ITEM PARTIDAS
04.00.00 DEMOLICIONES
07.00.00 SARDINELES
09.00.00 VEREDAS
10.00.00 SEÑALIZACION
10.01.00 SEÑALES HORIZONTALES
13.00.00 OTROS
UNIDAD METRADO
UND 1.00
MES 2.00
MES 2.00
GLB 1.00
UND 6.00
UND 6.00
UND 2.00
GLB 1.00
M3 22.59
M3 675.37
M2 710.32
M3 18.83
M3 32.94
M2 3,452.56
M3 2,245.24
M2 3,207.48
3,207.48
M2 3,207.48
M2 3,207.48
M2 3,207.48
M2 3,207.48
M3 3.49
M3 3,959.97
M2 5,000.00
M2 3,207.48
M2 771.07
M3 3.49
M 332.50
M 285.86
M 954.56
M 2,077.57
M2 3,207.48
33.48
M3 10.04
*
M3 12.56
M3 12.56
M3 16.74
M2 111.60
M2 66.96
M 33.48
M3 18.83
M2 69.43
29.42
KG 3,441.38
M2 26.48
757.24
M3 75.72
M2 757.24
M2 757.24
M3 13.14
M3 25.89
M3 25.89
M2 757.24
M2 90.41
M 323.26
M2 757.24
M2 649.84
M2 74.40
M 1,332.00
M 2,664.00
GLB 1.00
UND 50.00
UND 1.00
MES 2.00
GLB 1.00
UND 4.00
DIA 52.00
UND 6.00
GLB 1.00
M2 193.68
193.68
GLB 1.00
4221.302
10727.74
39.35%
1 OBRAS PRELIMINARES
1.01 CARTEL DE OBRA 3.60x4.80
DETALLE
METRADO OBSERVACIONES
UBIC
00 + 000 1.00
DETALLE
METRADO OBSERVACIONES
UBIC
00 + 000 1.00
DETALLE
METRADO OBSERVACIONES
UBIC
00 + 000 1.00
DETALLE
METRADO OBSERVACIONES
UBIC
00 + 000 1.00
DESCRIPCION
METRADO OBSERVACIONES
UBIC
SEÑALES SEGÚN APU 6.00
02.02.00 TRANQUERA DE MADERA MOVIL PARA DESVIACION VEHICULAR (2"x4" L=2.40 M) H=1.20 M
DESCRIPCION
METRADO OBSERVACIONES
UBIC
TRANQUERA 6.00
PROGRESIVA
METRADO OBSERVACIONES
UBIC
00 + 000 2.00
PROGRESIVA
METRADO OBSERVACIONES
UBIC
00 + 000 1.00
CALLE
LONG. ANCHO ALTO METRADO OBSERVACIONES
INICIO FIN
CALLE
LONG. ANCHO AREA/CAD METRADO OBSERVACIONES
INICIO FIN
LADO DERECHO
0 + 061.40 0 + 347.26 285.86 VARIABLE 3,376.84 675.37
E= 0.20
TOTAL = 675.37
CALLE
LONG. ANCHO AREA/CAD METRADO OBSERVACIONES
INICIO FIN
0 + 071.78 0 + 120.00 48.22 VARIABLE 26.00 26.00
0 + 130.00 0 + 189.00 59.00 VARIABLE 169.66 169.66
0 + 195.00 0 + 239.00 44.00 VARIABLE 61.40 61.40
0 + 244.00 0 + 290.00 46.00 VARIABLE 55.20 55.20
0 + 295.00 0 + 347.00 52.00 VARIABLE 32.06 32.06
0 + 361.00 0 + 444.00 83.00 VARIABLE 366.00 366.00
- -
TOTAL = 710.32
CALLE
LONG. ANCHO ALTO METRADO OBSERVACIONES
INICIO FIN
0 + 060.93 0 + 072.93
CAJA Y TAPA 29.42 1.00 1.00 29.42
DESCUENTO 29.42 0.60 0.60 -10.59
- -
TOTAL = 18.83
CALLE
LONG. ANCHO ALTO METRADO OBSERVACIONES
INICIO FIN
PROGRESIVA
METRADO OBSERVACIONES
DE A
PAVIMENTOS 3,376.84 INICIAL Y PERM.
VEREDAS 75.72 INICIAL Y PERM.
