4 CONTRATO No : 028-2010-MEM/DGER
7 VALORIZACION Nº : 007
Amortización de Adelantos ( B )
PROYECTO N° 14 REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA 380/220 V. DEL CENTRO POBLADO VILLA PRADO, DISTRITO JUANJUI, PROVINCIA MARISCAL CACERES, REGION SAN MARTIN
PENDIENTE DE
CALENDARIO TOTAL CALENDARIO PAGADO
PAGO
VALORIZACION
Jul-10 AD. Directo 30,969.92 0.00 5,884.29 36,854.21 36,854.21 36,854.21 149,704.74
Oct-10 VAL 01 Oct-10 27,798.33 Sep-10 1.028881 802.85 28,601.18 -1.26 6,115.63 4,938.82 17,545.47 3,333.64 0.00 0.00 0.00 20,879.11 20,879.11 110,599.12 75,959.83
Nov-10 VAL 02 Nov-10 25,986.59 Oct-10 1.031 805.58 26,792.17 -352.92 5,717.05 19,749.07 973.13 184.89 0.00 0.00 0.00 1,158.02 1,158.02 111,757.14 74,801.81
Dec-10 VAL 03 Dec-10 13,463.73 Nov-10 1.04 538.55 14,002.28 -31.22 3,069.23 0.00 10,901.83 2,071.35 0.00 0.00 0.00 12,973.18 12,973.18 124,730.32 61,828.63
Jan-11 VAL 04 Jan-11 10,832.91 Dec-10 1.046 498.31 11,331.22 -77.62 4,224.83 7,000.00 28.77 5.47 0.00 0.00 0.00 34.24 34.24 124,764.56 61,794.39
Feb-11 VAL 05 Feb-11 8,475.12 Jan-11 1.052 440.71 8,915.83 -361.61 1,864.53 2,152.37 4,537.32 816.72 0.00 0.00 0.00 5,354.04 5,354.04 130,118.60 56,440.35
Mar-11 VAL 06 Mar-11 25,189.65 Feb-11 1.061 1,536.57 26,726.22 -220.63 9,978.65 10,584.78 5,942.16 1,069.59 0.00 0.00 0.00 7,011.75 7,011.75 137,130.35 49,428.60
Apr-11 VAL 07 Apr-11 43,646.02 Mar-11 1.065 2,836.99 46,483.01 0.00 0.00 0.00 46,483.01 8,366.94 0.00 0.00 0.00 54,849.95 54,849.95 191,980.30 -5,421.35
TOTAL 155,392.35 162,851.91 -1,045.26 30,969.92 44,425.04 86,411.69 15,848.60 30,969.92 44,425.04 14,325.05 191,980.30 191,980.30 191,980.30 -5,421.35
DIRECCION GENERAL DE ELECTRIFICACION RURAL FECHA: 30-04-11
SISTEMA DE VALORIZACION DE OBRAS HORA:
RESUMEN DE VALORIZACIONES
TODAS LAS SECCIONES DE OBRA
PROYECTO N° 14 REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA 380/220 V. DEL CENTRO POBLADO
VILLA PRADO, DISTRITO JUANJUI, PROVINCIA MARISCAL CACERES, REGION SAN MARTIN
CONCEPTO SOLES
Observaciones
CONCEPTO SOLES
Otros 0.00
Observaciones
CONCEPTO SOLES
Otros
Observaciones
CONCEPTO SOLES
Otros
Observaciones
CONCEPTO SOLES
Otros
Observaciones
UBICADAS : EN LOS DEPARTAMENTOS DE PIURA, LAMBAYEQUE, CAJAMARCA, LA LIBERTAD, SAN MARTIN, LORETO Y ANCASH
CONTRATO No : 028-2010-MEM/DGER
CONTRATISTA : CONSORCIO PACIFICO
PROYECTO N° 14 REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA
380/220 V. DEL CENTRO POBLADO VILLA PRADO, DISTRITO JUANJUI, PROVINCIA MARISCAL
CACERES, REGION SAN MARTIN
UBICADAS : EN LOS DEPARTAMENTOS DE PIURA, LAMBAYEQUE, CAJAMARCA, LA LIBERTAD, SAN MARTIN, LORETO Y ANCASH
CONTRATO No : 028-2010-MEM/DGER
CONTRATISTA : CONSORCIO PACIFICO
PROYECTO N° 14 REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA
380/220 V. DEL CENTRO POBLADO VILLA PRADO, DISTRITO JUANJUI, PROVINCIA MARISCAL
CACERES, REGION SAN MARTIN
UBICADAS : EN LOS DEPARTAMENTOS DE PIURA, LAMBAYEQUE, CAJAMARCA, LA LIBERTAD, SAN MARTIN, LORETO Y ANCASH
CONTRATO No : 028-2010-MEM/DGER
CONTRATISTA : CONSORCIO PACIFICO
PROYECTO N° 14 REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA
380/220 V. DEL CENTRO POBLADO VILLA PRADO, DISTRITO JUANJUI, PROVINCIA MARISCAL
CACERES, REGION SAN MARTIN
UBICADAS : EN LOS DEPARTAMENTOS DE PIURA, LAMBAYEQUE, CAJAMARCA, LA LIBERTAD, SAN MARTIN, LORETO Y ANCASH
CONTRATO No : 028-2010-MEM/DGER
UBICADAS : EN LOS DEPARTAMENTOS DE PIURA, LAMBAYEQUE, CAJAMARCA, LA LIBERTAD, SAN MARTIN, LORETO Y ANCASH
CONTRATO No : 028-2010-MEM/DGER
UBICADAS : EN LOS DEPARTAMENTOS DE PIURA, LAMBAYEQUE, CAJAMARCA, LA LIBERTAD, SAN MARTIN, LORETO Y ANCASH
CONTRATO No : 028-2010-MEM/DGER
PROYECTO N° 14 REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA 380/220 V. DEL CENTRO POBLADO VILLA PRADO, DISTRITO JUANJUI,
PROVINCIA MARISCAL CACERES, REGION SAN MARTIN
UBICADAS : EN LOS DEPARTAMENTOS DE PIURA, LAMBAYEQUE, CAJAMARCA, LA LIBERTAD, SAN MARTIN, LORETO Y ANCASH
CONTRATO No : 028-2010-MEM/DGER Presup. Contratado : C.D. 1,579.71
CONTRATISTA : CONSORCIO PACIFICO
PROYECTO N° 14 REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA 380/220 V. DEL CENTRO POBLADO VILLA PRADO, DISTRITO JUANJUI,
PROVINCIA MARISCAL CACERES, REGION SAN MARTIN
UBICADAS : EN LOS DEPARTAMENTOS DE PIURA, LAMBAYEQUE, CAJAMARCA, LA LIBERTAD, SAN MARTIN, LORETO Y ANCASH
CONTRATO No : 028-2010-MEM/DGER Presup. Contratado : C.D. 0.00
CONTRATISTA : CONSORCIO PACIFICO
PROYECTO N° 14 REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA 380/220 V. DEL CENTRO POBLADO VILLA PRADO, DISTRITO JUANJUI,
PROVINCIA MARISCAL CACERES, REGION SAN MARTIN
UBICADAS : EN LOS DEPARTAMENTOS DE PIURA, LAMBAYEQUE, CAJAMARCA, LA LIBERTAD, SAN MARTIN, LORETO Y ANCASH
CONTRATO No : 028-2010-MEM/DGER Presup. Contratado : C.D. 138,395.49
CONTRATISTA : CONSORCIO PACIFICO
TOTAL GENERAL DE ADELANTOS DE MATERIALES (SIN I.G.V.) S/. 4,938.82 TOTAL GENERAL (LP+RP+RRSS) 4,938.82 0.00 1.73 1.73
DIRECCION EJECUTIVA DE PROYECTOS FECHA: 30-04-11
SISTEMA DE VALORIZACION DE OBRAS HORA:
VAR470000
PROYECTO N° 14 REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA 380/220 V. DEL CENTRO POBLADO VILLA PRADO, DISTRITO JUANJUI,
PROVINCIA MARISCAL CACERES, REGION SAN MARTIN
UBICADAS : EN LOS DEPARTAMENTOS DE PIURA, LAMBAYEQUE, CAJAMARCA, LA LIBERTAD, SAN MARTIN, LORETO Y ANCASH
CONTRATO No : 028-2010-MEM/DGER Presup. Contratado : C.D. 1,579.71
CONTRATISTA : CONSORCIO PACIFICO
PROYECTO N° 14 REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA 380/220 V. DEL CENTRO POBLADO VILLA PRADO, DISTRITO JUANJUI,
PROVINCIA MARISCAL CACERES, REGION SAN MARTIN
UBICADAS : EN LOS DEPARTAMENTOS DE PIURA, LAMBAYEQUE, CAJAMARCA, LA LIBERTAD, SAN MARTIN, LORETO Y ANCASH
CONTRATO No : 028-2010-MEM/DGER Presup. Contratado : C.D. 0.00
CONTRATISTA : CONSORCIO PACIFICO
PROYECTO N° 14 REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA 380/220 V. DEL CENTRO POBLADO VILLA PRADO, DISTRITO JUANJUI,
