Está en la página 1de 4

L=4

VC-7.83m

.10m
25 D S=43.
T. PVC-
S25 S=

N=16 42%
0.00
DN= 5.01

mm 160.00 mm
L=19.60m 5.07%
160 %
115 m
0.00 m

.00

T. PVC-S25 DN=S=3
237
DN==1162.56%

mm
-S 2 5
T. PLV=C24.58m S T.
L=1PVC-S
232 238
LECHO DE
SECADO
EXISTENTE

LEYENDA

A
0.50 0.10

0.40

0.40
0.10

0.10
0.40
0.30

0.30

0.10
0.40

0.10

0.40

0.15
IMHOFF

0.10

0.50

A
EXISTENTE

B
116 9.82 25 .40

1.00
Y
m DN=

1.90
Y
detalle
Ver .20

ESCALERA PVC
DE

1.30
BAFLE

.20
1.90

1.00

.40 PVC .55


DE

X
BAFLE

X
.15

1.50

1.20
.15

.55
1.30

LLEGA
DE
DN=200mm

TUBERIA
TANQUE

H°D°
IMHOFF
S = 2%

CANALETA
S

= 2%
= 2%

S
S = 2% VARILLAS Ø1/2"

CANALETA
S=
S = 2%

CANALETA
S = 2%

2%
S = 2%
S=
2%
PLANCHA
Acero
Inoxidable
METALICA
AISI-304
e=3mm
ZANJA
DE

= 2%
PERCOLACIÓN

S
CODO

CANALETA
DE
4"X45°

S = 2%
CANALETA
= 2%

S=
S

2%
S=
ZANJA CODO

2%
DE DE

= 2%
PERCOLACIÓN 4"X45°

S
CODO
DE

= 2%
4"X45°
CODO VIENE

S
DE

CANALETA
DE DE
4"X45°

SECADO
LECHO

S=
S = 2%

2%
T.

S=3 160
L=3PVC-S

233
1.44m 25
DN
S=26.=250.0

236
94% 0 mm

8.01 .00
T.
L=2PVC-S
9.75m 25
DN
S=29.=250.0

% mm
14% 0 mm

DESCRIPCION SIMBOLO
T.
L=4PVC-S
5.50m 25 DN

117
S=23.=250.0
29% 0 mm

244 T.

T. P=32.99m
L=42PVC-S
.61 25

T. P=V4C5.36m
m DN
S=21=250
.29 .00
% mm

26

L
L
T.
L=30PVC-S

V C -S S
.45 25
m DN
S=26=250
.08 .00

Curvas Mayores cada 5m


% mm

150

T. PVCL=22.29
-S25 m S=1
DN=25 8.54
m
-S25 D S=4.60%

0.00 %
mm
25 D =35.

8% 0 m
C

T. PVL=56.0
T

C-S 4m
6.9 0.0

25 DNS=6
L=5. PVC

=25.96%
N=1 13%

0.00
mm
S= =25
235 38

N=250

T. PL=35
Curvas Menores cada 1m
289

6.8 -S2

60.0

9m D N

T. PVC2.56
VC .31m

L=5
8m 5 D

-S25m S=1
DN= 1.41%
1.8 S25

250.00
CEMENTERIO

-S2
S=1N=16
167 168

mm
0 mm
.00 m
H
234 37

L=4PVC-

5 D S=8

mm
B

L=52.66m S=18.40%
7.5 0.0
156

T. PVC-S25 DN=250.00
mm T. PVC 202
250.00% L=32 -S25 200
DN= 9.03 .21m DN=2
-S25m S=2 50.00
S=1.46% T. PV
T. PVC mm
L=39.83 C-S
25 DN

mm
Buzón proyectado

N=2 .52
0% 0 m
m
T. PVC-S25 DN=250.00

L=3
8.70% 0
L=23.58m S=33.96% mm 201

S=1 =250.0
=25

3.03m
0.00

T.

2.93m25 DN

S=1.0
mm
169 DN=200.00 mm

L=2PVC-S

7%
288 mm T. PVC-S25 S=7.20%
0.00 L=19.24m

T.
56
=20 .90% T. PVC-

m
S25 DN=2
L=19.36m
25 DN S=2

36
211
287 209
mm C-S 4m S=8.900.00
D

T. PVC-S2 S=13.35
T. PVL=21.7 6% mm

50. %
50.00

L=15.67m
25 DN=2 5% T.
T. PVC-S96m S=7.2 L=25PVC-S25

5 DN=250 %
AUD 39

.20% mm
T. PVC-S25 DN=250.00 L=57. .72m DN= 158

0 mm
S=7.16%200.00

.00 mm
L=29.45m S=6.61% mm

S=1660.00
mmT. PVC-S2
I

0.0
210

3%
L L=10.14m5 DN=200.00

S25 DN=1

=20
T. PVC

S=1.2
mm S=2.78% mm

ITOR

00
L=45.22-S25

DN
.00

4.44% mm
279

L=39.28m
DN=

8.0 25
=2503.21%

T. PVC .86m
m S=6

0m
250

S=1 0.00
L=3 C-S
T. PVC-
.44%.00 mm T.

L=45
5 DN S= 215
L=33PVC-

T. PV

=20
-S25 S=9.33%
C-S2.81m 212

7.49m DN
.63 S25 DN

IO
T. PVL=39

L=3 C-S25
322

DN=
m =2

35
S= 00 227
371

T. PV
m
214

250.00
208 213 5.8 .00 229
T. 321 5% mm
L=4PVC-S2
292

mm
8.24 5 DN= 225 323
m S=1 250 320 231

0.00 mm
m

mm
.04%.00 mm 205

mm
Buzón reemplazar

18% 0
203

T. PVL=29.5
T. EXI 345

14.=200.0
S=9.77
206 230

4.5 .00

.21%.00 mm
248 L=4 STE

8mDN=16
118

C-S 8m
S= =250
0%
1.86 NTE 319

S=DN
370 207

25 S=
m DN

m DN
T. 249

TE
S=1 =20
L=3PVC-S
G

DN 9.6
m S=5 200
.08 S25
L=39.525
250 2.04% 0.00

L=4 ISTEN
M

0m

=20 1%
1.87 DN=
T. PVC-S
7.4 25 204

L=51PVC-
mm 318

2.2
3m DN T.

82%mm 0.0
T. EX
T.
L=5PVC-S2 245

L=5 -S25
S=8.4=250.0

0 mm
T.
217

mm

S=10.0.00
2.50m 5 DN 237
T.

T. PVC
5% 0 mm

5.29m DN=20
S=2 =250.0 246 247 L=2EXIST

T. L=28
.48% 0 mm 9.6 EN

PV .89
283 1m TE

L=3C-S25
301

C-S2 m
L=5 PVC
284 238 251 S= DN

T. PVC8.83m
34
mm 0.7 =20 218

5 DNS=1.4
T. PVC

T. PV
T. PVC-S25 DN=250.00 4% 0.0

L=2
252
L=20.00m S=1.55% L=20.10 -S25 DN= 0 mm

=2008%
236 219

O
244

-S25 S=16.15
T. PVC-S25 253 228

131
m S=4 160

.00
L=32.24m DN=160.00 mm T. EX
3.42 .00 mm

mm
DN=
L=3 IST 220

74%0.00 mm
S=13.99%

0.0 %
% mm 232 243

mm
2.1 EN 221
160.00 %

5 DN=16 7%
250.00%

0.00 mm
255 3m TE

.98%.00 mm
T.

T. PVC-S2 0m S=35.0

.08% 0.00
DN= 2.56 T. PVC 233 DN 222
L=3PVC-S2

T. L=
-S25 m S=1 S=2.4

S=10.=20
L=19 -S25 T. PV 254 =20

PV33.27
S=3 =20
5.0 -S25

mm
3.22m 5 DN .82m DN=160.0 0% 0.00

DN
T. PVCL=24.58

C-S2m
L=3 C-S

m S=6 250
S=38 0 mm 38 64

m DN
256 mm
S=1 =160.0 CUNAMAS

3.71m TE
5.3 25

L=19.6
.01% 223

0.00 mm

1.89 DN=

5 DNS=14
1m DN

7.27 NTE

L=3 ISTEN
0.72% 0 mm
S=8.5=250.0

=258.47

25 DN=25 0%

=200.05%
T.

