AÑO 2036
Q_2=(Dot.×D)/86400=
Consumo Medio:
Qm = 15.60 lt/s
Q_mh=2.0×Q_m
Consumo Máximo Horario:
Q_(unit.)=Q_mh/L_Total =
0.000834 L/s.m
01 02 100 604.40 7,311.23 7,915.63 0.00083 0.000 0.000 0.000 6.601 01 0.000 -31.200 24.960 4,112.100 4,111.170 0.930 0.00154 0.224808 8.00 180.800
01 04 100 77.75 1,525.48 1,603.23 0.00083 0.000 0.000 0.000 1.337 02 6.601 6.601 6.240 4,112.100 4,110.790 1.310 0.01685 0.081185 3.00 81.400
04 05 100 540.85 4,483.10 5,023.95 0.00083 0.000 0.000 0.000 4.189 4.903 4,110.790 4,101.700 9.090 0.01681 0.074111 3.00 81.400
06 05 100 747.05 4,936.89 5,683.94 0.00083 0.000 0.000 0.000 4.740 04 1.337 1.337 3.898 4,103.860 4,101.700 2.160 0.00289 0.097488 4.00 99.400
02 06 100 517.53 1,141.44 1,658.97 0.00083 0.000 0.000 0.000 1.383 07 5.466 5.466 9.180 4,111.170 4,103.860 7.310 0.01412 0.097486 4.00 99.400
02 03 100 668.23 8,307.14 8,975.37 0.00083 0.000 0.000 0.000 7.484 03 7.484 7.484 9.180 4,111.170 4,106.650 4.520 0.00676 0.113396 6.00 144.600
03 07 100 432.33 3,551.06 3,983.39 0.00083 0.000 0.000 0.000 3.322 06 1.383 1.383 1.695 4,106.650 4,101.090 5.560 0.01286 0.052286 2.50 67.800
06 07 100 642.94 1,928.44 2,571.38 0.00083 0.000 0.000 0.000 2.144 05 8.929 8.929 3.898 4,103.860 4,101.090 2.770 0.00431 0.089824 4.00 99.400
01 02 -1 604.40 8.00 -0.0250 0.0044 -2.69 107.7724 -0.00085 -0.02581 0.0047 -2.86 110.8232 -0.0021
01 04 1 77.75 3.00 0.0062 0.0166 1.29 206.7307 -0.00085 0.00539 0.0127 0.99 183.5670 -0.0021
04 05 1 540.85 3.00 0.0049 0.0106 5.76 1174.7637 -0.00085 0.00406 0.0075 4.05 998.4620 -0.0021
06 05 -1 747.05 4.00 -0.0039 0.0026 -1.97 505.3662 -0.00085 -0.00475 0.0038 -2.83 596.4124 -0.0021
02 06 -1 517.53 4.00 -0.0092 0.0128 -6.65 724.4250 -0.00215 -0.01133 0.0190 -9.82 866.6839 -0.0029
-4.26 2719.06 -10.47 2755.95
02 06 1 517.53 4.00 0.0092 0.0128 6.65 724.4250 0.00215 0.01133 0.0190 9.82 866.6839 0.0029
02 03 -1 668.23 6.00 -0.0092 0.0021 -1.38 150.3318 -0.00130 -0.01048 0.0026 -1.77 168.8340 -0.0008
03 07 -1 432.33 2.50 -0.0017 0.0036 -1.57 926.0393 -0.00130 -0.00300 0.0104 -4.51 1503.6507 -0.0008
06 07 1 642.94 4.00 0.0039 0.0026 1.69 433.5375 -0.00130 0.00259 0.0012 0.80 308.3815 -0.0008
5.39 2234.33 4.34 2847.55
CÁLCULO DE LAS MALLAS POR EL MÉTODO DE HARDY CROSS - SECTOR 03
