Está en la página 1de 8

ITEM DESCRIPCION UND

01 OBRAS PRELIMINARES
01.01 BANNER DE IDENTIFICACION DE LA OBRA 6.00x1.50M und
01.02 LIMPIEZA PERMANENTE DE OBRA m2
01.03 ALQUILER DE LOCAL PARA LA OBRA mes
02 TRABAJOS PRELIMINARES
02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb
02.02 TRAZO Y REPLANTEO PARA VEREDAS, RAMPAS Y MARTILLOS m2
02.03 TRAZO Y REPLANTEO PARA PISTAS km
03 DEMOLICIONES
03.01 CORTE Y PERFILADO DE VEREDAS, RAMPAS Y MARTILLOS m
03.02 DEMOLICION DE VEREDAS LOSAS E=0.10M C/EQUIPO m2
03.03 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2
04 MOVIMIENTO DE TIERRAS
04.01 EXCAVACION A NIVEL SUBRASANTE PARA VEREDAS m3
04.02 EXCAVACION DE ZANJAS PARA SARDINEL PERALTADO DE BORDE (0.15x0.20M) m3
04.03 EXCAVACION A NIVEL SUBRASANTE PARA PISTAS MANUAL m3
04.04 ELIMINACION DE DESMONTE,cargador s/llantas inc.volquete,D=10km m3
05 VEREDAS
05.01 REFINE,CONFORMACION Y COMPACTACION CON MAQUINA A NIVEL m2
05.02 BASE DE AFIRMADO E=0.10M PARA VEREDAS Y MARTILLOS m2
05.03 RAMPA DE CONCRETO PARA MINUSVALIDOS DE 1.00x1.50M m2
05.04 VEREDAS DE CONCRETO E=4" F'C=175KG/CM2, INC ENCOFRADO Y B m2
05.05 JUNTAS ASFALTICAS E=1"-3/8" PARA VEREDAS m
05.06 VEREDAS CON ADOQUIN
05.06.01 COLOCACION DE ADOQUINES PARA VEREDA, INC CAMA DE ARENA m2
06 SARDINEL
06.01 SARDINEL SUMERGIDO DE CONFINAMIENTO
06.01.01 CONCRETO PREMESCLADO F'C=175 KG/CM2 P/SARDINEL SUMERGIDO INC ENCOFRADO m
06.02 SARDINEL PERALTADO DE BORDE
06.02.01 CONCRETO F'C=175 KG/CM2, PARA SARDINEL DE BORDE m
06.02.02 ENCOFRADO Y DESENCOFRADO PARA SARDINEL PERALTADO m2
06.02.03 ACERO CORRUGADO FY= 4200 KG/CM2 kg
06.02.04 JUNTAS ASFALTICAS EN SARDINELES m
06.02.05 RESANE DE BORDE DE SARDINEL m
07 PAVIMENTOS
07.01 CONFORMACION DE SUBRASANTE MANUAL m2
07.02 BASE GRANULAR E=0.20 m m2
07.03 SELLADO DE GRIETAS EN GENERAL m
07.04 RIEGO DE LIGA m2
07.05 CARPETA ASFALTICA DE 1 1/2" m2
07.06 CAPA NIVELANTE ASFALTICA m3
07.07 GIBAS DE ASFALTO H=0.07m m2
08 SEÑALIZACION
08.01 SEÑALIZACION HORIZONTAL
08.01.01 SEÑALIZACION HORIZONTAL(LINEA CONTINUA BLANCA) m
08.01.02 SEÑALIZACION HORIZONTAL(LINEA DISCONTINUA) m
08.01.03 SEÑALIZACION HORIZONTAL SIMBOLO Y LETRAS m2
08.01.04 PINTURA DE SARDINELES DE VEREDAS m
08.02 SEÑALIZACION VERTICAL
08.02.01 POSTE INDICADOR DE CALLES und
08.02.02 SEÑAL PREVENTIVA und
08.02.03 SUMINISTRO E INSTALACION DE PAPELERA METALICA und
09 SEGURIDAD Y SALUD
09.01 ELABORACION,IMPLEMENTACION Y ADMINISTRACION PLAN DE SEGURIDAD glb
09.02 EQUIPO DE PROTECCION INDIVIDUAL glb
09.03 CAPACITACION DE SEGURIDAD Y SALUD glb
10 VARIOS
10.01 NIVELACION DE BUZONES DE DESAGUE und

