PRESUPUESTO REFERENCIAL
ITEM DESCRIPCIÓN
UND METRADO PRECIO PARCIAL
PRESUPUESTO DE OBRA 124,826,161.09
CONSTRUCCION DEL PUENTE HUALLAGA Y ACCESOS 115,654,760.11
105 MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL glb 1.00 1,460,550.60 1,460,550.60
106 ACCESOS A CANTERAS, DME, PLANTAS Y FUENTES DE AGUA km 7.60 33,700.60 256,124.56
320.01.04 ACERO DE REFUERZO FY=4200 KG/CM2 BAJO AGUA EN PILOTES kg 84,474.00 6.10 515,291.40
320.01.05 CONCRETO TIPO C, F'C= 280 KG/CM2 BAJO AGUA EN PILOTES m² 395.84 623.50 246,806.24
301 EXCAVACION PARA ESTRUCTUAS EN MATERIAL COMUN EN SECO m³ 205.05 5.50 1,127.78
310.01 CONCRETO TIPO F1 DE NIVELACION, F´C= 100 KG/CM2 m² 6.37 404.90 2,579.21
310.02 CONCRETO TIPO C, F'C= 280 KG/CM2 EN SECO m³ 313.32 568.70 178,185.08
320.02.03 ACERO DE REFUERZO FY=4200 KG/CM2 BAJO AGUA kg 1,675,220.00 6.10 10,218,842.00
320.02.04 CONCRETO TIPO C, F'C= 280 KG/CM2 BAJO AGUA m³ 5,202.48 623.50 3,243,746.28
322 PRUEBA DE CARGA PILOTE CON CELDA OSTERBERG und 2.00 1,288,292.20 2,576,584.40
300.03.01 EXCAVACION PARA ESTRUCTUAS EN MATERIAL COMUN BAJO AGUA m³ 4,404.36 405.10 1,784,206.24
300.03.03 ENCOFRADO Y DESENCOFRADO CARA VISTA, BAJO AGUA m² 400.00 147.00 58,800.00
300.03.04 ACERO DE REFUERZO FY=4200 KG/CM2 BAJO AGUA kg 729,228.00 6.10 4,448,290.80
300.03.05 CONCRETO TIPO F1 DE NIVELACION, F´C= 100 KG/CM2 m² 55.40 404.90 22,431.46
VALORIZACIÓN REFERENCIAL PERIODO DEL 01.11.2021 AL 15.11.2021
PRESUPUESTO REFERENCIAL
ITEM DESCRIPCIÓN
UND METRADO PRECIO PARCIAL
300.03.06 CONCRETO TIPO C, F'C= 280 KG/CM2 BAJO AGUA m³ 3,119.60 623.50 1,945,070.60
300.04.01 ENCOFRADO Y DESENCOFRADO CARA VISTA EN SECO (TREPANTE) m² 5,347.13 272.00 1,454,419.36
300.04.03 CONCRETO TIPO C, F'C= 280 KG/CM2 EN SECO m³ 1,612.20 568.70 916,858.14
300.04.04 CONCRETO TIPO A, F'C= 350 KG/CM2 - Zona de anclajes m³ 614.32 663.62 407,676.02
300.04.07 ESTRUCTURAS TEMPORALES PARA IZAJE Y MOVILIZACION VERTICAL und 1.00 2,403,250.20 2,403,250.20
400.03.05 MONTAJE DE LOSAS PREFABRICADAS CON LOS CARROS DE IZAJE und 242.00 2,768.10 669,880.20
400.03.06 ENCOFRADO Y DESENCOFRADO CARA VISTA, LOSA IN SITU m² 285.25 105.30 30,036.83
400.03.07 ACERO DE REFUERZO FY=4200 KG/CM2 LOSA IN SITU kg 84,802.32 5.70 483,373.22
400.03.08 CONCRETO TIPO C, F'C= 280 KG/CM2 EN SECO, IN SITU m³ 607.16 568.70 345,291.89
603.02.01 DISPOSITIVO DE RESTRICCION SISMICA TRANSVERSAL EN CONTRAPESOS und 48.00 1,294.60 62,140.80
603.02.02 DISPOSITIVO DE RESTRICCION SISMICA TRANSVERSAL EN TORRES und 32.00 10,468.19 334,982.40
604 DISPOSITIVO DE DRENAJE - TUBO DE PVC Ø4"; L=2.10M und 328.00 42.10 13,808.80
604.02 DISPOSITIVO DE DRENAJE - TUBO DE PVC Ø4"; L=3.50M und 174.00 70.20 12,214.80
702 TRANSPORTE DE MATERIAL EXCEDENTE ENTRE 120 Y 1000 MT m3k 12,777.07 10.30 131,603.82
704 TRANSPORTE DE MATERIAL EXCEDENDE PARA DISTANCIAS MAYORES A 1000 m m3k 12,565.82 2.30 28,901.39
705 TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS MAYORES A 1000 m m3k 196,500.95 3.10 609,152.95
904.02 ESTRUCTURA DE SOPORTE SEÑALES TIPO E-1 und 2.00 1,950.10 3,900.20
Distancia Velocidad
EQUIPO AUTOTRANSPORTADO CANTIDAD HM (S/.) HORAS PARCIAL (S/.)
(Km.) (Km./h)
CAMIONETA PICK UP 4x2 84 HP 4.00 36.48 829 40.0 21 3,064.46
CAMION VOLQUETE DE 15 m3 6.00 199.20 829 40.0 21 25,099.07
CAMION CISTERNA 4X2 (AGUA) 2,000 GAL 2.00 154.99 829 40.0 21 6,509.75
CAMION CONCRETERO DE 12 m3 3.00 232.96 829 40.0 21 14,676.45
CAMIÓN SEMITRAILER DE 35 TON 1.00 190.40 829 40.0 21 3,998.41
CAMION IMPRIMADOR 6X2 178-210 HP 2,000 gl 0.00 136.00 829 40.0 21 0.00
GRUA HIAB SOBRE CAMIÓN DE 12 TN 1.00 141.10 829 40.0 21 2,963.01
MOVILIZACIÓN DE EQUIPO AUTOTRANSPORTADO (S/.) 56,311.15
Distancia Velocidad
EQUIPO AUTOTRANSPORTADO CANTIDAD HM (S/.) HORAS PARCIAL (S/.)
