PRESUPUESTO VALORIZAC. VALORIZAC. VALORIZAC. VALORIZAC. VALORIZAC. VALORIZAC. VALORIZAC. VALORIZAC. VALORIZAC. ACUMULADO POR
ITEM DESCRIPCION DE FORMULA TOTAL N1 N2 N3 N4 N5 N6 N7 N8 N9 ACTUAL VALORIZAR
S/ S/ S/ S/ S/ S/ S/ S/ S/ S/ S/ S/
PRESUPUESO PARCIAL (SIN IGV) 4,327,457.24 775,229.16 955,753.72 153,296.14 173,192.99 790,179.68 345,140.86 146,546.97 188,493.90 3,527,833.42 799,623.82
1
PRESUPUESO PARCIAL (CON IGV) 5,106,399.54 914,770.41 1,127,789.39 180,889.45 204,367.73 932,412.02 407,266.21 172,925.42 222,422.80 4,162,843.43 943,556.11
PRESUPUESO ACUMULADO (SIN IGV) 4,327,457.24 775,229.16 1,730,982.88 1,884,279.02 2,057,472.01 2,847,651.69 3,192,792.55 3,339,339.52 3,527,833.42
2
PRESUPUESO ACUMULADO (CON IGV-SIN REAJUST 5,106,399.54 914,770.41 2,042,559.80 2,223,449.25 2,427,816.98 3,360,229.00 3,767,495.21 3,940,420.63 4,162,843.43
PRORRATEO PARA DEDUCCION FONDO DE GARANTIA EN CASO DE ACOGIMIENTO A RETENCION DE FIEL CUMPLIMIENTO
2016 2017
MESES 10% P. OFER NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO
C. DIRECTO 432,745.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
C. TOTAL 510,639.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Según Clausula séptima referida a las garantías, el contratista entrega con fines de perfeccionamiento de contrato,
CUADRO SIN REAJUSTES Y SIN AMORTIZACIONES una Carta Fianza de fiel cumplimiento que tiene la característica de ser incondicional, solidaria, irrevocable y de
VALORIZACION DEL MES DE JUNIO
realización automática en el país al solo requerimiento de la entidad, en favor de la entidad, hasta fecha
V 188,493.90
26/06/2017 estaba vigente la anterior carta fianza otorgada por la -Entidad Financiera Caja Huancayo, con carta
REAJUSTE DEL MES DE JUNIO R 0.00
de Fiel Cumplimiento Nº 107-008-0452-2016/CMAC-H, en concordancia al artículo 158, Capitulo II, Del
DEDUCCION DE REAJUSTE D 0.00
Reglamento de la Ley de Contrataciones del Estado, se sugiere a la entidad a traves de sus funcionarios
VALORIZACION BRUTA VB=V+R-D 188,493.90 encargados de la custodia de la carta fianza (tesorero), solicitar a traves de un documento formal para que la
AMORTIZACION DE ADELANTOS A 0.00 entidad de a conocer al contratista para que extienda la carta fianza por el tiempo ampliado, segun resolucion Nº
VALORIZACION NETA VN=VB-A 188,493.90 084 y carta Nº 028, que extienda como minimo hasta el 30/07/2017.
EFECTIVO (VAL. LIQUIDA) EFECT= VN 188,493.90
IGV (18%) IGV= 0.18*VN 33,928.90
TOTAL FACTURAR VALORIZACION Nº 8 TOTAL 222,422.80
RETENCION X GARANTIA DE FIEL CUMPLIMIENTO TOTAL 0.00
TOTAL NETO RECIBIDO VALORIZACION Nº 8 TOTAL 222,422.80
RESUMEN DE VALORIZACION DE OBRA (FORMATO 2- HOJA 1)
U. EJ. MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES
OBRA
EN LA CAPITAL DEL DISTRITO DE SAN JUAN DEL ORO-SANDIA-PUNO
PRES. BASE 5,106,399.54
PRES. OFERT. 5,106,399.54
PLAZO 60 DIAS CALENDARIOS
MONTO % SALDO
VALORIZACION
DESCRIPCION CONTRATO AVANCE POR
ANTERIOR ACTUAL ACUMULADOACUMULADOVALORIZAR
A: VALORIZACION CONTRACTUAL
01 SISTEMA DE AGUA POTABLE 997,344.57 719,722.54 -15,740.67 703,981.87 70.59% 29.41%
02 SISTEMA DE ALCANTARILLADO 1,131,397.54 870,801.60 150,802.16 1,021,603.76 90.30% 9.70%
03 PLANTA DE TRATAMIENTO DE AGUAS RESIDIALES 1,466,089.52 1,146,260.85 28,619.97 1,174,880.82 80.14% 19.86%
04 MEDIDAS DE SEGURIDAD Y MITIGACION AMBIENTAL 85,612.36 85,612.36 0.00 85,612.36 100.00% 0.00%
05 INTERVENCION SOCIAL 53,367.27 53,367.27 0.00 53,367.27 100.00% 0.00%
06 PLAN DE MONITOREO ARQUEOLOGICO 24,000.00 24,000.00 0.00 24,000.00 100.00% 0.00%
AVANCE PORCENTUAL DE OBRA 77.17% 4.36% 81.52% 81.52% 18.48%
COSTO DIRECTO 3,757,811.26 2,899,764.62 163,681.46 3,063,446.08 694,365.18
GASTOS GENERALES (10.16%) 381,755.42 294,586.60 16,628.37 311,214.97 70,540.45
UTILIDAD (5%) 187,890.56 144,988.23 8,184.07 153,172.30 34,718.26
SUB TOTAL 4,327,457.24 3,339,339.45 188,493.90 3,527,833.35 799,623.89
IGV (18%) 778,942.30 601,081.10 33,928.90 635,010.00 143,932.30
TOTAL (A) 5,106,399.54 3,940,420.63 222,422.80 4,162,843.43 943,556.11
D= RETENCIONES
FONDO DE GARANTIA (10*VB) (RLCE ART 126 LEY 30225) 0.00 0.00 0.00
MULTA POR ATRASO DE OBRA 0.00 0.00 0.00
TOTAL ( D ) 0.00 0.00 0.00
MONTO % SALDO
VALORIZACION
DESCRIPCION CONTRATO AVANCE POR
ANTERIOR ACTUAL ACUMULADOACUMULADOVALORIZAR
A: VALORIZACION CONTRACTUAL
02 SISTEMA DE ALCANTARILLADO 1,131,397.54 870,801.60 150,802.16 1,021,603.76 90.30% 9.70%
AVANCE PORCENTUAL DE OBRA 76.97% 13.33% 90.30% 90.30% 9.70%
COSTO DIRECTO 1,131,397.54 870,801.60 150,802.16 1,021,603.76 109,793.78
GASTOS GENERALES (10.16%) 114,938.49 88,464.59 15,319.97 103,784.56 11,153.93
UTILIDAD (5%) 56,569.88 43,540.08 7,540.11 51,080.19 5,489.69
SUB TOTAL 1,302,905.91 1,002,806.27 173,662.24 1,176,468.51 126,437.40
IGV (18%) 234,523.06 180,505.13 31,259.20 211,764.33 22,758.73
TOTAL (A) 1,537,428.97 1,183,311.40 204,921.44 1,388,232.84 149,196.13
MONTO % SALDO
VALORIZACION
DESCRIPCION CONTRATO AVANCE POR
ANTERIOR ACTUAL ACUMULADOACUMULADOVALORIZAR
A: VALORIZACION CONTRACTUAL
03 PLANTA DE TRATAMIENTO DE AGUAS RESIDIALES 1,466,089.52 1,146,260.85 28,619.97 1,174,880.82 80.14% 19.86%
AVANCE PORCENTUAL DE OBRA 78.18% 1.95% 80.14% 80.14% 19.86%
COSTO DIRECTO 1,466,089.52 1,146,260.85 28,619.97 1,174,880.82 291,208.70
GASTOS GENERALES (10.16%) 148,939.79 116,448.45 2,907.50 119,355.95 29,583.84
UTILIDAD (5%) 73,304.48 57,313.04 1,431.00 58,744.04 14,560.44
SUB TOTAL 1,688,333.79 1,320,022.34 32,958.47 1,352,980.81 335,352.98
IGV (18%) 303,900.08 237,604.02 5,932.52 243,536.55 60,363.53
TOTAL (A) 1,992,233.87 1,557,626.36 38,890.99 1,596,517.36 395,716.51
MONTO % SALDO
VALORIZACION
DESCRIPCION CONTRATO AVANCE POR
ANTERIOR ACTUAL ACUMULADOACUMULADOVALORIZAR
A: VALORIZACION CONTRACTUAL
04 MEDIDAS DE SEGURIDAD Y MITIGACION AMBIENTAL 85,612.36 85,612.36 0.00 85,612.36 100.00% 0.00%
AVANCE PORCENTUAL DE OBRA 100.00% 0.00% 100.00% 100.00% 0.00%
COSTO DIRECTO 85,612.36 85,612.36 0.00 85,612.36 0.00
GASTOS GENERALES (10.16%) 8,697.35 8,697.35 0.00 8,697.35 0.00
UTILIDAD (5%) 4,280.62 4,280.62 0.00 4,280.62 0.00
SUB TOTAL 98,590.33 98,590.33 0.00 98,590.33 0.00
IGV (18%) 17,746.26 17,746.26 0.00 17,746.26 0.00
TOTAL (A) 116,336.59 116,336.59 0.00 116,336.59 0.00
MONTO % SALDO
VALORIZACION
DESCRIPCION CONTRATO AVANCE POR
ANTERIOR ACTUAL ACUMULADOACUMULADOVALORIZAR
A: VALORIZACION CONTRACTUAL
05 INTERVENCION SOCIAL 53,367.27 53,367.27 0.00 53,367.27 100.00% 0.00%
AVANCE PORCENTUAL DE OBRA 100.00% 0.00% 100.00% 100.00% 0.00%
COSTO DIRECTO 53,367.27 53,367.27 0.00 53,367.27 0.00
GASTOS GENERALES (10.16%) 5,421.57 5,421.57 0.00 5,421.57 0.00
UTILIDAD (5%) 2,668.36 2,668.36 0.00 2,668.36 0.00
SUB TOTAL 61,457.20 61,457.20 0.00 61,457.20 0.00
IGV (18%) 11,062.30 11,062.30 0.00 11,062.30 0.00
TOTAL (A) 72,519.50 72,519.50 0.00 72,519.50 0.00
MONTO % SALDO
VALORIZACION
DESCRIPCION CONTRATO AVANCE POR
ANTERIOR ACTUAL ACUMULADOACUMULADOVALORIZAR
A: VALORIZACION CONTRACTUAL
06 PLAN DE MONITOREO ARQUEOLOGICO 24,000.00 24,000.00 0.00 24,000.00 100.00% 0.00%
AVANCE PORCENTUAL DE OBRA 100.00% 0.00% 100.00% 100.00% 0.00%
COSTO DIRECTO 24,000.00 24,000.00 0.00 24,000.00 0.00
GASTOS GENERALES (10.16%) 2,438.16 2,438.16 0.00 2,438.16 0.00
UTILIDAD (5%) 1,200.00 1,200.00 0.00 1,200.00 0.00
SUB TOTAL 27,638.16 27,638.16 0.00 27,638.16 0.00
IGV (18%) 4,974.87 4,974.87 0.00 4,974.87 0.00
TOTAL (A) 32,613.03 32,613.03 0.00 32,613.03 0.00
CUADRO DE CONTROL FINANCIERO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO DE SAN JUAN DEL ORO-SANDIA-PUNO
UBICACIÓN :
PRESUPUESTO PROGRAMADO : S/. 5,106,399.54 GARANTIA DE FIEL CUMPLIMIENTO : S/. 510,639.95
PLAZO DE EJECUCION : 60 DIAS CALENDARIOS Para ejecutor de obra se tiene Carta fianza otorgada por la -Entidad Financiera Caja
MONTO CONTRACTUAL : S/. 5,106,399.54 Huancayo, con carta de Fiel Cumplimiento Nº 107-008-0452-2016/CMAC-H, en
DEDUCTIVO DE OBRA : S/. 0.00 concordancia al artículo 158, Capitulo II, Del Reglamento de la Ley de
ADICIONAL DE OBRA : S/. 0.00 Contrataciones del Estado.
MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO DE SAN JUAN DEL ORO-SANDIA-PUNO
UBICACIÓN :
PRESUPUESTO PROGRAMADO : S/. 5,106,399.54 GARANTIA DE FIEL CUMPLIMIENTO : S/. 510,639.95
PLAZO DE EJECUCION : 60 DIAS CALENDARIOS Para ejecutor de obra se tiene Carta fianza otorgada por la -Entidad Financiera Caja
MONTO CONTRACTUAL : S/. 5,106,399.54 Huancayo, con carta de Fiel Cumplimiento Nº 107-008-0452-2016/CMAC-H, en
DEDUCTIVO DE OBRA : S/. 0.00 concordancia al artículo 158, Capitulo II, Del Reglamento de la Ley de
ADICIONAL DE OBRA : S/. 0.00 Contrataciones del Estado.
MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO DE SAN JUAN DEL ORO-SANDIA-PUNO
UBICACIÓN :
PRESUPUESTO PROGRAMADO : S/. 5,106,399.54 GARANTIA DE FIEL CUMPLIMIENTO : S/. 510,639.95
PLAZO DE EJECUCION : 60 DIAS CALENDARIOS Para ejecutor de obra se tiene Carta fianza otorgada por la -Entidad Financiera Caja
MONTO CONTRACTUAL : S/. 5,106,399.54 Huancayo, con carta de Fiel Cumplimiento Nº 107-008-0452-2016/CMAC-H, en
DEDUCTIVO DE OBRA : S/. 0.00 concordancia al artículo 158, Capitulo II, Del Reglamento de la Ley de
ADICIONAL DE OBRA : S/. 0.00 Contrataciones del Estado.
TOTAL EJECUCION DE OBRA Y SUPERVISION RESUMEN S/. 4,086,165.89 S/. 0.00 S/. 0.00 S/. 4,086,165.89
VALORIZACION DE OBRA Nº 8 - TODAS LAS FORMULAS
PROPIET: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO MONTO PRESUPUESTADO: 5,106,399.54 CORRESPONDIENTE AL MES DE: JUNIO
OBRA: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO FECHA DE PRESENTACION: AL 30 DE JUNIO DEL 2017
AVANCES
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCIÓN
P.UNITARIO PRESUPUESTO VALORIZADO VALORIZADO VALORIZADO VALORIZADO
UND METRADO S/. S/. METRADO S/. METRADO S/. METRADO S/. % METRADO S/. %
04.01.01.01 ACCESORIO PVC SAP 4" Y 6" und 1 1539.65 1539.65 1.00 1539.65 0.00 0 1.00 1539.65 100.00% 0.00 0.00 0.00%
04.01.02 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0 0.00
04.01.02.01 TARRAJEO EN EXTERIORES MEZCLA DE 1:5 C-A, E=1.5CM m2 13.68 16.04 219.43 13.68 219.43 0.00 0 13.68 219.43 100.00% 0.00 0.00 0.00%
04.01.03 PINTURA 0.00 0 0.00
04.01.03.01 PINTADO DE MURO EXTERIOR CON ESMALTE m2 35.86 12.66 453.99 35.86 453.99 0.00 0 35.86 453.99 100.00% 0.00 0.00 0.00%
04.01.04 OTROS 0.00 0 0.00
04.01.04.01 PANTALLA DIFUSORA 1" und 1 129.23 129.23 1.00 129.23 0.00 0 1.00 129.23 100.00% 0.00 0.00 0.00%
04.01.04.02 TAPA DE ALUMINIO CON PLANCHA DE 1/4" und 1 2044.53 2044.53 1.00 2044.53 0.00 0 1.00 2044.53 100.00% 0.00 0.00 0.00%
4.02 MEJORAMIENTO DE FILTRO LENTO 0.00 0 0.00
04.02.01 CONCRETO ARMADO 0.00 0 0.00
04.02.01.01 ESTRUCTURA DE FILTRO LENTO 0.00 0 0.00
04.02.01.01.01 CONCRETO f 'c=210 kg/cm2 m3 0.13 601.24 78.16 39.99 24043.59 -39.86 -23965.43 0.13 78.16 100.00% 0.00 0.00 0.00%
04.02.01.01.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 0.37 25.24 9.34 207.31 5232.50 -206.94 -5223.17 0.37 9.34 100.00% 0.00 0.00 0.00%
04.02.01.01.03 ACERO DE REFUERZO fy=4200 KG/CM2 kg 8.37 6.43 53.82 1934.07 12436.07 -1925.70 -12382.25 8.37 53.82 100.00% 0.00 0.00 0.00%
04.02.02 CARPINTERIA METALICA 0.00 0 0.00
04.02.02.01 COMPUERTA DE ALIVIO 60X50CM EN INGRESO und 1 204.61 204.61 1.00 204.61 0.00 0 1.00 204.61 100.00% 0.00 0.00 0.00%
04.02.02.02 COMPUERTA METALICA PARA AISLAR FILTRO DE 40X50CM und 1 197.82 197.82 1.00 197.82 0.00 0 1.00 197.82 100.00% 0.00 0.00 0.00%
04.02.02.03 COMPUERTA METALICA TIPO GUSANO 0.10X0.1X3.80M und 1 278.46 278.46 1.00 278.46 0.00 0 1.00 278.46 100.00% 0.00 0.00 0.00%
04.02.02.04 VERTEDERO DE MADERA 55X60CM EN EL INGRESO und 1 74.61 74.61 1.00 74.61 0.00 0 1.00 74.61 100.00% 0.00 0.00 0.00%
04.02.03 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0 0.00
04.02.03.01 TARRAJEO EN EXTERIORES MEZCLA DE 1:5 C-A, E=1.5CM m2 41.5 16.04 665.66 41.50 665.66 0.00 0 41.50 665.66 100.00% 0.00 0.00 0.00%
04.02.04 FILTROS 0.00 0 0.00
04.02.04.01 FILTRO DE ARENA m3 20 228.97 4579.40 20.00 4579.40 0.00 0 20.00 4579.40 100.00% 0.00 0.00 0.00%
04.02.04.02 FILTRO DE GRAVA m3 30 186.63 5598.90 30.00 5598.90 0.00 0 30.00 5598.90 100.00% 0.00 0.00 0.00%
04.02.04.03 PISO DE LADRILLO INDUSTRIAL m2 36 80.57 2900.52 36.00 2900.52 0.00 0 36.00 2900.52 100.00% 0.00 0.00 0.00%
04.02.05 PINTURA 0.00 0 0.00
04.02.05.01 PINTADO EXTERIOR CON ESMALTE m2 162.48 12.87 2091.12 162.48 2091.12 0.00 0 162.48 2091.12 100.00% 0.00 0.00 0.00%
4.03 CERCO PERIMETRICO 0.00 0 0.00
04.03.01 TRABAJOS PRELIMINARES 0.00 0 0.00
04.03.01.01 LIMPIEZA DE TERRENO MANUAL ML 46 1.18 54.28 0.00 0.00 0 0.00 0.00 0.00% 46.00 54.28 100.00%
04.03.01.02 TRAZO Y REPLANTEO ML 46 1.24 57.04 0.00 0.00 0 0.00 0.00 0.00% 46.00 57.04 100.00%
04.03.02 MOVIMIENTO DE TIERRAS 0 0.00
04.03.02.01 EXCAVACION PARA INSTALACION DE ACCESORIOS m3 1.8 39.36 70.85 0.00 0.00 0 0.00 0.00 0.00% 1.80 70.85 100.00%
04.03.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 2.16 47.24 102.04 0.00 0.00 0 0.00 0.00 0.00% 2.16 102.04 100.00%
04.03.03 CONCRETO SIMPLE 0 0.00
04.03.03.01 CONCRETO 1:10 +30% P.G. PARA ANCLAJES m3 1.67 195.46 326.42 0.00 0.00 0 0.00 0.00 0.00% 1.67 326.42 100.00%
04.03.04 CONCRETO ARMADO 0 0.00
04.03.04.01 CONCRETO f 'c=210 kg/cm2 EN POSTES DE CERCO m3 0.63 461.9 291.00 0.00 0.00 0 0.00 0.00 0.00% 0.63 291.00 100.00%
04.03.04.02 ENCOFRADO Y DESENCOFRADO EN POSTES DE CONCRETO m2 183.94 34.14 6279.71 0.00 0.00 0 0.00 0.00 0.00% 183.94 6279.71 100.00%
04.03.04.03 ACERO DE REFUERZO fy=4200 KG/CM2 kg 74.74 6.43 480.58 0.00 0.00 0 0.00 0.00 0.00% 74.74 480.58 100.00%
04.03.05 REVOQUES ENLUCIDOS Y MOLDURAS 0 0.00
04.03.05.01 TARRAJEO EN EXTERIORES MEZCLA DE 1:5 C-A, E=1.5CM m2 17.46 16.04 280.06 0.00 0.00 0 0.00 0.00 0.00% 17.46 280.06 100.00%
VALORIZACION DE OBRA Nº 8 - TODAS LAS FORMULAS
PROPIET: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO MONTO PRESUPUESTADO: 5,106,399.54 CORRESPONDIENTE AL MES DE: JUNIO
OBRA: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO FECHA DE PRESENTACION: AL 30 DE JUNIO DEL 2017
AVANCES
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCIÓN
P.UNITARIO PRESUPUESTO VALORIZADO VALORIZADO VALORIZADO VALORIZADO
UND METRADO S/. S/. METRADO S/. METRADO S/. METRADO S/. % METRADO S/. %
05.03.11.03 SALIDA TOMACORRIENTE CON AWG TW 2.5 mm pto 2 170.49 340.98 2.00 340.98 0.00 0 2.00 340.98 100.00% 0.00 0.00 0.00%
TABLERO ELECTRICO GABINETE METALICO PARA DISTRIBUCION DE 3
05.03.11.04 CIRCUITOS und 1 236.6 236.60 1.00 236.60 0.00 0 1.00 236.60 100.00% 0.00 0.00 0.00%
05.03.11.05 FLUORESCENTE RECTO ISPE 2 X 40 W INCLUYE EQUIPO Y PANTALLA und 4 81.66 326.64 4.00 326.64 0.00 0 4.00 326.64 100.00% 0.00 0.00 0.00%
05.03.11.06 PLACA INTERRUPTOR DE BAKELITA DE 1 GOLPE - SWITCH und 1 99.61 99.61 1.00 99.61 0.00 0 1.00 99.61 100.00% 0.00 0.00 0.00%
05.03.11.07 PLACA TOMACORRIENTE DE BAKELITA BIPOLAR X 1 und 1 46.61 46.61 1.00 46.61 0.00 0 1.00 46.61 100.00% 0.00 0.00 0.00%
POZO CONEXION A TIERRA EN SISTEMA CON EQUIPO BOMBEO ALUMBRAD0
05.03.11.08 TOMACORRIENTE und 1 451.01 451.01 0.00 0.00 0 0.00 0.00 0.00% 1.00 451.01 100.00%
05.03.12 VEREDA 0.00 0 0.00
05.03.12.01 JUNTAS DE DILATACION EN VEREDAS ML 4 5.43 21.72 4.00 21.72 0.00 0 4.00 21.72 100.00% 0.00 0.00 0.00%
05.03.12.02 VEREDA DE CONCRETO f'c= 140 kg/cm2 CON MEZCLA E=10CM INC. ACBADO Y BRUÑADO m2 11.3 77.49 875.64 11.30 875.64 0.00 0 11.30 875.64 100.00% 0.00 0.00 0.00%
05.03.13 VÁLVULAS ACCESORIOS 0.00 0 0.00
05.03.13.01 ACCESORIOS DE INGRESO Ø DE CASETA DE VALVULA und 1 967.27 967.27 1.00 967.27 0.00 0 1.00 967.27 100.00% 0.00 0.00 0.00%
05.03.13.02 ACCESORIO DE SALIDA CON Ø 6" DE CACETA DE VALVULA und 1 598.27 598.27 1.00 598.27 0.00 0 1.00 598.27 100.00% 0.00 0.00 0.00%
05.03.13.03 ACCESORIO DE REBOSE Y LIMPIA DE Ø 6" DE CASETA DE VALVULAS und 1 625.24 625.24 1.00 625.24 0.00 0 1.00 625.24 100.00% 0.00 0.00 0.00%
05.03.14 INSTALACIONES HIDRAULICAS DE RESERVORIO 0.00 0 0.00
05.03.14.01 TUBERIA DE ACERO SCHEDULE 40 PARA EQUIPO 6" (150 mm) INCLUYE 1% DESPERDICIO ML 33.23 324 10766.52 0.00 0.00 0 0.00 0.00 0.00% 33.23 10766.52 100.00%
05.03.14.02 INSTALACION DE TUBERIA DE ACERO SCHEDULE - 40 P/EQ. 6" (160MM) INC 1% DE DESP. ML 33.23 61.09 2030.02 0.00 0.00 0 0.00 0.00 0.00% 33.23 2030.02 100.00%
05.03.14.03 BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DE 6" (160 mm) und 4 20 80.00 0.00 0.00 0 0.00 0.00 0.00% 4.00 80.00 100.00%
05.03.14.04 CANASTILLA DE BRONCE BRIDADA DE 6" und 1 600 600.00 0.00 0.00 0 0.00 0.00 0.00% 1.00 600.00 100.00%
05.03.14.05 EMPAQUETADURA DE JEBE ENLONADO DE 6" (160 mm) und 10 28 280.00 0.00 0.00 0 0.00 0.00 0.00% 10.00 280.00 100.00%
05.03.14.06 CODO DE FIERRO FUNDIDO BRIDADO 6"X90DN (160 mm) und 4 260 1040.00 0.00 0.00 0 0.00 0.00 0.00% 4.00 1040.00 100.00%
05.03.14.07 CODO DE FIERRO FUNDIDO BRIDADO 6"X45DN (160 mm) und 4 260 1040.00 0.00 0.00 0 0.00 0.00 0.00% 4.00 1040.00 100.00%
05.03.14.08 TEE DE FIERRO FUNDIDO BRIDADO DE 6" X 6" und 4 360 1440.00 0.00 0.00 0 0.00 0.00 0.00% 4.00 1440.00 100.00%
05.03.14.09 PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DE 6" (160 mm) und 100 6.5 650.00 0.00 0.00 0 0.00 0.00 0.00% 100.00 650.00 100.00%
05.03.14.10 UNION FLEXIBLE TIPO DRESSER DE 6" (150 MM) und 4 460 1840.00 0.00 0.00 0 0.00 0.00 0.00% 4.00 1840.00 100.00%