PROVINCIA MARISCAL CACERES, REGION SAN MARTIN
UBICADAS : EN LOS DEPARTAMENTOS DE PIURA, LAMBAYEQUE, CAJAMARCA, LA LIBERTAD, SAN MARTIN, LORETO Y ANCASH
CONTRATO No : 028-2010-MEM/DGER Presup. Contratado : C.D. 138,395.49
CONTRATISTA : CONSORCIO PACIFICO
PROYECTO N° 14 REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA 380/220 V. DEL CENTRO POBLADO VILLA PRADO, DISTRITO JUANJUI, PROVINCIA MARISCAL CACERES, REGION SAN MARTIN
Valorización 0001 Valorización 0002 Valorización 0003 Valorización 0004 Valorización 0005 Valorización 0006 Valorización 0007 S/,
Monto Valorizado en el Presente Mes 27,798.33 25,986.59 13,463.73 10,832.91 8,475.12 25,189.65 43,646.02 155,392.35
VALORIZACION Val Nro 007 27,798.33 25,986.59 13,463.73 10,832.91 8,475.12 25,189.65 43,646.02 155,392.35
Monto Por Reajuste 802.85 805.58 538.55 498.31 440.71 1,536.57 2,836.99 7,459.56
AMORTIZACION DE ADELANTO EN EFECTIVO -6,115.63 -5,717.05 -3,069.23 -4,224.83 -1,864.53 -9,978.65 0.00 -30,969.92
Amortizacion de Adelanto en Efectivo 6,115.63 5,717.05 3,069.23 4,224.83 1,864.53 9,978.65 0.00 30,969.92
AMORTIZACION DE ADELANTO DE MATERIALES -4,938.82 -19,749.07 0.00 -7,000.00 -2,152.37 -10,584.78 0.00 -44,425.04
Amortizacion de Adelanto de Materiales N° 01 4,938.82 0.00 0.00 0.00 0.00 0.00 0.00 4,938.82
Amortizacion de Adelanto de Materiales N° 02 0.00 19,749.07 0.00 7,000.00 2,152.37 10,584.78 0.00 39,486.22
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE -1.26 -352.92 -31.22 -77.62 -361.61 -220.63 0.00 -1,045.26
Deduccion del Reajuste - Amort. Adel. Efectivo -0.47 11.67 31.22 68.57 41.13 307.41 0.00 459.53
Deduccion del Reajuste - Amort. Adel. Materiales N° 01 1.73 0.00 0.00 0.00 0.00 0.00 0.00 1.73
Deduccion del Reajuste - Amort. Adel. Materiales N° 02 0.00 341.25 0.00 9.05 320.48 -86.78 0.00 584.00
Otros 0.00
I. MONTO FACTURABLE (Sin IGV) 17,545.47 973.13 10,901.83 28.77 4,537.32 5,942.16 46,483.01 86,411.69
Monto Retenido por Fondo de Garantía 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
II. TOTAL DE RETENCION 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
III. MONTO LIQUIDO A APAGAR 17,545.47 973.13 10,901.83 28.77 4,537.32 5,942.16 46,483.01 86,411.69
IV. I.G.V. (18% DE I) 3,333.64 184.89 2,071.35 5.47 816.72 1,069.59 8,366.94 15,848.60
V. MONTO A FACTURAR (I + IV) 20,879.11 1,158.02 12,973.18 34.24 5,354.04 7,011.75 54,849.95 102,260.29
= DIRECCION EJECUTIVA DE PROYECTOS FECHA: 30-04-11
SISTEMA DE VALORIZACION DE OBRAS HORA:
VAR41001
PROYECTO N° 14 REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA 380/220 V. DEL CENTRO POBLADO VILLA PRADO, DISTRITO JUANJUI, PROVINCIA MARISCAL CACERES, REGION SAN MARTIN
Valorización 0001 Valorización 0002 Valorización 0003 Valorización 0004 Valorización 0005 Valorización 0006 Valorización 0007 S/,
Monto Valorizado en el Presente Mes 1,101.40 0.00 0.00 0.00 0.00 0.00 0.00 1,101.40
VALORIZACION Val Nro 007 1,101.40 0.00 0.00 0.00 0.00 0.00 0.00 1,101.40
Monto Por Reajuste 28.64 0.00 0.00 0.00 0.00 0.00 0.00 28.64
AMORTIZACION DE ADELANTO EN EFECTIVO -242.31 0.00 -107.21 0.00 0.00 0.00 0.00 -349.52
Amortizacion de Adelanto en Efectivo 242.31 0.00 107.21 0.00 0.00 0.00 0.00 349.52
AMORTIZACION DE ADELANTO DE MATERIALES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Amortizacion de Adelanto de Materiales N° 01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Amortizacion de Adelanto de Materiales N° 02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE 0.47 0.00 -0.42 0.00 0.00 0.00 0.00 0.05
Deduccion del Reajuste - Amort. Adel. Efectivo -0.47 0.00 0.42 0.00 0.00 0.00 0.00 -0.05
Deduccion del Reajuste - Amort. Adel. Materiales N° 01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Deduccion del Reajuste - Amort. Adel. Materiales N° 02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Otros
I. MONTO FACTURABLE (Sin IGV) 888.20 0.00 -107.63 0.00 0.00 0.00 0.00 780.57
Monto Retenido por Fondo de Garantía 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
II. TOTAL DE RETENCION 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
III. MONTO LIQUIDO A APAGAR 888.20 0.00 -107.63 0.00 0.00 0.00 0.00 780.57
IV. I.G.V. (18% DE I) 168.76 0.00 -20.45 0.00 0.00 0.00 0.00 148.31
V. MONTO A FACTURAR (I + IV) 1,056.96 0.00 -128.08 0.00 0.00 0.00 0.00 928.88
DIRECCION EJECUTIVA DE PROYECTOS FECHA: 30-04-11
SISTEMA DE VALORIZACION DE OBRAS HORA:
VAR41001
PROYECTO N° 14 REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA 380/220 V. DEL CENTRO POBLADO VILLA PRADO, DISTRITO JUANJUI, PROVINCIA MARISCAL CACERES, REGION SAN MARTIN
Valorización 0001 Valorización 0002 Valorización 0003 Valorización 0004 Valorización 0005 Valorización 0006 Valorización 0007 S/,
Monto Valorizado en el Presente Mes 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
VALORIZACION Val Nro 007 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Monto Por Reajuste 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
AMORTIZACION DE ADELANTO EN EFECTIVO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Amortizacion de Adelanto en Efectivo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
AMORTIZACION DE ADELANTO DE MATERIALES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Amortizacion de Adelanto de Materiales N° 01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Amortizacion de Adelanto de Materiales N° 02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Deduccion del Reajuste - Amort. Adel. Efectivo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Deduccion del Reajuste - Amort. Adel. Materiales N° 01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Deduccion del Reajuste - Amort. Adel. Materiales N° 02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Otros 0.00
I. MONTO FACTURABLE (Sin IGV) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Monto Retenido por Fondo de Garantía 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
