Está en la página 1de 4

acero temperatura sotano 3

metros emapalmes cantidad metrado


sector 2 22.06 0.6 26 589.16
17 0.3 24 415.2
sector 1 18.23 0.3 26 481.78
23.26 0.6 24 572.64
sector 3 16.54 0.6 18 308.52
17 0.3 37 640.1
sector 4 16.8 0.3 34 581.4
23.26 0.6 37 882.82
sector 5 20.94 0.6 37 796.98
4.2 8 33.6
5.16 5 25.8
sector 6 19.3 0.6 45 895.5
16.55 0.6 10 171.5
6395
6mm (kg) 0.222
1419.69
1" 3//4" 5/8" 1/2"
SEMANA 51
ZAPATA Z-4 1114.37
M-24 NIVEL SOT. 3 EJECUTADO
LOSA S-5 / s-7 (SOT. 3) 4720.29
LOSA S-5 (SOT. 2) 2360.15
LOSA S-1 (SOT. 1) 2360.15
0.00 1114.37 0.00 9440.59
SEMANA 52
ZAPATA Z-3 875.97
ZAPATA ZA-1 60.19
ZAPATA ZA-2 30.98 18.03
875.97 30.98 78.22 0.00
SEMANA 1
ZAPATA ZB-2 2345.42
ZAPATA ZB-3 566.87
ZAPATA ZA-2 30.98 18.03
ZAPATA ZA-1 60.19
ZAPATA Z-3 875.97
LOSAS S-6 (SOT. 3) 2360.15
LOSAS S-1-2-3 (SOT. 1) 2832.18
3788.26 30.98 78.22 5192.32
3/8" 1/4"

7044.00 500.00
1901.77 106.85
1901.77 106.85
10847.55 713.71 1" 3//4"
SEMANA 51
ZAPATA Z-4 1
M-24 NIVEL SOT. 3 EJECUTADO
LOSA S-5 / s-7 (SOT. 3)
0.00 0.00 LOSA S-5 (SOT. 2)
LOSA S-1 (SOT. 1)
0.00 1
SEMANA 52
ZAPATA Z-3 875.97
ZAPATA ZA-1
ZAPATA ZA-2
1901.77 106.85 875.97
2282.13 128.22 SEMANA 1
4183.90 235.08 ZAPATA ZB-2 2345.42
ZAPATA ZB-3 566.87
ZAPATA ZA-2
ZAPATA ZA-1
ZAPATA Z-3 875.97
LOSAS S-6 (SOT. 3)
LOSAS S-1-2-3 (SOT. 1)
3788.26
1" 3//4" 5/8" 1/2" 3/8" 1/4"

1114.37
TADO
4720.29 7044.00 500.00
2360.15 1901.77 106.85
2360.15 1901.77 106.85
0.00 1114.37 0.00 9440.59 10847.55 713.71

875.97
60.19
30.98 18.03
875.97 30.98 78.22 0.00 0.00 0.00

2345.42
566.87
30.98 18.03
60.19
875.97
2360.15 1901.77 106.85
2832.18 2282.13 128.22
3788.26 30.98 78.22 5192.32 4183.90 235.08

También podría gustarte