05.03.14.11 BRIDA DE ACERO PARA SOLDAR ROMPE AGUA DE 6" und 4 220 880.00 0.00 0.00 0 0.00 0.00 0.00% 4.00 880.00 100.00%
05.03.14.12 ACOPLE MAXFIT PARA TUBERIA DN 160MM R=160/181.60 und 2 240 480.00 0.00 0.00 0 0.00 0.00 0.00% 2.00 480.00 100.00%
05.03.14.13 INSTALACION DE ACOPLE MECANICOS P/TUBERIA DN 100mm A 160 mm und 2 50.26 100.52 0.00 0.00 0 0.00 0.00 0.00% 2.00 100.52 100.00%
05.03.14.14 VALVULA COMPUERTA BRIDADA JUNTA ELASTOMERICA VASTAGO DE ACERO und 4 720 2880.00 0.00 0.00 0 0.00 0.00 0.00% 4.00 2880.00 100.00%
05.03.14.15 MONTAJE DE ACCESORIOS DE FIERRO FUNDIDO BRIDADA DN 110-160mm und 24 30.74 737.76 24.00 737.76 0.00 0 24.00 737.76 100.00% 0.00 0.00 0.00%
05.03.14.16 CONCRETO PARA ANCLAJES DE ACCESORIOS IN/ENCOFRADO und 3 31 93.00 3.00 93.00 0.00 0 3.00 93.00 100.00% 0.00 0.00 0.00%
05.03.15 CASETA DE CLORACION 0.00 0 0.00
05.03.15.01 SUMIN. E INSTAL. DE HIPOCLORADOR POR GOTEO DE CARGA CONSTANTE C/CASETA-R50M3 und 1 2232.2 2232.20 1.00 2232.20 0.00 0 1.00 2232.20 100.00% 0.00 0.00 0.00%
5.04 CERCO PERIMETRICO EN RESERVORIOS DE 120M3 Y 280M3 0.00 0 0.00
05.04.01 TRABAJOS PRELIMINARES 0.00 0 0.00
05.04.01.01 LIMPIEZA DE TERRENO MANUAL ML 280 1.18 330.40 280.00 330.40 0.00 0 280.00 330.40 100.00% 0.00 0.00 0.00%
05.04.01.02 TRAZO Y REPLANTEO ML 280 1.24 347.20 280.00 347.20 0.00 0 280.00 347.20 100.00% 0.00 0.00 0.00%
05.04.02 MOVIMIENTO DE TIERRAS 0.00 0 0.00
05.04.02.01 EXCAVACION PARA INSTALACION DE ACCESORIOS m3 5.1 39.36 200.74 5.10 200.74 0.00 0 5.10 200.74 100.00% 0.00 0.00 0.00%
05.04.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 6.12 47.24 289.11 6.12 289.11 0.00 0 6.12 289.11 100.00% 0.00 0.00 0.00%
05.04.03 CONCRETO SIMPLE 0.00 0 0.00
05.04.03.01 CONCRETO 1:10 +30% P.G. PARA ANCLAJES m3 4.72 195.46 922.57 2.30 449.56 0 2.30 449.56 49.00% 2.42 473.01 51.00%
05.04.04 CONCRETO ARMADO 0 0.00
VALORIZACION DE OBRA Nº 8 - TODAS LAS FORMULAS
PROPIET: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO MONTO PRESUPUESTADO: 5,106,399.54 CORRESPONDIENTE AL MES DE: JUNIO
OBRA: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO FECHA DE PRESENTACION: AL 30 DE JUNIO DEL 2017
AVANCES
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCIÓN
P.UNITARIO PRESUPUESTO VALORIZADO VALORIZADO VALORIZADO VALORIZADO
UND METRADO S/. S/. METRADO S/. METRADO S/. METRADO S/. % METRADO S/. %
05.04.04.01 CONCRETO f 'c=210 kg/cm2 EN POSTES DE CERCO m3 1.77 461.9 817.56 0.97 448.04 0 0.97 448.04 55.00% 0.80 369.52 45.00%
05.04.04.02 ENCOFRADO Y DESENCOFRADO EN POSTES DE CONCRETO m2 183.94 34.14 6279.71 22.61 771.91 0 22.61 771.91 12.00% 161.33 5507.80 88.00%
05.04.04.03 ACERO DE REFUERZO fy=4200 KG/CM2 kg 211.77 6.43 1361.68 74.66 480.06 0 74.66 480.06 35.00% 137.11 881.62 65.00%
05.04.05 REVOQUES ENLUCIDOS Y MOLDURAS 0 0.00
05.04.05.01 TARRAJEO EN EXTERIORES MEZCLA DE 1:5 C-A, E=1.5CM m2 49.47 16.04 793.50 16.66 267.23 0 16.66 267.23 34.00% 32.81 526.27 66.00%
05.04.06 CARPINTERIA METALICA 0.00 0 0.00
05.04.06.01 PUERTA METALICA DE MALLA GALVANIZADA N°8 CON MARCO F°G° DE 2" (3X1.8M) und 1 293.55 293.55 1.00 293.55 0.00 0 1.00 293.55 100.00% 0.00 0.00 0.00%
05.04.06.02 CERCO DE ALAMBRE DE PUA GALV. N° 12 EN COLUMNAS DE CONCRETO ML 2240 6.65 14896.00 2240.00 14896.00 0.00 0 2240.00 14896.00 100.00% 0.00 0.00 0.00%
05.04.07 PINTURA 0.00 0 0.00
05.04.07.01 PINTURA ESMALTE EN CARPINTERIA METALICA m2 3.6 17.88 64.37 3.60 64.37 0.00 0 3.60 64.37 100.00% 0.00 0.00 0.00%
05.04.07.02 PINTURA ESMALTE EN EXTERIORES m2 49.47 13 643.11 49.47 643.11 0.00 0 49.47 643.11 100.00% 0.00 0.00 0.00%
6 RED DE DISTRIBUCION DE AGUA POTABLE 0.00 0 0.00
6.01 RED DE DISTRIBUCIÓN 0.00 0 0.00
06.01.01 TRABAJOS PRELIMINARES 0.00 0 0.00
06.01.01.01 TRAZO Y REPLANTEO ML 3514.67 1.24 4358.19 3514.67 4358.19 0.00 0 3514.67 4358.19 100.00% 0.00 0.00 0.00%
06.01.02 OBRAS DE DEMOLICION Y PEPOSICION DE PAVIMENTOS 0.00 0 0.00
06.01.02.01 DEMOLICION DE PAVIMENTO DE CONCRETO m2 477.41 19.86 9481.36 477.41 9481.36 0.00 0 477.41 9481.36 100.00% 0.00 0.00 0.00%
06.01.02.02 EXTRACCION DE ADOQUINES DE CONCRETO m2 211.14 4.82 1017.69 211.14 1017.69 0.00 0 211.14 1017.69 100.00% 0.00 0.00 0.00%
06.01.02.03 REPOSICION DE BASE GRANULAR m3 70.77 185.88 13154.73 70.77 13154.73 0.00 0 70.77 13154.73 100.00% 0.00 0.00 0.00%
06.01.02.04 LOSA PAV: CONCRETO FC=210KG/CM2 m3 151.65 472.29 71622.78 0.00 0.00 0 0.00 0.00 0.00% 151.65 71622.78 100.00%
06.01.02.05 REPOSICION DE ADOQUINES DE CONCRETO m2 263.92 15.05 3972.00 263.92 3972.00 0.00 0 263.92 3972.00 100.00% 0.00 0.00 0.00%
06.01.03 MOVIMIENTO DE TIERRAS 0.00 0 0.00
06.01.03.01 EXCAVACION DE ZANJA CON MAQUINARIA EN TERRENO CONGLOMERADO H=1.20M - 1.50M, A=0 ML 3514.67 11.29 39680.62 3514.67 39680.62 0.00 0 3514.67 39680.62 100.00% 0.00 0.00 0.00%
06.01.03.02 REFINE Y NIVELACION DE FONDOS PARA TUBERIAS ML 3514.67 1.81 6361.55 3514.67 6361.55 0.00 0 3514.67 6361.55 100.00% 0.00 0.00 0.00%
06.01.03.03 CAMA DE ARENA E=0.10M P/TUB. DE AGUA (MANUAL) ML 3514.67 12.18 42808.68 3514.67 42808.68 0.00 0 3514.67 42808.68 100.00% 0.00 0.00 0.00%
06.01.03.04 RECUBRIMIENTO DE TUBERIA CON MATERIAL DE PRESTAMO SELECCIONADO P/TUB. AGUA ML 3514.67 13.49 47412.90 3158.74 42611.40 355.93 4801.5 3514.67 47412.90 100.00% 0.00 0.00 0.00%
06.01.03.05 RELLENO Y COMPACTACION DE ZANJA EN CAPA DE 0.20M CON MATERIAL PROPIO C/EQUIPO ML 3514.67 11.04 38801.96 3158.74 34872.49 355.93 3929.47 3514.67 38801.96 100.00% 0.00 0.00 0.00%
06.01.03.06 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=2KM m3 632.64 11.85 7496.78 567.07 6719.78 65.57 777 632.64 7496.78 100.00% 0.00 0.00 0.00%
06.01.04 SUMINISTRO E INSTALACION DE TUBERIAS 0.00 0 0.00
06.01.04.01 SUMINISTRO E INSTALACION DE TUBERIA PVC NTP ISO 4422 C-10, DN=110MM ML 102.71 21.14 2171.29 92.00 1944.88 10.71 226.41 102.71 2171.29 100.00% 0.00 0.00 0.00%
06.01.04.02 SUMINISTRO E INSTALACION DE TUBERIA PVC NTP ISO 4422 C-10, DN=90MM ML 571.64 15.66 8951.88 511.87 8015.88 59.77 936 571.64 8951.88 100.00% 0.00 0.00 0.00%
06.01.04.03 SUMINISTRO E INSTALACION DE TUBERIA PVC NTP ISO 4422 C-10, DN=63MM ML 2840.32 9.44 26812.62 2551.87 24089.65 288.45 2722.97 2840.32 26812.62 100.00% 0.00 0.00 0.00%
06.01.05 VÁLVULAS ACCESORIOS 0.00 0 0.00
06.01.05.01 SUMINISTRO Y COLOCACION DE ACCESORIOS VARIOS GLB 1 4359.12 4359.12 1.00 4359.12 0.00 0 1.00 4359.12 100.00% 0.00 0.00 0.00%
06.01.06 ANCLAJE DE TUBERIAS 0.00 0 0.00
06.01.06.01 CONCRETO Fc=140 KG/CM2 PARA ANCLAJE DE ACCESORIOS und 93 23.9 2222.70 93.00 2222.70 0.00 0 93.00 2222.70 100.00% 0.00 0.00 0.00%
06.01.07 PRUEVA HIDRÁULICA 0.00 0 0.00
06.01.07.01 PRUEBA HIDRAULICA + DESINFECCION DE REDES ML 3514.67 1.31 4604.22 3158.74 4137.95 355.93 466.27 3514.67 4604.22 100.00% 0.00 0.00 0.00%
6.02 CONEXIONES DOMICILIARIAS 0.00 0 0.00
06.02.01 OBRAS PRELIMINARES 0.00 0 0.00
06.02.01.01 TRAZO Y REPLANTEO ML 1239.4 1.24 1536.86 1239.40 1536.86 0.00 0 1239.40 1536.86 100.00% 0.00 0.00 0.00%
06.02.02 MOVIMIENTO DE TIERRAS 0.00 0 0.00
VALORIZACION DE OBRA Nº 8 - TODAS LAS FORMULAS
PROPIET: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO MONTO PRESUPUESTADO: 5,106,399.54 CORRESPONDIENTE AL MES DE: JUNIO
OBRA: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO FECHA DE PRESENTACION: AL 30 DE JUNIO DEL 2017
AVANCES
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCIÓN
P.UNITARIO PRESUPUESTO VALORIZADO VALORIZADO VALORIZADO VALORIZADO
UND METRADO S/. S/. METRADO S/. METRADO S/. METRADO S/. % METRADO S/. %
06.02.02.01 EXCAVACION DE ZANJA CON MAQUINARIA EN TERRENO CONGLOMERADO H=1.20M - 1.50M, A=0 ML 1239.4 11.29 13992.83 1239.40 13992.83 0.00 0 1239.40 13992.83 100.00% 0.00 0.00 0.00%
06.02.02.02 REFINE Y NIVELACION DE FONDOS PARA TUBERIAS ML 1239.4 1.81 2243.31 1239.40 2243.31 0.00 0 1239.40 2243.31 100.00% 0.00 0.00 0.00%
06.02.02.03 CAMA DE ARENA E=0.10M P/TUB. DE AGUA (MANUAL) ML 1239.4 12.18 15095.89 1239.40 15095.89 0.00 0 1239.40 15095.89 100.00% 0.00 0.00 0.00%
06.02.02.04 RECUBRIMIENTO DE TUBERIA CON MATERIAL DE PRESTAMO SELECCIONADO P/TUB. AGUA ML 1239.4 13.49 16719.51 1110.30 14977.95 129.10 1741.56 1239.40 16719.51 100.00% 0.00 0.00 0.00%
06.02.02.05 RELLENO Y COMPACTACION DE ZANJA EN CAPA DE 0.20M CON MATERIAL PROPIO C/EQUIPO ML 1239.4 11.04 13682.98 1110.30 12257.71 129.10 1425.26 1239.40 13682.98 100.00% 0.00 0.00 0.00%
06.02.02.06 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=2KM m3 644.33 11.85 7635.31 579.02 6861.39 65.31 773.92 644.33 7635.31 100.00% 0.00 0.00 0.00%
06.02.03 SUMINISTRO E INSTALACION DE TUBERIAS 0.00 0 0.00
06.02.03.01 TUBERIA PVC SAP C-7.5 D=3/4" ML 84 9.83 825.72 76.00 747.08 8.00 78.64 84.00 825.72 100.00% 0.00 0.00 0.00%
06.02.03.02 TUBERIA PVC SAP C-7.5 D=1/2" ML 1155.4 4.73 5465.04 1036.30 4901.70 119.10 563.34 1155.40 5465.04 100.00% 0.00 0.00 0.00%
06.02.04 VÁLVULAS ACCESORIOS 0.00 0 0.00
06.02.04.01 INSTALACION DE ACCESORIOS PARA CONEXION DOMICILIARIA D=3/4" und 14 498.7 6981.80 12.80 6383.36 1.20 598.44 14.00 6981.80 100.00% 0.00 0.00 0.00%
06.02.04.02 INSTALACION DE ACCESORIOS PARA CONEXION DOMICILIARIA D=1/2" und 360 325.28 117100.80 324.00 105390.72 36.00 11710.08 360.00 117100.80 100.00% 0.00 0.00 0.00%
06.02.04.03 ABRAZADERA PVC D=4" CON PERFORACION D=3/4" und 1 20.64 20.64 1.00 20.64 0.00 0 1.00 20.64 100.00% 0.00 0.00 0.00%
06.02.04.04 ABRAZADERA PVC D=3" CON PERFORACION D=3/4" und 1 12.44 12.44 1.00 12.44 0.00 0 1.00 12.44 100.00% 0.00 0.00 0.00%
06.02.04.05 ABRAZADERA PVC D=2" CON PERFORACION D=3/4" und 12 15.44 185.28 10.00 154.40 2.00 30.88 12.00 185.28 100.00% 0.00 0.00 0.00%
06.02.04.06 ABRAZADERA PVC D=2" CON PERFORACION D=1/2" und 270 14.44 3898.80 244.00 3523.36 26.00 375.44 270.00 3898.80 100.00% 0.00 0.00 0.00%
6.03 VALVULAS DE PURGA (04 UND) 0.00 0 0.00
06.03.01 OBRAS PRELIMINARES 0.00 0 0.00
06.03.01.01 LIMPIEZA DE TERRENO m2 34.92 3.83 133.74 0.00 0.00 0 0.00 0.00 0.00% 34.92 133.74 100.00%
06.03.01.02 TRAZO Y REPLANTEO m2 34.92 17.77 620.53 0.00 0.00 0 0.00 0.00 0.00% 34.92 620.53 100.00%
06.03.02 MOVIMIENTO DE TIERRAS 0 0.00
06.03.02.01 EXCAVACION PARA CIMIENTACIONES m3 25.18 39.36 991.08 0.00 0.00 0 0.00 0.00 0.00% 25.18 991.08 100.00%
06.03.02.02 NIVELACION Y APISONADO MANUAL m2 34.92 3.93 137.24 0.00 0.00 0 0.00 0.00 0.00% 34.92 137.24 100.00%
06.03.03 CONCRETO SIMPLE 0 0.00
06.03.03.01 CONCRETO FC=210KM/CM2 P/EMPOTRADO DE TAPA m3 0.24 606.41 145.54 0.00 0.00 0 0.00 0.00 0.00% 0.24 145.54 100.00%
06.03.03.02 CONCRETO FC=210KM/CM2 EN MURO m3 0.61 606.41 369.91 0.00 0.00 0 0.00 0.00 0.00% 0.61 369.91 100.00%
06.03.03.03 ENCOFRADO Y DESENCOFRADO DE MUROS (02 CARAS) m2 12.16 46.67 567.51 0.00 0.00 0 0.00 0.00 0.00% 12.16 567.51 100.00%
06.03.03.04 CONCRETO FC=210KM/CM2 EN LOSA FONDO m3 0.26 606.41 157.67 0.00 0.00 0 0.00 0.00 0.00% 0.26 157.67 100.00%
06.03.04 CONCRETO ARMADO 0 0.00
06.03.04.01 CONCRETO FC=210KM/CM2 EN LOSA TAPA m3 0.08 567.05 45.36 0.00 0.00 0 0.00 0.00 0.00% 0.08 45.36 100.00%
06.03.04.02 ENCOFRADO Y DESENCOFRADO LOZA MACISA und 3.04 73.85 224.50 0.00 0.00 0 0.00 0.00 0.00% 3.04 224.50 100.00%
06.03.04.03 ACERO fy=4200 KG/CM2 PARA LOSA TAPA kg 10.4 5.88 61.15 0.00 0.00 0 0.00 0.00 0.00% 10.40 61.15 100.00%
06.03.05 REVOQUES ENLUCIDOS Y MOLDURAS 0 0.00
06.03.05.01 TARRAJEO DE MURO INT. Y EXTERIOR MORTERO 1:5 m2 5.12 54.75 280.32 0.00 0.00 0 0.00 0.00 0.00% 5.12 280.32 100.00%
06.03.06 VÁLVULAS ACCESORIOS 0 0.00
06.03.06.01 VALVULA DE CONTROL D=2" und 4 235.43 941.72 0.00 0.00 0 0.00 0.00 0.00% 4.00 941.72 100.00%
06.03.06.02 ACCESORIOS PVC SAP D=2" und 4 51.2 204.80 0.00 0.00 0 0.00 0.00 0.00% 4.00 204.80 100.00%
06.03.06.03 TUBERIA PVC SAP C-7.5 D=2" ML 46 12.71 584.66 0.00 0.00 0 0.00 0.00 0.00% 46.00 584.66 100.00%
06.03.07 OTROS 0 0.00
06.03.07.01 TAPA DE F°F°20X30CM und 4 156.27 625.08 0.00 0.00 0 0.00 0.00 0.00% 4.00 625.08 100.00%
6.04 VALVULA DE AIRE (01 UND) 0.00 0 0.00
06.04.01 OBRAS PRELIMINARES 0.00 0 0.00
VALORIZACION DE OBRA Nº 8 - TODAS LAS FORMULAS
PROPIET: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO MONTO PRESUPUESTADO: 5,106,399.54 CORRESPONDIENTE AL MES DE: JUNIO
OBRA: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO FECHA DE PRESENTACION: AL 30 DE JUNIO DEL 2017
AVANCES
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCIÓN
P.UNITARIO PRESUPUESTO VALORIZADO VALORIZADO VALORIZADO VALORIZADO
UND METRADO S/. S/. METRADO S/. METRADO S/. METRADO S/. % METRADO S/. %
06.04.01.01 TRAZO Y REPLANTEO m2 4.8 17.77 85.30 4.80 85.30 0.00 0 4.80 85.30 100.00% 0.00 0.00 0.00%
06.04.02 MOVIMIENTO DE TIERRAS 0.00 0 0.00
06.04.02.01 EXCAVACION PARA INSTALACION DE ACCESORIOS m3 6.4 39.36 251.90 6.40 251.90 0.00 0 6.40 251.90 100.00% 0.00 0.00 0.00%
06.04.02.02 REFINE Y NIVELACION EN TERRENO NORMAL m2 8 1.17 9.36 8.00 9.36 0.00 0 8.00 9.36 100.00% 0.00 0.00 0.00%
06.04.03 CONCRETO SIMPLE 0.00 0 0.00
06.04.03.01 CONCRETO FC=210KM/CM2 EN MURO m3 0.32 606.41 194.05 0.32 194.05 0 0 0.32 194.05 100.00% 0.00 0.00 0.00%
06.04.03.02 ENCOFRADO Y DESENCOFRADO DE MUROS (02 CARAS) m2 2.64 46.67 123.21 2.64 123.21 0 0 2.64 123.21 100.00% 0.00 0.00 0.00%
06.04.03.03 CONCRETO FC=210KM/CM2 EN LOSA FONDO m3 0.75 606.41 454.81 0.75 454.81 0 0 0.75 454.81 100.00% 0.00 0.00 0.00%
06.04.04 CONCRETO ARMADO 0 0 0.00
06.04.04.01 CONCRETO FC=210KM/CM2 EN LOSA TAPA m3 0.16 567.05 90.73 0.16 90.73 0 0 0.16 90.73 100.00% 0.00 0.00 0.00%
06.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL LOSA TAPA m2 0.09 61.01 5.49 0.09 5.49 0 0 0.09 5.49 100.00% 0.00 0.00 0.00%
06.04.04.03 ACERO DE REFUERZO fy=4200 KG/CM2 kg 3.25 6.43 20.90 3.25 20.90 0 0 3.25 20.90 100.00% 0.00 0.00 0.00%
06.04.05 VÁLVULAS ACCESORIOS 0 0 0.00
06.04.05.01 TUBERIA PVC SAP C-7.5 D=1" ML 10 5.36 53.60 10.00 53.60 0 0 10.00 53.60 100.00% 0.00 0.00 0.00%
06.04.05.02 ACCESORIOS PARA VALVULA AUTOMATICA DE AIRE D=1" E INSTALACION und 2 194.63 389.26 2.00 389.26 0 0 2.00 389.26 100.00% 0.00 0.00 0.00%
06.04.06 OTROS 0 0 0.00
06.04.06.01 TAPA DE F°F° CON MARCO und 2 213.27 426.54 2.00 426.54 0 0 2.00 426.54 100.00% 0.00 0.00 0.00%
06.04.06.02 TAPA DE F°F°20X30CM und 2 156.27 312.54 2.00 312.54 0 0 2.00 312.54 100.00% 0.00 0.00 0.00%
6.05 GRIFO CONTRA INCENDIOS (02 UND) 0.00 0 0.00
06.05.01 OBRAS PRELIMINARES 0.00 0 0.00
06.05.01.01 TRAZO Y REPLANTEO m2 3.2 17.77 56.86 0.00 0.00 3.20 56.86 3.20 56.86 100.00% 0.00 0.00 0.00%
06.05.02 MOVIMIENTO DE TIERRAS 0.00 0 0.00
06.05.02.01 EXCAVACION PARA CAJAS DE VALVULAS m3 3.2 29.52 94.46 0.00 0.00 3.20 94.46 3.20 94.46 100.00% 0.00 0.00 0.00%
06.05.02.02 REFINE Y NIVELACION EN TERRENO NORMAL m2 3.2 1.17 3.74 0.00 0.00 3.20 3.74 3.20 3.74 100.00% 0.00 0.00 0.00%
06.05.03 CONCRETO SIMPLE 0.00 0 0.00
06.05.03.01 CONCRETO FC=210KM/CM2 m3 0.13 495.21 64.38 0.00 0.00 0.13 64.38 0.13 64.38 100.00% 0.00 0.00 0.00%
06.05.03.02 ENCOFRADO Y DESENCOFRADO DE MUROS (02 CARAS) m2 3.36 46.67 156.81 0.00 0.00 3.36 156.81 3.36 156.81 100.00% 0.00 0.00 0.00%
06.05.03.03 CONCRETO FC=210KM/CM2 EN LOSA FONDO m3 0.08 606.41 48.51 0.00 0.00 0.08 48.51 0.08 48.51 100.00% 0.00 0.00 0.00%
06.05.03.04 Concreto simple f'c = 100 kg/cm2 PARA ANCLAJES m3 0.25 432.82 108.21 0.00 0.00 0.25 108.21 0.25 108.21 100.00% 0.00 0.00 0.00%
06.05.04 CONCRETO ARMADO 0.00 0 0.00
06.05.04.01 CONCRETO FC=210KM/CM2 m3 0.04 495.21 19.81 0.00 0.00 0.04 19.81 0.04 19.81 100.00% 0.00 0.00 0.00%
06.05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL LOSA TAPA m2 0.53 61.01 32.34 0.00 0.00 0.53 32.34 0.53 32.34 100.00% 0.00 0.00 0.00%
06.05.04.03 ACERO DE REFUERZO fy=4200 KG/CM2 kg 6.65 6.43 42.76 0.00 0.00 6.65 42.76 6.65 42.76 100.00% 0.00 0.00 0.00%
06.05.05 VÁLVULAS ACCESORIOS 0.00 0 0.00
06.05.05.01 VALVULA CONTRA INCENDIOS + ACCESORIOS und 2 5876.53 11753.06 0.00 0.00 2.00 11753.06 2.00 11753.06 100.00% 0.00 0.00 0.00%
06.05.06 OTROS 0.00 0 0.00
06.05.06.01 TAPA DE F°F° CON MARCO und 1 213.27 213.27 0.00 0.00 1.00 213.27 1.00 213.27 100.00% 0.00 0.00 0.00%
6.06 CASETA Y VALVULA REDUCTORA DE PRESION (16 UND) 0.00 0 0.00
06.06.01 OBRAS PRELIMINARES 0.00 0 0.00
06.06.01.01 LIMPIEZA DE TERRENO m2 94.08 3.83 360.33 4.25 16.28 0 4.25 16.28 5.00% 89.83 344.05 95.00%
06.06.01.02 TRAZO Y REPLANTEO m2 94.08 17.77 1671.80 4.25 75.52 0 4.25 75.52 5.00% 89.83 1596.28 95.00%
06.06.02 MOVIMIENTO DE TIERRAS 0 0.00
VALORIZACION DE OBRA Nº 8 - TODAS LAS FORMULAS
PROPIET: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO MONTO PRESUPUESTADO: 5,106,399.54 CORRESPONDIENTE AL MES DE: JUNIO
OBRA: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO FECHA DE PRESENTACION: AL 30 DE JUNIO DEL 2017
AVANCES
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCIÓN
P.UNITARIO PRESUPUESTO VALORIZADO VALORIZADO VALORIZADO VALORIZADO
UND METRADO S/. S/. METRADO S/. METRADO S/. METRADO S/. % METRADO S/. %
06.06.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL m3 188.16 29.52 5554.48 5.31 156.75 0 5.31 156.75 3.00% 182.85 5397.73 97.00%
06.06.02.02 NIVELACION Y APISONADO MANUAL m2 94.08 3.93 369.73 4.25 16.70 0 4.25 16.70 5.00% 89.83 353.03 95.00%
06.06.03 CONCRETO SIMPLE 0 0.00
06.06.03.01 SOLADO E=4" m2 94.08 32.59 3066.07 4.25 138.51 0 4.25 138.51 5.00% 89.83 2927.56 95.00%
06.06.04 CONCRETO ARMADO 0 0.00
06.06.04.01 LOSA PISO 0 0.00
