Está en la página 1de 47

Nombre Apellido Excel Word Access Promedio Nota final

Dostin Hurtado 5 5 5 5.0 APROBO


Sandy Olivera 2 2 4 2.7 REPROBO
Polo Isacc 1 5 4 3.3 APROBO
Giovanny Rodriguez 3 2 5 3.3 APROBO

FORM. PAGO CONTADO


CANTIDAD DESCRIPCION VR. UNITARIO VR. TOTAL
2 EQUIPO SON 700 1400
1 ESTUFA 600 600
2 NEVERA 1500 3000

SUB. TOTAL 5000


DESC. 500 0
TOTAL 4500 500
GRAFICO ESTADISTICO

SUELDO ENERO
NOMBRES Y APELLIDOS DIAS TRABAJADOS SUELDO BASICO TOTAL SUELDO
DOSTIN HURTADO 30 800 800 1800
SANDY OLIVERA 18 900 540 1600
CARLOS RAMIREZ 15 1000 500 1400
VICTOR ESPINOZA 10 1100 367
1200
JUAN PLABLO MAECHA 25 1200 1000
EDGAR ORTIZ 30 1300 1300 1000
TATIANA AYA 30 1400 1400 800
JULIANO CENTURION 25 1500 1250 600

400

200

0
DOSTIN SANDY
HURTADO OLIVERA
SUELDO FEBRERO
NOMBRES Y APELLIDOS DIAS TRABAJADOS SUELDO BASICO TOTAL SUELDO
DOSTIN HURTADO 30 1200 1200
SANDY OLIVERA 18 1300 780
CARLOS RAMIREZ 30 1400 1400
VICTOR ESPINOZA 10 1500 500
JUAN PLABLO MAECHA 25 1600 1333
EDGAR ORTIZ 28 1700 1587
TATIANA AYA 15 1800 900
JULIANO CENTURION 25 1900 1583
SUELDO ENERO VS FEBRERO
1800

1600

1400

1200

1000 ENERO
800 FEBRERO

600

400

200

0
DOSTIN SANDY CARLOS VICTOR JUAN EDGAR TATIANA JULIANO
HURTADO OLIVERA RAMIREZ ESPINOZA PLABLO ORTIZ AYA CENTURION
MAECHA
FUNCIÓN SI

Nombre Apellido Excel Word Access Promedio Nota final


Dostin Hurtado 5 5 5 5.0 REPROBO
Sandy Olivera 2 2 4 2.7 REPROBO
Polo Isacc 1 5 4 3.3 REPROBO
Giovanny Rodriguez 3 2 5 3.3 REPROBO

Nombre Apellido Excel Word Access Promedio Nota final


Dostin Hurtado 15 15 10 13.3 APROBADO
Sandy Olivera 12 8.5 10 10.2 DESAPROBADO
Polo Isacc 11 27 5 14.3 APROBADO
Giovanny Rodriguez 11 10 9 10.0 DESAPROBADO

">" MAYOR
"<" MENOR
">=" MAYOR IGUAL
"<=" MENOR IGUAL
"<>" DIFERENTE
"=" IGUAL

FORM. PAGOCONTADO

CANTIDAD DESCRIPCIONVR. UNITARI VR. TOTAL


3 EQUIPO SON 700 2100
2 ESTUFA 600 1200
5 NEVERA 1500 7500

SUB. TOTAL 10800


DESC. 1080
TOTAL 9720
FUNCIÓN SI

Nombre Apellido Excel Word Access Promedio Nota final


Dostin Hurtado 3 5 5 4.3 SOBRESALIENTE
Sandy Olivera 2 2 4 2.7 INSUFICIENTE
Polo Isacc 1 5 4 3.3 ACEPTABLE
Giovanny Rodriguez 3 2 5 3.3 ACEPTABLE

Nombre Apellido Excel Word Access Promedio Nota final


Dostin Hurtado 18 12 18 16.0 SOBRESALIENTE
Sandy Olivera 12 16 17 15.0 SOBRESALIENTE
Polo Isacc 11 8 9 9.3 INSUFICIENTE
Giovanny Rodriguez 11 12 13 12.0 ACEPTABLE
CONDICION RESPUESTA
<2 DEFICIENTE
<3 INSUFICIENTE
<4 ACEPTABLE
<5 SOBRESALIENTE
5 EXCELENTE

CONDICION RESPUESTA
<9 DEFICIENTE
<10 INSUFICIENTE
<14 ACEPTABLE
<18 SOBRESALIENTE
20 EXCELENTE
O Y
Nombre Apellido Apto Nombre Apellido Apto
Dostin cerro de pasco si Dostin 22 SI
Sandy yauli si Sandy 20 SI
Polo cerro de pasco si Polo 18 NO
Giovanny Huancayo no Giovanny 26 NO
Nombre Apellido Excel Word Access Promedio Nota final
Dostin Hurtado 10 10 10 10.0 DESAPROBADO
Sandy Olivera 7 9 6 7.3 DESAPROBADO
Polo Isacc 17 18 1 12.0 APROBADO
Giovanny Rodriguez 5 9 7 7.0 DESAPROBADO

DETALLES DE CALIFICACIONES
Nota mas Alta 12.0
Nota mas Baja 7.0
Nota mas Repetida NINGUNA
Promedio del curso 9.1
Total de Alumnos 4
Número de Reprobados 1
Promedio de Aprobados 12
Promedio de Reprobados 8.11
1 3 4 5 6

