Ubicación de la Ejecución de Obra : Anexo.:SAN MIGUEL DE CURIS - Dist.:SANTIAGO DE CHOCORVOS - Prov.:HUAYTARA - Dpto.:HUANCAVELICA
Domicilio legal del Contratista : Urb. El oasis 2da Etapa cale Sol y Mar Mz L Lte 11- Ica-Ica-Ica.
Nº de contrato : N°055-2020-MPH/GM
SUPERVISOR DE OBRA
RESIDENTE DE OBRA
“AMPLIACION, MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DE ALCANTARILLADO DEL ANEXO DE SAN MIGUEL DE CURIS, DISTRITO DE SANTIAGO DE CHOCORVOS - HUAYTARA - HUANCAVELICA’’
METRADO
PARCIAL
P. UNIT
UNID
DESCRIPCION 21/10/2020 -31/10/20 1/11/20-30/11/20 01/12/20-31/12/20 01/01/21-31/01/21 01/02/21-28/02/21 01/03/20-19/03/21 1/11/20-30/11/20
UTI (0.07) 180,406.35 1,536.27 11,627.57 31,160.01 60,562.70 52,316.87 23,202.93 40,557.96
I.G.V. (18%) 480,155.63 4,088.81 30,947.04 82,933.07 161,189.00 139,242.54 61,755.16 107,945.96
PT 3,147,686.90 26,804.43 202,875.05 543,672.37 1,056,683.47 912,812.21 404,839.37 707,645.71
PROCENTAJE 100.00% 0.85% 6.45% 267.98% 194.36% 86.38% 44.35% 174.80%
VALORIZACION N°02
: 01/11/2020 AL 30/11/2020
OBRA:
“AMPLIACION, MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DE ALCANTARILLADO DEL ANEXO DE SAN MIGUEL DE CURIS, DISTRITO DE SANTIAGO DE CHOCORVOS - HUAYTARA - HUANCAVELICA’’
ACTUAL
METRADO
PARCIAL
P. UNIT
UNID
PARTIDA DESCRIPCION
A.1 IMPLEMENTACION DEL PLAN PARA LA VIGILANCIA, PREVENCION Y CONTROL COVID 19 GLB 1.00 18,483.54 18,483.54 0.30 5545.06 30.00% 0.30 5545.06 30.00% 0.60 11090.12 60.00% 0.40 7393.42 40.00%
1 SISTEMA DE AGUA POTABLE -LOCALIDAD DE SAN NIGUEL DE CURIS 0.00
1.01 OBRAS PROVISIONALES 0.00
01.01.01 CAMPAMENTO PROVISIONAL DE OBRA m2 81.00 157.77 12,779.37 81.00 12779.37 100.00% 0.00 0.00 0.00% 81.00 12779.37 100.00% 0.00 0.00 0.00%
01.01.02 CARTEL DE IDENTIFICACION DE OBRA und 2.00 1,073.98 2,147.96 1.00 1073.98 50.00% 1.00 1073.98 50.00% 2.00 2147.96 100.00% 0.00 0.00 0.00%
01.01.03 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA GLB 1.00 4,000.00 4,000.00 0.00 0.00% 0.20 800.00 20.00% 0.20 800.00 20.00% 0.80 3200.00 80.00%
1.02 SEGURIDAD EN OBRA 0.00
ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL
01.02.01 GLB 1.00 2,189.80 2,189.80
TRABAJO 1.00 2189.80 100.00% 0.00 0.00 0.00% 1.00 2189.80 100.00% 0.00 0.00 0.00%
01.02.02 EQUIPOS DE PROTECCION Y SEGURIDAD (EPP) GLB 1.00 9,520.00 9,520.00 0.20 1904.00 20.00% 0.20 1904.00 20.00% 0.40 3808.00 40.00% 0.60 5712.00 60.00%
01.02.03 SEGURIDAD EN OBRA (SEÑALIZACION TEMPORAL) GLB 1.00 11,352.09 11,352.09 0.10 1135.21 10.00% 0.10 1135.21 10.00% 0.20 2270.42 20.00% 0.80 9081.67 80.00%
01.02.04 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD EN OBRA GLB 1.00 3,804.32 3,804.32 0.25 951.08 25.00% 0.25 951.08 25.00% 0.50 1902.16 50.00% 0.50 1902.16 50.00%
01.02.05 CAPACITACION EN SEGURIDAD Y SALUD GLB 1.00 2,500.00 2,500.00 0.10 250.00 10.00% 0.10 250.00 10.00% 0.20 500.00 20.00% 0.80 2000.00 80.00%
1.03 SISTEMA DE AGUA POTABLE 0.00
01.03.01 CAPTACION DE LADERA ( 01 und) 0.00 0.00
01.03.01.01 TRABAJOS PRELIMINARES 0.00 0.00
01.03.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 24.48 1.35 33.05 0.00 0.00% 24.48 33.05 100.00% 24.48 33.05 100.00% 0.00 0.00 0.00%
01.03.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 24.48 2.25 55.08 0.00 0.00% 24.48 55.08 100.00% 24.48 55.08 100.00% 0.00 0.00 0.00%
01.03.01.02 MOVIMIENTO DE TIERRAS 0.00 0.00
01.03.01.02.01 EXCAVACION TERRENO SEMI ROCOSO m3 19.25 48.81 939.59 0.00 0.00% 19.25 939.59 100.00% 19.25 939.59 100.00% 0.00 0.00 0.00%
01.03.01.02.02 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 5.67 3.46 19.62 0.00 0.00% 5.67 19.62 100.00% 5.67 19.62 100.00% 0.00 0.00 0.00%
01.03.01.02.03 RELLENO CON MATERIAL PROPIO m3 4.74 24.41 115.70 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.74 115.70 100.00%
01.03.01.02.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30m m3 18.14 20.34 368.97 0.00 0.00% 18.14 368.97 100.00% 18.14 368.97 100.00% 0.00 0.00 0.00%
01.03.01.03 FILTROS 0.00 0.00
01.03.01.03.01 FILTRO PARA CAPTACION - GRAVA 3/4" A 1" m3 1.72 161.43 277.66 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.72 277.66 100.00%
01.03.01.03.02 FILTRO PARA CAPTACION - GRAVA 2" m3 0.17 161.43 27.44 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.17 27.44 100.00%
01.03.01.04 OBRAS DE CONCRETO SIMPLE 0.00 0.00
01.03.01.04.01 SOLADO DE CONCRETO f'c=100 kg/cm2, e=4" m2 1.73 41.05 71.02 0.00 0.00% 1.73 71.02 100.00% 1.73 71.02 100.00% 0.00 0.00 0.00%
01.03.01.04.02 CONCRETO F'C=140 KG/CM2 m3 0.52 466.71 242.69 0.00 0.00% 0.52 242.69 100.00% 0.52 242.69 100.00% 0.00 0.00 0.00%
01.03.01.04.03 CONCRETO f'c=140 kg/cm2+30% PM - PARA RELLENO m3 2.76 417.28 1,151.69 0.00 0.00% 2.76 1151.69 100.00% 2.76 1151.69 100.00% 0.00 0.00 0.00%
01.03.01.05 OBRAS DE CONCRETO ARMADO 0.00 0.00
01.03.01.05.01 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 193.32 3.98 769.41 0.00 0.00% 193.32 769.41 100.00% 193.32 769.41 100.00% 0.00 0.00 0.00%
01.03.01.05.02 ENCOFRADO Y DESENCOFRADO DE MUROS (2 CARAS) m2 25.44 59.94 1,524.87 0.00 0.00% 25.44 1524.87 100.00% 25.44 1524.87 100.00% 0.00 0.00 0.00%
01.03.01.05.03 CONCRETO F'C=210 KG/CM2 m3 1.50 510.96 766.44 0.00 0.00% 1.50 766.44 100.00% 1.50 766.44 100.00% 0.00 0.00 0.00%
01.03.01.06 REVOQUES Y ENLUCIDOS 0.00 0.00
01.03.01.06.01 TARRAJEO EXTERIOR, e=1.5 cm, 1:4 m2 10.04 22.11 221.98 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.04 221.98 100.00%
01.03.01.06.02 TARRAJEO INTERIOR, e= 1.5cm, 1:4 m2 1.76 24.81 43.67 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.76 43.67 100.00%
01.03.01.06.03 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 1:2, e=2.0 cm m2 4.24 27.09 114.86 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.24 114.86 100.00%
01.03.01.07 CARPINTERIA METALICA 0.00 0.00
01.03.01.07.01 TAPA METALICA 0.50x0.40 m, CON LLAVE TIPO BUJIA und 1.00 127.77 127.77 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 127.77 100.00%
01.03.01.07.02 TAPA METALICA 0.60x0.60 m , CON LLAVE TIPO BUJIA und 1.00 147.30 147.30 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 147.30 100.00%
01.03.01.08 VALVULAS Y ACCESORIOS 0.00 0.00
01.03.01.08.01 ACCESORIOS PVC AGUA PARA CAPTACION SALIDA 2" GLB 1.00 434.93 434.93 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 434.93 100.00%
01.03.01.09 PINTURA 0.00 0.00
01.03.01.09.01 PINTURA EXTERIOR EN ESTRUCTURAS, 2 MANOS m2 9.54 12.12 115.62 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.54 115.62 100.00%
01.03.01.09.02 PINTURA ESMALTE 2 MANOS PARA TAPAS m2 1.12 14.31 16.03 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.12 16.03 100.00%
01.03.02 CERCO PERIMETRICO DE CAPTACION 0.00 0.00
01.03.02.01 TRABAJOS PRELIMINARES 0.00 0.00
01.03.02.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 120.00 2.25 270.00 0.00 0.00% 120.00 270.00 100.00% 120.00 270.00 100.00% 0.00 0.00 0.00%
01.03.02.01.02 LIMPIEZA DE TERRENO MANUAL m2 120.00 1.35 162.00 0.00 0.00% 120.00 162.00 100.00% 120.00 162.00 100.00% 0.00 0.00 0.00%
01.03.02.02 MOVIMIENTO DE TIERRAS 0.00 0.00
01.03.02.02.01 EXCAVACION DE HOYO DE 0.40X0.40.X0.50M EN MATERIAL CONGLOMERADO m3 1.86 30.51 56.75 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.86 56.75 100.00%
01.03.02.02.02 ELIMINACION MATERIAL EXCEDENTE HASTA 100m m3 1.60 20.34 32.54 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.60 32.54 100.00%
01.03.02.02.03 REFINE, NIVELACION Y APISONADO DE TERRENO m2 1.60 2.30 3.68 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.60 3.68 100.00%
01.03.02.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
01.03.02.03.01 CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS (SIN AGREGADOS) m3 1.86 245.30 456.26 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.86 456.26 100.00%
01.03.02.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
01.03.02.04.01 CONCRETO FC=175 KG/CM2 COLUMNA m3 1.25 510.00 637.50 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.25 637.50 100.00%
01.03.02.04.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 26.00 63.72 1,656.72 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 26.00 1656.72 100.00%
01.03.02.04.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 62.88 4.03 253.41 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 62.88 253.41 100.00%
01.03.02.05 VARIOS 0.00 0.00
01.03.02.05.01 PUERTA METALICA DE 1.20X2.20m UNA HOJA CON TUBO DE 2" Y MALLA ROMBO 1/2"x1/2" N°12 und 1.00 306.44 306.44 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 306.44 100.00%
01.03.02.05.02 MALLA METALICA PROTECTORA CON ALAMBRE TIPO PUAS m2 45.60 35.32 1,610.59 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 45.60 1610.59 100.00%
01.03.02.05.03 CERCO DE ALAMBRE TIPO PUAS m 77.00 2.90 223.30 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 77.00 223.30 100.00%
01.03.02.05.04 POSTES DE TUBO DE 2" und 12.00 47.80 573.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 573.60 100.00%
01.03.03 CAMARA ROMPE PRESION TIPO 06 Ø 2" (04 UND) , TOTAL=04 UND 0.00 0.00
01.03.03.01 TRABAJOS PRELIMINARES 0.00 0.00
01.03.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 4.00 1.35 5.40 0.00 0.00% 4.00 5.40 100.00% 4.00 5.40 100.00% 0.00 0.00 0.00%
01.03.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 4.00 2.25 9.00 0.00 0.00% 4.00 9.00 100.00% 4.00 9.00 100.00% 0.00 0.00 0.00%
01.03.03.02 MOVIMIENTO DE TIERRAS 0.00 0.00
01.03.03.02.01 EXCAVACION TERRENO SEMI ROCOSO m3 3.46 48.81 168.88 0.00 0.87 42.22 25.00% 0.87 42.22 25.00% 2.60 126.66 75.00%
01.03.03.02.02 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 3.56 3.46 12.32 0.00 0.00% 0.89 3.08 25.00% 0.89 3.08 25.00% 2.67 9.24 75.00%
01.03.03.02.03 ELIMINACION MATERIAL EXCEDENTE HASTA 30m m3 3.98 20.34 80.95 0.00 0.00% 1.00 20.24 25.00% 1.00 20.24 25.00% 2.99 60.71 75.00%
01.03.03.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
01.03.03.03.01 SOLADO DE CONCRETO f'c=100 kg/cm2, e=4" m2 4.00 41.05 164.20 0.00 0.00% 1.00 41.05 25.00% 1.00 41.05 25.00% 3.00 123.15 75.00%
01.03.03.03.02 CONCRETO F'C=140 KG/CM2 m3 0.05 466.71 23.34 0.00 0.00% 0.01 5.83 24.98% 0.01 5.83 24.98% 0.04 17.50 74.98%
01.03.03.03.03 CONCRETO f'c=140 kg/cm2+30% PM - PARA RELLENO m3 0.20 417.28 83.46 0.00 0.00% 0.05 20.86 24.99% 0.05 20.86 24.99% 0.15 62.59 74.99%
01.03.03.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
01.03.03.04.01 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 229.70 3.98 914.21 0.00 0.00% 57.43 228.55 25.00% 57.43 228.55 25.00% 172.28 685.65 75.00%
01.03.03.04.02 ENCOFRADO Y DESENCOFRADO DE MUROS (2 CARAS) m2 21.60 59.94 1,294.70 0.00 0.00% 5.40 323.68 25.00% 5.40 323.68 25.00% 16.20 971.03 75.00%
01.03.03.04.03 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL m3 2.22 510.96 1,134.33 0.00 0.00% 0.56 283.58 25.00% 0.56 283.58 25.00% 1.67 850.75 75.00%
01.03.03.05 REVOQUES Y ENLUCIDOS 0.00 0.00
01.03.03.05.01 TARRAJEO EXTERIOR, e=1.5 cm, 1:4 m2 14.76 22.11 326.34 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.76 326.34 100.00%
01.03.03.05.02 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 1:2, e=2.0 cm m2 10.08 27.09 273.07 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.08 273.07 100.00%
01.03.03.06 CARPINTERIA METALICA 0.00 0.00
01.03.03.06.01 TAPA METALICA 0.60x0.60 m , CON LLAVE TIPO BUJIA und 4.00 147.30 589.20 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 589.20 100.00%
01.03.03.07 VALVULAS Y ACCESORIOS 0.00 0.00
01.03.03.07.01 ACCESORIOS DE SALIDA C.R.P TIPO 6 - 2" und 1.00 290.94 290.94 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 290.94 100.00%
01.03.03.08 PINTURA 0.00 0.00
01.03.03.08.01 PINTURA EXTERIOR EN ESTRUCTURAS, 2 MANOS m2 12.96 12.12 157.08 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.96 157.08 100.00%
01.03.03.08.02 PINTURA ESMALTE 2 MANOS PARA TAPAS m2 5.76 14.31 82.43 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.76 82.43 100.00%
01.03.04 LINEA DE CONDUCCION (Ø 63mm L=5,067.15m) 0.00 0.00
01.03.04.01 OBRAS PRELIMINAR 0.00 0.00
01.03.04.01.01 TRAZO Y REPLANTEO INICIAL PARA LINEAS DE AGUA KM 5.07 786.86 3,989.38 0.00 0.00% 5.07 3989.38 100.00% 5.07 3989.38 100.00% 0.00 0.00 0.00%
01.03.04.01.02 TRAZO Y REPLANTEO FINAL PARA LINEAS DE AGUA KM 5.07 808.79 4,100.57 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.07 4100.57 100.00%
01.03.04.02 EXCAVACION DE ZANJA 0.00 0.00
01.03.04.02.01 EXCAVACION MANUAL EN TERRENO NORMAL (0.45x0.70) m 506.71 10.98 5,563.68 0.00 0.00% 253.36 2781.84 50.00% 253.36 2781.84 50.00% 253.36 2781.84 50.00%
01.03.04.02.02 EXCAVACION MANUAL SEMI ROCA (0.45x0.70) m 1,520.15 15.38 23,379.91 0.00 0.00% 450.00 6921.00 29.60% 450.00 6921.00 29.60% 1070.15 16458.91 70.40%
01.03.04.02.03 EXCAVACION EN TERRENO ROCOSO(0.45x0.70) m 3,040.29 43.14 131,158.11 0.00 0.00% 400.00 17256.00 13.16% 400.00 17256.00 13.16% 2640.29 113902.11 86.84%
01.03.04.03 RELLENO Y COMPACTACION DE ZANJA 0.00 0.00
01.03.04.03.01 REFINE Y NIVELACION DE ZANJA EN TERRENO NORMAL - SEMI ROCA m 2,026.86 2.50 5,067.15 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2026.86 5067.15 100.00%
01.03.04.03.02 REFINE Y NIVELACION DE ZANJA EN TERRENO ROCOSO m 3,040.29 4.21 12,799.62 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3040.29 12799.62 100.00%
01.03.04.03.03 CAMA DE APOYO PARA TUBERIA TODA PROFUNDIDAD TERRENO NORMAL - SEMI ROCA m 2,026.86 8.19 16,599.98 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2026.86 16599.98 100.00%
01.03.04.03.04 CAMA DE APOYO PARA TUBERIA TODA PROFUNDIDAD TERRENO ROCOSO m 3,040.29 13.79 41,925.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3040.29 41925.60 100.00%