06.06.04.01.01 CONCRETO FC=210KM/CM2 m3 18.81 495.21 9314.90 0.85 420.93 0 0.85 420.93 5.00% 17.96 8893.97 95.00%
06.06.04.01.02 ACERO DE REFUERZO fy=4200 KG/CM2 kg 1172.34 6.43 7538.15 24.98 160.62 0 24.98 160.62 2.00% 1147.36 7377.53 98.00%
06.06.04.02 MUROS 0 0.00
06.06.04.02.01 CONCRETO FC=210KM/CM2 EN MURO m3 37.8 606.41 22922.30 1.13 685.24 0 1.13 685.24 3.00% 36.67 22237.06 97.00%
06.06.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 378 25.24 9540.72 15.12 381.63 0 15.12 381.63 4.00% 362.88 9159.09 96.00%
06.06.04.02.03 ACERO DE REFUERZO fy=4200 KG/CM2 kg 3023.2 6.43 19439.18 45.29 291.21 0 45.29 291.21 1.00% 2977.91 19147.97 99.00%
06.06.04.03 LOSA TECHO 0 0.00
06.06.04.03.01 CONCRETO FC=210KM/CM2(MANUAL) EN LOSA TAPA m3 15.96 545.98 8713.84 0.52 283.91 0 0.52 283.91 3.00% 15.44 8429.93 97.00%
06.06.04.03.02 ENCOFRADO Y DESENCOFRADO DE LOSA MACISA m2 82.04 73.85 6058.65 3.54 261.43 0 3.54 261.43 4.00% 78.50 5797.22 96.00%
06.06.04.03.03 ACERO fy=4200 KG/CM2 PARA LOSA TAPA kg 2070.1 5.88 12172.19 20.38 119.83 0 20.38 119.83 1.00% 2049.72 12052.36 99.00%
06.06.05 REVOQUES ENLUCIDOS Y MOLDURAS 0 0.00
06.06.05.01 TARRAJEO DE MURO INT. Y EXTERIOR MORTERO 1:5 m2 155.4 54.75 8508.15 19.71 1079.12 0 19.71 1079.12 13.00% 135.69 7429.03 87.00%
06.06.06 VÁLVULAS ACCESORIOS 0 0.00
06.06.06.01 SUMINISTRO E INSTALACION DE VALVULA REDUCTORA DE PRESION Y ACCESORIOS und 16 3756.09 60097.44 2.00 7512.18 0 2.00 7512.18 13.00% 14.00 52585.26 88.00%
06.06.07 OTROS 0 0.00
06.06.07.01 TAPA DE F°F° CIRCULAR TIPO BUZON 90CM CON MARCO und 16 328.44 5255.04 1.00 328.44 0 1.00 328.44 6.00% 15.00 4926.60 94.00%
06.06.07.02 TAPA DE F°F° TIPO REJILLA CON MARCO D 60CM und 14 287.65 4027.10 0.00 0.00 0 0.00 0.00 0.00% 14.00 4027.10 100.00%
06.06.07.03 FILTRO DE GRAVA m3 1.8 186.63 335.93 0.03 5.60 0 0.03 5.60 2.00% 1.77 330.33 98.00%
7 FLETE TERRESTRE 0.00 0 0.00
7.01 FLETE TERRESTRE (AGUA POTABLE) 0.00 0 0.00
7.01.01 FLETE TERRESTRE GLB 1 39000 39000.00 1.00 39000.00 0.00 0 1.00 39000.00 100.00% 0.00 0.00 0.00%
2 SISTEMA DE ALCANTARILLADO 0.00 0.00
1.01 OBRAS PROVISIONALES 0.00 0 0.00
1.01.01 TRANQUERAS DE MADERA 1.20X1.10 m PARA DESVIO TRANSITO VEHICULAR und 10 285.93 2859.30 10.00 2859.30 0.00 0 10.00 2859.30 100.00% 0.00 0.00 0.00%
1.01.02 SEÑALIZACION EN DESVIOS Y SEGURIDAD EN VIAS DE GRAN TRANSITO und 10 632.25 6322.50 10.00 6322.50 0.00 0 10.00 6322.50 100.00% 0.00 0.00 0.00%
1.01.03 CONO DE VIDRIO FOSFORECENTE und 13 303.16 3941.08 13.00 3941.08 0.00 0 13.00 3941.08 100.00% 0.00 0.00 0.00%
1.01.04 PUENTE DE MADERA PROVICIONAL, PARA PASE PEATONAL SOBRE ZANJAS und 8 806.1 6448.80 8.00 6448.80 0.00 0 8.00 6448.80 100.00% 0.00 0.00 0.00%
1.01.05 CINTA PLASTICA SEÑALIZADORA PARA LIMITE DE SEGURIDAD DE OBRA ML 2500 2.77 6925.00 2500.00 6925.00 0.00 0 2500.00 6925.00 100.00% 0.00 0.00 0.00%
1.01.06 SEÑALES NOCTURNAS und 40 119.71 4788.40 40.00 4788.40 0.00 0 40.00 4788.40 100.00% 0.00 0.00 0.00%
1.02 TRABAJOS PRELIMINARES 0.00 0 0.00
1.02.01 LIMPIEZA DE TERRENO MANUAL ML 3256.65 1.18 3842.85 3256.65 3842.85 0.00 0 3256.65 3842.85 100.00% 0.00 0.00 0.00%
1.02.02 REPLANTEO DURANTE LA EJECUCION DE OBRA ML 3256.65 3.7 12049.61 3256.65 12049.61 0.00 0 3256.65 12049.61 100.00% 0.00 0.00 0.00%
1.03 OBRAS DE DEMOLICION Y PEPOSICION DE PAVIMENTOS 0.00 0 0.00
1.03.01 DEMOLICION DE BUZONES DE CONCRETO und 16 142.08 2273.28 16.00 2273.28 0.00 0 16.00 2273.28 100.00% 0.00 0.00 0.00%
1.03.02 EXTRACCION DE ADOQUINES DE CONCRETO m2 222.35 4.82 1071.73 189.00 910.98 33.35 160.75 222.35 1071.73 100.00% 0.00 0.00 0.00%
1.03.03 DEMOLICION DE PAVIMENTO DE CONCRETO m2 471.18 19.86 9357.63 471.18 9357.63 0.00 0 471.18 9357.63 100.00% 0.00 0.00 0.00%
VALORIZACION DE OBRA Nº 8 - TODAS LAS FORMULAS
PROPIET: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO MONTO PRESUPUESTADO: 5,106,399.54 CORRESPONDIENTE AL MES DE: JUNIO
OBRA: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO FECHA DE PRESENTACION: AL 30 DE JUNIO DEL 2017
AVANCES
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCIÓN
P.UNITARIO PRESUPUESTO VALORIZADO VALORIZADO VALORIZADO VALORIZADO
UND METRADO S/. S/. METRADO S/. METRADO S/. METRADO S/. % METRADO S/. %
1.03.04 REPOSICION DE ADOQUINES DE CONCRETO m2 222.35 15.05 3346.37 189.00 2844.45 33.35 501.92 222.35 3346.37 100.00% 0.00 0.00 0.00%
1.03.05 REPOSICION DE BASE GRANULAR m3 94.24 185.88 17517.33 80.16 14900.14 14.08 2617.19 94.24 17517.33 100.00% 0.00 0.00 0.00%
1.03.06 LOSA PAV: CONCRETO FC=210KG/CM2 m3 94.24 472.29 44508.61 0.00 0.00 0.00 0 0.00 0.00 0.00% 94.24 44508.61 100.00%
1.04 MOVIMIENTO DE TIERRAS 0.00 0 0.00
1.04.01 EXCAVACION DE ZANJA CON MAQUINARIA EN TERRENO CONGLOMERADO H=1.20M - 1.50M, A=0 ML 3256.65 11.29 36767.58 3256.65 36767.58 0.00 0 3256.65 36767.58 100.00% 0.00 0.00 0.00%
1.04.02 REFINE Y NIVELACION DE FONDOS PARA TUBERIAS ML 3256.65 1.81 5894.54 3256.65 5894.54 0.00 0 3256.65 5894.54 100.00% 0.00 0.00 0.00%
1.04.03 CAMA DE ARENA E=0.10M P/TUB. DE DESAGUE (MANUAL) ML 3256.65 13.83 45039.47 3256.65 45039.47 0.00 0 3256.65 45039.47 100.00% 0.00 0.00 0.00%
1.04.04 RECUBRIMIENTO DE TUBERIA CON MATERIAL DE PRESTAMO SELECCIONADO H=0.30M P/TUB DES ML 3256.65 17.17 55916.68 2768.00 47526.56 488.65 8390.12 3256.65 55916.68 100.00% 0.00 0.00 0.00%
1.04.05 RELLENO Y COMPACTACION DE ZANJA EN CAPA DE 0.20M CON MATERIAL PROPIO C/EQUIPO ML 3256.65 34.23 111475.13 2768.00 94748.64 488.65 16726.49 3256.65 111475.13 100.00% 0.00 0.00 0.00%
1.04.06 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=2KM m3 1424.78 11.85 16883.64 1211.00 14350.35 213.78 2533.29 1424.78 16883.64 100.00% 0.00 0.00 0.00%
1.05 SUMINISTRO E INSTALACION DE TUBERIAS 0.00 0 0.00
1.05.01 SUMINISTRO E INSTALACION DE TUBERIA PVC NTP ISO 4435 DN=315MM ML 61.48 97.93 6020.74 61.48 6020.74 0.00 0 61.48 6020.74 100.00% 0.00 0.00 0.00%
1.05.02 SUMINISTRO E INSTALACION DE TUBERIA PVC ISO 4435 25 DN 200 MM D8" ML 3207.72 33.32 106881.23 2726.40 90843.78 481.32 16037.45 3207.72 106881.23 100.00% 0.00 0.00 0.00%
1.06 PRUEBA HIDRÁULICA 0.00 0 0.00
1.06.01 PRUEBA DE GRADIENTE DE HIDRAULICO, TENCION TRACTIVA Y VELOCIDAD TUB. PVC 315MM ML 61.48 3.64 223.79 61.48 223.79 0.00 0 61.48 223.79 100.00% 0.00 0.00 0.00%
1.06.02 PRUEBA DE GRADIENTE DE HIDRAULICO, TENCION TRACTIVA Y VELOCIDAD TUB. PVC 200MM ML 3207.72 3.64 11676.10 2725.51 9920.86 482.21 1755.24 3207.72 11676.10 100.00% 0.00 0.00 0.00%
1.07 BUZONES DE INSPECCION 0.00 0 0.00
1.07.01 TRABAJOS PRELIMINARES 0.00 0 0.00
01.07.01.01 TRAZO Y REPLANTEO CON NIVEL m2 92 5.85 538.20 92.00 538.20 0.00 0 92.00 538.20 100.00% 0.00 0.00 0.00%
01.07.02 MOVIMIENTO DE TIERRAS 0.00 0 0.00
01.07.02.01 EXCAVACION PARA BUZONES CON MAQUINARIA EN TERRENO NORMAL H=1.20M-1.50M, D=1.80M und 92 45.15 4153.80 77.00 3476.55 15.00 677.25 92.00 4153.80 100.00% 0.00 0.00 0.00%
01.07.02.02 REFINE, NIVELACION Y COFORMACION DE FONDO DE BUZON D=1.80M und 92 4.01 368.92 77.00 308.77 15.00 60.15 92.00 368.92 100.00% 0.00 0.00 0.00%
01.07.02.03 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=2KM m3 244.26 11.85 2894.48 206.58 2447.97 37.68 446.51 244.26 2894.48 100.00% 0.00 0.00 0.00%
01.07.03 CONCRETO SIMPLE 0.00 0 0.00
01.07.03.01 CONCRETO f'c=100 kg/cm2 PARA SOLADO m2 162.84 29.45 4795.64 137.64 4053.50 25.20 742.14 162.84 4795.64 100.00% 0.00 0.00 0.00%
01.07.03.02 DADOS DE ANCLAJE 0.40X0.40X0.30M PARA TUBERIA F'c=140 KG/CM2 und 92 66.83 6148.36 77.00 5145.91 15.00 1002.45 92.00 6148.36 100.00% 0.00 0.00 0.00%
01.07.04 BUZONES 0.00 0 0.00
01.07.04.01 CONSTRUCCION DE BUZON D=1.20; H=1.20 - 1.50M und 92 1932.02 177745.84 77.00 148765.54 15.00 28980.3 92.00 177745.84 100.00% 0.00 0.00 0.00%
2 PASE AEREO PARA TUBERIAS DE 10" L=15m 0.00 0 0.00
2.01 OBRAS PRELIMINARES 0.00 0 0.00
2.01.01 TRAZO Y REPLANTEO m2 17.8 17.77 316.31 0.00 0.00 0 0.00 0.00 0.00% 17.80 316.31 100.00%
2.01.02 ELIMINACION DE MALEZA m2 17.8 3.93 69.95 0.00 0.00 0 0.00 0.00 0.00% 17.80 69.95 100.00%
2.02 MOVIMIENTO DE TIERRAS 0 0.00
2.02.01 EXCAVACION MANUAL EN TERRENO SEMIROCOSO m3 28.38 19.68 558.52 0.00 0.00 0 0.00 0.00 0.00% 28.38 558.52 100.00%
2.02.02 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=2KM m3 36.89 11.85 437.15 0.00 0.00 0 0.00 0.00 0.00% 36.89 437.15 100.00%
2.03 CONCRETO SIMPLE 0 0.00
2.03 CONCRETO PARA CAMARA DE ANCLAJE FC=175KG/CM2 und 21.16 491.72 10404.80 0.00 0.00 0 0.00 0.00 0.00% 21.16 10404.80 100.00%
2.03.01 CONCRETO f'c=100 kg/cm2 PARA SOLADO m2 7.22 29.45 212.63 0.00 0.00 0 0.00 0.00 0.00% 7.22 212.63 100.00%
2.04 CONCRETO ARMADO 0 0.00
2.04.01 CONCRETO EN ZAPATAS FC=175KG/CM2 m3 7.22 489.73 3535.85 0.00 0.00 0 0.00 0.00 0.00% 7.22 3535.85 100.00%
2.04.02 CONCRETO EN COLUMNAS f'c=210 kg/cm2 m3 3.3 484.21 1597.89 0.00 0.00 0 0.00 0.00 0.00% 3.30 1597.89 100.00%
2.04.03 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 13.74 61.3 842.26 0.00 0.00 0 0.00 0.00 0.00% 13.74 842.26 100.00%
VALORIZACION DE OBRA Nº 8 - TODAS LAS FORMULAS
PROPIET: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO MONTO PRESUPUESTADO: 5,106,399.54 CORRESPONDIENTE AL MES DE: JUNIO
OBRA: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO FECHA DE PRESENTACION: AL 30 DE JUNIO DEL 2017
AVANCES
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCIÓN
P.UNITARIO PRESUPUESTO VALORIZADO VALORIZADO VALORIZADO VALORIZADO
UND METRADO S/. S/. METRADO S/. METRADO S/. METRADO S/. % METRADO S/. %
2.04.04 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 488.04 6.06 2957.52 0.00 0.00 0 0.00 0.00 0.00% 488.04 2957.52 100.00%
2.05 REBOQUES Y ENLUCIDOS 0 0.00
2.05.01 TARRAJEO EN EXTERIORES MEZCLA DE 1:5 C-A, E=1.5CM m2 27.48 35.66 979.94 0.00 0.00 0 0.00 0.00 0.00% 27.48 979.94 100.00%
2.06 PINTURA 0 0.00
2.06.01 PINTURA EN METAL ANTICORROSIVA Y ESMALTE 2 MANOS m2 27.48 132.34 3636.70 0.00 0.00 0 0.00 0.00 0.00% 27.48 3636.70 100.00%
2.07 TUBERIAS CABLES Y ACCESORIOS 0 0.00
2.07.01 SUMINISTRO E INSTALACION DE SISTEMA DE SUSPENCION und 1 13299.33 13299.33 0.00 0.00 0 0.00 0.00 0.00% 1.00 13299.33 100.00%
2.07.02 SUMINISTRO E INSTALACION DE TUBERIA DE F"F" DN=315MM Y ACCESORIOS EN CRUCE AEREO und 1 26436.34 26436.34 0.00 0.00 0 0.00 0.00 0.00% 1.00 26436.34 100.00%
3 CONEXIONES DOMICILIARIAS 0.00
3.01 OBRAS PRELIMINARES 0.00
3.01.01 TRAZO Y REPLANTEO ML 1058.1 1.24 1312.04 899.32 1115.16 158.78 196.89 1058.10 1312.04 100.00% 0.00 0.00 0.00%
3.02 OBRAS DE DEMOLICION Y PEPOSICION DE PAVIMENTOS 0.00 0 0.00
3.02.01 EXTRACCION DE ADOQUINES DE CONCRETO m2 250.75 4.82 1208.62 250.75 1208.62 0.00 0 250.75 1208.62 100.00% 0.00 0.00 0.00%
3.02.02 DEMOLICION DE PAVIMENTO DE CONCRETO m2 463.25 19.86 9200.15 463.25 9200.15 0.00 0 463.25 9200.15 100.00% 0.00 0.00 0.00%
3.02.03 REPOSICION DE ADOQUINES DE CONCRETO m2 250.75 15.05 3773.79 213.00 3205.65 37.75 568.14 250.75 3773.79 100.00% 0.00 0.00 0.00%
3.02.04 REPOSICION DE BASE GRANULAR m3 92.65 185.88 17221.78 78.75 14638.51 13.90 2583.27 92.65 17221.78 100.00% 0.00 0.00 0.00%
3.02.05 LOSA PAV: CONCRETO FC=210KG/CM2 m3 92.65 472.29 43757.67 0.00 0.00 92.65 43757.67 92.65 43757.67 100.00% 0.00 0.00 0.00%
3.03 MOVIMIENTO DE TIERRAS 0.00 0 0.00
3.03.01 EXCAVACION DE ZANJA MANUAL P/TUB DE DESAGUE EN TERRENO CONGLOMERADO ML 1020.9 29.52 30136.97 867.83 25618.34 153.07 4518.63 1020.90 30136.97 100.00% 0.00 0.00 0.00%
12 REFINE Y NIVELACION FONDOS PARA TUB. DESAGUE ML 1020.9 1.97 2011.17 867.83 1709.63 153.07 301.55 1020.90 2011.17 100.00% 0.00 0.00 0.00%
3.03.03 CAMA DE ARENA E=0.10M P/TUB. DE DESAGUE (MANUAL) ML 1020.9 13.83 14119.05 867.83 12002.09 153.07 2116.96 1020.90 14119.05 100.00% 0.00 0.00 0.00%
3.03.04 RECUBRIMIENTO DE TUBERIA CON MATERIAL DE PRESTAMO SELECCIONADO H=0.30M P/TUB DES ML 1020.9 17.17 17528.85 867.83 14900.64 153.07 2628.21 1020.90 17528.85 100.00% 0.00 0.00 0.00%
3.03.05 RELLENO Y COMPACTACION DE ZANJA EN CAPA DE 0.20M CON MATERIAL PROPIO C/EQUIPO ML 1020.9 34.23 34945.41 867.83 29705.82 153.07 5239.59 1020.90 34945.41 100.00% 0.00 0.00 0.00%
3.03.06 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=2KM m3 63.81 11.85 756.15 54.21 642.39 9.60 113.76 63.81 756.15 100.00% 0.00 0.00 0.00%
3.04 CONEXIONES DOMICILIARIAS 0.00 0 0.00
3.04.01 SUMINISTRO E INSTALACION DE TUBERIA PVC NTP ISO 4435, D=110MM, S-20 ML 1020.9 24.19 24695.57 867.83 20992.81 153.07 3702.76 1020.90 24695.57 100.00% 0.00 0.00 0.00%
3.04.02 CONEXIONES DOMICILIARIAS DE DESAGUE und 298 201.28 59981.44 278.00 55955.84 20.00 4025.6 298.00 59981.44 100.00% 0.00 0.00 0.00%
3.05 PRUEBAS HIDRAULICAS 0.00 0 0.00
3.05.01 PRUEBA DE GRADIENTE DE TUBERIA PVC DESAGUE ML 1020.9 2.73 2787.06 867.83 2369.18 153.07 417.88 1020.90 2787.06 100.00% 0.00 0.00 0.00%
4 FLETE TERRESTRE 0.00 0 0.00
4.01 FLETE TERRESTRE (ALCANTARILLADO) 0.00 0 0.00
4.02 FLETE TERRESTRE SISTEMA DE DESAGUE GLB 1 84000 84000.00 1.00 84000.00 0.00 0 1.00 84000.00 100.00% 0.00 0.00 0.00%
01.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE DM=1KM m3 14.17 13.27 188.04 14.17 188.04 0.00 0 14.17 188.04 100.00% 0.00 0.00 0.00%
1.01.03 OBRAS DE CONCRETO SIMPLE 0.00 0 0.00
01.01.03.01 CONCRETO f'c=100 kg/cm2 PARA SOLADO m2 19.08 29.45 561.91 19.08 561.91 0.00 0 19.08 561.91 100.00% 0.00 0.00 0.00%
1.01.04 OBRAS DE CONCRETO ARMADO 0.00 0 0.00
01.01.04.01 LOSAS MACIZA DE FONDO 0.00 0 0.00
01.01.04.01.01 CONCRETO FC=210KM/CM2 EN LOSA FONDO m3 2.86 476.24 1362.05 2.86 1362.05 0.00 0 2.86 1362.05 100.00% 0.00 0.00 0.00%
01.01.04.01.02 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 142.74 6.06 865.00 142.74 865.00 0.00 0 142.74 865.00 100.00% 0.00 0.00 0.00%
01.01.04.01.03 ENCOFRADO Y DESENCOFRADO EN LOSA FONDO m2 1.9 45.61 86.66 1.90 86.66 0.00 0 1.90 86.66 100.00% 0.00 0.00 0.00%
01.01.04.02 MUROS 0.00 0 0.00
01.01.04.02.01 CONCRETO EN MUROS REFORZADOS FC=210KG/CM2 m3 4.45 492.81 2193.00 4.45 2193.00 0.00 0 4.45 2193.00 100.00% 0.00 0.00 0.00%
01.01.04.02.02 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 307.56 6.06 1863.81 307.56 1863.81 0.00 0 307.56 1863.81 100.00% 0.00 0.00 0.00%
01.01.04.02.03 ENCOFRADO Y DESENCOFRADO EN MUROS m2 53.82 52.83 2843.31 53.82 2843.31 0.00 0 53.82 2843.31 100.00% 0.00 0.00 0.00%
01.01.05 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0 0.00
01.01.05.01 TARRAJEO INTERIOR CON IMPERMEABILIZANTE MEZCLA E=1.5CM m2 46.23 49.53 2289.77 46.23 2289.77 0.00 0 46.23 2289.77 100.00% 0.00 0.00 0.00%
01.01.05.02 TARRAJEO EN EXTERIORES MEZCLA DE 1:5 C-A, E=1.5CM m2 13.57 35.66 483.91 13.57 483.91 0.00 0 13.57 483.91 100.00% 0.00 0.00 0.00%
01.01.05.03 PINTURA EXTERIOR AL LATEX m2 13.57 15.59 211.56 13.57 211.56 0.00 0 13.57 211.56 100.00% 0.00 0.00 0.00%
01.01.06 VARIOS 0.00 0 0.00
01.01.06.01 SUMINISTRO E INSTALACION DE ESTRUCTURAS METALICAS GLB 1 8420 8420.00 1.00 8420.00 0.00 0 1.00 8420.00 100.00% 0.00 0.00 0.00%
01.01.06.02 SUMINISTRO E INSTALACION DE WATER STOP DE PVC DE 6" E=4.2MM ML 3.6 46.28 166.61 3.60 166.61 0.00 0 3.60 166.61 100.00% 0.00 0.00 0.00%
1.02 DESARENADOR 0.00 0 0.00
01.02.01 TRABAJOS PRELIMINARES 0.00 0 0.00
01.02.01.01 TRAZO Y REPLANTEO INICIAL m2 9.56 2.52 24.09 9.56 24.09 0.00 0 9.56 24.09 100.00% 0.00 0.00 0.00%
01.02.01.02 LIMPIEZA DE TERRENO MAN. m2 9.56 3.93 37.57 9.56 37.57 0.00 0 9.56 37.57 100.00% 0.00 0.00 0.00%
01.02.02 MOVIMIENTO DE TIERRAS 0.00 0 0.00
01.02.02.01 EXCAVACION MANUAL EN TERRENO SEMIROCOSO m3 13.46 19.68 264.89 13.46 264.89 0.00 0 13.46 264.89 100.00% 0.00 0.00 0.00%
01.02.02.02 REFINE, NIVELACION Y COMPACTADO m2 9.56 6.02 57.55 9.56 57.55 0.00 0 9.56 57.55 100.00% 0.00 0.00 0.00%
01.02.02.03 RELLENO COMPACTADO CON EQUIPO Y MATERIAL PROPIO m3 1.91 24.13 46.09 1.91 46.09 0.00 0 1.91 46.09 100.00% 0.00 0.00 0.00%
01.02.02.04 ELIMINACION DE MATERIAL EXCEDENTE DM=1KM m3 14.44 13.27 191.62 14.44 191.62 0.00 0 14.44 191.62 100.00% 0.00 0.00 0.00%
01.02.03 OBRAS DE CONCRETO SIMPLE 0.00 0 0.00
01.02.03.01 CONCRETO f'c=100 kg/cm2 PARA SOLADO m2 9.56 29.45 281.54 9.56 281.54 0.00 0 9.56 281.54 100.00% 0.00 0.00 0.00%
01.02.04 OBRAS DE CONCRETO ARMADO 0.00 0 0.00
01.02.04.01 LOSAS MACIZA DE FONDO 0.00 0 0.00
01.02.04.01.01 CONCRETO FC=210KM/CM2 EN LOSA FONDO m3 1.43 476.24 681.02 1.43 681.02 0.00 0 1.43 681.02 100.00% 0.00 0.00 0.00%
01.02.04.01.02 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 166.33 6.06 1007.96 166.33 1007.96 0.00 0 166.33 1007.96 100.00% 0.00 0.00 0.00%
01.02.04.01.03 ENCOFRADO Y DESENCOFRADO EN LOSA FONDO m2 19.12 45.61 872.06 19.12 872.06 0.00 0 19.12 872.06 100.00% 0.00 0.00 0.00%
01.02.04.02 MUROS 0.00 0 0.00
01.02.04.02.01 CONCRETO EN MUROS REFORZADOS FC=210KG/CM2 m3 4.35 492.81 2143.72 4.35 2143.72 0.00 0 4.35 2143.72 100.00% 0.00 0.00 0.00%
01.02.04.02.02 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 531.22 6.06 3219.19 531.22 3219.19 0.00 0 531.22 3219.19 100.00% 0.00 0.00 0.00%
01.02.04.02.03 ENCOFRADO Y DESENCOFRADO EN MUROS m2 58.06 52.83 3067.31 58.06 3067.31 0.00 0 58.06 3067.31 100.00% 0.00 0.00 0.00%
01.02.05 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0 0.00
01.02.05.01 TARRAJEO INTERIOR CON IMPERMEABILIZANTE MEZCLA E=1.5CM m2 36.31 49.53 1798.43 36.31 1798.43 0.00 0 36.31 1798.43 100.00% 0.00 0.00 0.00%
01.02.05.02 TARRAJEO EN EXTERIORES MEZCLA DE 1:5 C-A, E=1.5CM m2 29.03 35.66 1035.21 29.03 1035.21 0.00 0 29.03 1035.21 100.00% 0.00 0.00 0.00%
