CALCULO HIDRAULICO DEL RESERVORIO


PROYECTO :
UBICACIÓN : SECTOR CHIWACRO
ELABORADO :

1. DATOS DE RIEGO
1.1 CAUDAL DE OFERTA Qe 7.24 lt/seg
1.2 NOMBRE DE LA FUENTE CHACA RIO
1.3 TIPO DE RESERVORIO CONCRETO ARMADO

2. DATOS HIDRAULICOS DEL RESERVORIO


2.1 CARGA HIDRAULICA H= 2.00 m
2.2 COEFICIENTE DE VELOCIDAD c= 0.61 Adim
2.3 ACELERACION DE LA GRAVEDAD g= 9.81 m/seg2
2.4 VELOCIDAD v=c(2gH)0.5 v= 3.82 m/seg

3. SIMULACION DE ALMACENAMIENTO

SIMULACION DE OPERACIÓN DEL RESERVORIO


CAUDAL DE LLENADO CAUDAL DE VOLUMEN DE VOLUMEN DEL
ENTRADA Hr RESERVORIO VOL. HORARIO DESCARGA DESCARGA/DIA RESER.
(lt/seg) (hr) (m3) (lt/seg) (m3) (m3)
7.24 1.00 26.06
7.24 2.00 52.13
7.24 3.00 78.19
7.24 4.00 104.26
NOCTURNO

7.24 5.00 130.32


7.24 6.00 156.38
7.24 7.00 182.45
7.24 8.00 208.51
7.24 9.00 234.58
7.24 10.00 260.64
7.24 11.00 286.70
7.24 12.00 312.77 14.48 313
7.24 1.00 26.06 14.48 52.1
7.24 2.00 52.13 14.48 104.3
7.24 3.00 78.19 14.48 156.4
7.24 4.00 104.26 14.48 208.5
DIURNO

7.24 5.00 130.32 14.48 260.6


7.24 6.00 156.38 14.48 312.8
7.24 7.00 182.45 14.48 364.9
7.24 8.00 208.51 14.48 417.0
7.24 9.00 234.58 14.48 469.2
7.24 10.00 260.64 14.48 521.3
7.24 11.00 286.70 14.48 573.4
7.24 12.00 312.77 14.48 625.54

4. RESULTADOS
4.1 VOLUMEN DEL RESERVORIO REQUERIDO V = 313.0 m3
4.2 CAUDAL DE DESCARGA DESEADA Qd = 14.48 lt/seg
4.3 TIEMPO DE LLENADO TL = 12.0 hr
4.4 TIEMPO DE DESCARGA Ts = 6.0 hr
4.5 DIAMETRO TUBERIA DE DESCARGA φ = 2.73 pulg
4.6 DIAMETRO TUBERIA DE DESCARGA φ = 4.00 pulg
AYUM
CALCULO HIDRAULICO DEL RESERVORIO
PROYECTO :
UBICACIÓN : SECTOR QUISWARPUQUIO
ELABORADO :

1. DATOS DE RIEGO
1.1 CAUDAL DE OFERTA Qe 25.00 lt/seg
1.2 NOMBRE DE LA FUENTE CCASCCARUMI I
1.3 TIPO DE RESERVORIO CONCRETO ARMADO

2. DATOS HIDRAULICOS DEL RESERVORIO


2.1 CARGA HIDRAULICA H= 2.00 m
2.2 COEFICIENTE DE VELOCIDAD c= 0.61 Adim
2.3 ACELERACION DE LA GRAVEDAD g= 9.81 m/seg2
2.4 VELOCIDAD v=c(2gH)0.5 v= 3.82 m/seg

3. SIMULACION DE ALMACENAMIENTO

SIMULACION DE OPERACIÓN DEL RESERVORIO


CAUDAL DE LLENADO CAUDAL DE VOLUMEN DE VOLUMEN DEL
ENTRADA Hr RESERVORIO VOL. HORARIO DESCARGA DESCARGA/DIA RESER.
(lt/seg) (hr) (m3) (lt/seg) (m3) (m3)
25.00 1.00 90.00
25.00 2.00 180.00
25.00 3.00 270.00
25.00 4.00 360.00
NOCTURNO

