días 31 31
Tipo_Prg Metodo_Prg Valores Jul Ago
Tajo CRM-B Toneladas 21,260 21,492
Ag (g/t). 127.78 168.54
Au (g/t). 3.56 5.35
Pot (m). 3.8 3.8
Dil (%). 39.6% 36.9%
TL-LONG Toneladas 51,378 63,188
Ag (g/t). 180.81 181.34
Au (g/t). 4.82 4.56
Pot (m). 5.6 5.6
Dil (%). 23.4% 23.5%
TL-LONG-PUENTE Toneladas 5,843 7,239
Ag (g/t). 127.39 140.95
Au (g/t). 3.54 4.39
Pot (m). 7.2 6.8
Dil (%). 23.6% 21.5%
TL-Trans Toneladas 18,625 5,986
Ag (g/t). 69.97 56.27
Au (g/t). 2.74 2.11
Pot (m). 11.6 9.7
Dil (%). 15.3% 19.1%
Toneladas Tajo 97,106 97,905
Ag (g/t). Tajo 144.73 167.90
Au (g/t). Tajo 4.07 4.57
Pot (m). Tajo 6.4 5.5
Dil (%). Tajo 25.5% 26.1%
Número de tajos 32 35
Toneladas taladros largos 75,846 76,413
Metros de perf
Tipo Ratio (ton/metro perforado) Jul Ago
TL-LONG 3.5 14,680 18,054
TL-LONG-PUENTE 2.9 2,015 2,496
TL-Trans 6.3 2,956 950
Repaso 60 m/tajo 1920 2100
CB tajos 120 m/tajo 3840 4200
CB intersecciones 140 m/mes 140 140
Total de metros de perforación 25,551 27,940
NECESIDAD DE EQUIPOS CON RENDIMIENTO REAL
Equipo Metros perforados por guardia (m/guardia)
Simba 90 5580 5580
Boomer T1D 78 4836 4836
*Se considera rendimiento de los 5 primeros meses
Jul Ago
Necesidad de equipos 5.1 5.6
30 31 30 31
Sep Oct Nov Dic
21,058 21,595 21,347 21,516
137.41 148.90 137.28 126.30
3.42 4.65 4.51 3.75
3.4 4.0 3.6 3.2
34.4% 33.5% 31.7% 35.5%
71,476 54,467 70,215 70,095
150.05 160.48 161.27 145.71
4.25 4.57 4.13 4.01
5.3 5.4 5.2 5.4
24.0% 24.7% 25.8% 24.8%
4,583 6,828 1,342 1,394
133.36 140.36 128.92 154.97
3.59 4.16 2.42 2.89
7.5 6.9 3.4 4.5
19.4% 17.7% 22.2% 24.0%
13,765 2,955 5,887
84.14 87.97 84.13
3.98 4.84 4.60
7.4 5.1 7.5
15.4% 10.0% 23.4%
97,117 96,655 95,859 98,891
146.52 145.60 153.21 137.95
4.04 4.48 4.21 3.98
5.0 5.5 4.8 5.0
26.1% 24.9% 26.6% 27.0%
38 34 35 35
76,059 75,060 74,512 77,375
Metros de perforación(m)
Sep Oct Nov Dic
20,422 15,562 20,061 20,027
1,580 2,355 463 481
0 2,185 469 934
2280 2040 2100 2100
4560 4080 4200 4200
140 140 140 140
28,982 26,362 27,433 27,882
NECESIDAD DE EQUIPOS CON RENDIMIENTO PPTO
Equipo Metros perforados por guardia (m/guardia)
5400 5580 5400 5580 Simba 120
4680 4836 4680 4836 Boomer T1D 100
*Se considera rendimiento ppto
Sep Oct Nov Dic
6.0 5.3 5.7 5.6 Necesidad de equipos
ON RENDIMIENTO PPTO
rforados por guardia (m/guardia)
120 7440 7440 7200 7440 7200 7440
100 6200 4836 4680 4836 4680 4836
Jul Ago Sep Oct Nov Dic
idad de equipos 3.9 5.2 5.7 4.9 5.3 5.2