II. TOTAL DE RETENCION 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
III. MONTO LIQUIDO A APAGAR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
IV. I.G.V. (18% DE I) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
V. MONTO A FACTURAR (I + IV) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DIRECCION EJECUTIVA DE PROYECTOS FECHA: 30-04-11
SISTEMA DE VALORIZACION DE OBRAS HORA:
VAR41001
PROYECTO N° 14 REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA 380/220 V. DEL CENTRO POBLADO VILLA PRADO, DISTRITO JUANJUI, PROVINCIA MARISCAL CACERES, REGION SAN MARTIN
Valorización 0001 Valorización 0002 Valorización 0003 Valorización 0004 Valorización 0005 Valorización 0006 Valorización 0007 S/,
Monto Valorizado en el Presente Mes 26,696.93 25,986.59 13,463.73 10,832.91 8,475.12 25,189.65 43,646.02 154,290.95
VALORIZACION Val Nro 007 26,696.93 25,986.59 13,463.73 10,832.91 8,475.12 25,189.65 43,646.02 154,290.95
Monto Por Reajuste 774.21 805.58 538.55 498.31 440.71 1,536.57 2,836.99 7,430.92
AMORTIZACION DE ADELANTO EN EFECTIVO -5,873.32 -5,717.05 -2,962.02 -4,224.83 -1,864.53 -9,978.65 0.00 -30,620.40
Amortizacion de Adelanto en Efectivo 5,873.32 5,717.05 2,962.02 4,224.83 1,864.53 9,978.65 0.00 30,620.40
AMORTIZACION DE ADELANTO DE MATERIALES -4,938.82 -19,749.07 0.00 -7,000.00 -2,152.37 -10,584.78 0.00 -44,425.04
Amortizacion de Adelanto de Materiales N° 01 4,938.82 0.00 0.00 0.00 0.00 0.00 0.00 4,938.82
Amortizacion de Adelanto de Materiales N° 02 0.00 19,749.07 0.00 7,000.00 2,152.37 10,584.78 0.00 39,486.22
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE -1.73 -352.92 -30.80 -77.62 -361.61 -220.63 0.00 -1,045.31
Deduccion del Reajuste - Amort. Adel. Efectivo 0.00 11.67 30.80 68.57 41.13 307.41 0.00 459.58
Deduccion del Reajuste - Amort. Adel. Materiales N° 01 1.73 0.00 0.00 0.00 0.00 0.00 0.00 1.73
Deduccion del Reajuste - Amort. Adel. Materiales N° 02 0.00 341.25 0.00 9.05 320.48 -86.78 0.00 584.00
Otros 0.00
I. MONTO FACTURABLE (Sin IGV) 16,657.27 973.13 11,009.46 28.77 4,537.32 5,942.16 46,483.01 85,631.12
Monto Retenido por Fondo de Garantía 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
II. TOTAL DE RETENCION 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
III. MONTO LIQUIDO A APAGAR 16,657.27 973.13 11,009.46 28.77 4,537.32 5,942.16 46,483.01 85,631.12
IV. I.G.V. (18% DE I) 3,164.88 184.89 2,091.80 5.47 816.72 1,069.59 8,366.94 15,700.29
V. MONTO A FACTURAR (I + IV) 19,822.15 1,158.02 13,101.26 34.24 5,354.04 7,011.75 54,849.95 101,331.41
FECHA:
cx
SISTEMA DE VALORIZACION DE OBRAS
UBICADAS : EN LOS DEPARTAMENTOS DE PIURA, LAMBAYEQUE, CAJAMARCA, LA LIBERTAD, SAN MARTIN, LORETO Y ANCASH
CONTRATO No : 028-2010-MEM/DGER
CONTRATISTA : CONSORCIO PACIFICO FECHA DEL PRESUPUESTO BASE : NOV-2009
PC 062 POSTES Y CRUCETAS DE CONCRETO 977,714.07 100.00% 0.160 380.68 0.164 390.43 0.164 390.86 0.167 398.50 0.169 402.07 0.171
DI 030 CONDUCTORES DE AAAC Y ACCESORIOS 799,396.80 100.00% 0.131 363.47 0.129 357.53 0.129 358.95 0.128 356.00 0.128 355.50 0.129
AE1 011 EQUIPOS DE PROTECCIÓN 46,361.75 5.95% 0.128 237.25 0.138 233.36 0.140 234.19 0.142 231.86 0.147 230.45 0.147
AE2 011 AISLADORES Y ACCESORIOS 327,868.06 42.10% 237.25 233.36 234.19 231.86 230.45
MN 043 POSTES Y CRUCETAS DE MADERA 126,676.43 16.27% 562.22 569.51 571.11 574.70 582.39
FE 002 RETENIDAS Y ANCLAJES 88,593.22 11.38% 459.08 520.51 522.36 533.49 578.78
FP 002 FERRETERIA PARA POSTES Y CRUCETAS 89,667.04 11.51% 459.08 520.51 522.36 533.49 578.78
CU 006 CONDUCTOR DE COBRE Y ACCESORIOS 73,426.50 9.43% 687.13 832.77 857.54 899.42 929.76
PT 006 MATERIAL PARA PUESTA A TIERRA 26,191.99 3.36% 687.13 832.77 857.54 899.42 929.76
J 047 MONTAJE ELECTROMECANICO 2,116,541.10 85.66% 0.405 413.41 0.419 430.83 0.421 430.83 0.418 427.68 0.418 427.68 0.418
FT 032 TRANSPORTE 354,377.53 14.34% 418.41 416.10 427.41 427.41 427.41
GG 039 GASTOS GENERALES Y UTILIDADES 1,070,260.44 100.00% 0.176 346.35 0.180 354.04 0.180 354.67 0.181 356.05 0.182 357.41 0.183
FORMULA : K = 0.160 PCr/PCo + 0.131 DIr/DIo + 0.128 AEr/AEo + 0.405 Jr/Jo + 0.176 GGr/GGo
FECHA:
SISTEMA DE VALORIZACION DE OBRAS
VAR41001
UBICADAS : EN LOS DEPARTAMENTOS DE PIURA, LAMBAYEQUE, CAJAMARCA, LA LIBERTAD, SAN MARTIN, LORETO Y ANCASH
CONTRATO No : 028-2010-MEM/DGER
CONTRATISTA : CONSORCIO PACIFICO FECHA DEL PRESUPUESTO BASE : NOV-2009
PC 062 POSTES Y CRUCETAS DE CONCRETO 324,289.67 64.76% 0.183 380.68 0.196 390.43 0.197 390.86 0.202 398.50 0.207 402.07 0.209
MN 043 POSTES Y CRUCETAS DE MADERA 58,357.45 11.65% 562.22 569.51 571.11 574.70 582.39
FP 002 FERRETERIA PARA POSTES Y CRUCETAS 29,826.11 5.96% 459.08 520.51 522.36 533.49 578.78
FE 002 RETENIDAS Y ANCLAJES 30,296.89 6.05% 459.08 520.51 522.36 533.49 578.78
CU 006 CONDUCTOR DE COBRE Y ACCESORIOS 29,899.80 5.97% 687.13 832.77 857.54 899.42 929.76
PT 006 MATERIAL PARA PUESTA A TIERRA 28,091.54 5.61% 687.13 832.77 857.54 899.42 929.76
AE1 011 EQUIPOS DE PROTECCIÓN 105,275.81 31.93% 0.121 237.25 0.121 233.36 0.122 234.19 0.122 231.86 0.122 230.45 0.122
AE2 011 AISLADORES Y ACCESORIOS 93,518.22 28.36% 237.25 233.36 234.19 231.86 230.45
NY 019 CABLES DE ENERGÍA 16,843.45 5.11% 608.76 705.07 727.43 762.06 781.47
DI 030 CONDUCTORES DE AAAC Y ACCESORIOS 114,086.99 34.60% 363.47 357.53 358.95 356.00 355.50
EN 048 TRANSFORMADORES DE DISTRIBUCIÓN Y TABLEROS 736,043.86 100.00% 0.270 330.19 0.271 331.70 0.272 332.35 0.271 331.54 0.271 331.31 0.272
J 047 MONTAJE ELECTROMECANICO 539,965.60 79.16% 0.250 413.41 0.258 430.83 0.259 430.83 0.258 427.68 0.258 427.68 0.258
FT 032 TRANSPORTE 142,145.16 20.84% 418.41 416.10 427.41 427.41 427.41
GG 039 GASTOS GENERALES Y UTILIDADES 478,758.67 100.00% 0.176 346.35 0.180 354.04 0.180 354.67 0.181 356.05 0.182 357.41 0.183
FORMULA : K = 0.183 FEr/FEo + 0.121 AEr/AEo + 0.270 ENr/ENo + 0.250 Jr/Jo + 0.176 GGr/GGo
FECHA:
SISTEMA DE VALORIZACION DE OBRAS
VAR41001