L=4 -S25
242

L=5 STE
235 37 224 63
L=31EXIST

T. PVC-S 5m S=20.3

T. EX
2% 0 mm

.00
T. PVC

T. EXI
113 39 241

mm
.98 ENTE

119
T. 366 62 65 T.
150 L=5PVC
6.88-S25 DN= 234 36 240 IGLESIA P m DN L=2PVC-S

T. PVL=32
S=0.4 =2 3.9 25 216

1m D
m S=1 160 61

297
T. PV 57

Buzón existente
GRASS

L=42.8
239
INSTITUCIÓN 1% 00.00
9m DN

31%0 mm
T. L=47

C-S.99m
114 7.50 .00 mm 35 L=3 C-S 58 S=8.4=200.0

PV .83
SINTÉTICO % 40 mm
N

25 S=
5.2 25

C-S2 m

S=10. 0.0
EDUCATIVA 8% 0 mm 296

DN 35
5m DN

N
279

9m =20
INICIAL

5 DN S=
115 59
S=9.0=250.0

=160 .13%
34 I.E. SAN

3.8 25 DN
.47% 0 mm
=1605.01%

.00
AUDITORIO 1% 0 mm

mm
S= N=16
FRANCISCO

5 D S=
U

mm

L=6 C-S
S=8 0.0
.00
41 25 66

3%00.00
.44% mm
S.H DE ASIS 294

mm

m =25
60 306

T. PV
116 T. EX

S=1 200.00
131

S=1.2 =2
6.07 5 DN
L=58IST

5m DN
42 85
.20 ENTE
295

m DN=
T. PVC

L=3 -S2

6.4 ENTE
117

T. PVL=60
297 20 67 m DN

T. PVC
L=55.01-S25

L=3 STENTE
84 291

L=5 IST
T. S= =2

C-S2.04m
DN= 33

-S207m
m S=1 L=5PVC-S 7.0 00

T. EX
160

2.58
307

T. PV
BANCO DE 21

5 DN S=7.4
0.85 .00 mm
82 9% .00 290

T. EXI
6.0 25 83

L=4
mm
T. P=V4C5.30m

LA NACIÓN 4m DN

C-S 6m

=200 8%
% 68

10. 0.0

5.3
32
S=3.5=250.0 22

25 DNS=4

.00
U
Q
26 130
1% 0 mm

mm
31
J

=25.60%
81

.80% mm
69 308

0.00
T. PVC

% mm

S=3 200.00
C
L=34.77-S25 30 80

mm

0 mm
78
L

0.65.00
85% 0 m
DN=

120
344 m S=1

DN=
76 309

S=1 250
200

PV 6.
PLAZA

.36% 0.0
2.58 .00 mm 79

mm
343 28

m DN=

L=3 STENTE
T.

S=1DN=20
118 129 % PAUCARBAMBA L=32.PVC-S
70

.55% 0.00
2.75m
27 mm
T. PVC-S25 DN=200.00

L=49.15-S25
77

S=0DN=20
30m 25 DN L=16.09m S=1.51%
F

T. EXI
T. PVC 75

1.88m TE
71

T. PVC
119 342 L=34.80-S25

130

L=3 ISTEN
S=7.1=250.

T. L=3 33
128 103
DN=

6.54m TE
m S=1 310 mm
200 7% 00 mm

L=5 ISTEN
T. EX
A' .00
7.69.00 mm 145

T. PVL=45.3

T. L=61
72 311

m E
120 104
=2000.97% 146

PV .06
91 % T. EXIST
127 102

Casas
74

T. EX

C-S2 m
C-S 0m
L=14 ENTE DN=2 5 DNm S=

mm
.78m 00.00 293

5 DN S=
R

25 DNS=0
C-S251.45

T. PVL=31
73 312
S=8.30% mm
V

.17% 0.00
121

=20018.84
92 101
T. PV L=
90

C-S.43m
-S25 DS=0.97

=25.97%
T. PVC-S25 DN=250.00

S=1DN=20

25 S=

.00 %
144

mm
0.00
L=33.52m S=14.29% mm

DN 11
147

mm
122 mm 89

=250 .16
100

.46% 0.00
94 MUNICIPALIDAD

mm

2.36m NTE
.00 T. 148

.00 %
93

S=1DN=20
L=40.EXIST DISTRITAL DE mm

.38% 0 mm
=2509.03% T. PVC
0.00
K

L=3 STE

mm
99 305
L=40.76-S25 53mENTE PAUCARBAMBA 313 =20 .96%
5 DN S=

S=1=200.0
T. EXI
126 DN=

6.53mNTE
C-S2.82m
m S=2 200 88
282 S= DN=2 25 DN S=1 149
2.10 .00 mm

7.90m DN
ESTADIO C-S 8m

L=4 STE
4.0 00. 110 143
T. PVL=48 171 % 3% 00 T. T. PVL=16.3

L=2 C-S25
125
D' L=39.PVC-S

T. EXI
86 285 281 mm 105 304
B'

0 mm

T. PV
124 87 109 78m 25 DN
0 mm T. PVC 106
S=12.=250.0 mm

.92% 0.0
0.0 8% 170 286 337 314 .00
L=40.94-S25

9% 0 mm
S=6DN=20
=20 5.0 18% 0 mm =200 5%

T. PVL=44.8
DN S= DN=

mm
DN 3.0
123 263 m S=2 338
200

S=2.2 0.0
25 S=
25 0m 107

T. PVC-S25 S=11.21%
142

0% mm
1.78 .00 mm LOSA

C-S 0m

8.75m TE

2m =20

DN=160.00
C-S 1.2 262 % 324 T. C-S .17m mm

1.0 .00
T. PV L=5 DN=160.00

L=3 ISTEN
DEPORTIVA

25 DN S=0
L=5PVC-S

1.1 DN
C' T. PVL=50

S= 50
T. PVC-S25 S=7.93%

m =2
32
339

L=3 C-S25
T. 8.4 25 108 T. PV 315

T. EX
.00 S25 DN
L=35.52m
L=4PVC

=25 .94%
2m DN

% mm
267 T. EXI
N=250 %

8.87-S25 DN= 43

L=38.16m
336 L=3 C-S

121
S=13.=20 340

T. PV
0.00

12.81 .00
L=38.66STE 7.46m25 DN COMISARIA
268 m S=2 200 33%0.0

S=3 0.00 mm
L=30PVC-
9

S= =160
NTE 0 mm PNP

mm
T. PVC-S25 DN=250.00 mm 0.83 .00 mm m S=9DN= 55 44
45 341 S=8.1=250.0

m DN
.41%
112 L=12.00m S=1.32%

T.
% .44%200.00 3% 0 mm
373
141

.17 25
.45% mm
9.64 =20
269 mm 54

L=34PVC-S
5%0 mm
46

L=5 -S25 DN
358

S=2 0.00
53 325
8

S=8.90.0
T.

Lotes

T.
=20
10 52 47 T.
L=48PVC-

=20
W
316
T. L=26PVC-S

9.25m DN
T. PVC
L=47PVC-S25 mm

DN
.09 S25 51 326 T. PVC-S25 DN=200.00 T. PVC-S25 DN=200.00

L=2 C-S25
.33m DN= S.H 7 T. EXI 48 .98 25 DN .00 mm L=43.90m S=6.50%

L=3C-S25
1m
m DN 50 335 m =2 L=45.12m S=6.69% mm

0% 0 mm
200.00
S=31.42 STE 5 DN=200

8.7
S= =200 5 L=58.64 S=7.6 50

T. PV
2.7 .00 % mm NTE T. PVC-S2m S=8.01%

T. PV
49
1%.00 mm

S=7.9 0.0
6% 270 4 m S=9DN= 327 L=41.34

6m =16
mm 260 .04%200.00 357

2.4 DN
271 3 mm IGLESIA 365
T.
L=3PVC-S2

L=4 C-S25
mm
6

8.26 mm
272 2 328
EVANGELICA

E'
0.29m 261 334 183
5 DN

4%00
m S=2200.00
%

T. PV
1

0.900.
333 T.
S=1 =200.0
.00 mm

0%0 mm
L=51PVC-S

S==2
273 4.06% 0 mm 332

DN
DN=
T. 184 185 363
L=3EXISTE .90 25 DN

S=5.30.0
4.9 25
329

4m
331 182
S

=20
m

-S25

L=3 C-S
9.19 NTE S=15 =200.