(Km.) (Km./h)
CAMIONETA PICK UP 4x2 84 HP 4.00 36.48 829 40.0 21
CAMION VOLQUETE DE 15 m3 6.00 199.20 829 40.0 21
CAMION CISTERNA 4X2 (AGUA) 2,000 GAL 2.00 154.99 829 40.0 21
CAMION CONCRETERO DE 12 m3 6.00 232.96 829 40.0 21
CAMIÓN SEMITRAILER DE 35 TON 1.00 190.40 829 40.0 21
CAMION IMPRIMADOR 6X2 178-210 HP 2,000 gl 1.00 136.00 829 40.0 21
GRUA HIAB SOBRE CAMIÓN DE 12 TN 2.00 141.10 829 40.0 21
DESMOVILIZACIÓN DE EQUIPO AUTOTRANSPORTADO (S/.) 0.00
SEGUROS DE TRANSPORTE 2,815.56
MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPO AUTOTRANSPORTADO (S/.) 59,126.71
NOTA :
El resto de Equipos sera transportado en los Volquetes o remolcado por los mismos.
Esta relación no es limitativa, debiendo el Contratista compatibilizarla con la de su propuesta, de tal manera de poder terminar la obra en el plazo planteado
El Seguro de Transporte cubre la movilizacion y desmovilizacion de los equipos transportados.
El Equipo de Topografia sera transportado en las camionetas.
MANO DE OBRA
CAPATAZ H-H 1.0 22.60 160.00 3,615.90
OPERARIO H-H 2.0 17.39 160.00 5,563.33
PEON H-H 4.0 12.59 160.00 8,055.62
EQUIPO
HERRAMIENTAS MANUALES %MO 5.0% 17,234.86 861.74
CARGADOR SOBRE LLANTAS 125 HP 2.50 yd3 H-M 1.0 150.37 80.00 12,029.33
SUBPARTIDAS
CONCRETO CLASE E (F'C=175KG/CM2) M3 4.0 306.00 1,223.98
ACERO DE REFUERZO KG 240.0 4.18 1,003.04
ENCOFRADO Y DESENCOFRADO M2 16.8 77.40 1,300.38
MONTAJE (01) PLANTA CHANCADORA (S/.) 16,826.67
NRO. DE UBICACIONES DE LAS PLANTAS CHANCADORAS 1.00
MONTAJE DE PLANTAS CHANCADORAS (S/.) 16,826.67
MANO DE OBRA
CAPATAZ H-H 1.0 22.60 80.00 1,807.95
OPERARIO H-H 2.0 17.39 80.00 2,781.67
PEON H-H 4.0 12.59 80.00 4,027.81
EQUIPO
HERRAMIENTAS MANUALES %MO 5% 8,617.43 430.87
CARGADOR SOBRE LLANTAS 125 HP 2.50 yd3 H-M 1.0 150.37 40.00 6,014.67
SUBPARTIDAS
CONCRETO CLASE E (F'C=175KG/CM2) M3 4.0 306.00 1,223.98
ACERO DE REFUERZO KG 240 4.18 1,003.04
ENCOFRADO Y DESENCOFRADO M2 16.8 77.40 1,300.38
MONTAJE DE (01) ZARANDAS (S/.) 9,295.18
N° DE ZARANDAS VIBRATORIAS 1.00
MONTAJE DE ZARANDAS VIBRATORIAS (S/.) 9,295.18
DESMONTAJE DE ZARANDAS VIBRATORIAS (S/.) 9,295.18
MANO DE OBRA
CAPATAZ H-H 1.0 22.60 48.00 1,084.77
OPERARIO H-H 2.0 17.39 48.00 1,669.00
PEON H-H 4.0 12.59 48.00 2,416.69
EQUIPO
HERRAMIENTAS MANUALES %MO 5% 5,170.46 258.52
CARGADOR SOBRE LLANTAS 125 HP 2.50 yd3 H-M 1.0 150.37 24.00 3,608.80
SUBPARTIDAS
CONCRETO CLASE E (F'C=175KG/CM2) M3 5.0 306.00 1,529.98
ACERO DE REFUERZO KG 300 4.18 1,253.80
ENCOFRADO Y DESENCOFRADO M2 21 77.40 1,625.47
MONTAJE DE (01) PLANTA DE CONCRETO (S/.) 6,723.52
N° DE PLANTAS DE CONCRETO 1.00
MONTAJE DE PLANTA DE CONCRETO (S/.) 6,723.52
MANO DE OBRA
CAPATAZ H-H 0.1 22.60 36.00 81.36
OPERARIO H-H 2.0 17.39 36.00 1,251.75
PEON H-H 4.0 12.59 36.00 1,812.51
EQUIPO
HERRAMIENTAS MANUALES %MO 5% 3,145.62 157.28
CARGADOR SOBRE LLANTAS 125 HP 2.50 yd3 H-M 1.0 150.37 18.00 2,706.60
SUBPARTIDAS
CONCRETO CLASE E (F'C=175KG/CM2) M3 8.0 306.00 2,447.97
ACERO DE REFUERZO KG 480 4.18 2,006.08
ENCOFRADO Y DESENCOFRADO M2 33.6 77.40 2,600.75
MONTAJE DE (01) PLANTA DE CONCRETO (S/.) 6,532.15
N° DE PLANTAS DE CONCRETO 1.00
MONTAJE DE PLANTA DE CONCRETO (S/.) 0.00
DESMONTAJE DE PLANTA DE CONCRETO (S/.) 0.00
RESUMEN DE METRADOS
TOPOGRAFÍA Y GEOREFERENCIACIÓN
Puente (Luz= 407 m, ancho= 12.60m) m2 750.00 12.60 9,450.00
Metrado por Replanteo al 30 de Abril 2021 m2 2,835.00