VALORIZACION DE OBRA Nº 8 - TODAS LAS FORMULAS
PROPIET: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO MONTO PRESUPUESTADO: 5,106,399.54 CORRESPONDIENTE AL MES DE: JUNIO
OBRA: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO FECHA DE PRESENTACION: AL 30 DE JUNIO DEL 2017
AVANCES
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCIÓN
P.UNITARIO PRESUPUESTO VALORIZADO VALORIZADO VALORIZADO VALORIZADO
UND METRADO S/. S/. METRADO S/. METRADO S/. METRADO S/. % METRADO S/. %
01.02.05.03 PINTURA EXTERIOR AL LATEX m2 29.03 15.59 452.58 29.03 452.58 0.00 0 29.03 452.58 100.00% 0.00 0.00 0.00%
01.02.06 VARIOS 0.00 0 0.00
01.02.06.01 SUMINISTRO E INSTALACION DE COMPUERTA METALICA SEGUN DISEÑO und 4 733.53 2934.12 4.00 2934.12 0.00 0 4.00 2934.12 100.00% 0.00 0.00 0.00%
01.02.06.02 SUMINISTRO E INSTALACION DE WATER STOP DE PVC DE 6" E=4.2MM ML 3.76 46.28 174.01 3.76 174.01 0.00 0 3.76 174.01 100.00% 0.00 0.00 0.00%
01.02.06.03 SUMINISTRO E INSTALACION DE VERTEDERO SUTRO-REGULADOR DE CAUDAL und 2 434.53 869.06 2.00 869.06 0.00 0 2.00 869.06 100.00% 0.00 0.00 0.00%
1.03 MEDIDOR DE CAUDAL PARSHALL (INGRESO Y SALIDA PTAR) 0.00 0 0.00
01.03.01 TRABAJOS PRELIMINARES 0.00 0 0.00
01.03.01.01 TRAZO Y REPLANTEO INICIAL m2 6.15 2.52 15.50 6.15 15.50 0.00 0 6.15 15.50 100.00% 0.00 0.00 0.00%
01.03.01.02 LIMPIEZA DE TERRENO MAN. m2 6.15 3.93 24.17 6.15 24.17 0.00 0 6.15 24.17 100.00% 0.00 0.00 0.00%
01.03.02 MOVIMIENTO DE TIERRAS 0.00 0 0.00
01.03.02.01 EXCAVACION MANUAL EN TERRENO SEMIROCOSO m3 4.92 19.68 96.83 4.92 96.83 0.00 0 4.92 96.83 100.00% 0.00 0.00 0.00%
01.03.02.02 REFINE, NIVELACION Y COMPACTADO m2 6.15 6.02 37.02 6.15 37.02 0.00 0 6.15 37.02 100.00% 0.00 0.00 0.00%
01.03.02.03 RELLENO COMPACTADO CON EQUIPO Y MATERIAL PROPIO m3 0.97 24.13 23.41 0.97 23.41 0.00 0 0.97 23.41 100.00% 0.00 0.00 0.00%
01.03.02.04 ELIMINACION DE MATERIAL EXCEDENTE DM=1KM m3 9.86 13.27 130.84 9.86 130.84 0.00 0 9.86 130.84 100.00% 0.00 0.00 0.00%
01.03.03 OBRAS DE CONCRETO SIMPLE 0.00 0 0.00
01.03.03.01 CONCRETO f'c=100 kg/cm2 PARA SOLADO m2 6.15 29.45 181.12 6.15 181.12 0.00 0 6.15 181.12 100.00% 0.00 0.00 0.00%
01.03.04 OBRAS DE CONCRETO ARMADO 0.00 0 0.00
01.03.04.01 LOSAS MACIZA DE FONDO 0.00 0 0.00
01.03.04.01.01 CONCRETO FC=210KM/CM2 EN LOSA FONDO m3 0.92 476.24 438.14 0.92 438.14 0.00 0 0.92 438.14 100.00% 0.00 0.00 0.00%
01.03.04.01.02 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 43.24 6.06 262.03 43.24 262.03 0.00 0 43.24 262.03 100.00% 0.00 0.00 0.00%
01.03.04.01.03 ENCOFRADO Y DESENCOFRADO EN LOSA FONDO m2 3.04 45.61 138.65 3.04 138.65 0.00 0 3.04 138.65 100.00% 0.00 0.00 0.00%
01.03.04.02 MUROS 0.00 0 0.00
01.03.04.02.01 CONCRETO EN MUROS REFORZADOS FC=210KG/CM2 m3 3.08 492.81 1517.85 3.08 1517.85 0.00 0 3.08 1517.85 100.00% 0.00 0.00 0.00%
01.03.04.02.02 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 147 6.06 890.82 147.00 890.82 0.00 0 147.00 890.82 100.00% 0.00 0.00 0.00%
01.03.04.02.03 ENCOFRADO Y DESENCOFRADO EN MUROS m2 41.12 52.83 2172.37 41.12 2172.37 0.00 0 41.12 2172.37 100.00% 0.00 0.00 0.00%
01.03.05 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0 0.00
01.03.05.01 TARRAJEO INTERIOR CON IMPERMEABILIZANTE MEZCLA E=1.5CM m2 23.59 49.53 1168.41 23.59 1168.41 0.00 0 23.59 1168.41 100.00% 0.00 0.00 0.00%
01.03.05.02 TARRAJEO EN EXTERIORES MEZCLA DE 1:5 C-A, E=1.5CM m2 21.28 35.66 758.84 21.28 758.84 0.00 0 21.28 758.84 100.00% 0.00 0.00 0.00%
01.03.05.03 PINTURA EXTERIOR AL LATEX m2 21.28 15.59 331.76 21.28 331.76 0.00 0 21.28 331.76 100.00% 0.00 0.00 0.00%
01.03.06 VARIOS 0.00 0 0.00
01.03.06.01 SUMINISTRO E INSTALACION DE TUBERIA PVC NTP ISO 4435 DN=315MM ML 2 97.93 195.86 2.00 195.86 0.00 0 2.00 195.86 100.00% 0.00 0.00 0.00%
01.03.06.02 SUMINISTRO E INSTALACION DE PARSHALL PRE-FABRICADO und 2 839.92 1679.84 2.00 1679.84 0.00 0 2.00 1679.84 100.00% 0.00 0.00 0.00%
01.03.06.03 SUMINISTRO E INSTALACION DE ACCESORIOS COMPLEMENTARIOS P/PARSHALL und 2 483.1 966.20 2.00 966.20 0.00 0 2.00 966.20 100.00% 0.00 0.00 0.00%
1.04 TANQUE IMHOFF 0.00 0 0.00
01.04.01 TRABAJOS PRELIMINARES 0.00 0 0.00
01.04.01.01 LIMPIEZA DE TERRENO MAN. m2 159.52 3.93 626.91 159.52 626.91 0.00 0 159.52 626.91 100.00% 0.00 0.00 0.00%
01.04.01.02 TRAZO Y REPLANTEO INICIAL m2 159.52 2.52 401.99 159.52 401.99 0.00 0 159.52 401.99 100.00% 0.00 0.00 0.00%
01.04.01.03 TRAZO Y REPLANTEO CON NIVEL m2 159.52 5.85 933.19 159.52 933.19 0.00 0 159.52 933.19 100.00% 0.00 0.00 0.00%
01.04.02 MOVIMIENTO DE TIERRAS 0.00 0 0.00
01.04.02.01 EXCAVACION CON EQUIPO EN TERRENO SEMIROCOSO m3 554.93 36.93 20493.56 554.93 20493.56 0.00 0 554.93 20493.56 100.00% 0.00 0.00 0.00%
01.04.02.02 REFINE Y NIVELACION EN TERRENO CONGLOMERADO m2 171.54 12.03 2063.63 171.54 2063.63 0.00 0 171.54 2063.63 100.00% 0.00 0.00 0.00%
01.04.02.03 RELLENO COMPACTADO CON EQUIPO Y MATERIAL PROPIO m3 25.4 24.13 612.90 25.40 612.90 0.00 0 25.40 612.90 100.00% 0.00 0.00 0.00%
VALORIZACION DE OBRA Nº 8 - TODAS LAS FORMULAS
PROPIET: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO MONTO PRESUPUESTADO: 5,106,399.54 CORRESPONDIENTE AL MES DE: JUNIO
OBRA: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO FECHA DE PRESENTACION: AL 30 DE JUNIO DEL 2017
AVANCES
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCIÓN
P.UNITARIO PRESUPUESTO VALORIZADO VALORIZADO VALORIZADO VALORIZADO
UND METRADO S/. S/. METRADO S/. METRADO S/. METRADO S/. % METRADO S/. %
01.04.02.04 ELIMINACION DE MATERIAL EXCEDENTE DM=1KM m3 635.44 13.27 8432.29 635.44 8432.29 0.00 0 635.44 8432.29 100.00% 0.00 0.00 0.00%
01.04.03 OBRAS DE CONCRETO SIMPLE 0.00 0 0.00
01.04.03.01 CONCRETO f'c=100 kg/cm2 PARA SOLADO m2 228.96 29.45 6742.87 228.96 6742.87 0.00 0 228.96 6742.87 100.00% 0.00 0.00 0.00%
01.04.03.02 CONCRETO f'c=175 kg/cm2 m3 0.1 509.05 50.91 0.10 50.91 0.00 0 0.10 50.91 100.00% 0.00 0.00 0.00%
01.04.04 OBRAS DE CONCRETO ARMADO 0.00 0 0.00
01.04.04.01 ZAPATAS 0.00 0 0.00
01.04.04.01.01 CONCRETO f'c= 210 kg/cm2 EN ZAPATAS m3 53.4 439.24 23455.42 53.40 23455.42 0.00 0 53.40 23455.42 100.00% 0.00 0.00 0.00%
01.04.04.01.02 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 1503.33 6.06 9110.18 1503.33 9110.18 0.00 0 1503.33 9110.18 100.00% 0.00 0.00 0.00%
01.04.04.02 LOSAS MACIZA DE FONDO 0.00 0 0.00
01.04.04.02.01 CONCRETO FC=210KM/CM2 EN LOSA FONDO m3 36.77 476.24 17511.34 36.77 17511.34 0.00 0 36.77 17511.34 100.00% 0.00 0.00 0.00%
01.04.04.02.02 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 3705.04 6.06 22452.54 3705.04 22452.54 0.00 0 3705.04 22452.54 100.00% 0.00 0.00 0.00%
01.04.04.02.03 ENCOFRADO Y DESENCOFRADO EN LOSA FONDO m2 19.79 45.61 902.62 19.79 902.62 0.00 0 19.79 902.62 100.00% 0.00 0.00 0.00%
01.04.04.03 MUROS 0.00 0 0.00
01.04.04.03.01 CONCRETO EN MUROS REFORZADOS FC=210KG/CM2 m3 52.28 492.81 25764.11 52.28 25764.11 0.00 0 52.28 25764.11 100.00% 0.00 0.00 0.00%
01.04.04.03.02 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 7465.54 6.06 45241.17 7465.54 45241.17 0.00 0 7465.54 45241.17 100.00% 0.00 0.00 0.00%
01.04.04.03.03 ENCOFRADO Y DESENCOFRADO EN MUROS m2 697.13 52.83 36829.38 697.13 36829.38 0.00 0 697.13 36829.38 100.00% 0.00 0.00 0.00%
01.04.04.04 SEDIMENTADOR 0.00 0 0.00
01.04.04.04.01 CONCRETO f'c=210 kg/cm2 m3 20.62 503.85 10389.39 20.62 10389.39 0.00 0 20.62 10389.39 100.00% 0.00 0.00 0.00%
01.04.04.04.02 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 1549.73 6.06 9391.36 1549.73 9391.36 0.00 0 1549.73 9391.36 100.00% 0.00 0.00 0.00%
01.04.04.04.03 ENCOFR. Y DESENCOFRADO m2 280.25 48.1 13480.03 280.25 13480.03 0.00 0 280.25 13480.03 100.00% 0.00 0.00 0.00%
01.04.05 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0 0.00
01.04.05.01 TARRAJEO INTERIOR CON IMPERMEABILIZANTE MEZCLA E=1.5CM m2 737.07 49.53 36507.08 737.07 36507.08 0.00 0 737.07 36507.08 100.00% 0.00 0.00 0.00%
01.04.05.02 TARRAJEO EN EXTERIORES MEZCLA DE 1:5 C-A, E=1.5CM m2 360 35.66 12837.60 360.00 12837.60 0.00 0 360.00 12837.60 100.00% 0.00 0.00 0.00%
01.04.05.03 PINTURA EXTERIOR AL LATEX m2 360 15.59 5612.40 360.00 5612.40 0.00 0 360.00 5612.40 100.00% 0.00 0.00 0.00%
01.04.06 VARIOS 0.00 0 0.00
01.04.06.01 PANTALLAS DE ACERO INOXIDABLE PARA ENTRADA Y SALIDA DEL TANQUE IMHOFF und 4 899.33 3597.32 4.00 3597.32 0.00 0 4.00 3597.32 100.00% 0.00 0.00 0.00%
01.04.06.02 INSTALACION HIDRAULICA EN TANQUE IMHOFF und 4 2795.3 11181.20 4.00 11181.20 0.00 0 4.00 11181.20 100.00% 0.00 0.00 0.00%
01.04.06.03 SUMINISTRO E INSTALACION DE TUBERIA PVC ISO 4435 25 DN 250 MM D10" ML 33.28 61.96 2062.03 33.28 2062.03 0.00 0 33.28 2062.03 100.00% 0.00 0.00 0.00%
01.04.06.04 TAPA METALICA DE INSPECCION DE 0.70m X 0.70m und 4 214.37 857.48 4.00 857.48 0.00 0 4.00 857.48 100.00% 0.00 0.00 0.00%
01.04.06.05 SUMINISTRO E INSTALACION DE WATER STOP DE PVC DE 6" E=4.2MM ML 103.8 46.28 4803.86 103.80 4803.86 0.00 0 103.80 4803.86 100.00% 0.00 0.00 0.00%
1.05 FILTRO PERCOLADOR 0.00 0 0.00
01.05.01 TRABAJOS PRELIMINARES 0.00 0 0.00
01.05.01.01 TRAZO Y REPLANTEO INICIAL m2 112.2 2.52 282.74 112.20 282.74 0.00 0 112.20 282.74 100.00% 0.00 0.00 0.00%
01.05.01.02 LIMPIEZA DE TERRENO MAN. m2 112.2 3.93 440.95 112.20 440.95 0.00 0 112.20 440.95 100.00% 0.00 0.00 0.00%
01.05.01.03 TRAZO Y REPLANTEO CON NIVEL m2 112.2 5.85 656.37 112.20 656.37 0.00 0 112.20 656.37 100.00% 0.00 0.00 0.00%
01.05.02 MOVIMIENTO DE TIERRAS 0.00 0 0.00
01.05.02.01 EXCAVACION CON EQUIPO EN TERRENO SEMIROCOSO m3 149.29 36.93 5513.28 149.29 5513.28 0.00 0 149.29 5513.28 100.00% 0.00 0.00 0.00%
01.05.02.02 REFINE, NIVELACION Y COMPACTADO m2 112.2 6.02 675.44 112.20 675.44 0.00 0 112.20 675.44 100.00% 0.00 0.00 0.00%
01.05.02.03 RELLENO COMPACTADO CON EQUIPO Y MATERIAL PROPIO m3 15.84 24.13 382.22 15.84 382.22 0.00 0 15.84 382.22 100.00% 0.00 0.00 0.00%
01.05.02.04 ELIMINACION DE MATERIAL EXCEDENTE DM=1KM m3 160.14 13.27 2125.06 160.14 2125.06 0.00 0 160.14 2125.06 100.00% 0.00 0.00 0.00%
01.05.03 OBRAS DE CONCRETO SIMPLE 0.00 0 0.00
01.05.03.01 CONCRETO f'c=100 kg/cm2 PARA SOLADO m2 87.49 29.45 2576.58 87.49 2576.58 0.00 0 87.49 2576.58 100.00% 0.00 0.00 0.00%
VALORIZACION DE OBRA Nº 8 - TODAS LAS FORMULAS
PROPIET: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO MONTO PRESUPUESTADO: 5,106,399.54 CORRESPONDIENTE AL MES DE: JUNIO
OBRA: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO FECHA DE PRESENTACION: AL 30 DE JUNIO DEL 2017
AVANCES
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCIÓN
P.UNITARIO PRESUPUESTO VALORIZADO VALORIZADO VALORIZADO VALORIZADO
UND METRADO S/. S/. METRADO S/. METRADO S/. METRADO S/. % METRADO S/. %
01.07.04.01.02 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 19.08 6.06 115.62 0.00 0.00 19.08 115.62 19.08 115.62 100.00% 0.00 0.00 0.00%
01.07.04.01.03 ENCOFR. Y DESENCOFRADO m2 27.2 48.1 1308.32 0.00 0.00 27.20 1308.32 27.20 1308.32 100.00% 0.00 0.00 0.00%
01.07.04.02 COLUMNAS 0.00 0 0.00
01.07.04.02.01 CONCRETO f'c=210 kg/cm2 PARA COLUMNAS m3 0.77 549.46 423.08 0.00 0.00 0.77 423.08 0.77 423.08 100.00% 0.00 0.00 0.00%
01.07.04.02.02 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 483.84 6.06 2932.07 0.00 0.00 483.84 2932.07 483.84 2932.07 100.00% 0.00 0.00 0.00%
01.07.04.02.03 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 15.84 64.04 1014.39 0.00 0.00 15.84 1014.39 15.84 1014.39 100.00% 0.00 0.00 0.00%
01.07.04.03 VIGAS DE CIMENTACION 0.00 0 0.00
01.07.04.03.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS m3 1.11 502.87 558.19 0.00 0.00 1.11 558.19 1.11 558.19 100.00% 0.00 0.00 0.00%
01.07.04.03.02 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 179.51 6.06 1087.83 0.00 0.00 179.51 1087.83 179.51 1087.83 100.00% 0.00 0.00 0.00%
01.07.04.03.03 ENCOFRADO Y DESENCOFRADO PARA VIGAS m2 28.59 64.53 1844.91 0.00 0.00 28.59 1844.91 28.59 1844.91 100.00% 0.00 0.00 0.00%
01.07.04.04 LOSAS ALIGERADAS 0.00 0 0.00
01.07.04.04.01 CONCRETO f'c=210 kg/cm2 PARA LOSAS ALIGERADAS m3 3.73 608.07 2268.10 0.00 0.00 3.73 2268.1 3.73 2268.10 100.00% 0.00 0.00 0.00%
01.07.04.04.02 ENCOFRADO Y DESENCOFRADO PARA LOSAS ALIGERADAS m2 56.31 48.54 2733.29 0.00 0.00 56.31 2733.29 56.31 2733.29 100.00% 0.00 0.00 0.00%
01.07.04.04.03 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 244.08 6.06 1479.12 0.00 0.00 244.08 1479.12 244.08 1479.12 100.00% 0.00 0.00 0.00%
01.07.04.04.04 LADRILLO HUECO DE ARCILLA 15X30X30CM PARA TECHO ALIGERADO und 399 2.01 801.99 0.00 0.00 399.00 801.99 399.00 801.99 100.00% 0.00 0.00 0.00%
01.07.05 ALBAÑILERIA 0.00 0 0.00
01.07.05.01 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA m2 50.34 82.62 4159.09 0.00 0.00 50.34 4159.09 50.34 4159.09 100.00% 0.00 0.00 0.00%
01.07.06 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0 0.00
01.07.06.01 TARRAJEO INTERIOR CON IMPERMEABILIZANTE MEZCLA E=1.5CM m2 141.51 49.53 7008.99 0.00 0.00 0 0.00 0.00 0.00% 141.51 7008.99 100.00%
01.07.06.02 TARRAJEO EN EXTERIORES MEZCLA DE 1:5 C-A, E=1.5CM m2 71.3 35.66 2542.56 0.00 0.00 0 0.00 0.00 0.00% 71.30 2542.56 100.00%
01.07.06.03 PINTURA EXTERIOR AL LATEX m2 71.3 15.59 1111.57 0.00 0.00 0 0.00 0.00 0.00% 71.30 1111.57 100.00%
01.07.07 CARPINTERIA DE MADERA 0 0.00
01.07.07.01 PUERTA TABLERO REBAJADO, INCLUYE MARCO CEDRO 2" X 3" m2 3.9 222.76 868.76 0.00 0.00 0 0.00 0.00 0.00% 3.90 868.76 100.00%
01.07.08 CARPINTERIA METALICA 0 0.00
01.07.08.01 VENTANA DE FIERRO CON PERFIL DE 1" X 1/8" + HOJA BASTIDOR "L" 3/4" m2 10.78 339.03 3654.74 0.00 0.00 0 0.00 0.00 0.00% 10.78 3654.74 100.00%
01.07.08.02 VIDRIO SEMIDOBLE PROVISION Y COLOCACION EN VENTANAS FIERRO m2 5.81 7.08 41.13 0.00 0.00 0 0.00 0.00 0.00% 5.81 41.13 100.00%
01.07.09 INSTALACIONES ELECTRICAS 0 0.00
01.07.09.01 SALIDA PARA CENTROS DE LUZ pto 4 103.78 415.12 0.00 0.00 0 0.00 0.00 0.00% 4.00 415.12 100.00%
01.07.09.02 SALIDA PARA INTERRUPTOR DE CONMUTACION pto 4 102.28 409.12 0.00 0.00 0 0.00 0.00 0.00% 4.00 409.12 100.00%
01.07.09.03 SALIDA PARA INTERRUPTOR CABLE N" 16+TUB.3/4 pto 4 106.98 427.92 0.00 0.00 0 0.00 0.00 0.00% 4.00 427.92 100.00%
01.07.09.04 SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES CON PVC pto 6 112.47 674.82 0.00 0.00 0 0.00 0.00 0.00% 6.00 674.82 100.00%
01.07.09.05 CABLE ELECTRICO NYY 2 X 2.5 mm2 ML 26.77 1.89 50.60 0.00 0.00 0 0.00 0.00 0.00% 26.77 50.60 100.00%
01.07.09.06 TUBERIA PVC SAP C-7.5 D=3/4" ML 27 9.83 265.41 0.00 0.00 0 0.00 0.00 0.00% 27.00 265.41 100.00%
01.07.09.07 FLUORESCENTE CIRCULAR DE 1x40WATTSINCL. EQUIPO COMPLETO und 6 85.57 513.42 0.00 0.00 0 0.00 0.00 0.00% 6.00 513.42 100.00%
TABLERO ELECTRICO GABINETE METALICO PARA DISTRIBUCION DE 3
01.07.09.08 CIRCUITOS und 1 236.6 236.60 0.00 0.00 0 0.00 0.00 0.00% 1.00 236.60 100.00%
01.07.09.09 PRUEBA ELECTRICA GLB 1 120 120.00 0.00 0.00 0 0.00 0.00 0.00% 1.00 120.00 100.00%
01.07.10 INSTALACIONES HIDRAULICAS 0 0.00
01.07.10.01 SUMINISTRO E INSTALACION DE ACCESORIOS HIDRAULICOS GLB 1 1092.96 1092.96 0.00 0.00 0 0.00 0.00 0.00% 1.00 1092.96 100.00%
01.07.10.02 SUMINISTRO EQUIPAMIENTO E INSTALACION DEL SISTENA DE CLORACIONDE EMERGENCIA (HIPOC GLB 1 5988.16 5988.16 0.00 0.00 0 0.00 0.00 0.00% 1.00 5988.16 100.00%
01.07.10.03 SUMINISTRO EQUIPAMIENTO E INSTALACION DEL SISTEMA DE CLORACION CON CLORO LIQUIDO GLB 1 4604.96 4604.96 0.00 0.00 0 0.00 0.00 0.00% 1.00 4604.96 100.00%
1.08 CAMARA DE CONTACTO 0.00 0 0.00
01.08.01 TRABAJOS PRELIMINARES 0.00 0 0.00
VALORIZACION DE OBRA Nº 8 - TODAS LAS FORMULAS
PROPIET: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO MONTO PRESUPUESTADO: 5,106,399.54 CORRESPONDIENTE AL MES DE: JUNIO
OBRA: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO FECHA DE PRESENTACION: AL 30 DE JUNIO DEL 2017
AVANCES
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCIÓN
P.UNITARIO PRESUPUESTO VALORIZADO VALORIZADO VALORIZADO VALORIZADO
UND METRADO S/. S/. METRADO S/. METRADO S/. METRADO S/. % METRADO S/. %
01.08.01.01 TRAZO Y REPLANTEO INICIAL m2 42.12 2.52 106.14 42.12 106.14 0.00 0 42.12 106.14 100.00% 0.00 0.00 0.00%
01.08.01.02 LIMPIEZA DE TERRENO MAN. m2 42.12 3.93 165.53 42.12 165.53 0.00 0 42.12 165.53 100.00% 0.00 0.00 0.00%
01.08.01.03 TRAZO Y REPLANTEO CON NIVEL m2 42.12 5.85 246.40 42.12 246.40 0.00 0 42.12 246.40 100.00% 0.00 0.00 0.00%
01.08.02 MOVIMIENTO DE TIERRAS 0.00 0 0.00
01.08.02.01 EXCAVACION CON EQUIPO EN TERRENO SEMIROCOSO m3 50.54 36.93 1866.44 50.54 1866.44 0.00 0 50.54 1866.44 100.00% 0.00 0.00 0.00%
01.08.02.02 REFINE, NIVELACION Y COMPACTADO m2 42.12 6.02 253.56 42.12 253.56 0.00 0 42.12 253.56 100.00% 0.00 0.00 0.00%
01.08.02.03 RELLENO COMPACTADO CON EQUIPO Y MATERIAL PROPIO m3 12.8 24.13 308.86 12.80 308.86 0.00 0 12.80 308.86 100.00% 0.00 0.00 0.00%
01.08.02.04 ELIMINACION DE MATERIAL EXCEDENTE DM=1KM m3 47.18 13.27 626.08 47.18 626.08 0.00 0 47.18 626.08 100.00% 0.00 0.00 0.00%
01.08.03 OBRAS DE CONCRETO SIMPLE 0.00 0 0.00
01.08.03.01 CONCRETO f'c=100 kg/cm2 PARA SOLADO m2 42.12 29.45 1240.43 42.12 1240.43 0.00 0 42.12 1240.43 100.00% 0.00 0.00 0.00%
01.08.04 OBRAS DE CONCRETO ARMADO 0.00 0 0.00
01.08.04.01 LOSAS MACIZA DE FONDO 0.00 0 0.00
01.08.04.01.01 CONCRETO FC=210KM/CM2 EN LOSA FONDO m3 8.42 476.24 4009.94 8.42 4009.94 0.00 0 8.42 4009.94 100.00% 0.00 0.00 0.00%