L=25.80
226 m DN

DN
T. PV
274

T. PVC

.79% mm
S=1 =20 .76 00 mm

8m
L=3C-S25
T. 6.92 0.00 330

mm
L=4PVC-S %

9.0
S=3200.00
181
F' 15 % mm

31

0 mm
137

T. PV
5.37m 25 155 175

122
275 DN

m DN=
T. S=1 =200.0

S=3.7 0.0
367
L=2 PVC-S2

6%
T. EXI

T.

mm

6m =16
4.80 5 369 2.91% 0 160 180 356
L=35.83STENTE

-S25
mm

%.00
m S=3DN=20

2.3 DN
L=56.85
Alcantarillado Existente
m S=1 DN=

11=2.3000
T. PVC

L=4 C-S25
1.15 0.00 136
% mm 5.50 200.00 179
177 359

DN
178

S=
T

5% mm
16 % mm T.

T. PV
19
L=4PVC-S

.33 25
L=3PVC
T. 161 360

1.0 .00
L=1 PVC-S2
X

L=35C-S
17

65%.00

S= =200
135 T. 9.9 25 364 361

T. PV
9.43 5 DN
280 9m DN
m =20 L=4PVC-S 162 176

m DN
T. PVC S=12.=200.0

129
S=2 0.00 276 138 2.57m25 18 186

.42 S25
300 L=53 -S25 DN=
1.17 mm DN .15m 12% 0 mm 362

L=46PVC-
% mm S=1 =200.0 S=13 200.00 mm
3.85% 0 172

1% mm
0.00 .70%

T.
mm
DN=20 .48%

S=7.8 00
J'
344

10. 5 0
-S25 m S=4

m 60.
EVANGELICA

T. PVC
IGLESIA

.70 DN=1
4.7 -S25
T. PVC

L=3
9.59 T.

-S25 m S=9
L=1

2.12
L=32.PVC-S

L=30 25
Ø = 200 mm
mm
G'

DN=20 .29%

C-S
160.00 76m 25 DN

T. PVC-S 8m S=3.41

T. PV
DN= .05%

0.00
SD=N=2
-S25 m S=5

6% mm
S=16.=200.

L=11.2

T. PVL=42.5
02%mm
mm

25 DN=20 %
277

5.8 .00
T. PVC
L=34.36 60%00 mm 354

S=13.00.00

S= 00
C-S 0m
266

N'

0.00 mm
278

m =2
1.04% mm

25 S=
25 DN=2

.50 S25 DN
7m D
134 355

4% mm
S=2 0.00

DN 12.
192 T.

L=16.77m
L=32.PVC-S

=20

=20 63%
174

S=8.660.00

L=46 C-
298

T. PVC-S
111 353

4.85m DN

PV
0.0
mm
T. 82m 25 DN

L=2 -S25

79mDN=1
173

T.
0 mm
187
L=3PVC-S2

3% 0
299
S=17.=200.

T. PVC
S=0.9 0.0
5.83m 5 DN

L=37. 25
N

=16
68% 00 mm

C-S
mm S=2 =200.0

0.99m DN
0.00

T. PV
350

3% mm
2.01% 0 mm 265
DN=20S=2.28%
352

30

L=4 C-S25
348 T.

343 S=1 =20

S=1.060.00
-S29.805 m L=3PVC-S2
POSTA 302 351
4.62m 5 DN Y

T. PV
5m 5

=1
T. PVCL=1 T. PVC

Alcantarillado proyectado
MEDICA

T. PV 4.0

90m DN
128
S=1 =200.0 L=42 -S25

L=4

L=39.C-S25
0.85% 0 mm .20m DN=

7% mm
K'

C-S 1m S=
372

9.1-S2
200.00

T. PVL=31.6
349 S=33.63

25 8.6

S=0.800.00

T. PV
% mm

C-S 8m
DN 6%

25 S=
191

2.5 0.00

=20

S25 DN=2

DN 33.

T. PVL=28
=20 98%
0.0
190 T. PVC

0.0
0 mm

L=30.96m

C-S2.98m
132

0 mm
.00 mm 346 L=42 -S25
5 DN=160 % .96m DN=

5 DN S=16
T. PVC-
T. PVC-S2 m S=0.75 189 mm 200.00
S=38.61

L=4VC
0.00

=200 .27
347 T. % mm
133 L=52.86
I' L=3PVC-S
257
=16 10.49%

.00 %
0.46m 25 258
25 DN S=

8% m

mm
DN 198 T. PVC

Ø = 160 mm
S=1 =200.0 259 188 C-S 1m L=35 -S25 DN=
T. PVL=42.6

mm
8.90% 0 .37m

T. PVL=26.3
mm S=43 200.00 mm

T. PVC-S25 S=0.87%
DN=200.00
.70%

127

C-S 7m
T. P

25 DNS=2
264

m
199

L=20.25m
T. PVC

=201.87%
197
L=49.40-S25

0.00
T. DN=
L=5PVC

00% 0 mm
m S=2
Z 200

mm
m
2.51-S25 DN=
H' 2.37 .00 mm

9m S=6. 200.0
m
m S=3 200 %

L=8.6 -S25 DN=


. 00 m
.76% .00 mm

T. PVC

T. PV
0m

S=2 0.00 mm

L=4
98 12

C-S 8m
%
97 mm 151

0.5
T. PVC-S25 DN=200.00

2.38

25 S=
Alcantarillado proyectado
L=26.81m S=22.90% T.
L=5PVC

9.85 =20
=20=05.08%

DN 21.
T.
L=1PVC
152
0.28-S25 DN

=20 37%
L=2 -S25 DN
7.66-S25 DN=

28
m S=1 =20

0.0
0.0
m S=1 200 153
1.290.00 mm

0 mm
9.99 .00 mm

T. PVC
% 13 %
96 T. 194
L=27PVC-

N
.33mS25 DN=200.00 154 166

m 342
S=25.59% mm

3.73 mm
=N 20 .80%
A'
195

T. PV
T. PVC- mm T. PVC-S25 DN=200.00 196

S=1 200.00
%
L=16.83mS25 DN=2 .00%

5 S 00 m
L=54.21m S=24.42% mm
=200.68

T. PVC
00.00

C-S2 0m
S=23.82%

m DN=
mm DN 31

L=4
165 193 25 S= T. PVC-S25 DN=200.00

-S25m S=2
T.

2.59
Ø = 200 mm
L=51.22m S=13.31% mm
L=29PVC-

5
C-S.20m

L=30.37-S2
T.
.81mS25 DN=200.00 T. PV

L=33 C-S25 D

DN=20 1.79
L=38

T. PVC
250.3%
S=6.0 mm

126
3% 140
139

T. PVC.71m
0.00 %
T. PVC

T. PV L=51.2

L=26
L=21 -S25

D 3

mm
mm
.15m DN=200.