TOTAL M2 3,452.56
6 MOVIMIENTO DE TIERRAS
CALLE
LONG. ANCHO AREA/CAD METRADO
INICIO FIN
2245.24
0+320.00 20.00 7.970 167.40
0+340.00 20.00 8.030 160.00
0+347.26 7.26 11.480 70.82
2245.24
CALLE
LONG. ANCHO AREA/CAD METRADO
INICIO FIN
AREA DE PAVIMENTO RIGIDO
0 + 061.40 0 + 347.26 285.86 VARIABLE 3,207.48 3,207.48
E= 1.00
TOTAL = 3,207.48
CALLE
LONG. ANCHO AREA/CAD METRADO
INICIO FIN
Desde calle cuzco hasta avenida Grau
0 + 061.40 0 + 347.26 285.86 VARIABLE 3,207.48 3,207.48
E= 1.00
TOTAL = 3,207.48
CALLE
LONG. ANCHO AREA/CAD METRADO
INICIO FIN
Desde calle cuzco hasta avenida Grau
0 + 061.40 0 + 347.26 285.86 VARIABLE 3,207.48 3,207.48
E= 1.00
TOTAL = 3,207.48
06.01.05 EXTENDIDO, RIEGO Y COMPACTACION DE SUB BASE CON E M2
CALLE
LONG. ANCHO AREA/CAD METRADO
INICIO FIN
desde calle cuzco hasta Grau
0 + 061.40 0 + 347.26 285.86 VARIABLE 3,207.48 3,207.48
E= 1.00
TOTAL = 3,207.48
CALLE
LONG. ANCHO AREA/CAD METRADO
INICIO FIN
PROGRESIVAS
LONG. ANCHO ALTO METRADO
INICIO FIN
CRUCE CON CUZCO 20.00 0.20 0.20 0.80
CRUCE CON AYACUCHO 13.23 0.20 0.20 0.53
CRUCE CON CALLAO 11.92 0.20 0.20 0.48
CRUCE CON MOQUEGUA 12.00 0.20 0.20 0.48
CRUCE CON LIBERTAD 14.03 0.20 0.20 0.56
EMPALME CON GRAU 16.00 0.20 0.20 0.64
TOTAL 3.49
06.01.06 ELIMINACION DE MATERIAL EXCEDENTE M3
CALLE
LONG. ANCHO ALTO METRADO
INICIO FIN
DEMOLICION DE SARDINEL EXISTENTE CON EQUIPO 22.59
DEMOLICION DE PAVIMENTO DE CONCRETO 675.37
DEMOLICION DE VEREDAS LOSAS e=10cm CON EQUIPO 71.03
DEMOLICION DE ESTRUCTURAS DE CONCRETO 18.83
DEMOLICION DE UÑAS EN VEREDAS 32.94
820.76
TOTAL ELIMINACION CON ESPONJAMIENTO E=40% 1,149.07
CORTE MATERIAL CONSOLIDADO 2,245.24
EXCAVACION MANUAL DE ZANJAS PARA UÑAS EN PAVIMENTO 3.49
2,248.72
TOTAL ELIMINACION CON ESPONJAMIENTO E=25% 2,810.90
TOTAL = 3,959.97
PROGRESIVA
METRADO OBSERVACIONES
UBIC
AREA 5,000.00
TOTAL M2 5,000.00
CALLE
LONG. ANCHO AREA/CAD METRADO
INICIO FIN
CALLE
LONG. Nº ALTO METRADO
INICIO FIN
0 + 061.40 0 + 347.26
Perimetro 2,077.57 1.00 0.20 415.51
Varios cruce cuzco 144.26 1.00 0.20 28.85
Transversales entre cuzco - call 12.05 29.00 0.20 69.89
Varios cruce ayacucho 117.54 1.00 0.20 23.51
Varios cruce callao 82.60 1.00 0.20 16.52
longitudinales cuzco callao 125.80 2.00 0.20 50.32
122.51 1.00 0.20 24.50
Transversales entre callao - libe 6.00 24.00 0.20 28.80
central entre callao - libertad 87.05 1.00 0.20 17.41
varios cruce amazonas 54.06 1.00 0.20 10.81
varios cruce libertad 84.48 1.00 0.20 16.90
Transversales entre libertad - g 11.35 13.00 0.20 29.51
