500 DRENAJE
501.E EXCAVACIÓN NO CLASIFICADA PARA ESTRUCTURAS m3 48.80 65.40 - -16.60
502.A RELLENOS PARA ESTRUCTURAS m3 89.77 20.10 69.67 -
503.D CONCRETO CLASE D (F'C = 210 KG/CM2) m3 13.79 13.79 -
503.E CONCRETO CLASE E (F'C = 175 KG/CM2) m3 4.62 14.10 - -9.48
503.H CONCRETO CLASE H (F'C = 100 KG/CM2) m3 0.52 0.52 -
503.I ENCOFRADO Y DESENCOFRADO m2 66.31 55.60 10.71 -
504.A ACERO DE REFUERZO FY=4200 KG/CM2 kg 707.98
511.A2 GEOTEXTIL NO TEJIDO CLASE A m2 22.11
515.A TUBERIA PERFORADA DE PVC-SAP D=3" m 9.27
515.D TUBERIA PERFORADA DE PVC-SAP D=6" m 8.80
516.A JUNTA PARA MUROS m2 - - - -
519.A TUBERIA TMC ɸ = 48" m 12.96 12.10 0.86 -
520.A TUBERIA TMC ɸ = 60" m - - -
523.A FILTRO DRENANTE m3 4.51
600 OBRAS COMPLEMENTARIAS
601.B EMBOQUILLADO DE PIEDRA E= 0.15M m2 18.43 4.10 14.33 -
601.C EMBOQUILLADO DE PIEDRA E= 0.20M m2 - - -
601.D PIEDRA ASENTADA m3 18.18 18.18 -
604.F DEMOLICION DE ESTRUCTURAS EXISTENTES m3 - -
609.A DESMONTAJE Y TRANSPORTE DE ALC. TMC EXISTENTES m - -

* CR-AL = CAJA RECEPTORA - ALERO DE SALIDA


* AL-AL = ALERO DE ENTRADA - ALERO DE SALIDA
* CR-MURO = CAJA RECEPTORA - MURO DE CONCRETO (ARMADO/CICLOPEO)
* CR-MSR = CAJA RECEPTORA - MURO DE SUELO REFORZADO

560302218.xlsx Página 1
OBRAS DE ARTE Y DRENAJE
SUSTENTO DE METRADOS
123 ALCANTARILLA TMC Ø 48 KM 50+690.00 TIPO AL-MR
LONG. = 12.96 m N° CUERPOS 16

METRADOS: EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS


VOLUMEN
DESCRIPCION N° veces Largo Ancho Area 1 Area 2 Altura
PARCIAL

PROTECC. DE ENTRADA (AC-1) 4.57 2.78 12.70

ALERO DE ENTRADA (AC-2) 5.51 1.16 6.39

SECCION CUERPO (AC-3) 2.12 0.19 0.40

ALERO DE SALIDA (AC-4) 0.00 0.00 -

ENCAUZ. DE SALIDA (AC-5) 5.00 2.16 10.80


DESCUENTOS:
ISLA ALERO ENTRADA (A-C6) -1.00 1.87 0.25 -0.47

ISLA ALERO SALIDA (A-C7) -1.00 0.00 - -


TOTAL ==> 29.83

501.E EXCAVACIÓN NO CLASIFICADA PARA ESTRUCTURAS m3 29.83

METRADOS: RELLENO PARA ESTRUCTURAS


VOLUMEN
DESCRIPCION N° veces Largo Ancho Area 1 Area 2 Altura
PARCIAL

RELLENO LOSA (AL-1) 2 Ar.Lat. Al.=0.62 0.40 0.50

RELLENO ALAS (AL-2) 2 Ar.Lat. Al.=1.08 1.00 2.14

ALERO DE ENTRADA (AR-1) 1 3.33 1.56 5.19

SECCION CUERPO (AR-2) 1 2.12 19.34 41.00

SECCION CUERPO (AR-3) 1 2.12 6.48 13.74

ALERO DE SALIDA (AR-4) 1 0.00 0.00 -

DEDUCIR TEBERIA -1 10.13 1.17 -11.85

TOTAL ==> 50.71

502.A RELLENOS PARA ESTRUCTURAS m3 50.71

METRADOS: CONCRETO CLASE (F'C = 175 KG/CM2)