Metrado por Control de campo al 31 de Mayo 2021 m2 315.00
Metrado por Control de campo al 15 de Junio 2021 m2 157.50
Metrado por Control de campo al 30 de Junio 2021 m2 157.50
Metrado por Control de campo al 15 de Julio 2021 m2 157.50
103.00
Metrado por Control de campo al 31 de Julio 2021 m2 157.50
Metrado por Control de campo al 15 de Agosto 2021 m2 157.50
Metrado por Control de campo al 31 de Agosto 2021 m2 157.50
Metrado por Control de campo al 15 de Setiembre 2021 m2 157.50
Metrado por Control de campo al 30 de Setiembre 2021 m2 157.50
Metrado por Control de campo al 15 de Octubre 2021 m2 157.50
Metrado por Control de campo al 31 de Octubre 2021 m2 157.50
Metrado por Control de campo al 15 de Noviembre 2021 m2 157.50
METRADO TOTAL ACUMULADO m2 4,882.50
PAGO: Vm
xMpx(1 Fd )
Mc
Vm = Monto Total de la Valorización Mensual (Junio 2021) 6,202,728.53
Mc = Monto Total del Contrato 159,574,914.23
Mp = Monto de la Partida 105 1,460,550.60
Fd = Factor de descuento 0.00
(El Contratista no emplea transporte de personal)
ÍTEM DESCRIPCIÓN UND INICIO FIN LONGITUD (m) LONGITUD (km) PARCIAL
300. SUBESTRUCTURA
METRADO
ÍTEM DESCRIPCIÓN UND CANTIDAD PESO (tn) SUBTOTAL INCIDENCIA
EJECUTADO
Largo Area
Descripcion Volumen (m3)
(m) (m2)
Long. Excavacion
Descripcion Long. Pilote (m) H terreno (m) H plataforma (m) Cant. Pilotes (#)
(m)
(pulg) (#) (m) (m) (#) (m) (m) (#) (m) (m)
P1 1-3/8" 3 - - 36 22.00 0.00 0 22.00 2376.00
P2 1-3/8" 3 - - 36 12.00 0.00 0 12.00 1296.00
P3 3/4" 3 9.87 0.100 100 7.55 0.00 0 7.55 2265.00
P4 3/4" 3 11.93 0.075 160 7.55 0.00 0 7.55 3624.00
Resumen:
Diametro Longitud Peso/m Total
(pulg) (m) (kg/m) (kg)
3/4" 5889.00 2.24 13,191.36
1-3/8" 3672.00 7.91 29,045.52
TOTAL= 42,236.88
(pulg) (#) (m) (m) (#) (m) (m) (#) (m) (m)
P1 1-3/8" 3 - - 36 17.00 0.00 0 17.00 1836.00
P2 1-3/8" 3 - - 36 17.00 0.00 0 17.00 1836.00
P3 3/4" 3 9.87 0.100 100 7.55 0.00 0 7.55 2265.00
P4 3/4" 3 11.93 0.075 160 7.55 0.00 0 7.55 3624.00
Resumen:
Diametro Longitud Peso/m Total
(pulg) (m) (kg/m) (kg)
3/4" 5889.00 2.24 13,191.36
1-3/8" 3672.00 7.91 29,045.52
TOTAL= 42,236.88
Longitud Pilote
Descripcion Diametro (m) H descabezado (m) N° de pilotes (#) Volumen (m3)
(m)
300.02 ESTRIBOS
Llave de Corte
Cabezal
Largo Area
Descripcion Volumen (m3)
(m) (m2)
Long. Excavacion
Descripcion Long. Pilote (m) H terreno (m) H plataforma (m) Cant. Pilotes (#)
(m)
(pulg) (#) (m) (m) (#) (m) (m) (#) (m) (m)
P1 1-3/8" 11 - - 40 47.00 0.00 0 47.00 20680.00
P2 1-3/8" 11 - - 40 36.00 0.00 0 36.00 15840.00
P3 1-3/8" 11 - - 40 30.00 0.00 0 30.00 13200.00
P4 3/4" 11 11.90 0.100 120 7.52 0.00 0 7.52 9926.40
P5 3/4" 11 26.93 0.075 360 7.52 0.00 0 7.52 29779.20
P6 3/4" 11 7.90 0.100 160 7.52 0.00 0 7.52 13235.20
Resumen:
Diametro Longitud Peso/m Total
(pulg) (m) (kg/m) (kg)
3/4" 86630.40 2.24 194,052.10
1-3/8" 81360.00 7.91 643,557.60
TOTAL= 837,609.70
(pulg) (#) (m) (m) (#) (m) (m) (#) (m) (m)
P1 1-3/8" 18 - - 40 47.00 0.00 0 47.00 33840.00
P2 1-3/8" 18 - - 40 36.00 0.00 0 36.00 25920.00
P3 1-3/8" 18 - - 40 30.00 0.00 0 30.00 21600.00
P4 3/4" 18 11.90 0.100 120 7.52 0.00 0 7.52 16243.20
P5 3/4" 18 26.93 0.075 360 7.52 0.00 0 7.52 48729.60
P6 3/4" 18 7.90 0.100 160 7.52 0.00 0 7.52 21657.60
Resumen:
Diametro Longitud Peso/m Total
(pulg) (m) (kg/m) (kg)
3/4" 86630.40 2.24 194,052.10
1-3/8" 81360.00 7.91 643,557.60
TOTAL= 837,609.70
Longitud Pilote