PRECIOS UNITARIOS AVANCES, PRODUCCION, ACEROS,


ENMADERADO, SERVICIOS Y OTROSCOSTO COSTO
CODIGO DESCRIPCION UND ACTUAL MODIFICAD
O
1 Gal 8'x9' c/pala 21B (en Mineral) Costo/m 515.39
2 Gal 8'x8' c/pala 12B (en Mineral) Costo/m 487.82
3 Gal 7'x8' c/pala 12B (en Mineral) Costo/m 428.77
4 Xc 8'x9' c/pala 21B (con scoop) Costo/m 491.76
5 Xc 8'x8' c/pala 21B (en Desmonte) Costo/m 457.32
6 S/N 5 x 6 s/winche Costo/m 438.48
7 S/N 4 x 6 s/winche Costo/m 432.34
8 S/N 5 x 6 c/winche Costo/m 330.17
9 S/N 4 x 6 c/winche Costo/m 324.03
10 Ch 8 x 5 Costo/m 362.80
11 Ch 5 x 5 Costo/m 335.37
12 Ch 4 x 4 Costo/m 354.13
13 Chi 8 x 5 c/winche Costo/m 387.95
14 Chi 5 x 5 c/winche Costo/m 316.85
15 Chi 4 x 4 c/winche Costo/m 347.82
16 Chi 8 x 5 s/winche Costo/m 496.22
17 Chi 5 x 5 s/winche Costo/m 425.14
18 Chi 4 x 4 s/winche Costo/m 412.57
19 S/N 6 x 7 s/winche Costo/m 425.14
20 S/N 6 x 7 c/winche Costo/m 432.34
21 Xc 10'x10' c/pala 21B (en Desmonte) Costo/m 342.45
22 Xc 10'x10' c/pala 21B (con scoop) Costo/m 576.54
23 Ch 10 x 6 Costo/m 576.54
24 Chi 10 x 6 c/winche Costo/m 422.23
25 Chi 10 x 6 s/winche Costo/m 442.70
26 Ch 5 x 5 Costo/m 428.77
27 Chi 5 x 5 c/winche Costo/m 422.23
28 Chi 5 x 5 s/winche Costo/m 401.75
29 EST 8 x 9 c/sc Costo/m 576.54
30 RP 8 x 9 c/sc Costo/m 523.99
31 VTN 4 x 6 c/winche Costo/m 324.03
32 S/N 4 x 6 manual Costo/m 436.94
33 Camaras y Pilares Simulados Costo/m3 150.06
34 Corte y Relleno Ascendente Costo/m3 140.52
35 Recuperación de Puentes y Pilares Costo/m3 157.79
36 Corte y Relleno con Rotura Selectiva (Circado) Costo/m3 257.77
37 Long Wall Costo/m3 132.29
38 Camaras y Pilares Simulados Costo/m3 115.99
39 Corte y Relleno Ascendente Costo/m3 112.35
40 Recuperación de Puentes y Pilares Costo/m3 149.11
41 Corte y Relleno con Rotura Selectiva (Circado) Costo/m3 215.64
42 Long Wall Costo/m3 104.88
43 Camaras y Pilares Simulados Costo/m3 210.90
44 Corte y Relleno Ascendente Costo/m3 200.17
45 Recuperación de Puentes y Pilares Costo/m3 216.38
46 Corte y Relleno con Rotura Selectiva (Circado) Costo/m3 310.83
47 Long Wall Costo/m3 188.41
48 Camaras y Pilares Simulados Costo/m3 161.64
49 Corte y Relleno Ascendente Costo/m3 157.99
50 Recuperación de Puentes y Pilares Costo/m3 203.97
51 Corte y Relleno con Rotura Selectiva (Circado) Costo/m3 259.04
52 Long Wall Costo/m3 147.91
53 Corte y Relleno Mecanizado Costo/m3 76.65
54 Corte y Relleno Mecanizado Costo/m3 76.65
55 ANILLOS EN CH 5 X5 (4 PZAS/VUELTA) PZA 50.50 61.75

