FECHA: Dec-21
BANQUILLO
TRABAJOS PRELIMINARES
LIMPIEZA DEL TERRENO
LIMPIEZA DE TERRENO MANUAL M2
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO PRELIMINAR
M2
MOVIMIENTO DE TIERRA
EXACAVACION M3
CONCRETO ARMADO
CONCRETO F'C = 210KG/CM2 M3
LOSA Y MURO E = 0.10 M (AUTOCAD)
ENCONFRADO Y DESENCOFRADO M2
SISTEMA DESAGUE
TUBERIA DE PVC SAP 2" M
CODO DE 90 UND
SUMIDERO UND
TARRAJERO M2
CORREA DE 100X50X3MM M
HORIZONTAL
PLANCHA DE POLICARBONATO M2
LADO IZQUIERDA Y DERECHA
Nº DE MEDIDAS
CANT. PARCIAL TOTAL
VECES LARGO ANCHO ALTURA
24.14
1.00 2.00 7.10 1.70 24.14
24.14
1.00 2.00 7.10 1.70 24.14
17.28
1.00 2.00 7.10 0.4 1.04 5.91
1.00 2.00 7.10 0.98 0.64 8.91
1.00 2.00 7.10 0.25 0.46 1.63
1.00 2.00 7.10 0.21 0.28 0.83
22.47
1.30 17.28 22.47
26.13
2.00 7.10 0.40 5.68
2.00 7.10 0.98 13.92
2.00 7.10 0.25 3.55
2.00 7.10 0.21 2.98
5.66
2.83 2.00 5.66
7.67
3.00 2.00 7.10 0.18 7.67
24.28
1.00 2.00 7.10 1.25 17.75
1.00 2.00 7.10 0.25 3.55
1.00 2.00 7.10 0.21 2.98
87.36
2.00 2.00 4.09 16.36
71.00
5.00 2.00 7.10 71.00
50.55
1.00 2.00 7.10 3.56 50.55
40.00
2.00 10.00 20.00
2.00 10.00 20.00
40.00
4.00 5.00 20.00
4.00 5.00 20.00
50.00
5.00 5.00 25.00
5.00 5.00 25.00
24.00
12.00 2.00 24.00