LOOKAHEAD PLANNING

NOMBRE DE PROYECTO: PROPIETARIO: FECHA: UBICACION:


ENCUENTRO DE INGENIERÍA PRO CAPÍTULO PERUANO DEL LEAN CONSTRUCTION INTITUTE Monday, April 26, 2021 Dirección 123
SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 SEMANA 5 SEMANA 6 SEMANA 7 SEMANA 8
Metrado
Código Descripción de la Actividad Und Total L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D
31 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Encofrado de Columnas y Placas m2 3,613.12 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 13

Concreto de Columnas y Placas m3 476.32 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64

Encofrado de Vigas m2 1,625.88 60 60 60 60 60 60 60 60 60 60 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64

Encofrado de Losas Aligeradas y Macizas m2 5,459.20 60 60 60 60 60 60 60 60 60 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64

Concreto de Horizontales m3 981.20 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
HOJA DE RESULTADOS
Número de Sectores: 4

Número de días que tomará culminar el proyecto: 40

Sectores Tentativos Sectores Sector


Actividad Metrados totales Sectores Tentativos 4 RESTRICCIONES Und.
3 Tentativos 5 1 2 3 4 5
Encofrado de Verticales 3613.12 12.00 8.00 20.00 Stock de encofrado m2 60.20 130.48 95.34 81.34 155.54

Vaciado de Verticales 476.32 12.00 8.00 20.00 Bomba de conreto m3 19.25 17.15 12.62 10.52 31.87

Encofrado de Vigas 1625.88 17.00 8.50 25.50 Stock de encofrado m2 14.45 10.20 11.90 8.50 26.35

Encofrado de Losas 5459.20 7.00 6.00 13.00 Stock de encofrado m2 202.63 202.63 138.57 138.57 341.20

Vaciado de Horizontales 981.20 17.00 16.00 33.00 Bomba de conreto m3 31.51 30.83 18.31 17.79 49.81

HH HH HH Personas al personas Personas


Actividad PROMEDIO Mínimo Maximo PRODUCTIVIDAD Und. Promedio conservador
Número de Personas
Promedio Minimo Maximo aveasdo
Encofrado de Verticales 104.58 60.20 155.54 m2 70.50 39.3 101.7 8.8 9.00

Vaciado de Verticales 18.28 10.52 31.87 m3 17.72 14.6 20.8 2.2 3.00

Encofrado de Vigas 14.28 8.50 26.35 m2 10.32 3.4 17.2 1.3 2.00

Encofrado de Losas 204.72 138.57 341.20 m2 191.14 159.3 223.0 23.9 24.00

Vaciado de Horizontales 29.65 17.79 49.81 m3 25.54 18.5 32.6 3.2 4.00

TOTAL 1457.5152

SEC 1 SEC 2 SEC 3 SEC 4

19.25 31.51 17.15 30.83 12.62 18.31 10.52 17.79

DÍA
1 2 3 4 5 6 7 8 9 10
19.25 31.51 36.40 60.00 49.02 49.81 59.54 49.29 59.54 60.00 474.37

11 12 13 14 15 16 17 18 19 20
59.54 60.00 59.54 60.00 59.54 60.00 59.54 60.00 59.54 55.34 593.04
CONCRETO A VACIARSE
POR DÍA
21 22 23 24 25 26 27 28 29 30
59.54 62.34 59.54 55.34 59.54 62.34 31.46 390.10

31 32 33 34 35 36 37 38 39 40
0.00

1457.51 1457.5152
Ratio Concreto Ratio Encofrado
ELEMENTOS CANTIDAD
CONCRETO Elemento ENCOFRADO Elemento

C1 4 0.32 1.28 3.92 15.68


C2 16 0.63 10.08 5.32 85.12
C3 14 1.05 14.70 7.00 98.00
P1 6 5.58 33.48 42.14 252.84
Vigas X-X 4.75m 26 0.13 16.06 0.85 104.98
Vigas y-y 2.78m 20 0.13 7.23 0.85 47.26
Vigas Y-Y 6.00m 10 0.13 7.80 0.85 51.00
LOSAS MACIZAS 64.06 2 0.20 25.62 1.00 128.12
LOSAS ALIGERADAS 31.19 12 0.08 29.94 1.00 374.28
LOSAS MACIZAS 15 12 0.20 36.00 1.00 180.00
Descripción

SECTOR 1
SECTOR 2
SECTOR 3
SECTOR 4

Cantidad Sector 1 Cantidad Sector 1 Cantidad Sector 2 Cantidad Sector 2


Sector 1 Conc ENC 1 Enc Sector 2 Conc ENC 2 Enc

1 0.32 1.00 3.92 1 0.32 1.00 3.92


4 2.52 4.00 21.28 4 2.52 4.00 21.28
5 5.25 5.00 35.00 3 3.15 3.00 21.00
2 11.16 2.00 84.28 2 11.16 2.00 84.28
9 1.17 9.00 7.65 5 0.65 5.00 4.25
5 0.65 5.00 4.25 5 0.65 5.00 4.25
3 0.39 3.00 2.55 2 0.26 2.00 1.70
1 12.81 1.00 64.06 1 12.81 1.00 64.06
3 7.49 3.00 93.57 3 7.46 3.00 93.57
3 9.00 3.00 45.00 3 9.00 3.00 45.00
Cantidad Sector 3 Cantidad Sector 3 Cantidad Sector 4 Cantidad Sector 4
Sector 3 Conc ENC 3 Enc Sector 4 Conc ENC 4 Enc

1 0.32 1.00 3.92 1 0.32 1.00 3.92


4 2.52 4.00 21.28 4 2.52 4.00 21.28
4 4.20 4.00 28.00 2 2.10 2.00 14.00
1 5.58 1.00 42.14 1 5.58 1.00 42.14
6 0.78 6.00 5.10 4 0.52 4.00 3.40
5 0.65 5.00 4.25 4 0.52 4.00 3.40
3 0.39 3.00 2.55 2 0.26 2.00 1.70
0 0.00 0.00 0.00 0 0.00 0.00 0.00
3 7.49 3.00 93.57 3 7.49 3.00 93.57
3 9.00 3.00 45.00 3 9.00 3.00 45.00
C1
C2
C3
P1
Vigas X-X 4.75m
Vigas y-y 2.78m
Vigas Y-Y 6.00m
LOSAS MACIZAS 64.06
LOSAS ALIGERADAS 31.19
LOSAS MACIZAS 15