TRAMO HORARIO PRIMERA ITERACIÓN SEGUNDA ITERACIÓN
/
LONGITUD DIÁMETRO
ANTIHORA
De A RIO Q J H H/Q ∆Q Q J H H/Q ∆Q
01 02 -1 604.40 8.00 -0.0258 0.0047 -2.86 110.8232 -0.0021 -0.02375 0.0041 -2.45 103.1434 -0.0002
01 04 1 77.75 3.00 0.0054 0.0127 0.99 183.5670 -0.0021 0.00745 0.0231 1.79 240.4 -0.0002
04 05 1 540.85 3.00 0.0041 0.0075 4.05 998.46 -0.0021 0.00611 0.0160 8.65 1415.8 -0.0002
06 05 -1 747.05 4.00 -0.0047 0.0038 -2.83 596.4124 -0.0021 -0.00269 0.0013 -0.99 367.8 -0.0002
02 06 -1 517.53 4.00 -0.0113 0.0190 -9.82 866.6839 -0.0029 -0.00845 0.0110 -5.71 675.5 -0.0009
-10.47 2755.95 1.29 2802.6
02 06 1 517.53 4.00 0.0113 0.0190 9.82 866.6839 0.0029 0.00845 0.0110 5.71 675.5 0.0009
02 03 -1 668.23 6.00 -0.0105 0.0026 -1.77 168.8340 -0.0008 -0.00966 0.0023 -1.52 157.4 -0.0007
03 07 -1 432.33 2.50 -0.0030 0.0104 -4.51 1503.6507 -0.0008 -0.00218 0.0058 -2.49 1144.6 -0.0007
06 07 1 642.94 4.00 0.0026 0.0012 0.80 308.3815 -0.0008 0.00342 0.0021 1.33 389.1 -0.0007
4.34 2847.55 3.03 2366.51
CÁLCULO DE LAS MALLAS POR EL MÉTODO DE HARDY CROSS - SECTOR 03
TRAMO HORARIO SEGUNDA ITERACIÓN TERCERA ITERACIÓN
/
LONGITUD DIÁMETRO
ANTIHORA
De A RIO Q J H H/Q ∆Q Q J H H/Q ∆Q
01 02 -1 604.40 8.00 -0.02375 0.00406 -2.45000 103.1434 -0.00025 -0.02400 0.0041 -2.50 104.1574 -0.0002
01 04 1 77.75 3.00 0.00745 0.02308 1.79000 240.3759 -0.00025 0.00720 0.0217 1.68 233.4026 -0.0002
04 05 1 540.85 3.00 0.00611 0.01600 8.65000 1,415.7626 -0.00025 0.00586 0.0148 8.01 1366.6662 -0.0002
06 05 -1 747.05 4.00 -0.00269 0.00132 -0.99000 367.8253 -0.00025 -0.00294 0.0016 -1.17 397.9186 -0.0002
02 06 -1 517.53 4.00 -0.00845 0.01103 -5.71000 675.4876 -0.00094 -0.00939 0.0134 -6.94 738.7656 -0.0006
1.29 2,802.6 -0.92 2840.91
02 06 1 517.53 4.00 0.00845 0.01103 5.71000 675.48759 0.00094 0.00939 0.0134 6.94 738.7656 0.0006
02 03 -1 668.23 6.00 -0.00966 0.00228 -1.52000 157.35281 -0.00069 -0.01035 0.0026 -1.73 167.1189 -0.0004
03 07 -1 432.33 2.50 -0.00218 0.00576 -2.49000 1,144.5541 -0.00069 -0.00287 0.0096 -4.15 1447.1979 -0.0004
06 07 1 642.94 4.00 0.00342 0.00206 1.33000 389.11232 -0.00069 0.00273 0.0014 0.87 319.1553 -0.0004
3.03 2366.51 1.93 2672.24
CÁLCULO DE LAS MALLAS POR EL MÉTODO DE HARDY CROSS - SECTOR 03
TRAMO HORARIO TERCERA ITERACIÓN CUARTA ITERACIÓN