25.00 5.00 450.00


25.00 6.00 540.00
25.00 7.00 630.00
25.00 8.00 720.00
25.00 9.00 810.00
25.00 10.00 900.00
25.00 11.00 990.00
25.00 12.00 1080.00 50.00 1080
25.00 1.00 90.00 50.00 180.0
25.00 2.00 180.00 50.00 360.0
25.00 3.00 270.00 50.00 540.0
25.00 4.00 360.00 50.00 720.0
DIURNO

25.00 5.00 450.00 50.00 900.0


25.00 6.00 540.00 50.00 1,080.0
25.00 7.00 630.00 50.00 1,260.0
25.00 8.00 720.00 50.00 1,440.0
25.00 9.00 810.00 50.00 1,620.0
25.00 10.00 900.00 50.00 1,800.0
25.00 11.00 990.00 50.00 1,980.0
25.00 12.00 1080.00 50.00 2160.00

4. RESULTADOS
4.1 VOLUMEN DEL RESERVORIO REQUERIDO V = 1,080.0 m3
4.2 CAUDAL DE DESCARGA DESEADA Qd = 50.00 lt/seg
4.3 TIEMPO DE LLENADO TL = 12.0 hr
4.4 TIEMPO DE DESCARGA Ts = 6.0 hr
4.5 DIAMETRO TUBERIA DE DESCARGA φ = 5.08 pulg
4.6 DIAMETRO TUBERIA DE DESCARGA φ = 6.00 pulg
AYUM
CALCULO HIDRAULICO DEL RESERVORIO
PROYECTO :
UBICACIÓN : SECTOR QUISWARPUQUIO
ELABORADO :

1. DATOS DE RIEGO
1.1 CAUDAL DE OFERTA Qe 7.46 lt/seg
1.2 NOMBRE DE LA FUENTE CCASCCARUMI II
1.3 TIPO DE RESERVORIO CONCRETO ARMADO

2. DATOS HIDRAULICOS DEL RESERVORIO


2.1 CARGA HIDRAULICA H= 2.00 m
2.2 COEFICIENTE DE VELOCIDAD c= 0.61 Adim
2.3 ACELERACION DE LA GRAVEDAD g= 9.81 m/seg2
2.4 VELOCIDAD v=c(2gH)0.5 v= 3.82 m/seg

3. SIMULACION DE ALMACENAMIENTO

SIMULACION DE OPERACIÓN DEL RESERVORIO


CAUDAL DE LLENADO CAUDAL DE VOLUMEN DE VOLUMEN DEL
ENTRADA Hr RESERVORIO VOL. HORARIO DESCARGA DESCARGA/DIA RESER.
(lt/seg) (hr) (m3) (lt/seg) (m3) (m3)
7.46 1.00 26.86
7.46 2.00 53.71
7.46 3.00 80.57
7.46 4.00 107.42
NOCTURNO

7.46 5.00 134.28


7.46 6.00 161.14
7.46 7.00 187.99
7.46 8.00 214.85
7.46 9.00 241.70
7.46 10.00 268.56
7.46 11.00 295.42
7.46 12.00 322.27 14.92 322
7.46 1.00 26.86 14.92 53.7
7.46 2.00 53.71 14.92 107.4
7.46 3.00 80.57 14.92 161.1
7.46 4.00 107.42 14.92 214.8
DIURNO

7.46 5.00 134.28 14.92 268.6


7.46 6.00 161.14 14.92 322.3
7.46 7.00 187.99 14.92 376.0
7.46 8.00 214.85 14.92 429.7
7.46 9.00 241.70 14.92 483.4
7.46 10.00 268.56 14.92 537.1
7.46 11.00 295.42 14.92 590.8
7.46 12.00 322.27 14.92 644.54