longitudinales libertad - grau 61.22 3.00 0.20 36.73
varios grau 9.00 1.00 0.20 1.80
TOTAL = 771.07
PROGRESIVAS
LONG. ANCHO ALTO METRADO
INICIO FIN
CRUCE CON CUZCO 20.00 0.20 0.20 0.80
CRUCE CON AYACUCHO 13.23 0.20 0.20 0.53
CRUCE CON CALLAO 11.92 0.20 0.20 0.48
CRUCE CON MOQUEGUA 12.00 0.20 0.20 0.48
CRUCE CON LIBERTAD 14.03 0.20 0.20 0.56
EMPALME CON GRAU 16.00 0.20 0.20 0.64
TOTAL 3.49
CALLE
LONG. ANCHO AREA/CAD METRADO
INICIO FIN
PROGRESIVAS
LONG. ANCHO METRADO OBSERVACIONES
INICIO FIN
TOTAL 332.50 M
PROGRESIVAS
LONG. ANCHO METRADO OBSERVACIONES
INICIO FIN
LONGITUDINALES
0 + 061.40 0 + 347.26 285.86 285.86
TOTAL 285.86 M
DESCRIPCION
LONG. ANCHO METRADO OBSERVACIONES
PROGRESIVAS
LONG. ANCHO METRADO OBSERVACIONES
INICIO FIN
LONGITUDINALES
0 + 061.40 0 + 347.26 2,077.57 RIMETRO CAD 2,077.57
TOTAL 2,077.57 M
06.02.09 SUMINISTRO Y APLICACION DE CURADOR QUIMICO EN LO M2
CALLE
LONG. ANCHO AREA/CAD METRADO
INICIO FIN
OBSERVACIONES
el espesor de diseño
3,207.48
OBSERVACIONES
3,207.48
OBSERVACIONES
3,207.48
OBSERVACIONES
3,207.48
OBSERVACIONES
3,207.48
OBSERVACIONES
3.49
OBSERVACIONES
3,959.97
OBSERVACIONES
M3
5,000.00
3,207.48
OBSERVACIONES
771.07
OBSERVACIONES
3.49
OBSERVACIONES
3,207.48
OBSERVACIONES
332.50
285.86
954.56
2,077.57
3,207.48
OBSERVACIONES
07.00.00 SARDINELES
07.01.00 MOVIMIENTO DE TIERRAS
CALLE
LONG. ANCHO ALTO METRADO OBSERVACIONES
INICIO FIN
CALLE
LONG. ANCHO ALTO METRADO OBSERVACIONES
INICIO FIN
CALLE
LONG. ANCHO ALTO METRADO OBSERVACIONES
INICIO FIN
CALLE
LONG. ANCHO ALTO METRADO OBSERVACIONES
INICIO FIN
CALLE
LONG. VECES ALTO METRADO OBSERVACION
INICIO FIN
CALLE
LONG. VECES ALTO METRADO OBSERVACIONES
INICIO FIN
CALLE
LONG. ANCHO ALTO METRADO OBSERVACIONES
INICIO FIN
CALLE
LONG. ALTO VECES METRADO OBSERVACIONES
INICIO FIN
CALLE
LONG. ANCHO METRADO OBSERVACIONES
INICIO FIN
CALLE
LONG. ANCHO METRADO OBSERVACIONES
INICIO FIN
CALLE
LONG. ANCHO ALTO METRADO OBSERVACIONES
INICIO FIN
CALLE
LONG. ANCHO ALTO METRADO OBSERVACIONES
INICIO FIN
MARTILLO CUZCO 10.18
MARTILLO CUZCO 8.20
0 + 071.78 0 + 120.00 40.44 1.20 1.00 48.53
DERECHO MARTILLO CUZCO 1.00 19.50
DERECHO MARTILLO AYACUCHO 12.00
38.73 1.20 1.00 46.48
MARTILLO CUZCO 11.25
MARTILLO AYACUCHO 15.10
0 + 130.00 0 + 189.00 51.02 2.50 1.00 127.55
MARTILLO AYACUCHO 15.00
MARTILLO CALLAO 9.10
35.28 1.20 1.00 42.34
MARTILLO AYACUCHO 14.05
MARTILLO CALLAO 19.54
0 + 195.00 0 + 239.00 31.85 1.80 1.00 57.33
MARTILLO CALLAO 25.00
MARTILLO AMAZONAS 9.50