UBICADAS : EN LOS DEPARTAMENTOS DE PIURA, LAMBAYEQUE, CAJAMARCA, LA LIBERTAD, SAN MARTIN, LORETO Y ANCASH
PC 062 POSTES DE CONCRETO 1,464,229.66 100.00% 0.149 380.68 0.153 390.43 0.153 390.86 0.156 398.50 0.157 402.07 0.160
DI1 030 CABLES Y CONDUCTORES DE ALUMINIO 926,623.27 52.75% 0.178 363.47 0.175 357.53 0.176 358.95 0.174 356.00 0.174 355.50 0.176
DI2 030 CONEXIONES DOMICILIARIAS 829,517.62 47.25% 363.47 357.53 358.95 356.00 355.50
AE1 011 LUMINARIAS, LAMPARAS Y ACCESORIOS 386,224.17 25.12% 0.155 237.25 0.178 233.36 0.181 234.19 0.187 231.86 0.195 230.45 0.195
AE2 011 ACCESORIOS PARA CABLES AUTOPORTANTES 216,902.34 14.11% 237.25 233.36 234.19 231.86 230.45
FE1 002 RETENIDAS Y ANCLAJES 231,425.79 15.05% 459.08 520.51 522.36 533.49 578.78
FE2 002 ACCESORIOS DE FERRETERIA PARA ESTRUCTURAS 113,110.13 7.36% 459.08 520.51 522.36 533.49 578.78
CU 006 CABLES Y CONDUCTORES DE COBRE 519,819.24 33.81% 687.13 832.77 857.54 899.42 929.76
PT 006 PUESTA A TIERRA 70,002.88 4.55% 687.13 832.77 857.54 899.42 929.76
J 047 MONTAJE ELECTROMECANICO 2,859,762.12 84.87% 0.342 413.41 0.354 430.83 0.355 430.83 0.353 427.68 0.353 427.68 0.353
FT 032 TRANSPORTE 509,499.62 15.13% 418.41 416.10 427.41 427.41 427.41
GG 039 GASTOS GENERALES Y UTILIDADES 1,730,346.65 100.00% 0.176 346.35 0.180 354.04 0.180 354.67 0.181 356.05 0.182 357.41 0.183
FORMULA : K = 0.149 PCr/PCo + 0.178 DIr/DIo + 0.155 CUr/CUo + 0.342 Jr/Jo + 0.176 GGr/Ggo
11-05-22
Mar-11
Indice
407.69
358.42
230.11
230.11
584.31
586.17
586.17
926.74
926.74
427.68
423.94
359.92
11-05-22
Mar-11
Indice
407.69
584.31
586.17
586.17
926.74
926.74
230.11
230.11
778.19
358.42
332.16
427.68
423.94
359.92
11-05-22
Mar-11
Indice
407.69
358.42
358.42
230.11
230.11
586.17
586.17
926.74
926.74
427.68
423.94
359.92
DIRECCION GENERAL DE ELECTRIFICACION RURAL FECHA: 30-04-11
SISTEMA DE VALORIZACIONES HORA:
PRESUPUESTO PRINCIPAL
SECCION No 01 : LINEAS PRIMARIAS
PROYECTO N° 14 REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA 380/220 V. DEL CENTRO POBLADO VILLA
PRADO, DISTRITO JUANJUI, PROVINCIA MARISCAL CACERES, REGION SAN MARTIN
PROYECTO : ELECTRIFICACION RURAL GRUPO 9, UBICADOS EN 12 DEPARTAMENTOS (ÍTEM 1) FECHA DEL PRESUPUESTO BASE : Nov-2009
UBICADAS : EN LOS DEPARTAMENTOS DE PIURA, LAMBAYEQUE, CAJAMARCA, LA LIBERTAD, SAN MARTIN, LORETO Y ANCASH
PPTO BASE : CONTRATISTA : CONSORCIO PACIFICO
PPTO CONT. : : 1,579.71 CONTRATO No : 028-2010-MEM/DGER
July-10
August-10
September-10
October-10 983.39 983.39 62.25% 62.25% 983.39 983.39 62.25% 62.25% 100.00% 0.00%
November-10 0.00 983.39 0.00% 62.25% 0.00 983.39 0.00% 62.25% 100.00% 0.00%
December-10 0.00 983.39 0.00% 62.25% 0.00 983.39 0.00% 62.25% 100.00% 0.00%
January-11 0.00 983.39 0.00% 62.25% 0.00 983.39 0.00% 62.25% 100.00% 0.00%
February-11 0.00 983.39 0.00% 62.25% 0.00 983.39 0.00% 62.25% 100.00% 0.00%
March-11 236.96 1,220.35 15.00% 77.25% 0.00 983.39 0.00% 62.25% 80.58% 15.00%
April-11 359.36 1,579.71 22.75% 100.00% 0.00 983.39 0.00% 62.25% 62.25% 22.75%
1,579.71 1,579.71 100.00% 77.25% 983.39 983.39 62.25% 62.25% 62.25% 22.75%
DIRECCION GENERAL DE ELECTRIFICACION RURAL FECHA: 30-04-11
SISTEMA DE VALORIZACIONES HORA:
PRESUPUESTO PRINCIPAL
SECCION No 02 : REDES PRIMARIAS
PROYECTO N° 14 REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA 380/220 V. DEL CENTRO POBLADO VILLA
PRADO, DISTRITO JUANJUI, PROVINCIA MARISCAL CACERES, REGION SAN MARTIN
PROYECTO : ELECTRIFICACION RURAL GRUPO 9, UBICADOS EN 12 DEPARTAMENTOS (ÍTEM 1) FECHA DEL PRESUPUESTO BASE : Nov-2009
UBICADAS : EN LOS DEPARTAMENTOS DE PIURA, LAMBAYEQUE, CAJAMARCA, LA LIBERTAD, SAN MARTIN, LORETO Y ANCASH 0.00
PPTO BASE CONTRATISTA : CONSORCIO PACIFICO
PPTO CONT. : 0.00 CONTRATO No : 028-2010-MEM/DGER
July-10
August-10
September-10
October-10 0.00 0.00 0.00% 0.00% 0.00 0.00 0.00% 0.00% 0.00% 0.00%
November-10 0.00 0.00 0.00% 0.00% 0.00 0.00 0.00% 0.00% 0.00% 0.00%
December-10 0.00 0.00 0.00% 0.00% 0.00 0.00 0.00% 0.00% 0.00% 0.00%
January-11 0.00 0.00 0.00% 0.00% 0.00 0.00 0.00% 0.00% 0.00% 0.00%
February-11 0.00 0.00 0.00% 0.00% 0.00 0.00 0.00% 0.00% 0.00% 0.00%
March-11 0.00 0.00 0.00% 0.00% 0.00 0.00 0.00% 0.00% 0.00% 0.00%
April-11 0.00 0.00 0.00% 0.00% 0.00 0.00 0.00% 0.00% 0.00% 0.00%
0.00 0.00 0.00% 0.00% 0.00 0.00 0.00% 0.00% 0.00% 0.00%
DIRECCION GENERAL DE ELECTRIFICACION RURAL FECHA: 30-04-11
SISTEMA DE VALORIZACIONES HORA:
PRESUPUESTO PRINCIPAL
SECCIÓN N° 03 : REDES SECUNDARIAS Y CONEXIONES DOMICILIARIAS
PROYECTO N° 14 REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA 380/220 V. DEL CENTRO POBLADO VILLA
PRADO, DISTRITO JUANJUI, PROVINCIA MARISCAL CACERES, REGION SAN MARTIN
PROYECTO : ELECTRIFICACION RURAL GRUPO 9, UBICADOS EN 12 DEPARTAMENTOS (ÍTEM 1) FECHA DEL PRESUPUESTO BASE : Nov-2009
UBICADAS : EN LOS DEPARTAMENTOS DE PIURA, LAMBAYEQUE, CAJAMARCA, LA LIBERTAD, SAN MARTIN, LORETO Y ANCASH
PPTO BASE CONTRATISTA : CONSORCIO PACIFICO
PPTO CONT. : 138,395.49 CONTRATO No : 028-2010-MEM/DGER
July-10
August-10
September-10
October-10 23,836.54 23,836.54 17.22% 17.22% 23,836.54 23,836.54 17.22% 17.22% 100.00% 0.00%
November-10 23,202.31 47,038.85 16.77% 33.99% 23,202.31 47,038.85 16.77% 33.99% 100.00% 0.00%
December-10 12,021.18 59,060.03 8.69% 42.67% 12,021.18 59,060.03 8.69% 42.67% 100.00% 0.00%
January-11 9,672.24 68,732.27 6.99% 49.66% 9,672.24 68,732.27 6.99% 49.66% 100.00% 0.00%
February-11 7,566.13 76,298.40 5.47% 55.13% 7,567.07 76,299.34 5.47% 55.13% 100.00% 0.00%
March-11 47,039.31 123,337.71 33.99% 89.12% 22,490.76 98,790.10 16.25% 71.38% 80.10% 17.74%
April-11 15,057.78 138,395.49 10.88% 100.00% 38,969.66 137,759.76 28.16% 99.54% 99.54% -17.28%
138,395.49 138,395.49 100.00% 89.12% 137,759.76 137,759.76 99.54% 99.54% 99.54% -17.28%
DIRECCION GENERAL DE ELECTRIFICACION RURAL FECHA: 30-04-11
SISTEMA DE VALORIZACIONES HORA:
PRESUPUESTO PRINCIPAL
RESUMEN GENERAL POR SECCIONES
PROYECTO N° 14 REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA 380/220 V. DEL CENTRO POBLADO VILLA