L=3PVC
mm

-S25 S=10.49%
S=8.04% 00

L=18.19m S=14.41%
T. PVC-S25 DN=200.00

T. PVC-S25 DN=160.00
mm
L=42.50m S=22.92%
164

27
95

DN=160.
= .52m N=2 NTE S=
T. 317
L=39PVC-S25
T. PV=C44.80m

00 mm
.95m DN=

N
14
303 200.00
S=23.25

mm
% mm

25 D =9.

L=15.23m S=17.65%
T. PVC-S25 DN=160.00
163

S=14 50.00 m 4.8 -S25


mm

Alcantarillado proyectado
00.00

E
S25 DN=2 23
.21%
T. PVC- 40m S=11

125

T. PVC
C-S S T
L=32.

L=30.00
L

mm 24
200.00

-S25 m S=1
XIS .75
DN= .22%

.29% m

DN= .49%
-S25m S=1

0m D
T. PVC

200.00
159
L=26.66

.T PV=48.82m

mm
mm
00.00
DN=2
-S25 S=1.10%

T. PVL=19.6
S=N=20 T. E L=32
T. PVC .91m

124

C-S 0m
Ø = 250 mm
L=39

25 DNS=1
-S25 D S=0.94

DN=200.00 mm
M'

=200.28%
T. PVC-S25 S=8.20%

0.00
L=35.12m

mm
11

L 17. 0.0 29

123 91 69% 0 m
368
N=250 %

157

T. m
D' L=4PVC

T. EX L=14.78
m 94 92
0m 0.7 -S25
.00 mm

ISTEN m
50.0% 6m D

TE DN S=8.3
112 =2 171 S= N=20 93 90
T. P=48.09

N 0

=200. 0%
T. PVC-S2 5 D 1.0
L

L=12.00m5 DN=250.00 m -S2 S= 22. 0.0

00 mm
VC- m

10% 0 m 89 m
S=1.32% m . PVC 0.00m 267 T .00
m
S25 S=2

m
T L=3 L=4. PVC 2 00
DN= .76%

268 8.8 -S2 N= 6%


7m 5 D 88 E DS=1.4
200

S= N=20 170 N T

T. EL=40.
TE m PERFIL LONGITUDINAL
.0 0

86
20. 0. T. XIS46.53

XIS 53m
m

8 0
269 3% 0 m L=4PVC E PASAJE 2
m

87
T. L=

TEN S
m 263
0.9 -S25 285 282 H=1000 V=100

TE =4.0
4m D
26% mm

S= N=20 3384 3384

DN 3%
262
B'
28. 00

=20
21. 0.0 286 BZ - 84
S= 200.

78% 0 m C.T=3383.12

0.0
0m N =

C.F=3381.82
m mm

0m
5.8 25 D

H=1.30
.00

m
T. 324
200%
L=2VC-S

L=4 PVC =
7.3 -S25 mm DN .92
T. P

3m D .00 1% T. TE =6
S= N=2 0
2 .0 4 9 L=3EXIS T EN m S 3382 3382
270 31.4 00.0 N= =3 8.6 TEN XIS 8.75
T. P =24.80

2% 0 m 5 D4m S T. E L=3
L

10 6m TE
VC- m S

m 2
-S 6 S= DN=
S25 =3

VC 59. 9.4 20
DN= 1.15%

271 S.H T. P L= 4% 0.0


200.

0 mm 55
00 m

272 8
m

T. PL=30
T. P =19.43

3380 3380
VC .29m

F'
L

280
VC- m S

-S2 S

260
S25 =2

5 D =1

273 7 3394PERFIL LONGITUDINAL 3394


N= 4.0
DN= 1.17%

261 JR. INDEPENDENCIA TRAMO3


200 6%
200.

.00

274 5
00 m

300 H=1000 V=100


mm

E'
m

9% mm

4
3.7 .00

275 6 3378 3378


S= =200
T. PV32.12m S
L=

137
5m DN
C-S25 =9.29

T. PL=45

T. P L=56
3392 3392
6.8 25

VC .88
VC .37m

-S2 m
L=5VC-S
DN=2 %

5 D S=
-S2

N= 17.5
T. P

5 D S=1

369

16 0 %
00.00

BE - 14

0.0
136
N = 2 .9

0m
C.T=3390.69
200 1%
3.02 mm

m
mm

C.F=3389.18
276 367 15 H=1.50
.00
S=1 00.00
%

EVAN 135 3376 3376


mm

IGLG
.77m DN=2

ESEILAICA
0 mm 3390 3390
L=16C-S25

-S2 5 DN=20.40.08%
4
V

111 . PVC S=
T. P

mm T L=19.59m m
277 DN =160.05%0 16 0m
278 25
T. PV=C34-S.36m S=5.0
13 8
= 2 010.3.00%
T. PVC-S2.258mDN=2S=3.41%

J'
T. PL=42

L 17 19 N1
298 5 D S=
L=11

PO S 3374 3374
VC .57m

-.S332m
BZ - 88
MED TA 299
-S 2

mm VC 5
C.T=3373.42

T. LP=3
18 C.F=3372.12
ICA mm
5 D S=1

.00 % 3388 3388


00.00 mm

0.00
H=1.30
0
N= 3.8

372 6
=1 .93 353 N=20 21.04%
200 5%
T. PV44.01m S

DN S=0 5 D S= 134
L=

.00

C-S2 5m
302 2 5
-S 9 m .T PV L=24.8
C-S25 =8.66

mm

VC 0.9
T. P L=4 .00 mm
348 350
N=2=020.28%
T. PL=35.8
DN=2 %

25 D 3372 3372
VC- 3m

-S S
T. PVLC=19.80m
S25 S=
00.00

351 352 3386 3386


DN= 22.0
m

T. PVC-S25 DN=160.00 mm
.87% 0 m
mm

200 1%

L=52.86m S=0.75%
S=0 00.0

.00

349
mm
m N=2

346 BZ - 83
0.96 5 D

C.T=3384.42
L=3VC-S2

C.F=3383.12
H=1.30 3370 3370
T. P

3384 3384

mm
DN= 38.01%
160.00
S=
T. PV 19.82m
C-S25
L=
3400 PERFIL LONGITUDINAL 3400 3368 3368
CALLE 7 TRAMO 1
H=1000 V=100 3382 3382
BZ - 140
C.T=3366.38
C.F=3365.08
H=1.30
BZ - 93
C.T=3397.79 BZ - 85

3398 C.F=3395.59
H=2.20 3398 C.T=3380.08
C.F=3378.78
3366 3366
BZ - 92 H=1.30
C.T=3397.19
C.F=3395.99
H=1.20
3380 3380

3364 3364

T.
3396 3396

PV =24
L
BZ - 141

C .58
-S m
25
C.T=3363.31

DN S=
C.F=3362.01
3378 3378

=1 12.
H=1.30

60 56
.0 %
0
m
m
3377 3377
0+000.00

0+034.27

0+068.77
3394 3394 3362 3362
BZ - 94
PROGRESIVAS:
C.T=3392.99
C.F=3391.79
H=1.20

0+074.55
0+000.00

0+056.02

0+098.94
DISTANCIA PARCIAL L= 34.80 m L= 34.77 m
PROGRESIVAS:
3392 3392
BZ - 95 COTA TAPA BZ 3390.69 3384.42 3380.08
C.T=3390.83
C.F=3389.63
DISTANCIA PARCIAL L= 56.88 m L= 19.82 m L= 24.58 m
H=1.20

COTA FONDO BZ 3389.18 3383.12 3378.78


3390 3390 COTA TAPA BZ 3383.12 3373.42 3366.38 3363.31
PROFUNDIDAD H=1.50 m H=1.30 m H=1.30 m
BUZON
S= 17 S= 12.5 COTA FONDO BZ 3381.82 3372.12 3365.08 3362.01
PENDIENTE DE .69% 8%
BZ - 96
C.T=3387.86 TUBERIA PROFUNDIDAD
3388 C.F=3386.66
3388 H=1.30 m H=1.30 m H=1.30 m H=1.30 m
H=1.20
DIAMETRO DE BUZON
PVC -UF ISO 4435 DN= 200.00 mm S-25 S=
TUBERIA PENDIENTE DE S= 17.50% 38. S= 12.56%
01%
TUBERIA
DIAMETRO DE PVC -UF ISO 4435 DN= 160.00 mmPVC
S-25 -UF ISO 4435 DN= 160.00 mm S-25
3386 3386 BE - 14 BZ - 83 BZ - 85 TUBERIA

3385 3385
0+000.00

0+052.85

0+096.70

0+113.34

0+145.32

BZ - 84 BZ - 88 BZ - 140 BZ - 141
PROGRESIVAS: PERFIL LONGITUDINAL
CALLE TRAMO3
H=1000 V=100
DISTANCIA PARCIAL L= 52.86 m L= 44.01 m L= 16.77 m L= 32.12 m
BE - 21
C.T=3386.24
C.F=3384.74
H=1.50

