Datos:
Materiales:
kgf kgf
f' c ≔ 210 ―― 2
fy ≔ 4200 ――
cm cm 2
Suelo:
kgf
qu_suelo ≔ 4.18 ⋅ ―― FS ≔ 2
cm 2
1. Dimensionamiento en Planta
‾‾‾‾‾
PSer
Zapata Cuadrada A≔ ――= 150.52 cm
Despejando A: qadm
PMay kgf
Capacidad de qu. ≔ ――= 2.71 ――
Carga Ultima: A⋅B cm 2
2. Dimensionamiento en Elevacion:
2. Dimensionamiento en Elevacion:
d ≔ 22.50 cm
ϕ ≔ 0.75 (corte)
⎛ αs ⋅ d ⎞ ‾‾‾‾‾‾‾
kgf kgf
VC2 ≔ 0.27 ⋅ ⎜――⎟ ⋅ f' c ⋅ ―― = 15.31 ――
⎝ b0 ⎠
2
cm cm 2
‾‾‾‾‾‾‾kgf kgf
VC3 ≔ 1.10 ⋅ f' c ⋅ ―― 2
= 15.94 ――
cm cm 2
kgf
VCmin ≔ min ⎛⎝VC1 , VC2 , VC3⎞⎠ = 15.31 ――
cm 2
if Vu ≤ VCmin | = “Cumple”
‖ “Cumple” |
‖ |
else |
‖ “falla” |
‖ |
kgf
qx ≔ qu. ⋅ B = 406.47 ――
cm
⎛ m2 ⎞
My ≔ qx ⋅ ⎜―― ⎟ = 671940.43 kgf ⋅ cm
⎝ 2 ⎠
‾‾‾‾‾‾‾kgf kgf
Vcx ≔ 0.53 ⋅ f' c ⋅ ―― 2
= 7.68 ――
cm cm 2
verificamos a corte por flexion:
‾‾‾‾‾‾‾kgf kgf
Vcy ≔ 0.53 ⋅ f' c ⋅ ―― = 7.68 ――
cm 2 cm 2
verificamos a corte por flexion:
h ≔ d + rz = 30 cm d = 22.5 cm
4. Transferencia de Esfuerzos
h ≔ d + rz = 30 cm
4. Transferencia de Esfuerzos
PMay kgf
fa ≔ ――= 49.77 ―― ϕ ≔ 0.65 (compresion)
a⋅b cm 2
kgf
fau ≔ ϕ ⋅ 0.85 ⋅ f' c = 116.03 ――
cm 2
if fa ≤ fau | = “Cumple”
‖ “Cumple” |
‖ |
else |
‖ “falla” |
‖ |
x1 ≔ 2 ⋅ h = 60 cm x2 ≔ x1 = 0.6 m
‾‾‾
A2
― = 4.429
verificar A1
‾‾‾
A2 |
if ― ≤ 2 | = “2”
A1 | kgf
fauf ≔ fau ⋅ 2 = 232.05 ――
‖ “cumple” | cm 2
‖ |
else |
‖ “2” |
‖ |
if fa ≤ fauf | = “Cumple”
‖ “Cumple” |
‖ |
else |
‖ “falla” |
‖ |
Asx1 ≔ ρ ⋅ B ⋅ d = 8.132 cm 2
⎛ kgf ⎞
⎜ 0.0018 ⋅ 4200 ⋅ ―― ⎟
⎜ cm 2 ⎟
Asx1min1 ≔ ――――――― ⋅ B ⋅ h = 8.1 cm 2
⎜⎝ fy ⎟⎠
Asx1min2 ≔ 0.0014 ⋅ B ⋅ h = 6.3 cm 2
para un diametro de ϕb ≔ 12 mm
π ⋅ ϕb 2 Asx1min
Aacero ≔ ――― = 1.131 cm 2 Nbarras ≔ ――― = 7.19
4 Aacero
B'
Sep ≔ ――― = 18.776 cm Sep ≔ Floor ((Sep , cm )) = 18 cm
Nbarras
ϕ12c /18cm
B'
Nbarras ≔ ―― = 7.5 NbarrasX ≔ ceil ⎛⎝Nbarras ⎞⎠ = 8 barras
Sep
Colocar: 8 ϕ 12 c/18 cm
Asy1 ≔ ρ ⋅ A ⋅ d = 8.132 cm 2
⎛ kgf ⎞
⎜ 0.0018 ⋅ 4200 ⋅ ―― ⎟
⎜ cm 2 ⎟
Asy1min1 ≔ ――――――― ⋅ A ⋅ h = 8.1 cm 2
⎜⎝ fy ⎟⎠
para un diametro de ϕb ≔ 12 mm
π ⋅ ϕb 2 Asy1min
Aacero ≔ ――― = 1.131 cm 2 Nbarras ≔ ――― = 7.19
4 Aacero
A'
Sep ≔ ――― = 18.776 cm Sep ≔ Floor ((Sep , cm )) = 18 cm
Nbarras
ϕ12c /18cm
A'
Nbarras ≔ ―― = 7.5 NbarrasX ≔ ceil ⎛⎝Nbarras ⎞⎠ = 8 barras
Sep
Colocar: 8 ϕ 12 c/18 cm
debe cumplirse:
ltx ≔ m - rz = 0.5 m
⎛ cb + Ktr ⎞ |
Xt ≔ if ⎜――― ⎟ ≤ 2.5| = 2.5
⎝ ϕb ⎠ |
‖⎛c +K ⎞ |
b
‖ ⎜――― tr |
⎟
‖ ⎝ ϕb ⎠ |
‖ |
lty ≔ n - rz = 0.5 m else |
‖ 2.5 ||
‖
⎛ fy ψe ⋅ ψt ⋅ ψs ⋅ λ ⎞
ldt ≔ ⎜―――――⋅ ――――⎟ ⋅ ϕb = 31.798 cm
⎜ ‾‾‾‾‾‾‾kgf Xt ⎟
⎜ 3.5 ⋅ f' c ⋅ ―― 2 ⎟
⎝ cm ⎠
La longitud desarrollo para un diámetro 12mm en las direcciones X e Y se tiene:
debe cumplirse:
kgf
Por traslape a compresión: fy = 4200 ――
cm 2
⎛ 1 ⎞
ldt3 ≔ ⎜0.013 ⋅ fy ⋅ ――- 24⎟ ⋅ ϕb = 36.72 cm
⎜ kgf ⎟
――
⎜⎝ cm 2 ⎟⎠
7. Detalle de Armadura +
Planilla de Aceros
Colocar: 8 ϕ 12 c/18 cm
en ambas direcciones al ser una zapata cuadrada