PRADO, DISTRITO JUANJUI, PROVINCIA MARISCAL CACERES, REGION SAN MARTIN
PROYECTO : ELECTRIFICACION RURAL GRUPO 9, UBICADOS EN 12 DEPARTAMENTOS (ÍTEM 1) FECHA DEL PRESUPUESTO BASE : Nov-2009
UBICADAS : EN LOS DEPARTAMENTOS DE PIURA, LAMBAYEQUE, CAJAMARCA, LA LIBERTAD, SAN MARTIN, LORETO Y ANCASH
PPTO BASE CONTRATISTA : CONSORCIO PACIFICO
PPTO CONT. : 139,975.20 CONTRATO No : 028-2010-MEM/DGER
July-10
August-10
September-10
October-10 24,819.93 24,819.93 17.73% 17.73% 24,819.93 24,819.93 17.73% 17.73% 100.00% 0.00%
November-10 23,202.31 48,022.24 16.58% 34.31% 23,202.31 48,022.24 16.58% 34.31% 100.00% 0.00%
December-10 12,021.18 60,043.42 8.59% 42.90% 12,021.18 60,043.42 8.59% 42.90% 100.00% 0.00%
January-11 9,672.24 69,715.66 6.91% 49.81% 9,672.24 69,715.66 6.91% 49.81% 100.00% 0.00%
February-11 7,566.13 77,281.79 5.41% 55.21% 7,567.07 77,282.73 5.41% 55.21% 100.00% 0.00%
March-11 47,276.27 124,558.06 33.77% 88.99% 22,490.76 99,773.49 16.07% 71.28% 80.10% 17.71%
April-11 15,417.14 139,975.20 11.01% 100.00% 38,969.66 138,743.15 27.84% 99.12% 99.12% -16.83%
139,975.20 139,975.20 100.00% 88.99% 138,743.15 138,743.15 99.12% 99.12% 99.12% -16.83%
AVANCE FISICO PROGRAMADO Vs AVANCE FISICO EJECUTADO FECHA: 30-04-11
SISTEMA DE VALORIZACIONES HORA:
PROYECTO N° 14 REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA 380/220 V. DEL CENTRO POBLADO VILLA
PRADO, DISTRITO JUANJUI, PROVINCIA MARISCAL CACERES, REGION SAN MARTIN
140,000
138,743.15 100.00%
139,975.20 100.00% 99.12%
88.99%
90.00%
124,558.06 120,000
80.00%
70.00%
71.28%
99,773.49 100,000 60.00% 55.21%
49.81%
50.00% 42.90% 55.21%
34.31% 49.81%
42.90%
80,000 40.00% 34.31%
77,282.73 17.73%
77,281.79 30.00%
69,715.66
17.73%
69,715.66 20.00%
60,043.42 60,000
60,043.42 10.00%
48,022.24
0.00%
48,022.24
40,000 Oct-10
Nov-10 PROGRAMADO
Dec-10
24,819.93
Jan-11
24,819.93 20,000 EJECUTADO
Feb-11
Mar-11
Apr-11
0
October-10 November-10 December-10 January-11 February-11 March-11 April-11
EJECUTADO PROGRAMADO
AVANCE PROGRAMADO AVANCE EJECUTADO
MINISTERIO DE ENERGIA Y MINAS
DIRECCION GENERAL DE ELECTRIFICACION RURAL
PROYECTO N° 14 REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA 380/220 V. DEL CENTRO POBLADO VILLA PRADO,
DISTRITO JUANJUI, PROVINCIA MARISCAL CACERES, REGION SAN MARTIN
99.12%
88.99%
90%
PORCENTAJE
80%
70%
71.28%
60% 55.21%
49.81%
50% 55.21%
42.90% 49.81%
40% 42.90%
Nov-10
30% 34.31%
17.73%
20%
17.73%
10%
0%
Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11
Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11
PROGRAMADO 24,819.93 23,202.31 12,021.18 9,672.24 7,566.13 47,276.27 15,417.14
AVANCE SIN IGV.
REAL 24,819.93 23,202.31 12,021.18 9,672.24 7,567.07 22,490.76 38,969.66
RESUMEN GENERAL
VALORIZACION No 007 - ABRIL 2011
PROYECTO : ELECTRIFICACION RURAL GRUPO 9, UBICADOS EN 12 DEPARTAMENTOS (ÍTEM 1) ENTIDAD EJECUTORA : DGER/MEM
UBICADAS : EN LOS DEPARTAMENTOS DE PIURA, LAMBAYEQUE, CAJAMARCA, LA LIBERTAD, SAN MARTIN, LORETO Y ANCASH
CONTRATO No : 028-2010-MEM/DGER
PROYECTO N° 14 REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA 380/220 V. DEL CENTRO POBLADO VILLA PRADO, DISTRITO JUANJUI, PROVINCIA MARISCAL
CACERES, REGION SAN MARTIN
RESUMEN GENERAL
VALORIZACION No 007 - ABRIL 2011
PROYECTO : ELECTRIFICACION RURAL GRUPO 9, UBICADOS EN 12 DEPARTAMENTOS (ÍTEM 1) ENTIDAD EJECUTORA : DGER/MEM
UBICADAS : EN LOS DEPARTAMENTOS DE PIURA, LAMBAYEQUE, CAJAMARCA, LA LIBERTAD, SAN MARTIN, LORETO Y ANCASH
CONTRATO No : 028-2010-MEM/DGER
PROYECTO N° 14 REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA 380/220 V. DEL CENTRO POBLADO VILLA PRADO, DISTRITO JUANJUI, PROVINCIA MARISCAL
CACERES, REGION SAN MARTIN
RESUMEN GENERAL
VALORIZACION No 007 - ABRIL 2011
PROYECTO : ELECTRIFICACION RURAL GRUPO 9, UBICADOS EN 12 DEPARTAMENTOS (ÍTEM 1) ENTIDAD EJECUTORA : DGER/MEM
UBICADAS : EN LOS DEPARTAMENTOS DE PIURA, LAMBAYEQUE, CAJAMARCA, LA LIBERTAD, SAN MARTIN, LORETO Y ANCASH
CONTRATO No : 028-2010-MEM/DGER
CONTRATISTA : CONSORCIO PACIFICO
PROYECTO N° 14 REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA 380/220 V. DEL CENTRO POBLADO VILLA PRADO, DISTRITO JUANJUI, PROVINCIA MARISCAL
CACERES, REGION SAN MARTIN
RESUMEN GENERAL
VALORIZACION No 007 - ABRIL 2011
PROYECTO : ELECTRIFICACION RURAL GRUPO 9, UBICADOS EN 12 DEPARTAMENTOS (ÍTEM 1) ENTIDAD EJECUTORA : DGER/MEM
UBICADAS : EN LOS DEPARTAMENTOS DE PIURA, LAMBAYEQUE, CAJAMARCA, LA LIBERTAD, SAN MARTIN, LORETO Y ANCASH
CONTRATO No : 028-2010-MEM/DGER
CONTRATISTA : CONSORCIO PACIFICO
PROYECTO N° 14 REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA 380/220 V. DEL CENTRO POBLADO VILLA PRADO, DISTRITO JUANJUI, PROVINCIA MARISCAL
CACERES, REGION SAN MARTIN
RESUMEN GENERAL
VALORIZACION No 007 - ABRIL 2011
PROYECTO : ELECTRIFICACION RURAL GRUPO 9, UBICADOS EN 12 DEPARTAMENTOS (ÍTEM 1) ENTIDAD EJECUTORA : DGER/MEM
UBICADAS : EN LOS DEPARTAMENTOS DE PIURA, LAMBAYEQUE, CAJAMARCA, LA LIBERTAD, SAN MARTIN, LORETO Y ANCASH
CONTRATO No : 028-2010-MEM/DGER
CONTRATISTA : CONSORCIO PACIFICO
PROYECTO N° 14 REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA 380/220 V. DEL CENTRO POBLADO VILLA PRADO, DISTRITO JUANJUI, PROVINCIA MARISCAL
CACERES, REGION SAN MARTIN
Metrado Costo TOTAL Acumulado Mes Anterior Avance del Mes Acumulado Actual Saldo por Valorizar
ITEM DESCRIPCIÓN DE PARTIDAS UNID. (%) (%) (%) (%)
Cant. S/. Cant. S/. Cant. S/. Cant. S/.
Cantidad Unitario S/. Avance Avance Avance Avance
Metrado Costo TOTAL Acumulado Mes Anterior Avance del Mes Acumulado Actual Saldo por Valorizar
ITEM DESCRIPCIÓN DE PARTIDAS UNID. (%) (%) (%) (%)
Cant. S/. Cant. S/. Cant. S/. Cant. S/.
Cantidad Unitario S/. Avance Avance Avance Avance
A: SUMINISTRO DE MATERIALES
Metrado Costo TOTAL Acumulado Mes Anterior Avance del Mes Acumulado Actual Saldo por Valorizar
ITEM DESCRIPCIÓN DE PARTIDAS UNID. (%) (%) (%) (%)
Cant. S/. Cant. S/. Cant. S/. Cant. S/.