COTA TAPA BZ 3397.19 3397.79 3392.99 3390.83 3387.86 3386 3386

COTA FONDO BZ 3395.99 3395.59 3391.79 3389.63 3386.66

PROFUNDIDAD
BUZON
H=1.20 m H=2.20 m H=1.20 m H=1.20 m H=1.20 m 3384 BZ - 84
3384
S= C.T=3383.12

S= 0.75% S= 8.66% 13 S= 9.2 C.F=3381.82


PENDIENTE DE .02 9% H=1.30

TUBERIA %

DIAMETRO DE PVC -UF ISO 4435 DN= 160.00 mm PVC


S-25 -UF ISO 4435 DN=PVC
200.00
-UF mm
ISO 4435
S-25PVC
DN=-UF
200.00
ISO 4435
mm S-25
DN= 200.00 mm S-25
TUBERIA
3382 3382

BZ - 85
BZ - 92 BZ - 93 BZ - 94 BZ - 95 BZ - 96 C.T=3380.08
C.F=3378.78
H=1.30
3380 3380

3378 3378

PERFIL LONGITUDINAL
CALLE 7 TRAMO 2
H=1000 V=100
3390 3390 3376 3376
BZ - 86
C.T=3374.88
C.F=3373.58
H=1.30

BZ - 96
C.T=3387.86

3388 C.F=3386.66
H=1.20 3388 3374 3374

3386 3386 3372 3372

BZ - 89
C.T=3370.14
BZ - 97 C.F=3368.84
C.T=3383.83 H=1.30

3384 C.F=3382.63
H=1.20 3384 3370 3370

3382 3382 3368 3368

BZ - 79
C.T=3365.94
C.F=3364.44

3380 3380 3366 3366


H=1.50

3378 3378 3364 3364

BZ - 98
3363 3363
0+208.41
0+159.79
0+000.00

0+041.78

0+077.73

0+126.60

C.T=3376.56
C.F=3375.26
H=1.30

PROGRESIVAS:
3376 3376

DISTANCIA PARCIAL L= 41.89 m L= 49.15 m L= 33.52 m L= 48.82 m

3374 3374 COTA TAPA BZ 3386.24 3383.12 3380.08 3374.88 3370.14 3365.94

COTA FONDO BZ 3384.74 3381.82 3378.78 3373.58 3368.84 3364.44

PROFUNDIDAD H=1.50 m H=1.30 m H=1.30 m H=1.30 m H=1.30 m H=1.50 m


3372 3372 BUZON
S= 6.98% S= 10.65 S= 1 S= 9.03%
PENDIENTE DE % 4.29
%
TUBERIA
BZ - 99
C.T=3369.74 DIAMETRO DE PVC -UF ISO 4435 DN= 250.00 mm S-25 PVC -UF ISO 4435 DN= 250.00PVC
mm -UF
S-25ISO 4435 DN= 250.00PVC
mm-UF
S-25ISO 4435 DN= 250.00 mm S-25
3370 C.F=3368.24
H=1.50
3370 TUBERIA

BZ - 100
C.T=3368.21
C.F=3366.91
H=1.30
BE - 21 BZ - 84 BZ - 85 BZ - 86 BZ - 89 BZ - 79
3368 3368
PERFIL LONGITUDINAL
CALLE TRAMO 4
H=1000 V=100
BZ - 101 BZ - 79
3366 3366
C.T=3365.61
C.F=3363.61
C.T=3365.94
C.F=3364.44 BZ - 101
H=2.00
3366 H=1.50 BZ - 90
C.T=3365.47
C.F=3364.17
BZ - 91
C.T=3365.30
3366 C.T=3365.61
C.F=3363.61
H=2.00
H=1.30 C.F=3364.00
H=1.30

T. PVC-S25
DN=250.00
L=28.00m mm
S=1.00% T. PVC-S

3364 3364 25 DN
L=13.00m =250.00 mm
S=1.32%
T. PVC-S25 DN=
250.00 mm
3364 L=40.80m S=0.
94%
3364

3362 3362
3362 3362
3361 3361
0+019.01

0+042.69

0+115.59
0+000.00

0+067.52

0+166.72

3361 3361
0+000.00

0+028.00

0+041.00

0+081.80

PROGRESIVAS:
PROGRESIVAS:
DISTANCIA PARCIAL L= 19.43 m L= 24.80 m L= 25.80 m L= 48.09 m L= 51.20 m
DISTANCIA PARCIAL L= 28.00 m L= 13.00 m L= 40.80 m

COTA TAPA BZ 3387.86 3383.83 3376.56 3369.74 3368.21 3365.61


COTA TAPA BZ 3365.94 3365.47 3365.30 3365.61
COTA FONDO BZ 3386.66 3382.63 3375.26 3368.24 3366.91 3363.61
COTA FONDO BZ 3364.44 3364.17 3364.00 3363.61
PROFUNDIDAD H=1.20 m H=1.20 m H=1.30 m H=1.50 m H=1.30 m H=2.00 m
BUZON PROFUNDIDAD H=1.50 m H=1.30 m H=1.30 m H=2.00 m
S= 2 S= 3 S= 2 BUZON
PENDIENTE DE 1.17 1.15 8.26 S= 2.76% S= 5.08% S=
TUBERIA
% % %
PENDIENTE DE
S= 1.
00% 1.3
2%
S= 0.94
% MUNICIPALIDAD DISTRITAL DE PAUCARBAMBA
TUBERIA
DIAMETROPVC
DE -UF ISO 4435
PVCDN=
-UF200.00
ISO 4435
mmPVC
DN=
S-25
-UF
200.00
ISO 4435
mm S-25
DN= 200.00
PVCmm-UF S-25
ISO 4435 DN= 200.00 mm S-25
PVC -UF ISO 4435 DN= 200.00 mm S-25 PROYECTO: "AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN LA LOCALIDAD DE
TUBERIA DIAMETRO DE
PVC -UF ISO 4435
PVCDN=
-UF 250.00
ISO 4435
mmDN=
PVC
S-25
250.00
-UF ISO
mm4435
S-25
DN= 250.00 mm S-25
TUBERIA
PLANO:
PLANTA - PERFIL ALCANTARILLADO
BZ - 96 BZ - 97 BZ - 98 BZ - 99 BZ - 100 BZ - 101 GLORIA SHIRLEY
BZ - 79 BZ - 90BZ - 91 BZ - 101 JAVIER ALIAGA UBICACION
C.P. : PAUCARBAMBA
ESCALA : PROYECTISTA: V°B° WILMER

WILMER
LAMINA N°:
INDICADA
DIST. :
PPA-06
PAUCARBAMBA
ALCALDE PROV. : FECHA : CAD :
CHURCAMPA
GESTION EDIL 2019-2022 DPT. : HUANCAVELICA AGOSTO - 2021
287

169

% m
6.2000 m
T. PV

S=1 60.
L=29.4C-S25 DN
m N=1 5m S =250.0
LEYENDA
9.28 5 D
=6.61 0 mm
%
L=3VC-S2

T. PVC-S.825 D
T. P

L=45 6m
T.
L=4PVC-
5.2 S25 DESCRIPCION SIMBOLO
DN=2503%
2m DN
S=9.3

S= =250
6.4 .0
4% 0 m Curvas Mayores cada 5m
.00

m
mm

Curvas Menores cada 1m


T.
L=4PVC
8.2 -S2 .00 m
m
0.00 mm
H Buzón proyectado
T. PL=37.

4m 5 D N =25108.70% TL. =P2VC-S25 D 25 DNS==2259.03%


V C 43 m

S= N=25 D
5 =
C-S2 m S
3.58m N=250.0 T. P=V3C9-S T.
m Buzón reemplazar
-S 2 S

.8 3
1.0 0.0 T. PVL=22.93
S=33.9 0 mm L L=3PVC-S
5 D =8.

283 4% 0 m 6% 2.21 25 202


N=2 45%

m T. PVC-S25 DN=250.00 mm m DN=


S=1 250
50.