01.08.04.01.02 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 413.85 6.06 2507.93 413.85 2507.93 0.00 0 413.85 2507.93 100.00% 0.00 0.00 0.00%
01.08.04.01.03 ENCOFRADO Y DESENCOFRADO EN LOSA FONDO m2 5.28 45.61 240.82 5.28 240.82 0.00 0 5.28 240.82 100.00% 0.00 0.00 0.00%
01.08.04.02 MUROS 0.00 0 0.00
01.08.04.02.01 CONCRETO EN MUROS REFORZADOS FC=210KG/CM2 m3 17.34 492.81 8545.33 17.34 8545.33 0 0 17.34 8545.33 100.00% 0.00 0.00 0.00%
01.08.04.02.02 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 425.21 6.06 2576.77 425.21 2576.77 0 0 425.21 2576.77 100.00% 0.00 0.00 0.00%
01.08.04.02.03 ENCOFRADO Y DESENCOFRADO EN MUROS m2 176.42 52.83 9320.27 176.42 9320.27 0 0 176.42 9320.27 100.00% 0.00 0.00 0.00%
01.08.04.03 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0 0.00
01.08.04.03.01 TARRAJEO CON IMPERMEABILIZANTE MEZCLA E=1.5CM m2 175.18 34.72 6082.25 175.18 6082.25 0.00 0 175.18 6082.25 100.00% 0.00 0.00 0.00%
01.08.04.03.02 TARRAJEO EN EXTERIORES MEZCLA DE C-A 1:5 m2 25.62 26.17 670.48 25.62 670.48 0.00 0 25.62 670.48 100.00% 0.00 0.00 0.00%
01.08.04.03.03 PINTURA EXTERIOR AL LATEX m2 25.62 15.59 399.42 25.62 399.42 0.00 0 25.62 399.42 100.00% 0.00 0.00 0.00%
01.08.04.04 VARIOS 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.08.04.04.01 SUMINISTRO E INSTALACION DE TUBERIA PVC NTP ISO 4435 DN=315MM ML 2.8 97.93 274.20 2.80 274.20 0.00 0 2.80 274.20 100.00% 0.00 0.00 0.00%
1.09 LECHO DE SECADO DE LODOS 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.09.01 TRABAJOS PRELIMINARES 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.09.01.01 TRAZO Y REPLANTEO INICIAL m2 157.04 2.52 395.74 157.04 395.74 0.00 0 157.04 395.74 100.00% 0.00 0.00 0.00%
01.09.01.02 LIMPIEZA DE TERRENO MAN. m2 157.04 3.93 617.17 157.04 617.17 0.00 0 157.04 617.17 100.00% 0.00 0.00 0.00%
01.09.01.03 TRAZO Y REPLANTEO CON NIVEL m2 157.04 5.85 918.68 157.04 918.68 0.00 0 157.04 918.68 100.00% 0.00 0.00 0.00%
01.09.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.09.02.01 EXCAVACION CON EQUIPO EN TERRENO SEMIROCOSO m3 259.12 36.93 9569.30 259.12 9569.30 0.00 0 259.12 9569.30 100.00% 0.00 0.00 0.00%
01.09.02.02 REFINE, NIVELACION Y COMPACTADO m2 157.04 6.02 945.38 157.04 945.38 0.00 0 157.04 945.38 100.00% 0.00 0.00 0.00%
01.09.02.03 RELLENO COMPACTADO CON EQUIPO Y MATERIAL PROPIO m3 38.78 24.13 935.76 38.78 935.76 0.00 0 38.78 935.76 100.00% 0.00 0.00 0.00%
01.09.02.04 ELIMINACION DE MATERIAL EXCEDENTE DM=1KM m3 275.42 13.27 3654.82 275.42 3654.82 0.00 0 275.42 3654.82 100.00% 0.00 0.00 0.00%
01.09.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.09.03.01 CONCRETO f'c=100 kg/cm2 PARA SOLADO m2 131.4 29.45 3869.73 131.40 3869.73 0.00 0 131.40 3869.73 100.00% 0.00 0.00 0.00%
01.09.04.01 OBRAS DE CONCRETO ARMADO 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.09.04 ZAPATAS 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.09.04.01.01 CONCRETO f'c= 210 kg/cm2 EN ZAPATAS m3 2.56 439.24 1124.45 2.56 1124.45 0.00 0 2.56 1124.45 100.00% 0.00 0.00 0.00%
01.09.04.01.02 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 88.96 6.06 539.10 88.96 539.10 0.00 0 88.96 539.10 100.00% 0.00 0.00 0.00%
01.09.04.01.03 ENCOFR. Y DESENCOFRADO m2 12.8 48.1 615.68 12.80 615.68 0.00 0 12.80 615.68 100.00% 0.00 0.00 0.00%
VALORIZACION DE OBRA Nº 8 - TODAS LAS FORMULAS
PROPIET: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO MONTO PRESUPUESTADO: 5,106,399.54 CORRESPONDIENTE AL MES DE: JUNIO
OBRA: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO FECHA DE PRESENTACION: AL 30 DE JUNIO DEL 2017
AVANCES
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCIÓN
P.UNITARIO PRESUPUESTO VALORIZADO VALORIZADO VALORIZADO VALORIZADO
UND METRADO S/. S/. METRADO S/. METRADO S/. METRADO S/. % METRADO S/. %
01.09.04.02 COLUMNAS 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.09.04.02.01 CONCRETO f'c=210 kg/cm2 PARA COLUMNAS m3 1.36 549.46 747.27 1.36 747.27 0.00 0 1.36 747.27 100.00% 0.00 0.00 0.00%
01.09.04.02.02 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 232.23 6.06 1407.31 232.23 1407.31 0.00 0 232.23 1407.31 100.00% 0.00 0.00 0.00%
01.09.04.02.03 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 27.2 64.04 1741.89 27.20 1741.89 0.00 0 27.20 1741.89 100.00% 0.00 0.00 0.00%
01.09.04.03 LOSAS MACIZA DE FONDO 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.09.04.03.01 CONCRETO FC=210KM/CM2 EN LOSA FONDO m3 24.92 476.24 11867.90 24.92 11867.90 0.00 0 24.92 11867.90 100.00% 0.00 0.00 0.00%
01.09.04.03.02 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 1416.77 6.06 8585.63 1416.77 8585.63 0.00 0 1416.77 8585.63 100.00% 0.00 0.00 0.00%
01.09.04.03.03 ENCOFRADO Y DESENCOFRADO EN LOSA FONDO m2 9 45.61 410.49 9.00 410.49 0.00 0 9.00 410.49 100.00% 0.00 0.00 0.00%
01.09.04.04 MUROS 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.09.04.04.01 CONCRETO EN MUROS REFORZADOS FC=210KG/CM2 m3 18 492.81 8870.58 18.00 8870.58 0.00 0 18.00 8870.58 100.00% 0.00 0.00 0.00%
01.09.04.04.02 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 2403.53 6.06 14565.39 2403.53 14565.39 0.00 0 2403.53 14565.39 100.00% 0.00 0.00 0.00%
01.09.04.04.03 ENCOFRADO Y DESENCOFRADO EN MUROS m2 180 52.83 9509.40 180.00 9509.40 0.00 0 180.00 9509.40 100.00% 0.00 0.00 0.00%
01.09.04.05 VIGAS 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.09.04.05.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS m3 0.12 502.87 60.34 0.12 60.34 0 0 0.12 60.34 100.00% 0.00 0.00 0.00%
01.09.04.05.02 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 87.72 6.06 531.58 87.72 531.58 0 0 87.72 531.58 100.00% 0.00 0.00 0.00%
01.09.04.05.03 ENCOFRADO Y DESENCOFRADO PARA VIGAS m2 1.82 64.53 117.44 1.82 117.44 0 0 1.82 117.44 100.00% 0.00 0.00 0.00%
01.09.04.06 LOSA SALPICADURA 0.00 0.00 0.00 0 0 0.00 0.00 0.00 0.00
01.09.04.06.01 CONCRETO f'c=210 kg/cm2 m3 0.26 503.85 131.00 0.26 131.00 0 0 0.26 131.00 100.00% 0.00 0.00 0.00%
01.09.04.06.02 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 35.48 6.06 215.01 35.48 215.01 0 0 35.48 215.01 100.00% 0.00 0.00 0.00%
01.09.04.06.03 ENCOFR. Y DESENCOFRADO m2 1.28 48.1 61.57 1.28 61.57 0 0 1.28 61.57 100.00% 0.00 0.00 0.00%
01.09.05 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00 0.00 0 0 0.00 0.00 0.00 0.00
01.09.05.01 TARRAJEO INTERIOR CON IMPERMEABILIZANTE MEZCLA E=1.5CM m2 211 49.53 10450.83 211.00 10450.83 0 0 211.00 10450.83 100.00% 0.00 0.00 0.00%
01.09.05.02 TARRAJEO EN EXTERIORES MEZCLA DE 1:5 C-A, E=1.5CM m2 99.6 35.66 3551.74 99.60 3551.74 0 0 99.60 3551.74 100.00% 0.00 0.00 0.00%
01.09.05.03 PINTURA EXTERIOR AL LATEX m2 99.6 15.59 1552.76 99.60 1552.76 0.00 0 99.60 1552.76 100.00% 0.00 0.00 0.00%
01.09.06 CUBIERTAS LECHO DE SECADO 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.09.06.01 COBERTURA DE TECHO DE CALAMINA DE PVC TRANSPARENTE m2 147.42 44.89 6617.68 147.42 6617.68 0.00 0 147.42 6617.68 100.00% 0.00 0.00 0.00%
01.09.06.02 MADERA DE COBERTURA DE TECHO p2 3651.63 4.31 15738.53 3651.63 15738.53 0.00 0 3651.63 15738.53 100.00% 0.00 0.00 0.00%
01.09.06.03 PLANCHA METALICA E=3/8" m2 4.29 48 205.92 4.29 205.92 0.00 0 4.29 205.92 100.00% 0.00 0.00 0.00%
01.09.06.04 PERNO DE 4" X1/2" und 110 1.73 190.30 110.00 190.30 0.00 0 110.00 190.30 100.00% 0.00 0.00 0.00%
01.09.07 MAMPOSTERIA Y GRAVAS 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.09.07.01 SUMINISTRO Y COLOCACION DE GRAVA 1.6-51MM m3 30.25 293.53 8879.28 30.25 8879.28 0.00 0 30.25 8879.28 100.00% 0.00 0.00 0.00%
01.09.07.02 SUMINISTRO Y COLOCACION DE ARENA 0.3-1.3MM m3 24.2 283.53 6861.43 24.20 6861.43 0.00 0 24.20 6861.43 100.00% 0.00 0.00 0.00%
01.09.07.03 LADRILLO PARA LECHO DE SECADO m2 24.2 35.29 854.02 24.20 854.02 0.00 0 24.20 854.02 100.00% 0.00 0.00 0.00%
01.09.08 INSTALACIONES HIDRAULICAS 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.09.08.01 SUMINISTRO E INSTALACION DE TUBERIA PVC ISO 4435 25 DN 250 MM D10" ML 33.9 61.96 2100.44 33.90 2100.44 0.00 0 33.90 2100.44 100.00% 0.00 0.00 0.00%
01.09.08.02 SUMINISTRO E INSTALACION DEL SISTEMA DE DISTRIBUCION DE LODOS GLB 1 2131.3 2131.30 1.00 2131.30 0.00 0 1.00 2131.30 100.00% 0.00 0.00 0.00%
01.09.08.03 SUMINISTRO E INSTALACION DE TUBERIA CRIBADA PVC - D=250MM ML 10.2 69.69 710.84 10.20 710.84 0.00 0 10.20 710.84 100.00% 0.00 0.00 0.00%
1.10 ESTRUCTURA E INTERCONEXIONES PTAR 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.01 CÁMARA DISTRIBUIDORA DE CAUDAL 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.01.01 TRABAJOS PRELIMINARES 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.01.01.01 LIMPIEZA DE TERRENO MAN. m2 4.24 3.93 16.66 4.24 16.66 0.00 0 4.24 16.66 100.00% 0.00 0.00 0.00%
01.10.01.01.02 TRAZO Y REPLANTEO INICIAL m2 4.24 2.52 10.68 4.24 10.68 0.00 0 4.24 10.68 100.00% 0.00 0.00 0.00%
VALORIZACION DE OBRA Nº 8 - TODAS LAS FORMULAS
PROPIET: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO MONTO PRESUPUESTADO: 5,106,399.54 CORRESPONDIENTE AL MES DE: JUNIO
OBRA: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO FECHA DE PRESENTACION: AL 30 DE JUNIO DEL 2017
AVANCES
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCIÓN
P.UNITARIO PRESUPUESTO VALORIZADO VALORIZADO VALORIZADO VALORIZADO
UND METRADO S/. S/. METRADO S/. METRADO S/. METRADO S/. % METRADO S/. %
01.10.01.01.03 TRAZO Y REPLANTEO CON NIVEL m2 4.24 5.85 24.80 4.24 24.80 0.00 0 4.24 24.80 100.00% 0.00 0.00 0.00%
01.10.01.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.01.02.01 EXCAVACION MANUAL EN TERRENO SEMIROCOSO m3 2.54 19.68 49.99 2.54 49.99 0.00 0 2.54 49.99 100.00% 0.00 0.00 0.00%
01.10.01.02.02 REFINE, NIVELACION Y COMPACTADO m2 4.24 6.02 25.52 4.24 25.52 0.00 0 4.24 25.52 100.00% 0.00 0.00 0.00%
01.10.01.02.03 RELLENO COMPACTADO CON EQUIPO Y MATERIAL PROPIO m3 0.42 24.13 10.13 0.42 10.13 0.00 0 0.42 10.13 100.00% 0.00 0.00 0.00%
01.10.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE DM=1KM m3 1.32 13.27 17.52 1.32 17.52 0.00 0 1.32 17.52 100.00% 0.00 0.00 0.00%
01.10.01.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.01.03.01 CONCRETO f'c=100 kg/cm2 PARA SOLADO m2 2.44 29.45 71.86 2.44 71.86 0.00 0 2.44 71.86 100.00% 0.00 0.00 0.00%
01.10.01.04 OBRAS DE CONCRETO ARMADO 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.01.04.01 LOSAS MACIZA DE FONDO 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.01.04.01.01 CONCRETO FC=210KM/CM2 EN LOSA FONDO m3 0.37 476.24 176.21 0.37 176.21 0.00 0 0.37 176.21 100.00% 0.00 0.00 0.00%
01.10.01.04.01.02 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 13.38 6.06 81.08 13.38 81.08 0.00 0 13.38 81.08 100.00% 0.00 0.00 0.00%
01.10.01.04.01.03 ENCOFRADO Y DESENCOFRADO EN LOSA FONDO m2 0.99 45.61 45.15 0.99 45.15 0.00 0 0.99 45.15 100.00% 0.00 0.00 0.00%
01.10.01.04.02 MUROS 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.01.04.02.01 CONCRETO EN MUROS REFORZADOS FC=210KG/CM2 m3 1.27 492.81 625.87 1.27 625.87 0.00 0 1.27 625.87 100.00% 0.00 0.00 0.00%
01.10.01.04.02.02 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 62.15 6.06 376.63 62.15 376.63 0.00 0 62.15 376.63 100.00% 0.00 0.00 0.00%
01.10.01.04.02.03 ENCOFRADO Y DESENCOFRADO EN MUROS m2 2.54 52.83 134.19 2.54 134.19 0.00 0 2.54 134.19 100.00% 0.00 0.00 0.00%
01.10.01.05 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.01.05.01 TARRAJEO INTERIOR CON IMPERMEABILIZANTE MEZCLA E=1.5CM m2 7.79 49.53 385.84 7.79 385.84 0.00 0 7.79 385.84 100.00% 0.00 0.00 0.00%
01.10.01.05.02 TARRAJEO EN EXTERIORES MEZCLA DE 1:5 C-A, E=1.5CM m2 13.85 35.66 493.89 13.85 493.89 0.00 0 13.85 493.89 100.00% 0.00 0.00 0.00%
01.10.01.05.03 PINTURA EXTERIOR AL LATEX m2 13.85 15.59 215.92 13.85 215.92 0.00 0 13.85 215.92 100.00% 0.00 0.00 0.00%
01.10.01.06 VARIOS 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.01.06.01 SUMINISTRO E INSTALACION DE VERTEDERO RECTANGULAR und 2 405.45 810.90 2.00 810.90 0.00 0 2.00 810.90 100.00% 0.00 0.00 0.00%
01.10.01.06.02 SUMINISTRO E INSTALACION DE TUBERIA PVC ISO 4435 25 DN 250 MM D10" ML 2.25 61.96 139.41 2.25 139.41 0.00 0 2.25 139.41 100.00% 0.00 0.00 0.00%
01.10.02 TUBERIAS DE INTERCONEXION 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.02.01 TRABAJOS PRELIMINARES 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.02.01.01 TRAZO Y REPLANTEO ML 181.68 1.24 225.28 181.68 225.28 0.00 0 181.68 225.28 100.00% 0.00 0.00 0.00%
01.10.02.01.02 LIMPIEZA DE TERRENO MANUAL ML 181.68 1.18 214.38 181.68 214.38 0.00 0 181.68 214.38 100.00% 0.00 0.00 0.00%
01.10.02.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.02.02.01 EXCAVACION DE ZANJA PARA TUBERIA m3 112.75 18.58 2094.90 112.75 2094.90 0.00 0 112.75 2094.90 100.00% 0.00 0.00 0.00%
01.10.02.02.02 REFINE, NIVELACION Y COMPACTADO m2 187.92 6.02 1131.28 187.92 1131.28 0.00 0 187.92 1131.28 100.00% 0.00 0.00 0.00%
01.10.02.02.03 CAMA DE APOYO PARA TUBERIA TODA FUNDIDA ML 18.51 1.04 19.25 18.51 19.25 0.00 0 18.51 19.25 100.00% 0.00 0.00 0.00%
01.10.02.02.04 RELLENO DE ZANJA APISONADO CON MATERIAL PROPIO EN CAPAS DE 0.20M EN TERRENO NORM ML 77.99 12.67 988.13 77.99 988.13 0.00 0 77.99 988.13 100.00% 0.00 0.00 0.00%
01.10.02.02.05 ELIMINACION DE MATERIAL EXCEDENTE HASTA 100MT m3 20.32 17.7 359.66 20.32 359.66 0.00 0 20.32 359.66 100.00% 0.00 0.00 0.00%
01.10.02.03 SUMINISTRO E INSTALACION DE TUBERIAS 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.02.03.01 SUMINISTRO E INSTALACION DE TUBERIA DE PVC - U D=200MM ISO 4435 ML 289.04 44.09 12743.77 289.04 12743.77 0.00 0 289.04 12743.77 100.00% 0.00 0.00 0.00%
01.10.02.03.02 SUMINISTRO E INSTALACION DE TUBERIA DE F° F° DUCTIL DN=250MM ML 10.4 67.9 706.16 10.40 706.16 0.00 0 10.40 706.16 100.00% 0.00 0.00 0.00%
01.10.02.03.03 SUMINISTRO E INSTALACION DE ACCESORIOS PVC GLB 1 1489.3 1489.30 1.00 1489.30 0.00 0 1.00 1489.30 100.00% 0.00 0.00 0.00%
01.10.02.04 DOBLE PRUEBAS HIDRAULICAS Y NIVELACION 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.02.04.01 PRUEBA HIDRAULICA DE RED DE DESAGUE ML 308.44 2.82 869.80 308.44 869.80 0.00 0 308.44 869.80 100.00% 0.00 0.00 0.00%
01.10.02.05 BUZONES 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.02.05.01 CONSTRUCCION DE BUZONETA D=1.20; H=0.60 - 0.80M und 6 1144.93 6869.58 6.00 6869.58 0.00 0 6.00 6869.58 100.00% 0.00 0.00 0.00%
VALORIZACION DE OBRA Nº 8 - TODAS LAS FORMULAS
PROPIET: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO MONTO PRESUPUESTADO: 5,106,399.54 CORRESPONDIENTE AL MES DE: JUNIO
OBRA: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO FECHA DE PRESENTACION: AL 30 DE JUNIO DEL 2017
AVANCES
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCIÓN
P.UNITARIO PRESUPUESTO VALORIZADO VALORIZADO VALORIZADO VALORIZADO
UND METRADO S/. S/. METRADO S/. METRADO S/. METRADO S/. % METRADO S/. %
01.10.03 CAMARA DE REUNION (01 UND) 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.03.01 TRABAJOS PRELIMINARES 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.03.01.01 TRAZO Y REPLANTEO INICIAL m2 3.36 2.52 8.47 3.36 8.47 0.00 0 3.36 8.47 100.00% 0.00 0.00 0.00%
01.10.03.01.02 LIMPIEZA DE TERRENO MAN. m2 3.36 3.93 13.20 3.36 13.20 0.00 0 3.36 13.20 100.00% 0.00 0.00 0.00%
01.10.03.01.03 TRAZO Y REPLANTEO CON NIVEL m2 3.36 5.85 19.66 3.36 19.66 0.00 0 3.36 19.66 100.00% 0.00 0.00 0.00%
01.10.03.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.03.02.01 EXCAVACION MANUAL EN TERRENO SEMIROCOSO m3 2.69 19.68 52.94 2.69 52.94 0.00 0 2.69 52.94 100.00% 0.00 0.00 0.00%
01.10.03.02.02 REFINE, NIVELACION Y COMPACTADO m2 3.36 6.02 20.23 3.36 20.23 0.00 0 3.36 20.23 100.00% 0.00 0.00 0.00%
01.10.03.02.03 RELLENO COMPACTADO CON EQUIPO Y MATERIAL PROPIO m3 1.38 24.13 33.30 1.38 33.30 0.00 0 1.38 33.30 100.00% 0.00 0.00 0.00%
01.10.03.02.04 ELIMINACION DE MATERIAL EXCEDENTE DM=1KM m3 2.21 13.27 29.33 2.21 29.33 0.00 0 2.21 29.33 100.00% 0.00 0.00 0.00%
01.10.03.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.03.03.01 CONCRETO f'c=100 kg/cm2 PARA SOLADO m2 0.17 29.45 5.01 0.17 5.01 0.00 0 0.17 5.01 100.00% 0.00 0.00 0.00%
01.10.03.04 OBRAS DE CONCRETO ARMADO 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.03.04.01 LOSAS MACIZA DE FONDO 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.03.04.01.01 CONCRETO FC=210KM/CM2 EN LOSA FONDO m3 1.56 476.24 742.93 1.56 742.93 0.00 0 1.56 742.93 100.00% 0.00 0.00 0.00%
01.10.03.04.01.02 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 5.04 6.06 30.54 5.04 30.54 0.00 0 5.04 30.54 100.00% 0.00 0.00 0.00%
01.10.03.04.01.03 ENCOFRADO Y DESENCOFRADO EN LOSA FONDO m2 1.56 45.61 71.15 1.56 71.15 0.00 0 1.56 71.15 100.00% 0.00 0.00 0.00%
01.10.03.04.02 MUROS 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.03.04.02.01 CONCRETO EN MUROS REFORZADOS FC=210KG/CM2 m3 0.94 492.81 463.24 0.94 463.24 0.00 0 0.94 463.24 100.00% 0.00 0.00 0.00%
01.10.03.04.02.02 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 31.47 6.06 190.71 31.47 190.71 0.00 0 31.47 190.71 100.00% 0.00 0.00 0.00%
01.10.03.04.02.03 ENCOFRADO Y DESENCOFRADO EN MUROS m2 3.88 52.83 204.98 3.88 204.98 0.00 0 3.88 204.98 100.00% 0.00 0.00 0.00%
01.10.03.04.03 LOSA REMOVIBLE 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.03.04.03.01 CONCRETO f'c=210 kg/cm2 m3 0.07 503.85 35.27 0.07 35.27 0.00 0 0.07 35.27 100.00% 0.00 0.00 0.00%