Descripcion Diametro (m) H descabezado (m) N° de pilotes (#) Volumen (m3)
(m)
Torre Area (m2) Ancho (m) Volumen (m3) Descuento (m3) Volumen (m3)
Izquierda 69.59 34.00 0.00
Derecha 33.60 34.00 1,142.40 118.75 1,023.65
metrado = 1,023.65 m3
Resumen:
Diametro Longitud Peso/m Total
(pulg) (m) (kg/m) (kg)
3/8" 0.00 0.56 0.00
1/2" 0.00 1.00 0.00
5/8" 0.00 1.55 0.00
3/4" 1,297.97 2.24 2,907.45
1" 0.00 3.97 0.00
1-3/8" 25,827.30 7.91 204,293.94
metrado = 207,201.40 kg
Izquierdo 1,559.80
Derecho 1,559.80
metrado = 3,119.60 m3
300.04 TORRES
(pulg) (#) (m) (m) (#) (m) (m) (#) (m) (m)
Longitudinal en columnas
T1 1-3/8" 2 - - 148 11.00 0.00 0 11.00 3256.00
T1A 1-3/8" 2 - - 24 12.00 0.00 0 12.00 576.00
T1B 1-3/8" 2 - - 8 11.00 0.00 0 11.00 176.00
T1C 1-3/8" 2 - - 16 27.00 0.00 0 27.00 0.00
Inferior
T2 3/4" 2 3.00 0.10 124 2.95 0.00 0 2.95 0.00
T2 3/4" 2 10.30 0.10 416 2.95 0.00 0 2.95 0.00
T2 3/4" 2 1.00 0.10 44 2.95 0.00 0 2.95 0.00
T2 3/4" 2 13.05 0.15 352 2.95 0.00 0 2.95 0.00
T2 3/4" 2 7.00 0.10 284 2.95 0.00 0 2.95 0.00
T2* 3/4" 2 13.40 0.10 810 2.95 0.00 0 2.95 0.00
T3 3/4" 2 3.00 0.10 124 4.45 0.00 0 4.45 0.00
T3 3/4" 2 10.30 0.10 416 4.45 0.00 0 4.45 0.00
T3 3/4" 2 1.00 0.10 44 4.45 0.00 0 4.45 0.00
T3 3/4" 2 13.05 0.15 352 4.45 0.00 0 4.45 0.00
T3 3/4" 2 7.00 0.10 284 4.45 0.00 0 4.45 0.00
T3* 3/4" 2 13.40 0.10 810 4.45 0.00 0 4.45 0.00
T4 5/8" 2 3.00 0.10 248 0.84 0.00 0 0.84 0.00
T4 5/8" 2 10.30 0.10 1248 0.84 0.00 0 0.84 0.00
T4 5/8" 2 1.00 0.10 132 0.84 0.00 0 0.84 0.00
T4 5/8" 2 13.05 0.15 1056 0.84 0.00 0 0.84 0.00
T4 5/8" 2 7.00 0.10 852 0.84 0.00 0 0.84 0.00
T5 5/8" 2 3.00 0.10 496 0.64 0.00 0 0.64 0.00
T5 5/8" 2 10.30 0.10 1664 0.64 0.00 0 0.64 0.00
T5 5/8" 2 1.00 0.10 308 0.64 0.00 0 0.64 0.00
T5 5/8" 2 13.05 0.15 2464 0.64 0.00 0 0.64 0.00
T5 5/8" 2 7.00 0.10 1988 0.64 0.00 0 0.64 0.00
Superior
T2A 3/4" 1 24.20 0.10 972 3.27 0.00 0 3.27 0.00
T3 3/4" 1 24.20 0.10 972 4.45 0.00 0 4.45 0.00
T4* 3/4" 1 24.20 0.10 1944 0.95 0.00 0 0.95 0.00
T5 5/8" 1 24.20 0.10 4860 0.64 0.00 0 0.64 0.00
T5A 5/8" 1 24.20 0.10 1944 1.25 0.00 0 1.25 0.00
V. Inferior
V1A 1-3/8" 1 - - 34 24.89 Empalme mecánico 24.89 0.00
V1B 1-3/8" 1 - - 34 24.15 Empalme mecánico 24.15 0.00
V1C 1-3/8" 1 - - 34 21.80 Empalme mecánico 21.80 0.00
V2 1-3/8" 1 - - 34 21.50 Empalme mecánico 21.50 0.00
V3 1" 1 - - 48 22.32 2.34 2 27.00 0.00
V4 1" 1 - - 26 18.00 Empalme mecánico 18.00 0.00
V5 3/4" 1 - - 140 4.50 0.00 0 4.50 0.00
V6 1-3/8" 1 - - 34 21.20 Empalme mecánico 21.20 0.00
V7A 1-3/8" 1 - - 34 21.50 Empalme mecánico 21.50 0.00
V7B 1-3/8" 1 - - 34 24.00 Empalme mecánico 24.00 0.00
V7C 1-3/8" 1 - - 34 24.00 Empalme mecánico 24.00 0.00
V8 5/8" 2 6.60 0.100 132 8.70 0.00 0 8.70 0.00
V8 5/8" 2 3.98 0.150 53 8.70 0.00 0 8.70 0.00
V9 5/8" 2 6.60 0.100 660 3.75 0.00 0 3.75 0.00
V9 5/8" 2 3.98 0.150 106 3.75 0.00 0 3.75 0.00
V10 5/8" 2 6.60 0.100 264 4.35 0.00 0 4.35 0.00
V10 5/8" 2 3.98 0.150 106 4.35 0.00 0 4.35 0.00
V11 1/2" 2 - - 209 4.27 0.00 0 4.27 0.00
V. superior
V1A 1-3/8" 1 - - 34 20.06 Empalme mecánico 20.06 0.00
V1B 1-3/8" 1 - - 34 19.30 Empalme mecánico 19.30 0.00
V1C 1-3/8" 1 - - 34 18.93 Empalme mecánico 18.93 0.00
V2 1-3/8" 1 - - 34 17.90 Empalme mecánico 17.90 0.00
V3 1" 1 - - 12 22.32 2.34 2 27.00 0.00
V3* 1" 1 - - 24 17.52 1.74 2 21.00 0.00
V4 1" 1 - - 26 18.00 Empalme mecánico 18.00 0.00
V5 3/4" 1 - - 140 4.50 0.00 0 4.50 0.00