T. P V L=57.96m S=7.25%
284 .46% .00 Buzón existente
00

C-S2 m
00 m m 200
mm

m
5 DN=
160.0 N= 250..21%
D 3

T. PVL=33.03
0 mm S25 S=
VC- 1m 00 mm T. PVC-S25 DN=200.00 mm
T. PVC-S

Casas

C-S2 m S
T. P L=39.8 209
=200. %
L=28.83m

L=19.24m S=7.20%
5 DN S=2.90

5 DN =1.07
-
C mS 2
T. PVL=21.74

=250 %
201
25 DN=26.5015%
T. PL=33

T. PL=52
211 T.

.00 m
L=1PVC-S2 Lotes
VC .22m

VC .50m
mm mm
S=1
-S 2

9.36 5 D

-S2

m
.00 .00% m S N=2
5 D S=1

5 D S=2
= 25050% 00
=2 23 =8.9 00.00 Alcantarillado Existente
N= 0.7

N= . 4 8
N DN =1.
.00 mm

.
25 D S=4 6% m
160 2%

250 %
25 m S m
C-S m 210
.00

Ø = 200 mm

.00
S
.T PV=51.08 -
VC 8.00

T. PVC-S25 DN=250..305%0 mm
T
mm

mm
L=2 . PVC

L=15.67m S=13
L T. P L=3
T. PVC-S25 DN=250.00 mm

GRA
L 5.72 -S25 Alcantarillado proyectado
L=42.85m S=20.30%

m DN 56
SINT SS S=7 =20
Ø = 160 mm
É T IC
O
T. PVC-S25 DN=2
L=20.00m S=1.550.00 mm
5% G .16% 0.00
mm T. P
L=10.VC-S25 DN Alcantarillado proyectado

T. PLV=20.10
113 208
T. PL=47.8

14m =200

C-S2 m S=
Ø = 200 mm
VC- 3m

S .0
mm =2.78% 0 mm

5 DN 43.4
370
S25 S=

0 0

=160 2%
212 . 44%
114 0 0
N=2 =14
. 158 Alcantarillado proyectado
DN= 5.01%

.00 m
T.

m
248

1% 0 m
25 D9m S

160.00 mm
L=4EXIS

L=19.60m 5.07%
Ø = 250 mm

m
213 215
160

5.2 0.0
T -S 4
mm 249 1.86 EN VC 7.

T. PL=33.6
115

S= =20
160.00
.00

T. PVC-S25 DN=S=3
237
25 DNS==12.56% T m TE T. P L=3 322

7m DN

VC- 3m
206
mm

C -S 245 S D 214

1.8 S25
P V
T. L=24.58 m 250 =12 N=2

S25 S=
. 232 205
L=1PVC-S 207

L=5PVC-
238 .04 00. 321
mm

DN= 5.85
9.82 25 % 00
116 00 320

T.
m DN= 246 mm 00.
225

200 %
S=3 160
N=24.18%
233 236 323
8.01 .00 247

.00
D
% m m 204 TE =1

m
292
117 EN S 319

m
244
IST2.20m 229

T. P=32.99m
T. P=V4C5.36m

X
T. E L=4

T. EL=29
26

L
L

V C -S S
318

XIS .61m
O
150

T. PV=29.58m
243

m
-S25 D S=4.60%

231
M

TEN S
25 D =35.1

8% 0 m

L
251
T

C-S2 S=9.
6.9 0.0

TE =0.
L=5. PVC

N=1 3%

S= =25
235 38
N=250

D N 74%
T. PL=35
6.8 -S2 252

5 DN 61%
60.0

9m DN

=20
253

VC .31m
8m 5 D

1.8 S25

0.0
S=1N=16

-S2
0 mm
.00 mm

=200
234 37 255

L=4PVC-

0
5 D S=8
mm

mm
7.5 0.0 217
.00 82%

.0 0 m
N=2 .52
0% 0 m

T.
mm 0

T. EL=32
m 36 254 228 0 .

50. %
2
N= =10
AUD 39 242 256
.00

m
ITOR

XIS .13m
00
279
IO 35
200% 218 5D S

mm
-C S25.29m

TEN S
118 = 219
241 N 8

T. LP=28.89
E D 3.0 V 3

TE =2.
T. mm
L=5 PVC 34
NT S= T. P L=

DN 40%

VC- m
5.0 -S25
131
.00 E CUN

=20
250.47% 240 T m AMA 221

S25 S=1
119 1m D 297 = XIS .27 S 220

0.0
T. PL=35
S= N=16
N 8
5 D S=
40 .T E L=57 mm

DN= .48%
0
.00

VC .25m
222

mm
239
-S207m 0
T. P=V4C5.30m

10. 0.0 0
U

-S2

200
85% 0 m C IGLE =2 4%
L

120

F PV 6.
P DN 0.7

5 D S=9
130 SIA

.00
m T. L=3 223
TE S=1

T. EL=31.
N=2 .01
-S25 D S=0.97

33 366

m
N
224 TE 1m

m
X IS 9 8 m
50. %
XIS 3.7 64

00

TEN S
41
T. E L=3
32
N=250 %

121

mm
mm INST PERFIL LONGITUDINAL

TE =0.4

T. P=33.27m
42 63
.00 EDU ITUCIÓN

L
DN 1%
.00 mm

00 PASAJE 1

VC-S S
CATI
N=2

=20
D VA

0.00
H=1000 V=100

25 D =14.
TE
EN

mm
ST

N=2 05%
EXI
BZ - 85
T. C.T=3380.08

00.0
LECHO DE
SECADO
EXISTENTE
A

0.50

0.10
c

0.40

0.40

0.10
0.10
0.40

0.30
0.30

0.10

0.40
0.10

0.40

0.15

IMHOFF
0.10

0.50

EXISTENTE

C.F=3378.78
B

0m
H=1.30
.40
1.00
Y

1.90
Y

3380 3380
detalle
.20

Ver

ESCALERA PVC
DE
1.30

BAFLE
.20

1.90 1.00
.40

PVC .55
DE
BAFLE
X

.15

1.50

1.20
.15

.55

1.30
LLEGA
DE
DN=200mm

TUBERIA
TANQUE

H°D°
IMHOFF
S = 2%

CANALETA
S

= 2%
= 2%

S = 2% VARILLAS Ø1/2"
CANALETA
= 2%

S=
S

CANALETA

S = 2%
2%
S = 2%
S=
2%

PLANCHA
Acero
Inoxidable
METALICA
AISI-304
e=3mm
ZANJA
DE
PERCOLACIÓN
CODO

S = 2%
CANALETA
DE
4"X45°

S = 2%
S = 2%
CANALETA

S=
ZANJA

2%
DE

S=
PERCOLACIÓN

CODO
2%

DE
= 2%

4"X45°
S

CODO
DE
= 2%

4"X45°

CODO VIENE DE LECHO


S
DE

CANALETA

DE
4"X45°
SECADO

S=

S = 2%
2%

m
T.
L=3PVC-S
1.44m 25
DN
S=26.=250.0
94% 0 mm
T.
L=2PVC-S
9.75m 25
DN
S=29.=250.0
14% 0 mm

T.

PERFIL LONGITUDINAL
L=4PVC-S
5.50m 25
DN
S=2 =250.0
3.29% 0 mm

T.
L=42PVC-S

INTERCEPTOR TRAMO1
.61 25
m DN
S=21 =250
.29 .00
% mm

T.
L=30PVC-S
.45 25
m DN
S=26=250

H=1000 V=100
.08 .00
% mm
T. PVCL=22.2
-S259m S=1
DN=25 8.54%
0.00
mm

C
T. PVL=56.0

3378 3378
C-S 4m
25 DNS=6
=25.96%
0.00

BZ - 117
mm

289
C.T=3382.59
C.F=3381.09
T. PVC2.56
L=5
-S25m S=1

H=1.50
DN= 1.41%
250.00

CEMENTERIO 167 168


mm

H
mm

B
L=52.66m S=18.40%

mm 156
T. PVC-S25 DN=250.00

T. PVC 202
250.00
DN= 9.03% -S25
L=32.21m 200
DN=2
-S25m S=2 50.00
S=1.46%
T. PVC mm
L=39.83
T. PV L=33.0

3382 3382
mm

C-S 3m

T. PVC-S25 DN=250.00
L=23.58m S=33.96% mm
25 DN S=
8.70% 0

201
S=1 =250.0

=25 1.07%
DN

0.00

mm
2.93m25

169
PVC-S25 DN=200.00
L=2PVC-S

mm

288 mm T. L=19.24m S=7.20%


0.00 %
T.