/
LONGITUD DIÁMETRO
ANTIHORA
De A RIO Q J H H/Q ∆Q Q J H H/Q ∆Q
01 02 -1 604.40 8.00 -0.02400 0.00414 -2.50000 104.15738 -0.00018 -0.02383 0.0041 -2.47 103.6635 -0.0001
01 04 1 77.75 3.00 0.00720 0.02167 1.68000 233.40256 -0.00018 0.00737 0.0227 1.76 238.7116 -0.0001
04 05 1 540.85 3.00 0.00586 0.01481 8.01000 1,366.6662 -0.00018 0.00604 0.0156 8.46 1401.5844 -0.0001
06 05 -1 747.05 4.00 -0.00294 0.00156 -1.17000 397.9186 -0.00018 -0.00277 0.0014 -1.04 376.0961 -0.0001
02 06 -1 517.53 4.00 -0.00939 0.01341 -6.94000 738.7656 -0.00057 -0.00883 0.0120 -6.19 701.1305 -0.0006
-0.92 2,840.9105 0.52 2821.19
02 06 1 517.53 4.00 0.00939 0.01341 6.94000 738.7656 0.00057 0.00883 0.0120 6.19 701.1305 0.0006
02 03 -1 668.23 6.00 -0.01035 0.00259 -1.73000 167.1189 -0.00039 -0.00996 0.0024 -1.61 161.6221 -0.0005
03 07 -1 432.33 2.50 -0.00287 0.00960 -4.15000 1,447.1979 -0.00039 -0.00248 0.0073 -3.17 1279.6655 -0.0005
06 07 1 642.94 4.00 0.00273 0.00136 0.87000 319.15534 -0.00039 0.00312 0.0017 1.12 359.3953 -0.0005
1.93 2672.24 2.53 2501.81
CÁLCULO DE LAS MALLAS POR EL MÉTODO DE HARDY CROSS - SECTOR 03
TRAMO HORARIO CUARTA ITERACIÓN QUINTA ITERACIÓN
/
LONGITUD DIÁMETRO
ANTIHORA
De A RIO Q J H H/Q ∆Q Q J H H/Q ∆Q
01 02 -1 604.40 8.00 -0.02383 0.00408 -2.47000 103.6635 -0.00010 -0.02393 0.0041 -2.48 103.6498 -0.0001
01 04 1 77.75 3.00 0.00737 0.02265 1.76000 238.7116 -0.00010 0.00727 0.0221 1.72 236.4820 -0.0001
04 05 1 540.85 3.00 0.00604 0.01564 8.46000 1,401.5844 -0.00010 0.00594 0.0152 8.20 1381.3100 -0.0001
06 05 -1 747.05 4.00 -0.00277 0.00139 -1.04000 376.0961 -0.00010 -0.00286 0.0015 -1.11 387.4504 -0.0001
02 06 -1 517.53 4.00 -0.00883 0.01195 -6.19000 701.1305 -0.00065 -0.00947 0.0136 -7.05 744.0742 -0.0004
0.52 2,821.2 -0.72 2852.97
02 06 1 517.53 4.00 0.00883 0.01195 6.19000 701.1305 0.00065 0.00947 0.0136 7.05 744.0742 0.0004
02 03 -1 668.23 6.00 -0.00996 0.00241 -1.61000 161.6221 -0.00055 -0.01051 0.0027 -1.78 169.3925 -0.0003
03 07 -1 432.33 2.50 -0.00248 0.00732 -3.17000 1,279.6655 -0.00055 -0.00302 0.0106 -4.58 1514.6302 -0.0003
06 07 1 642.94 4.00 0.00312 0.00174 1.12000 359.3953 -0.00055 0.00257 0.0012 0.78 303.5356 -0.0003
2.53 2501.81 1.47 2731.63
CÁLCULO DE LAS MALLAS POR EL MÉTODO DE HARDY CROSS - SECTOR 03