34.08 1.20 1.00 40.90
MARTILLO CALLAO 11.20
MARTILLO AMAZONAS 10.20
0 + 244.00 0 + 290.00 36.06 0.60 1.00 21.64
MARTILLO AMAZONAS 9.50
MARTILLO LIBERTAD 15.01
39.86 1.20 1.00 47.83
MARTILLO AMAZONAS 8.30
MARTILLO LIBERTAD 7.20
0 + 295.00 0 + 347.00 43.00 1.20 1.00 51.60
MARTILLO LIBERTAD 8.23
MARTILLO GRAU 35.00
0 + 361.00 0 + 444.00 69.06 2.80 1.00
MARTILLO GRAU
MARTILLO PROGRESO
70.69 1.80 1.00
MARTILLO GRAU
MARTILLO PROGRESO
TOTAL = 757.24
CALLE
LONG. ANCHO ALTO METRADO OBSERVACIONES
INICIO FIN
CALLE
LONG. ANCHO ALTO METRADO OBSERVACIONES
INICIO FIN
CALLE
LONG. ANCHO ALTO METRADO OBSERVACIONES
INICIO FIN
UÑAS DE VEREDAS Y MARTILLOS 13.14
VEREDAS 7.57 E=25%
TOTAL = 20.71 25.89
CALLE
LONG. ANCHO ALTO METRADO OBSERVACIONES
INICIO FIN
UÑAS DE VEREDAS Y MARTILLOS 13.14
VEREDAS 7.57 E=25%
TOTAL = 20.71 25.89
CALLE
LONG. ANCHO ALTO METRADO OBSERVACIONES
INICIO FIN
CALLE
LONG. ANCHO ALTO METRADO OBSERVACIONES
INICIO FIN
CALLE
LONG. ANCHO ALTO METRADO OBSERVACIONES
INICIO FIN
CALLE
LONG. ANCHO ALTO METRADO OBSERVACIONES
INICIO FIN
CALLE
LONG. ANCHO ALTO METRADO OBSERVACION
INICIO FIN
Cruce Cuzco 4 7.11 1.00 28.44
4 6.80 1.00 27.20
4 12.01 1.00 48.04
4 7.00 1.00 28.00
Cruce Ayacucho 4 12.11 1.00 48.44
4 6.90 1.00 27.60
4 12.04 1.00 48.16
4 7.98 1.00 31.92
Cruce Callao 4 12.03 1.00 48.12
4 5.90 1.00 23.60
4 6.18 1.00 24.72
4 6.00 1.00 24.00
Cruce Amazonas 4 6.14 1.00 24.56
4 5.86 1.00 23.44
4 6.00 1.00 24.00
4 6.00 1.00 24.00
Cruce Libertad 4 6.00 1.00 24.00
4 8.33 1.00 33.32
4 11.47 1.00 45.88
4 5.85 1.00 23.40
Cruce Grau 4 8.86 1.00 35.44
TOTAL = 649.84
PROGRESIVA
METRADO OBSERVACIONES
VECES CANT/UND
FLECHAS DIRECCIONALES
6.00 4.00 36.00
AREA 1.50
LETRAS
6.00 2.00 38.40
AREA 3.20
TOTAL M2 74.40
74.40 M2
1,332.00 ML
OBSERVACION
11 SEGURIDAD Y SALUD
DESCRIPCION OBSERVACIONE
METRADO
DE A S
UNIDAD 1.00
TOTAL UND 1.00
DESCRIPCION OBSERVACIONE
METRADO
DE A S
UNIDAD 50.00
TOTAL UND 50.00
DESCRIPCION OBSERVACIONE
METRADO
DE A S
UNIDAD 1.00
TOTAL UND 1.00
DESCRIPCION
METRADO OBSERVACIONES
UBIC
TOTAL 2.00
TOTAL MES 2.00
DESCRIPCION
METRADO OBSERVACIONES
UBIC
TOTAL 1.00
OBSERVACION
1.00
50.00 ML
1.00
2.00
1.00
12 MITIGACION AMBIENTAL
DETALLE
METRADO OBSERVACIONES
DE A
UNIDAD 52.00
TOTAL DIA 52.00
GL
DIAS
13 OTROS
PROGRESIVA OBSERVACIO
METRADO
DE A NES
6.00
PROGRESIVA
METRADO OBSERVACIONES
DE A
TOTAL DE OBRA 1.00
TOTAL GLB 1.00
CALLE
LONG. ANCHO ALTO METRADO OBSERVACIONES
INICIO FIN
PROGRESIVA
METRADO OBSERVACIONES
DE A
TOTAL DE OBRA 1.00
TOTAL GLB 1.00