Documentos de Académico
Documentos de Profesional
Documentos de Cultura
“ACTIVIDAD 2”
Integrantes:
Docente:
Ing. Gonzalo Hugo García
Curso:
Diseño de Puentes
Trujillo – Perú
2021
B C
A
14 m
5.928/2 5.928/2
.50 7.20 .50 .15 de sardinel a cada lado
14.8 ton R 14.8 ton
EJE A 3.6 ton
A B C
CL
R1 R2
4.30 m 4.70 m
4.70
𝑥=5.928 𝑚
7-(5.928/ 2)
0.964
R = 33.2 tn
∑Mr1 = 3.6 (4.0355) + 14.8( 4.036 + 4.30) + 14.8 (4.036 + 4.30 + 4.70) = R2 x 14
R2 = 23.63 tn
R1= 9.57 tn
9.57 3.6
14.8
5.97
0 0
-8.83
14.8
- 23.63 DMF:
9.57 x 4.036 = 38.624
( 5.97 x 4.30) = 64.294
(- 8.83 x 4.70) = 22.79
0 0
22.79
38.624
64.295
EJE B
5.928
5.929 - 4.30 / 2= 0.8145
3.8855
0.8145
R
14.8 ton 14.8 ton
3.6 ton
1.8855 A C
B CL
R1 R2
*R1 + R2 = 3.6 + 14.8 + 1.8
4.30 m 4.70 m R1 + R2 = 33.2 tn
𝑥=5.928 𝑚
* ∑Mr1 = 3.6 (1.8855) + 14.8( 4.30 + 1.8855) + 14.8 (4.70 + 4.30 + 1.8855) = R2 x 14
14.67 3.6 R2 = 18.531 tn
R1 = 14.669 tn
11.069 14.8
0 0
- 3.731 18.531
14.8
- 3.731 18.531
14.8
- 18.531
DMF:
14.669 x 1.8855 = 27.658
27.658 + 11.069 x 4.30) = 75.2547
75.25 + (-3.731 x 4.70) = 57.711
57.711 + (-18.531 x 3.1145) = 0
0 0
27.65
57.7
75.25
1.63
* ∑Mr1 = 3.6 (1.8855) + 14.8( 4.30 + 1.8855) + 14.8 (4.70 + 4.30 + 1.8855) = R2 x 14
14.67
11.069 14.8
0 0
-3.731 18.531
14.8
-18.531
DMF:
14.669 x 1.8855 = 27.658
27.658 + 11.069 x 4.30) = 75.2547
75.25 + (-3.731 x 4.70) = 57.711
57.711 + (-18.531 x 3.1145) = 0
0 0
27.65
57.711
75.25
5
B C
A
14 m
ANCHO EFECTIVO
L1 = 14 000 mm * Para un carril cargado
NL =2 𝐸=25+0.42 √𝐿1 𝑤1
W1 = 7200 mm 𝐸=0.25+0.42 √14 𝑥 7.2
W = 8500 mm 𝑬=𝟒.𝟒𝟔𝟔 𝒎
se escoge el menor
2 o mas vias cargadas (B) = W/ NL * Para mas de un carril cargado
E = 3304.79 mm < 4250 mm 𝐸=2.1+0.12 √𝐿1 𝑤1
𝐸=2.1+0.12 √14𝑥7.2
Por lo tanto el ancho critico es E = 3.30 m 𝑬=𝟑.𝟑𝟎 𝒎
MOMENTO ULTIMO
Mu = 1.05 (1.25 x (35.28) + 1.50 (2.75) + 1.75 (22.65))
Mu = 92.255 tn-m