56 ANILLOS EN CH R2 (4 PZAS/VUELTA) VLT 16.83 20.58

57 ANILLADO EN TAJOS (X VUELTA) VLT 72.35 88.40

58 ASERRADO DE MADERA CON SIERRA MEC NICA PI2 0.00 0.00

59 BOLSACRETS (ARENA, RELAVE + CEMENTO) BLS 4.80 5.86

60 BOLSACRETS (DETRITUS) BLS 2.40 2.93

61 CABALLETE PARA ECHADERO (3 PZAS) PZA 0.00 0.00

62 CABALLETE PARA ECHADERO (4 PZAS) PZA 0.00 0.00

63 CUADRO COJO DE CHIMENEA PZA 109.78 134.25

64 CUADRO COJO EN GALERIA PZA 261.36 320.08

65 CUADRO COJO DE SUBNIVEL PZA 109.78 134.25

66 CUADRO COJO EN TAJO PZA 243.94 298.75

67 GUARDA CABEZA PZA 36.07 44.12

68 CUADRO COMPLETO GALERIA (4PZAS) PZA 0.00 0.00

69 CUADRO COMPLETO CHIMENEA (3 PZAS) PZA 126.25 154.39

70 SOBRECUADRO DE CHIMENEA PZA 252.49 308.77

71 CUADRO COMPLETO CHIMENEA (3PZA) › 4 X5 PZA 129.48 158.35

72 CUADRO COMPLETO CHIMENEA (3PZA) › 5 X6 PZA 144.28 176.44

73 CUADRO COMPLETO CHIMENEA (3PZA) > 5 X5 PZA 136.48 166.91

74 CUADRO COMPLETO CHIMENEA (3PZA) Ø 5 X8 PZA 168.33 205.85

75 CUADRO COMPLETO DE CHIMENEA Ø 6 X6 PZA 168.33 205.85

76 CUADRO COMPLETO DE CHIMENEA > 7 X8 PZA 318.18 389.66

77 CUADROS ESPECIALES DE 4 MTS. PZA 0.00 0.00

78 CUADRO COMPLETO GALERIA (3 PZAS) > 8 X8 PZA 318.18 389.66

79 CUADRO COMPLETO GALERIA (3 PZAS) > 9 X9 PZA 365.91 448.11

80 SOBRECUADRO DE GALERIA PZA 385.17 471.69

81 CUADRO COMPLETO GALERIA (4 PZAS) PZA 0.00 0.00

82 CUADRO COMPLETO GALERIA (3 PZAS) > 7 X8 PZA 304.92 373.43


83 CUADRO COMPLETO GALERIA (3 PZAS) > 6 X6 PZA 157.81 192.99

84 CUADRO COMPLETO GALERIA (3 PZAS) > 8 X9 PZA 365.91 448.11

85 CUADRO COMPLETO GALERIA (3 PZAS) > 8 X10 PZA 0.00 0.00

86 CUADRO COMPLETO GALERIA (3 PZAS) > 5 X6 PZA 136.48 166.91

87 CUADRO COMPLETO GALERIA (3 PZAS) > 5 X8 PZA 168.33 205.85

88 CUADRO COMPLETO GALERIA (3 PZAS) Ø 9 X8 PZA 365.91 448.11

89 CUADRO COMPLETO CHIMENEA (3 PZAS) Ø 6 X5 PZA 0.00 0.00

90 CUADRO COMPLETO DE S/N (3 PZAS) Ø 4 X5 PZA 136.48 166.91

91 CUADRO COMPLETO DE S/N (3 PZAS) Ø 5 X6 PZA 136.48 166.91

92 SOBRECUADRO DE SUBNIVEL PZA 162.90 199.21

93 CUADRO COMPLETO PIQUE 18X7, 3 PZA 0.00 0.00


COMPARTIMIENTOS
94 CUADRO COMPLETO CON SOLERAS DE 4 X5 UND 168.33 205.85

95 SQUARE SET (7X8) PZA 609.85 746.85

96 SQUARE SET (5X6) PZA 420.82 514.62

97 SQUARE SET COJO PZA 457.39 560.14

98 SQUARE SET DOBLE COMPARTIMIENTO 5 X8 PZA 504.98 617.54

99 SQUARE SET PZA 609.85 746.85

100 CUADRO EN TJ (3 PZAS) Ø 5 X6 PZA 153.02 187.13

101 CUADRO EN TJ (3 PZAS) Ø 8 X8 PZA 365.91 448.11

102 CUADRO EN TJ (3 PZAS) Ø 5 X8 PZA 180.35 220.55

103 CUADRO EN TJ (3 PZAS) Ø 7 X8 PZA 318.18 389.66

104 CUADRO EN TJ (3 PZAS) Ø 9 X9 PZA 457.39 560.14

105 CUADRO EN TJ (4 PZAS) Ø 7 X8 PZA 430.48 527.18

106 SOBRECUADRO EN TJ (3 PZAS) Ø 7 X8 PZA 365.91 448.11

107 SOBRECUADRO EN TJ (4 PZAS) Ø 7 X8 PZA 422.62 517.78

108 CUADRO EN TJ (3 PZAS) Ø 4 X5 PZA 126.25 154.39

109 CUADRO EN TJ (3 PZAS) Ø 5 X5 PZA 140.27 171.54

110 SOBRECUADRO EN TJ (3 PZAS) Ø 5 X6 PZA 201.99 247.02

111 CUADRO EN TJ (3 PZAS) Ø 6 X8 PZA 201.99 247.02

112 CUADRO EN TJ (3 PZAS) Ø 6 X7 PZA 180.35 220.55

113 CUADRO EN TJ (3 PZAS) Ø 7 X7 PZA 292.73 358.48

114 INSTALACION DE CIMBRAS DE 8 X8 EN AVANCE PZA 502.53 612.33

115 COLOCACION DE CIMBRAS DE 10 X10 PZA 0.00 0.00

116 INSTALACION DE CIMBRAS DE 8 X8 EN PZA 743.64 906.81


REHABILITACION
117 CRIBBING (4 PZAS/VUELTA) VLT 16.83 20.58

118 DESCANSO EN CAMINO, CHIMENEA PZA 42.08 51.47

119 BASE PARA WINCHE MT2 126.25 154.39

120 ENCAMADO MT2 15.78 19.29

121 ENMALLADO EN PIQUE VERTICAL MT2 0.00 0.00

122 ENMALLADO EN CHIMENEA MT2 14.13 28.02

123 ENMALLADO EN GALERIA MT2 14.13 28.02

124 ENMALLADO EN SUB NIVEL MT2 14.13 28.02

125 ENREJADO (INCLUYE LLENADO CON CARGA) MT2 21.04 25.73

126 ENTABLADO MT2 15.78 19.29


127 RECUPERACIÓN DE ENTABLADO PZA 7.89 9.65

128 PLATAFORMA DE CAMINO MT2 42.08 51.47

129 RECUPERACIÓN DE ENTABLADO MT2 7.89 9.65

130 ESCALERA PZA 16.83 20.58

131 ESCALERA CAMINO PRINCIPAL PZA 33.67 41.17

132 ESCALERA DE PINO DE 5.00 M (INSTALACIÓN) PZA 512.27 627.35

133 ESCALERAS RECUPERADAS PZA 8.42 10.30

134 CONSTRUCCIÓN DE GAVIONES MT3 0.00 0.00

135 INSTALACION DE DURMIENTE PZA 16.83 20.58

136 INSTALACIÓN DE GATAS HIDRAULICAS PZA 0.00 0.00

137 INSTALACIÓN DE GUARDALINEA MTO 18.98 23.21

138 INSTALACIÓN DE RIEL DE 30 Y 40 LBS (1) MTO 21.04 25.73

139 IZAJE DE MADERA DE 10 X7" EN CH R2 PZA 0.00 0.00

140 LIMPIEZA DE MATERIAL EN GALERIAS, MANUAL MT3 0.00 0.00

141 LIMPIEZA DE MATERIAL EN GALERIAS, PALA MT3 0.00 0.00

142 MANTENIMIENTO DE VIAS MTO 8.42 10.30

143 MANTENIMIENTO DE VIAS (AJUSTE DE PERNOS) MTO 8.42 10.30

144 MARCHAVANTES PZA 8.42 10.30

145 RUMAS (INCLUYE LA SELECTIVIDAD) MT3 29.70 36.32

146 MANTENIMIENTO DE MONA PARA RIEL PZA 50.50 61.75


(AJUSTE/REEMPLAZO DE PERNOS)
147 PARRILLA EN GALERIA PAR 162.90 199.21

