OBRA :
TAMIZ ABERT. mm. PESO RET. %RET. PARC. %RET. AC. % Q' PASA HUSO B DESCRIPCIÓN DE LA MUESTRA
3" 76.200 0.0 0.0 100.0 PESO TOTAL = 5,000.0 gr
2 1/2" 63.500 0.0 0.0 100.0 PESO LAVADO = 4908.4 gr
2" 50.800 0.00 0.0 0.0 100.0 100 - 100 PESO FINO = 500.0 gr
1 1/2" 38.100 308.10 6.2 6.2 93.8 LÍMITE LÍQUIDO = 17.50 %
1" 25.400 269.10 5.4 11.5 88.5 75 - 95 LÍMITE PLÁSTICO = 15.09 %
3/4" 19.050 417.6 8.4 19.9 80.1 ÍNDICE PLÁSTICO = 2.41 %
1/2" 12.700 499.1 10.0 29.9 70.1 CLASF. AASHTO = A-1-a 0
3/8" 9.525 334.9 6.7 36.6 63.4 40 - 75 CLASF. SUCCS = GP
1/4" 6.350 0.0 36.6 63.4 Ensayo Malla #200 P.S.Seco. P.S.Lavado % 200
#4 4.760 870.5 17.4 54.0 46.0 30 - 60 5000.0 4908.4 1.8
#8 2.360 0.0 54.0 46.0 % Grava = 54.0 %
# 10 2.000 90.5 8.3 62.3 37.7 20 - 45 %Arena = 44.2 %
# 30 0.600 0.0 62.3 37.7 % Fino = 1.8 %
# 40 0.420 214.6 19.8 82.1 17.9 15 - 30 P.S.H 506.6
# 50 0.300 0.0 82.1 17.9 P.S.S 486.5
# 80 0.180 0.0 82.1 17.9 AGUA 20.1
# 100 0.150 162.5 15.0 97.0 3.0 PESO TARRO
# 200 0.075 12.5 1.2 98.2 1.8 5 - 15 SUELO SECO 486.5
< # 200 FONDO 19.9 1.8 100.0 0.0 % HUMEDAD 4.1
FRACCIÓN 500.0 Coef. Uniformidad 46 Índice de Consistencia
TOTAL 5,000.0 Coef. Curvatura 0.8 7.3
Descripción suelo: Grava pobremente gradada con arena Pot. de Expansión Bajo Estable
CURVA GRANULOMÉTRICA
P orcentaje que pasa (% )
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
100
90
80
70
60
50
40
30
20
10
0
2
2
2
2
2
2
2
LÍMITES DE ATTERBERG
MTC E 110 Y E 111 - ASTM D 4318 - AASHTO T-89 Y T-90
OBRA :
0
LÍMITE LÍQUIDO
Nº TARRO 3 3 24
Nº DE GOLPES 14 22 32
LÍMITE PLÁSTICO
Nº TARRO 4 5
DIAGRAMA DE FLUIDEZ
20.0
19.0
18.0
17.0
EQUIVALENTE DE ARENA
MTC E 114 - ASTM D 2419 - AASHTO T-176
OBRA :
0
CANTERA :
IDENTIFICACIÓN
MUESTRA ###
1 2 3 4
Hora de entrada a saturación 3:30 3:32 3:34
Hora de salida de saturación (más 10' ) 3:40 3:42 3:44
Hora de entrada a decantación 3:42 3:44 3:46
Hora de salida de decantación (más 20' ) 4:02 4:04 4:06
Altura máxima de material fino cm 8.31 8.60 9.00
Altura máxima de la arena cm 2.40 2.50 2.60
Equivalente de arena % 29 30 29
Equivalente de arena promedio % 29.3
Observaciones:
LABORATORIO DE SUELOS, CONCRETO Y ASFALTO
OBRA :
0
COMPACTACIÓN
MÉTODO DE COMPACTACIÓN : "A"
NUMERO DE GOLPES POR CAPA : 56
NUMERO DE CAPAS : 5
NÚMERO DE ENSAYO 1 2 3 4
PESO (SUELO + MOLDE) (gr) 10950 11080 11218 11287
PESO DE MOLDE (gr) 6310 6310 6310 6310
PESO SUELO HÚMEDO (gr) 4640 4770 4908 4977
VOLUMEN DEL MOLDE (cm3) 2141 2141 2141 2141
DENSIDAD HÚMEDA (gr/cm3) 2.167 2.228 2.292 2.325
DENSIDAD SECA (gr/cm3) 2.114 2.132 2.155 2.148
CONTENIDO DE HUMEDAD
RECIPIENTE Nº s/n s/n s/n s/n
PESO (SUELO HÚMEDO + TARA) (gr) 189.11 221.96 234.00 210.99
PESO (SUELO SECO + TARA) (gr) 184.50 212.40 220.00 195.00
