02 REPARACION
02.01 OBRAS PROVISIONALES
02.01.01 CARTEL DE IDENTIFICACIÓN DE LA OBRA DE 3.60x4.80m Und 1.00
02.01.02 MANTENIMIENTO Y DESVIO DEL TRANSITO Glb 1.00
02.02 OBRAS PRELIMINARES
02.02.01 ELIMINACION DE MATERIAL EXCEDENTE C/ ESPONJAMIENTO m3 799.73
02.03 PARCHADO SUPERFICIAL EN CALZADA DE PAVIMENTO FLEXIBLE
02.03.01 PERFILADO EN BORDES EN AREA DE PARCHADO m 3890.20
02.03.02 CORTE DE BASE EN PARCHE e=15cm m3 499.84
02.03.03 REPOSICION DE BASE EN PARCHE e= 15 cm m2 3332.24
02.03.04 IMPRIMACION ASFALTICA EN PARCHES m2 3332.24
02.03.05 EXTENDIDO Y COMPACTADO DE MEZCLA ASFALTICA EN PARCHES e= 2" m2 3332.24
02.04 SLURRY SEAL e= 10 mm
02.04.01 BARRIDO Y LIMPIEZA P/SLURRY SEAL m2 65693.79
02.04.02 SLURRY SEAL e= 10 mm m2 65693.79
02.05 SALUD Y SEGURIDAD EN OBRA
02.05.01 SEÑALIZACION TEMPORAL DE SEGURIDAD Glb 1.00
02.05.02 CAPACITACION EN SEGURIDAD Y SALUD Glb 1.00
02.05.03 RECURSO PARA PROPUESTA ANTE EMERGENCIAS EN SEGURIDAD Y SA Glb 1.00
ACTIVIDAD : "IMPLEMENTACION DEL SISTEMA DE CICLOVIAS"
PLANILLA DE METRADOS
2.01 OBRAS PROVISIONALES
02.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 x 4 UNIDAD: Und.
CANTIDAD VECES QUE UNIDAD
DESCRIPCION ( Und.) SE REPITE ( Und. )
(1) (2) (3) = (1) x (2)
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 1.00 1.00 1.00
TOTAL: 1.00
TOTAL: 3,890.20
TOTAL: 499.84
SS79 A= 0.00
SS80 A= 0.00
SS81 A= 0.00
SS82 A= 0.00
SS83 A= 0.00
SS84 A= 0.00
SS85 A= 0.00
SS86 A= 0.00
SS87 A= 0.00
SS88 A= 0.00
SS89 A= 0.00
SS90 A= 0.00
SS91 A= 0.00
SS92 A= 0.00
SS93 A= 0.00
SS94 A= 0.00
SS95 A= 0.00
SS96 A= 0.00
SS97 A= 0.00
7.3 AV. AMERICA OESTE
SS181 A= 626.87 626.87
SS182 A= 633.72 633.72
SS183 A= 207.82 207.82
SS184 A= 280.18 280.18
SS185 A= 30.95 30.95
SS186 A= 42.99 42.99
SS187 A= 217.45 217.45
SS188 A= 314.57 314.57
SS189 A= 1560.8 1560.80
SS190 A= 1536.52 1536.52
SS191 A= 897.02 897.02
SS192 A= 864.82 864.82
SS193 A= 1030.26 1030.26
SS194 A= 1033.75 1033.75
SS195 A= 97.99 97.99
SS196 A= 83.98 83.98
SS197 A= 670.17 670.17
SS198 A= 670.38 670.38
8. MIRAFLORES (NO SE CONSIDERARA PARCHES POR PROYECTO IOAR)
TOTAL: 65,693.79