V6 1-3/8" 1 - - 34 16.73 Empalme mecánico 16.73 0.00
V7A 1-3/8" 1 - - 34 18.93 Empalme mecánico 18.93 0.00
V7B 1-3/8" 1 - - 34 19.30 Empalme mecánico 19.30 0.00
V7C 1-3/8" 1 - - 34 19.63 Empalme mecánico 19.63 0.00
V8 5/8" 2 5.28 0.100 106 8.70 0.00 0 8.70 0.00
V8 5/8" 2 3.08 0.150 41 8.70 0.00 0 8.70 0.00
V9 5/8" 2 5.28 0.100 528 3.75 0.00 0 3.75 0.00
V9 5/8" 2 3.08 0.150 82 3.75 0.00 0 3.75 0.00
V10 5/8" 2 5.28 0.100 211 4.35 0.00 0 4.35 0.00
V10 5/8" 2 3.08 0.150 82 4.35 0.00 0 4.35 0.00
V11 1/2" 2 - - 209 4.27 0.00 0 4.27 0.00
Zona de Topes
R1 1/2" 2 - - 125 3.00 0.00 0 3.00 0.00
R2 1/2" 2 - - 110 4.26 0.00 0 4.26 0.00
R3 1/2" 4 - - 78 1.50 0.00 0 1.50 0.00
R4 3/4" 4 - - 42 3.60 0.00 0 3.60 0.00
Resumen:
Diametro Longitud Peso/m Total
(pulg) (m) (kg/m) (kg)
3/8" 0.00 0.56 0.00
1/2" 0.00 1.00 0.00
5/8" 0.00 1.55 0.00
3/4" 0.00 2.24 0.00
1" 0.00 3.97 0.00
1-3/8" 4,008.00 7.91 31,703.28
metrado = 31,703.28 kg
Concreto en Zona de
Anclajes
f'c=350 Kg/cm2
500.00 ACCESOS
500.01 MOVIMIENTO DE TIERRAS
501.00 EXCAVACION PARA EXPLANACIONES
Area de perfilado y
Descripcion Progresiva Distancia Ancho (m)
compactado (m2)
0+000 0.00 0.00
0+020 20.00 0.00
0+040 20.00 0.00
0+060 20.00 0.00
Margen Izquierda
0+080 20.00 0.00
0+100 20.00 25.32 253.20
0+120 20.00 15.60 409.20
0+140 20.00 8.00 236.00
0+513.90 0.00 16.07 0.00
0+520 6.10 16.07 0.00
0+530 10.00 16.49 0.00
0+540 10.00 16.76 0.00
0+550 10.00 17.39 0.00
0+560 10.00 17.84 0.00
0+570 10.00 17.69 0.00
0+580 10.00 17.51 0.00
0+590 10.00 17.33 0.00
0+600 10.00 17.33 0.00
0+610 10.00 16.98 0.00
Margen Derecha
0+620 10.00 16.98 0.00
0+630 10.00 16.81 0.00
0+640 10.00 16.81 0.00
0+650 10.00 16.30 0.00
0+660 10.00 15.32 0.00
0+670 10.00 14.87 0.00
0+680 10.00 14.25 0.00
0+700 20.00 13.60 0.00
0+720 20.00 13.10 0.00
0+740 20.00 12.60 0.00
0+750 10.00 12.60 0.00
metrado = 0.00 m2
500.02.01 MURO DE SUELO REFORZADO
Area de Relleno
Descripcion Progresiva Distancia Volumen de relleno (m3)
(m2)
0+000 0.00 14.86 0.00 *Inicio MSR
0+020 20.00 20.95 358.10
0+040 20.00 25.14 460.90
Margen Izquierda 0+060 20.00 33.60 587.40
0+080 20.00 47.33 809.30
0+100 20.00 62.00 1,093.30
0+106.10 6.10 63.91 384.03 *Fin de MSR
0+513.90 0.00 119.13 0.00 *Inicio MSR
0+520 6.10 117.21 720.84
0+523.24 3.24 116.20 378.12
0+530 6.76 116.31 785.88
0+540 10.00 116.16 1,162.35
0+550 10.00 117.55 1,168.55
0+560 10.00 105.45 1,115.00
0+563.24 3.24 100.45 333.56
0+570 6.76 92.91 653.56
0+580 10.00 83.80 883.55
0+590 10.00 79.07 814.35
0+600 10.00 75.04 770.55
0+610 10.00 65.13 700.85
Margen Derecha
0+620 10.00 57.71 614.20
0+630 10.00 52.88 552.95
0+640 10.00 49.06 509.70
0+641.89 1.89 48.06 91.78
0+650 8.11 44.00 373.30
0+660 10.00 36.65 403.25
0+670 10.00 36.62 366.35
0+680 10.00 30.27 334.45
0+681.90 1.90 29.27 56.56
0+700 18.10 17.07 419.38
0+720 20.00 11.50 285.70 *Fin de MSR
0+740 20.00 7.05 185.50
0+750 10.00 0.00 35.25
metrado = 17,408.56 m3
metrado = 983.62 m3
AREA CARA (m2) 729.78 810.19 213.64 213.64 121.80 60.04 2,150.00 -
GEOMALLA UNIAXIAL HDPE UX1500 (m2) 6,169.80 6,827.55 939.45 939.45 1,461.60 300.20 17,470.95 216.00
Area Rollos (Rollos de 1.33 x 61.00) (m2) - - - - - - - 17,524.08
GEOMANTO PERMANENTE P300 (m2) 2,919.10 3,240.75 854.56 854.56 487.20 240.16 9,456.70 142.00
Area Rollos (Rollos de 2.03 x 32.95) (m2) - - - - - - 9,498.17