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE 0.20M EN TERRENO NORMAL -
01.03.04.03.05 m 506.71 12.83 6,501.09
HASTA 0.7 m
0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 506.71 6501.09 100.00%
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE 0.20M EN TERRENO SEMIROCA
01.03.04.03.06 m 1,520.15 30.88 46,942.23
- HASTA 0.7 m 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1520.15 46942.23 100.00%
RELLENO DE ZANJAS APISONADIO CON MATERIAL PROPIO EN CAPAS DE 0.20M EN TERRENO ROCOSO -
01.03.04.03.07 m 3,040.29 57.73 175,515.94
HASTA 0.7 m 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3040.29 175515.94 100.00%
01.03.04.03.08 ELIMINACION MATERIAL EXCEDENTE HASTA 30m m3 570.05 20.34 11,594.82 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 570.05 11594.82 100.00%
01.03.04.04 INSTALACIONES DE TUBERIA DE HDPE 0.00 0.00
01.03.04.04.01 SUMINISTRO E INSTALACION DE TUBERIA ISO 4427 HDPE DN:63 mm SDR 13.60 m 5,067.15 12.99 65,822.28 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5067.15 65822.28 100.00%
01.03.04.04.02 ANCLAJE DE TUBERIA DE HDPE 0.00 0.00
01.03.04.04.02.01 CONCRETO F'C=140 KG/CM2 m3 4.56 466.71 2,128.20 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.56 2128.20 100.00%
01.03.04.04.02.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 331.52 3.98 1,319.45 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 331.52 1319.45 100.00%
01.03.04.04.02.03 ACCESORIOS DE HDPE DE LINEA DE CONDUCCION D= 63mm GLB 1.00 2,043.92 2,043.92 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 2043.92 100.00%
01.03.04.05 PRUEBAS HIDRAULICA Y DESINFECCION 0.00 0.00
01.03.04.05.01 PRUEBAS HIDRAULICA Y DESINFECCION m 5,067.15 2.16 10,945.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5067.15 10945.04 100.00%
01.03.05 CRUCE AEREO DE TUBERIA (1 und, L=40 m) 0.00 0.00
01.03.05.01 TRABAJOS PRELIMINARES 0.00 0.00
01.03.05.01.01 LIMPIEZA DE TERRENO MANUAL m2 65.94 1.35 89.02 0.00 0.00% 65.94 89.02 100.00% 65.94 89.02 100.00% 0.00 0.00 0.00%
01.03.05.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 149.94 2.25 337.37 0.00 0.00% 149.94 337.37 100.00% 149.94 337.37 100.00% 0.00 0.00 0.00%
01.03.05.02 MOVIMIENTO DE TIERRAS 0.00 0.00
01.03.05.02.01 EXCAVACION TERRENO SEMI ROCOSO m3 11.76 48.81 574.01 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.76 574.01 100.00%
01.03.05.02.02 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 8.40 3.46 29.06 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.40 29.06 100.00%
01.03.05.02.03 RELLENO CON MATERIAL PROPIO m3 6.43 24.41 156.96 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.43 156.96 100.00%
01.03.05.02.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30m m3 6.66 20.34 135.46 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.66 135.46 100.00%
01.03.05.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
01.03.05.03.01 SOLADO DE CONCRETO f'c=100 kg/cm2, e=4" m2 8.40 41.05 344.82 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.40 344.82 100.00%
01.03.05.03.02 CONCRETO f'c=100 kg/cm2, e=4" m3 0.69 417.28 287.92 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.69 287.92 100.00%
01.03.05.03.03 ENCOFRADO Y DESENCOFRADO - LOSA DE FONDO m2 3.92 53.05 207.96 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.92 207.96 100.00%
01.03.05.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
01.03.05.04.01 ZAPATAS 0.00 0.00
01.03.05.04.01.01 ACERO DE REFUERZO FY=4200 KG/CM2 - LOSA DE FONDO kg 68.67 3.96 271.93 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 68.67 271.93 100.00%
01.03.05.04.01.02 ENCOFRADO Y DESNCOFRADO - LOSA DE FONDO m2 8.60 53.05 456.23 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.60 456.23 100.00%
01.03.05.04.01.03 CONCRETO F'C=210 KG/CM2- ESTRUCTURAL - LOSA DE FONDO m3 4.20 479.07 2,012.09 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.20 2012.09 100.00%
01.03.05.04.02 COLUMNAS 0.00 0.00
01.03.05.04.02.01 ACERO DE REFUERZO FY=4200 KG/CM2 - COLUMNA kg 377.72 4.03 1,522.21 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 377.72 1522.21 100.00%
01.03.05.04.02.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 26.40 63.72 1,682.21 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 26.40 1682.21 100.00%
01.03.05.04.02.03 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - LOSA DE FONDO m3 1.98 527.98 1,045.40 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.98 1045.40 100.00%
01.03.05.04.03 VIGAS 0.00 0.00
01.03.05.04.03.01 ACERO DE REFUERZO FY=4200 KG/CM2 - VIGAS kg 126.11 4.08 514.53 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 126.11 514.53 100.00%
01.03.05.04.03.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8.55 69.12 590.98 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.55 590.98 100.00%
01.03.05.04.03.03 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL VIGAS m3 0.91 544.04 495.08 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.91 495.08 100.00%
01.03.05.05 CAMARA DE ANCLAJE 0.00 0.00
01.03.05.05.01 MOVIMIENTO DE TIERRAS 0.00 0.00
01.03.05.05.01.01 EXCAVACION TERRENO SEMI ROCOSO m3 14.76 48.81 720.44 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.76 720.44 100.00%
01.03.05.05.01.02 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 6.00 3.46 20.76 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 20.76 100.00%
01.03.05.05.01.03 RELLENO CON MATERIAL PROPIO m3 5.76 24.41 140.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.76 140.60 100.00%
01.03.05.05.01.04 ELIMINACION DE MATERIAL EXCESENTE HASTA 30m m3 11.25 20.34 228.83 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.25 228.83 100.00%
01.03.05.05.02 CONCRETO SIMPLE 0.00 0.00
01.03.05.05.02.01 ENCOFRADO Y DESENCOFRADO - LOSA DE FONDO m2 21.00 53.05 1,114.05 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 21.00 1114.05 100.00%
01.03.05.05.02.02 CONCRETO f'c=140 kg/cm2 +30% PM - PARA RELLENO m3 9.00 417.28 3,755.52 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.00 3755.52 100.00%
01.03.05.06 ESTRUCTURA DE ANCLAJE 0.00 0.00
01.03.05.06.01 MACISO PERFIL I, ANCLAJE DE CABLE und 2.00 168.44 336.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 336.88 100.00%
01.03.05.07 REVOQUES Y ENLUCIDOS 0.00 0.00
01.03.05.07.01 TARRAJEO EXTERIOR, e=1.5 cm, 1:4 m2 29.40 22.11 650.03 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 29.40 650.03 100.00%
01.03.05.08 CARPINTERIA METALICA 0.00 0.00
01.03.05.08.01 CARRO DE DILATACION und 2.00 647.89 1,295.78 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 1295.78 100.00%
01.03.05.08.02 CABLE DE ACERO PRINCIPAL DE 5/8" TIPO BOA ALMA DE ACERO m 75.67 28.42 2,150.54 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 75.67 2150.54 100.00%
01.03.05.08.03 CABLE DE DE ACERO D=3/8", PENDOLAS, TIPO BOA m 61.16 16.72 1,022.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.16 1022.60 100.00%
01.03.05.08.04 ARGOLLA DE 1/4" D=2 1/2" P/SOPORTE DE TUBERIA und 27.00 108.73 2,935.71 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 27.00 2935.71 100.00%
01.03.05.08.05 ACCESORIOS DE CAMARA DE ANCLAJE und 2.00 198.84 397.68 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 397.68 100.00%
01.03.05.08.06 ACCESORIOS DE PENDOLA und 54.00 38.12 2,058.48 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 54.00 2058.48 100.00%
01.03.05.09 TUBERIAS DE HDPE 0.00 0.00
01.03.05.09.01 SUMINISTRO E INSTALACION DE TUBERIA ISO 4427 HDPE DN:63 mm SDR 13.60 - aereo m 43.32 15.35 664.96 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 43.32 664.96 100.00%
01.03.05.09.02 ACCESORIOS PARA UNION HDPE - HDPE D= 63mm und 2.00 46.02 92.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 92.04 100.00%
01.03.06 CRUCE AEREO DE TUBERIA L=80m (01 und) 0.00 0.00
01.03.06.01 TRABAJOS PRELIMINARES 0.00 0.00
01.03.06.01.01 LIMPIEZA DE TERRENO MANUAL m2 197.34 1.35 266.41 0.00 0.00% 197.34 266.41 100.00% 197.34 266.41 100.00% 0.00 0.00 0.00%
01.03.06.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 509.34 2.25 1,146.02 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 509.34 1146.02 100.00%
01.03.06.02 MOVIMIENTO DE TIERRAS 0.00 0.00
01.03.06.02.01 EXCAVACION TERRENO SEMI ROCOSO m3 32.26 48.81 1,574.61 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 32.26 1574.61 100.00%
01.03.06.02.02 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 20.16 3.46 69.75 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.16 69.75 100.00%
01.03.06.02.03 RELLENO CON MATERIAL PROPIO m3 19.35 24.41 472.33 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.35 472.33 100.00%
01.03.06.02.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30m m3 16.13 20.34 328.08 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.13 328.08 100.00%
01.03.06.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
01.03.06.03.01 SOLADO DE CONCRETO f'c=100 kg/cm2, e=4" m2 20.16 41.05 827.57 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.16 827.57 100.00%
01.03.06.03.02 CONCRETO f'c=140 kg/cm2+30% PM - PARA RELLENO m3 2.64 417.28 1,101.62 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.64 1101.62 100.00%
01.03.06.03.03 ENCOFRADO Y DESENCOFRADO - LOSA DE FONDO m2 9.20 53.05 488.06 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.20 488.06 100.00%
01.03.06.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
01.03.06.04.01 ZAPATAS 0.00 0.00
01.03.06.04.01.01 ACERO DE REFUERZO FY=4200 KG/CM2 - LOSA FONDO kg 138.92 3.96 550.12 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 138.92 550.12 100.00%
01.03.06.04.01.02 ENCOFRADO Y DESENCOFRADO - LOSA FONDO m2 12.80 53.05 679.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.80 679.04 100.00%
01.03.06.04.01.03 CONCRETOF'C=210 KG/CM2 - ESTRUCTURAL - LOSA FONDO m3 10.08 479.07 4,829.03 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.08 4829.03 100.00%
01.03.06.04.02 COLUMNAS 0.00 0.00
01.03.06.04.02.01 ACERO DE REFUERZO FY=4200 KG/CM2 - COLUMNA kg 218.42 4.03 880.23 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 218.42 880.23 100.00%
01.03.06.04.02.02 ENCOFRADOY DESENCOFRADO - LOSA FONDO m2 15.00 63.72 955.80 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.00 955.80 100.00%
01.03.06.04.02.03 CONCRETO F'C=210 KG/CM2 - ESCTRUCTURAL - LOSA DE FONDO m3 2.09 527.98 1,103.48 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.09 1103.48 100.00%
01.03.06.04.03 VIGAS 0.00 0.00
01.03.06.04.03.01 ACERO DE REFUERZO FY=4200 KG/CM2 - VIGAS kg 218.42 4.08 891.15 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 218.42 891.15 100.00%
01.03.06.04.03.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 15.00 69.12 1,036.80 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.00 1036.80 100.00%
01.03.06.04.03.03 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL VIGAS m3 2.09 544.04 1,137.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.09 1137.04 100.00%
01.03.06.05 CAMARA DE ANCLAJE 0.00 0.00
01.03.06.05.01 MOVIMIENTO DE TIERRAS 0.00 0.00
01.03.06.05.01.01 EXCAVACION TERRENO SEMI ROCOSO m3 25.50 48.81 1,244.66 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 25.50 1244.66 100.00%
01.03.06.05.01.02 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 10.00 3.46 34.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.00 34.60 100.00%
01.03.06.05.01.03 RELLENO CON MATERIAL PROPIO m3 10.50 24.41 256.31 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.50 256.31 100.00%
01.03.06.05.01.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30m m3 18.75 20.34 381.38 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.75 381.38 100.00%
01.03.06.05.02 CONCRETO SIMPLE 0.00 0.00
01.03.06.05.02.01 ENCOFRADO Y DESENCOFRADO - LOSA DE FONDO m2 27.00 53.05 1,432.35 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 27.00 1432.35 100.00%
01.03.06.05.02.02 CONCRETO f'c=140kg/cm2 +30% PM - PARA RELLENO m3 15.00 417.28 6,259.20 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.00 6259.20 100.00%
01.03.06.06 ESTRUCTURA DE ANCLAJE 0.00 0.00
01.03.06.06.01 MACISO PERFIL I, ANCLAJE DE CABLE und 2.00 168.44 336.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 336.88 100.00%
01.03.06.07 REVOQUES Y ENLUCIDOS 0.00 0.00
01.03.06.07.01 TARRAJEO EXTERIOR, e=1.5 cm, 1:4 m2 73.89 22.11 1,633.71 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 73.89 1633.71 100.00%
01.03.06.08 CARPINTERIA METALICA 0.00 0.00
01.03.06.08.01 CARRO DE DILATACION und 2.00 647.89 1,295.78 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 1295.78 100.00%
01.03.06.08.02 CABLE DE ACERO PRINCIPAL DE 5/8" TIPO BOA ALMA DE ACERO m 123.68 28.42 3,514.99 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 123.68 3514.99 100.00%
01.03.06.08.03 CABLE DE ACERO D=3/8", PENDOLAS, TIPO BOA m 188.22 16.72 3,147.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 188.22 3147.04 100.00%
01.03.06.08.04 ARGOLLA DE 1/4" D=2 1/2" P/SOPORTE DE TUBERIA und 53.00 108.73 5,762.69 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 53.00 5762.69 100.00%
01.03.06.08.05 ACCESORIOS DE CAMARA DE ANCLAJE und 2.00 198.84 397.68 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 397.68 100.00%
01.03.06.08.06 ACCESORIOS DE PENDOLA und 106.00 38.12 4,040.72 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 106.00 4040.72 100.00%
01.03.06.09 TUBERIAS DE HDPE 0.00 0.00