4. RESULTADOS
4.1 VOLUMEN DEL RESERVORIO REQUERIDO V = 322.0 m3
4.2 CAUDAL DE DESCARGA DESEADA Qd = 14.92 lt/seg
4.3 TIEMPO DE LLENADO TL = 12.0 hr
4.4 TIEMPO DE DESCARGA Ts = 6.0 hr
4.5 DIAMETRO TUBERIA DE DESCARGA φ = 2.78 pulg
4.6 DIAMETRO TUBERIA DE DESCARGA φ = 4.00 pulg
CALCULO HIDRAULICO DEL RESERVORIO

PROYECTO :
UBICACIÓN : SECTOR QUISWARPUQUIO
ELABORADO :

1. DATOS DE RIEGO
1.1 CAUDAL ENTRADA Qe 2.70 lt/seg
1.2 NOMBRE DE LA FUENTE CHUÑUNAPAMPA
1.3 TIPO DE RESERVORIO CONCRETO ARMADO

2. DATOS HIDRAULICOS DEL RESERVORIO


2.1 CARGA HIDRAULICA H= 2.00 m
2.2 COEFICIENTE DE VELOCIDAD c= 0.61 Adim
2.3 ACELERACION DE LA GRAVEDAD g= 9.81 m/seg2
2.4 VELOCIDAD v=c(2gH)0.5 v= 3.82 m/seg

3. SIMULACION DE ALMACENAMIENTO

SIMULACION DE OPERACIÓN DEL RESERVORIO


CAUDAL DE LLENADO VOL. CAUDAL DE VOLUMEN DE VOLUMEN DEL
ENTRADA Hr RESERVORIO HORARIO DESCARGA DESCARGA/DIA RESER.
(lt/seg) (hr) (m3) (lt/seg) (m3) (m3)
2.70 1.00 9.72
2.70 2.00 19.44
2.70 3.00 29.16
2.70 4.00 38.88
NOCTURNO

2.70 5.00 48.60


2.70 6.00 58.32
2.70 7.00 68.04
2.70 8.00 77.76
2.70 9.00 87.48
2.70 10.00 97.20
2.70 11.00 106.92
2.70 12.00 116.64 5.40 117
2.70 1.00 9.72 5.40 19.4
2.70 2.00 19.44 5.40 38.9
2.70 3.00 29.16 5.40 58.3
2.70 4.00 38.88 5.40 77.8
DIURNO

2.70 5.00 48.60 5.40 97.2


2.70 6.00 58.32 5.40 116.6
2.70 7.00 68.04 5.40 136.1
2.70 8.00 77.76 5.40 155.5
2.70 9.00 87.48 5.40 175.0
2.70 10.00 97.20 5.40 194.4
2.70 11.00 106.92 5.40 213.8
2.70 12.00 116.64 5.40 233.28
4. RESULTADOS
4.1 VOLUMEN DEL RESERVORIO REQUERIDO V = 117.0 m3
4.2 CAUDAL DE DESCARGA DESEADA Qd = 5.40 lt/seg
4.3 TIEMPO DE LLENADO TL = 12.0 hr
4.4 TIEMPO DE DESCARGA Ts = 6.0 hr
4.5 DIAMETRO TUBERIA DE DESCARGA φ = 1.67 pulg
4.6 DIAMETRO TUBERIA DE DESCARGA φ = 2.00 pulg
VOLUMEN DE ALMACENAMIENTO

PRESA : LLULLUCHA.

ALTITUD AREA AREA ha*m VOL. PARC VOL. ACUM VOLUMEN


(ms.n.m.) (m2) (has) (m3) (m3) (m3) (MMC)
3990.0 0.00 0.000
3991.0 78.10 0.008 0.004 39.05 39.05 0.000039
3992.0 349.74 0.035 0.021 213.92 252.97 0.000253
3993.0 1231.30 0.123 0.079 790.52 1043.49 0.001043
3994.0 2150.60 0.215 0.169 1690.95 2734.44 0.002734
3995.0 2592.84 0.259 0.237 2371.72 5106.16 0.005106
3996.0 3015.01 0.302 0.280 2803.93 7910.09 0.007910
3997.0 3020.00 0.302 0.281 2806.42 10,716.51 0.010717
CURVA: ALTITUD - AREA Y VOLUMEN DE ALMACENAMIENTO
PRESA : LLULLUCHA.