GEOMALLA BIAXIAL BX1100 (m2) 4,378.65 4,861.13 1,281.84 1,281.84 730.80 360.24 13,539.75 61.00
Area Rollos (Rollos de 3.00x75.00) (m2) - - - - - - - 13,725.00
GEOTEXTIL NO TEJIDO CLASE 2 (m2) 2,919.10 3,240.75 854.56 854.56 487.20 240.16 9,456.70 17.00
Area Rollos (Rollos de 4.00x140.00) (m2) - - - - - 9,520.00
Margen Derecha
Longitud Espesor
Descripcion Area de Encofrado (m3)
(m) (m)
Lado Izquierdo 240.23 0.20 48.05
Lado Central 236.10 0.20 47.22
Lado Derecho 232.40 0.20 46.48
Lados transversales 607.38 0.20 121.48
263.22
metrado = 377.28 m2
Margen Izquierda
Cantidad Longitud Longitud Total
Descripcion
(und) (m) (m)
Juntas de Contraccion 52 3.30 171.60
Margen Derecha
Cantidad Longitud Prom Longitud Total
Descripcion
(und) (m) (m)
Juntas de Contraccion 155 2.95 457.25
metrado = 628.85 m
Margen Izquierda
Cantidad Longitud Longitud Total
Descripcion
(und) (m) (m)
Juntas de Dilatacion 2 106.10 212.20
Juntas de Dilatacion 52 1.20 62.40
Margen Derecha
Cantidad Longitud Prom Longitud Total
Descripcion
(und) (m) (m)
Juntas de Dilatacion 1 240.23 240.23
Juntas de Dilatacion 1 84.00 84.00
Juntas de Dilatacion 114 1.20 136.80
metrado = 735.63 m
6) JUNTAS DE AMARRE
Margen Izquierda
Cantidad Longitud Longitud Total
Descripcion
(und) (m) (m)
Juntas de Amarre 1 106.10 106.10
Margen Derecha
Cantidad Longitud Prom Longitud Total
Descripcion
(und) (m) (m)
Juntas de Amarre 1 236.10 236.10
Juntas de Amarre 1 148.40 148.40
metrado = 490.60 m
3) ACERO
Cantidad Modulos de
Plancha Peso (ton) Cantidad (#) 3m TOTAL (ton)
4) ANCLAJES
Cantidad Modulos de
Cara Area (m2) # Caras 3m TOTAL (m2)
Posterior 2.325 1.00 227.00 527.78
Frontal 1 1.24 1.00 227.00 281.48
Frontal 2 3.751 1.00 227.00 851.48
Frontal 3 1.581 1.00 227.00 358.89
Lateral 1.94 2.00 227.00 880.76
2,900.38
Cantidad
Código Diametro Piezas Longitud Real Longitud Total
Cantidad Modulos de 3m
(pulg) (#) (m) (m)
B1 1/2" 18.00 3.00 227.00 12,258.00
B2 1/2" 18.00 2.25 227.00 9,193.50
B3 1/2" 18.00 1.00 227.00 4,086.00
B4 1/2" 20.00 3.00 227.00 13,620.00
B5 1/2" 8.00 3.00 227.00 5,448.00
B6 1/2" 3.00 3.00 227.00 2,043.00
B7 1/2" 18.00 2.25 227.00 9,193.50
B8 1" 2.00 0.15 227.00 68.10
Resumen:
Diametro Longitud Peso/m Total
(pulg) (m) (kg/m) (kg)
1/2" 55,842.00 1.00 55,842.00
1" 68.10 3.97 270.36
56,113.00
5) ACABADO EN VEREDAS
2) Telecomunicaciones
3) Electricidad
Largo Area
Descripcion Volumen (m3)
(m) (m2)
Long. Excavacion
Descripcion Long. Pilote (m) H terreno (m) H plataforma (m) Cant. Pilotes (#)
(m)
(pulg) (#) (m) (m) (#) (m) (m) (#) (m) (m)
P1 1-3/8" 3 - - 36 22.00 0.00 0 22.00 2376.00
P2 1-3/8" 3 - - 36 12.00 0.00 0 12.00 1296.00
P3 3/4" 3 9.87 0.100 100 7.55 0.00 0 7.55 2265.00
P4 3/4" 3 11.93 0.075 160 7.55 0.00 0 7.55 3624.00
Resumen:
Diametro Longitud Peso/m Total
(pulg) (m) (kg/m) (kg)
3/4" 5889.00 2.24 13,191.36
1-3/8" 3672.00 7.91 29,045.52
TOTAL= 0.00
(pulg) (#) (m) (m) (#) (m) (m) (#) (m) (m)
P1 1-3/8" 3 - - 36 17.00 0.00 0 17.00 1836.00
P2 1-3/8" 3 - - 36 17.00 0.00 0 17.00 1836.00
P3 3/4" 3 9.87 0.100 100 7.55 0.00 0 7.55 2265.00
P4 3/4" 3 11.93 0.075 160 7.55 0.00 0 7.55 3624.00
Resumen:
Diametro Longitud Peso/m Total
(pulg) (m) (kg/m) (kg)
3/4" 5889.00 2.24 13,191.36
1-3/8" 3672.00 7.91 29,045.52
TOTAL= 42,236.88
Longitud Pilote
Descripcion Diametro (m) H descabezado (m) N° de pilotes (#) Volumen (m3)
(m)
300.02 ESTRIBOS
Llave de Corte
Cabezal
Largo Area
Descripcion Volumen (m3)