Cantidad Unitario S/. Avance Avance Avance Avance
9.00 ACCESORIOS PARA CONDUCTOR DE ALEACION ALUMINIO 0.00 0.00
10.00 CONDUCTOR DE COBRE 0.00 0.00
11.00 MATERIAL DE FERRETERIA PARA POSTES Y CRUCETAS 0.00 0.00
12.00 RETENIDAS Y ANCLAJES 0.00 0.00
13.00 MATERIAL PARA PUESTA A TIERRA 0.00 0.00
14.00 EQUIPO DE PROTECCION Y MANIOBRA 0.00 0.00
15.00 TRANSFORMADORES DE DISTRIBUCIÓN 0.00 0.00
16.00 TABLEROS DE DISTRIBUCIÓN 0.00 0.00
17.00 CABLES DE ENERGÍA DE BAJA TENSIÓN 0.00 0.00
0.00
0.00
VALORIZACION DE OBRA N° 007 - ABRIL 2011
ELECTRIFICACION RURAL GRUPO N° 09 - ITEM 1
UBICADO : EN LOS DEPARTAMENTOS DE PIURA, LAMBAYEQUE, CAJAMARCA, LA LIBERTAD, SAN MARTIN, LORETO Y ANCASH.
SECCIÓN II : REDES SECUNDARIAS
PROYECTO N° 14 : REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA 380/220 V. DEL CENTRO POBLADO VILLA PRADO, DISTRITO JUANJUI, PROVINCIA MARISCAL CACERES, REGION SAN
MARTIN
Metrado Costo TOTAL Acumulado Mes Anterior Avance del Mes Acumulado Actual Saldo por Valorizar
ITEM DESCRIPCIÓN DE PARTIDAS UNID. (%) (%) (%) (%)
Cant. S/. Cant. S/. Cant. S/. Cant. S/.
Cantidad Unitario S/. Avance Avance Avance Avance
A: SUMINISTRO DE MATERIALES
Metrado Costo TOTAL Acumulado Mes Anterior Avance del Mes Acumulado Actual Saldo por Valorizar
ITEM DESCRIPCIÓN DE PARTIDAS UNID. (%) (%) (%) (%)
Cant. S/. Cant. S/. Cant. S/. Cant. S/.
Cantidad Unitario S/. Avance Avance Avance Avance
Metrado Costo TOTAL Acumulado Mes Anterior Avance del Mes Acumulado Actual Saldo por Valorizar
ITEM DESCRIPCIÓN DE PARTIDAS UNID. (%) (%) (%) (%)
Cant. S/. Cant. S/. Cant. S/. Cant. S/.
Cantidad Unitario S/. Avance Avance Avance Avance
0.00
B: MONTAJE ELECTROMECANICO 0.00
0.00
1.00 OBRAS PRELIMINARES 0.00
Replanteo Topográfico, Ubicación de Estructuras de Redes Secundarias. Incluye Elaboración de
1.01 M Loc 1.00 457.99 457.99 1.000 457.99 100.00% 0.00 0.00% 1.000 457.99 100.00% 0.000 0.00 0.00%
Planos de Concesión Rural.
SUB-TOTAL 1 : 0.00 457.99 457.99 0.00 457.99 0.00
2.00 INSTALACIÓN DE POSTES 0.00 0.00
2.01 MTransporte de Poste de 8 m/200 daN de Almacen a Punto de Izaje u 85.00 85.00 7,225.00 85.000 7,225.00 100.00% 0.00 0.00% 85.000 7,225.00 100.00% 0.000 0.00 0.00%
2.05 MExcavación en terreno Tipo I (arcilloso y conglomerado) m3 41.00 32.00 1,312.00 41.000 1,312.00 100.00% 0.00 0.00% 41.000 1,312.00 100.00% 0.000 0.00 0.00%
2.06 MExcavación en terreno Tipo II (rocoso) m3 17.95 102.00 1,830.90 0.000 0.00 0.00% 17.95 1,830.90 100.00% 17.950 1,830.90 100.00% 0.000 0.00 0.00%
2.07 MIzaje, identificación y señalización de poste de 8 m/2000 N (*) u 85.00 42.00 3,570.00 85.000 3,570.00 100.00% 0.00 0.00% 85.000 3,570.00 100.00% 0.000 0.00 0.00%
2.11 MRelleno y Compactación para cimentación de Poste 8m, en Terreno Tipo I m3 56.02 42.00 2,352.84 0.000 0.00 0.00% 56.02 2,352.84 100.00% 56.020 2,352.84 100.00% 0.000 0.00 0.00%
SUB-TOTAL 2 : 0.00 16,290.74 12,107.00 4,183.74 16,290.74 0.00
3.00 INSTALACIÓN DE RETENIDAS 0.00 0.00
3.01 MExcavación en terreno Tipo I (arcilloso y conglomerado) m3 36.36 38.58 1,402.77 36.360 1,402.77 100.00% 0.00 0.00% 36.360 1,402.77 100.00% 0.000 0.00 0.00%
3.02 MExcavación en terreno Tipo II (rocoso) m3 9.09 114.98 1,045.17 0.000 0.00 0.00% 9.09 1,045.17 100.00% 9.090 1,045.17 100.00% 0.000 0.00 0.00%
3.03 MInstalación de retenida inclinada u 29.00 38.83 1,126.07 29.000 1,126.07 100.00% 0.00 0.00 0.00% 29.000 1,126.07 100.00% 0.000 0.00 0.00%
3.04 MInstalación de retenida vertical u 2.00 42.48 84.96 0.000 0.00 0.00% 2.00 84.96 100.00% 2.000 84.96 100.00% 0.000 0.00 0.00%
3.05 MRelleno y compactación de retenida en terreno Tipo I m3 44.71 44.10 1,971.71 44.710 1,971.71 100.00% 0.00 0.00% 44.710 1,971.71 100.00% 0.000 0.00 0.00%
SUB-TOTAL 3 : 0.00 5,630.68 4,500.55 1,130.13 5,630.68 0.00
4.00 MONTAJE DE ARMADOS 0.00 0.00
4.01 MArmado Tipo E1, con caja de derivación para acometida u 4.00 20.00 80.00 0.000 0.00 0.00% 4.00 80.00 100.00% 4.000 80.00 100.00% 0.000 0.00 0.00%
4.02 MArmado Tipo E1/S, sin caja de derivación para acometida u 37.00 16.05 593.85 0.000 0.00 0.00% 37.00 593.85 100.00% 37.000 593.85 100.00% 0.000 0.00 0.00%
4.04 MArmado Tipo E2/S, sin caja de derivación para acometida u 1.00 20.00 20.00 0.000 0.00 0.00% 1.00 20.00 100.00% 1.000 20.00 100.00% 0.000 0.00 0.00%
4.06 MArmado Tipo E3/S, sin caja de derivación para acometida u 23.00 16.21 372.83 0.000 0.00 0.00% 23.00 372.83 100.00% 23.000 372.83 100.00% 0.000 0.00 0.00%
4.08 MArmado Tipo E4/S, sin caja de derivación para acometida u 11.00 20.00 220.00 0.000 0.00 0.00% 11.00 220.00 100.00% 11.000 220.00 100.00% 0.000 0.00 0.00%
4.10 MArmado Tipo E5/S, sin caja de derivación para acometida u 17.00 25.33 430.61 0.000 0.00 0.00% 17.00 430.61 100.00% 17.000 430.61 100.00% 0.000 0.00 0.00%
SUB-TOTAL 4 : 0.00 1,717.29 0.00 1,717.29 1,717.29 0.00
5.00 MONTAJE DE CONDUCTORES AUTOPORTANTES 0.00 0.00
Comprende Tendido y puesta en Flecha de : 0.00 0.00
5.03 MConductor Autoportante de Aluminio 3x16+16/25 mm² km 2.920 806.24 2,354.22 2.034 1,639.89 69.66% 0.886 714.33 30.34% 2.920 2,354.22 100.00% 0.000 0.00 0.00%
5.04 MConductor Autoportante de Aluminio 3x16/25 mm² km 0.480 650.19 312.09 0.480 312.09 100.00% 0.00 0.00% 0.480 312.09 100.00% 0.000 0.00 0.00%
SUB-TOTAL 5 : 0.00 2,666.31 1,951.98 714.33 2,666.31 0.00
6.00 INSTALACIÓN DE PUESTA A TIERRA 0.00 0.00
6.01 MExcavación en terreno Tipo I (arcilloso y conglomerado) m3 38.02 35.00 1,330.70 19.800 693.00 52.08% 18.22 637.70 47.92% 38.020 1,330.70 100.00% 0.000 0.00 0.00%
6.02 MExcavación en terreno Tipo II (rocoso) m3 9.50 105.00 997.50 0.000 0.00 0.00% 9.50 997.50 100.00% 9.500 997.50 100.00% 0.000 0.00 0.00%
6.03 MInstalacion de puesta a tierra Tipo PAT-1 en poste de concreto u 24.00 16.00 384.00 10.000 160.00 41.67% 14.00 224.00 58.33% 24.000 384.00 100.00% 0.000 0.00 0.00%
6.04 MRelleno y compactación de puesta a tierra Tipo PAT-1 con material adecuado. m3 37.45 42.00 1,572.90 15.600 655.20 41.66% 21.85 917.70 58.34% 37.450 1,572.90 100.00% 0.000 0.00 0.00%
SUB-TOTAL 6 : 0.00 4,285.10 1,508.20 2,776.90 4,285.10 0.00
7.00 PASTORALES, LUMINARIAS Y LAMPARAS 0.00 0.00
7.01 MInstalación de pastoral de A° G° u 38.00 21.20 805.60 25.000 530.00 65.79% 13.00 275.60 34.21% 38.000 805.60 100.00% 0.000 0.00 0.00%
7.02 MInstalación de Luminaria, Lámpara y Accesorios u 38.00 37.62 1,429.56 25.000 940.50 65.79% 13.00 489.06 34.21% 38.000 1,429.56 100.00% 0.000 0.00 0.00%
SUB-TOTAL 7 : 0.00 2,235.16 1,470.50 764.66 2,235.16 0.00
8.00 CONEXIONES DOMICILIARIAS 0.00 0.00
Instalación de acometida domiciliaria, que comprende: Conexión de Acometida Domiciliarias,
0.00 0.00
Montaje de Medidor y Contraste del Medidor.