VOLUMEN
DESCRIPCION N° veces Largo Ancho Area 1 Area 2 Altura
PARCIAL
ALERO:
ZAPATA (Area Mayor) 1 4.87 2.20 5.73 0.40 2.29
ZAPATA (Area Mayor) 1 4.87 4.17 1.58 0.40 0.63
Deducir Solado -1 3.10 1.45 1.87 0.25 -0.47
PANTALLA (Exterior) 1 1.87 1.62 0.26 1.52 0.40
PANTALLA (Interior) 1 2.03 1.62 0.46 1.52 0.69
Deducir Tuberia -1 0.49 -0.49
ALAS 2 0.30 0.09 1.80 1.41
PARAPETO 1 1.87 1.62 0.52 0.30 0.16
TOTAL ==> 1 m3 4.62

503.E CONCRETO CLASE E (F'C = 175 KG/CM2) m3 4.62

560302218.xlsx Página 2
OBRAS DE ARTE Y DRENAJE
SUSTENTO DE METRADOS
123 ALCANTARILLA TMC Ø 48 KM 50+690.00 TIPO AL-MR
LONG. = 12.96 m N° CUERPOS 16
METRADOS: ENCOFRADO Y DESENCOFRADO
VOLUMEN
DESCRIPCION N° veces Largo Ancho Area 1 Area 2 Altura
PARCIAL

ALERO:
ZAPATA (LOSA) 1 11.57 0.40 4.63
PANTALLA EXTERIOR 1 1.62 1.52 2.46
PANTALLA INTERIOR 1 2.03 1.87 1.95 1.52 2.96
Deducir Tuberia -2 1.17 -2.34
ALA INTERIOR 2 1.80 1.11 4.00
ALA EXTERIOR 2 1.98 1.11 4.38
TAPAS ALA 2 0.25 0.70 0.35
PARAPETO 2 1.87 1.62 0.30 1.24
TOTAL ==> 1 m2 17.69

503.I ENCOFRADO Y DESENCOFRADO m2 17.69

METRADOS: TUBERIA METALICA CIRCULAR Ø 48"


DESCRIPCION PARTIDAS
DESCRIPCION
Long. Anillo N° Anillo T. Anillos N° Cuerpos L. Total 609.A

Tuberia TMC Ø 48" 0.81 1 16 16 12.96 12.96


TOTAL ==> 12.96

519.A TUBERIA TMC ɸ = 48" m 12.96

METRADOS: EMBOQUILLADO DE PIEDRA E= 0.15M


DESCRIPCION
DESCRIPCION
N° Veces Largo Ancho Alto Area Volumen SubTotal
ENTRADA MURO LATERAL (L1) 2 3.00 0.15 0.15 0.45 0.90
ENTRADA MURO LATERAL (L2) 2 3.00 0.49 0.15 1.47 2.94
BASE (L3) 1 3.53 0.15 0.20 0.62 2.19 14.59
TOTAL ==> 18.43
601.B EMBOQUILLADO DE PIEDRA E= 0.15M m2 18.43