01.03.06.09.01 SUMINISTRO E INSTALACION DE TUBERIA ISO 4427 HDPE DN:63 mm SDR 13.60 - aereo m 83.32 15.35 1,278.96 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 83.32 1278.96 100.00%
01.03.06.09.02 ACCESORIO PARA UNION HDPE - HDPE D=63mm und 2.00 46.02 92.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 92.04 100.00%
01.03.07 CRUCE AEREO DE TUBERIA L=8 m (02 und) 0.00 0.00
01.03.07.01 TRABAJOS PRELIMINARES 0.00 0.00
01.03.07.01.01 LIMPIEZA DE TERRENO MANUAL m2 23.45 1.35 31.66 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.45 31.66 100.00%
01.03.07.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 44.25 2.25 99.56 0.00 0.00% 44.25 99.56 100.00% 44.25 99.56 100.00% 0.00 0.00 0.00%
01.03.07.02 MOVIMIENTO DE TIERRAS 0.00 0.00
01.03.07.02.01 EXCAVACION TERRENO SEMI ROCOSO m3 5.20 48.81 253.81 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.20 253.81 100.00%
01.03.07.02.02 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 4.00 3.46 13.84 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 13.84 100.00%
01.03.07.02.03 RELLENO CON MATERIAL PROPIO m3 3.19 24.41 77.87 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.19 77.87 100.00%
01.03.07.02.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30m m3 5.03 20.34 102.31 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.03 102.31 100.00%
01.03.07.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
01.03.07.03.01 SOLADO DE CONCRETO f'c=100 kg/cm2, e=4" m2 4.00 41.05 164.20 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 164.20 100.00%
01.03.07.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
01.03.07.04.01 ZAPATAS 0.00 0.00
01.03.07.04.01.01 ACERO DE REFUERZO FY=4200 KG/CM2 - LOSA DE FONDO kg 30.03 3.96 118.92 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 30.03 118.92 100.00%
01.03.07.04.01.02 ENCOFRADO Y DESENCOFRADO - LOSA DE FONDO m2 5.60 53.05 297.08 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.60 297.08 100.00%
01.03.07.04.01.03 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - LOSA DE FONDO m3 1.40 479.07 670.70 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.40 670.70 100.00%
01.03.07.04.02 COLUMNAS 0.00 0.00
01.03.07.04.02.01 ACERO DE REFUERZO FY=4200 KG/CM2 - COLUMNA kg 145.06 4.03 584.59 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 145.06 584.59 100.00%
01.03.07.04.02.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 9.40 63.72 598.97 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.40 598.97 100.00%
01.03.07.04.02.03 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - COLUMNAS m3 0.59 527.98 311.51 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.59 311.51 100.00%
01.03.07.05 CAMARA DE ANCLAJE 0.00 0.00
01.03.07.05.01 MOVIMIENTO DE TIERRAS 0.00 0.00
01.03.07.05.01.01 EXCAVACION TERRENO SEMI ROCOSO m3 5.83 48.81 284.56 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.83 284.56 100.00%
01.03.07.05.01.02 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 3.20 3.46 11.07 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.20 11.07 100.00%
01.03.07.05.01.03 RELLENO CON MATERIAL PROPIO m3 3.27 24.41 79.82 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.27 79.82 100.00%
01.03.07.05.01.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30m m3 2.94 20.34 59.80 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.94 59.80 100.00%
01.03.07.05.02 CONCRETO SIMPLE 0.00 0.00
01.03.07.05.02.01 ENCOFRADO Y DESENCOFRADO - LOSA DE FONDO m2 11.52 53.05 611.14 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.52 611.14 100.00%
01.03.07.05.02.02 CONCRETO f'c=140 kg/cm2 +30% PM - PARA RELLENO m3 2.56 417.28 1,068.24 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.56 1068.24 100.00%
01.03.07.06 ESTRUCTURA DE ANCLAJE 0.00 0.00
01.03.07.06.01 MACISO PERFIL I, ANCLAJE DE CABLE und 4.00 168.44 673.76 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 673.76 100.00%
01.03.07.07 REVOQUES Y ENLUCIDOS 0.00 0.00
01.03.07.07.01 TARRAJEO EXTERIOR, e=1.5 cm, 1:4 m2 6.00 22.11 132.66 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 132.66 100.00%
01.03.07.08 CARPINTERIA METALICA 0.00 0.00
01.03.07.08.01 CARRO DE DILATACION und 4.00 647.89 2,591.56 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 2591.56 100.00%
01.03.07.08.02 CABLE DE ACERO PRINCIPAL DE 3/8" TIPO BOA ALMA DE ACERO m 27.52 16.72 460.13 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 27.52 460.13 100.00%
01.03.07.08.03 CABLE DE ACERO D=1/4", PENDOLAS, TIPO COBRA 6 x 19 m 24.76 13.17 326.09 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.76 326.09 100.00%
01.03.07.08.04 ARGOLLA DE 1/8" D=2 1/2" P/SOPORTE DE TUBERIA und 14.00 94.93 1,329.02 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.00 1329.02 100.00%
01.03.07.08.05 ACCESORIOS DE CAMARA DE ANCLAJE und 4.00 198.84 795.36 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 795.36 100.00%
01.03.07.08.06 ACCESORIOS DE PENDOLA und 28.00 38.12 1,067.36 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.00 1067.36 100.00%
01.03.07.09 TUBERIAS DE HDPE 0.00 0.00
01.03.07.09.01 SUMINISTRO E INSTALACION DE TUBERIA ISO 4427 HDPE DN:63 mm SDR 13.60 - aereo m 20.00 15.35 307.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.00 307.00 100.00%
01.03.07.09.02 ACCESORIOS PARA UNION HDPE - HDPE D= 63mm und 2.00 46.02 92.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 92.04 100.00%
01.03.08 CRUCE AEREO DE TUBERIA L=10m (01 und) 0.00 0.00
01.03.08.01 TRABAJOS PRELIMINARES 0.00 0.00
01.03.08.01.01 LIMPIEZA DE TERRENO MANUAL m2 24.99 1.35 33.74 0.00 0.00% 24.99 33.74 100.00% 24.99 33.74 100.00% 0.00 0.00 0.00%
01.03.08.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 37.99 2.25 85.48 0.00 0.00% 37.99 85.48 100.00% 37.99 85.48 100.00% 0.00 0.00 0.00%
01.03.08.02 MOVIMIENTO DE TIERRAS 0.00 0.00
01.03.08.02.01 EXCAVACION TERRENO SEMI ROCOSO m3 2.60 48.81 126.91 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.60 126.91 100.00%
01.03.08.02.02 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 2.00 3.46 6.92 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 6.92 100.00%
01.03.08.02.03 RELLENO CON MATERIAL PROPIO m3 1.59 24.41 38.81 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.59 38.81 100.00%
01.03.08.02.04 ELIMNACION MATERIAL EXCEDENTE HASTA 30m m3 1.26 20.34 25.63 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.26 25.63 100.00%
01.03.08.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
01.03.08.03.01 SOLADO DE CONCRETO f'c=100 kg/cm2, e=4" m2 2.00 41.05 82.10 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 82.10 100.00%
01.03.08.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
01.03.08.04.01 ZAPATAS 0.00 0.00
01.03.08.04.01.01 ACERO DE REFUERZO FY=4200 KG/CM2 - LOSA DE FONDO kg 15.01 3.96 59.44 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.01 59.44 100.00%
01.03.08.04.01.02 ENCOFRADO Y DESENCOFRADO - LOSA DE FONDO m2 2.80 53.05 148.54 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.80 148.54 100.00%
01.03.08.04.01.03 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - LOSA DE FONDO m3 0.70 479.07 335.35 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.70 335.35 100.00%
01.03.08.04.02 COLUMNAS 0.00 0.00
01.03.08.04.02.01 ACERO DE REFUERZO FY=4200 KG/CM2 - COLUMNA kg 72.53 4.03 292.30 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 72.53 292.30 100.00%
01.03.08.04.02.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 4.70 63.72 299.48 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.70 299.48 100.00%
01.03.08.04.02.03 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - COLUMNAS m3 0.29 527.98 153.11 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.29 153.11 100.00%
01.03.08.05 CAMARA DE ANCLAJE 0.00 0.00
01.03.08.05.01 MOVIMIENTO DE TIERRAS 0.00 0.00
01.03.08.05.01.01 EXCAVACION TERRENO SEMI ROCOSO m3 3.43 48.81 167.42 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.43 167.42 100.00%
01.03.08.05.01.02 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 1.60 3.46 5.54 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.60 5.54 100.00%
01.03.08.05.01.03 RELLENO CON MATERIAL PROPIO m3 2.15 24.41 52.48 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.15 52.48 100.00%
01.03.08.05.01.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30m m3 1.47 20.34 29.90 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.47 29.90 100.00%
01.03.08.05.02 CONCRETO SIMPLE 0.00 0.00
01.03.08.05.02.01 ENCOFRADO Y DESENCOFRADO - LOSA DE FONDO m2 5.76 53.05 305.57 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.76 305.57 100.00%
01.03.08.05.02.02 CONCRETO f'c=140 kg/cm2+30% PM - PARA RELLENO m3 1.28 417.28 534.12 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.28 534.12 100.00%
01.03.08.06 ESTRUCTURA DE ANCLAJE 0.00 0.00
01.03.08.06.01 MACISO PERFIL I, ANCLAJE DE CABLE und 2.00 168.44 336.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 336.88 100.00%
01.03.08.07 REVOQUES Y ENLUCIDOS 0.00 0.00
01.03.08.07.01 TARRAJEO EXTERIOR, e=1.5 cm, 1:4 m2 3.00 22.11 66.33 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 66.33 100.00%
01.03.08.08 CARPINTERIA METALICA 0.00 0.00
01.03.08.08.01 CARRO DE DILATACION und 2.00 647.89 1,295.78 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 1295.78 100.00%
01.03.08.08.02 CABLE DE ACERO PRINCIPAL DE 3/8" TIPO BOA ALMA DE ACERO m 15.86 16.72 265.18 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.86 265.18 100.00%
01.03.08.08.03 CABLE DE ACERO D=1/4", PENDOLAS, TIPO COBRA 6 x 19 m 16.08 13.17 211.77 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.08 211.77 100.00%
01.03.08.08.04 ARGOLLA DE 1/8" D=2 1/2" P/SOPORTE DE TUBERIA und 9.00 94.93 854.37 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.00 854.37 100.00%
01.03.08.08.05 ACCESORIOS DECAMARA DE ANCLAJE und 2.00 198.84 397.68 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 397.68 100.00%
01.03.08.08.06 ACCESORIOS DE PENDOLA und 18.00 38.12 686.16 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.00 686.16 100.00%
01.03.08.09 TUBERIAS DE HDPE 0.00 0.00
01.03.08.09.01 SUMINISTRO E INSTALACION DE TUBERIA ISO 4427 HDPE DN:63 mm SDR 13.60 - aereo m 12.00 15.35 184.20 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 184.20 100.00%
01.03.08.09.02 ACCESORIOS PARA UNION HDPE - HDPE D= 63mm und 2.00 46.02 92.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 92.04 100.00%
01.03.09 VALVULA DE PURGA EN LINEA DE CONDUCCION DE 2 " (Ø PURGA 1" 03 UND ) TOTAL= 03 UND 0.00 0.00
01.03.09.01 TRABAJOS PRELIMINARES 0.00 0.00
01.03.09.01.01 LIMPIEZA DE TERRENO MANUAL m2 3.42 1.35 4.62 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.42 4.62 100.00%
01.03.09.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 3.42 2.25 7.70 0.00 0.00% 3.42 7.70 100.00% 3.42 7.70 100.00% 0.00 0.00 0.00%
01.03.09.02 MOVIMIENTO DE TIERRAS 0.00 0.00
01.03.09.02.01 EXCAVACION TERRENO SEMI ROCOSO m3 2.11 48.81 102.99 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.11 102.99 100.00%
01.03.09.02.02 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 1.92 3.46 6.64 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.92 6.64 100.00%
01.03.09.02.03 RELLENO CON MATERIAL PROPIO m3 0.43 27.13 11.67 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.43 11.67 100.00%
01.03.09.02.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30m m3 2.10 20.34 42.71 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.10 42.71 100.00%
01.03.09.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
01.03.09.03.01 SOLADO DE CONCRETO f'c=100 kg/cm2, e=4" m2 2.21 41.05 90.72 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.21 90.72 100.00%
01.03.09.03.02 ENCOFRADO Y DESENCOFRADO - LOSA FONDO m2 10.80 53.05 572.94 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.80 572.94 100.00%
01.03.09.03.03 CONCRETO F'C=175 KG/CM2 m3 0.73 485.88 354.69 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.73 354.69 100.00%
01.03.09.03.04 CONCRETO f'c=140 kg/cm2 +30% PM - PARA RELLENO m3 0.17 417.28 70.94 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.17 70.94 100.00%
01.03.09.04 REVOQUES Y ENLUCIDOS 0.00 0.00
01.03.09.04.01 TARRAJEO EXTERIOR, e=1.5 cm, 1:4 m2 5.88 22.11 130.01 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.88 130.01 100.00%
01.03.09.04.02 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 1:2, e=2.0 cm m2 4.20 27.09 113.78 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.20 113.78 100.00%
01.03.09.05 VALVULAS Y ACCESORIOS 0.00 0.00
01.03.09.05.01 ACCESORIOS DE VALVULA DE PURGA D=1 1/2" und 3.00 179.94 539.82 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 539.82 100.00%
01.03.09.06 PINTURA 0.00 0.00
01.03.09.06.01 PINTURA EXTERIOR EN ESTRUCTURAS, 2 MANOS m2 2.52 12.12 30.54 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.52 30.54 100.00%
01.03.09.06.02 PINTURA ESMALTE 2 MANOS PARA TAPAS m2 0.72 14.31 10.30 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.72 10.30 100.00%
01.03.09.07 CARPINTERIA METALICA 0.00 0.00
01.03.09.07.01 TAPA METALICA 0.60x0.60 m , CON LLAVE TIPO BUJIA und 3.00 147.30 441.90 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 441.90 100.00%
01.03.09.08 DRENAJES 0.00 0.00
01.03.09.08.01 GRAVA D MAX 1" m3 0.13 157.72 20.50 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.13 20.50 100.00%
01.03.10 VALVULA DE AIRE EN LINEA DE CONDUCCION DE 2" (Ø VAL. AIRE 1/2",04 UND); TOTAL= 04 UND. 0.00 0.00
01.03.10.01 TRABAJOS PRELIMINARES 0.00 0.00