01.10.03.04.03.02 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 1.85 6.06 11.21 1.85 11.21 0.00 0 1.85 11.21 100.00% 0.00 0.00 0.00%
01.10.03.04.03.03 ENCOFR. Y DESENCOFRADO m2 1.67 48.1 80.33 1.67 80.33 0.00 0 1.67 80.33 100.00% 0.00 0.00 0.00%
01.10.03.05 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.03.05.01 TARRAJEO INTERIOR CON IMPERMEABILIZANTE MEZCLA E=1.5CM m2 4.82 49.53 238.73 4.82 238.73 0.00 0 4.82 238.73 100.00% 0.00 0.00 0.00%
01.10.03.05.02 TARRAJEO EN EXTERIORES MEZCLA DE 1:5 C-A, E=1.5CM m2 4.58 35.66 163.32 4.58 163.32 0.00 0 4.58 163.32 100.00% 0.00 0.00 0.00%
01.10.03.05.03 PINTURA EXTERIOR AL LATEX m2 4.58 15.59 71.40 4.58 71.40 0.00 0 4.58 71.40 100.00% 0.00 0.00 0.00%
01.10.03.06 VARIOS 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.03.06.01 SUMINISTRO E INSTALACION DE VERTEDERO RECTANGULAR und 2 405.45 810.90 2.00 810.90 0.00 0 2.00 810.90 100.00% 0.00 0.00 0.00%
01.10.03.06.02 SUMINISTRO E INSTALACION DE TUBERIA PVC NTP ISO 4435 DN=315MM ML 1 97.93 97.93 1.00 97.93 0.00 0 1.00 97.93 100.00% 0.00 0.00 0.00%
01.10.03.06.03 SUMINISTRO E INSTALACION DE TUBERIA PVC ISO 4435 25 DN 250 MM D10" ML 2 61.96 123.92 2.00 123.92 0.00 0 2.00 123.92 100.00% 0.00 0.00 0.00%
01.10.04 EMISOR DE VERTIMIENTO DE AGUA TRATADA 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.04.01 TRABAJOS PRELIMINARES 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.04.01.01 TRAZO Y REPLANTEO INICIAL m2 3.25 2.52 8.19 3.25 8.19 0.00 0 3.25 8.19 100.00% 0.00 0.00 0.00%
01.10.04.01.02 LIMPIEZA DE TERRENO MAN. m2 3.25 3.93 12.77 3.25 12.77 0.00 0 3.25 12.77 100.00% 0.00 0.00 0.00%
01.10.04.01.03 TRAZO Y REPLANTEO CON NIVEL m2 3.25 5.85 19.01 3.25 19.01 0.00 0 3.25 19.01 100.00% 0.00 0.00 0.00%
01.10.04.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.04.02.01 EXCAVACION MANUAL EN TERRENO SEMIROCOSO m3 1.93 19.68 37.98 1.93 37.98 0.00 0 1.93 37.98 100.00% 0.00 0.00 0.00%
01.10.04.02.02 REFINE, NIVELACION Y COMPACTADO m2 3.25 6.02 19.57 3.25 19.57 0.00 0 3.25 19.57 100.00% 0.00 0.00 0.00%
01.10.04.02.03 RELLENO COMPACTADO CON EQUIPO Y MATERIAL PROPIO m3 1.83 24.13 44.16 1.83 44.16 0.00 0 1.83 44.16 100.00% 0.00 0.00 0.00%
VALORIZACION DE OBRA Nº 8 - TODAS LAS FORMULAS
PROPIET: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO MONTO PRESUPUESTADO: 5,106,399.54 CORRESPONDIENTE AL MES DE: JUNIO
OBRA: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO FECHA DE PRESENTACION: AL 30 DE JUNIO DEL 2017
AVANCES
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCIÓN
P.UNITARIO PRESUPUESTO VALORIZADO VALORIZADO VALORIZADO VALORIZADO
UND METRADO S/. S/. METRADO S/. METRADO S/. METRADO S/. % METRADO S/. %
01.10.04.02.04 ELIMINACION DE MATERIAL EXCEDENTE DM=1KM m3 0.13 13.27 1.73 0.13 1.73 0.00 0 0.13 1.73 100.00% 0.00 0.00 0.00%
01.10.04.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.04.03.01 CONCRETO f'c=100 kg/cm2 PARA SOLADO m2 0.25 29.45 7.36 0.25 7.36 0.00 0 0.25 7.36 100.00% 0.00 0.00 0.00%
01.10.04.03.02 DADO DE CONCRETO 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.04.03.02.01 CONCRETO f'c=175 kg/cm2 m3 0.13 509.05 66.18 0.13 66.18 0.00 0 0.13 66.18 100.00% 0.00 0.00 0.00%
01.10.04.03.02.02 ENCOFR. Y DESENCOFRADO m2 1 48.1 48.10 1.00 48.10 0.00 0 1.00 48.10 100.00% 0.00 0.00 0.00%
01.10.04.04 INSTALACIONES HIDRAULICAS 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.04.04.01 SUMINISTRO E INSTALACION DE TUBERIA DE HDPE - D=250MM ML 44.6 90.26 4025.60 44.60 4025.60 0.00 0 44.60 4025.60 100.00% 0.00 0.00 0.00%
01.10.04.04.02 SUMINISTRO E INSTALACION DE ACCESORIOS GLB 1 1433.84 1433.84 1.00 1433.84 0.00 0 1.00 1433.84 100.00% 0.00 0.00 0.00%
01.10.05 INTERCONEXIONES Y ACCESOS PARA PTAR 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.05.01 TRABAJOS PRELIMINARES 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.05.01.01 TRAZO Y REPLANTEO INICIAL m2 337.27 2.52 849.92 337.27 849.92 0.00 0 337.27 849.92 100.00% 0.00 0.00 0.00%
01.10.05.01.02 LIMPIEZA DE TERRENO MAN. m2 337.27 3.93 1325.47 337.27 1325.47 0.00 0 337.27 1325.47 100.00% 0.00 0.00 0.00%
01.10.05.01.03 TRAZO Y REPLANTEO CON NIVEL m2 337.27 5.85 1973.03 337.27 1973.03 0.00 0 337.27 1973.03 100.00% 0.00 0.00 0.00%
01.10.05.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.05.02.01 EXCAVACION MANUAL EN TERRENO SEMIROCOSO m3 35.61 19.68 700.80 35.61 700.80 0.00 0 35.61 700.80 100.00% 0.00 0.00 0.00%
01.10.05.02.02 REFINE, NIVELACION Y COMPACTADO m2 337.27 6.02 2030.37 337.27 2030.37 0.00 0 337.27 2030.37 100.00% 0.00 0.00 0.00%
01.10.05.02.03 ELIMINACION DE MATERIAL EXCEDENTE DM=1KM m3 35.61 13.27 472.54 35.61 472.54 0.00 0 35.61 472.54 100.00% 0.00 0.00 0.00%
01.10.05.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.05.03.01 CONCRETO f'c=175 kg/cm2 m3 0.5 509.05 254.53 0.50 254.53 0.00 0 0.50 254.53 100.00% 0.00 0.00 0.00%
01.10.05.03.02 ENCOFR. Y DESENCOFRADO m2 1 48.1 48.10 1.00 48.10 0.00 0 1.00 48.10 100.00% 0.00 0.00 0.00%
01.10.05.04 PISOS Y PAVIMENTOS 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.05.04.01 VEREDA DE CONCRETO f'c= 175 kg/cm2 m2 50.59 85.32 4316.34 50.59 4316.34 0.00 0 50.59 4316.34 100.00% 0.00 0.00 0.00%
01.10.05.04.02 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 50.14 44.97 2254.80 50.14 2254.80 0.00 0 50.14 2254.80 100.00% 0.00 0.00 0.00%
01.10.05.05 PLATAFORMA DE OPERACION Y MANTENIMIENTO 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.05.05.01 CONCRETO f'c=210 kg/cm2 m3 6.93 503.85 3491.68 6.93 3491.68 0.00 0 6.93 3491.68 100.00% 0.00 0.00 0.00%
01.10.05.05.02 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 269.64 6.06 1634.02 269.64 1634.02 0.00 0 269.64 1634.02 100.00% 0.00 0.00 0.00%
01.10.05.05.03 ENCOFR. Y DESENCOFRADO m2 6.72 48.1 323.23 6.72 323.23 0.00 0 6.72 323.23 100.00% 0.00 0.00 0.00%
01.10.05.06 CARPINTERIA METALICA 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.05.06.01 BARANDA DE TUBO FIERRO GALVANIZADO PASAMANO 1 1/2" - PARANTE 1" X 1 m ML 47.6 156.25 7437.50 47.60 7437.50 0.00 0 47.60 7437.50 100.00% 0.00 0.00 0.00%
01.10.05.07 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.10.05.07.01 TUBERIA PVC SAP C-7.5 D=3/4" ML 212.73 9.83 2091.14 212.73 2091.14 0.00 0 212.73 2091.14 100.00% 0.00 0.00 0.00%
01.10.05.07.02 TUBERIA PVC SAP C-7.5 D=1/2" ML 9.73 4.73 46.02 9.73 46.02 0.00 0 9.73 46.02 100.00% 0.00 0.00 0.00%
01.10.05.07.03 SUMINISTRO E INSTALACION DE TUBERIA PVC ISO 4435 25 DN 250 MM D10" ML 22 61.96 1363.12 22.00 1363.12 0.00 0 22.00 1363.12 100.00% 0.00 0.00 0.00%
01.10.05.07.04 SUMINISTRO E INSTALACION DE ACCESORIOS PVC GLB 1 347.46 347.46 1.00 347.46 0.00 0 1.00 347.46 100.00% 0.00 0.00 0.00%
1.11 INFRAESTRUCTURA COMPLEMENTARIA PTAR 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.11.01 OFICINA, GUARDIANIA Y LABORATORIO EN PTAR 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.11.01.01 TRABAJOS PRELIMINARES 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.11.01.01.01 TRAZO Y REPLANTEO INICIAL m2 84 2.52 211.68 0.00 0.00 0 0.00 0.00 0.00% 84.00 211.68 100.00%
01.11.01.01.02 LIMPIEZA DE TERRENO MAN. m2 84 3.93 330.12 0.00 0.00 0 0.00 0.00 0.00% 84.00 330.12 100.00%
01.11.01.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.11.01.02.01 EXCAVACION MANUAL EN TERRENO SEMIROCOSO m3 19.89 19.68 391.44 0.00 0.00 0 0.00 0.00 0.00% 19.89 391.44 100.00%
VALORIZACION DE OBRA Nº 8 - TODAS LAS FORMULAS
PROPIET: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO MONTO PRESUPUESTADO: 5,106,399.54 CORRESPONDIENTE AL MES DE: JUNIO
OBRA: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO FECHA DE PRESENTACION: AL 30 DE JUNIO DEL 2017
AVANCES
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCIÓN
P.UNITARIO PRESUPUESTO VALORIZADO VALORIZADO VALORIZADO VALORIZADO
UND METRADO S/. S/. METRADO S/. METRADO S/. METRADO S/. % METRADO S/. %
01.11.01.02.02 REFINE, NIVELACION Y COMPACTADO m2 7.76 6.02 46.72 0.00 0.00 0 0.00 0.00 0.00% 7.76 46.72 100.00%
01.11.01.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO EN ZANJAS m3 7.95 23.62 187.78 0.00 0.00 0 0.00 0.00 0.00% 7.95 187.78 100.00%
01.11.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE HASTA 100MT m3 11.93 17.7 211.16 0.00 0.00 0 0.00 0.00 0.00% 11.93 211.16 100.00%
01.11.01.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.11.01.03.01 CIMIENTOS CORRIDOS Fc=100Kg/cm2 + 30% P.G. m3 13.46 204.36 2750.69 0.00 0.00 0 0.00 0.00 0.00% 13.46 2750.69 100.00%
01.11.01.03.02 SOBRECIMIENTOS Fc=100Kg/cm2 + 25% P.M. m3 2.7 244.6 660.42 0.00 0.00 0 0.00 0.00 0.00% 2.70 660.42 100.00%
01.11.01.03.03 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 5.85 47.69 278.99 0.00 0.00 0 0.00 0.00 0.00% 5.85 278.99 100.00%
01.11.01.03.04 FALSO PISO DE 4" DE CONCRETO 1:10 m2 18.92 72.74 1376.24 0.00 0.00 0 0.00 0.00 0.00% 18.92 1376.24 100.00%
01.11.01.04 OBRAS DE CONCRETO ARMADO 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.11.01.04.01 COLUMNAS 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.11.01.04.01.01 CONCRETO f'c=210 kg/cm2 PARA COLUMNAS m3 1.89 549.46 1038.48 0.00 0.00 0 0.00 0.00 0.00% 1.89 1038.48 100.00%
01.11.01.04.01.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 22.46 64.04 1438.34 0.00 0.00 0 0.00 0.00 0.00% 22.46 1438.34 100.00%
01.11.01.04.01.03 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 306.77 6.06 1859.03 0.00 0.00 0 0.00 0.00 0.00% 306.77 1859.03 100.00%
01.11.01.04.02 VIGAS 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.11.01.04.02.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS m3 2.43 502.87 1221.97 0.00 0.00 0 0.00 0.00 0.00% 2.43 1221.97 100.00%
01.11.01.04.02.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS m2 11.26 64.53 726.61 0.00 0.00 0 0.00 0.00 0.00% 11.26 726.61 100.00%
01.11.01.04.02.03 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 343.11 6.06 2079.25 0.00 0.00 0 0.00 0.00 0.00% 343.11 2079.25 100.00%
01.11.01.04.03 LOSAS ALIGERADAS 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.11.01.04.03.01 CONCRETO f'c=210 kg/cm2 PARA LOSAS ALIGERADAS m3 3.64 608.07 2213.37 0.00 0.00 0 0.00 0.00 0.00% 3.64 2213.37 100.00%
01.11.01.04.03.02 ENCOFRADO Y DESENCOFRADO PARA LOSAS ALIGERADAS m2 37.41 48.54 1815.88 0.00 0.00 0 0.00 0.00 0.00% 37.41 1815.88 100.00%
01.11.01.04.03.03 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 315.56 6.06 1912.29 0.00 0.00 0 0.00 0.00 0.00% 315.56 1912.29 100.00%
01.11.01.04.03.04 LADRILLO HUECO DE ARCILLA 15X30X30CM PARA TECHO ALIGERADO und 399.84 2.01 803.68 0.00 0.00 0 0.00 0.00 0.00% 399.84 803.68 100.00%
01.11.01.05 ALBAÑILERIA 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.11.01.05.01 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA m2 70.61 82.62 5833.80 0.00 0.00 0 0.00 0.00 0.00% 70.61 5833.80 100.00%
01.11.01.06 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.11.01.06.01 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA m2 86.26 26.01 2243.62 0.00 0.00 0 0.00 0.00 0.00% 86.26 2243.62 100.00%
01.11.01.06.02 TARRAJEO EN EXTERIORES MEZCLA DE C-A 1:5 m2 94.88 26.17 2483.01 0.00 0.00 0 0.00 0.00 0.00% 94.88 2483.01 100.00%
01.11.01.06.03 TARRAJEO EN COLUMNAS m2 15.62 41.91 654.63 0.00 0.00 0 0.00 0.00 0.00% 15.62 654.63 100.00%
01.11.01.06.04 TARRAJEO EN VIGAS m2 9.98 49.18 490.82 0.00 0.00 0 0.00 0.00 0.00% 9.98 490.82 100.00%
01.11.01.06.05 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA m2 37.19 60.5 2250.00 0.00 0.00 0 0.00 0.00 0.00% 37.19 2250.00 100.00%
01.11.01.06.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS ML 61.4 19.4 1191.16 0.00 0.00 0 0.00 0.00 0.00% 61.40 1191.16 100.00%
01.11.01.06.07 CONTRAZOCALO CEMENTO SCIN COLOREAR H = 30 cm ML 47.15 13.48 635.58 0.00 0.00 0 0.00 0.00 0.00% 47.15 635.58 100.00%
01.11.01.07 PISOS Y PAVIMENTOS 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.11.01.07.01 PISO DE CEMENTO PULIDO COLOREADO m2 37.19 61.26 2278.26 0.00 0.00 0 0.00 0.00 0.00% 37.19 2278.26 100.00%
01.11.01.07.02 PISO DE CERAMICA DE COLOR (0.30x0.30) m2 5.7 47.52 270.86 0.00 0.00 0 0.00 0.00 0.00% 5.70 270.86 100.00%
01.11.01.07.03 ZOCALO DE MAYOLICA BLANCA DE 11 X 11 cm DE 1RA m2 3.35 66.56 222.98 0.00 0.00 0 0.00 0.00 0.00% 3.35 222.98 100.00%
01.11.01.07.04 VEREDA DE CONCRETO f'c= 175 kg/cm2 m2 32.6 85.32 2781.43 0.00 0.00 0 0.00 0.00 0.00% 32.60 2781.43 100.00%
01.11.01.07.05 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 77.86 44.97 3501.36 0.00 0.00 0 0.00 0.00 0.00% 77.86 3501.36 100.00%
01.11.01.08 PINTURA 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.11.01.08.01 PINTURA VINILICA EN INTERIORES 2 MANOS m2 86.26 11.43 985.95 0.00 0.00 0 0.00 0.00 0.00% 86.26 985.95 100.00%
01.11.01.08.02 PINTURA VINILICA EN MUROS EXTERIORES 2 MANOS m2 94.88 11.39 1080.68 0.00 0.00 0 0.00 0.00 0.00% 94.88 1080.68 100.00%
01.11.01.08.03 PINTURA VINILICA EN CIELO RASO 2 MANOS m2 37.19 14.02 521.40 0.00 0.00 0 0.00 0.00 0.00% 37.19 521.40 100.00%
VALORIZACION DE OBRA Nº 8 - TODAS LAS FORMULAS
PROPIET: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO MONTO PRESUPUESTADO: 5,106,399.54 CORRESPONDIENTE AL MES DE: JUNIO
OBRA: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO FECHA DE PRESENTACION: AL 30 DE JUNIO DEL 2017
AVANCES
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCIÓN
P.UNITARIO PRESUPUESTO VALORIZADO VALORIZADO VALORIZADO VALORIZADO
UND METRADO S/. S/. METRADO S/. METRADO S/. METRADO S/. % METRADO S/. %
01.11.01.08.04 PINTURA EN CONTRAZOCALOS CON ESMALTE m2 47.15 4.93 232.45 0.00 0.00 0 0.00 0.00 0.00% 47.15 232.45 100.00%
01.11.01.08.05 PINTURA EN PUERTAS CON BARNIZ 2 MANOS m2 9.24 16.19 149.60 0.00 0.00 0 0.00 0.00 0.00% 9.24 149.60 100.00%
01.11.01.09 CARPINTERIA DE MADERA 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.11.01.09.01 PUERTA PABLERO REBAJADO, INCLUYE MARCO CEDRO 2"X3" m2 9.24 222.76 2058.30 0.00 0.00 0 0.00 0.00 0.00% 9.24 2058.30 100.00%
01.11.01.10 CARPINTERIA METALICA 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.11.01.10.01 VENTANA DE FIERRO CON PERFIL DE 1" X 1/8" + HOJA BASTIDOR "L" 3/4" m2 8.98 339.03 3044.49 0.00 0.00 0 0.00 0.00 0.00% 8.98 3044.49 100.00%
01.11.01.10.02 VIDRIO SEMIDOBLE PROVISION Y COLOCACION EN VENTANAS FIERRO m2 0.83 7.08 5.88 0.00 0.00 0 0.00 0.00 0.00% 0.83 5.88 100.00%
01.11.01.11 INSTALACIONES ELECTRICAS 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.11.01.11.01 SALIDA PARA CENTROS DE LUZ pto 7 103.78 726.46 0.00 0.00 0 0.00 0.00 0.00% 7.00 726.46 100.00%
01.11.01.11.02 SALIDA PARA INTERRUPTOR CABLE N" 16+TUB.3/4 pto 5 106.98 534.90 0.00 0.00 0 0.00 0.00 0.00% 5.00 534.90 100.00%
01.11.01.11.03 SALIDA PARA INTERRUPTOR DE CONMUTACION pto 1 102.28 102.28 0.00 0.00 0 0.00 0.00 0.00% 1.00 102.28 100.00%
01.11.01.11.04 SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES CON PVC pto 12 112.47 1349.64 0.00 0.00 0 0.00 0.00 0.00% 12.00 1349.64 100.00%
01.11.01.11.05 CABLE ELECTRICO NYY 2 X 2.5 mm2 ML 176 1.89 332.64 0.00 0.00 0 0.00 0.00 0.00% 176.00 332.64 100.00%
01.11.01.11.06 TUBERIA PVC SAP C-7.5 D=3/4" ML 88 9.83 865.04 0.00 0.00 0 0.00 0.00 0.00% 88.00 865.04 100.00%
01.11.01.11.07 FLUORESCENTE CIRCULAR DE 1x40WATTSINCL. EQUIPO COMPLETO und 7 85.57 598.99 0.00 0.00 0 0.00 0.00 0.00% 7.00 598.99 100.00%
TABLERO ELECTRICO GABINETE METALICO PARA DISTRIBUCION DE 3
01.11.01.11.08 CIRCUITOS und 2 236.6 473.20 0.00 0.00 0 0.00 0.00 0.00% 2.00 473.20 100.00%
01.11.01.11.09 PRUEBA ELECTRICA GLB 1 120 120.00 0.00 0.00 0 0.00 0.00 0.00% 1.00 120.00 100.00%
01.11.01.12 INSTALACIONES SANITARIAS 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.11.01.12.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 4 75.61 302.44 0.00 0.00 0 0.00 0.00 0.00% 4.00 302.44 100.00%
01.11.01.12.02 SALIDA DE DESAGUE EN PVC DE 2" pto 7 80.8 565.60 0.00 0.00 0 0.00 0.00 0.00% 7.00 565.60 100.00%
01.11.01.12.03 SALIDA DE TUBERIA PVC SAL PARA VENTILACION DE 2" pto 1 84.63 84.63 0.00 0.00 0 0.00 0.00 0.00% 1.00 84.63 100.00%
01.11.01.12.04 SUM. E INST. DEL SISTEMA DE DISTRIBUCION INTERNA DE AGUA GLB 1 347.17 347.17 0.00 0.00 0 0.00 0.00 0.00% 1.00 347.17 100.00%
01.11.01.12.05 SUM. E INST. DEL SISTEMA DE DISTRIBUCION INTERNA DE DESAGUE GLB 1 315.9 315.90 0.00 0.00 0 0.00 0.00 0.00% 1.00 315.90 100.00%
01.11.01.12.06 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 2 127.54 255.08 0.00 0.00 0 0.00 0.00 0.00% 2.00 255.08 100.00%
01.11.01.13 EQUIPAMIENTO DE LABORATORIO 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.11.01.13.01 EQUIPAMIENTO DE LABORATORIO GLB 1 50000 50000.00 0.00 0.00 0 0.00 0.00 0.00% 1.00 50000.00 100.00%
1.12 CERCO PERIMETRICO EN PTAR 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.12.01 TRABAJOS PRELIMINARES 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.12.01.01 LIMPIEZA DE TERRENO MANUAL ML 273.86 1.18 323.15 0.00 0.00 0 0.00 0.00 0.00% 273.86 323.15 100.00%
01.12.01.02 TRAZO Y REPLANTEO ML 273.86 1.24 339.59 0.00 0.00 0 0.00 0.00 0.00% 273.86 339.59 100.00%
01.12.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.12.02.01 EXCAVACION CON EQUIPO EN TERRENO SEMIROCOSO m3 65.73 36.93 2427.41 0.00 0.00 0 0.00 0.00 0.00% 65.73 2427.41 100.00%