METRADOS: PIEDRA ASENTADA E= 0.80M


PARED LATERAL 2 4.80 0.20 0.30 0.29 0.58
BASE 1 2.50 5.00 0.80 10.00 10.00
1 1.90 5.00 0.80 7.60 7.60
TOTAL ==> 18.18

601.D PIEDRA ASENTADA m3 18.18

560302218.xlsx Página 3
MINISTERIO DE TRANSPORTES Y COMUNICACIONES
: MEJORAMIENTO, CONSERVACION POR NIVELES DE SERVICIO Y OPERACIÓN DEL CORREDOR VIAL: HUANUCO-LA UNION-HUALLANCA
OBRA
Dv. ANTAMINA/EMP. PE-3N (TINGO CHICO)-NUEVAS FLORES-LLATA-ANTAMINA
TRAMO : TRAMO I KM. 0+000.00 - KM. 52+920.00
SUPERVISION : CONSORCIO SUPERVISOR LOUIS BERGER - HOB
CONTRATISTA : CHINA RAILWAY 20 BUREAU GROUP CORPORATION

SUSTENTO DE METRADOS - CAJA RECEPTORA Ø 48''

503.E CONCRETO CLASE E (F'C = 175 KG/CM2)

ZAPATA (LOSA) ( 2.40 X 2.20 ) 16 0.60 - ( 1.40 X 1.60 X 0.30 ) = 2.50 m3

MUROS LATERALES ( 1.40 X 2.10 X 0.30 X 2.00 ) - ( 1.20 X 0.30 ) X 0.30 X 2.00 = 1.66 m3
2.00

MURO FRONTAL (INTERNO) ( 0.30 + 0.50 ) X 2.55 X 2.20 - (π X 1.22² ) X 0.44 = 1.73 m3
2.00 4.00

MURO POSTERIOR (EXTERNO) ( 0.30 + 0.50 ) X 2.10 X 2.20 - ( 0.90 + 0.60 ) X 0.35 X 0.32 = 1.77 m3
2.00 2.00

TOTAL = 7.65 m3

503.I ENCOFRADO Y DESENCOFRADO

ZAPATA (LOSA) 2.40 X 2.00 + 2.20 X 2.00 X 0.60 = 5.52 m2

1.40 + 1.60 X 2.00 X 2.10 - 1.20 X 0.30 X 2.00 -


2.00

PANTALLA CARA INTERIOR (π X 1.22² ) - 0.90 + 0.60 X 0.35 + 0.35 X 2.20 = 11.58 m2
4.00 2.00

2.00 + 2.40 X 2.10 X 2.00 + 2.10 X 2.20 + 2.55 X 2.20 +


2.00

PANTALLA CARA EXTERIOR 0.30 + 0.33 X 0.35 X 2.00 - 0.90 + 0.60 X 0.35 - (π X 1.22 = 18.26 m2
2.00 2.00 4.00
4
TOTAL = 35.36 m2
14
0.30 0.35 0.90 0.35 0.30
24 0.30 1.40 0.30
0.30 0.35 0.90
5

2 0.60 0.30

7 0.35
1.80 2.70

0.60 0.90

0.30 0.35

0.30 0.30

0.30 1.60 0.30


8

1.40 0.30

0.45 0.30
dsdsd 0.30 0.20 0.30 0.90
0.30
0.35

0.33
2.55 1.70
0.44 3.15
1.75

0.10
0.30 0.30
0.60
0.30 0.30

0.30 1.60 0.30


0.50 1.40 0.50
MURO DE CONCRETO ARMADO
"km 50+687.41 - km 50+692.59"
Long= 5.00 m

Área Volumen
Partida Descripción Unid. Cant. Largo Ancho Altura Kg Subtotal
Parcial Parcial
501.E Excavación no clasificada para estructuras m3 18.97
50+687.41 - 3.84
50+692.59 5.00 4.52 20.90
Descuento Alc. Existente - 1.65 1.17 - 1.93
502.A Relleno para estructuras m3 39.06
50+687.41 - 7.20
50+692.59 5.00 7.65 37.13
Descuento TMC 48" 1.65 1.17 1.93

503.D Concreto clase D (f'c=210 kg/cm2) m3 13.79


50+687.41 - 2.90 -
50+692.59 5.00 3.01 14.78
Descuento Tub. 3" -9 1.03 0.005 - 0.04
Descuento Cajuelas 0 0.30 0.31 0.32 0.10 -
Descuento TMC 48" - 0.81 1.17 - 0.95