01.03.10.01.01 LIMPIEZA DE TERRENO MANUAL m2 1.92 1.35 2.59 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.92 2.59 100.00%
01.03.10.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 1.92 2.25 4.32 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.92 4.32 100.00%
01.03.10.02 MOVIMIENTO DE TIERRAS 0.00 0.00
01.03.10.02.01 EXCAVACION TERRENO SEMI ROCOSO m3 1.54 48.81 75.17 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.54 75.17 100.00%
01.03.10.02.02 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 1.92 3.46 6.64 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.92 6.64 100.00%
01.03.10.02.03 ELIMINACION MATERIAL EXCEDENTE m3 1.93 20.34 39.26 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.93 39.26 100.00%
01.03.10.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
01.03.10.03.01 SOLADO DE CONCRETO f'c=100 kg/cm2, e=4" m2 1.76 41.05 72.25 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.76 72.25 100.00%
01.03.10.03.02 ENCOFRADO Y DESENCOFRADO - LOSA DE FONDO m2 13.44 53.05 712.99 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.44 712.99 100.00%
01.03.10.03.03 CONCRETO F'C=175 KG/CM2 m3 0.90 485.88 437.29 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.90 437.29 100.00%
01.03.10.04 REVOQUES Y ENLUCIDOS 0.00 0.00
01.03.10.04.01 TARRAJEO EXTERIOR, e=1.5 cm, 1:4 m2 7.84 22.11 173.34 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.84 173.34 100.00%
01.03.10.05 DRENAJES 0.00 0.00
01.03.10.05.01 GRAVA D MAX 1" m3 0.10 157.72 15.77 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.10 15.77 100.00%
01.03.10.06 VALVULAS Y ACCESORIOS 0.00 0.00
01.03.10.06.01 ACCESORIOS DE VALCULA DE AIRE D=1/2", EN RED DE D=1 1/2" und 4.00 98.24 392.96 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 392.96 100.00%
01.03.10.07 CARPINTERIA METALICA 0.00 0.00
01.03.10.07.01 TAPA METALICA 0.60x0.60 m , CON LLAVE TIPO BUJIA und 4.00 147.30 589.20 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 589.20 100.00%
01.03.10.08 PINTURA 0.00 0.00
01.03.10.08.01 PINTURA EXTERIOR EN ESTRUCTURAS, 2 MANOS m2 4.48 12.12 54.30 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.48 54.30 100.00%
01.03.10.08.02 PINTURA ESMALTE 2 MANOS PARA TAPAS m2 0.96 14.31 13.74 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.96 13.74 100.00%
01.03.11 RESERVORIO Y CASETA DE VALVULA (V= 20 M3) (01 UND) 0.00 0.00
01.03.11.01 TRABAJOS PRELIMINARES 0.00 0.00
01.03.11.01.01 LIMPIEZA DE TERRENO MANUAL m2 47.49 1.35 64.11 0.00 0.00% 47.49 64.11 100.00% 47.49 64.11 100.00% 0.00 0.00 0.00%
01.03.11.01.02 TRAZO, NIVELACION Y REPLANTEO m2 47.49 2.34 111.13 0.00 0.00% 47.49 111.13 100.00% 47.49 111.13 100.00% 0.00 0.00 0.00%
01.03.11.02 MOVIMIENTO DE TIERRAS 0.00 0.00
01.03.11.02.01 EXCAVACION TERRENO SEMI ROCOSO m3 75.36 48.81 3,678.32 0.00 0.00% 75.36 3678.32 100.00% 75.36 3678.32 100.00% 0.00 0.00 0.00%
01.03.11.02.02 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 23.89 3.46 82.66 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.89 82.66 100.00%
01.03.11.02.03 RELLENO Y COMPACTACION CON MATERTIAL PROPIO - SEGUNDO RELLENO m3 6.57 28.48 187.11 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.57 187.11 100.00%
01.03.11.02.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30m m3 85.99 20.34 1,749.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 85.99 1749.04 100.00%
01.03.11.02.05 GRAVA D MAX 1" m3 0.25 157.72 39.43 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.25 39.43 100.00%
01.03.11.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
01.03.11.03.01 CONCRETO SIMPLE EN RESERVORIO 0.00 0.00
01.03.11.03.01.01 SOLADO DE CONCRETO f'c=100 kg/cm2, e=4" m2 18.34 41.05 752.86 0.00 0.00% 18.34 752.86 100.00% 18.34 752.86 100.00% 0.00 0.00 0.00%
01.03.11.03.01.02 CONCRETO F'C=140 KG/CM2 P/LOSA DE FONDO m3 0.01 445.77 4.46 0.00 0.00% 0.01 4.46 100.00% 0.01 4.46 100.00% 0.00 0.00 0.00%
01.03.11.03.01.03 CONCRETO f'C=140 kg/cm2 +30% PM - PARA RELLENO m3 0.20 417.28 83.46 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.20 83.46 100.00%
01.03.11.03.02 CONCRETO SIMPLE EN VEREDA 0.00 0.00
01.03.11.03.02.01 CORTE EN TERRENO NATURAL PARA VEREDAS, e=0.10m m2 9.60 1.74 16.70 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.60 16.70 100.00%
01.03.11.03.02.02 BASE GRANULAR PARA VEREDAS, e=0.10m m2 9.60 18.23 175.01 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.60 175.01 100.00%
01.03.11.03.02.03 VEREDA, e=4" CONCRETO f'c= 140 kg/cm2 m2 9.60 54.27 520.99 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.60 520.99 100.00%
01.03.11.03.02.04 JUNTAS DE DILATACION EN VEREDAS CADA 3 METROS, e=1/2" m 1.80 7.94 14.29 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.80 14.29 100.00%
01.03.11.03.02.05 BRUÑA PARA VEREDA E= 1.00 CM m 11.40 8.22 93.71 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.40 93.71 100.00%
01.03.11.03.02.06 ENCOFRADO Y DESENCOFRADO - LOSA DE FONDO m2 2.76 53.05 146.42 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.76 146.42 100.00%
01.03.11.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
01.03.11.04.01 LOSA MACIZA DE FONDO 0.00 0.00
01.03.11.04.01.01 ACERO DE REFUERZO FY=4200 KG/CM2 - LOSA FONDO kg 148.20 3.96 586.87 0.00 0.00% 148.20 586.87 100.00% 148.20 586.87 100.00% 0.00 0.00 0.00%
01.03.11.04.01.02 ENCOFRADO Y DESENCOFRADO - LOSA DE FONDO m2 6.82 53.05 361.80 0.00 0.00% 6.82 361.80 100.00% 6.82 361.80 100.00% 0.00 0.00 0.00%
01.03.11.04.01.03 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - LOSA DE FONDO m3 4.86 479.07 2,328.28 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.86 2328.28 100.00%
01.03.11.04.02 MUROS 0.00 0.00
01.03.11.04.02.01 ACERO DE REFUERZO FY=4200 KG/CM2 - MUROS kg 314.06 4.03 1,265.66 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 314.06 1265.66 100.00%
01.03.11.04.02.02 ENCOFRADO Y DESENCOFRADO DE MUROS (2 CARAS) m2 74.08 59.94 4,440.36 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 74.08 4440.36 100.00%
01.03.11.04.02.03 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - MUROS m3 6.85 514.82 3,526.52 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.85 3526.52 100.00%
01.03.11.04.03 LOSA MACIZA DE TECHO 0.00 0.00
01.03.11.04.03.01 ACERO DE REFUERZO FY=4200 KG/CM2 - TECHO kg 109.57 4.08 447.05 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 109.57 447.05 100.00%
01.03.11.04.03.02 ENCOFRADO Y DESENCOFRADO DE MUROS - TECHO m2 18.10 73.76 1,335.06 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.10 1335.06 100.00%
01.03.11.04.03.03 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - TECHO m3 3.21 536.50 1,722.17 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.21 1722.17 100.00%
01.03.11.05 JUNTAS 0.00 0.00
01.03.11.05.01 JUNTAS WATER STOP m 14.00 26.92 376.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.00 376.88 100.00%
01.03.11.06 REVOQUES Y ENLUCIDOS 0.00 0.00
01.03.11.06.01 TARRAJEO EXTERIOR, e=1.5 cm, 1:4 m2 69.00 22.11 1,525.59 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 69.00 1525.59 100.00%
01.03.11.06.02 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 1:2, e=2.0 cm m2 51.84 27.09 1,404.35 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 51.84 1404.35 100.00%
01.03.11.07 CARPINTERIA METALICA 0.00 0.00
01.03.11.07.01 TAPA METALICA 0.60x0.60 m , CON LLAVE TIPO BUJIA und 2.00 147.30 294.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 294.60 100.00%
01.03.11.07.02 PUERTA MALLA METALICA TIPO P-3 PARA CASETA DE CLORACION und 1.00 1,188.01 1,188.01 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1188.01 100.00%
01.03.11.07.03 ESCALERA TUBO FIERRO GALVANIZADO CON PARANTES DE 1" X PELDAÑOS DE 5/8" und 1.00 74.33 74.33 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 74.33 100.00%
01.03.11.07.04 ESCALERA METALICA TIPO GATO und 1.00 507.23 507.23 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 507.23 100.00%
01.03.11.08 SUMINISTRO E INSTALACION DE ACCESORIOS EN RESERVORIOS Y CAJA DE VALVULA 0.00 0.00
01.03.11.08.01 SUMINISTRO E INSTALACION DE ACCESORIOS DE INGRESO A RESERVORIOS D=2" GLB 1.00 690.73 690.73 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 690.73 100.00%
01.03.11.08.02 SUMINISTRO E INSTALACION DE ACCESORIOS DE INGRESO A RESERVORIOS D=3" GLB 1.00 1,147.29 1,147.29 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1147.29 100.00%
01.03.11.08.03 SUMINISTRO E INSTALACION DE ACCESORIOS DE INGRESO A RESERVORIOS D=4" (rebose) GLB 1.00 1,993.31 1,993.31 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1993.31 100.00%
01.03.11.08.04 CLORACION POR GOTEO INCLUYE ACCESORIOS und 1.00 280.57 280.57 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 280.57 100.00%
01.03.11.09 CERCO PERIMETRICO 0.00 0.00
01.03.11.09.01 EXCAVACION TERRENO SEMI ROCOSO m3 1.28 48.81 62.48 0.00 0.00% 1.28 62.48 100.00% 1.28 62.48 100.00% 0.00 0.00 0.00%
01.03.11.09.02 SUM / INST POSTES DE MADERA EUCALIPTO ROLLIZO DE 4", INC. DADO und 16.00 38.08 609.28 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.00 609.28 100.00%
01.03.11.09.03 CERCO DE ALAMBRE TIPO PUAS m 273.60 2.90 793.44 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 273.60 793.44 100.00%
01.03.11.09.04 PUERTA DE MADERA EUCALIPTO ROLLIZO DE 3" und 1.00 193.41 193.41 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 193.41 100.00%
01.03.11.10 PINTURA 0.00 0.00
01.03.11.10.01 PINTURA EXTERIOR EN ESTRUCTURAS, 2 MANOS m2 60.28 12.12 730.59 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 60.28 730.59 100.00%
01.03.11.10.02 PINTURA ESMALTE 2 MANOS PARA PUERTA, TAPAS Y POSTES m2 14.01 10.01 140.24 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.01 140.24 100.00%
01.03.12 CERCO PERIMETRICO DE RESERVORIO 0.00 0.00
01.03.12.01 TRABAJOS PRELIMINARES 0.00 0.00
01.03.12.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 160.00 2.25 360.00 0.00 0.00% 160.00 360.00 100.00% 160.00 360.00 100.00% 0.00 0.00 0.00%
01.03.12.01.02 LIMPIEZA DE TERRENO MANUAL m2 160.00 1.35 216.00 0.00 0.00% 160.00 216.00 100.00% 160.00 216.00 100.00% 0.00 0.00 0.00%
01.03.12.02 MOVIMIENTO DE TIERRAS 0.00 0.00
01.03.12.02.01 EXCAVACION DE HOYO DE 0.40X0.40.X0.50M EN MATERIAL CONGLOMERADO m3 2.11 30.51 64.38 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.11 64.38 100.00%
01.03.12.02.02 ELIMINACION MATERIAL EXCEDENTE HASTA 100m m3 1.92 20.34 39.05 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.92 39.05 100.00%
01.03.12.02.03 REFINE, NIVELACION Y APISONADO DE TERRENO m2 1.92 2.30 4.42 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.92 4.42 100.00%
01.03.12.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
01.03.12.03.01 CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS (SIN AGREGADOS) m3 2.11 245.30 517.58 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.11 517.58 100.00%
01.03.12.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
01.03.12.04.01 CONCRETO FC=175 KG/CM2 COLUMNA m3 0.35 510.00 178.50 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.35 178.50 100.00%
01.03.12.04.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 5.20 63.72 331.34 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.20 331.34 100.00%
01.03.12.04.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 62.88 4.03 253.41 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 62.88 253.41 100.00%
01.03.12.05 VARIOS 0.00 0.00
01.03.12.05.01 PUERTA METALICA DE 1.20X2.20m UNA HOJA CON TUBO DE 2" Y MALLA ROMBO 1/2"x1/2" N°12 und 1.00 306.44 306.44 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 306.44 100.00%
01.03.12.05.02 MALLA METALICA PROTECTORA CON ALAMBRE N° 12 m2 61.60 35.32 2,175.71 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.60 2175.71 100.00%
01.03.12.05.03 CERCO DE ALAMBRE TIPO PUAS m 96.00 2.90 278.40 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 96.00 278.40 100.00%
01.03.12.05.04 POSTES DE TUBO DE 2" und 12.00 47.80 573.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 573.60 100.00%
01.03.13 LINEA DE ADUCCION (Ø 3" L=271,90m) 0.00 0.00
01.03.13.01 OBRAS PRELIMINAR 0.00 0.00
01.03.13.01.01 TRAZO Y REPLANTEO INICIAL PARA LINEAS DE AGUA KM 0.27 786.86 212.45 0.00 0.00% 0.27 212.45 100.00% 0.27 212.45 100.00% 0.00 0.00 0.00%
01.03.13.01.02 TRAZO Y REPLANTEO FINAL PARA LINEAS DE AGUA KM 0.27 808.79 218.37 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.27 218.37 100.00%
01.03.13.02 EXCAVACION DE ZANJA 0.00 0.00
01.03.13.02.01 EXCAVACION EN TERRENO ROCOSO(0.45x0.70) m 271.90 43.14 11,729.77 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 271.90 11729.77 100.00%
01.03.13.03 RELLENO Y COMPACTACION DE ZANJA 0.00 0.00
01.03.13.03.01 REFINE Y NIVELACION DE ZANJA EN TERRENO ROCOSO m 271.90 4.21 1,144.70 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 271.90 1144.70 100.00%
01.03.13.03.02 CAMA DE APOYO PARA TUBERIA TODA PROFUNDIDAD TERRENO ROCOSO m 271.90 13.79 3,749.50 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 271.90 3749.50 100.00%
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE 020 M. EN TERRENO ROCOSO -
01.03.13.03.03 m 271.90 57.73 15,696.79 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 271.90 15696.79 100.00%
HASTA 0.7m
01.03.13.03.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30m m3 41.11 20.34 836.18 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 41.11 836.18 100.00%
01.03.13.04 SUMINISTRO E INSTALACION DE TUBERIAS 0.00 0.00
01.03.13.04.01 SUMINISTRO DE TUBERIA P.V.C. C-7.5 de 3" m 271.90 11.05 3,004.50 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 271.90 3004.50 100.00%