TRAMO HORARIO QUINTA ITERACIÓN SEXTA ITERACIÓN
/
LONGITUD DIÁMETRO
ANTIHORA
De A RIO Q J H H/Q ∆Q Q J H H/Q ∆Q
01 02 -1 604.40 8.00 -0.02393 0.00411 -2.48000 103.6498 -0.00014 -0.02406 0.0042 -2.51 104.3089 -0.0003
01 04 1 77.75 3.00 0.00727 0.02209 1.72000 236.4820 -0.00014 0.00714 0.0213 1.66 232.5951 -0.0003
04 05 1 540.85 3.00 0.00594 0.01517 8.20000 1,381.3100 -0.00014 0.00580 0.0145 7.86 1355.1775 -0.0003
06 05 -1 747.05 4.00 -0.00286 0.00149 -1.11000 387.4504 -0.00014 -0.00300 0.0016 -1.21 403.1588 -0.0003
02 06 -1 517.53 4.00 -0.00947 0.01362 -7.05000 744.0742 -0.00043 -0.00990 0.0148 -7.65 772.5584 -0.0005
-0.72 2,853.0 -1.85 2867.80
02 06 1 517.53 4.00 0.00947 0.01362 7.05000 744.0742 0.00043 0.00990 0.0148 7.65 772.5584 0.0005
02 03 -1 668.23 6.00 -0.01051 0.00266 -1.78000 169.3925 -0.00029 -0.01080 0.0028 -1.87 173.1637 -0.0002
03 07 -1 432.33 2.50 -0.00302 0.01059 -4.58000 1,514.6302 -0.00029 -0.00331 0.0126 -5.43 1638.1440 -0.0002
06 07 1 642.94 4.00 0.00257 0.00122 0.78000 303.5356 -0.00029 0.00228 0.0010 0.63 276.4578 -0.0002
1.47 2731.63 0.98 2860.32
CÁLCULO DE LAS MALLAS POR EL MÉTODO DE HARDY CROSS - SECTOR 03
TRAMO HORARIO SEXTA ITERACIÓN SEPTIMA ITERACIÓN
/
LONGITUD DIÁMETRO
ANTIHORA
De A RIO Q J H H/Q ∆Q Q J H H/Q ∆Q
01 02 -1 604.40 8.00 -0.02406 0.00415 -2.51000 104.30892 -0.00035 -0.02371 0.0040 -2.44 102.8909 0.0000
01 04 1 77.75 3.00 0.00714 0.02133 1.66000 232.59512 -0.00035 0.00749 0.0233 1.81 241.7987 0.0000
04 05 1 540.85 3.00 0.00580 0.01453 7.86000 1,355.1775 -0.00035 0.00615 0.0162 8.75 1423.0702 0.0000
06 05 -1 747.05 4.00 -0.00300 0.00162 -1.21000 403.15879 -0.00035 -0.00265 0.0013 -0.96 361.9092 0.0000
02 06 -1 517.53 4.00 -0.00990 0.01478 -7.65000 772.55843 -0.00053 -0.00937 0.0133 -6.90 736.5291 -0.0002
-1.85 2,867.8 0.26 2866.20
02 06 1 517.53 4.00 0.00990 0.01478 7.65000 772.55843 0.00053 0.00937 0.0133 6.90 736.5291 0.0002
02 03 -1 668.23 6.00 -0.01080 0.00280 -1.87000 173.16373 -0.00019 -0.01061 0.0027 -1.81 170.5322 -0.0002
03 07 -1 432.33 2.50 -0.00331 0.01256 -5.43000 1,638.1440 -0.00019 -0.00313 0.0113 -4.88 1559.3407 -0.0002
06 07 1 642.94 4.00 0.00228 0.00097 0.63000 276.45778 -0.00019 0.00246 0.0011 0.72 292.2044 -0.0002
0.98 2860.32 0.93 2758.61