503.H Concreto Clase H (f'c=100 kg/cm2) m3 0.52


50+687.41 - 0.10 -
50+692.59 5.00 0.10 0.52

503.I Encofrado y desencofrado m2 48.62


Interior
50+687.41 - 3.87
50+692.59 5.00 4.15 20.05

Exterior
50+687.41 - 3.86
50+692.59 5.00 4.14 20.00

Tapas
50+687.41 1 2.90
50+692.59 1 3.01
Zapatas h=0.60 (PAÑO 1 ) 2 5.00 0.50 5.00
Descuento TMC 48" - 2.34

504.A Acero de Refuerzo (fy=4200 Kg/cm2) Kg 707.98


PAÑO 1 (H=4.50 (H)) 1 - -

511.A2 Geotextil no tejido clase 2 m2 22.11


50+687.41 - 4.52
50+692.59 5.00 4.79 23.28
Descuento TMC 48" - 1.17

515.A Tubería perforada PVC-SAP D=3" m 9.27


Paños 1-4 9 1.03 9.27

515.D Tubería perforada PVC - SAP D=6" m 8.80


Paños 1 5.00
Descarga Transversal (Paño 1) 3.80

516.A Junta para muros m2 0.00


50+687.41 -
50+692.59 -

523.A Filtro Drenante m3 4.51


50+687.41 - 0.90
50+692.59 5.00 1.08 4.95
Descuento Tub. 6" -1 5.00 0.02 - 0.09
Descuento TMC 48" -1 0.30 1.17 - 0.35
SUSTENTOS DE METRADOS

MURO DE CONCRETO ARMADO "km 50+687.41 - km 50+692.59"

504.A ACERO DE REFUERZO

MURO CONCRETO ARMADO (MCA) PAÑO 1 - ACERO DE REFUERZO H = 4.36 - 4.64

PAÑO : 1
Long Muro : 5.00 m. h: 4.00 m. h/2: 2.00 m.
Long Zapata : 2.70 m. Hz: 0.50 m.
H 4.50 m.

TIPO LONGITUD LONG. LONG. LONGITUD Peso de PESO


ESPAC. ALTURA BARRA EMPAL. CANTIDAD N°.
COD. PARCIAL TOTAL TOTAL Acero ( TOTAL
(ml) (h) Ø A B C D (ml) (Und.) VECES
Detalle de Acero (m) (m) (ml) Kg/m ) (Kg)

Z1 TRANSVERSAL SUPERIOR 0.175 0.50 1/2 0.20 2.60 0.20 3.00 0.00 3.00 29 1 87.00 1.00 87.00
2.60
0.20 0.20

Z2 TRANSVERSAL INFERIOR 0.175 0.50 3/8 0.20 2.60 0.20 3.00 0.00 3.00 29 1 87.00 0.56 48.72
2.60
0.20 0.20

Z3 LONGITUDINAL SUPERIOR 0.300 0.50 1/2 0.20 4.90 0.20 5.30 0.00 5.30 10 1 53.00 1.00 53.00
4.90
0.20 0.20

Z3 LONGITUDINAL INFERIOR 0.300 0.50 1/2 0.20 4.90 0.20 5.30 0.00 5.30 10 1 53.00 1.00 53.00

0.20 4.90 0.20

M1 Barras Verticales Parte Inferior 0.175 4.50 3/8 0.20 4.40 0.50 5.10 0.00 5.10 29 1 147.90 0.56 82.82
0.20

4.40

0.50

M2 TRANSVERSAL 0.175 4.50 5/8 0.00 2.50 0.50 3.00 0.00 3.00 29 1 87.00 1.55 134.85

2.50

0.50

M3 Barras Verticales Parte exterior 0.175 4.50 1/2 0.20 4.40 0.70 5.30 0.00 5.30 29 1 153.70 1.00 153.70
0.20

4.40

0.70
M4 LONGITUDINAL INTERIOR 0.175 3/8 0.20 4.90 0.20 5.30 0.00 5.30 23 1 121.90 0.56 68.26

0.20 4.90 0.20

M4 LONGITUDINAL EXTERIOR 0.175 3/8 0.20 4.90 0.20 5.30 0.00 5.30 23 1 121.90 0.56 68.26

0.20 4.90 0.20

ACERO EN TUB. TMC D=48"

1/2 0.50 1.22 0.50 2.22 0.00 2.22 2 2 8.88 1.00 8.88

1/2 0.50 1.22 0.50 2.22 0.00 2.22 2 2 8.88 1.00 8.88

DESCONTAR ACERO VERT. M1 TMC 3/8 1.10 1.10 0.00 1.10 7 -1 -7.70 0.56 -4.31

DESCONTAR ACERO VERT. M2 TMC 5/8 1.10 1.10 0.00 1.10 7 -1 -7.70 1.55 -11.94

DESCONTAR ACERO VERT. M3 TMC 1/2 1.10 1.10 0.00 1.10 7 -1 -7.70 1.00 -7.70

DESCONTAR ACERO HORZ. M4 TUB. 3/4 0.99 0.99 0.00 0.99 8 -2 -15.82 2.24 -35.44

Sub Total (Kg) 707.98


N° De Paños 1
Sub Total (Kg) 707.98

560302218.xlsx Página 6
SUSTENTO DE METRADO ALERO TMC Ø 48"

503.E CONCRETO CLASE E (F'C = 175 KG/CM2)

ZAPATA (LOSA) ( 2.20 + 4.87 ) 16.00 1.62 + ( 4.87 + 4.17 ) X 0.35 X 0.40 -
2.00 2.00

( 1.45 + 3.10 ) X 0.82 X 0.25 = 2.46 m3


2.00

PANTALLA ( 1.62 + 1.87 ) x 0.30 + ( 1.62 + 2.03 ) x 0.50 / 2.00 X 1.52 -


2.00 2.00

(π X 1.22² ) X 0.42 = 0.60 m3


4.00

ALAS ( 0.30 + 0.50 ) x 1.52 + ( 0.20 + 0.30 ) x 0.70 / 2.00 X 1.80 X 2.00 = 1.41 m3
2.00 2.00

PARAPETO ( 1.62 + 1.87 ) x 0.30 X 0.30 = 0.16 m3


2.00

TOTAL = 4.62 m3

503.I ENCOFRADO Y DESENCOFRADO

ZAPATA (LOSA) ( 4.17 + 2.20 ) + ( 2.10 X 2.00 ) + ( 0.50 X 2.00 ) X 0.40 = 4.63 m2

PANTALLA CARA INTERIOR 1.62 X 1.52 + ( 1.87 + 2.03 ) X 1.52 - (π X 1.22² ) X 2.00 = 3.09 m2
2.00 4.00

( 1.52 + 0.70 ) X 1.80 + ( 1.93 + 2.02 ) X ( 1.52 + 0.70 ) + ( 0.20 + 0.30 ) X


4 2.00 2.00 2.00 2.00

ALAS 14 0.70 ) X 2.00 = 8.73 m2

PARAPETO 24 ( 1.62 + 1.87 ) + ( 0.32 X 2.00 ) X 0.30 = 1.24 m2

5 TOTAL = 17.69 m2

2
0.30
7 4.87

2.20 0.30
0.30
2.03

0.34
1.52
0.32 0.42
0.70
1.87 2.10 0.50
8 2.02 1.62 1.62
1.45 0.15 0.40
1.93 0.25
1.80 0.82 0.90 0.82 0.25
0.35
0.20 1.97
0.30 3.10 0.50
0.20
4.17

También podría gustarte