01.03.13.04.02 INSTALACION DE TUBERIA DE PVC HASTA 3" m 271.90 3.13 851.05 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 271.90 851.05 100.00%
01.03.13.04.03 ACCESORIOS LINEA DE ADUCCION GLB 1.00 474.21 474.21 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 474.21 100.00%
01.03.13.05 PRUEBAS HIDRAULICA Y DESINFECCION 0.00 0.00
01.03.13.05.01 PRUEBAS HIDRAULICA Y DESINFECCION m 271.90 2.16 587.30 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 271.90 587.30 100.00%
01.03.14 LINEA DE DISTRIBUCION (Ø 1" L=324,42 m) (Ø 1 1/2" L=286,02 m) (Ø 2" L=583,46m) 0.00 0.00
01.03.14.01 OBRAS PRELIMINAR 0.00 0.00
01.03.14.01.01 TRAZO Y REPLANTEO INICIAL PARA LINEAS DE AGUA KM 1.95 786.86 1,534.38 0.00 0.00% 1.95 1534.38 100.00% 1.95 1534.38 100.00% 0.00 0.00 0.00%
01.03.14.01.02 TRAZO Y REPLANTEO FINAL PARA LINEAS DE AGUA KM 1.95 808.79 1,577.14 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.95 1577.14 100.00%
01.03.14.02 MOVIMIENTO DE TIERRAS 0.00 0.00
01.03.14.02.01 EXCAVACION MANUAL EN TERRENO NORMAL (0.45x0.70) m 194.52 10.98 2,135.83 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 194.52 2135.83 100.00%
01.03.14.02.02 EXCAVACION DE ZANJA, PARA TUBERIA APROM 0.45 M, h=1.00m, TERRENO NORMAL-Manual m 778.08 14.12 10,986.49 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 778.08 10986.49 100.00%
01.03.14.02.03 EXCAVACION MANUAL SEMI ROCA (0.45x0.70) m 118.07 15.38 1,815.92 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 118.07 1815.92 100.00%
01.03.14.02.04 EXCAVACION DE ZANJA, PARA TUBERIA APROM 0.45 M, h=1.00m, TERRENO SEMI ROCOSO-Manual m 472.27 19.78 9,341.50 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 472.27 9341.50 100.00%
01.03.14.02.05 EXCAVACION EN TERRENO ROCOSO(0.45x0.70) m 390.27 43.14 16,836.25 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 390.27 16836.25 100.00%
01.03.14.03 RELLENO Y COMPACTACION DE ZANJA 0.00 0.00
01.03.14.03.01 REFINE Y NIVELACION DE ZANJA EN TERRENO NORMAL - SEMI ROCA m 1,562.94 2.50 3,907.35 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1562.94 3907.35 100.00%
01.03.14.03.02 REFINE Y NIVELACION DE ZANJA EN TERRENO ROCOSO m 390.27 4.21 1,643.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 390.27 1643.04 100.00%
01.03.14.03.03 CAMA DE APOYO PARA TUBERIA TODA PROFUNDIDA TERRENO NORMAL - SEMI ROCA m 1,562.94 8.19 12,800.48 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1562.94 12800.48 100.00%
01.03.14.03.04 CAMA DE APOYO PARA TUBERIA TODA PROFUNDIDAD TERRENO ROCOSO m 390.27 13.79 5,381.82 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 390.27 5381.82 100.00%
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE 0.20M EN TERRENO NORMAL -
01.03.14.03.05 m 972.60 17.26 16,787.08 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 972.60 16787.08 100.00%
HASTA 1 m
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE 0.20M EN TERRENO SEMI
01.03.14.03.06 m 590.34 26.40 15,584.98 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 590.34 15584.98 100.00%
ROCA - HASTA 1 m
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE 0.20M EN TERRENO ROCOSO -
01.03.14.03.07 m 390.27 57.73 22,530.29 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 390.27 22530.29 100.00%
HASTA 0.7 m
01.03.14.03.08 ELIMINACION MATERIAL EXCEDENTE HASTA 100m m3 295.33 30.51 9,010.52 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 295.33 9010.52 100.00%
01.03.14.04 SUMINISTRO E INSTALACION DE TUBERIAS 0.00 0.00
01.03.14.04.01 SUMINISTRO DE TUBERIA P.V.C. C-10 de 1" m 519.27 4.61 2,393.83 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 519.27 2393.83 100.00%
01.03.14.04.02 SUMINISTRO DE TUBERIA P.V.C. C-7.5 de 1 1/2" m 435.44 7.06 3,074.21 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 435.44 3074.21 100.00%
01.03.14.04.03 SUMINISTRO DE TUBERIA P.V.C. C-7.5 de 2" m 998.50 10.29 10,274.57 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 998.50 10274.57 100.00%
01.03.14.04.04 INSTALACION DE TUBERIA DE PVC HASTA 1" m 519.27 2.14 1,111.24 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 519.27 1111.24 100.00%
01.03.14.04.05 INSTALACION DE TUBERIA DE PVC HASTA 2" m 1,433.94 2.31 3,312.40 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1433.94 3312.40 100.00%
01.03.14.05 PRUEBAS HIDRAULICA Y DESINFECCION 0.00 0.00
01.03.14.05.01 PRUEBAS HIDRAULICA Y DESINFECCION m 1,193.90 2.16 2,578.82 0.00 0.00 0.00% 0.00 0.00 0.00% 1193.90 2578.82 100.00%
01.03.15 CRUCE AEREO DE TUBERIA L=20m (01 und) 0.00 0.00
01.03.15.01 TRABAJOS PRELIMINARES 0.00 0.00
01.03.15.01.01 LIMPIEZA DE TERRENO MANUAL m2 51.74 1.35 69.85 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 51.74 69.85 100.00%
01.03.15.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 107.74 2.25 242.42 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 107.74 242.42 100.00%
01.03.15.02 MOVIMIENTO DE TIERRAS 0.00 0.00
01.03.15.02.01 EXCAVACION TERRENO SEMI ROCOSO m3 11.25 48.81 549.11 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.25 549.11 100.00%
01.03.15.02.02 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 7.50 3.46 25.95 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.50 25.95 100.00%
01.03.15.02.03 RELLENO CON MATERIAL PROPIO m3 7.14 24.41 174.29 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.14 174.29 100.00%
01.03.15.02.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30m m3 5.14 20.34 104.55 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.14 104.55 100.00%
01.03.15.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
01.03.15.03.01 SOLADO DE CONCRETO f'c=100 kg/cm2, e=4" m2 7.50 41.05 307.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.50 307.88 100.00%
01.03.15.03.02 CONCRETO f'c=100 kg/cm2, e=4" m3 0.69 417.28 287.92 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.69 287.92 100.00%
01.03.15.03.03 ENCOFRADO Y DESENCOFRADO - LOSA FONDO m2 3.92 53.05 207.96 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.92 207.96 100.00%
01.03.15.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
01.03.15.04.01 ZAPATAS 0.00 0.00
01.03.15.04.01.01 ACERO DE REFUERZO FY=4200 KG/CM2 - LOSA FONDO kg 54.32 3.96 215.11 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 54.32 215.11 100.00%
01.03.15.04.01.02 ENCOFRADO Y DESENCOFRADO - LOSA DE FONDO m2 6.40 53.05 339.52 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.40 339.52 100.00%
01.03.15.04.01.03 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - LOSA DE FONDO m3 3.00 479.07 1,437.21 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 1437.21 100.00%
01.03.15.04.02 COLUMNAS 0.00 0.00
01.03.15.04.02.01 ACERO DE REFUERZO FY=4200 KG/CM2 - COLUMNA kg 258.76 4.03 1,042.80 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 258.76 1042.80 100.00%
01.03.15.04.02.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 16.08 63.72 1,024.62 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.08 1024.62 100.00%
01.03.15.04.02.03 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - COLUMNAS m3 1.21 527.98 638.86 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.21 638.86 100.00%
01.03.15.04.03 VIGAS 0.00 0.00
01.03.15.04.03.01 ACERO DE REFUERZO FY=4200 KG/CM2 - VIGAS kg 81.21 4.08 331.34 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 81.21 331.34 100.00%
01.03.15.04.03.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 7.20 69.12 497.66 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.20 497.66 100.00%
01.03.15.04.03.03 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL VIGAS m3 0.54 544.04 293.78 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.54 293.78 100.00%
01.03.15.05 CAMARA DE ANCLAJE 0.00 0.00
01.03.15.05.01 MOVIMIENTO DE TIERRAS 0.00 0.00
01.03.15.05.01.01 EXCAVACION TERRENO SEMI ROCOSO m3 13.93 48.81 679.92 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.93 679.92 100.00%
01.03.15.05.01.02 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 5.40 3.46 18.68 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.40 18.68 100.00%
01.03.15.05.01.03 RELLENO CON MATERIAL PROPIO m3 5.83 24.41 142.31 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.83 142.31 100.00%
01.03.15.05.01.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30m m3 10.13 20.34 206.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.13 206.04 100.00%
01.03.15.05.02 CONCRETO SIMPLE 0.00 0.00
01.03.15.05.02.01 ENCOFRADO Y DESENCOFRADO- LOSA DE FONDO m2 19.80 53.05 1,050.39 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.80 1050.39 100.00%
01.03.15.05.02.02 CONCRETO f'c=140 kg/cm2 + 30% PM - PARA RELLENO m3 8.10 417.28 3,379.97 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.10 3379.97 100.00%
01.03.15.06 ESTRUCTURA DE ANCLAJE 0.00 0.00
01.03.15.06.01 MACISO PERFIL I, ANCLAJE DE CABLE und 2.00 168.44 336.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 336.88 100.00%
01.03.15.07 REVOQUES Y ENLUCIDOS 0.00 0.00
01.03.15.07.01 TARRAJEO EXTERIOR, e=1.5 cm, 1:4 m2 18.12 22.11 400.63 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.12 400.63 100.00%
01.03.15.08 CARPINTERIA METALICA 0.00 0.00
01.03.15.08.01 CARRO DE DILATACION und 2.00 647.89 1,295.78 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 1295.78 100.00%
01.03.15.08.02 CABLE DE ACERO PRINCIPAL DE 5/8" TIPO BOA ALMA DE ACERO m 41.45 28.42 1,178.01 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 41.45 1178.01 100.00%
01.03.15.08.03 CABLE DE ACERO D=1/4", PENDOLAS, TIPO COBRA 6 x 19 m 28.79 13.17 379.16 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.79 379.16 100.00%
01.03.15.08.04 ARGOLLA DE 1/4" D=2 1/2" P/SOPORTE DE TUBERIA und 19.00 108.73 2,065.87 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.00 2065.87 100.00%
01.03.15.08.05 ACCESORIOS DE CAMARA DE ANCLAJE und 2.00 198.84 397.68 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 397.68 100.00%
01.03.15.08.06 ACCESORIOS DE PENDOLA und 38.00 38.12 1,448.56 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 38.00 1448.56 100.00%
01.03.15.09 TUBERIAS DE HDPE 0.00 0.00
01.03.15.09.01 SUMINISTRO E INSTALACION DE TUBERIA ISO 4427 HDPE DN:90 mm SDR 13.60 - aereo m 23.32 24.40 569.01 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.32 569.01 100.00%
01.03.15.09.02 ACCESORIO PARA UNION HDPE - PVC D=90mm und 2.00 59.52 119.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 119.04 100.00%
01.03.16 CONEXIONES DOMICILIARIAS (149 und) 0.00 0.00
01.03.16.01 OBRAS PRELIMINAR 0.00 0.00
01.03.16.01.01 TRAZO Y REPLANTEO INICIAL PARA LINEAS DE AGUA KM 1.19 786.86 936.36 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.19 936.36 100.00%
01.03.16.01.02 TRAZO Y REPLANTEO FINAL PARA LINEAS DE AGUA KM 1.19 808.79 962.46 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.19 962.46 100.00%
01.03.16.02 EXCAVACION DE ZANJA 0.00 0.00
01.03.16.02.01 EXCAVACION MANUAL SEMI ROCA (0.45x0.70) m 1,192.00 15.38 18,332.96 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1192.00 18332.96 100.00%
01.03.16.02.02 REFINE Y NIVELACION DE ZANJA EN TERRENO NORMAL - SEMI ROCA m 1,192.00 2.50 2,980.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1192.00 2980.00 100.00%
01.03.16.02.03 CAMA DE APOYO PARA TUBERIA TODA PROFUNDIDAD TERRENO NORMAL - SEMI ROCA m 1,192.00 8.19 9,762.48 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1192.00 9762.48 100.00%
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE 0.20M EN TERRENO SEMI
01.03.16.02.04 m 1,192.00 26.40 31,468.80 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1192.00 31468.80 100.00%
ROCA - HASTA 1 m
01.03.16.02.05 ELIMINACION MATERIAL EXCEDENTE HASTA 100m m3 70.40 30.51 2,147.90 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 70.40 2147.90 100.00%
01.03.16.03 TUBERIAS 0.00 0.00
01.03.16.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC SP D=1/2" C-10 m 1,176.00 3.50 4,116.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1176.00 4116.00 100.00%
01.03.16.03.02 SUMINISTRO E INSTALACION DE TUBERIA PVC SP D=3/4" C-10 m 16.00 4.35 69.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.00 69.60 100.00%
01.03.16.03.03 SUMINISTRO E INSTALACION DE ACCESORIOS EN CONEXIONES D=1/2" und 147.00 63.63 9,353.61 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 147.00 9353.61 100.00%
01.03.16.03.04 SUMINISTRO E INSTALACION DE ACCESORIOS EN CONEXIONES D=3/4" und 2.00 81.57 163.14 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 163.14 100.00%
01.03.16.03.05 PRUEBAS HIDRAULICA Y DESINFECCION DE LINEAS DE TUBERIA m 1,192.00 1.14 1,358.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1192.00 1358.88 100.00%
01.03.16.04 CAJAS Y TAPAS 0.00 0.00
01.03.16.04.01 EXCAVACION TERRENO SEMI ROCOSO m3 8.94 48.81 436.36 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.94 436.36 100.00%
01.03.16.04.02 SOLADO DE CONCRETO f'c=100 kg/cm2, e=4" m2 22.35 41.05 917.47 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 22.35 917.47 100.00%
01.03.16.04.03 SUM. E INSTAL.CAJAS DE REGISTRO C/TAPA DE FIERRO GALVANIZADO und 149.00 120.76 17,993.24 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 149.00 17993.24 100.00%
01.03.17 VALVULA DE PURGA EN RED DE DISTRIBUCION DE 1" (Ø PURGA 1", 5 UND ) TOTAL= 5 UND 0.00 0.00
01.03.17.01 TRABAJOS PRELIMINARES 0.00 0.00
01.03.17.01.01 LIMPIEZA DE TERRENO MANUAL m2 5.70 1.35 7.70 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.70 7.70 100.00%
01.03.17.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 5.70 2.25 12.83 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.70 12.83 100.00%