(m) (m2)
Long. Excavacion
Descripcion Long. Pilote (m) H terreno (m) H plataforma (m) Cant. Pilotes (#)
(m)
(pulg) (#) (m) (m) (#) (m) (m) (#) (m) (m)
P1 1-3/8" 18 - - 40 47.00 0.00 0 47.00 33840.00
P2 1-3/8" 18 - - 40 36.00 0.00 0 36.00 25920.00
P3 1-3/8" 18 - - 40 30.00 0.00 0 30.00 21600.00
P4 3/4" 18 11.90 0.100 120 7.52 0.00 0 7.52 16243.20
P5 3/4" 18 26.93 0.075 360 7.52 0.00 0 7.52 48729.60
P6 3/4" 18 7.90 0.100 160 7.52 0.00 0 7.52 21657.60
Resumen:
Diametro Longitud Peso/m Total
(pulg) (m) (kg/m) (kg)
3/4" 86630.40 2.24 194,052.10
1-3/8" 81360.00 7.91 643,557.60
TOTAL= 0.00
(pulg) (#) (m) (m) (#) (m) (m) (#) (m) (m)
P1 1-3/8" 2 - - 40 47.00 0.00 0 47.00 3760.00
P2 1-3/8" 2 - - 40 36.00 0.00 0 36.00 2880.00
P3 1-3/8" 2 - - 40 30.00 0.00 0 30.00 2400.00
P4 3/4" 2 11.90 0.100 120 7.52 0.00 0 7.52 1804.80
P5 3/4" 2 26.93 0.075 360 7.52 0.00 0 7.52 5414.40
P6 3/4" 2 7.90 0.100 160 7.52 0.00 0 7.52 2406.40
Resumen:
Diametro Longitud Peso/m Total
(pulg) (m) (kg/m) (kg)
3/4" 9625.60 2.24 21,561.34
1-3/8" 9040.00 7.91 71,506.40
TOTAL= 74,454.20
Longitud Pilote
Descripcion Diametro (m) H descabezado (m) N° de pilotes (#) Volumen (m3)
(m)
Resumen:
Diametro Longitud Peso/m Total
(pulg) (m) (kg/m) (kg)
3/8" 0.00 0.56 0.00
1/2" 0.00 1.00 0.00
5/8" 0.00 1.55 0.00
3/4" 1,821.74 2.24 4,080.70
1" 12,497.73 3.97 49,615.97
1-3/8" 39,306.78 7.91 310,916.63
metrado = 364,613.30 kg
Izquierdo 1,559.80
Derecho 1,559.80
metrado = 3,119.60 m3
300.04 TORRES
(pulg) (#) (m) (m) (#) (m) (m) (#) (m) (m)
Longitudinal en columnas
T1 1-3/8" 2 - - 148 59.94 0.00 0 59.94 17742.24
T1A 1-3/8" 2 - - 24 12.00 0.00 0 12.00 576.00
T1B 1-3/8" 2 - - 8 40.00 0.00 0 40.00 640.00
T1C 1-3/8" 2 - - 16 27.00 0.00 0 27.00 864.00
Inferior
T2 3/4" 2 3.00 0.10 124 2.95 0.00 0 2.95 731.60
T2 3/4" 2 10.30 0.10 416 2.95 0.00 0 2.95 2454.40
T2 3/4" 2 1.00 0.10 44 2.95 0.00 0 2.95 259.60
T2 3/4" 2 13.05 0.15 352 2.95 0.00 0 2.95 2076.80
T2 3/4" 2 7.00 0.10 284 2.95 0.00 0 2.95 1675.60
T2* 3/4" 2 13.40 0.10 810 2.95 0.00 0 2.95 4779.00
T3 3/4" 2 3.00 0.10 124 4.45 0.00 0 4.45 1103.60
T3 3/4" 2 10.30 0.10 416 4.45 0.00 0 4.45 3702.40
T3 3/4" 2 1.00 0.10 44 4.45 0.00 0 4.45 391.60
T3 3/4" 2 13.05 0.15 352 4.45 0.00 0 4.45 3132.80
T3 3/4" 2 7.00 0.10 284 4.45 0.00 0 4.45 2527.60
T3* 3/4" 2 13.40 0.10 810 4.45 0.00 0 4.45 7209.00
T4 5/8" 2 3.00 0.10 248 0.84 0.00 0 0.84 416.64
T4 5/8" 2 10.30 0.10 1248 0.84 0.00 0 0.84 2096.64
T4 5/8" 2 1.00 0.10 132 0.84 0.00 0 0.84 221.76
T4 5/8" 2 13.05 0.15 1056 0.84 0.00 0 0.84 1774.08
T4 5/8" 2 7.00 0.10 852 0.84 0.00 0 0.84 1431.36
T5 5/8" 2 3.00 0.10 496 0.64 0.00 0 0.64 634.88
T5 5/8" 2 10.30 0.10 1664 0.64 0.00 0 0.64 2129.92
T5 5/8" 2 1.00 0.10 308 0.64 0.00 0 0.64 394.24
T5 5/8" 2 13.05 0.15 2464 0.64 0.00 0 0.64 3153.92
T5 5/8" 2 7.00 0.10 1988 0.64 0.00 0 0.64 2544.64
Superior
T2A 3/4" 2 24.20 0.10 972 3.27 0.00 0 3.27 6356.88
T3 3/4" 2 24.20 0.10 972 4.45 0.00 0 4.45 8650.80
T4* 3/4" 2 24.20 0.10 1944 0.95 0.00 0 0.95 3693.60
T5 5/8" 2 24.20 0.10 4860 0.64 0.00 0 0.64 6220.80
T5A 5/8" 2 24.20 0.10 1944 1.25 0.00 0 1.25 4840.56
V. Inferior
V1A 1-3/8" 1 - - 34 24.89 Empalme mecánico 24.89 846.26
V1B 1-3/8" 1 - - 34 24.15 Empalme mecánico 24.15 821.10
V1C 1-3/8" 1 - - 34 21.80 Empalme mecánico 21.80 741.20
V2 1-3/8" 1 - - 34 21.50 Empalme mecánico 21.50 731.00
V3 1" 1 - - 48 22.32 2.34 2 27.00 1296.00