148 RECUPERACIÓN DE PARRILLA PZA 41.06 50.21

149 PARRILLA EN TAJOS PAR 81.45 99.60

150 PERNOS CON RESINA (L = 2.4 M) PZA 14.89 18.04

151 PERNOS CEMENTADOS (L = 1.5 M) PZA 1.13 1.28

152 PERNOS CEMENTADOS (L = 1.8 M) PZA 21.76 26.44

153 PERNOS CEMENTADOS (L = 2.4 M) PZA 26.44 32.13

154 PERNOS CEMENTADOS CON STRAP (L = 1.8 M) PZA 1.47 1.68

155 PERNO CEMENTADO CEM. COM. (L=2.40 M) PZA 2.10 2.40

156 PERNOS CEMENTADOS CEM.COM (L = 1.80 M) PZA 13.10 15.88

157 PERNOS CEMENTADOS CEM.COM. (L=1.5M) PZA 11.79 14.31

158 PERNOS POSIMIX (L= 2.40 M) PZA 14.89 45.00

159 PERNOS POSIMIX (L= 1.80 M) PZA 13.10 43.51

160 PERNOS POSIMIX (L= 1.50 M) PZA 13.10 15.88

161 PERNOS CON RESINA (L = 1.8 M) PZA 13.10 15.88

162 PERNOS SWELLEX PZA 0.00 22.95

163 PIRCAS CON PUNTALES MT3 50.50 61.75

164 PIRCAS POR MATERIAL DESMONTE MT3 25.25 30.88

165 PUNTAL DE AVANCE EN ESTOCADA PZA 63.12 77.20

166 PUNTAL DE AVANCE EN CHIMENEA PZA 63.12 77.20

167 PUNTALES DE LINEA PZA 84.16 102.92

168 PATA DE GALLO EN CUADRO PZA 43.91 53.70

169 PUNTALES DE SEGURIDAD (> ÷ 7 ) PZA 42.08 51.47

170 PUNTAL DE SEGURIDAD C/KOJAK 200 MM. ›7PULG PZA 36.07 44.12

171 RECUPERACION DE CUADROS (*) PZA 126.25 154.39


172 RECUPERACION DE CUADROS (1) PZA 126.25 154.39

173 RECUPERACION DE SAPA SIN REPONER LA VIA PZA 63.12 77.20

174 RECUPERACION DE SAPA CON REPONER LA VIA PZA 252.49 308.77

175 SOLERA RECUPERACION EN CHIMENEA PZA 25.25 30.88

176 CAMBIO DE DURMIENTE PZA 25.25 30.88

177 REEMPLAZO GUIAS EN PIQUE VERTICAL 16 (RETIRO E PAR 0.00 0.00


INSTALACION)
178 RELLENO CONVENCIONAL C/W 1 MT3 370.18

179 RELLENO CONVENCIONAL C/W 2 MT3 421.80

180 RELLENO CONVENCIONAL S/W 1 MT3 31.56 38.60

181 RELLENO CONVENCIONAL S/W 2 MT3 0.00 0.00

182 RELLENO CEMENTADO MT3 0.00 0.00

183 RECUPERACION DE RIEL DE 30 Y 40 LBS (1) MTO 4.21 5.14

184 RECUPERACION DE RIEL DE 30 Y 40 LBS (*) MTO 0.00 0.00

185 RECUPERACION DE GUARDALINEA PZA 4.21 5.14

186 RECUPERACION DE PUNTALES PZA 27.30 33.39

187 REPARACION DE SAPA PZA 252.49 308.77

188 INSTALACION DE SAPA PZA 252.49 308.77

189 INSTALACION DE UNA MONA PARA RIEL PZA 76.51 93.57

190 RECUPERACION DE UNA MONA DE RIEL PZA 37.69 46.09

191 REEMPLAZO O CAMBIO DE MONA PZA 76.51 93.57


(DURMIENTE,FIJACION,NIVELACION)
192 ALIVA - SHOTCRETE DE 2" MT2 44.80 78.28

193 RECUPARECION DE SOBRECUADRO PZA 148.52 181.63

194 SOLERAS EN CHIMENEA PZA 63.12 77.20

195 SOLERA EN GALERIAS PZA 84.16 102.92

196 SOLERAS DE PIQUE 18X7 PZA 0.00 0.00

197 SOLERA EN SUBNIVEL PZA 50.50 61.75

198 SOLERA EN TAJOS PZA 50.50 61.75

199 TOLVA CHINA PZA 631.23 771.94

200 TOLVA COMPLETA CON CUADROS PZA 1,136.21 1,389.48

201 TOLVA PATA DE GALLO PZA 757.47 926.33

202 RECUPERACION DE TOLVA PZA 252.49 308.77

203 CUADRO COMPLETO EN TAJO 10X10 PZA 548.86 672.16

204 CUADRO COMPLETO EN TAJO 10X9 PZA 378.74 463.16

205 GUARDA CABEZA EN SECCION > 9X9 PZA 120.23 147.04

206 ACARREO DE RIEL DE 30 LBS Y 40 LBS (TONELADA X TNxMTO 0.06 0.08


METROS ACARREADOS)
207 ENDEREZADO DE RIEL MTO 2.27 2.79

208 BAJAR RIELES DE 30 LBS Y 40 LBS - VERTICAL TNxMTO 3.50 4.29


(TONELADA X METROS BAJADOS)
209 BAJAR RIELES DE 30 LBS Y 40 LBS- INCLINADO TNxMTO 3.46 4.25
(TONELADA X METROS BAJADOS)
210 PERNOS SPLIT SET (L = 1.20 M.) PZA

211 PERNOS SPLIT SET (L = 1.50 M.) PZA

212 PERNOS SPLIT SET (L = 2.10 M.) PZA

213 PERNOS POSIMIX (L= 1.20 M) PZA

214 PERNOS SPLIT SET(L= 0.30 M) PZA


215 LOSA DE CONCRETO SIMPLE (EN LABORES) CON MT3
MEZCLADOR (1.5 M3) CAPACIDAD
216 MT3
LOSA DE CONCRETO SIMPLE (EN LABORES) - MANUAL

217 OCMER - SHOCRETE DE 2" MT2

218 OCMER - SHOCRETE DE 2.5" MT2

219 SPRAYCON - SHOCRETE DE 2.5" MT2

220 MALLA ELECTROSOLDADA NO GALVANIZADO DE MT2


ALAMBRE N°8 DE 2" x 2" x 2.42 M, ANCHO
221 MALLA ELECTROSOLDADA NO GALVANIZADO DE MT2
ALAMBRE N°8 DE 4" x 4" x 2.42 M, ANCHO
222 MALLA ELECTROSOLDADA GALVANIZADO DE MT2
ALAMBRE N°8 DE 2" x 2" x 2.42 M, ANCHO
223 MALLA ELECTROSOLDADA GALVANIZADO DE MT2
ALAMBRE N°8 DE 4" x 4" x 2.42 M, ANCHO
224 ALIVA - SHOCRETE DE 2.5" MT2

225 SPRAYCON - SHOCRETE DE 3.0" MT2

226 SPRAYCON - SHOCRETE DE 2.0" MT2

227 OCMER - SHOCRETE DE 3.0" MT2

228 ALIVA - SHOCRETE DE 3" MT2

229 PERNO CON BARRA HELICOIDAL (L=1.5 m) PZA

230 PERNO CON BARRA HELICOIDAL (L=2.4 m) PZA

231 SPRAYCON - SHOCRETE DE 1.0" MT2

232 OCMER - SHOCRETE DE 1" MT2

233 DESQUINCHE EN BATIDOS Y FRENTES M3 62.72

234 TAREAS ADMINISTRATIVAS MINA TAR 153.69

235 TAREAS ADMINISTRATIVAS OPERADOR SCOOP TAR 222.04

236 LIMPIEZA DE EVACUADOS (U-35) M3 30.70

237 MURO DE CONCRETO M3 339.87

costo herramientas / Gdia


BB.SS
Categoria L S PV
137.00%
MO1 79.12 5.93 2.13 11.27
MO2 76.38 5.93 2.13 11.27
MO3 0.00 5.93 2.13 11.27
AP1 67.88 5.93 2.13 11.27
AP2 66.51 5.93 2.13 11.27
operador 97.61 5.93 2.13 11.27
PM 64.18 5.93 2.13 11.27
Trabajos de Carrilanos
PROMEDIO