8.03 MConexión de acometidas domiciliarias, configuración: Corta u 84.00 38.28 3,215.52 0.000 0.00 0.00% 84.00 3,215.52 100.00% 84.000 3,215.52 100.00% 0.000 0.00 0.00%
8.04 MConexión de acometida domiciliarias, configuración: Larga u 47.00 46.29 2,175.63 0.000 0.00 0.00% 47.00 2,175.63 100.00% 47.000 2,175.63 100.00% 0.000 0.00 0.00%
8.05 MInstalación de medidor monofásico de energia activa y caja u 131.00 12.03 1,575.93 0.000 0.00 0.00% 131.00 1,575.93 100.00% 131.000 1,575.93 100.00% 0.000 0.00 0.00%
8.06 MContraste de medidor monofásico de energía activa - electrónico u 131.00 21.85 2,862.35 0.000 0.00 0.00% 131.00 2,862.35 100.00% 131.000 2,862.35 100.00% 0.000 0.00 0.00%
SUB-TOTAL 8 : 0.00 9,829.43 0.00 9,829.43 9,829.43 0.00
9.00 PRUEBAS Y PUESTA EN SERVICIO: 0.00 0.00
9.01 MPruebas y puesta en servicio Loc 1.00 543.10 543.10 0.000 0.00 0.00% 0.00 0.00% 0.000 0.00 0.00% 1.000 543.10 100.00%
9.02 Expediente tecnico finales conforme a obra (1 Original + 3 Copias) de redes 0.00 0.00
Msecundarias, incluye la presentación digitalizada del expediente en un CD Loc 1.00 110.00 110.00 0.000 0.00 0.00% 0.00 0.00% 0.000 0.00 0.00% 1.000 110.00 100.00%
SUB-TOTAL 9 : 0.00 653.10 0.00 0.00 0.00 653.10
0.00
0.00
TOTAL MONTAJE ELECTROMECÁNICO 0.00 43,765.80 21,996.22 21,116.48 43,112.70 653.10
0.00
VALORIZACION DE OBRA N° 007 - ABRIL 2011
ELECTRIFICACION RURAL GRUPO N° 09 - ITEM 1
UBICADO : EN LOS DEPARTAMENTOS DE PIURA, LAMBAYEQUE, CAJAMARCA, LA LIBERTAD, SAN MARTIN, LORETO Y ANCASH.
SECCIÓN II : REDES SECUNDARIAS
PROYECTO N° 14 : REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA 380/220 V. DEL CENTRO POBLADO VILLA PRADO, DISTRITO JUANJUI, PROVINCIA MARISCAL CACERES, REGION SAN
MARTIN
Metrado Costo TOTAL Acumulado Mes Anterior Avance del Mes Acumulado Actual Saldo por Valorizar
ITEM DESCRIPCIÓN DE PARTIDAS UNID. (%) (%) (%) (%)
Cant. S/. Cant. S/. Cant. S/. Cant. S/.
Cantidad Unitario S/. Avance Avance Avance Avance
0.00
C: TRANSPORTE DE MATERIALES 0.00
0.00
1.00 POSTES DE CONCRETO ARMADO CENTRIFUGADO 0.00
1.01 S Poste de C.A.C. de 8 m/200 daN (Incluye perilla) u 85.00 75.00 6,375.00 85.000 6,375.00 100.00% 0.00 0.00% 85.000 6,375.00 100.00% 0.000 0.00 0.00%
SUB-TOTAL 1: 0.00 6,375.00 6,375.00 0.00 6,375.00 0.00
2.00 CABLES Y CONDUCTORES DE ALUMINIO 0.00 0.00
2.03 S Conductor Autoportante de Aluminio 3x16+16/25 mm² km 2.920 108.50 316.82 2.034 220.69 69.66% 0.886 96.13 30.34% 2.920 316.82 100.00% 0.000 0.00 0.00%
2.04 S Conductor Autoportante de Aluminio 3x16/25 mm² km 0.480 87.15 41.82 0.409 35.64 85.22% 0.071 6.18 14.78% 0.480 41.82 100.00% 0.000 0.00 0.00%
SUB-TOTAL 2: 0.00 358.64 256.33 102.31 358.64 0.00
3.00 ACCESORIOS DE CABLES AUTOPORTANTES 0.00 0.00
3.01 S Grapa de suspension angular para conductor de Aleacion de 25 mm2 u 58.00 0.05 2.90 46.000 2.30 79.31% 12.00 0.60 20.69% 58.000 2.90 100.00% 0.000 0.00 0.00%
3.02 S Grapa de anclaje conica para conductor de Aleacion de Aluminio de 25 mm2 u 64.00 0.05 3.20 64.000 3.20 100.00% 0.00 0.00 0.00% 64.000 3.20 100.00% 0.000 0.00 0.00%
3.03 S Conector Bimetálico, para Al 25 mm2/Cu 4-10mm2, para neutro desnudo, tipo cuña u 4.00 0.01 0.04 3.000 0.03 75.00% 1.00 0.01 25.00% 4.000 0.04 100.00% 0.000 0.00 0.00%
3.04 S Conector Bimetalico aislado, para Al 35 mm2/Cu 4-10mm2, para fase aislada, tipo perforacion u 12.00 0.01 0.12 9.000 0.09 75.00% 3.00 0.03 25.00% 12.000 0.12 100.00% 0.000 0.00 0.00%
3.05 S Conector, para Al 25mm², para neutro desnudo, tipo cuña u 18.00 0.01 0.18 14.000 0.14 77.78% 4.00 0.04 22.22% 18.000 0.18 100.00% 0.000 0.00 0.00%
3.06 S Conector aislado, para Al 35mm2, para fases aislada, tipo perforacion u 54.00 0.01 0.54 43.000 0.43 79.63% 11.00 0.11 20.37% 54.000 0.54 100.00% 0.000 0.00 0.00%
3.07 S Correa plastica de amarre, color negro u 430.00 0.01 4.30 344.000 3.44 80.00% 86.00 0.86 20.00% 430.000 4.30 100.00% 0.000 0.00 0.00%
3.08 S Cinta autofundente para extremo de cable m 6.00 0.01 0.06 4.000 0.04 66.67% 2.00 0.02 33.33% 6.000 0.06 100.00% 0.000 0.00 0.00%
3.09 S Cinta aislante m 3.00 0.01 0.03 0.000 0.00 0.00% 3.00 0.03 100.00% 3.000 0.03 100.00% 0.000 0.00 0.00%
SUB-TOTAL 3: 0.00 11.37 9.67 1.70 11.37 0.00
4.00 CABLES Y CONDUCTORES DE COBRE 0.00 0.00
4.02 S Conductor de Cobre Recocido, tipo N2XY, Tripolar, 3 x 10 mm2, cubierta negra m 4.80 0.08 0.38 0.000 0.00 0.00% 4.80 0.38 100.00% 4.800 0.38 100.00% 0.000 0.00 0.00%
4.04 S Conductor de Cobre Recocido, tipo N2XY, Bipolar, 2 x 2,5 mm2 m 57.00 0.07 3.99 57.000 3.99 100.00% 0.00 0.00 0.00% 57.000 3.99 100.00% 0.000 0.00 0.00%
4.05 S Conductor de Cobre Concéntrico, 2 x 4 mm2, con aislamiento y cubierta de PVC m 2,670.00 0.08 213.60 2,520.000 201.60 94.38% 150.00 12.00 5.62% 2670.000 213.60 100.00% 0.000 0.00 0.00%
4.07 S Conductor de Cobre Recocido, Cableado, de 16 mm², para Puesta a Tierra m 240.00 0.06 14.40 240.000 14.40 100.00% 0.00 0.00 0.00% 240.000 14.40 100.00% 0.000 0.00 0.00%
SUB-TOTAL 4: 0.00 232.37 219.99 12.38 232.37 0.00
5.00 LUMINARIAS, LAMPARAS Y ACCESORIOS 0.00 0.00
Pastoral tubo A°G° 38 mm Ø interior, 500 mm avance horizontal, 720 mm altura y 20°