V4 1" 1 - - 26 18.00 Empalme mecánico 18.00 468.00
V5 3/4" 1 - - 140 4.50 0.00 0 4.50 630.00
V6 1-3/8" 1 - - 34 21.20 Empalme mecánico 21.20 720.80
V7A 1-3/8" 1 - - 34 21.50 Empalme mecánico 21.50 731.00
V7B 1-3/8" 1 - - 34 24.00 Empalme mecánico 24.00 816.00
V7C 1-3/8" 1 - - 34 24.00 Empalme mecánico 24.00 816.00
V8 5/8" 2 6.60 0.100 132 8.70 0.00 0 8.70 2296.80
V8 5/8" 2 3.98 0.150 53 8.70 0.00 0 8.70 922.20
V9 5/8" 2 6.60 0.100 660 3.75 0.00 0 3.75 4950.00
V9 5/8" 2 3.98 0.150 106 3.75 0.00 0 3.75 795.00
V10 5/8" 2 6.60 0.100 264 4.35 0.00 0 4.35 2296.80
V10 5/8" 2 3.98 0.150 106 4.35 0.00 0 4.35 922.20
V11 1/2" 2 - - 209 4.27 0.00 0 4.27 1784.86
V. superior
V1A 1-3/8" 1 - - 34 20.06 Empalme mecánico 20.06 682.04
V1B 1-3/8" 1 - - 34 19.30 Empalme mecánico 19.30 656.20
V1C 1-3/8" 1 - - 34 18.93 Empalme mecánico 18.93 643.62
V2 1-3/8" 1 - - 34 17.90 Empalme mecánico 17.90 608.60
V3 1" 1 - - 12 22.32 2.34 2 27.00 324.00
V3* 1" 1 - - 24 17.52 1.74 2 21.00 504.00
V4 1" 1 - - 26 18.00 Empalme mecánico 18.00 468.00
V5 3/4" 1 - - 140 4.50 0.00 0 4.50 630.00
V6 1-3/8" 1 - - 34 16.73 Empalme mecánico 16.73 568.82
V7A 1-3/8" 1 - - 34 18.93 Empalme mecánico 18.93 643.62
V7B 1-3/8" 1 - - 34 19.30 Empalme mecánico 19.30 656.20
V7C 1-3/8" 1 - - 34 19.63 Empalme mecánico 19.63 667.42
V8 5/8" 2 5.28 0.100 106 8.70 0.00 0 8.70 1835.70
V8 5/8" 2 3.08 0.150 41 8.70 0.00 0 8.70 713.40
V9 5/8" 2 5.28 0.100 528 3.75 0.00 0 3.75 3956.25
V9 5/8" 2 3.08 0.150 82 3.75 0.00 0 3.75 615.00
V10 5/8" 2 5.28 0.100 211 4.35 0.00 0 4.35 1835.70
V10 5/8" 2 3.08 0.150 82 4.35 0.00 0 4.35 713.40
V11 1/2" 2 - - 209 4.27 0.00 0 4.27 1784.86
Zona de Topes
R1 1/2" 2 - - 125 3.00 0.00 0 3.00 750.00
R2 1/2" 2 - - 110 4.26 0.00 0 4.26 937.20
R3 1/2" 4 - - 78 1.50 0.00 0 1.50 468.00
R4 3/4" 4 - - 42 3.60 0.00 0 3.60 604.80
Resumen:
Diametro Longitud Peso/m Total
(pulg) (m) (kg/m) (kg)
3/8" 0.00 0.56 0.00
1/2" 5,724.92 1.00 5,724.92
5/8" 47,711.89 1.55 73,953.43
3/4" 50,610.08 2.24 113,366.58
1" 3,060.00 3.97 12,148.20
1-3/8" 31,172.12 7.91 246,571.47
metrado = 451,764.60 kg
Concreto en Zona de
Anclajes
f'c=350 Kg/cm2
400.00 SUPERESTRUCTURA
400.01 ESTRUCTURA METÁLICA
700.00 TRANSPORTES
EXCAVACION EN PUENTE
Pilotes Estribo Izquierdo 0+112.25 0.00 0.73 0.00
Pilotes Torre Izquierda 0+199.75 610.73 0.73 442.78
442.78
EXCAVACION EN PUENTE
Pilotes Estribo Derecho 0+507.75 196.58 1.23 242.34
Pilotes Torre Derecha 0+420.25 2747.70 1.15 3146.80
3,389.14
Relleno en Accesos
Distancia de
Volumen Relleno Centro de
Progresiva Cantera al Distancia Total Momento Transporte
(m3) Gravedad
km 0+000
Distancia de
Volumen Centro de
Progresiva Cantera al Distancia Total Momento Transporte
Sub-Base Gravedad
km 0+000
Volumen Distancia a
Descripcion Progresiva Momento Transporte (m3 x Km)
(m3) Cantera (km)
300 SUBESTRUCTURA
320.02 PILOTES EXCAVADOS (TORRES)
320.02.01 PLATAFORMA DE OPERACIONES
300. SUBESTRUCTURA
METRADO
ÍTEM DESCRIPCIÓN UND CANTIDAD PRECIO SUBTOTAL INCIDENCIA
EJECUTADO
700. TRANSPORTE
METRADO
DURANCION DEL
ÍTEM DESCRIPCIÓN UND CANTIDAD PARCIAL
PROYECTO (MESES)
MES
700 TRANSPORTES
709 TRANSPORTE FLUVIAL INTERNO glb
glb
glb
glb
glb
glb
glb
glb
glb
glb
glb
glb
glb
SUMINISTRO DE 02 BARCAZAS PARA EL TRANSPORTE DE
PERSONAL, MATERIALES Y EQUIPOS ENTRE MARGENES 0.0454 0.0227
PARA LA CONSTRUCCION DEL PUENTE HUALLAGA - FQ13
glb
glb
glb