56
=20 .90 T. PVC-
S25 DN=2
L=19.36m
287 209 25 DN S=2 211
S=8.900.00
50.00 mm C-S1.74m
D
T. PVC-S2 S=13.35

T. PVL=2 6% mm
L=15.67m

25 DN=2 5% T.
T. PVC-S96m S=7.2 L=25PVC-S25
5 DN=250 %
.20% mm

T. PVC-S25 DN=250.00 L=57. .72m DN= 158


3% 0 mm

L=29.45m S=6.61% mm S=7.16%200.00


.00 mm
S=1660.00

mmT. PVC-S2
I
S=1.2=200.0

210
L L=10.14m5 DN=200.00
S25 DN=1

T. PVC
mm S=2.78% mm
0m DN

L=45.22-S25 .00
4.44% mm

DN=
L=39.28m

8.0 25
T. PVC 5.86m

m S=6 250 =2503.21%


L=3PVC-S

S=1 0.00

.44%.00 mm
T. PVC-

T.
L=4

5 DN S= 215
L=33PVC-
=20
-S25 S=9.33%

C-S2.81m
212
T.

7.49m DN

.63 S25
T. PVL=39
L=3C-S25

322
DN=

m DN 227
214 S= =200 371
250.00

T. PV

208 213 5.8 .00 229


T. 5% mm

3376 3376
321
L=4PVC-S2
292
mm

8.24 5 DN 225 323


m S=1=25 320 231
8m S=9.70.00 mm

18%0.00 mm

.04%0.00 205
0% mm

mm 345 203
7%

T. PVL=29.5

T. EXI 206 230


4.5 .00

S=14. =20
.21%.00 mm

248
L=39.5 25 DN=16

L=4 STE
S= =250

C-S 8m

1.86 NTE 319


0m DN

370 207
25 S=

m DN
.08 S25 DN

T. 249
2.2 TE

S=1 =20
L=3PVC-S
G
m S=5 200

DN 9.6

250 2.04 0.00


L=4 ISTEN

M
m

=20 1%
1.87 DN=
T. PVC-S

204
L=51PVC-

7.4 25 % mm 318
3m DN T.
82%mm 0.0
T. EX

L=5PVC-S2
L=5 -S25

245
S=8.4=250.0
T.

0 mm

217
S=10.0.00

2.50m 5 DN 237
T. PVC

5% 0 mm T.
5.29m DN=20

246
S=2 =250.0 247 L=2EXIST

BZ - 118
T. L=28

.48% 0 mm 9.6 EN
PV .89

283
1m TE
L=3C-S25

301
C-S2 m

284 238 251 S= DN


T. PVC8.83m

mm 0.7 =20 218


5 DNS=1.4

T. PVC
T. PV

T. PVC-S25 DN=250.00
L=2

2524% 0.0
L=20.00m S=1.55% L=20.10 -S25 DN=
=200 8%

236 0 mm 219

O
244

BZ - 119
-S25 S=16.15

T. PVC-S25 253 228


m S=4 160

C.T=3380.31
.00

7
L=32.24m DN=160.00 mm T. EX
mm

3.42 .00 mm
DN=

S=13.99% 220
mm

% mm 232 243 L=3 IST 221


mm

2.1 EN
160.00 %
5 DN=16 7%
250.00%

0.00 mm

74%0.00

255 3m TE
.98%.00 mm

T. PVC DN= 2.56 T. PVC-S25


T. PVC-S2 0m S=35.0

.08% 0.00

233 DN 222
T. PV
S=10.=20

L=3 -S2 -S25 m S=1 L=19 DN= T. 254 S=2.4 =20


L=33

C.T=3380.16
S=3DN=20

L=3PVC-S
mm

DN

3.22m 5 DN .82m 160. 0% 0.0


C-S2 m

T. PVCL=24.58
C.F=3379.11
250

38 0 mm 64
.27

S=38 00 mm 256
S=1 =160.0 5.3 25
3.71m TE

CUNAMAS
L=19.6

223
5 DNS=14
DN=

.01%
0.00 mm

m S=6

1m DN
L=3 ISTEN
7.27m NTE

0.72% 0 mm S=8.5=250.0
25 DN=25 0%

=200.05%
L=41.89-S25

242 T. 63
L=5 STE

235 37 224
L=31EXIST
T. PVC-S 5m S=20.3

T. EX

2% 0 mm
.00
T. PVC

241
T. EXI

113

C.F=3378.76
39
mm

T. 366 .98 ENTE


P H=1.20
62 65 T.
150 L=5PVC
6.88-S25 DN= 234 36 240 IGLESIA m DN L=2PVC-S
T. PVL=32

S= 3.9 25 216
GRASS m S=1 160 T. 0.4 =200 61 57 9m DN
L=42.8

L=3PVC-S
239
0 mm
T. L=47

C-S.99m

114 7.50 .00 mm INSTITUCIÓN 1% .00 S=8.4=20


PV .83

35 58
%
N
25 S=

SINTÉTICO 40 mm
5.2 25 8%0.0
C-S2 m

EDUCATIVA
0.0
31%

296

H=1.40
DN 35

279 5m DN 0 mm
=20
5 DN S=

S=9.0=250.0
=160 .13%

115 INICIAL 59
S=10.

34 I.E. SAN
DN
mm
=1605.01%

.00

AUDITORIO 1% 0 mm
mm

3.8 25

FRANCISCO
.47% 0

U
9m
mm
.00

L=6 C-S
S=8 0.0

25 66
00

41
.44% mm

S.H DE ASIS 294


mm

3%00.
m =25

60 306

3380 3380
T. EX
T. PV

116
S=1 200.00

131

BZ - 120
=2

BZ - 87
6.07 5 DN

L=58 IST
DN
S=1.2

42 85
.20 ENTE
DN=

295
TE

T.
L=3 -S2

117
L=5PVC
T. PVL=60

297 67
45mEN

20 m DN
L=3 STENTE
T. PVC

5.01-S25 DN= 84 291


L=56.IST

T. PV S= =2
C-S2.04m

33
2.58m

m S=1 160 7.0 00.00


T. EX

307
T. PV

BANCO DE L=56. C-S 21 82 9%


5 DN S=7.4

290
T. EXI

0.85 .00 mm
C.T=3379.49
83
04m25 DN
C.T=3374.25
L=4

% LA NACIÓN mm
C-S 6m

=200 8%

32 68
5.3

S=3.5=250.0 22
25 DNS=4

.00

26 130
1% 0 mm
Q
mm

31
J
=25.60%

81
.80% mm

T. PVC 69 308
0.00

C.F=3378.29 C.F=3372.95
0.65.00 mm

S=3 200.00

L=34.77-S25 30 80
mm

0 mm

78
DN=
%

344 m S=1
DN=

200 76 309
S=1 250

2.58.00 mm PLAZA
.36% 0.0

mm

28 79
L=3 STENTE

343
m DN=

% T.
S=1DN=20

118 129 PAUCARBAMBA 70


L=32.PVC-S
.55% 0.00
2.75m

27 mm
T. PVC-S25 DN=200.00
H=1.20 H=1.30
L=49.15-S25

S=0DN=20

30m 25 77
F
T. EXI

T. PVC 75 L=16.09m S=1.51%


1.88m TE

S=DN7.1=2
71
T. PVC

119 342
L=3 ISTEN

128 L=34.80-S25 103


7%50.
6.54m TE

DN=
m S=1 00 310 mm
200
L=5 ISTEN
T. EX

.00 145
A' 7.69 .00 mm mm 72
T. PV

T. PVL=61

311
E
120
127
91 % T. EXIS
104 102 =200 0.97% 146
L=4

T. EX

74
C-S2.06m

5 DNm S=
C-S 0m

L=14 TENTE T.
5.3

mm

293
L=31PVC-S
.78m DN=200.00
R C-S251.45
5 DN S=
25 DNS=0

3374 3374
73
V
312
.17% 0.00

121 92 S=8.30% mm 101


T. PV L=
=20018.84

90 .43 25
=25.97%

S=1DN=20

T. PVC-S25 DN=250.00 m DN
.00 %

144
0 mm

S=11=250
0.00

L=33.52m S=14.29% mm 147


mm