CÁLCULO DE LAS MALLAS POR EL MÉTODO DE HARDY CROSS - SECTOR 03
TRAMO HORARIO SEPTIMA ITERACIÓN OCTAVA ITERACIÓN
/
LONGITUD DIÁMETRO
ANTIHORA
De A RIO Q J H H/Q ∆Q Q J H H/Q ∆Q
01 02 -1 604.40 8.00 -0.02371 0.00404 -2.44000 102.8909 -0.00005 -0.02376 0.0041 -2.45 103.0994 0.0000
01 04 1 77.75 3.00 0.00749 0.02330 1.81000 241.7987 -0.00005 0.00744 0.0230 1.79 240.7036 0.0000
04 05 1 540.85 3.00 0.00615 0.01619 8.75000 1,423.0702 -0.00005 0.00610 0.0159 8.62 1413.1973 0.0000
06 05 -1 747.05 4.00 -0.00265 0.00129 -0.96000 361.9092 -0.00005 -0.00270 0.0013 -1.00 370.1465 0.0000
02 06 -1 517.53 4.00 -0.00937 0.01334 -6.90000 736.5291 -0.00023 -0.00960 0.0140 -7.22 752.1202 -0.0002
0.26 2,866.20 -0.26 2879.27
02 06 1 517.53 4.00 0.00937 0.01334 6.90000 736.5291 0.00023 0.00960 0.0140 7.22 752.1202 0.0002
02 03 -1 668.23 6.00 -0.01061 0.00271 -1.81000 170.5322 -0.00018 -0.01080 0.0028 -1.87 173.2113 -0.0001
03 07 -1 432.33 2.50 -0.00313 0.01129 -4.88000 1,559.3407 -0.00018 -0.00331 0.0125 -5.42 1636.5929 -0.0001
06 07 1 642.94 4.00 0.00246 0.00112 0.72000 292.2044 -0.00018 0.00228 0.0010 0.63 276.0981 -0.0001
0.93000 2758.61 0.56 2838.02
CÁLCULO DE LAS MALLAS POR EL MÉTODO DE HARDY CROSS - SECTOR 03
TRAMO HORARIO OCTAVA ITERACIÓN NOVENA ITERACIÓN
/
LONGITUD DIÁMETRO
ANTIHORA
De A RIO Q J H H/Q ∆Q Q J H H/Q ∆Q
01 02 -1 604.40 8.00 -0.02376 0.00406 -2.45000 103.09941 -0.00005 -0.02371 0.0040 -2.44 102.8899 0.0000
01 04 1 77.75 3.00 0.00744 0.02302 1.79000 240.70363 -0.00005 0.00749 0.0233 1.81 241.8059 0.0000
04 05 1 540.85 3.00 0.00610 0.01595 8.62000 1,413.19727 -0.00005 0.00615 0.0162 8.75 1423.1217 0.0000
06 05 -1 747.05 4.00 -0.00270 0.00133 -1.00000 370.14649 -0.00005 -0.00265 0.0013 -0.96 361.8788 0.0000
02 06 -1 517.53 4.00 -0.00960 0.01396 -7.22000 752.12020 -0.00016 -0.00944 0.0135 -7.01 742.2656 -0.0002
-0.26 2,879.3 0.15 2871.96
02 06 1 517.53 4.00 0.00960 0.01396 7.22000 752.12020 0.00016 0.00944 0.0135 7.01 742.2656 0.0002
02 03 -1 668.23 6.00 -0.01080 0.00280 -1.87000 173.21134 -0.00011 -0.01069 0.0027 -1.83 171.1976 -0.0001
03 07 -1 432.33 2.50 -0.00331 0.01254 -5.42000 1,636.59285 -0.00011 -0.00321 0.0118 -5.10 1591.2147 -0.0001
06 07 1 642.94 4.00 0.00228 0.00098 0.63000 276.09811 -0.00011 0.00239 0.0011 0.68 284.7026 -0.0001