PESO DE LA TARA (gr)
PESO DE AGUA (gr) 4.61 9.56 14.00 15.99
PESO DE SUELO SECO (gr) 184.50 212.40 220.00 195.00
CONTENIDO DE HUMEDAD (%) 2.50 4.50 6.36 8.20
MÁXIMA DENSIDAD SECA (gr/cm3) 2.158 ÓPTIMO CONTENIDO DE HUMEDAD (%) 7.10
CURVA DE COMPACTACIÓN
D ENSID A D SEC A (gr/cm3)
2.170
2.160
2.150
2.140
2.130
2.120
2.110
2.100
2.0 4.0 6.0 8.0 10.0
CONTENIDO DE HUMEDAD (%)
LABORATORIO DE SUELOS, CONCRETO Y ASFALTO
ENSAYO DE CBR
MTC E 132 - ASTM D 1883 - AASHTO T-193
Molde Nº 1 2 3
Nº Capa 5 5 5
Golpes por capa Nº 56 25 12
Cond. de la muestra NO SATURADO SATURADO NO SATURADO SATURADO NO SATURADO SATURADO
Peso molde + suelo húmedo (gr) 12570 13897 12326 11942 11839 11635
Peso de molde (gr) 7725 7775 7455
Peso del suelo húmedo (gr) 4845 4551 4384
Volumen del molde (cm3) 2114 2114 2120
Densidad húmeda (gr/cm3) 2.292 2.153 2.068
Humedad (%) 7.26 7.10 7.30
Densidad seca (gr/cm3) 2.137 2.010 1.927
Tarro Nº - - -
Tarro + Suelo húmedo (gr) 243.18 252.68 229.43
Tarro + Suelo seco (gr) 229.33 238.38 216.35
Peso del Agua (gr) 13.85 14.30 13.08
Peso del tarro (gr) 38.51 36.98 37.19
Peso del suelo seco (gr) 190.82 201.40 179.16
Humedad (%) 7.26 7.10 7.30
Promedio de Humedad (%) 7.26 7.10 7.30
EXPANSIÓN
PENETRACIÓN
ENSAYO DE CBR
MTC E 132 - ASTM D 1883 - AASHTO T-193
OBRA :
0
2.25
2.20
C.B.R. AL 100% DE M.D.S. (%) 0.1": 392.0 0.2": 556.1
C.B.R. AL 95% DE M.D.S. (%) 0.1": 275.5 0.2": 391.3
2.15
1.95
OBSERVACIONES:
0.0 65.0 130.0 195.0 260.0 325.0 390.0 455.0 520.0 585.0
CBR (%)
CBR 0.1 CBR 0.2
Row 42 Row 42
X 0 600 #0## 300
800.0 120.0
600.0
760.0
720.0 560.0 110.0
680.0 520.0
100.0
640.0
480.0
600.0 90.0
440.0
560.0
520.0 400.0 80.0
480.0 360.0
70.0
440.0
320.0
400.0 60.0
280.0 f(x) = 4034.114072 x³ − 1357.824247 x² + 248.5057319 x
360.0
320.0 50.0
240.0
280.0
200.0 40.0
240.0
200.0 160.0
30.0
160.0 120.0
120.0 20.0
80.0
80.0 f(x) = − 253.540351 x³ + 433.698881 x² f(x) = 3132.3447 x³ − 1271.783456 x² + 380.3556122 x
+ 269.501306 x 40.0 10.0
40.0
0.0
6.120864280891 0.0 0.0
-0.1 0.0 0.1 0.2 0.3 -0.1 0.0 0.1 0.2 0.3 0.0 0.1 0.2 0.3
LABORATORIO DE SUELOS, CONCRETO Y ASFALTO
OBRA :
0
Tamiz Gradaciones
Pasa - Retiene A B C D
No de esferas 12 11 8 6
OBSERVACIONES :
MINISTERIO DE TRANSPORTES Y COMUNICACIONES
PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL - CONCESIONES
PROVÍAS NACIONAL
DATOS DE LA MUESTRA
AGREGADO GRUESO
OBSERVACIONES:
CONTRATISTA SUPERVISIÓN
PROVÍAS NACIONAL
VIMENTOS
REGADOS
MENTOS
PROMEDIO
ING. RESPONSABLE
LABORATORIO DE SUELOS, CONCRETO Y ASFALTO
P
(P+PO) - (PS)
OBSERVACIONES:
CONSULTORES T & F AMAZONICOS S.A.C
ESTUDIO DE SUELOS, CONCRETO Y ASFALTO ALQUILER DE EQUIPOS DE LABORATORIO
Jr: Yurimaguas Nº 465
Banda de Shilcayo
Cel: 942932814 - 942847729
