00
01.02 EXCAVACION DE ZANJA EN TERRENO SATURADO M3 922.00
01.03 RELLENO COMPACTADO CON MATERIAL PROPIO M3 1,568.80
01.04 ELIMINACION DE MATERIAL EXCEDENTE M3 822.75
02 MURO DE CONCRETO ARMADO
02.01 SOLADO DE CONCRETO F´C=140KG/CM2 M2 500.00
02.02 MURO - CONCRETO F´C=280 KG/CM2 M3 407.50
02.03 MURO - ACERO FY= 4200 KG/CM2 KG 8,774.17
02.04 MURO - ENCOFRADO Y DESENCOFRADO CON PANELES M2 1,343.54
02.05 JUNTA CON WATTER STOP E=1/2" EN MUROS ML 1,081.08
03 MURO DE CONCRETO CICLOPEO
03.01 SOLADO DE CONCRETO F´C=140KG/CM2 M2 200.00
03.02 MURO DE CONCRETO CICLOPEO 1:8 + 25% PM M3 301.00
03.03 MURO - ENCOFRADO Y DESENCOFRADO CON PANELES M2 903.21
03.04 JUNTA CON WATTER STOP E=1/2" EN MUROS ML 121.60
04 CANAL DE RIEGO
04.01 CONCRETO F´C= 175 KG/CM2 EN CANALES M3 55.20
04.02 CANAL - ENCOFRADO Y DESENCOFRADO CON PANELES M2 674.75
03.03 SELLADO DE JUNTA CON ASFALTO E=1/2" ML 168.92

PRESUPUESTO TOTAL
TRAMO I
COSTO PARCIAL TOTAL X METRO LINEAL 200

4.15 S/ 5,415.75 S/ 18.05 COSTO TOTAL/300


5.25 S/ 4,840.50 S/ 16.14 COSTO TOTAL/300
26.4 S/ 41,416.32 S/ 138.05 COSTO TOTAL/300
10.4 S/ 8,556.60 S/ 28.52 COSTO TOTAL/300

55.7 S/ 27,850.00 S/ 139.25 COSTO TOTAL/200


425.35 S/ 173,330.13 S/ 866.65 COSTO TOTAL/200
7.11 S/ 62,384.36 S/ 311.92 COSTO TOTAL/200
119.23 S/ 160,189.98 S/ 800.95 COSTO TOTAL/200
51.66 S/ 55,848.59 S/ 279.24 COSTO TOTAL/200

55.7 S/ 11,140.00 S/ 111.40 COSTO TOTAL/100


315.43 S/ 94,944.43 S/ 949.44 COSTO TOTAL/100
119.23 S/ 107,689.73 S/ 1,076.90 COSTO TOTAL/100
51.66 S/ 6,281.86 S/ 62.82 COSTO TOTAL/100

355.43 S/ 19,619.74 S/ 65.40 COSTO TOTAL/300


79.23 S/ 53,460.60 S/ 178.20 COSTO TOTAL/300
45.66 S/ 7,712.89 S/ 25.71 COSTO TOTAL/300

S/ 840,681.47
TRAMO II
100

OSTO TOTAL/300
OSTO TOTAL/300
OSTO TOTAL/300
OSTO TOTAL/300

OSTO TOTAL/200
OSTO TOTAL/200
OSTO TOTAL/200
OSTO TOTAL/200
OSTO TOTAL/200

OSTO TOTAL/100
OSTO TOTAL/100
OSTO TOTAL/100
OSTO TOTAL/100

OSTO TOTAL/300
OSTO TOTAL/300
OSTO TOTAL/300

También podría gustarte