0.56 2838.02 0.76 2789.38
CÁLCULO DE LAS MALLAS POR EL MÉTODO DE HARDY CROSS - SECTOR 03
TRAMO HORARIO OCTAVA ITERACIÓN NOVENA ITERACIÓN
/
LONGITUD DIÁMETRO
ANTIHORA
De A RIO Q J H H/Q ∆Q Q J H H/Q ∆Q
01 02 -1 604.40 8.00 -0.02371 0.00404 -2.44000 102.88994 -0.00003 -0.02369 0.0040 -2.44 103.0126 0.0000
01 04 1 77.75 3.00 0.00749 0.02330 1.81000 241.80591 -0.00003 0.00751 0.0235 1.82 242.2283 0.0000
04 05 1 540.85 3.00 0.00615 0.01618 8.75000 1,423.12173 -0.00003 0.00618 0.0163 8.83 1429.5690 0.0000
06 05 -1 747.05 4.00 -0.00265 0.00129 -0.96000 361.87880 -0.00003 -0.00262 0.0013 -0.94 358.1512 0.0000
02 06 -1 517.53 4.00 -0.00944 0.01354 -7.01000 742.26563 -0.00018 -0.00962 0.0140 -7.25 753.6722 -0.0001
0.15 2,872.0 0.02 2886.63
02 06 1 517.53 4.00 0.00944 0.01354 7.01000 742.26563 0.00018 0.00962 0.0140 7.25 753.6722 0.0001
02 03 -1 668.23 6.00 -0.01069 0.00274 -1.83000 171.19763 -0.00015 -0.01084 0.0028 -1.88 173.4849 -0.0001
03 07 -1 432.33 2.50 -0.00321 0.01180 -5.10000 1,591.21470 -0.00015 -0.00335 0.0128 -5.54 1652.5596 -0.0001
06 07 1 642.94 4.00 0.00239 0.00106 0.68000 284.70260 -0.00015 0.00224 0.0009 0.61 272.1780 -0.0001
0.76 2789.38 0.44 2851.89
CÁLCULO DE LAS MALLAS POR EL MÉTODO DE HARDY CROSS - SECTOR 03
TRAMO HORARIO OCTAVA ITERACIÓN NOVENA ITERACIÓN
/
LONGITUD DIÁMETRO
ANTIHORA
De A RIO Q J H H/Q ∆Q Q J H H/Q ∆Q
01 02 -1 604.40 8.00 -0.02369 0.00403 -2.44000 103.01257 0.00000 -0.02369 0.0040 -2.44 102.9963 0.0000
01 04 1 77.75 3.00 0.00751 0.02346 1.82000 242.22826 0.00000 0.00751 0.0234 1.82 242.3491 0.0000
04 05 1 540.85 3.00 0.00618 0.01632 8.83000 1,429.56896 0.00000 0.00617 0.0163 8.82 1428.8163 0.0000
06 05 -1 747.05 4.00 -0.00262 0.00126 -0.94000 358.15119 0.00000 -0.00263 0.0013 -0.95 361.4455 0.0000
02 06 -1 517.53 4.00 -0.00962 0.01401 -7.25000 753.67216 -0.00009 -0.00953 0.0138 -7.13 747.9733 0.0000
0.02 2,886.6 0.12 2883.58
02 06 1 517.53 4.00 0.00962 0.01401 7.25000 753.67216 0.00009 0.00953 0.0138 7.13 747.9733 0.0000
02 03 -1 668.23 6.00 -0.01084 0.00282 -1.88000 173.48492 -0.00008 -0.01092 0.0029 -1.91 174.9073 0.0000
03 07 -1 432.33 2.50 -0.00335 0.01282 -5.54000 1,652.55960 -0.00008 -0.00344 0.0134 -5.80 1688.1215 0.0000
06 07 1 642.94 4.00 0.00224 0.00094 0.61000 272.17798 -0.00008 0.00216 0.0009 0.57 264.1599 0.0000