1 Total costo directo (A)


1 Gastos Generales
2.1 Gastos fijos
2.2 Gastos variables
Total gastos generales (B)
3 Utilidad (c)
SUBTOTAL (A+B+C)
4 IGV
5 Monto de la Oferta
PU PARCIAL (S/.) TOTAL (S/.)
3,912.46 3,912.46
3.00 350.00 1,050.00
2,724.92 0.50 1,362.46
1.50 1,000.00 1,500.00
2,623.86 2,623.86
1.00 2,037.54 2,037.54
166.59 1.42 236.56
0.29 1,206.08 349.76
11,337.69 11,337.69
180.93 17.09 3,092.09
163.34 15.78 2,577.51
75.99 74.59 5,668.09
1,627.48 1,627.48
16.33 6.11 99.78
2.77 41.75 115.65
15.20 12.17 184.98
63.91 19.20 1,227.07
12,382.94 12,382.94
192.25 6.78 1,303.46
192.25 12.78 2,456.96
24.95 47.38 1,182.13
88.02 36.73 3,232.97
12.38 6.07 75.15
4,132.27 4,132.27
76.68 52.52 4,132.27
4,799.82 4,799.82
504.20 504.20
30.21 16.69 504.20
4,295.62 4,295.62
62.11 26.70 1,658.34
37.27 18.86 702.91
103.34 3.87 399.93
1.00 7.03 7.03
172.20 8.87 1,527.41
75,031.84 75,031.84
63.91 4.06 259.47
63.91 15.44 986.77
87.60 4.85 424.86
2,558.33 3.84 9,823.99
2,558.33 21.92 56,078.59
12.78 544.43 6,957.82
11.51 43.47 500.34
10,023.54 10,023.54
7,680.10 7,680.10
45.00 11.23 505.35
81.00 11.23 909.63
106.52 29.63 3,156.19
271.76 11.44 3,108.93
2,343.44 2,343.44
4.00 324.86 1,299.44
2.00 322.00 644.00
1.00 400.00 400.00
2,730.00 2,730.00
1.00 2,000.00 2,000.00
1.00 470.00 470.00
1.00 260.00 260.00
718.75 718.75
5.00 143.75 718.75

125,188.38
12,518.84
1,134.34
11,384.50
12,518.84
6,259.42
143,966.64
25,913.99
169,880.63
DESAGREGADO DE GASTOS GENERALES
MEJORAMIENTO DE PISTAS, VEREDAS Y ESCALERAS DE ACCESOS EN EL AA.HH. RODRIGO FRANCO SECTOR
OBRA:
SANTIAGO DE SURCP-LIMA-LIMA
LUGAR: SANTIAGO DE SURCO - LIMA - LIMA

FECHA: ABRIL DEL 2019

COSTO DIRECTO: S/. 125,188.38

I. CARACTERISTICAS
Costo directo
Gastos Generales
Utilidad
Subtotal
IGV
Total

Item Descripción Und.


GASTOS ADMINISTRATIVOS
1 Costo de Preparación de Oferta para Licitación est.

LIQUIDACION DE OBRA
1 Copias, Planos y Documentos est.

IMPUESTOS
1 SENCICO (0.2% presupuesto sin igv) Glb.

Total de Gastos Generales Fijos S/.

Item Descripción Und. Cant. Descripción Incidencia


PERSONAL TECNICO ADMINISTRATIVO
A AREA DE PRODUCCION
1 Especialista en Impacto Ambiental Mes 1.50 0.10
2 Ing. Residente de Obra Mes 1.50 1.00
2 Maestro de Obra Mes 1.50 0.10

B MOVILIZACION Y DESMOVILIZACION
1 Transporte Terrestre del Personal profesional est. 1.50

C EQUIPOS NO INCLUIDOS EN LOS COSTOS DIRECTOS


1 Equipos de Radio Comunicación Mes 1.50
2 Camionetas Pick Up Doble Cabina 4x4 Mes 1.50

D GASTOS FINANCIEROS
1 Carta Fianza de Fiel Cumplimiento de Contrato Glb 1.00

E SEGUROS
1 Seguros de Accidentes Personales
2 Responsabilidad civil contra terceros
Total de Gastos Generales Variables S/.
GENERALES
A.HH. RODRIGO FRANCO SECTOR VIVA EL PERU-MUNICIPALIDAD

125,188.38

125,188.38
12,518.84
6,259.42
143,966.64
25,913.99
169,880.63

Cantidad Precio Unitario S/. Valor Total S/.

1.00 600.00 600.00

1.00 509.30 509.30

0.002 12518.84 25.04

1,134.34

Cantidad Precio Unitario S/. Valor Total S/.

1.00 3200.00 480.00


1.00 3500.00 5,250.00
1.00 1500.00 225.00

1.00 550.00 825.00

1.00 545.00 817.50


0.50 1000.00 750.00

1.00 987.00 987.00

1,500.00
550.00
11,384.50 12,518.84 12,518.84
0.00

También podría gustarte