01.12.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO EN ZANJAS m3 3.42 23.62 80.78 0.00 0.00 0 0.00 0.00 0.00% 3.42 80.78 100.00%
01.12.02.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 100MT m3 62 17.7 1097.40 0.00 0.00 0 0.00 0.00 0.00% 62.00 1097.40 100.00%
01.12.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.12.03.01 CONCRETO F'C=140 KG/CM2 +30% PG PARA CIMIENTOS CORRIDOS m3 65.73 374.1 24589.59 0.00 0.00 0 0.00 0.00 0.00% 65.73 24589.59 100.00%
01.12.03.02 CONCRETO f'c=175 kg/cm2 PARA SOBRECIMIENTOS m3 27.39 505.22 13837.98 0.00 0.00 0 0.00 0.00 0.00% 27.39 13837.98 100.00%
01.12.03.03 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 219.09 47.69 10448.40 0.00 0.00 0 0.00 0.00 0.00% 219.09 10448.40 100.00%
01.12.04 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.12.04.01 TARRAJEO EN EXTERIORES MEZCLA DE 1:5 C-A, E=1.5CM m2 287.55 16.04 4612.30 0.00 0.00 0 0.00 0.00 0.00% 287.55 4612.30 100.00%
01.12.05 CARPINTERIA METALICA 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.12.05.01 SUMINISTRO Y COLOCACION DE POSTES GALVANIZADOS DE 3" und 67 336.11 22519.37 0.00 0.00 0 0.00 0.00 0.00% 67.00 22519.37 100.00%
VALORIZACION DE OBRA Nº 8 - TODAS LAS FORMULAS
PROPIET: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO MONTO PRESUPUESTADO: 5,106,399.54 CORRESPONDIENTE AL MES DE: JUNIO
OBRA: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO FECHA DE PRESENTACION: AL 30 DE JUNIO DEL 2017
AVANCES
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCIÓN
P.UNITARIO PRESUPUESTO VALORIZADO VALORIZADO VALORIZADO VALORIZADO
UND METRADO S/. S/. METRADO S/. METRADO S/. METRADO S/. % METRADO S/. %
01.12.05.02 SUMINISTRO Y COLOCACION DE PANEL ENMALLADO DE 4x2M. und 67 547.01 36649.67 0.00 0.00 0 0.00 0.00 0.00% 67.00 36649.67 100.00%
01.12.05.03 SUMINISTRO Y COLOCACION DE PUERTA ENMALLADO DE 4x2.5M. und 1 856.11 856.11 0.00 0.00 0 0.00 0.00 0.00% 1.00 856.11 100.00%
01.12.05.04 SUMINISTRO Y COLOCACION DE PUERTA ENMALLADO DE 1x2.5M. und 1 460.59 460.59 0.00 0.00 0 0.00 0.00 0.00% 1.00 460.59 100.00%
01.12.05.05 SUMINISTRO Y COLOCACION DE ALAMBRE DE PUAS GALV. N° 12 ML 836.58 3.69 3086.98 0.00 0.00 0 0.00 0.00 0.00% 836.58 3086.98 100.00%
01.12.06 PINTURA 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
01.12.06.01 PINTURA ESMALTE EN CARPINTERIA METALICA m2 1369.3 17.88 24483.08 0.00 0.00 0 0.00 0.00 0.00% 1369.30 24483.08 100.00%
01.12.06.02 PINTURA ESMALTE EN EXTERIORES m2 301.93 13 3925.09 0.00 0.00 0 0.00 0.00 0.00% 301.93 3925.09 100.00%
1.13 FLETES DE PTAR 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
1.13.01 FLETE RURAL A PTAR GLB 1 87000 87000.00 1.00 87000.00 0.00 0 1.00 87000.00 100.00% 0.00 0.00 0.00%
4 MEDIDAS DE SEGURIDAD Y MITIGACION AMBIENTAL 0.00 0.00
1.01 PLAN DE SEGURIDAD 0.00 0 0.00
1.01.01 ELABORACION E IMPLEMENTACION DE SEGURIDAD GLB 1 5000 5000.00 1.00 5000.00 0.00 0 1.00 5000.00 100.00% 0.00 0.00 0.00%
1.02 SALUD EN EL TRABAJO 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
1.02.01 EQUIPOS DE PROTECCION INDIVIDUAL GLB 1 7550 7550.00 1.00 7550.00 0.00 0 1.00 7550.00 100.00% 0.00 0.00 0.00%
1.02.02 EQUIPOS DE PROTECCION COLECTIVA GLB 1 2002.36 2002.36 1.00 2002.36 0.00 0 1.00 2002.36 100.00% 0.00 0.00 0.00%
1.02.03 SEÑALIZACION TEMPORAL DE SEGURIDAD GLB 1 3000 3000.00 1.00 3000.00 0.00 0 1.00 3000.00 100.00% 0.00 0.00 0.00%
1.02.04 CAPACITACION EN SEGURIDAD Y SALUD GLB 1 2000 2000.00 1.00 2000.00 0.00 0 1.00 2000.00 100.00% 0.00 0.00 0.00%
1.03 EMERGENCIAS 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
1.03.01 SUMINISTRO DE RECURSOS PARA EMERGENCIAS MES 6 2260 13560.00 6.00 13560.00 0.00 0 6.00 13560.00 100.00% 0.00 0.00 0.00%
2 MITIGACION AMBIENTAL 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
2.01 ACTIVIDADES DE CAPACITACION 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
2.01.01 CAPACITACION EN MITIGACION AMBIENTAL GLB 1 3000 3000.00 1.00 3000.00 0.00 0 1.00 3000.00 100.00% 0.00 0.00 0.00%
2.01.02 CAPACITACION EN MANEJO DE RESIDUOS SOLIDOS Y LIQUIDOS GLB 1 4000 4000.00 1.00 4000.00 0.00 0 1.00 4000.00 100.00% 0.00 0.00 0.00%
2.02 MEDIDAS DE PREVENCION, MITIGACION Y/O CORRECCION DE IMPACTOS AMBIENTALES 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
2.02.01 MEDIDAS DE PREVENCION Y MITIGACION GLB 1 13500 13500.00 1.00 13500.00 0.00 0 1.00 13500.00 100.00% 0.00 0.00 0.00%
2.03 SEGUIMIENTO Y CONTROL 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
2.03.01 MONITOREO Y CONTROL DE IMPACTOS GLB 1 15000 15000.00 1.00 15000.00 0.00 0 1.00 15000.00 100.00% 0.00 0.00 0.00%
2.04 PLAN DE CONTINGENCIA 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
2.04.01 PROCEDIMIENTOS DE RESPUESTA ANTE EMERGENCIAS GLB 1 7000 7000.00 1.00 7000.00 0.00 0 1.00 7000.00 100.00% 0.00 0.00 0.00%
2.05 PLAN DE CIERRE Y ABANDONO 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
2.05.01 ACONDICIONAMIENTO Y RESTAURACION DE AREAS INTERVENIDAS GLB 1 10000 10000.00 1.00 10000.00 0.00 0 1.00 10000.00 100.00% 0.00 0.00 0.00%
5 INTERVENCION SOCIAL 0.00 0.00
1.01 ACCIONES PRELIMINARES 0.00 0 0.00
1.01.01 ACTIVIDADES DE PROMOCION 0.00 0 0.00
01.01.01.01 ELABORACION DE LINEA BASE (SOLO INSUMOS) GLB 1 7521.81 7521.81 1.00 7521.81 0.00 0 1.00 7521.81 100.00% 0.00 0.00 0.00%
01.01.01.02 PRESENTACION DEL PROYECTO GLB 1 180.15 180.15 1.00 180.15 0.00 0 1.00 180.15 100.00% 0.00 0.00 0.00%
01.01.01.03 TALLER DE IDENTIFICACION Y ANALISIS DE LA PROBLEMATICA GLB 1 165.6 165.60 1.00 165.60 0.00 0 1.00 165.60 100.00% 0.00 0.00 0.00%
01.01.01.04 TALLER DE IMPORTANCIA DE LA ORGANIZACION Y PARTICIPACION CIUDADANA GLB 1 142.5 142.50 1.00 142.50 0.00 0 1.00 142.50 100.00% 0.00 0.00 0.00%
01.01.01.05 FORTALECIMIENTO A LA GESTION DE LA JASS GLB 1 6356.01 6356.01 1.00 6356.01 0.00 0 1.00 6356.01 100.00% 0.00 0.00 0.00%
01.01.02 ACTIVIDADES DE CAPACITACION 0.00 0 0.00
01.01.02.01 TALLER DE ESTATUS Y REGLAMENTOS GLB 1 135.72 135.72 1.00 135.72 0.00 0 1.00 135.72 100.00% 0.00 0.00 0.00%
01.01.02.02 EDUCACION PARALA HIGIENE Y LA SALUD 0.00 0 0.00
VALORIZACION DE OBRA Nº 8 - TODAS LAS FORMULAS
PROPIET: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO MONTO PRESUPUESTADO: 5,106,399.54 CORRESPONDIENTE AL MES DE: JUNIO
OBRA: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO FECHA DE PRESENTACION: AL 30 DE JUNIO DEL 2017
AVANCES
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCIÓN
P.UNITARIO PRESUPUESTO VALORIZADO VALORIZADO VALORIZADO VALORIZADO
UND METRADO S/. S/. METRADO S/. METRADO S/. METRADO S/. % METRADO S/. %
01.01.03.01 PLAN DE TRABAJO EN EL DISTRITO DE SAN JUAN DEL ORO GLB 1 596.76 596.76 1.00 596.76 0.00 0 1.00 596.76 100.00% 0.00 0.00 0.00%
1.02 ACCIONES DURANTE 0.00 0 0.00
1.02.01 ACTIVIDADES DE PROMOCION 0.00 0 0.00
01.02.01.01 CONVOCATORIA PARALOS TALLERES DE LA JASS GLB 1 36.36 36.36 1.00 36.36 0.00 0 1.00 36.36 100.00% 0.00 0.00 0.00%
01.02.01.02 PASANTIA (FAMILIAS, CONSEJO DIRECTO DE LA JASS Y ACTORES SOCIALES) GLB 1 6174.51 6174.51 1.00 6174.51 0.00 0 1.00 6174.51 100.00% 0.00 0.00 0.00%
01.02.01.03 TALLER DE GENERO GLB 1 347.55 347.55 1.00 347.55 0.00 0 1.00 347.55 100.00% 0.00 0.00 0.00%
01.02.01.04 TALLER DE AUTOESTIMA GLB 1 347.52 347.52 1.00 347.52 0.00 0 1.00 347.52 100.00% 0.00 0.00 0.00%
01.02.01.05 TALLER DE LA IMPORTANCIA DEL AGUA PARA LA VIDA Y SALUD GLB 1 48.78 48.78 1.00 48.78 0.00 0 1.00 48.78 100.00% 0.00 0.00 0.00%
01.02.01.06 TALLER DE LA IMPORTANCIA DE LA ADECUADA ELIMINACION DE ESCRETAS GLB 1 48.78 48.78 1.00 48.78 0.00 0 1.00 48.78 100.00% 0.00 0.00 0.00%
01.02.01.07 TALLER DE PREVENCION DE ENFERMEDADES LIGADAS AL SANEAMIENTO GLB 1 48.78 48.78 1.00 48.78 0.00 0 1.00 48.78 100.00% 0.00 0.00 0.00%
01.02.01.08 TALLER DE HABITOS DE HIGENE PERSONAL DEL HOGAR Y COMUNAL GLB 1 48.78 48.78 1.00 48.78 0.00 0 1.00 48.78 100.00% 0.00 0.00 0.00%
01.02.02 ACTIVIDADES DE CAPACITACION 0.00 0 0.00
01.02.02.01 TALLER DE ADMINISTRACION Y COMPATIVILIDAD GLB 1 1225.59 1225.59 1.00 1225.59 0.00 0 1.00 1225.59 100.00% 0.00 0.00 0.00%
01.02.02.02 TALLER DE PARTES DEL SISTEMA Y MANEJO DEL ALMACEN GLB 1 489.21 489.21 1.00 489.21 0.00 0 1.00 489.21 100.00% 0.00 0.00 0.00%
01.02.02.03 TALLER DE GASFITERIA Y REPARACIONES GLB 1 872.19 872.19 1.00 872.19 0.00 0 1.00 872.19 100.00% 0.00 0.00 0.00%
01.02.02.04 TALLER DE OPERACIONE Y MANTENIMIENTO DEL SISTEMA DE AGUA Y BAÑOS GLB 1 84.36 84.36 1.00 84.36 0.00 0 1.00 84.36 100.00% 0.00 0.00 0.00%
01.02.02.05 TALLER DE LA CLORACION Y DESINFECCION GLB 1 1227.75 1227.75 1.00 1227.75 0.00 0 1.00 1227.75 100.00% 0.00 0.00 0.00%
01.02.03 EDUCACION PARALA HIGIENE Y LA SALUD 0.00 0 0.00
01.02.03.01 CONSTITUCION Y FUNCIONAMIENTO DEL COMITE DE HIGENE GLB 1 174.3 174.30 1.00 174.30 0.00 0 1.00 174.30 100.00% 0.00 0.00 0.00%
01.02.03.02 VERIFICACION DE LOS HABITOS DE HIGIENE DE LOS NIÑOS GLB 1 154.62 154.62 1.00 154.62 0.00 0 1.00 154.62 100.00% 0.00 0.00 0.00%
1.03 ACCIONES DEL DESPUES 0.00 0 0.00
01.03.01 ACTIVIDADES DE PROMOCION 0.00 0 0.00
01.03.01.01 ACOMPAÑAMIENTO Y APOYO A LA GESTION DE LA JASS GLB 1 1437.36 1437.36 1.00 1437.36 0.00 0 1.00 1437.36 100.00% 0.00 0.00 0.00%
01.03.01.02 SEGUIMIENTO A LAS FAMILIAS APLICANDO EL SID Y REFORZAMIENTO DE ACCIONES DE PROMOCIONGLB 1 13002 13002.00 1.00 13002.00 0.00 0 1.00 13002.00 100.00% 0.00 0.00 0.00%
01.03.02 ACTIVIDADES DE CAPACITACION 0.00 0 0.00
01.03.02.01 HABITOS DE HIGIENE Y SEGUIMIENTO A LAS FAMILIAS - SID GLB 1 406.26 406.26 1.00 406.26 0.00 0 1.00 406.26 100.00% 0.00 0.00 0.00%
01.03.02.02 PARTICIPACION CIUDADANA GLB 1 47.52 47.52 1.00 47.52 0.00 0 1.00 47.52 100.00% 0.00 0.00 0.00%
01.03.02.03 CONSERVACION DEL AGUA EN LA MICROCUENCA GLB 1 47.52 47.52 1.00 47.52 0.00 0 1.00 47.52 100.00% 0.00 0.00 0.00%
01.03.02.04 GESTION DE RIESGOS Y ATENCION DE EMERGENCIAS GLB 1 47.52 47.52 1.00 47.52 0.00 0 1.00 47.52 100.00% 0.00 0.00 0.00%
01.03.02.05 REFORZAMIENTO DE LOS TALLERES DE CAPACITACION GLB 1 994.92 994.92 1.00 994.92 0.00 0 1.00 994.92 100.00% 0.00 0.00 0.00%
01.03.03 EDUCACION PARALA HIGIENE Y LA SALUD 0.00 0 0.00
01.03.03.01 VERIFICACION, USO DE SERVICIOS Y HABITOS DE HIGIENE GLB 1 150.42 150.42 1.00 150.42 0.00 0 1.00 150.42 100.00% 0.00 0.00 0.00%
01.03.03.02 CONCURSO SOBRE HIGIENE EN EL DISTRITO PARA LOGRAR C.C. SALUDABLE GLB 1 1456.26 1456.26 1.00 1456.26 0.00 0 1.00 1456.26 100.00% 0.00 0.00 0.00%
01.03.03.03 CONCURSO EN LA II. EE. DE ESCUELA SALUDABLE GLB 1 312.72 312.72 1.00 312.72 0.00 0 1.00 312.72 100.00% 0.00 0.00 0.00%
01.03.03.04 ORGANIZACION Y DESARROLLO DE CAMPAÑA DE SALUD E HIGIENE GLB 1 7942.14 7942.14 1.00 7942.14 0.00 0 1.00 7942.14 100.00% 0.00 0.00 0.00%
01.03.03.05 ORGANIZACION Y DESARROLLO DE CAMPAÑA DE SALUD E HIGIENE EN LA II. EE. GLB 1 795 795.00 1.00 795.00 0.00 0 1.00 795.00 100.00% 0.00 0.00 0.00%
01.03.03.06 DIFUCION DE MENSAJES EDUCATIVOS SOBRE SANEAMIENTO GLB 1 300 300.00 1.00 300.00 0.00 0 1.00 300.00 100.00% 0.00 0.00 0.00%
6 PLAN DE MONITOREO ARQUEOLOGICO 0.00 0.00
1.01 PLAN DE MONITOREO ARQUEOLÓGICO GLB 1 24000 24000.00 1.00 24000.00 0.00000000 0 1.00 24000.00 100.00% 0.00 0.00 0.00%
COSTO DIRECTO 3,757,811.26 2,899,764.62 163,681.46 3,063,446.08 81.52% 694,365.15 18.48%
PORCENTAJE DE AVANCE 100.00 % 77.17 % 4.36 % 81.52 % 18.48 %
GASTOS GENERALES (10.16%) 381,755.42 294,586.61 16,628.37 311,214.98 70,540.44
VALORIZACION DE OBRA Nº 8 - TODAS LAS FORMULAS
PROPIET: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO MONTO PRESUPUESTADO: 5,106,399.54 CORRESPONDIENTE AL MES DE: JUNIO
OBRA: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO FECHA DE PRESENTACION: AL 30 DE JUNIO DEL 2017
AVANCES
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCIÓN
P.UNITARIO PRESUPUESTO VALORIZADO VALORIZADO VALORIZADO VALORIZADO
UND METRADO S/. S/. METRADO S/. METRADO S/. METRADO S/. % METRADO S/. %
2 SISTEMA DE ALCANTARILLADO
1.01 OBRAS PROVISIONALES
36892 TRANQUERAS DE MADERA 1.20X1.10 m PARA DESVIO TRANSITO VEHICULAR und 10 285.93 2859.30 10.00 2859.30 0.00 0 10.00 2859.30 100.00% 0.00 0.00 0.00%
36893 SEÑALIZACION EN DESVIOS Y SEGURIDAD EN VIAS DE GRA TRANSITO und 10 632.25 6322.50 10.00 6322.50 0.00 0 10.00 6322.50 100.00% 0.00 0.00 0.00%
36894 CONO DE VIDRIO FOSFORECENTE und 13 303.16 3941.08 13.00 3941.08 0.00 0 13.00 3941.08 100.00% 0.00 0.00 0.00%
36895 PUENTE DE MADERA PROVICIONAL, PARA PASE PEATONAL SOBRE ZANJAS und 8 806.1 6448.80 8.00 6448.80 0.00 0 8.00 6448.80 100.00% 0.00 0.00 0.00%
36896 CINTA PLASTICA SEÑALIZADORA PARA LIMITE DE SEGURIDAD DE OBRA ML 2500 2.77 6925.00 2500.00 6925.00 0.00 0 2500.00 6925.00 100.00% 0.00 0.00 0.00%
36897 SEÑALES NOCTURNAS und 40 119.71 4788.40 40.00 4788.40 0.00 0 40.00 4788.40 100.00% 0.00 0.00 0.00%
1.02 TRABAJOS PRELIMINARES 0.00 0.00 0.00
36923 LIMPIEZA DE TERRENO MANUAL ML 3256.65 1.18 3842.85 3256.65 3842.85 0.00 0 3256.65 3842.85 100.00% 0.00 0.00 0.00%
36924 REPLANTEO DURANTE LA EJECUCION DE OBRA ML 3256.65 3.7 12049.61 3256.65 12049.61 0.00 0 3256.65 12049.61 100.00% 0.00 0.00 0.00%
1.03 OBRAS DE DEMOLICION Y PEPOSICION DE PAVIMENTOS 0.00 0.00 0.00
36951 DEMOLICION DE BUZONES DE CONCRETO und 16 142.08 2273.28 16.00 2273.28 0.00 0 16.00 2273.28 100.00% 0.00 0.00 0.00%
36952 EXTRACCION DE ADOQUINES DE CONCRETO m2 222.35 4.82 1071.73 189.00 910.98 33.35 160.75 222.35 1071.73 100.00% 0.00 0.00 0.00%
36953 DEMOLICION DE PAVIMENTO DE CONCRETO m2 471.18 19.86 9357.63 471.18 9357.63 0.00 0 471.18 9357.63 100.00% 0.00 0.00 0.00%
36954 REPOSICION DE ADOQUINES DE CONCRETO m2 222.35 15.05 3346.37 189.00 2844.45 33.35 501.92 222.35 3346.37 100.00% 0.00 0.00 0.00%
36955 REPOSICION DE BASE GRANULAR m3 94.24 185.88 17517.33 80.16 14900.14 14.08 2617.19 94.24 17517.33 100.00% 0.00 0.00 0.00%
36956 LOSA PAV: CONCRETO FC=210KG/CM2 m3 94.24 472.29 44508.61 0.00 0.00 0.00 0 0.00 0.00 0.00% 94.24 44508.61 100.00%
1.04 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00
36982 EXCAVACION DE ZANJA CON MAQUINARIA EN TERRENO CONGLOMERADO H=1.20M - 1.50M, A=0.80M ML 3256.65 11.29 36767.58 3256.65 36767.58 0.00 0 3256.65 36767.58 100.00% 0.00 0.00 0.00%
36983 REFINE Y NIVELACION DE FONDOS PARA TUBERIAS ML 3256.65 1.81 5894.54 3256.65 5894.54 0.00 0 3256.65 5894.54 100.00% 0.00 0.00 0.00%
36984 CAMA DE ARENA E=0.10M P/TUB. DE DESAGUE (MANUAL) ML 3256.65 13.83 45039.47 3256.65 45039.47 0.00 0 3256.65 45039.47 100.00% 0.00 0.00 0.00%
36985 RECUBRIMIENTO DE TUBERIA CON MATERIAL DE PRESTAMO SELECCIONADO H=0.30M P/TUB DESAGUE ML 3256.65 17.17 55916.68 2768.00 47526.56 488.65 8390.12 3256.65 55916.68 100.00% 0.00 0.00 0.00%
36986 RELLENO Y COMPACTACION DE ZANJA EN CAPA DE 0.20M CON MATERIAL PROPIO C/EQUIPO ML 3256.65 34.23 111475.13 2768.00 94748.64 488.65 16726.49 3256.65 111475.13 100.00% 0.00 0.00 0.00%
36987 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=2KM m3 1424.78 11.85 16883.64 1211.00 14350.35 213.78 2533.29 1424.78 16883.64 100.00% 0.00 0.00 0.00%
1.05 SUMINISTRO E INSTALACION DE TUBERIAS 0.00 0.00 0.00
37012 SUMINISTRO E INSTALACION DE TUBERIA PVC NTP ISO 4435 DN=315MM ML 61.48 97.93 6020.74 61.48 6020.74 0.00 0 61.48 6020.74 100.00% 0.00 0.00 0.00%
37013 SUMINISTRO E INSTALACION DE TUBERIA PVC ISO 4435 25 DN 200 MM D8" ML 3207.72 33.32 106881.23 2726.40 90843.78 481.32 16037.45 3207.72 106881.23 100.00% 0.00 0.00 0.00%
1.06 PRUEVA HIDRÁULICA 0.00 0.00 0.00
37043 PRUEBA DE GRADIENTE DE HIDRAULICO, TENCION TRACTIVA Y VELOCIDAD TUB. PVC 315MM ML 61.48 3.64 223.79 61.48 223.79 0.00 0 61.48 223.79 100.00% 0.00 0.00 0.00%
37044 PRUEBA DE GRADIENTE DE HIDRAULICO, TENCION TRACTIVA Y VELOCIDAD TUB. PVC 200MM ML 3207.72 3.64 11676.10 2725.51 9920.86 482.21 1755.24 3207.72 11676.10 100.00% 0.00 0.00 0.00%
1.07 BUZONES DE INSPECCION 0.00 0.00 0.00
37073 TRABAJOS PRELIMINARES 0.00 0.00 0.00
01.07.01.01 TRAZO Y REPLANTEO CON NIVEL m2 92 5.85 538.20 92.00 538.20 0.00 0 92.00 538.20 100.00% 0.00 0.00 0.00%
37074 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00
01.07.02.01 EXCAVACION PARA BUZONES CON MAQUINARIA EN TERRENO NORMAL H=1.20M-1.50M, D=1.80M und 92 45.15 4153.80 77.00 3476.55 15.00 677.25 92.00 4153.80 100.00% 0.00 0.00 0.00%
01.07.02.02 REFINE, NIVELACION Y COFORMACION DE FONDO DE BUZON D=1.80M und 92 4.01 368.92 77.00 308.77 15.00 60.15 92.00 368.92 100.00% 0.00 0.00 0.00%
01.07.02.03 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=2KM m3 244.26 11.85 2894.48 206.58 2447.97 37.68 446.51 244.26 2894.48 100.00% 0.00 0.00 0.00%
37075 CONCRETO SIMPLE 0.00 0.00 0.00
01.07.03.01 CONCRETO f'c=100 kg/cm2 PARA SOLADO m2 162.84 29.45 4795.64 137.64 4053.50 25.20 742.14 162.84 4795.64 100.00% 0.00 0.00 0.00%
01.07.03.02 DADOS DE ANCLAJE 0.40X0.40X0.30M PARA TUBERIA F'c=140 KG/CM2 und 92 66.83 6148.36 77.00 5145.91 15.00 1002.45 92.00 6148.36 100.00% 0.00 0.00 0.00%
VALORIZACION DE OBRA Nº 8 - FORMULA Nº 2
PROPIET: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO MONTO PRESUPUESTADO: 5,106,399.54 CORRESPONDIENTE AL MES DE: JUNIO
OBRA: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO DE S FECHA DE PRESENTACION: AL 30 DE JUNIO DEL 2017
AVANCES
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCIÓN
UND METRADO P.UNITARIO PRESUPUESTO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO %
S/. S/. S/. S/. S/. S/.