0.44 2851.89 -0.01 2875.16
CÁLCULO DE LAS MALLAS POR EL MÉTODO DE HARDY CROSS - SECTOR 03
TRAMO HORARIO OCTAVA ITERACIÓN NOVENA ITERACIÓN
/
LONGITUD DIÁMETRO
ANTIHORA
De A RIO Q J H H/Q ∆Q Q J H H/Q ∆Q
01 02 -1 604.40 8.00 -0.02369 0.00404 -2.44000 102.99629 -0.00002 -0.02371 0.0040 -2.44 102.8986 0.00000
01 04 1 77.75 3.00 0.00751 0.02344 1.82000 242.34906 -0.00002 0.00749 0.0233 1.81 241.7416 0.00000
04 05 1 540.85 3.00 0.00617 0.01630 8.82000 1,428.81630 -0.00002 0.00615 0.0162 8.76 1424.2866 0.00000
06 05 -1 747.05 4.00 -0.00263 0.00127 -0.95000 361.44554 -0.00002 -0.00265 0.0013 -0.96 362.1508 0.00000
02 06 -1 517.53 4.00 -0.00953 0.01378 -7.13000 747.97332 -0.00002 -0.00956 0.0138 -7.16 749.2047 0.00000
0.12 2,883.6 0.01 2880.28
02 06 1 517.53 4.00 0.00953 0.01378 7.13000 747.97332 0.00002 0.00956 0.0138 7.16 749.2047 0.00000
02 03 -1 668.23 6.00 -0.01092 0.00286 -1.91000 174.90725 0.00000 -0.01092 0.0029 -1.91 174.8771 0.00000
03 07 -1 432.33 2.50 -0.00344 0.01342 -5.80000 1,688.12146 0.00000 -0.00344 0.0134 -5.81 1690.1072 0.00000
06 07 1 642.94 4.00 0.00216 0.00088 0.57000 264.15988 0.00000 0.00216 0.0009 0.56 259.7518 0.00000
-0.01 2875.16 0.00 2873.94
CÁLCULO DE LAS MALLAS POR EL MÉTODO DE HARDY CROSS - SECTOR 03
TRAMO HORARIO OCTAVA ITERACIÓN NOVENA ITERACIÓN
/
LONGITUD DIÁMETRO
ANTIHORA
De A RIO Q J H H/Q ∆Q Q J H H/Q ∆Q
01 02 -1 604.40 8.00 -0.02371 0.00404 -2.44000 102.89858 0.00000 -0.02371 0.0040 -2.44 102.8904 0.00000
01 04 1 77.75 3.00 0.00749 0.02331 1.81000 241.74157 0.00000 0.00749 0.0233 1.81 241.8022 0.00000
04 05 1 540.85 3.00 0.00615 0.01619 8.76000 1,424.28665 0.00000 0.00615 0.0162 8.75 1423.0950 0.00000
06 05 -1 747.05 4.00 -0.00265 0.00129 -0.96000 362.15077 0.00000 -0.00265 0.0013 -0.96 361.8946 0.00000
02 06 -1 517.53 4.00 -0.00956 0.01384 -7.16000 749.20474 0.00000 -0.00956 0.0138 -7.17 750.1038 0.00000
0.01 2,880.3 -0.01 2879.79
02 06 1 517.53 4.00 0.00956 0.01384 7.16000 749.20474 0.00000 0.00956 0.0138 7.17 750.1038 0.00000
02 03 -1 668.23 6.00 -0.01092 0.00286 -1.91000 174.87715 0.00000 -0.01092 0.0029 -1.91 174.8771 0.00000
03 07 -1 432.33 2.50 -0.00344 0.01343 -5.81000 1,690.10720 0.00000 -0.00344 0.0134 -5.81 1690.1072 0.00000