COSTO + PRECIO
UNITARIO
4%

20.62 611.65 536.0


19.51 578.68 507.3
17.15 508.60 445.9
19.67 653.88 511.4
18.29 477.34 475.6
17.54 497.72 456.0
17.29 490.58 449.6
13.21 374.40 343.4
12.96 367.27 337.0
14.51 412.08 377.3
13.41 379.45 348.8
14.17 400.49 368.3
15.52 440.92 403.5
12.67 359.10 329.5
13.91 393.10 361.7
19.85 564.25 516.1
17.01 482.42 442.1
16.50 466.20 429.1
17.01 504.80 442.1
17.29 381.58 449.6
13.70 617.52 356.2
23.06 599.6
23.06 599.6
16.89 477.20 439.1
17.71 597.25 460.4
17.15 445.9
16.89 387.65 439.1
16.07 510.85 417.8
23.06 599.6
20.96 544.95 544.9
12.96 337.0
436.9
6.00 169.33 Tajos (con winche) PV < = 0.70
5.62 158.02
6.31 210.66
10.31 290.69
5.29 148.94
4.64 130.92 Tajos (con winche) PV > 0.70
4.49 126.37
5.96 167.68
8.63 243.24
4.20 118.19
8.44 237.56 Tajos (sin winche) PV < = 0.70
8.01 224.91
8.66 288.66
12.43 350.93
7.54 211.96
6.47 182.07 Tajos (sin winche) PV > 0.70
6.32 177.52
8.16 229.17
10.36 292.52
5.92 166.51
3.07 93.48
3.07 95.16
2.47 63.53 64.224554
0.82 21.18 21.408185
3.54 91.50 91.936194
0.00 0.00 0
0.23 6.08 6.0913767
0.12 3.04 3.0515794
0.00 0.00 0
0.00 0.00 0
5.37 138.12 139.6186
12.80 331.50 332.88137
5.37 138.12 139.6186
11.95 309.40 310.69556
1.76 45.38 45.879731
0.00 0.00 0
6.18 158.83 160.56728
12.35 317.67 321.12277
6.33 162.91 164.67925
7.06 181.52 183.49536
6.68 171.71 173.58656
8.23 211.78 214.08185
8.23 211.78 214.08185
15.59 403.56 405.24739
0.00 0.00 0
15.59 403.56 405.24739
17.92 464.10 466.03156
18.87 580.12 490.56201
0.00 0.00 0
14.94 386.75 388.36356
7.72 198.54 200.7091
17.92 464.10 466.03156
0.00 0.00 0
6.68 171.71 173.58656
8.23 211.78 214.08185
17.92 464.10 466.03156
0.00 0.00 0
6.68 171.71 173.58656
6.68 171.71 173.58656
7.97 211.78 207.1775
0.00 0.00 0
8.23 211.78 214.08185
29.87 773.50 776.72712
20.58 529.44 535.20462
22.41 580.12 582.54534
24.70 635.33 642.24554
29.87 773.50 776.72712
7.49 192.52 194.61772
17.92 464.10 466.03156
8.82 226.90 229.37509
15.59 403.56 405.24739
22.41 580.12 582.54534
21.09 546.00 548.27103
17.92 464.10 466.03156
20.71 580.12 538.49184
6.18 158.83 160.56728
6.86 176.48 178.40547
9.88 254.13 256.89822
9.88 254.13 256.89822
8.82 226.90 229.37509
14.34 371.28 372.82289
24.49 631.54 636.82575
0.00 638.12 0
36.27 936.43 943.07943
0.82 21.18 21.408185
2.06 52.94 53.526353
6.18 158.83 160.56728
0.77 19.85 20.065018
0.00 0.00 0
1.12 17.87 28.02
1.12 17.87 28.02
1.12 17.87 28.02
1.03 26.47 26.757285
0.77 19.85 20.065018
0.39 9.93 10.0384
2.06 52.94 53.526353
0.39 9.93 10.0384
0.82 21.18 21.408185
1.65 42.36 42.816369
25.09 649.74 652.44889
0.41 10.59 10.709983
0.00 0.00 0
0.82 21.18 21.408185
0.00 0.00 0
0.93 23.88 24.141646
1.03 26.47 26.757285
0.00 0.00 0
0.00 0.00 0
0.00 0.00 0
0.41 10.59 10.709983
0.41 10.59 10.709983
0.41 10.59 10.709983
1.45 48.87 37.773605
2.47 63.53 64.224554
7.97 204.95 207.1775
2.01 51.65 52.218533
3.98 102.47 103.58875
0.72 21.92 18.757199
0.05 3.37 1.3313841
1.06 29.80 27.499561
1.29 36.58 33.414206
0.07 4.23 1.7437597
0.10 5.90 2.4978179
0.64 18.79 16.518588
0.57 16.72 14.880868
1.80 53.37 45
1.74 44.00 43.51
0.64 30.93 16.518588
0.64 18.79 16.518588
0.92 0.00 22.95
2.47 63.53 64.224554 47.76
1.24 31.77 32.118168
3.09 79.42 80.283638
3.09 79.42 80.283638
4.12 105.89 107.04092
2.15 55.25 55.847438
2.06 52.94 53.526353
1.76 45.38 45.879731
6.18 158.83 160.56728
6.18 158.83 160.56728
3.09 79.42 80.283638
12.35 317.67 321.12277
1.24 31.77 32.118168
1.24 31.77 32.118168
0.00 0.00 0
21.18 370.1804
21.18 421.8004
1.54 39.71 40.141819
0.00 0.00 0
0.00 0.00 0
0.21 5.29 5.3491006
0.00 0.00 0
0.21 5.29 5.3491006
1.34 34.34 34.722026
12.35 317.67 321.12277
12.35 317.67 321.12277
3.74 96.26 97.308859
1.84 47.41 47.929827
3.74 96.26 97.308859
3.13 77.68 78.28
7.27 186.86 188.89159
3.09 79.42 80.283638
4.12 105.89 107.04092
0.00 0.00 0
2.47 63.53 64.224554
2.47 63.53 64.224554
30.88 794.16 802.81282
55.58 1,429.50 1445.0584
37.05 953.00 963.38009
12.35 317.67 321.12277
26.89 696.15 699.04733
18.53 476.50 481.69005
5.88 151.27 152.92065
0.00 0.08 0.0824751
0.11 2.88 2.8984114
0.17 4.44 4.4654386

0.17 4.38 4.41831


17.80
20.16
28.89
22.74
6.66
352.34

405.24

52.94
68.46
65.91
39.11

29.63

38.79

30.63

96.18
80.60
53.70
82.15
118.81
39.86
42.83
26.87
26.76
3.85 65.15 66.569019
6.15 159.84 159.83537
8.88 230.92 230.91825
1.88 32.58 32.580403
13.59 353.46 353.4648

mientas / Gdia costo EPP / Gdia

REHAB. L S PV REHAB.

11.33 2.42 2.51 2.73 2.51


11.33 2.42 2.51 2.73 2.51
11.33 2.42 2.51 2.73 2.51
11.33 2.42 2.51 2.73 2.51
11.33 2.42 2.51 2.73 2.51
11.33 2.42 2.51 2.73 2.51
11.33 2.42 2.51 2.73 2.51
FACTURA DE BODEGA