01.03.17.02 MOVIMIENTO DE TIERRAS 0.00 0.00
01.03.17.02.01 EXCAVACION TERRENO SEMI ROCOSO m3 3.74 48.81 182.55 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.74 182.55 100.00%
01.03.17.02.02 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 3.20 3.46 11.07 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.20 11.07 100.00%
01.03.17.02.03 RELLENO CON MATERIAL PROPIO m3 0.72 27.13 19.53 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.72 19.53 100.00%
01.03.17.02.04 ELIMINACION MATERIAL EXCEDENTE HASTA 100m m3 3.49 20.34 70.99 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.49 70.99 100.00%
01.03.17.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
01.03.17.03.01 SOLADO DE CONCRETO f'c=100 kg/cm2, e=4" m2 3.69 41.05 151.47 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.69 151.47 100.00%
01.03.17.03.02 ENCOFRADO Y DESENCOFRADO - LOSA DE FONDO m2 18.00 53.05 954.90 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.00 954.90 100.00%
01.03.17.03.03 CONCRETO F'C=175 KG/CM2 m3 1.22 485.88 592.77 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.22 592.77 100.00%
01.03.17.03.04 CONCRETO f'c=140 kg/cm2 + 30% PM - PARA RELLENO m3 0.28 417.28 116.84 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.28 116.84 100.00%
01.03.17.04 REVOQUES Y ENLUCIDOS 0.00 0.00
01.03.17.04.01 TARRAJEO EXTERIOR, e=1.5 cm, 1:4 m2 9.80 22.11 216.68 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.80 216.68 100.00%
01.03.17.04.02 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 1:2, e=2.0 cm m2 7.00 27.09 189.63 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.00 189.63 100.00%
01.03.17.05 VALVULAS Y ACCESORIOS 0.00 0.00
01.03.17.05.01 SUMINISTRO/INSTALACION DE ACCESORIOS DE CAJA DE VALVULA DE CONTROL D=1" und 3.00 148.81 446.43 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 446.43 100.00%
01.03.17.05.02 SUMINISTRO/INSTALACION DE ACCESORIOS DE CAJA DE VALVULA DE CONTROL D=1 1/2" und 2.00 211.17 422.34 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 422.34 100.00%
01.03.17.06 PINTURA 0.00 0.00
01.03.17.06.01 PINTURA EXTERIOR EN ESTRUCTURAS, 2 MANOS m2 4.20 12.12 50.90 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.20 50.90 100.00%
01.03.17.06.02 PINTURA ESMALTE 2 MANOS PARA TAPAS m2 1.20 14.31 17.17 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.20 17.17 100.00%
01.03.17.07 CARPINTERIA METALICA 0.00 0.00
01.03.17.07.01 TAPA METALICA 0.60x0.60 m , CON LLAVE TIPO BUJIA und 5.00 147.30 736.50 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 736.50 100.00%
01.03.17.08 DRENAJES 0.00 0.00
01.03.17.08.01 GRAVA D MAX 1" m3 0.22 157.72 34.70 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.22 34.70 100.00%
01.03.18 VALVULA DE AIRE EN REDES DE DISTRIBUCION DE 1" (Ø VAL. AIRE 1/2", 04 UND); TOTAL= 04 UND. 0.00 0.00
01.03.18.01 TRABAJOS PRELIMINARES 0.00 0.00
01.03.18.01.01 LIMPIEZA DE TERRENO MANUAL m2 1.92 1.35 2.59 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.92 2.59 100.00%
01.03.18.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 1.92 2.25 4.32 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.92 4.32 100.00%
01.03.18.02 MOVIMIENTO DE TIERRAS 0.00 0.00
01.03.18.02.01 EXCAVACION TERRENO SEMI ROCOSO m3 1.54 48.81 75.17 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.54 75.17 100.00%
01.03.18.02.02 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 1.92 3.46 6.64 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.92 6.64 100.00%
01.03.18.02.03 ELIMINACION MATERIAL EXCEDENTE HASTA 100m m3 1.93 20.34 39.26 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.93 39.26 100.00%
01.03.18.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
01.03.18.03.01 SOLADO DE CONCRETO f'c=100 kg/cm2, e=4" m2 1.76 41.05 72.25 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.76 72.25 100.00%
01.03.18.03.02 ENCOFRADO Y DESENCOFRADO - LOSA DE FONDO m2 13.44 53.05 712.99 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.44 712.99 100.00%
01.03.18.03.03 CONCRETO F'C=175 KG/CM2 m3 0.90 485.88 437.29 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.90 437.29 100.00%
01.03.18.04 REVOQUES Y ENLUCIDOS 0.00 0.00
01.03.18.04.01 TARRAJEO EXTERIOR, e=1.5 cm, 1:4 m2 7.84 22.11 173.34 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.84 173.34 100.00%
01.03.18.05 DRENAJES 0.00 0.00
01.03.18.05.01 GRAVA D MAX 1" m3 0.10 157.72 15.77 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.10 15.77 100.00%
01.03.18.06 ACCESORIOS 0.00 0.00
01.03.18.06.01 ACCESORIOS DE VALVULA DE AIRE D= 1/2", EN RED DE D=1 1/2" und 4.00 98.24 392.96 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 392.96 100.00%
01.03.18.07 CARPINTERIA METALICA 0.00 0.00
01.03.18.07.01 TAPA METALICA 0.60X0.60 m, CON LLAVE TIPO BUJIA und 4.00 147.30 589.20 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 589.20 100.00%
01.03.18.08 PINTURA 0.00 0.00
01.03.18.08.01 PINTURA EXTERIOR EN ESTRUCTURAS, 2 MANOS m2 4.48 12.12 54.30 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.48 54.30 100.00%
01.03.18.08.02 PINTURA ESMALTE 2 MANOS PARA TAPAS m2 3.84 14.31 54.95 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.84 54.95 100.00%
01.03.19 VALVULA DE CONTROL Y REGULACION (Ø 1" 04 UND, Ø 1 1/2" 04 UND y Ø 2" 05 UND) TOTAL = 13 UND 0.00 0.00
01.03.19.01 TRABAJOS PRELIMINARES 0.00 0.00
01.03.19.01.01 LIMPIEZA DE TERRENO MANUAL m2 10.40 1.35 14.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.40 14.04 100.00%
01.03.19.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 10.40 2.25 23.40 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.40 23.40 100.00%
01.03.19.02 MOVIMIENTO DE TIERRAS 0.00 0.00
01.03.19.02.01 EXCAVACION TERRENO SEMI ROCOSO m3 8.63 48.81 421.23 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.63 421.23 100.00%
01.03.19.02.02 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 10.40 3.46 35.98 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.40 35.98 100.00%
01.03.19.02.03 RELLENO CON MATERIAL PROPIO m3 2.18 27.13 59.14 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.18 59.14 100.00%
01.03.19.02.04 ELIMINACION MATERIAL EXCEDENTE HASTA 100m m3 8.06 20.34 163.94 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.06 163.94 100.00%
01.03.19.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
01.03.19.03.01 SOLADO DE CONCRETO f'c=100 kg/cm2, e=4" m2 9.59 41.05 393.67 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.59 393.67 100.00%
01.03.19.03.02 ENCOFRADO Y DESENCOFRADO - LOSA FONDO m2 43.68 53.05 2,317.22 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 43.68 2317.22 100.00%
01.03.19.03.03 CONCRETO F'C=175 KG/CM2 m3 3.31 485.88 1,608.26 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.31 1608.26 100.00%
01.03.19.04 REVOQUES Y ENLUCIDOS 0.00 0.00
01.03.19.04.01 TARRAJEO EXTERIOR m2 25.48 22.11 563.36 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 25.48 563.36 100.00%
01.03.19.05 VALVULAS Y ACCESORIOS 0.00 0.00
01.03.19.05.01 SUMINISTRO/INSTALACION DE ACCESORIOS DE CAJA DE VALVULA DE CONTROL D=1" und 4.00 148.81 595.24 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 595.24 100.00%
01.03.19.05.02 SUMINISTRO/INSTALACION DE ACCESORIOS DE CAJA DE VALVULA DE CONTROL D=1 1/2" und 9.00 211.17 1,900.53 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.00 1900.53 100.00%
01.03.19.06 PINTURA 0.00 0.00
01.03.19.06.01 PINTURA EXTERIOR EN ESTRUCTURAS, 2 MANOS m2 12.74 12.12 154.41 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.74 154.41 100.00%
01.03.19.06.02 PINTURA ESMALTE 2 MANOS PARA TAPAS m2 3.12 14.31 44.65 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.12 44.65 100.00%
01.03.19.07 CARPINTERIA METALICA 0.00 0.00
01.03.19.07.01 TAPA METALICA 0.60x0.60 m , CON LLAVE TIPO BUJIA und 13.00 147.30 1,914.90 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 1914.90 100.00%
01.03.19.08 DRENAJES 0.00 0.00
01.03.19.08.01 GRAVA D MAX 1" m3 0.33 157.72 52.05 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.33 52.05 100.00%
01.03.20 LAVADERO DE USO MULTIPLE (149 Und) 0.00 0.00
01.03.20.01 LAVADEROS EN VIVIENDAS Y LOCALES SOCIALES (147 UND) 0.00 0.00
01.03.20.01.01 TRABAJOS PRELIMINARES 0.00 0.00
01.03.20.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 75.19 1.35 101.51 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 75.19 101.51 100.00%
01.03.20.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 75.19 2.25 169.18 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 75.19 169.18 100.00%
01.03.20.01.02 MOVIMIENTO DE TIERRAS 0.00 0.00
01.03.20.01.02.01 EXCAVACION EN TERRENO NORMAL m3 4.85 34.87 169.12 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.85 169.12 100.00%
01.03.20.01.02.02 REFINE Y NIVELACION EN TERRENO NORMAL m2 24.26 1.36 32.99 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.26 32.99 100.00%
01.03.20.01.02.03 ELIMINACION MATERIAL EXCEDENTE HASTA 100m m3 6.06 30.51 184.89 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.06 184.89 100.00%
01.03.20.01.03 OBRAS DE CONCRETO ARMADO 0.00 0.00
01.03.20.01.03.01 ALAMBRE NEGRO RECOCIDO N° 08 kg 479.57 5.14 2,464.99 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 479.57 2464.99 100.00%
01.03.20.01.03.02 ENCOFRADO Y DESENCOFRADO EN MUROS (2 CARAS) m2 521.12 59.94 31,235.93 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 521.12 31235.93 100.00%
01.03.20.01.03.03 CONCRETO CIMIENTO CORRIDO 1:10+20% P.G. m3 4.85 350.86 1,701.67 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.85 1701.67 100.00%
01.03.20.01.03.04 CONCRETO F'C=175 KG/CM2 m3 12.64 485.88 6,141.52 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.64 6141.52 100.00%
01.03.20.01.04 OBRAS DE ALBAÑILERIA 0.00 0.00
01.03.20.01.04.01 MURO DE LADRILLO KK DE 18 HUECOS DE CANTO m2 92.17 55.70 5,133.87 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 92.17 5133.87 100.00%
01.03.20.01.05 REVOQUES Y ENLUCIDOS 0.00 0.00
01.03.20.01.05.01 TARRAJEO EXTERIOR, e=1.5 cm, 1:4 m2 506.56 22.11 11,200.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 506.56 11200.04 100.00%
01.03.20.01.06 ACCESORIOS 0.00 0.00
01.03.20.01.06.01 ACCESORIOS DE AGUA LAVADERO DOMICILIARIO und 147.00 71.94 10,575.18 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 147.00 10575.18 100.00%
01.03.20.01.06.02 CONEXIONES INTRADOMICILIARIAS AGUA POTABLE und 147.00 39.35 5,784.45 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 147.00 5784.45 100.00%
01.03.20.01.06.03 ACCESORIOS DE AGUA LAVADERO DOMICILIARIO und 147.00 49.82 7,323.54 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 147.00 7323.54 100.00%
01.03.20.02 LAVADEROS EN CENTRO EDUCATIVO (02 UND) 0.00 0.00
01.03.20.02.01 TRABAJOS PRELIMINARES 0.00 0.00
01.03.20.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 4.32 1.35 5.83 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.32 5.83 100.00%
01.03.20.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 4.32 2.25 9.72 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.32 9.72 100.00%
01.03.20.02.02 MOVIMIENTO DE TIERRAS 0.00 0.00
01.03.20.02.02.01 EXCAVACION EN TERRENO NORMAL m3 0.43 34.87 14.99 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.43 14.99 100.00%
01.03.20.02.02.02 REFINE Y NIVELACION EN TERRENO NORMAL m2 1.92 1.36 2.61 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.92 2.61 100.00%
01.03.20.02.02.03 ELIMINACION MATERIAL EXCEDENTE HASTA 100m m3 0.54 30.51 16.48 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.54 16.48 100.00%
01.03.20.02.03 OBRAS DE CONCRETO ARMADO 0.00 0.00
01.03.20.02.03.01 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 17.61 3.98 70.09 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 17.61 70.09 100.00%
01.03.20.02.03.02 ENCOFRADO Y DESENCOFRADO DE MUROS (2 CARAS) m2 1.21 59.94 72.53 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.21 72.53 100.00%
01.03.20.02.03.03 CONCRETO CIMIENTO CORRIDO 1:10+20% P.G. m3 0.43 350.86 150.87 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.43 150.87 100.00%
01.03.20.02.03.04 CONCRETO F'C=175 KG/CM2 m3 0.22 485.88 106.89 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.22 106.89 100.00%
01.03.20.02.04 OBRAS DE ALBAÑILERIA 0.00 0.00
01.03.20.02.04.01 MURO DE LADRILLO KK DE 18 HUECOS DE CANTO m2 1.75 55.70 97.48 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.75 97.48 100.00%
01.03.20.02.04.02 MURO DE LADRILLO TIPO IV, SOGA m2 3.43 74.13 254.27 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.43 254.27 100.00%
01.03.20.02.05 REVOQUES Y ENLUCIDOS 0.00 0.00
01.03.20.02.05.01 TARRAJEO EXTERIOR, e=1.5 cm, 1:4 m2 6.95 22.11 153.66 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.95 153.66 100.00%
01.03.20.02.06 ACCESORIOS 0.00 0.00
01.03.20.02.06.01 CONEXIONES DOMICILIARIAS AGUA POTABLE - IE und 2.00 49.07 98.14 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 98.14 100.00%
01.03.20.02.06.02 ACCESORIOS DE LAVADERO DOMICILIARIO - IE und 2.00 162.63 325.26 0.00 0.00% 0.00% 0.00 0.00 0.00% 2.00 325.26 100.00%
1.04 CONTROL DE CALIDAD EN SISTEMA DE AGUA POTABLE 0.00 0.00
01.04.01 ENSAYO DE LABORATORIO GLB 1.00 3,292.80 3,292.80 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 3292.80 100.00%
1.05 FLETES TERRESTRE Y RURAL 0.00 0.00
01.05.01 FLETE TERRESTRE GLB 1.00 48,000.00 48,000.00 0.20 9600.00 20.00% 0.20 9600.00 20.00% 0.80 38400.00 80.00%
