Está en la página 1de 1

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

1 2 8, 9, 10, 11, 12, 13, 27, 14, 15, 26, 28, 31, 36, 16, 55, 68,
25 44, 46, 56, 57, 59, 60, 37, 43, 45, 47, 51, 52, 93
PEAD
65, 66 62, 64, 67, 82, 90, 91
2"

2"

1 FO.GO.
2" 1 FO.GO. 1/2"
2" PEAD FO.GO. 1 2" PEAD FO.GO. 1 FO.GO. 1 FO.GO. 1
1/2"
2" 1/2" 2" x 1 1/2" 1/2" 1/2" 1/2"
2"

2"
PEAD
2"
PEAD

29, 33, 53, 80, 83, 30, 32 34 35, 39 38 42, 54, 58, 81, 87
84, 88, 92

1 FO.GO. 1 FO.GO.
1/2" 1 FO.GO.
1/2"
1 FO.GO. 1/2"
1/2"
1 FO.GO.
1/2" FO.GO. 1 1 FO.GO.
FO.GO. 1 FO.GO. 1 FO.GO. 1 1/2" 1/2"
1/2" FO.GO. 1
1/2" 1/2"
1 FO.GO. 1/2"
1/2"

49 79 89

1 FO.GO.
FO.GO. 2" 2"X2" FO.GO.
PEAD 2" 1/2"
1 1
1/2" 2" x 1 1/2" 2" x 1 1/2" 1/2"
2"
2" 1 FO.GO.
2" x 1 1/2" 1/2"
FO.GO. 1
2" x 1 1/2" 1/2"

1 FO.GO.
MAN
ANT 1/2"
IAL

REALIZARAN CON LA MISMA TUBERIA.


212 HABITANTES
BOM
BEO POBLACION ACTUAL (2016) 359 HABITANTES

POBLACION DE PROYECTO (2026) 421 HABITANTES

PORCENTAJE DE POBLACION BENEFICIADA 100 %

POBLACION BENEFICIADA 421 HABITANTES

DOTACION 100 LTS/HAB/DIA

GASTO MEDIO ANUAL 0.49 L.P.S.

GASTO MAXIMO DIARIO 0.69 L.P.S.

GASTO MAXIMO HORARIO 1.07 L.P.S.

COEFICIENTE DE VARIACION DIARIA 1.40

COEFICIENTE DE VARIACION HORARIA 1.55


TANQUE SUPERFICIAL
DE REGULARIZACION FUENTE DE ABASTECIMIENTO AGUA SUPERFICIAL
DE 180 M3 EXISTENTE

TIPO DE CAPTACION CARCAMO DE BOMBEO

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


CONDUCCION BOMBEO
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

TIPO DE ALMACENAMIENTO TANQUE SUPERFICIAL

CAPACIDAD DE REGULACION EXISTENTE 180.00 M3

DISTRIBUCION RED ABIERTA

- LIMPIEZA, TRAZO Y NIVELACION 3,664.86 M2.


VALVULA DE SECCIONAMIENTO
- TUBERIA DE FO.GO. L-200 DE 1 1/2" DE DIAM. 6,108.10 ML.

- ATRAQUES DE CONCRETO ARMADO 305 PZA.

- CAJA DE OPERACION DE VALVULA TIPO I 3.00 PZAS. No. DE NODO

- CAJA DE OPERACION DE VALVULA TIPO V 1.00 PZA. COTA DE TERRENO


CARGA DISPONIBLE

- LIMPIEZA GENERAL DE LA OBRA 3,664.86 M2

- TOMAS DOMICILIARIAS 104.00 PZAS.

- LETRERO DE IDENTIFICACION DE OBRA 1.00 PZA.

0.40
0.40

1.10 0.90

1 0.90 SALIDA
DESCRIPCION CANT.
0.40 0.40 DEMASIAS
CONTRAMARCO SENCILLO CENTRADO 12.00 LIMPIEZA
LLEGADA
MARCO Y TAPA DE CONCRETO PARA AGUA POTABLE 12.00

12.00
12.00
TAPA Y MARCO DE Fo.Fo.
6.00
TUBERIA FO.GO. 14.40
0.90
0.60 LOSA REFORZADA CON
MALLA ELECTROSOLDADAD
0.08

6.00 LOSA REFORZADA CON 6X6/4-4


6.00 MALLA ELECTROSOLDADA APLANADO CON MORTERO
6.00
6X6/4-4 CEMENTO-AREA 1:4
Y 1 CM DE ESPESOR
NOTAS DE CONSTRUCCION:
1.00 TERRENO NATURAL 12.00
MURO DE BLOCK
1.0

12.00 CAJA DE OPERACION DE VALVULAS


TORNILLOS CON CABEZA Y TUERCA HEXAGOANL DE 5/8 X 2 1/2" 48.00
ATRAQUE ISOMETRICO 6.00
12.60

6.00
0.20
1.20

0.40
ALZADO

CAJA PARA OPERACION DE VALVULAS


0.20
ZAPATA DE 0.40X0.40X0.20 CON ACERO
No.3 @15CM.
0.20 0.40 ATRAQUE DE 0.20X0.20 DE 1.00M DE
ALTURA, REFORZADO CON ARMEX DE
15X15CM.
VAR. No. 3 @ 10 cm. TAPA DE LAMINA
CANDADO
LOS CAMBIOS QUE SE HAGAN A ESTE A'
0.40 DATOS GENERALES DE LAS CAJAS
PROYECTO QUEDAN A JUICIO DEL
CAJA DIAMETRO DE NUMERO DE A B H

PLANTA RESIDENTE DE OBRA. TIPO VALVULA (mm.) VALVULAS (cm.) (cm.) (cm.) A
T.N.
1 25 a 50 1 70 70 80

2 60 a 75 1 90 100 100

3 100 a 150 1 120 140 100

4 200 1 160 170 120

5 50 a 150 2 90 90 90

12 75 a 150 2 140 110 140

VAR. No. 3 @ 20 cm.

CORTE A - A'

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

También podría gustarte