3998.0 CURVA
CURVA DE ALTTITUD ALTITUD
& VOLUMEN - VOLUMEN - PRESA QUIÑOTA
ALTITUD VOLUMEN AREA
ALTITUD (m.s.n.m)

(m.s.n.m) (m3) (M2)


3996.0 3990.0 0.00 0.0
3991.0 39.05 78.1
3992.0 252.97 349.7
3993.0 1043.49 1231.3
3994.0
3994.0 2734.44 2150.6
3995.0 5106.16 2592.8
3997.0 10716.51 3020.0
3992.0

3990.0

3988.0

3986.0
0 2000 4000 6000 8000 10000 12000
VOLUMEN (M3)
SIMULACION DE OPERACIÓN DEL RESERVORIO
PRESA : LLULLUCHA.

1. DATOS
TIEMPO DE RIEGO (Hr) Tr = 12.0 Hr
MODULO DE RIEGO Mr = 0.65 Adim
AREA TOTAL DE RIEGO Ar = Has

2. SIMULACION DE ALMACENAMIENTO

SIMULACION DE OPERACIÓN DEL RESERVORIO


CAUDAL DE CAUDAL DE VOLUMEN AGUA VOLUMEN AGUA VOLUMEN DEL AREA QUE
ENTRADA SALIDA ALMACENAMTO. DESEMBALSE RESERVORIO RIEGA
(lt/seg) (lt/seg) (m3) (m3) (m3) (has)
1.29 0.00 111.46 0.00 -111.46 0.00
1.29 1.00 111.46 43.20 -68.26 1.53
1.29 2.00 111.46 86.40 -25.06 3.06
1.29 4.00 111.46 172.80 61.34 6.13
1.29 6.00 111.46 259.20 147.74 9.19
1.29 8.00 111.46 345.60 234.14 12.26
1.29 10.00 111.46 432.00 320.54 15.32
1.29 11.00 111.46 475.20 363.74 16.86
1.29 12.00 111.46 518.40 406.94 18.39
1.29 10.92 111.46 471.74 360.29 16.73

3. VOLUMEN DEL RESERVORIO


VOLUMEN DESCARGADO V= 361.0 m3
VOLUMEN TOTAL EMBALSE VT 10,716.5 m3
DURACION 29.7 dias
FRECUENCIA f= 5.0 dias
18 Hr MODULO DE Mr Lt/seg/ha 0.286 0.197 0.105 0.309 0.401 0.406 0.479 0.551
DEMANDA DEQDA Lt/seg 0.229 0.157 0.084 0.247 0.120 0.122 0.144 0.165
0.653 0.454 0.413 0.241
0.196 0.181 0.330 0.193
SISTEMA OPERATIVO DE RESERVORIOS
IT ESTRUCTURA FUENTE ENTRADA UBICACION VOL. CALC. VOLUMEN Q descarga Q demanda CONDICION
01 RESERVORIO I WAYLLAPUQUIO 350 m3 9.04 CONCRETO ARMADO
02 RESERVORIO II ONCHIWAYPUQUIO 10 m 3
3.62 CONCRETO ARMADO
03 RESERVORIO III INCACHACA 313 350 m3 14.48 CONCRETO ARMADO
04 RESERVORIO IV CHUÑUNAPAMPA 150 m 3
5.43 CONCRETO ARMADO
05 RESERVORIO V CCASCCARUMI I 1080 1,100 m3 50.00 CONCRETO ARMADO
06 RESERVORIO VI CCASCCARUMI II 322 350 m 3
14.92 CONCRETO ARMADO
07 EMBALSE Y DIQUE LLULLUCHA 10,716.51 200 m3 5.43 CONCRETO MAMPOSTERICO