06 07 1 642.94 4.00 0.00216 0.00088 0.56000 259.75181 0.00000 0.00216 0.0009 0.56 259.7518 0.00000
0.00 2873.94 0.01 2874.84
CÁLCULO DE LAS MALLAS POR EL MÉTODO DE HARDY CROSS - SECTOR 03
TRAMO HORARIO OCTAVA ITERACIÓN NOVENA ITERACIÓN
/
LONGITUD DIÁMETRO
ANTIHORA
De A RIO Q J H H/Q ∆Q Q J H H/Q ∆Q
01 02 -1 604.40 8.00 -0.02371 0.00404 -2.44000 102.89044 0.00000 -0.02372 0.0040 -2.44 102.8823 0.00000
01 04 1 77.75 3.00 0.00749 0.02330 1.81000 241.80218 0.00000 0.00748 0.0233 1.81 241.8628 0.00000
04 05 1 540.85 3.00 0.00615 0.01618 8.75000 1,423.09498 0.00000 0.00615 0.0162 8.75 1423.5296 0.00000
06 05 -1 747.05 4.00 -0.00265 0.00129 -0.96000 361.89457 0.00000 -0.00265 0.0013 -0.96 361.6387 0.00000
02 06 -1 517.53 4.00 -0.00956 0.01385 -7.17000 750.10382 0.00000 -0.00956 0.0139 -7.17 749.8091 0.00000
-0.01 2,879.8 -0.01 2879.72
02 06 1 517.53 4.00 0.00956 0.01385 7.17000 750.10382 0.00000 0.00956 0.0139 7.17 749.8091 0.00000
02 03 -1 668.23 6.00 -0.01092 0.00286 -1.91000 174.87715 0.00000 -0.01092 0.0029 -1.91 174.8470 0.00000
03 07 -1 432.33 2.50 -0.00344 0.01343 -5.81000 1,690.10720 0.00000 -0.00344 0.0134 -5.81 1689.1833 0.00000
06 07 1 642.94 4.00 0.00216 0.00088 0.56000 259.75181 0.00000 0.00215 0.0009 0.56 259.9786 0.00000
0.01 2874.84 0.01 2873.82
RESULTADOS DEFINITIVOS - SECTOR 03
TRAMO HORARIO
/ VELOCIDA ELEVACIÓ PIEZOMÉT
LONGITUD DIÁMETRO CAUDAL CAÍDA, H PRESIÓN
ANTIHORA D N RICA
De A RIO
NUDO NUDO
# # (+) (-) m " mm m3/s m/s m m Condición
FINAL FINAL
Cota Piez. 1 4,111.10 4125.80 14.70
01 02 -1 604.40 8.00 180.80 0.0237 0.92 2.44 4,110.17 4123.36 13.2 OK
01 04 1 77.75 3.00 81.40 0.0075 1.44 1.81 4,109.79 4123.99 14.2 OK
04 05 1 540.85 3.00 81.40 0.0061 1.18 8.75 4,100.70 4115.24 14.5 OK
06 05 -1 747.05 4.00 99.40 0.0027 0.34 0.96 4,100.70 4115.23 14.5 OK
02 06 -1 517.53 4.00 99.40 0.0096 1.23 7.17 4,102.86 4116.19 13.3 OK
COTA PIEZOMÉTRICA A LA ENTRADA A LA RED, NUDO N° 01: COTA DE PROYECTO + PRESIÓN DE DISEÑO = 4,123.10 m
D=(Q/(0.2785×C×J^0.54 ))^(1⁄2.63)=
0.16 m = 8'' = 0.1808 m
J=(Q/(0.2785×C×D^2.63 ))^(1⁄0.54)=
0.00672077 m/m
COTA PIEZOMÉTRICA EN EL NUDO 01: COTA PIEZOMÉTRICA EN EL RESERV. - ( ∑REDUCT. DE VELOC.) - H = 4,125.80 m
PRESIÓN RESULTANTE EN EL NUDO 01: COTA PIEZOMÉTRICA - COTA DE PROYECTO NODO 01 = 14.70 mca