5.01 S u 38.00 0.98 37.24 0.000 0.00 0.00% 38.00 37.24 100.00% 38.000 37.24 100.00% 0.000 0.00 0.00%
inclinación, provisto de 2 abrazaderas dobles para poste de concreto
5.02 S Luminaria completa con equipo para Lámpara de Vapor de Sodio de 50 W u 38.00 1.75 66.50 38.000 66.50 100.00% 0.00 0.00 0.00% 38.000 66.50 100.00% 0.000 0.00 0.00%
5.04 S Lámpara de Vapor de Sodio de Alta Presión de 50 W u 38.00 0.50 19.00 38.000 19.00 100.00% 0.00 0.00 0.00% 38.000 19.00 100.00% 0.000 0.00 0.00%
5.06 S Portafusible unipolar 220V, de 5A provisto con fusible de 1A u 38.00 0.04 1.52 0.000 0.00 0.00% 38.00 1.52 100.00% 38.000 1.52 100.00% 0.000 0.00 0.00%
5.07 S Conector bimetálico para Al 25 mm2/Cu 4-10mm2, para neutro desnudo tipo cuña u 38.00 0.01 0.38 30.000 0.30 78.95% 8.00 0.08 21.05% 38.000 0.38 100.00% 0.000 0.00 0.00%
5.08 S Conector bimetálico forrado para Al 35 mm2/Cu 4-10mm2, para fase aislada tipo perforacion u 38.00 0.01 0.38 38.000 0.38 100.00% 0.00 0.00 0.00% 38.000 0.38 100.00% 0.000 0.00 0.00%
SUB-TOTAL 5: 0.00 125.02 86.18 38.84 125.02 0.00
6.00 RETENIDAS Y ANCLAJES 0.00 0.00
6.01 S Cable de acero grado Siemens Martin, de 10 mm ø, 7 hilos m 372.00 0.03 11.16 297.000 8.91 79.84% 75.00 2.25 20.16% 372.000 11.16 100.00% 0.000 0.00 0.00%
6.03 S Perno Angular con Ojal Guardacabo de A°G°, 16 mm Ø x 254 mm, provisto de Tuerca y Contratuerca u 31.00 0.09 2.79 31.000 2.79 100.00% 0.00 0.00 0.00% 31.000 2.79 100.00% 0.000 0.00 0.00%
Varilla de anclaje de A° G° de 16 mm ø x 2.40 m, prov. de ojal guard. en un extremo; Tca y
6.05 S u 31.00 0.54 16.74 24.000 12.96 77.42% 7.00 3.78 22.58% 31.000 16.74 100.00% 0.000 0.00 0.00%
Ctca en el otro
6.06 S Arandela de anclaje, de A° G°, 102 x 102 x 6,35 mm, agujero de 18 mmø u 31.00 0.01 0.31 24.000 0.24 77.42% 7.00 0.07 22.58% 31.000 0.31 100.00% 0.000 0.00 0.00%
6.07 S Grapa Paralela de A° G° de 152 mm de longitud provista de tres pernos u 62.00 0.03 1.86 62.000 1.86 100.00% 0.00 0.00 0.00% 62.000 1.86 100.00% 0.000 0.00 0.00%
6.08 S Arandela cuadrada curva de A° G°, 57 x 57 x 5 mm, agujero de 18 mmø u 62.00 0.01 0.62 49.000 0.49 79.03% 13.00 0.13 20.97% 62.000 0.62 100.00% 0.000 0.00 0.00%
6.09 S Soporte de contrapunta de 51 mmØx1000mm de long. con abrazadera partida en un extremo u 2.00 1.73 3.46 1.000 1.73 50.00% 1.00 1.73 50.00% 2.000 3.46 100.00% 0.000 0.00 0.00%
6.10 S Alambre de acero N° 12; para entorchado m 46.50 0.01 0.46 36.000 0.36 78.26% 10.50 0.10 21.74% 46.500 0.46 100.00% 0.000 0.00 0.00%
6.11 S Bloque de concreto de 0,40 x 0,40 x 0,15 m u 31.00 6.32 195.92 31.000 195.92 100.00% 0.00 0.00 0.00% 31.000 195.92 100.00% 0.000 0.00 0.00%
SUB-TOTAL 6: 0.00 233.32 225.26 8.06 233.32 0.00
7.00 ACCESORIOS DE FERRETERIA PARA ESTRUCTURAS 0.00 0.00
7.02 S Perno con gancho de 16mm Ø, provisto de arandela, tuerca y contrat., long. 254 mm u 54.00 0.05 2.70 43.000 2.15 79.63% 11.00 0.55 20.37% 54.000 2.70 100.00% 0.000 0.00 0.00%
7.03 S Perno con gancho de 16mm Ø, provisto de arandela, tuerca y contrat., long. 305 mm u 4.00 0.06 0.24 3.000 0.18 75.00% 1.00 0.06 25.00% 4.000 0.24 100.00% 0.000 0.00 0.00%
7.05 S Perno de AºGº de 13mm Ø, provisto de tuerca y contrat., long. 254 mm u 4.00 0.05 0.20 3.000 0.15 75.00% 1.00 0.05 25.00% 4.000 0.20 100.00% 0.000 0.00 0.00%
7.08 S Perno con ojal, de AºGº de 16mm Ø, provisto de tuerca y contrat., long. 254 mm u 47.00 0.05 2.35 47.000 2.35 100.00% 0.00 0.00 0.00% 47.000 2.35 100.00% 0.000 0.00 0.00%
7.09 S Perno con ojal, de AºGº de 16mm Ø, provisto de tuerca y contrat., long. 305 mm u 6.00 0.06 0.36 4.000 0.24 66.67% 2.00 0.12 33.33% 6.000 0.36 100.00% 0.000 0.00 0.00%
7.10 S Tuerca-Ojal de AºGº para perno de 16 mmØ u 11.00 0.03 0.33 11.000 0.33 100.00% 0.00 0.00 0.00% 11.000 0.33 100.00% 0.000 0.00 0.00%
7.11 S Fleje de acero inoxidable de 19 mm provisto de hebilla m 4.00 0.03 0.12 4.000 0.12 100.00% 0.00 0.00 0.00% 4.000 0.12 100.00% 0.000 0.00 0.00%
7.12 S Arandela cuadrada curva de AºGº 57x57 mm, agujero de 18mmØ u 162.00 0.01 1.62 129.000 1.29 79.63% 33.00 0.33 20.37% 162.000 1.62 100.00% 0.000 0.00 0.00%
7.15 S Caja de Derivacion para Acometidas, Sistema 380-22O V (10 Borneras en cada barra de cobre) u 4.00 0.50 2.00 0.000 0.00 0.00% 4.00 2.00 100.00% 4.000 2.00 100.00% 0.000 0.00 0.00%
7.17 S Portalinea unipolar de AºGº, provisto de PIN de 10 mm Ø u 8.00 0.02 0.16 8.000 0.16 100.00% 0.00 0.00 0.00% 8.000 0.16 100.00% 0.000 0.00 0.00%
SUB-TOTAL 7: 0.00 10.08 6.97 3.11 10.08 0.00
VALORIZACION DE OBRA N° 007 - ABRIL 2011
ELECTRIFICACION RURAL GRUPO N° 09 - ITEM 1
UBICADO : EN LOS DEPARTAMENTOS DE PIURA, LAMBAYEQUE, CAJAMARCA, LA LIBERTAD, SAN MARTIN, LORETO Y ANCASH.
SECCIÓN II : REDES SECUNDARIAS
PROYECTO N° 14 : REHABILITACION Y MEJORAMIENTO DE REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA 380/220 V. DEL CENTRO POBLADO VILLA PRADO, DISTRITO JUANJUI, PROVINCIA MARISCAL CACERES, REGION SAN
MARTIN
Metrado Costo TOTAL Acumulado Mes Anterior Avance del Mes Acumulado Actual Saldo por Valorizar
ITEM DESCRIPCIÓN DE PARTIDAS UNID. (%) (%) (%) (%)
Cant. S/. Cant. S/. Cant. S/. Cant. S/.
Cantidad Unitario S/. Avance Avance Avance Avance