CODIGO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
FACTURA DE BODEGA

DESCRIPCIÓN
Gal 8'x9' c/pala 21B (en Mineral)
Gal 8'x8' c/pala 12B (en Mineral)
Gal 7'x8' c/pala 12B (en Mineral)
Xc 8'x9' c/pala 21B (con scoop)
Xc 8'x8' c/pala 21B (en Desmonte)
S/N 5 x 6 s/winche
S/N 4 x 6 s/winche
S/N 5 x 6 c/winche
S/N 4 x 6 c/winche
Ch 8 x 5
Ch 5 x 5
Ch 4 x 4
Chi 8 x 5 c/winche
Chi 5 x 5 c/winche
Chi 4 x 4 c/winche
Chi 8 x 5 s/winche
Chi 5 x 5 s/winche
Chi 4 x 4 s/winche
S/N 6 x 7 s/winche
S/N 6 x 7 c/winche
Xc 10'x10' c/pala 21B (en Desmonte)
Xc 10'x10' c/pala 21B (con scoop)
Ch 10 x 6
Chi 10 x 6 c/winche
Chi 10 x 6 s/winche
Ch 5 x 5
Chi 5 x 5 c/winche
Chi 5 x 5 s/winche
EST 8 x 9 c/sc
RP 8 x 9 c/sc
VTN 4 x 6 c/winche
S/N 4 x 6 manual
Camaras y Pilares Simulados
Corte y Relleno Ascendente
Recuperación de Puentes y Pilares
Corte y Relleno con Rotura Selectiva (Circado)
Long Wall
Camaras y Pilares Simulados
Corte y Relleno Ascendente
Recuperación de Puentes y Pilares
Corte y Relleno con Rotura Selectiva (Circado)
Long Wall
Camaras y Pilares Simulados
Corte y Relleno Ascendente
Recuperación de Puentes y Pilares
Corte y Relleno con Rotura Selectiva (Circado)
Long Wall
Camaras y Pilares Simulados
Corte y Relleno Ascendente
Recuperación de Puentes y Pilares
Corte y Relleno con Rotura Selectiva (Circado)
Long Wall
Corte y Relleno Mecanizado
Corte y Relleno Mecanizado
ANILLOS EN CH 5 X5 (4 PZAS/VUELTA)
ANILLOS EN CH R2 (4 PZAS/VUELTA)
ANILLADO EN TAJOS (X VUELTA)
ASERRADO DE MADERA CON SIERRA MEC NICA
BOLSACRETS (ARENA, RELAVE + CEMENTO)
BOLSACRETS (DETRITUS)
CABALLETE PARA ECHADERO (3 PZAS)
CABALLETE PARA ECHADERO (4 PZAS)
CUADRO COJO DE CHIMENEA
CUADRO COJO EN GALERIA
CUADRO COJO DE SUBNIVEL
CUADRO COJO EN TAJO
GUARDA CABEZA
CUADRO COMPLETO GALERIA (4PZAS)
CUADRO COMPLETO CHIMENEA (3 PZAS)
SOBRECUADRO DE CHIMENEA
CUADRO COMPLETO CHIMENEA (3PZA) › 4 X5
CUADRO COMPLETO CHIMENEA (3PZA) › 5 X6
CUADRO COMPLETO CHIMENEA (3PZA) > 5 X5
CUADRO COMPLETO CHIMENEA (3PZA) Ø 5 X8
CUADRO COMPLETO DE CHIMENEA Ø 6 X6
CUADRO COMPLETO DE CHIMENEA > 7 X8
CUADROS ESPECIALES DE 4 MTS.
CUADRO COMPLETO GALERIA (3 PZAS) > 8 X8
CUADRO COMPLETO GALERIA (3 PZAS) > 9 X9
SOBRECUADRO DE GALERIA
CUADRO COMPLETO GALERIA (4 PZAS)
CUADRO COMPLETO GALERIA (3 PZAS) > 7 X8
CUADRO COMPLETO GALERIA (3 PZAS) > 6 X6
CUADRO COMPLETO GALERIA (3 PZAS) > 8 X9
CUADRO COMPLETO GALERIA (3 PZAS) > 8 X10
CUADRO COMPLETO GALERIA (3 PZAS) > 5 X6
CUADRO COMPLETO GALERIA (3 PZAS) > 5 X8
CUADRO COMPLETO GALERIA (3 PZAS) Ø 9 X8
CUADRO COMPLETO CHIMENEA (3 PZAS) Ø 6 X5
CUADRO COMPLETO DE S/N (3 PZAS) Ø 4 X5
CUADRO COMPLETO DE S/N (3 PZAS) Ø 5 X6
SOBRECUADRO DE SUBNIVEL
CUADRO COMPLETO PIQUE 18X7, 3 COMPARTIMIENTOS
CUADRO COMPLETO CON SOLERAS DE 4 X5
SQUARE SET (7X8)
SQUARE SET (5X6)
SQUARE SET COJO
SQUARE SET DOBLE COMPARTIMIENTO 5 X8
SQUARE SET
CUADRO EN TJ (3 PZAS) Ø 5 X6
CUADRO EN TJ (3 PZAS) Ø 8 X8
CUADRO EN TJ (3 PZAS) Ø 5 X8
CUADRO EN TJ (3 PZAS) Ø 7 X8
CUADRO EN TJ (3 PZAS) Ø 9 X9
CUADRO EN TJ (4 PZAS) Ø 7 X8
SOBRECUADRO EN TJ (3 PZAS) Ø 7 X8
SOBRECUADRO EN TJ (4 PZAS) Ø 7 X8
CUADRO EN TJ (3 PZAS) Ø 4 X5
CUADRO EN TJ (3 PZAS) Ø 5 X5
SOBRECUADRO EN TJ (3 PZAS) Ø 5 X6
CUADRO EN TJ (3 PZAS) Ø 6 X8
CUADRO EN TJ (3 PZAS) Ø 6 X7
CUADRO EN TJ (3 PZAS) Ø 7 X7
INSTALACION DE CIMBRAS DE 8 X8 EN AVANCE
COLOCACION DE CIMBRAS DE 10 X10
INSTALACION DE CIMBRAS DE 8 X8 EN REHABILITACION
CRIBBING (4 PZAS/VUELTA)
DESCANSO EN CAMINO, CHIMENEA
BASE PARA WINCHE
ENCAMADO
ENMALLADO EN PIQUE VERTICAL
ENMALLADO EN CHIMENEA
ENMALLADO EN GALERIA
ENMALLADO EN SUB NIVEL
ENREJADO (INCLUYE LLENADO CON CARGA)
ENTABLADO
RECUPERACIÓN DE ENTABLADO
PLATAFORMA DE CAMINO
RECUPERACIÓN DE ENTABLADO
ESCALERA
ESCALERA CAMINO PRINCIPAL
ESCALERA DE PINO DE 5.00 M (INSTALACIÓN)
ESCALERAS RECUPERADAS
CONSTRUCCIÓN DE GAVIONES
INSTALACION DE DURMIENTE
INSTALACIÓN DE GATAS HIDRAULICAS
INSTALACIÓN DE GUARDALINEA
INSTALACIÓN DE RIEL DE 30 Y 40 LBS (1)
IZAJE DE MADERA DE 10 X7" EN CH R2
LIMPIEZA DE MATERIAL EN GALERIAS, MANUAL
LIMPIEZA DE MATERIAL EN GALERIAS, PALA
MANTENIMIENTO DE VIAS
MANTENIMIENTO DE VIAS (AJUSTE DE PERNOS)
MARCHAVANTES
RUMAS (INCLUYE LA SELECTIVIDAD)
MANTENIMIENTO DE MONA PARA RIEL (AJUSTE/REEMPLAZO DE PERNOS)
PARRILLA EN GALERIA
RECUPERACIÓN DE PARRILLA
PARRILLA EN TAJOS
PERNOS CON RESINA (L = 2.4 M)
PERNOS CEMENTADOS (L = 1.5 M)
PERNOS CEMENTADOS (L = 1.8 M)
PERNOS CEMENTADOS (L = 2.4 M)
PERNOS CEMENTADOS CON STRAP (L = 1.8 M)
PERNO CEMENTADO CEM. COM. (L=2.40 M)
PERNOS CEMENTADOS CEM.COM (L = 1.80 M)
PERNOS CEMENTADOS CEM.COM. (L=1.5M)
PERNOS POSIMIX (L= 2.40 M)
PERNOS POSIMIX (L= 1.80 M)