37076 BUZONES 0.00 0.00 0.00
01.07.04.01 CONSTRUCCION DE BUZON D=1.20; H=1.20 - 1.50M und 92 1932.02 177745.84 77.00 148765.54 15.00 28980.3 92.00 177745.84 100.00% 0.00 0.00 0.00%
2 PASE AEREO PARA TUBERIAS DE 10" L=15m 0.00 0.00 0.00
2.01 OBRAS PRELIMINARES 0.00 0.00 0.00
37257 TRAZO Y REPLANTEO m2 17.8 17.77 316.31 0.00 0.00 0.00 0 0.00 0.00 0.00% 17.80 316.31 100.00%
37258 ELIMINACION DE MALEZA m2 17.8 3.93 69.95 0.00 0.00 0.00 0 0.00 0.00 0.00% 17.80 69.95 100.00%
2.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00
37288 EXCAVACION MANUAL EN TERRENO SEMIROCOSO m3 28.38 19.68 558.52 0.00 0.00 0.00 0 0.00 0.00 0.00% 28.38 558.52 100.00%
37289 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=2KM m3 36.89 11.85 437.15 0.00 0.00 0.00 0 0.00 0.00 0.00% 36.89 437.15 100.00%
2.03 CONCRETO SIMPLE 0.00 0.00 0.00
37316 CONCRETO PARA CAMARA DE ANCLAJE FC=175KG/CM2 und 21.16 491.72 10404.80 0.00 0.00 0.00 0 0.00 0.00 0.00% 21.16 10404.80 100.00%
37317 CONCRETO f'c=100 kg/cm2 PARA SOLADO m2 7.22 29.45 212.63 0.00 0.00 0.00 0 0.00 0.00 0.00% 7.22 212.63 100.00%
2.04 CONCRETO ARMADO 0.00 0.00 0.00
37347 CONCRETO EN ZAPATAS FC=175KG/CM2 m3 7.22 489.73 3535.85 0.00 0.00 0.00 0 0.00 0.00 0.00% 7.22 3535.85 100.00%
37348 CONCRETO EN COLUMNAS f'c=210 kg/cm2 m3 3.3 484.21 1597.89 0.00 0.00 0.00 0 0.00 0.00 0.00% 3.30 1597.89 100.00%
37349 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 13.74 61.3 842.26 0.00 0.00 0.00 0 0.00 0.00 0.00% 13.74 842.26 100.00%
37350 ACERO DE REFUERZO fy=4,200 KG/CM2 kg 488.04 6.06 2957.52 0.00 0.00 0.00 0 0.00 0.00 0.00% 488.04 2957.52 100.00%
2.05 REBOQUES Y ENLUCIDOS 0.00 0.00 0.00
37377 TARRAJEO EN EXTERIORES MEZCLA DE 1:5 C-A, E=1.5CM m2 27.48 35.66 979.94 0.00 0.00 0.00 0 0.00 0.00 0.00% 27.48 979.94 100.00%
2.06 PINTURA 0.00 0.00 0.00
37408 PINTURA EN METAL ANTICORROSIVA Y ESMALTE 2 MANOS m2 27.48 132.34 3636.70 0.00 0.00 0.00 0 0.00 0.00 0.00% 27.48 3636.70 100.00%
2.07 TUBERIAS CABLES Y ACCESORIOS 0.00 0.00 0.00
37438 SUMINISTRO E INSTALACION DE SISTEMA DE SUSPENCION und 1 13299.33 13299.33 0.00 0.00 0.00 0 0.00 0.00 0.00% 1.00 13299.33 100.00%
37439 SUMINISTRO E INSTALACION DE TUBERIA DE F"F" DN=315MM Y ACCESORIOS EN CRUCE AEREO und 1 26436.34 26436.34 0.00 0.00 0.00 0 0.00 0.00 0.00% 1.00 26436.34 100.00%
3 CONEXIONES DOMICILIARIAS 0.00 0.00 0.00
3.01 OBRAS PRELIMINARES 0.00 0.00 0.00
37622 TRAZO Y REPLANTEO ML 1058.1 1.24 1312.04 899.32 1115.16 158.78 196.89 1058.10 1312.04 100.00% 0.00 0.00 0.00%
3.02 OBRAS DE DEMOLICION Y PEPOSICION DE PAVIMENTOS 0.00 0.00 0.00
37653 EXTRACCION DE ADOQUINES DE CONCRETO m2 250.75 4.82 1208.62 250.75 1208.62 0.00 0 250.75 1208.62 100.00% 0.00 0.00 0.00%
37654 DEMOLICION DE PAVIMENTO DE CONCRETO m2 463.25 19.86 9200.15 463.25 9200.15 0.00 0 463.25 9200.15 100.00% 0.00 0.00 0.00%
37655 REPOSICION DE ADOQUINES DE CONCRETO m2 250.75 15.05 3773.79 213.00 3205.65 37.75 568.14 250.75 3773.79 100.00% 0.00 0.00 0.00%
37656 REPOSICION DE BASE GRANULAR m3 92.65 185.88 17221.78 78.75 14638.51 13.90 2583.27 92.65 17221.78 100.00% 0.00 0.00 0.00%
37657 LOSA PAV: CONCRETO FC=210KG/CM2 m3 92.65 472.29 43757.67 0.00 0.00 92.65 43757.67 92.65 43757.67 100.00% 0.00 0.00 0.00%
3.03 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00
37681 EXCAVACION DE ZANJA MANUAL P/TUB DE DESAGUE EN TERRENO CONGLOMERADO ML 1020.9 29.52 30136.97 867.83 25618.34 153.07 4518.63 1020.90 30136.97 100.00% 0.00 0.00 0.00%
37682 REFINE Y NIVELACION FONDOS PARA TUB. DESAGUE ML 1020.9 1.97 2011.17 867.83 1709.63 153.07 301.55 1020.90 2011.17 100.00% 0.00 0.00 0.00%
37683 CAMA DE ARENA E=0.10M P/TUB. DE DESAGUE (MANUAL) ML 1020.9 13.83 14119.05 867.83 12002.09 153.07 2116.96 1020.90 14119.05 100.00% 0.00 0.00 0.00%
37684 RECUBRIMIENTO DE TUBERIA CON MATERIAL DE PRESTAMO SELECCIONADO H=0.30M P/TUB DESAGUE ML 1020.9 17.17 17528.85 867.83 14900.64 153.07 2628.21 1020.90 17528.85 100.00% 0.00 0.00 0.00%
37685 RELLENO Y COMPACTACION DE ZANJA EN CAPA DE 0.20M CON MATERIAL PROPIO C/EQUIPO ML 1020.9 34.23 34945.41 867.83 29705.82 153.07 5239.59 1020.90 34945.41 100.00% 0.00 0.00 0.00%
37686 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=2KM m3 63.81 11.85 756.15 54.21 642.39 9.60 113.76 63.81 756.15 100.00% 0.00 0.00 0.00%
3.04 CONEXIONES DOMICILIARIAS 0.00 0.00 0.00
VALORIZACION DE OBRA Nº 8 - FORMULA Nº 2
PROPIET: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO MONTO PRESUPUESTADO: 5,106,399.54 CORRESPONDIENTE AL MES DE: JUNIO
OBRA: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO DE S FECHA DE PRESENTACION: AL 30 DE JUNIO DEL 2017
AVANCES
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCIÓN
UND METRADO P.UNITARIO PRESUPUESTO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO %
S/. S/. S/. S/. S/. S/.
37712 SUMINISTRO E INSTALACION DE TUBERIA PVC NTP ISO 4435, D=110MM, S-20 ML 1020.9 24.19 24695.57 867.83 20992.81 153.07 3702.76 1020.90 24695.57 100.00% 0.00 0.00 0.00%
37713 CONEXIONES DOMICILIARIAS DE DESAGUE und 298 201.28 59981.44 278.00 55955.84 20.00 4025.6 298.00 59981.44 100.00% 0.00 0.00 0.00%
3.05 PRUEBAS HIDRAULICAS 0.00 0.00 0.00
37742 PRUEBA DE GRADIENTE DE TUBERIA PVC DESAGUE ML 1020.9 2.73 2787.06 867.83 2369.18 153.07 417.88 1020.90 2787.06 100.00% 0.00 0.00 0.00%
4 FLETE TERRESTRE 0.00 0.00 0.00
4.01 FLETE TERRESTRE (ALCANTARILLADO) 0.00 0.00 0.00
04.01.01 FLETE TERRESTRE SISTEMA DE DESAGUE GLB 1 84000 84000.00 1.00 84000.00 0.00 0 1.00 84000.00 100.00% 0.00 0.00 0.00%
COSTO DIRECTO 1,131,397.54 870,801.60 150,802.16 1,021,603.74 90.30% 109,793.80 9.70%
PORCENTAJE DE AVANCE 100.00 % 76.97 % 13.33 % 90.30 % 9.70 %
GASTOS GENERALES (10.16%) 114,938.49 88,464.59 15,319.97 103,784.56 11,153.93
UTILIDAD (5.00%) 56,569.88 43,540.08 7,540.11 51,080.19 5,489.69
SUB TOTAL 1,302,905.91 1,002,806.27 173,662.24 1,176,468.49 126,437.42
IGV (18%) 234,523.06 180,505.13 31,259.20 211,764.33 22,758.74
TOTAL DE PRESUPUESTO 1,537,428.97 1,183,311.40 204,921.44 1,388,232.82 149,196.16
VALORIZACION DE OBRA Nº 8 - FORMULA Nº 3
PROPIET: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO MONTO PRESUPUESTADO: 5,106,399.54 CORRESPONDIENTE AL MES DE: JUNIO
OBRA: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO DE S FECHA DE PRESENTACION: AL 30 DE JUNIO DEL 2017
AVANCES
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCIÓN
UND METRADO P.UNITARIO PRESUPUESTO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO %
S/. S/. S/. S/. S/. S/.
4 MEDIDAS DE SEGURIDAD Y MITIGACION AMBIENTAL 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
1.01 PLAN DE SEGURIDAD 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
36892 ELABORACION E IMPLEMENTACION DE SEGURIDAD GLB 1 5000 5000.00 1.00 5000.00 0.00 0 1.00 5000.00 100.00% 0.00 0.00 0.00%
1.02 SALUD EN EL TRABAJO 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
36923 EQUIPOS DE PROTECCION INDIVIDUAL GLB 1 7550 7550.00 1.00 7550.00 0.00 0 1.00 7550.00 100.00% 0.00 0.00 0.00%
36924 EQUIPOS DE PROTECCION COLECTIVA GLB 1 2002.36 2002.36 1.00 2002.36 0.00 0 1.00 2002.36 100.00% 0.00 0.00 0.00%
36925 SEÑALIZACION TEMPORAL DE SEGURIDAD GLB 1 3000 3000.00 1.00 3000.00 0.00 0 1.00 3000.00 100.00% 0.00 0.00 0.00%
36926 CAPACITACION EN SEGURIDAD Y SALUD GLB 1 2000 2000.00 1.00 2000.00 0.00 0 1.00 2000.00 100.00% 0.00 0.00 0.00%
1.03 EMERGENCIAS 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
36951 SUMINISTRO DE RECURSOS PARA EMERGENCIAS MES 6 2260 13560.00 6.00 13560.00 0.00 0 6.00 13560.00 100.00% 0.00 0.00 0.00%
2 MITIGACION AMBIENTAL 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
2.01 ACTIVIDADES DE CAPACITACION 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
37257 CAPACITACION EN MITIGACION AMBIENTAL GLB 1 3000 3000.00 1.00 3000.00 0.00 0 1.00 3000.00 100.00% 0.00 0.00 0.00%
37258 CAPACITACION EN MANEJO DE RECIDUOS SOLIDOS Y LIQUIDOS GLB 1 4000 4000.00 1.00 4000.00 0.00 0 1.00 4000.00 100.00% 0.00 0.00 0.00%
2.02 MEDIDAS DE PREVENCION, MITIGACION Y/O CORRECCION DE IMPACTOS AMBIENTALES 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
37288 MEDIDAS DE PREVENCION Y MITIGACION GLB 1 13500 13500.00 1.00 13500.00 0.00 0 1.00 13500.00 100.00% 0.00 0.00 0.00%
2.03 SEGUIMIENTO Y CONTROL 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
37316 MONITOREO Y CONTROL DE IMPACTOS GLB 1 15000 15000.00 1.00 15000.00 0.00 0 1.00 15000.00 100.00% 0.00 0.00 0.00%
2.04 PLAN DE CONTINGENCIA 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
37347 PROCEDIMIENTOS DE RESPUESTA ANTE EMERGENCIAS GLB 1 7000 7000.00 1.00 7000.00 0.00 0 1.00 7000.00 100.00% 0.00 0.00 0.00%
2.05 PLAN DE CIERRE Y ABANDONO 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
37377 ACONDICIONAMIENTO Y RESTAURACION DE AREAS INTERVENIDAS GLB 1 10000 10000.00 1.00 10000.00 0.00 0 1.00 10000.00 100.00% 0.00 0.00 0.00%
COSTO DIRECTO 85,612.36 85,612.36 0.00 85,612.36 100.00% 0.00 0.00%
PORCENTAJE DE AVANCE 100.00 % 100.00 % 0.00 % 100.00 % 0.00 %
GASTOS GENERALES (10.16%) 8,697.35 8,697.35 0.00 8,697.35 0.00
UTILIDAD (5.00%) 4,280.62 4,280.62 0.00 4,280.62 0.00
SUB TOTAL 98,590.33 98,590.33 0.00 98,590.33 0.00
IGV (18%) 17,746.26 17,746.26 0.00 17,746.26 0.00
TOTAL DE PRESUPUESTO 116,336.59 116,336.59 0.00 116,336.59 0.00
VALORIZACION DE OBRA Nº 8 - FORMULA Nº 05
PROPIET: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO MONTO PRESUPUESTADO: 5,106,399.54 CORRESPONDIENTE AL MES DE: JUNIO
OBRA: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL DEL DISTRITO DE S FECHA DE PRESENTACION: AL 30 DE JUNIO DEL 2017
AVANCES
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCIÓN
UND METRADO P.UNITARIO PRESUPUESTO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO %
S/. S/. S/. S/. S/. S/.
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS
RESIDUALES EN LA CAPITAL DEL DISTRITO DE SAN JUAN DEL ORO-SANDIA-PUNO
ENTIDAD EJEC: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO MES ACTUAL: JUNIO
TODAS LAS FORMULAS
DEL PROGRAMADO
Ver cronograma de ejecucion valorizado con fecha real de inicio de obra
FECHA VALORIZACION PORCENTAJE ACUMULADO
DEL AL PROGRAMADA MENSUAL ACUMULADO AL 80.00%
24/11/2016 30/11/2016 673,181.67 17.91% 17.91% 14.33%
12/1/2016 31/12/2016 829,942.83 22.09% 40.00% 32.00%
1/1/2017 31/01/2017 73,624.88 1.96% 41.96% 33.57%
2/1/2017 28/02/2017 150,394.69 4.00% 45.96% 36.77%
3/1/2017 31/03/2017 686,164.17 18.26% 64.22% 51.38%
4/1/2017 30/04/2017 299,708.15 7.98% 72.20% 57.76%
5/1/2017 31/05/2017 127,256.22 3.39% 75.58% 60.47%
6/1/2017 30/06/2017 213,235.81 5.67% 81.26% 65.01%
7/1/2017 30/07/2017 263,124.35 7.00% 88.26% 70.61%
DEL EJECUTADO
Ver cronograma de ejecucion valorizado con fecha real de inicio de obra
FECHA VALORIZACION PORCENTAJE
DEL AL EJECUTADA MENSUAL ACUMULADO
11/24/2016 30/11/2016 673,181.67 17.91% 17.91%
12/1/2016 31/12/2016 829,942.83 22.09% 40.00%
1/1/2017 31/01/2017 133,116.96 3.54% 43.54%
2/1/2017 28/02/2017 150,394.69 4.00% 47.54%
3/1/2017 31/03/2017 686,164.17 18.26% 65.80%
4/1/2017 30/04/2017 299,708.15 7.98% 73.78%
5/1/2017 31/05/2017 127,256.22 3.39% 77.17%
6/1/2017 30/06/2017 163,681.46 4.36% 81.52%
7/1/2017 30/07/2017
La obra se encuentra retrasada pero existe justificacion por causas no atribuibles al contratista
y se encuentra compensada en general con los adicionales de obra ejecutados a la fecha
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS
RESIDUALES EN LA CAPITAL DEL DISTRITO DE SAN JUAN DEL ORO-SANDIA-PUNO
ENTIDAD EJEC: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO MES ACTUAL: JUNIO
TODAS LAS FORMULAS
DEL PROGRAMADO
Ver cronograma de ejecucion valorizado con fecha real de inicio de obra
FECHA VALORIZACION PORCENTAJE ACUMULADO
DEL AL PROGRAMADA MENSUAL ACUMULADO AL 80.00%
24/11/2016 30/11/2016 914,770.41 17.91% 17.91% 14.33%
01/12/2016 31/12/2016 1,127,789.39 22.09% 40.00% 32.00%
01/01/2017 31/01/2017 100,047.12 1.96% 41.96% 33.57%
01/02/2017 28/02/2017 204,367.73 4.00% 45.96% 36.77%
01/03/2017 31/03/2017 932,412.02 18.26% 64.22% 51.38%
01/04/2017 30/04/2017 407,266.21 7.98% 72.20% 57.76%
01/05/2017 31/05/2017 172,925.42 3.39% 75.58% 60.47%
01/06/2017 30/06/2017 289,761.02 5.67% 81.26% 65.01%
01/07/2017 30/07/2017 357,553.37 7.00% 88.26% 70.61%
DEL EJECUTADO
Ver cronograma de ejecucion valorizado con fecha real de inicio de obra
FECHA VALORIZACION PORCENTAJE
DEL AL EJECUTADA MENSUAL ACUMULADO
24/11/2016 30/11/2016 914,770.41 17.91% 17.91%
01/12/2016 31/12/2016 1,127,789.39 22.09% 40.00%
01/01/2017 31/01/2017 180,889.45 3.54% 43.54%
01/02/2017 28/02/2017 204,367.73 4.00% 47.54%
01/03/2017 31/03/2017 932,412.02 18.26% 65.80%
01/04/2017 30/04/2017 407,266.21 7.98% 73.78%
01/05/2017 31/05/2017 172,925.42 3.39% 77.17%
01/06/2017 30/06/2017 222,422.80 4.36% 81.52%
01/07/2017 30/07/2017
La obra se encuentra retrasada pero existe justificacion por causas no atribuibles al contratista
y se encuentra compensada en general con los adicionales de obra ejecutados a la fecha
CURVA "S" (TODAS LAS FORMULAS)
OBRA:
MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA CAPITAL
DEL DISTRITO DE SAN JUAN DEL ORO-SANDIA-PUNO
ENTIDAD: MUNICIPALIDAD DISTRITAL DE SAN JUAN DEL ORO Programado
LOCALIDAD: SAN JUAN DEL ORO - CERCADO Ejecutado
CURVA S
PROGRAMADO
DIAS % ACUM. Column B Column B
0 0.00%
7 17.91%
38 40.00% 88.26%
69 41.96%
81.52%
97 45.96% 81.26%
77.17%
128 64.22%
73.78% 75.58%
158 72.20% 72.20%
189 75.58%
65.80%
219 81.26% 64.22%
249 88.26%
% DE AVANCE
EJECUTADO 47.54%
43.54% 45.96%
DIAS % ACUM.
40.00% 41.96%
0 0.00% 40.00%
7 17.91%
38 40.00%
69 43.54%
97 47.54%
128 65.80% 17.91%
17.91%
158 73.78%
189 77.17%
219 81.52% DIAS CALENDARIOS
249
0.00%
0.00%
0 7 38 69 97 128 158 189 219 249
DIAS CALENDARIOS
0.00%
0.00%
0 7 38 69 97 128 158 189 219 249
CUADROS DE CONTROL DE VALORIZACIONES
Nombre 351706
del MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, Código SNIP:
Proyecto: ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES EN LA
CAPITAL DEL DISTRITO DE SAN JUAN DEL ORO-SANDIA-PUNO Fecha:
Total:
Nombre Teléfono Correo Electrónico
8.-Residente de Obra: Ing. Henry Willy LUPACA MIRANDA 985559155 hwlupacam@hotmail.com
9.-Inspector de Obra:
10.-Supervisor de Obra: Ing Rubine Ronald Valle Vivar 951412215 rubineronald@gmail.com
11.-Coordinador - U.E.:
12.-Coord. INFOBRAS:
13.-Otros Documentos Técnicos:
13.1.-Certificación Ambiental: SI X NO
13.2.-San. Físico Legal /Libre Disp. de Terreno: SI X NO
13.3.-Autorización de Fuente de Agua: SI X NO
13.4.-Aut. de Vert. de Aguas Residuales: SI NO X
13.5.-Cert. de Inex. de Restos Arqueologicos. (CIRA): SI X NO
13.6.-Otros: SI NO
HOJA 1
ANEXO 3-AVANCE DE EJECUCIÓN FÍSICA Y FINANCIERA DEL PROYECTO
CODIGO SNIP: 351706
UBICACIÓN:
REGION: PUNO PROVINCIA: SANDIA DISTRITO: SAN JUAN DEL ORO
CONTRATO DE
OBRA N° CONTRATO DE EJECUCION DE OBRA Contratista
Nº 001-2016-MDSJO/A CONSORCIO SAN JUAN
CARTAS FIANZA:
Fechas de Vigencia
Entidad Financiera Tipo Número Monto S/.
Inicio Fin
Adelanto Directo
Adel. Para Materiales
ADICIONALES DE OBRA:
DEDUCTIVOS DE OBRA:
AMPLIACIONES DE PLAZO:
HOJA 1
ANEXO 3-AVANCE DE EJECUCIÓN FÍSICA Y FINANCIERA DEL PROYECTO
Obs: Llemar el % de avance físico y financiero programado de acuerdo al cronograma aprobado desde la
fecha de inicio de obra hasta la fecha de culminación.
Atrasada: X Paralizada:
HOJA 2