DIMENSIONAMIENTO
VOLUMEN
IT ESTRUCTURA FUENTE ENTRADA LARGO (L) ANCHO (A) ALTURA (H) VOLUMEN CONDICION
(m3)
01 RESERVORIO I WAYLLAPUQUIO 350 15.0 10.0 2.40 360.00 CONCRETO ARMADO
02 RESERVORIO II ONCHIWAYPUQUIO 10 2.9 2.9 1.20 10.09 CONCRETO ARMADO
03 RESERVORIO III INCACHACA 350 15.0 10.0 2.40 360.00 CONCRETO ARMADO
04 RESERVORIO IV CHUÑUNAPAMPA 150 9.4 8.0 2.00 150.40 CONCRETO ARMADO
05 RESERVORIO V CCASCCARUMI I 1,100 28.5 19.0 2.00 1,083.00 CONCRETO ARMADO
06 RESERVORIO VI CCASCCARUMI II 350 15.0 10.0 2.40 360.00 CONCRETO ARMADO
07 EMBALSE Y DIQUE LLULLUCHA 200 12.0 8.0 2.10 201.60 CONCRETO ARMADO
UBICACIÓN DE RESERVORIOS Y EMBALSE EN COORDENADAS UTM
1. WAYLLAPUQUIO
ENE FEB MAR ABR MAY JUN JUL AGO
31 28 31 30 31 30 31 31
Q descarga (lt/s) 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
Q ofertado (lt/s) 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01
VOLUMEN (m3/hr) 3.64 3.64 3.64 3.64 3.64 3.64 3.64 3.64
HORAS ALMAC. (Hr) 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00
VOLUMEN (m3/mes) 2,705.2 2,443.4 2,705.2 2,617.9 2,705.2 2,617.9 2,705.2 2,705.2
VOLUMEN EMBALSE 10,558.9 m3

2. ONCHIWAYPUQUIO
ENE FEB MAR ABR MAY JUN JUL AGO
31 28 31 30 31 30 31 31
Q descarga (lt/s) 3.62 3.62 3.62 3.62 3.62 3.62 3.62 3.62
Q ofertado (lt/s) 0.246 0.246 0.246 0.246 0.246 0.246 0.246 0.246
VOLUMEN (m3/hr) 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89
HORAS ALMAC. (Hr) 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00
VOLUMEN (m3/mes) 658.9 595.1 658.9 637.6 658.9 637.6 658.9 658.9
VOLUMEN RESERVORIO 2,571.8 m3

4. LLULLUCHA
ENE FEB MAR ABR MAY JUN JUL AGO
31 28 31 30 31 30 31 31
Q descarga (lt/s) 5.43 5.43 5.43 5.43 5.43 5.43 5.43 5.43
Q ofertado (lt/s) 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190
VOLUMEN (m3/hr) 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68
HORAS ALMAC. (Hr) 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00
VOLUMEN (m3/mes) 508.9 459.6 508.9 492.5 508.9 492.5 508.9 508.9
VOLUMEN RESERVORIO 2,478.8 m3
SEP OCT NOV DIC
30 31 30 31
2.00 2.00 2.00 2.00
1.01 1.01 1.01 1.01
3.64 3.64 3.64 3.64
24.00 24.00 24.00 24.00
2,617.9 2,705.2 2,617.9 2,705.2

SEP OCT NOV DIC


30 31 30 31
3.62 3.62 3.62 3.62
0.246 0.246 0.246 0.246
0.89 0.89 0.89 0.89
24.00 24.00 24.00 24.00
637.6 658.9 637.6 658.9

SEP OCT NOV DIC


30 31 30 31
5.43 5.43 5.43 5.43
0.190 0.190 0.190 0.190
0.68 0.68 0.68 0.68
24.00 24.00 24.00 24.00
492.5 508.9 492.5 508.9