COSTO DE ELABORACION DEL EXPEDIENTE TECNICO

COSTO
ITEM DESCRIPCION UNIDAD CANTIDAD COSTO S/. COSTO TOTAL S/.
PARCIAL S/.
1.00 COSTO TOTAL DIRECTO 108,259.44
UTILIDAD 119,085.39 10.00% 10,825.94
2.00 IGV 18.00% 21,435.37
TOTAL DE PRESUPUESTO 140,520.76

PRESUPUESTO DIRECTO DE OBRA


COSTO
ITEM DESCRIPCION UNIDAD CANTIDAD COSTO S/. COSTO TOTAL S/.
PARCIAL S/.
1.00 COSTO DIRECTO DE INFRAESTRUCTURA 1,472,162.47
SUBTOTAL 1,836,642.51 1,472,162.47
2.00 GASTOS GENERALES 14.76% 217,263.79
2.00 UTILIDAD 10.00% 147,216.25
4.00 IGV 18.00% 330,595.65

PRESUPUESTO TOTAL DE EJECUCION DE OBRA 2,167,238.16

PRESUPUESTO DE EQUIPAMIENTO Y MOBILIARIO


COSTO
ITEM DESCRIPCION UNIDAD CANTIDAD COSTO S/. COSTO TOTAL S/.
PARCIAL S/.
1.00 COSTO DE EQUIPAMIENTO Y MOBILIARIO 81,711.29
SUBTOTAL 90,699.53 81,711.29
2.00 COSTO DE TRANSPORTE Y EMBALAJE (INCL. IGV) 5.00% 4,085.56
3.00 GASTOS GENERALES PARA EL MOBILIARIO Y EQUIPAMIENTO (INCL. IGV) 6.00% 4,902.68
4.00 UTILIDAD (INCL. IGV) 5.00% 4,085.59

PRESUPUESTO TOTAL DE EQUIPAMIENTO Y MOBILIARIO 94,785.12

TOTAL 2,402,544.04