6.01 TUBERIAS
6.01.01 Tubería PVC SAP 4" 19.00
reservorio - rebose ml 1 7.37 7.37
limpieza ml 1 1.75 1.75
ingredo de agua al reservorio ml 1 6.41 6.41
salida a aduccion ml 1 3.47 3.47
6.02 ACCESORIOS
6.02.01 Valvulas de compuerta de 4" und 4 4.00 4.00
CANT DE
DESCRIPCI LONG Nº DE
ITEM PARTIDA TIPO Ø ELEMENT Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
ON PARCIAL VECES
OS
CIMENTACION -MURO
VERTICAL EXTERIOR AC.PRINC Ø 1/2" 3.82 130.00 1.00 496.60
PERIMETRAL
INTERIOR AC.PRINC Ø 1/2" 3.82 124.00 1.00 473.68
INTERIOR REFUERZO Ø 1/2" 2.52 124.00 1.00 312.48
INTERIOR REFUERZO Ø 3/8" 3.95 248.00 1.00 979.60
HORIZONT
EXTERIOR AC.PRINC Ø 1/2" 17.14 21.00 1.00 359.94
AL
INTERIOR AC.PRINC Ø 3/8" 26.51 124.00 1.00
FONDO
VERTICAL Ø 3/8" 6.80 32.00 1.00 217.60
BASE HORIZONT
Ø 3/8" 6.80 32.00 1.00 217.60
AL
CASETA DE VALVULA BASE VERTICAL AC.PRINC Ø 3/8" 2.65 10.00 1.00 26.50
HORIZONT
AC.PRINC Ø 3/8" 1.99 14.00 1.00 27.86
AL
EJECUTADO % 32.89%
CRONOGRAMA
PROGRAMADO VS EJECUTADO
EN (%)
50.00%
45.00%
40.00%
35.00%
30.00%
25.00%
20.00%
15.00%
10.00%
5.00%
0.00%
1 2 3 4
EJECUTADO PROGRAMADO
CRONOGRAMA
PROGRAMADO VS EJECUTADO
EN (s/.)
160,000.00
140,000.00
120,000.00
100,000.00
80,000.00
60,000.00
40,000.00
20,000.00
0.00
1 2 3 4 5
EJECUTADO PROGRAMADO