PERNOS POSIMIX (L= 1.50 M)
PERNOS CON RESINA (L = 1.8 M)
PERNOS SWELLEX
PIRCAS CON PUNTALES
PIRCAS POR MATERIAL DESMONTE
PUNTAL DE AVANCE EN ESTOCADA
PUNTAL DE AVANCE EN CHIMENEA
PUNTALES DE LINEA
PATA DE GALLO EN CUADRO
PUNTALES DE SEGURIDAD (> ÷ 7 )
PUNTAL DE SEGURIDAD C/KOJAK 200 MM. ›7PULG
RECUPERACION DE CUADROS (*)
RECUPERACION DE CUADROS (1)
RECUPERACION DE SAPA SIN REPONER LA VIA
RECUPERACION DE SAPA CON REPONER LA VIA
SOLERA RECUPERACION EN CHIMENEA
CAMBIO DE DURMIENTE
REEMPLAZO GUIAS EN PIQUE VERTICAL 16 (RETIRO E INSTALACION)
RELLENO CONVENCIONAL C/W 1
RELLENO CONVENCIONAL C/W 2
RELLENO CONVENCIONAL S/W 1
RELLENO CONVENCIONAL S/W 2
RELLENO CEMENTADO
RECUPERACION DE RIEL DE 30 Y 40 LBS (1)
RECUPERACION DE RIEL DE 30 Y 40 LBS (*)
RECUPERACION DE GUARDALINEA
RECUPERACION DE PUNTALES
REPARACION DE SAPA
INSTALACION DE SAPA
INSTALACION DE UNA MONA PARA RIEL
RECUPERACION DE UNA MONA DE RIEL
REEMPLAZO O CAMBIO DE MONA (DURMIENTE,FIJACION,NIVELACION)
ALIVA - SHOTCRETE DE 2"
RECUPARECION DE SOBRECUADRO
SOLERAS EN CHIMENEA
SOLERA EN GALERIAS
SOLERAS DE PIQUE 18X7
SOLERA EN SUBNIVEL
SOLERA EN TAJOS
TOLVA CHINA
TOLVA COMPLETA CON CUADROS
TOLVA PATA DE GALLO
RECUPERACION DE TOLVA
CUADRO COMPLETO EN TAJO 10X10
CUADRO COMPLETO EN TAJO 10X9
GUARDA CABEZA EN SECCION > 9X9
ACARREO DE RIEL DE 30 LBS Y 40 LBS (TONELADA X METROS ACARREADOS)
ENDEREZADO DE RIEL
BAJAR RIELES DE 30 LBS Y 40 LBS - VERTICAL (TONELADA X METROS BAJADOS)
BAJAR RIELES DE 30 LBS Y 40 LBS- INCLINADO (TONELADA X METROS BAJADOS)
PERNOS SPLIT SET (L = 1.20 M.)
PERNOS SPLIT SET (L = 1.50 M.)
PERNOS SPLIT SET (L = 2.10 M.)
PERNOS POSIMIX (L= 1.20 M)
PERNOS SPLIT SET(L= 0.30 M)
LOSA DE CONCRETO SIMPLE (EN LABORES) CON MEZCLADOR (1.5 M3) CAPACIDAD
LOSA DE CONCRETO SIMPLE (EN LABORES) - MANUAL
OCMER - SHOCRETE DE 2"
OCMER - SHOCRETE DE 2.5"
SPRAYCON - SHOCRETE DE 2.5"
MALLA ELECTROSOLDADA NO GALVANIZADO DE ALAMBRE N°8 DE 2" x 2" x 2.42 M, ANCHO
MALLA ELECTROSOLDADA NO GALVANIZADO DE ALAMBRE N°8 DE 4" x 4" x 2.42 M, ANCHO
MALLA ELECTROSOLDADA GALVANIZADO DE ALAMBRE N°8 DE 2" x 2" x 2.42 M, ANCHO
MALLA ELECTROSOLDADA GALVANIZADO DE ALAMBRE N°8 DE 4" x 4" x 2.42 M, ANCHO
ALIVA - SHOCRETE DE 2.5"
SPRAYCON - SHOCRETE DE 3.0"
SPRAYCON - SHOCRETE DE 2.0"
OCMER - SHOCRETE DE 3.0"
ALIVA - SHOCRETE DE 3"
PERNO CON BARRA HELICOIDAL (L=1.5 m)
PERNO CON BARRA HELICOIDAL (L=2.4 m)
SPRAYCON - SHOCRETE DE 1.0"
OCMER - SHOCRETE DE 1"
DESQUINCHE EN BATIDOS Y FRENTES
TAREAS ADMINISTRATIVAS MINA
TAREAS ADMINISTRATIVAS OPERADOR SCOOP
LIMPIEZA DE EVACUADOS (U-35)
MURO DE CONCRETO
CANTIDAD PRECIO TOTAL
3 611.65 1834.95
578.68 0
508.6 0
653.88 0 E
477.34 0
497.72 0
490.58 0
374.4 0
367.27 0
412.08 0
379.45 0
400.49 0
440.92 0
359.1 0
393.1 0
564.25 0
482.42 0
466.2 0
504.8 0
381.58 0
617.52 0
0 0
0 0
477.2 0
597.25 0
0 0
387.65 0
510.85 0
0 0
544.948464 0
0 0
0 0
169.33 0
158.02 0
210.66 0
290.69 0
148.94 0
130.92 0
126.37 0
167.68 0
243.24 0
118.19 0
237.56 0
224.91 0
288.66 0
350.93 0
211.96 0
182.07 0
177.52 0
229.17 0
292.52 0
166.51 0
93.48 0
95.16 0
63.53 0
21.18 0
91.5 0
0 0
6.08 0
3.04 0
0 0
0 0
138.12 0
331.5 0
138.12 0
309.4 0
45.38 0
0 0
158.83 0
317.67 0
162.91 0
181.52 0
171.71 0
211.78 0
211.78 0
403.56 0
0 0
403.56 0
464.1 0
580.12 0
0 0
386.75 0
198.54 0
464.1 0
0 0
171.71 0
211.78 0
464.1 0
0 0
171.71 0
171.71 0
211.78 0
0 0
211.78 0
773.5 0
529.44 0
580.12 0
635.33 0
773.5 0
192.52 0
464.1 0
226.9 0
403.56 0
580.12 0
546 0
464.1 0
580.12 0
158.83 0
176.48 0
254.13 0
254.13 0
226.9 0
371.28 0
631.54 0
638.12 0
936.43 0
21.18 0
52.94 0
158.83 0
19.85 0
0 0
17.87 0
17.87 0
17.87 0
26.47 0
19.85 0
9.93 0
52.94 0
9.93 0
21.18 0
42.36 0
649.74 0
10.59 0
0 0
21.18 0
0 0
23.88 0
26.47 0
0 0
0 0
0 0
10.59 0
10.59 0
10.59 0
48.87 0
63.53 0
204.95 0
51.65 0
102.47 0
21.92 0
3.37 0
29.8 0
36.58 0
4.23 0
5.9 0
18.79 0
16.72 0
53.3736 0
43.9992 0
30.9333 0
18.79 0
0 0
63.53 0
31.77 0
79.42 0
79.42 0
105.89 0
55.25 0
52.94 0
45.38 0
158.83 0
158.83 0
79.42 0
317.67 0
31.77 0
31.77 0
0 0
21.18 0
21.18 0
39.71 0
0 0
0 0
5.29 0
0 0
5.29 0
34.34 0
317.67 0
317.67 0
96.26 0
47.41 0
96.26 0
77.6766019 0
186.86 0
79.42 0
105.89 0
0 0
63.53 0
63.53 0
794.16 0
1429.5 0
953 0
317.67 0
696.15 0
476.5 0
151.27 0
0.08 0
2.88 0
4.44 0
4.38 0
17.8026 0
20.1648 0
28.8895 0
22.7426 0
6.6616 0
352.342 0
405.242 0
52.9440646 0
68.4551453 0
65.9065246 0
39.1114818 0
29.6343326 0
38.7873 0
30.6263605 0
96.17865 0
80.6023847 0
53.6986933 0
82.1461744 0
118.807156 0
39.8617 0
42.8277 0
26.8674616 0
26.7602964 0
65.15 0
159.835369 0
230.918253 0
32.5804032 0
353.4648 0
SISTEMAS UNIDOS