01.05.02 FLETE RURAL GLB 1.00 38,519.73 38,519.73 0.20 7703.95 20.00% 0.20 7703.95 20.00% 0.80 30815.78 80.00%
1.06 PLAN DE MANEJO AMBIENTAL 0.00
01.06.01 PROGRAMA DE MANEJO DE RESIDUOS SOLIDOS Y LIQUIDOS 0.00 0.00
01.06.01.01 GESTION DE RESIDUOS SOLIDOS 0.00 0.00
01.06.01.01.01 ADQUISICION DE TACHOS DE COLORES und 6.00 125.00 750.00 2.00 250.00 33.33% 2.00 250.00 33.33% 4.00 500.00 66.67% 2.00 250.00 33.33%
01.06.01.01.02 TRANSPORTE DE RESIDUOS LIQUIDOS mes 5.00 834.07 4,170.35 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 4170.35 100.00%
01.06.01.01.03 RECOLECCION DE RESTO DE DESMONTE mes 5.00 488.14 2,440.70 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 2440.70 100.00%
01.06.01.02 GESTION DE RESIDUOS LIQUIDOS 0.00 0.00
01.06.01.02.01 IMPLEMENTACION DE LETRINAS mes 5.00 1,818.89 9,094.45 0.00 0.00% 2.00 3637.78 40.00% 2.00 3637.78 40.00% 3.00 5456.67 60.00%
01.06.02 PROGRAMA PREVENCION MITIGACION REMEDIACION AMBIENTAL 0.00 0.00
01.06.02.01 HUMEDECIMIENTO DE TERRENO Y AGREGADOS PARA EVITAR GENERAR POLVO m 12,477.59 0.20 2,495.52 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12477.59 2495.52 100.00%
01.06.02.02 LIMPIEZA PERMANENTE DE LA OBRA mes 5.00 598.32 2,991.60 0.00 0.00% 1.00 598.32 20.00% 1.00 598.32 20.00% 4.00 2393.28 80.00%
01.06.03 PROGRAMA DE SEGUIMIENTO Y CONTROL AMBIENTAL 0.00 0.00
01.06.03.01 MONITOREO DE LA CALIDAD DE AIRE pto 2.00 668.71 1,337.42 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 1337.42 100.00%
01.06.03.02 MONITOREO DE LA CALIDAD DE RUIDO pto 2.00 261.71 523.42 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 523.42 100.00%
01.06.03.03 MONITOREO DE LA CALIDAD DE SUELO pto 2.00 438.71 877.42 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 877.42 100.00%
01.06.04 PROGRAMA DE ABANDONO O CIERRE DE EJECUCION DE OBRA 0.00 0.00
01.06.04.01 ETAPA DE ABANDONO Y CIERRE pto 1.00 435.92 435.92 0.00 0.00% 0.00% 0.00 0.00 0.00% 1.00 435.92 100.00%
1.07 CAPACITACION Y EDUCACION SANITARIA 0.00 0.00
01.07.01 CAPACITACION EN ADMINISTRACION, OPERACIÓN Y MANTENIMIENTO A LA JASS GLB 1.00 8,500.00 8,500.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 8500.00 100.00%
01.07.02 CAPACITACION Y EDUCACION SANITARIA GLB 1.00 15,000.00 15,000.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 15000.00 100.00%
1.08 MONITOREO Y PLAN ARQUEOLOGICO 0.00 0.00
01.08.01 MONITOREO Y PLAN ARQUEOLOGICO GLB 1.00 25,000.00 25,000.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 25000.00 100.00%
2 SISTEMA DE ALCANTARILLADO LOCALIDAD DE SAN LUIS DE CORERAC 0.00 0.00
2.01 REDES DE ALCANTARILLADO ( Ø 160MM L=1603,13 m, Ø 200 MM L=633,42 m) 0.00 0.00
02.01.01 REDES DE ALCANTARILLADO 0.00 0.00
02.01.01.01 OBRAS PRELIMINAR 0.00 0.00
02.01.01.01.01 TRAZO Y REPLANTEO INICIAL PARA LINEAS DE AGUA KM 2.24 941.63 2,109.25 0.00 0.00% 2.24 2109.25 100.00% 2.24 2109.25 100.00% 0.00 0.00 0.00%
02.01.01.01.02 TRAZO Y REPLANTEO FINAL PARA LINEAS DE AGUA KM 2.24 892.58 1,999.38 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.24 1999.38 100.00%
02.01.01.02 MOVIMIENTO DE TIERRA 0.00 0.00
02.01.01.02.01 EXCAVACION DE ZANJA, PARA TUBERIA APROM 0.60 M, h=1.00m, TERRENO NORMAL - Manual m 38.43 15.89 610.65 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 38.43 610.65 100.00%
02.01.01.02.02 EXCAVACION DE ZANJA, PARA TUBERA APROM 0.60 M, h=1.00m, TERRENO SEMI ROCOSO - Manual m 28.82 26.22 755.66 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.82 755.66 100.00%
02.01.01.02.03 EXCAVACION DE ZANJA, PARA TUBERIA APROM 0.60 M, h=1.00m, TERRENO ROCOSO - Manual m 28.82 91.45 2,635.59 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.82 2635.59 100.00%
02.01.01.02.04 EXCAVACION DE ZANJA, PARA TUBERIA APROM 0.60 M, h=1.20m, TERRENO NORMAL - Maquina m 163.42 12.29 2,008.43 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 163.42 2008.43 100.00%
02.01.01.02.05 EXCAVACION DE ZANJA, PARA TUBERIA APROM 0.60 M, h=1.20m, TERRENO SEMI ROCA - Maquina m 122.56 18.75 2,298.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 122.56 2298.00 100.00%
02.01.01.02.06 EXCAVACION DE ZANJA, PARA TUBERIA APROM 0.60 M, h=1.20m, TERRENO ROCOSO m 122.56 112.27 13,759.81 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 122.56 13759.81 100.00%
02.01.01.02.07 EXCAVACION DE ZANJA, PARA TUBERIA APROM 0.60 M, h=1.50m, TERRENO NORMAL - Maquina m 754.52 13.96 10,533.10 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 754.52 10533.10 100.00%
02.01.01.02.08 EXCAVACION DE ZANJA, PARA TUBERIA APROM 0.60 M, h=1.50m, TERRENO SEMI ROCA - Maquina m 310.51 22.13 6,871.59 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 310.51 6871.59 100.00%
02.01.01.02.09 EXCAVACION DE ZANJA, PARA TUBERIA APROM 0.60 M, h=2.75m, TERRENO NORMAL - Maquina m 696.90 22.13 15,422.40 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 696.90 15422.40 100.00%
02.01.01.02.10 REFINE Y NIVELACION DE ZANJA EN TERRENO NOMRAL - SEMI ROCA m 2,085.16 1.94 4,045.21 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2085.16 4045.21 100.00%
02.01.01.02.11 REFINE Y NIVELACION DE ZANJA EN TERRENO ROCOSO m 151.38 3.41 516.21 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 151.38 516.21 100.00%
02.01.01.02.12 CAMA DE APOYO PARA TUBERIA TODA PROFUNDIDAD TERRENO NOMRAL/SEMI ROCA - ALCANTA. m 2,085.16 2.86 5,963.56 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2085.16 5963.56 100.00%
02.01.01.02.13 CAMA DE APOYO PARA TUBERIA TODA PROFUNDIDAD TERRENO ROCOSO - ALCANTA. m 151.38 18.67 2,826.26 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 151.38 2826.26 100.00%
02.01.01.02.14 PRIMER RELLENO 0.30 CM SOBRE LA TUBERIA m 2,236.64 33.73 75,441.87 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2236.64 75441.87 100.00%
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE 0.20M EN TERRENO
02.01.01.02.15 m 67.25 32.10 2,158.73 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 67.25 2158.73 100.00%
NORMAL/SEMI ROCA - HASTA 1m
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE 0.20M EN TERRENO ROCOSO -
02.01.01.02.16 m 28.82 44.45 1,281.05 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.82 1281.05 100.00%
HASTA 1m
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE 0.20M EN TERRENO
02.01.01.02.17 m 1,321.01 37.10 49,009.47 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1321.01 49009.47 100.00%
NORMAL/SEMI ROCA - HASTA 1-1.5 m
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE 0.20M EN TERRENO ROCOSO -
02.01.01.02.18 m 122.56 66.04 8,093.86 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 122.56 8093.86 100.00%
HASTA 1-1.5 m
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE 0.20M EN TERRENO
02.01.01.02.19 m 696.90 47.05 32,789.15 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 696.90 32789.15 100.00%
NORMAL/SEMI ROCA - HASTA 1.5-2.75 m
02.01.01.02.20 ELIMINACION MATERIAL EXCEDENTE HASTA 100m m3 754.83 30.51 23,029.86 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 754.83 23029.86 100.00%
02.01.01.03 TUBERIAS 0.00 0.00
02.01.01.03.01 SUMINISTRO E INSTAL. TUBERIA DE PVC-U SN-2 D=160 mm, ISO 4435 m 1,603.13 32.62 52,294.10 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1603.13 52294.10 100.00%
02.01.01.03.02 SUMINISTRO E INSTAL. TUBERIA DE PVC-U SN-2 D=200 mm, ISO 4435 m 633.42 47.97 30,385.16 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 633.42 30385.16 100.00%
02.01.01.03.03 PRUEBA HIFRAULICA A ZANJA ABIERTA Y NIVELACION DE TUBERIAS DE ALCANTARILLADO m 2,236.55 3.77 8,431.79 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2236.55 8431.79 100.00%
02.01.01.03.04 PRUEBA HIDRAULICA A ZANJA TAPADA DE TUBERIAS DE ALCANTARILLADO m 2,236.55 2.16 4,830.95 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2236.55 4830.95 100.00%
02.01.02 CONSTRUCCIONES DE BUZONES Y BUZONETES ( 62 BUZONES und Y 06 und BUZONETES) 0.00 0.00
02.01.02.01 TRABAJOS PRELIMINARES 0.00 0.00
02.01.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 206.84 1.35 279.23 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 206.84 279.23 100.00%
02.01.02.01.02 TRAZO Y REPALNTEO PRELIMINAR m2 206.84 2.25 465.39 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 206.84 465.39 100.00%
02.01.02.02 MOVIMIENTO DE TIERRAS 0.00 0.00
02.01.02.02.01 EXCAVACION TERRENO SEMI ROCOSO m3 356.42 48.81 17,396.86 0.00 0.00 0.00% 0.00 0.00 0.00% 356.42 17396.86 100.00%
02.01.02.02.02 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 131.44 3.46 454.78 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 131.44 454.78 100.00%
02.01.02.02.03 RELLENO CON MATERIAL PROPIO m3 128.76 24.41 3,143.03 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 128.76 3143.03 100.00%
02.01.02.02.04 ELIMINACION MATERIAL EXCEDENTE HASTA 100m m3 167.38 30.51 5,106.76 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 167.38 5106.76 100.00%
02.01.02.03 CONCRETO SIMPLE 0.00 0.00
02.01.02.03.01 SOLADO DE CONCRETO f'c=100 kg/cm2, e=4" m2 131.44 41.05 5,395.61 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 131.44 5395.61 100.00%
02.01.02.03.02 CONCRETO f'c=140 kg/cm2 + 30% PM - PARA RELLENO m3 7.44 417.28 3,104.56 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.44 3104.56 100.00%
02.01.02.03.03 CONCRETO F'C=175 KG/CM2 - LOSA DE FONDO m3 11.25 461.09 5,187.26 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.25 5187.26 100.00%
02.01.02.04 CONCRETO ARMADO 0.00 0.00
02.01.02.04.01 LOSA MACIZA DE FONDO 0.00 0.00
02.01.02.04.01.01 ENCOFRADO Y DESENCOFRADO - LOSA FONDO m2 65.72 53.05 3,486.45 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 65.72 3486.45 100.00%
02.01.02.04.01.02 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - MUROS m3 25.95 479.07 12,431.87 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 25.95 12431.87 100.00%
02.01.02.04.02 MUROS DE CONCRETO 0.00 0.00
02.01.02.04.01.01 ENCOFRADO METALICO PARA BUZON INTERNO Y EXTERNO und 62.00 130.28 8,077.36 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 62.00 8077.36 100.00%
02.01.02.04.01.02 ENCOFRADO METALICO PARA BUZONETE INTERNO Y EXTERNO und 6.00 100.28 601.68 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 601.68 100.00%
02.01.02.04.01.03 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - MUROS m3 71.00 514.82 36,552.22 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 71.00 36552.22 100.00%
02.01.02.04.03 CONCRETO EN TECHOS 0.00 0.00
02.01.02.04.03.01 ACERO ESTRUCTURAL FY=4200 KG/CM2 - TECHO kg 1,149.35 4.08 4,689.35 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1149.35 4689.35 100.00%
02.01.02.04.03.02 ENCOFRADO Y DESENCOFRADO DE MUROS - TECHO m2 54.71 73.76 4,035.41 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 54.71 4035.41 100.00%
02.01.02.04.03.03 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - TECHO m3 22.44 536.50 12,039.06 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 22.44 12039.06 100.00%
02.01.02.05 REVOQUES ENLUCIDOS 0.00 0.00
02.01.02.05.01 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 1:2, e=2.0 cm m2 305.77 27.09 8,283.31 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 305.77 8283.31 100.00%
02.01.02.06 MARCO Y TAPA DE HIERRO DUCTIL 0.00 0.00
02.01.02.06.01 MARCO Y TAPA PARA BUZON und 68.00 440.20 29,933.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 68.00 29933.60 100.00%
02.01.03 CONEXIONES DE ALCANTARILLADO PRE DOMICILIARIA (149 UND) 0.00 0.00
02.01.03.01 TRABAJOS PRELIMINARES 0.00 0.00
02.01.03.01.01 TRAZO Y REPLANTEO FINAL PARA LINEAS DE ALCANTARILLADO KM 0.89 892.58 794.40 0.00 0.00% 0.89 794.40 100.00% 0.89 794.40 100.00% 0.00 0.00 0.00%
02.01.03.01.02 TRAZO Y REPLANTEO INICIAL PARA LINEAS DE ALCANTARILLADO KM 0.89 941.63 838.05 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.89 838.05 100.00%
02.01.03.02 MOVIMIENTO DE TIERRAS 0.00 0.00
02.01.03.02.01 EXCAVACION EN MATERIAL NORMAL DESE 0.60 HASTA 1.25 M m 894.00 13.95 12,471.30 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 894.00 12471.30 100.00%
02.01.03.02.02 REFINE Y NIVELACION DE ZANJA EN TERRENO NOMRAL - SEMI ROCA m 894.00 1.94 1,734.36 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 894.00 1734.36 100.00%
02.01.03.02.03 CAMA DE APOYO PARA TUBERIA TODA PROFUNDIDAD TERRENO NORMAL/SEMI ROCA - ALCANTA. m 894.00 2.86 2,556.84 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 894.00 2556.84 100.00%
02.01.03.02.04 PRIMER RELLENO 0.30CM SOBRE LA TUBERIA m 894.00 33.73 30,154.62 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 894.00 30154.62 100.00%
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE 0.20M EN TERRENO
02.01.03.02.05 m 894.00 32.10 28,697.40 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 894.00 28697.40 100.00%
NORMAL/SEMI ROCA - HASTA 1m
02.01.03.02.06 ELIMINACION MATERIAL EXCEDENTE HASTA 100m m3 42.24 30.51 1,288.74 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 42.24 1288.74 100.00%
02.01.03.03 TUBERIA Y ACCESORIOS DE PVC 0.00 0.00
02.01.03.03.01 SUMINISTRO E INSTAL. TUBERIA DE PVC-U SN-4 D=110 mm, ISO 4435 EN CONEX. DOMICI. m 882.00 16.77 14,791.14 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 882.00 14791.14 100.00%
02.01.03.03.02 SUMINISTRO E INSTALACON DE ACCESORIOS EN CONEXIONES DN 110 mm und 147.00 60.27 8,859.69 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 147.00 8859.69 100.00%
02.01.03.03.03 SUMINISTRO E INSTAL. TUBERIA DE PVC-U SN-4 D=160 mm, ISO 4435 EN CONEX. DOMICI. m 12.00 30.69 368.28 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 368.28 100.00%
