OBRA: NICOLAS SAN JUAN 834 FECHA: 24-May-19

UBICACIÓN: AV. NICOLAS SAN JUAN No. 834., COL. DEL VALLE., ALCALDIA BENITO JUAREZ
CDMX
HOJA NO. 1

Concepto: Descipción: RESUMEN VARILLAS, EN DIFERENTES DIAMETROS, EN TODOS LOE NIVELES. REFERENCIA:
PLANOS ESTRUCTURALES
E-01, E02 ,E-03, E-04, E-05, E-06, E-07
E-08, E-09,E-10

LOCALIZACION RESULTADOS
UNIDAD Croquis de Localización
TOTAL

CIMENTACION
Varilla # 3 (3/8") Ton 6.99
Varilla # 4 (1/2") Ton 31.87
Varilla # 5 (5/8") Ton 0.51
Varilla # 6 (3/4") Ton 0.51
Varilla # 8 (1") Ton 11.02

NIVEL +0.54
Varilla # 2 (1/4") Ton 0.81
Varilla # 3 (3/8") Ton 12.30
Varilla # 4 (1/2") Ton 5.38
Varilla # 5 (5/8") Ton 8.02
Varilla # 6 (3/4") Ton 1.99
Varilla # 8 (1") Ton 0.90

NIVEL +1.80, +3.06


Varilla # 2 (1/4") Ton 1.62
Varilla # 3 (3/8") Ton 12.30
Varilla # 4 (1/2") Ton 5.38
Varilla # 5 (5/8") Ton 8.02
Varilla # 6 (3/4") Ton 1.99
Varilla # 8 (1") Ton 0.90

ELABORO Vo.Bo.
OBRA: NICOLAS SAN JUAN 834 FECHA: 24-May-19
UBICACIÓN: AV. NICOLAS SAN JUAN No. 834., COL. DEL VALLE., ALCALDIA BENITO JUAREZ
CDMX
HOJA NO. 2

Concepto: Descipción: REFERENCIA:


RESUMEN VARILLAS, EN DIFERENTES DIAMETROS, EN TODOS LOE NIVELES.
PLANOS ESTRUCTURALES
E-01, E02 ,E-03, E-04, E-05, E-06, E-07
E-08, E-09,E-10

LOCALIZACION RESULTADOS
UNIDAD Croquis de Localización
TOTAL

NIVEL +5.58
Varilla # 2 (1/4") Ton 0.64
Varilla # 3 (3/8") Ton 12.30
Varilla # 4 (1/2") Ton 5.38
Varilla # 5 (5/8") Ton 8.02
Varilla # 6 (3/4") Ton 1.72
Varilla # 8 (1") Ton 0.90

NIVEL +8.10
Varilla # 2 (1/4") Ton 0.64
Varilla # 3 (3/8") Ton 8.14
Varilla # 4 (1/2") Ton 5.38
Varilla # 5 (5/8") Ton 8.02
Varilla # 6 (3/4") Ton 1.72
Varilla # 8 (1") Ton 0.70

NIVEL +9.36, +10.62


Varilla # 2 (1/4") Ton 0.92
Varilla # 3 (3/8") Ton 12.30
Varilla # 4 (1/2") Ton 5.38
Varilla # 5 (5/8") Ton 8.02
Varilla # 6 (3/4") Ton 1.72
Varilla # 8 (1") Ton 0.90

ELABORO Vo.Bo.
OBRA: NICOLAS SAN JUAN 834 FECHA: 24-May-19
UBICACIÓN: AV. NICOLAS SAN JUAN No. 834., COL. DEL VALLE., ALCALDIA BENITO JUAREZ
CDMX
HOJA NO. 3

Concepto: Descipción: REFERENCIA:


RESUMEN VARILLAS, EN DIFERENTES DIAMETROS, EN TODOS LOE NIVELES.
PLANOS ESTRUCTURALES
E-01, E02 ,E-03, E-04, E-05, E-06, E-07
E-08, E-09,E-10

LOCALIZACION RESULTADOS
UNIDAD Croquis de Localización
TOTAL

NIVEL +13.14
Varilla # 2 (1/4") Ton 0.92
Varilla # 3 (3/8") Ton 8.40
Varilla # 4 (1/2") Ton 5.38
Varilla # 5 (5/8") Ton 8.02
Varilla # 6 (3/4") Ton 1.72
Varilla # 8 (1") Ton -

NIVEL +15.81
Varilla # 3 (3/8") Ton 2.97
Varilla # 4 (1/2") Ton 3.38
CM-1 (IR 6" X 22.40 Kg) Ton 3.03
VA-1 (IR 6" X 22.40 Kg) Ton 1.75

CUBIERTA DE ESCALERAS
Varilla # 3 (3/8") Ton 1.18
Varilla # 5 (5/8") Ton 0.90

COLUMNAS
Varilla # 3 (3/8") Ton 59.95
Varilla # 6 (3/4") Ton 6.55
Varilla # 8 (1") Ton 3.82

ELABORO Vo.Bo.
OBRA: NICOLAS SAN JUAN 834 FECHA: 24-May-19
UBICACIÓN: AV. NICOLAS SAN JUAN No. 834., COL. DEL VALLE., ALCALDIA BENITO JUAREZ
CDMX
HOJA NO. 1

Concepto: Descipción: RESUMEN CONCRETO PREMEZCLADO REFERENCIA:


PLANOS ESTRUCTURALES
E-01, E02 ,E-03, E-04, E-05, E-06, E-07
E-08, E-09,E-10

LOCALIZACION RESULTADOS
UNIDAD Croquis de Localización
TOTAL

CIMENTACION
CONTRATRABES m3 121.33
LOSA DE CIMENTACION m3 170.00
¹ CISTERNA m3 24.66
MODULO DE ELEVADORES m3 7.60
FOSO DE MONTA AUTOS m3 8.79
MUROS PERIMETRALES m3 74.69

NIVEL +0.54
LOSA m3 79.32

NIVEL +1.80, +3.06


LOSA m3 85.14

NIVEL +5.58
LOSA m3 80.40

NIVEL +8.10
LOSA m3 80.40

NIVEL +9.36, +10.62


LOSA m3 85.14

ELABORO Vo.Bo.
OBRA: NICOLAS SAN JUAN 834 FECHA: 24-May-19
UBICACIÓN: AV. NICOLAS SAN JUAN No. 834., COL. DEL VALLE., ALCALDIA BENITO JUAREZ
CDMX
HOJA NO. 2

Concepto: Descipción: REFERENCIA:


RESUMEN VARILLAS, EN DIFERENTES DIAMETROS, EN TODOS LOE NIVELES.
PLANOS ESTRUCTURALES
E-01, E02 ,E-03, E-04, E-05, E-06, E-07
E-08, E-09,E-10

LOCALIZACION RESULTADOS
UNIDAD Croquis de Localización
TOTAL

NIVEL +13.14
LOSA m3 85.14

NIVEL +15.81
LOSA m3 22.75

CUBIERTA DE ESCALERAS
LOSA m3 2.10

¹ NOTA: EN EL CASO DE LA CISTERNA SE CONSIDERA


CONCRETO PREMEZCLADO CON IMPERMEABILIZANTE
INTEGRAL

ELABORO Vo.Bo.