Nombre Apellido Excel Word Access Promedio Nota final


Dostin Hurtado 20 20 20 20.0 OPTIMO
Sandy Olivera 13 7 10 10.0 DEFICIENTE
Polo Isacc 14 15 15 14.7 REGULAR
Giovanny Rodriguez 10 8 13 10.3 REGULAR

DETALLES DE CALIFICACIONES NOTA MINIMA


Nota mas Alta 20.0 10.0
Nota mas Baja 10.0
Promedio del Curso 13.8
Numero de excelentes 1
Numero de sobresalientes 0
Numero de aceptables 2
Numero de insuficientes 0
Numero de deficientes 1
Numero de Alumnos 4
c

b
VALIDACIÓN DE DAT
BASE DE DATOS

DOCUMENTO NOMBRES Y APELLIDOS FECHA DE INGRESO SEXO


8/11/2020 FEMENINO
00986028 QUISPE PARI, JAVIER SALVADOR 10/2/1957 M
23251794 MALLQUI TOVAR ROLANDO FELIPE 3/15/1959 M
21112286 HUANACCHIRI GUTIERREZ LISETTE IDALIA 8/11/1964 F
32948142 BELITO ÑAHUI EDGAR 8/22/1962 F
29628927 SALVATIERRA CRISPIN, EDGAR 4/12/1968 M
23216743 VEGA LOPEZ, WILDER 1/15/1966 F
40840527 VILCHEZ LAURENTE YONY WILBER 8/6/1980 M
23258265 PANDURO TOLENTINO, OVENCESLAO SIMON 5/16/1975 F
42603550 QUIÑONES OTINIANO ALEX SANDRO 9/3/1984 M
40786197 ÑAUPARI RIVERA CARLOS LUIS 9/22/1979 M
23264641 LAURENTE QUISPE PERCY AMADOR 8/22/1976 M
42470632 MAMANI MARQUINA JAIME 6/6/1984 M
43320248 ACUÑA PONCE, ERNESTO 12/15/1985 M
DACIÓN DE DATOS
BASE DE DATOS

CARGO SUELDO BASICO DIAS TRAB. TOTAL SUELDO


INGENIERO
AYUDANTE 1 MINA DE PERFORISTA 2605.0000 28 2633.0000
AYUDANTE 2 MINA DE PERFORISTA 2440.0000 10 2450.0000
CAPATAZ-INTERIOR MINA 2605.0000 25 2630.0000
CHOFER 61.2500 20 81.2500
MAESTRO 1 DE OPERACION MINA - PERFORISTA 2605.0000 25 2630.0000
MAESTRO 1 DE SERVICIOS INTERIOR MINA - MOTORISTA 2925.0000 20 2945.0000
MAESTRO 2 DE OPERACION MINA - PERFORISTA 2440.0000 17 2457.0000
MAESTRO 2 DE SERVICIOS INTERIOR MINA - MOTORISTA 2440.0000 26 2466.0000
OPERADOR DE SCOOP 2440.0000 14 2454.0000
PEON MINA 5500.000 17 5517.0000
SUPERVISOR DE SEGURIDAD-INTERIOR MINA 5105.000 21 5126.0000
TECNICO SUPERVISOR DE EXPLOTACION MINERA 10000.000 22 10022.0000
TECNICO SUPERVISOR DE EXPLOTACION MINERA 8105.000 22 8127.0000
MES  Argentina  Bolivia  Brasil  Chile  Colombia  Ecuador Paraguay
Enero 6473.00 9726.00 4017.00 7848.00 9882.00 12 551 4852.00
Febrero 366.00 513.00 423.00 643.00 859.00 1060.00 20 373
Marzo 34 585 45 058 25 949 48 506 66 660 65 272 7137.00
Abril 12 572 15 518 12 887 15 373 22 931 30 323 306.00
Mayo 9049.00 10 596 7137.00 6758.00 13 438 15 823 95.00
Junio 194.00 1058.00 306.00 163.00 641.00 587.00 6431.00
Julio 202.00 209.00 95.00 228.00 215.00 273.00 643.00
Agosto 5491.00 6924.00 6431.00 8455.00 8233.00 12 240 48 506
Septiembre 1329.00 2106.00 1529.00 2289.00 2505.00 2710.00 15 373
Octubre 1505.00 1741.00 −2169 1849.00 3778.00 3216.00 6758.00
Noviembre 9151.00 21 090 6758.00 163.00 228.00 8455.00 859.00
Diciembre 423.00 25 949 12 887 7137.00 306.00 95.00 6431.00

MES  Argentina  Bolivia  Brasil  Chile  Colombia  Ecuador Paraguay


Enero 6473.00 9726.00 4017.00 7848.00 9882.00 12 551 4852.00

INGRESO DE DEVISAS
11999.00

9999.00

7999.00

5999.00

3999.00

1999.00

-1.00
 Argentina  Bolivia  Brasil  Chile  Colombia  Ecuador Paraguay P

Chart Title
12000.00

10000.00

8000.00

6000.00

4000.00
10000.00

8000.00

6000.00

4000.00

2000.00

0.00
 Argentina  Bolivia  Brasil  Chile  Colombia  Ecuador Paraguay Perú
Perú Uruguay Venezuela 1
9151.00 7233.00 9461.00
21 090 913.00 2486.00
6758.00 13 438 15 823
163.00 641.00 587.00
228.00 215.00 273.00
8455.00 8233.00 12 240
859.00 1060.00 2710.00
66 660 65 272 3216.00
22 931 30 323 66 660
13 438 15 823 22 931
66 660 587.00 13 438
10 596 1058.00 209.00

Perú Uruguay Venezuela


9151.00 7233.00 9461.00

VISAS

ador Paraguay Perú Uruguay Venezuela

Enero
Enero

or Paraguay Perú Uruguay Venezuela

También podría gustarte