RPM: #942932814 - #119533
OBSERVACIONES:
CONSULTORES T & F AMAZONICOS S.A.C
ESTUDIO DE SUELOS, CONCRETO Y ASFALTO ALQUILER DE EQUIPOS DE LABORATORIO
Jr: Yurimaguas Nº 465
Banda de Shilcayo
Cel: 942932814 - 942847729
RPM: #942932814 - #119533
Observaciones:
CONSULTORES T & F AMAZONICOS S.A.C
ESTUDIO DE SUELOS, CONCRETO Y ASFALTO ALQUILER DE EQUIPOS DE LABORATORIO
Jr: Yurimaguas Nº 465
Banda de Shilcayo
Cel: 942932814 - 942847729
RPM: #942932814 - #119533
ANÁLISIS CUANTITATIVO
AGREGADO GRUESO
Peso
TAMAÑO Peso Peso ret. Pérdida Pérdida
Gradación fracción Nº de
requerido después de corregida Nº de partículas
Original (%) ensayada partículas
Pasa Retiene (g) ensayo (g) Peso (gr) % (%)
(g)
2 1/2" 2" 3000±300 0.0 0.0 0.00
2" 1 1/2" 2000±200 0.0 0.0 0.00
1 1/2" 1" 10.5 1000±50 1000 980.0 20.0 2.0 0.21
1" 3/4" 24.6 500±30 510 483.0 27.0 5.3 1.30
3/4" 1/2" 41.8 670±10 675 640.0 35.0 5.2 2.17
1/2" 3/8" 9.3 330±5 330 295.0 35.0 10.6 0.99
3/8" Nº 4 13.8 300±5 301 290.0 11.0 3.7 0.50
TOTALES 100.0 2816.0 2688.0 5.17
OBRA :
0
ENSAYO N° 1 2 3 4
(1) Peso muestra (gr) 650.00 680.00 695.00
Observaciones :
LABORATORIO DE SUELOS, CONCRETO Y ASFALTO
OBRA :
0
Nº del recipiente 30 1 30
Peso de recip. + suelo humedo 182.90 941.60 182.90
Peso del recip.+ suelo seco 180.65 885.00 180.65
Tara 30.70 0.00 30.70
Peso del agua 2.25 56.60 2.25
Peso del suelo seco 149.95 885.00 149.95
Contenido de humedad (%) 1.50 6.40 1.50
Observaciones :
CONSULTORES T & F AMAZONICOS S.A.C
ESTUDIO DE SUELOS, CONCRETO Y ASFALTO ALQUILER DE EQUIPOS DE LABORATORIO
Jr: Las palmeras Nº 491
Banda de Shilcayo
Cel: 942932814 - 942820739
ÍNDICE DE DURABILIDAD
MTC E 214 - AASHTO T-210 - ASTM D 3744
AGREGADO FINO
IDENTIFICACIÓN
MUESTRA UNIDAD Promedio
1 2 3 4
Tamaño máximo (pasa malla Nº 4) mm 4.76 4.76 4.76
Hora de entrada a saturación 10:20 10:22 10:24
Hora de salida de saturación (mas 10´) 10:30 10:32 10:34
Hora de entrada a decantación 10:32 10:34 10:36
Hora de salida de decantación (mas 20´) 10:52 10:54 10:56
Altura máxima de material fino mm 6.80 6.90 6.90
Altura máxima de la arena mm 4.00 4.00 4.00
Índice de durabilidad % 59 58 58 59
Observaciones:
MINISTERIO DE TRANSPORTES Y COMUNICACIONES
PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL - CONCESIONES
PROVÍAS NACIONAL
OBRA : Nº REGISTRO :
TRAMO : TÉCNICO :
MATERIAL : BASE GRANULAR ING. RESP. :
CALICATA : RIO MAYO FECHA :
MUESTRA : #REF! HECHO POR :
PROFUND. : 44504 DEL KM :
CANTERA : Nueva Cajamarca AL KM :
UBICACIÓN : CARRIL :
CONTENIDO ORGÁNICO
ENSAYO N° 1 2 3 PROMEDIO
(B) Peso del crisol + suelo seco después de la ignición (gr) 148.65 144.44 146.90
(C) Peso del crisol (gr) 107.07 108.53 107.54
Observaciones :
CONTRATISTA: SUPERVISION: