Está en la página 1de 1

A B C

B Cumbrera de Plancha de
1 2 3 4 5 Calamina Galvanizada
.14
17.20 CORREAS .24 CORREAS
4.30 4.30 4.30 4.30 TB.NG.RECT. DE 2"X2"
3.00 1.26 TB.NG.RECT. DE 2"X2"
.60 3.90 3.90 3.40
C-1 .20 3.10 C-1 C-1 C-1 .55
Cobertura de Calamina
TB.NG.RECT. DE 2"X3"
TB.
NG.
REC
Galvanizada 1.26
C C (1.80x0.83mx3mm) Montante
T. D
E 2"
X3"
3.43 7.64 1.08 TB.NG.RECT. DE 2"x3"
"X3" 3.60
.15

C-2 1.60 CT. D


E 2
1.08 Diagonales 1.46 Diagonales Montante
G.RE
TUBERIA DE FºFº 200 mm. TB.N TB.NG.RECT. DE 2"x3" TB.NG.RECT. DE 2"x3"
.99
TB.NG.RECT. DE 2"x3"
TUBERIA DE ACERO SCH-40 8" (200 mm) 1.08
.25
2.80 6.01 1.85
APOYO TUBERIA APOYO TUBERIA
1.45 1.45
Salida de Tuberia 2.00 1.85 1.85
1.18 1.18
PVC Ø 8" (DN 200 TB.NG.RECT. DE 2"X3" TB.NG.RECT. DE 2"X3"
mm) Hacia pozo

S = 2%

S = 2%

S = 2%

S = 2%
percolador COLUMNA METALICA
TB.NG.CUAD. DE 4"X4" 1.50

2.48 1.91
APOYO TUBERIA COLUMNA
APOYO TUBERIA .20 DN 200mm 10.40 1.91 .20 METALICA
SALPICADOR 0.80x0.80M
D 2.80 TB.NG.CUAD.
SALPICADOR 0.80x0.80M SALPICADOR 0.80x0.80M DE 4"X4"
5.75 (VER DETALLE "X")
5.20 SALPICADOR 0.80x0.80M
Altura maxima de lodos
S = 1.5% Tuberia Perforada Ø8" S = 1.5% Tuberia Perforada Ø8" S = 1.5%
BZ Concreto simple
f'c=175 kg/cm2
1.20
.15 1.13
ARENA GRUESA
.25
1.19
.30

Lecho de Secado
Concreto simple
f'c=175 kg/cm2
NPT +0.30 .15 GRAVA 1/16" A 1/4"
NPT +0.30
Salida de Tuberia
.15 GRAVA 1/4" A 1"

D PVC Ø 8" (DN 200


mm) NTN +/-0.00 .15
GRAVA 1" A 2" S = 2% S = 2% S = 2% S = 2%
NTN +/-0.00

ENTRADA DE TUBERIA .40


S = 2%

S = 2%

S = 2%

S = 2%
F°F° 200mm. .80 Canaleta S=1.5% .80
Losa concreto f'c=175 de fondo Concreto Simple F'c=175
Concreto Simple F'c=175 kg/cm2, e=0.15m, S=1.5% 1.10
0.50 C:H 1:8+25% P.M. 0.50
C:H 1:8+25% P.M.
DETALLE TECHO: CORTE B - B
4.30 4.30 4.30
4.30

C B 11.50 B C
C-1 C-2
C-2 C-2 C-2 C-2
S = 2%

S = 2%

S = 2%

S = 2%
2.45 A B C
ENTRADA DE TUBERIA Cumbrera de Plancha de
F°F° 200mm. Calamina Galvanizada
.14
CORREAS .24
TB.NG.RECT. DE 2"X2" CORREAS
D Cobertura de Calamina
3.00 1.26 TB.NG.RECT. DE 2"X2"
TB.
TB.NG.RECT. DE 2"X3" NG.
Galvanizada 1.26 REC
T. D

5.75 5.35
0.20 S = 1.5% Tuberia Perforada Ø8" S = 1.5% Tuberia Perforada Ø8" S = 1.5%
BZ 1.60
(1.80x0.83mx3mm)

3.60
1.08

Diagonales
Montante
TB.NG.RECT. DE 2"x3"
Diagonales
E 2"
X3"

SALPICADOR 0.80x0.80M " 1.08 1.46 Montante


2"X3
Salida de Tuberia EC T. DE TB.NG.RECT. DE 2"x3" TB.NG.RECT. DE 2"x3"
.99
TB.NG.RECT. DE 2"x3"
G.R 1.08
D PVC Ø 8" (DN 200 TB.N
.25
SALPICADOR 0.80x0.80M mm)
A A
2.48

(VER DETALLE "X")


S = 2%

S = 2%

S = 2%

S = 2%
APOYO TUBERIA 2.00 1.85 1.85 1.85 2.00
2.45 APOYO TUBERIA TB.NG.RECT. DE 2"X3" TB.NG.RECT. DE 2"X3"
1.18 1.18
5.45 5.45
1.45 1.45
APOYO TUBERIA Concreto
2.80
Concreto
6.02 1.85 f'c=210 kg/cm2 f'c=210 kg/cm2
TUBERIA DE ACERO SCH-40 8" (200 mm) TUBERIA DE FºFº 200 mm.
2.80 .20 10.40 .20

3.43 7.64
Concreto

D A A D f'c=210 kg/cm2

1.20
.25
Altura maxima de lodos Altura maxima de lodos

NPT +0.50 Lecho de Secado


C-1 C-1 C-1 C-1 C-2 .15
.15
ARENA GRUESA

GRAVA 1/16" A 1/4"

1 2 3 4 5 .15 GRAVA 1/4" A 1"

.15
GRAVA 1" A 2"
S = 2% S = 2% S = 2% S = 2%

B .40 .30

Canaleta S=1.5%
Losa concreto f'c=175
PLANTA GENERAL: LECHO DE SECADO 1.10
kg/cm2, e=0.15m, S=1.5% 1.10
de fondo 1.10

1.21

CONCRETO CICLOPEO C:H, 1:10+30% P.G.

EJE 5-5 VISTA LATERAL DE COBERTURA

COLUMNA-02

COLUMNA-03 COLUMNA-03 COLUMNA-02


COLUMNA Tuberia perforada D=8"

7Ø1/2"@0.20m
C-2 Ver Detalle "X"
C-2
6 Ø 1/2" Losa concreto f'c=175
kg/cm2, e=0.15m, S=1.5%
Z-3 C-3

4Ø1/2"@0.20m
0.30
2Ø1/2"
1.10
COLUMNA C-3
2 Ø 3/8"
0.15
1Ø1/2"
Ø3/8" (ver detalle)
0.90
Z-2
0.30

Ø3/8"@0.20

2.80
0.30

2Ø1/2"
4Ø1/2"@0.20m
1Ø1/2" 2Ø1/2" Solado, e=0.10 m 7Ø1/2"@0.20m
06 Ø1/2" f'c=140 kg/cm2 Canaleta concreto
02Ø1/2" LOSA SALPICADORA
CONCRETO f'c=175 kg/cm2 SECCION D - D f'c=175 kg/cm2, S=1.5%
0.90
1.10
.25 DETALLE "X"
Ø3/8"; 2@0.05, 2@0.10,
Rsto0.20.
Ø3/8"; 2@0.05,2@0.10,
Rsto0.20
.90
ARMADURA EN COLUMNA
LOSA SALPICADORA Y SOPORTE 0.30

MUNICIPALIDAD DISTRITAL EXPEDIENTE TECNICO:


DE ANCHONGA "MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALACION DEL SISTEMA DE ALCANTARILLADO Y CODIGO DE PLANO:
TRATAMIENTO DE AGUAS RESIDUALES EN LA LOCALIDAD DE RANTAY , DISTRITO DE ANCHONGA
1.10 ANGARAES-HUANCAVELICA "
PLS-01
NOMBRE DE PLANO: LUGAR : C. P. RANTAY
ARMADURA EN COLUMNA INTERMEDIA PTAR: LECHO DE SECADO - HIDRAULICA Y ESTRUCTURAS
Distrito : ANCHONGA
NUMERO DE LAMINA:
RESPONSABLES DEL PROYECTO ESCALA: FECHA: Provincia : ANGARAES
ING.MARCO ANTONIO GAMBOA DELGADO INDICADA NOVIEMBRE DE 2021
10-A
Región : HUANCAVELICA

También podría gustarte