01 CERCO PERIMETRICO
01.01 TRABAJOS PRELIMINARES
01.01.01 LIMPIEZA DE TERRENO MANUAL m2 19.55
01.01.02 TRAZO , NIVELES Y REPLANTEO PRELIMINAR m2 19.55
01.01.03 TRAZO , NIVELES Y REPLANTEO DURANTE EL PROCESO m2 19.55
01.02 MOVIMIENTO DE ZANJAS
01.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS MANUAL m3 35.18
01.02.02 RELLENO COMPACTADO CON AFIRMADO EN BASE DE CIMIENTOS E=0.20 M. m3 16.20
01.02.03 ELIMINACION MAT. EXCEDENTE EN CARRETILLA m3 16.20
01.03 OBRAS DE CONCRETO SIMPLE
01.03.01 FALSO CIMIENTO, MEZCLA 1:12 (C:H) E=0.30 M. m2 3.85
01.03.02 CONCRETO EN CIMIENTOS CORRIDOS 1:10+30% PG m3 14.11
01.03.03 CONCRETO EN SOBRECIMIENTOS 1:8+25% PM E= 0.60 M. m3 14.11
01.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 19.24
01.04 OBRAS DE CONCRETO ARMADO
01.04.01 COLUMNAS
01.04.01.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2 m3 7.34
01.04.01.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 9.34
01.04.01.03 ACERO EN COLUMNAS fy=4200 Kg/cm2 GRADO 60 kg 1,026.67
01.04.02 VIGA DE CIMENTACION
01.04.02.01 CONCRETO EN VIGAS DE CIMENTACION f'c=175 kg/cm2 m3
01.04.02.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2
01.04.02.03 ACERO EN VIGAS DE CIMENTACION fy=4200 Kg/cm2 GRADO 60 kg
01.04.03 VIGAS DE AMARRE
01.04.03.01 CONCRETO EN VIGAS DE AMARRE f'c=175 kg/cm2 m3
01.04.03.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2
01.04.03.03 ACERO EN VIGAS DE AMARRE fy=4200 Kg/cm2 GRADO 60 kg
01.05 MUROS Y TABIQUES DE ALBAÑILERÍA
MURO DE LADRILLO K.K. DE ARCILLA DE SOGA CON MEZCLA 1:5 (C:A)
01.05.01 m2 141.75
COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDADES (10%)
SUBTOTAL
IMPUESTOS (18%)
TOTAL
PU PARCIAL
3.61 70.58
2.90 56.70
2.90 56.70
37.65 1,324.53
37.74 611.39
18.19 294.68
192.83 2,720.83
381.90 5,388.61
35.53 683.60
393.09 2,885.28
54.80 511.83
4.39 4,507.08
415.43 0.00
57.98 0.00
4.39 0.00
415.43 0.00
57.98 0.00
4.39 0.00
62.50 8,859.38
0.00
27.73 4,041.65
16.38 2,387.39
10.50 10,584.00
15.63 18,906.05
18.19 22,002.62
59.16 1,677.19
412.95 1,916.09
35.42 13,459.60
10.50 1,512.00
0.00
8,500.00 8,500.00
0.00
0.00
400.00 400.00
420.00 420.00
450.00 450.00
680.00 680.00
940.00 1,880.00
455.20 3,641.60
466.25 16,318.80
523.36 26,167.92
536.91 3,758.40
786.57 43,410.72
350.00 350.00
15.90 1,844.40
62.90 377.40
62.90 1,446.70
70.58 87,768.35
0.00
1,721.38 1,721.38
93.65 280.95
4,500.00 4,500.00
5,500.00 5,500.00
3,500.00 3,500.00
5,500.00 5,500.00
8,500.00 8,500.00
107.91 323.73
2,500.00 2,500.00
2,500.00 2,500.00 0.100125
17,500.00 17,500.00
8,500.00 8,500.00
0.00
0.00
0.00
362,698.09
36,269.81
36,269.81
435,237.71
78,342.79
513,580.50
ITEM DESCRIPCIÓN UND METRADO
01 CERCO PERIMETRICO
01.01 TRABAJOS PRELIMINARES
02.03.02 PISO CEMENTO PULIDO m2 1,243.53
02.03.03 PISO CEMENTO PULIDO BRUÑADO m2 7.86
COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDADES (10%)
SUBTOTAL
IMPUESTOS (18%)
TOTAL
PU PARCIAL
38.78 48,224.09
53.81 422.95
48,647.04
4,864.70
4,864.70
58,376.45
10,507.76
68,884.21