122 mm 89
94 MUNICIPALIDAD 100 .16 .00
2.36m NTE
.46% 0.0

148
mm

.00 T. % mm
93
L=4EXIST mm
S=1 =20

.38% 0 mm

T. PVC DISTRITAL DE
=2509.03% 0.00
L=3 STE

99 305
K
m DN

L=40.76-S25 0.5 EN PAUCARBAMBA 313


6%

5 DN S=
S=1=200.0
T. EXI

126 DN= 3m TE =20


S=1.9

25 DN
6.53 NTE

m S=2
C-S2.82m 200
2.10 .00 mm
88 282 S= DN=20 149
7.90m DN

ESTADIO 4.0 C-S


L=4 STE

6.38m

110 143
T. PVL=48 171 % 3% 0.0 T.
T. PV
L=2 C-S25

L=39.PVC-S
D'
125 0 mm
L=1
T. EXI

86 285 281 105 304


B'
0 mm

78m 25 DN
T. PV

124 87
0 mm T. PVC 106 109
S=12.=250.0
mm
.92% 0.0

0.0 8% 170 286 337 314 .00


L=40.94-S25
9% 0 mm

=200 5%
S=6DN=20

=20 5.0 18% 0 mm


T. PVL=44.8

DN S=
mm

123 263 DN=


m S=2 338
DN 3.0
S=2.2 0.0

25 200 107
25 S=
T. PVC-S25 S=11.21%

142
C-S 1.20m
0% mm

1.78 .00 mm LOSA


C-S 0m

8.75m TE

DN=160.00
2m =20

262 324 T. C-S .17m mm


1.0 .00

T. PV L=5 % DN=160.00
L=3 ISTEN
25 DN S=0

L=5PVC-S DEPORTIVA
1.1 DN

C' T. PVL=50
S= =250

8.4 25 T. PVC-S25 S=7.93%


L=3 C-S25

T. 108 339
T. PV 315
T. EX
.00 S25 DN
=25 .94%

L=4PVC 2m DN L=35.52m
% mm

267 T. EXI
L=38.16m

8.87-S25 DN= 43 S=13.=20 336 340 L=3 C-S


0.00

T. PV

COMISARIA
12.81 .00

L=38.66STE 7.46m25 DN
m

268 m S=2 200 33%0.0


L=30PVC-

9
S=3 0.00 mm

S= =160

NTE 0 mm PNP
mm

T. PVC-S25 DN=250.00 mm m S=9DN= 55 44


L=12.00m S=1.32% 0.83 .00 mm 45 341 S=8.1=250.0
.41%
T.

m DN

112 % .44%200.00 3% 0 mm
373 141
.45% mm

.17 25

269
9.64m =20

mm 54
L=34PVC-S
5%0 mm

46 358
S=2 0.00
L=5 -S25 DN

53 325
8
S=8.90.0

T.
=20

T.

10 52 T. PV
L=48PVC- 47
W
316
=20

T. PVC
9.25m DN
T. PVC

L=26 C-S mm
T. PVC-S25 DN=200.00
DN

.09 S25 L=47.33-S25 51 T. PVC-S25 DN=200.00


L=2 C-S25

326
m DN DN= S.H 7 T. EXI 48 .98 25 DN .00 mm L=43.90m S=6.50%
1m
L=3C-S25

m S=3 50 335 m =2 L=45.12m S=6.69% mm


0% 0 mm

200. STE 5 DN=200


8.7

S= =2 5 L=58.64
1.42% 00 mm
T. PV

2.7 00.00 NTE S=7.6 50 T. PVC-S2m S=8.01%


T. PV

49 .00
S=7.9 0.0

6% 270
4 m S=9DN= 327 1% mm L=41.34
6m =16

mm 260 .04%200.00 mm 357


2.4 DN

271 3 IGLESIA 365


T.
L=3PVC-S2
L=4 C-S25
mm

6
8.26 mm

272 2 328 EVANGELICA


E'
0.29m 5 DN 261 334
4%0.00

183
m S=2200.00
%

T. PV

1 333
S=1 =200.0 T.
=20

0%0 mm
S=0.9

273 4.06% 0 mm 332 L=51PVC-S


4m DN
DN=

T. 184 185 363


L=3EXI
S=5.30.0

.90 25 DN

3378 3378
4.9 25

9.19STENTE
329
331 182
S
=20

m
-S25

L=3 C-S

S=15=200
L=25.80

226 m S=1DN
DN
T. PV

274
T. PVC

.79% mm

6.92=200.00 .76 .00 mm


L=3C-S25
8m

T. 330 %
L=4PVC-S
9.0
S=3200.00

% mm 181
F' 15
T. PV

6% mm

137 5.37m 25 155 175


275 DN
m DN=

T. PVC
3.7 0.00

L=24.80 S=1 =200.0 367 T.


mm

-S25 2.91% 0 L=3EXI


S==16

369 160 STE 180


-S25

356
mm
.3000.00

m S=3DN=20 5.83 NTE


L=56.85

DN
%

m S=1 DN=
T. PVC

1.15 0.00
L=4 C-S25
S=11=2

136
6m

179
% mm 5.50 200.00 177 359
m DN

178
2.3

T.
T
5% mm

16 % mm
T. PV

19
.33 25

T. 161 L=49.PVC-S 360


1.0 .00

L=1 PVC-S2
X
L=35PVC-S

17
S= =200

364
9.43 5 DN
280 135 T. 99m 25 DN 361
m =20 L=4PVC-S 162 176
m DN
T.

S=2 0.00 300


276 138
2.57m25 18 T. PVC 186 S=12.=200.0
.42 S25

1.17 mm DN L=53 -S25 0 mm


.15m DN= 12% 362
L=46PVC-

% mm S=1 =200.0 S=13 200.00 172


3.85% 0
1% mm

0.00 .70% mm
T.

mm
DN=20 .48%
S=7.8 .00

EVANGELICA -S25 m S=4


J'
m 60
T. PVC

IGLESIA
.70 DN=1

T. PVC
L=3

9.59 T.
-S25 m S=9

L=1
2.12

L=32.PVC-S
L=30 25

mm
G'
DN=20 .29%

C-S

160.00 76m 25 DN
T. PVC-S 8m S=3.41

T. PV

DN= .05%
0.00

6% mm

3372 3372
-S25 m S=5 S=16.=200.
L=11.2
02%mm

T. PVL=42.5
mm

25 DN=20 %

277
5.8 .00

T. PVC 60%00 354


S=13.00.00

L=34.36
S= 00
C-S 0m

266 mm
N'
m =2

278
0.00 mm
1.04% mm
25 DN=2

.50 5 DN
25 S=12.

134 355
4% mm
S=2=200.00

DN 63%

192 T.
L=46 C-S2
L=16.77m

L=32.PVC-S
=20

S=8.6 00

298 174
T. PVC-S

353
4.85m DN

m 60.

PV

111
0.0
3% mm

T. 82m 25 DN
L=2 -S25

.79 DN=1

173
T.

187
L=3PVC-S2
0 mm
S=0.9 0.00

299
T. PVC

5.83m 5 S=17.=200.
L=37 25
=16

DN 68%00
C-S

mm S=2 =200.0 mm
0.99m DN

0.00
T. PV

350 2.01% 0
3% mm

265
DN=20S=2.28% 352
L=4 C-S25

348 mm T.
S=1.060.00

-S25 m L=3PVC-S2
POSTA 302 351
Y
T. PV

T. PVCL=19.80 4.62m 5 DN T. PVC


m =1

MEDICA
T. PV 4.0

.90 DN

S=1 =200.0 L=42 -S25


L=4

.20m DN=
L=39C-S25
7% mm

0.85% 0 mm
K'
C-S 1m S=

372 200.00
T. PVL=31.6

349 S=33.63
25 8.6

S=0.800.00

T. PV

% mm
C-S 8m
DN 6%

25 S=33.

191
=20

S25 DN=2

DN 98%

T. PVL=28
=20
0.0

190 T. PVC
0.0
0 mm

C-S2.98m

132
L=30.96m

0 mm

.00 mm 346 L=42.96-S25


DN=
5 DN S=16

5 DN=160 %

También podría gustarte