02.01.03.03.04 SUMINISTRO E INSTALACON DE ACCESORIOS EN CONEXIONES DN 160 mm und 2.00 80.40 160.80 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 160.80 100.00%
02.01.03.03.05 PRUEBA HIDRAULICA A ZANJA TAPADA DE TUBERIAS DE ALCANTARILLADO m 894.00 2.16 1,931.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 894.00 1931.04 100.00%
02.01.03.04 CAJAS Y TAPAS 0.00 0.00
02.01.03.04.01 EXCAVACION EN TERRENO NORMAL m3 37.55 34.87 1,309.37 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.55 1309.37 100.00%
02.01.03.04.02 REFINE Y NIVELACION EN TERRENO NORMAL m2 41.72 1.36 56.74 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 41.72 56.74 100.00%
02.01.03.04.03 RELLENO CON MATERIAL PROPIO m3 10.43 24.41 254.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.43 254.60 100.00%
02.01.03.04.04 ELIMINACION MATERIAL EXCEDENTE HASTA 100m m3 33.90 30.51 1,034.29 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 33.90 1034.29 100.00%
02.01.03.04.05 SUMINISTRO E INSTALACION DE CAJA DE REGISTRO DE 12"x24" und 149.00 138.02 20,564.98 0.00 0.00% 74.50 10282.49 50.00% 74.50 10282.49 50.00% 74.50 10282.49 50.00%
2.02 FLETES TERRESTRE Y RURAL 0.00
02.02.01 FLETE RURAL EN SISTEMADE ALCANTARILLADO GLB 1.00 9,870.87 9,870.87 0.00 0.00% 0.20 1974.17 20.00% 0.20 1974.17 20.00% 0.80 7896.70 80.00%
02.02.02 FLETE TERRESTRE SISTEMADE ALCANTARILLADO GLB 1.00 17,500.00 17,500.00 0.00 0.00% 0.20 3500.00 20.00% 0.20 3500.00 20.00% 0.80 14000.00 80.00%
3 DISPOSICION SANITARIAS DE EXCRETAS 0.00
3.01 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES - SAN LUIS DE CORERAC 0.00 0.00
03.01.01 CAMARA DE REJAS 0.00 0.00
03.01.01.01 TRABAJOS PRELIMINARES 0.00 0.00
03.01.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 4.70 1.35 6.35 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.70 6.35 100.00%
03.01.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 4.70 2.25 10.58 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.70 10.58 100.00%
03.01.01.02 MOVIMIENTO DE TIERRAS 0.00 0.00
03.01.01.02.01 EXCAVACION TERRENO SEMI ROCOSO m3 3.79 48.81 184.99 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.79 184.99 100.00%
03.01.01.02.02 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 3.99 3.46 13.81 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.99 13.81 100.00%
03.01.01.02.03 RELLENO CON MATERIAL PROPIO m3 0.78 27.13 21.16 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.78 21.16 100.00%
03.01.01.02.04 ELIMINACION MATERIAL EXCEDENTE m3 3.86 20.34 78.51 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.86 78.51 100.00%
03.01.01.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
03.01.01.03.01 CONCRETO F'C=100 KG/CM2 PARA SOLADO m3 0.20 388.39 77.68 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.20 77.68 100.00%
03.01.01.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
03.01.01.04.01 LOSA MACIZA DE FONDO 0.00 0.00
03.01.01.04.01.01 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - LOSA DE FONDO m3 0.60 479.07 287.44 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.60 287.44 100.00%
03.01.01.04.01.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 33.40 4.03 134.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 33.40 134.60 100.00%
03.01.01.04.01.03 ENCOFRADO Y DESENCOFRADO - LOSA DE FONDO m2 2.10 53.05 111.41 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.10 111.41 100.00%
03.01.01.04.02 MUROS 0.00 0.00
03.01.01.04.02.01 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL m3 1.10 510.96 562.06 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.10 562.06 100.00%
03.01.01.04.02.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 63.58 4.03 256.23 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 63.58 256.23 100.00%
03.01.01.04.02.03 ENCOFRADO Y DESENCOFRADO DE MUROS (2 CARAS) m2 14.92 59.94 894.30 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.92 894.30 100.00%
03.01.01.04.03 LOSA MACIZA DE TECHO 0.00 0.00
03.01.01.04.03.01 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - TECHO m3 0.02 536.50 10.73 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.02 10.73 100.00%
03.01.01.04.03.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 2.88 4.03 11.61 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.88 11.61 100.00%
03.01.01.04.03.03 ENCOFRADO Y DESENCOFRADO DE MUROS - TECHO m2 0.24 73.76 17.70 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.24 17.70 100.00%
03.01.01.05 REVOQUES Y ENLUCIDOS 0.00 0.00
03.01.01.05.01 TARRAJEO CON IMPERMEABILIZANTE MEZCLA E=1.5CM m2 9.23 33.83 312.25 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.23 312.25 100.00%
03.01.01.05.02 TARRAJEO EXTERIOR C/MORTERO 1:5 X1.5CM. m2 3.30 33.48 110.48 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.30 110.48 100.00%
03.01.01.05.03 PINTURA EXTERIOR A LATEX m2 3.30 17.24 56.89 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.30 56.89 100.00%
03.01.01.06 VARIOS 0.00 0.00
03.01.01.06.01 ACERO PARA REJAS und 1.00 182.37 182.37 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 182.37 100.00%
03.01.01.06.02 WATER STOP DE NEOPRENO DE 6", PROVISION Y COLOCADO DE JUNTA m 1.50 25.18 37.77 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.50 37.77 100.00%
03.01.02 DESARENADOR 0.00 0.00
03.01.02.01 TRABAJOS PRELIMINARES 0.00 0.00
03.01.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 6.44 1.35 8.69 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.44 8.69 100.00%
03.01.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 6.44 2.25 14.49 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.44 14.49 100.00%
03.01.02.02 MOVIMIENTO DE TIERRAS 0.00 0.00
03.01.02.02.01 EXCAVACION TERRENO SEMI ROCOSO m3 6.95 48.81 339.23 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.95 339.23 100.00%
03.01.02.02.02 REFINE Y NIVELACION EN TERRENO SMI ROCA m2 6.73 3.46 23.29 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.73 23.29 100.00%
03.01.02.02.03 RELLENO CON MATERIAL PROPIO m3 1.05 27.13 28.49 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.05 28.49 100.00%
03.01.02.02.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30m m3 7.26 20.34 147.67 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.26 147.67 100.00%
03.01.02.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
03.01.02.03.01 CONCRETO F'C=175 KG/CM2 m3 0.08 485.88 38.87 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.08 38.87 100.00%
03.01.02.03.02 CONCRETO F'C=100 KG/CM2 PARA SOLADO m3 0.37 388.39 143.70 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.37 143.70 100.00%
03.01.02.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
03.01.02.04.01 LOSA MACIZA DE FONDO 0.00 0.00
03.01.02.04.01.01 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - LOSA DE FONDO m3 1.10 479.07 526.98 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.10 526.98 100.00%
03.01.02.04.01.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 46.37 4.03 186.87 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 46.37 186.87 100.00%
03.01.02.04.01.03 ENCOFRADO Y DESENCOFRADO DE MUROS (2 CARAS) m2 1.96 53.05 103.98 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.96 103.98 100.00%
03.01.02.04.02 MUROS 0.00 0.00
03.01.02.04.02.01 CONCRETO F'C=210 KG/CM2 -ESTRUCTURAL m3 1.52 510.96 776.66 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.52 776.66 100.00%
03.01.02.04.02.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 75.52 4.03 304.35 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 75.52 304.35 100.00%
03.01.02.04.02.03 ENCOFRADO Y DESENCOFRADO DE MUROS (2 CARAS) m2 20.19 59.94 1,210.19 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.19 1210.19 100.00%
03.01.02.05 REVOQUES Y ENLUCIDOS 0.00 0.00
03.01.02.05.01 TARRAJEO CON IMPERMEABILIZANTE MEZCLA E=1.5CM m2 16.78 33.83 567.67 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.78 567.67 100.00%
03.01.02.05.02 TARRAJEO EXTERIOR C/MORTERO 1:5 X1.5CM. m2 5.09 33.48 170.41 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.09 170.41 100.00%
03.01.02.05.03 PINTURA EXTERIOR AL LATEX m2 5.09 17.24 87.75 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.09 87.75 100.00%
03.01.02.06 VARIOS 0.00 0.00
03.01.02.06.01 WATER STOP DE NEOPRENO DE 6", PROVISION Y COLOCADO DE JUNTA m 1.58 25.18 39.78 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.58 39.78 100.00%
03.01.02.06.02 SUMINISTRO E INSTALACION DE COMPUERTA DE FIBRA DE VIDRIO DE e=20mm m2 1.21 82.11 99.35 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.21 99.35 100.00%
03.01.03 CANALETA PARSHALL 0.00 0.00
03.01.03.01 TRABAJOS PRELIMINARES 0.00 0.00
03.01.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 2.50 1.35 3.38 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.50 3.38 100.00%
03.01.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 2.50 2.25 5.63 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.50 5.63 100.00%
03.01.03.02 MOVIMIENTO DE TIERRAS 0.00 0.00
03.01.03.02.01 EXCAVACION TERRENO SEMI ROCOSO m3 2.16 48.81 105.43 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.16 105.43 100.00%
03.01.03.02.02 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 3.09 3.46 10.69 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.09 10.69 100.00%
03.01.03.02.03 RELLENO CON MATERIAL PROPIO m3 0.48 27.13 13.02 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.48 13.02 100.00%
03.01.03.02.04 ELIMINACION DE MATERIAL EXCESENTE HASTA 30m m3 1.99 20.34 40.48 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.99 40.48 100.00%
03.01.03.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
03.01.03.03.01 CONCRETO F'C=100 KG/CM2 PARA SOLADO m3 0.16 388.39 62.14 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.16 62.14 100.00%
03.01.03.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
03.01.03.04.01 LOSA MACIZA DE FONDO 0.00 0.00
03.01.03.04.01.01 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - LOSA DE FONDO m3 0.47 479.07 225.16 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.47 225.16 100.00%
03.01.03.04.01.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 23.97 4.03 96.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.97 96.60 100.00%
03.01.03.04.01.03 ENCOFRADO Y DESENCOFRADO - LOSA DE FONDO m2 1.59 53.05 84.35 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.59 84.35 100.00%
03.01.03.04.02 MUROS 0.00 0.00
03.01.03.04.02.01 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL m3 0.98 510.96 500.74 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.98 500.74 100.00%
03.01.03.04.02.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 64.88 4.03 261.47 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 64.88 261.47 100.00%
03.01.03.04.02.03 ENCOFRADO Y DESENCOFRADO DE MUROS (2 CARAS) m2 13.62 59.94 816.38 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.62 816.38 100.00%
03.01.03.05 REVOQUES Y ENLUCIDOS 0.00 0.00
03.01.03.05.01 TARRAJEO CON IMPERMEABILIZANTE MEZCLA E=1.5CM m2 7.73 33.83 261.51 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.73 261.51 100.00%
03.01.03.05.02 TARRAJEO EXTERIOR C/MORTERO 1:5 X1.5CM. m2 3.69 33.48 123.54 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.69 123.54 100.00%
03.01.03.05.03 PINTURA EXTERIOR AL LATEX m2 3.69 17.24 63.62 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.69 63.62 100.00%
03.01.03.06 VARIOS 0.00 0.00
03.01.03.06.01 SUMINSTRO E INST. TUB. PVC TRANSPARENTE - 1" m 0.35 45.67 15.98 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.35 15.98 100.00%
03.01.03.06.02 SUMINISTRO E INSTALACION DE REGLA GRADUADA und 1.00 69.98 69.98 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 69.98 100.00%
03.01.04 TANQUE IMHOFF (01 und.) 0.00 0.00
03.01.04.01 TRABAJOS PRELIMINARES 0.00 0.00
03.01.04.01.01 LIMPIEZA DE TERRENO MANUAL m2 46.40 1.35 62.64 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 46.40 62.64 100.00%
03.01.04.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 46.40 2.25 104.40 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 46.40 104.40 100.00%
03.01.04.02 MOVIMIENTO DE TIERRAS 0.00 0.00
03.01.04.02.01 EXCAVACION TERRENO SEMI ROCA - Maquinaria HASTA 3.5m m3 175.27 19.53 3,423.02 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 175.27 3423.02 100.00%
03.01.04.02.02 EXCAVACION TERRENO SEMI ROCA - Maquinaria HASTA 7.5m m3 116.85 25.54 2,984.35 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 116.85 2984.35 100.00%
03.01.04.02.03 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 49.20 3.46 170.23 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 49.20 170.23 100.00%
03.01.04.02.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30m m3 225.50 20.34 4,586.67 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 225.50 4586.67 100.00%
03.01.04.02.05 RELLENO CON MATERIAL PROPIO m3 111.71 27.13 3,030.69 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 111.71 3030.69 100.00%
03.01.04.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
03.01.04.03.06 CONCRETO F'C=100KG/CM2 PARA SOLADO m3 4.73 388.39 1,837.08 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.73 1837.08 100.00%
03.01.04.03.07 ENCOFRADO Y DESENCOFRADO - LOSA DE FONDO m2 3.44 53.05 182.49 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.44 182.49 100.00%
03.01.04.03.08 CONCRETO F'C=175 KG/CM2 m3 6.22 485.88 3,022.17 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.22 3022.17 100.00%
03.01.04.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
03.01.04.04.01 LOSA MACIZA DE FONDO 0.00 0.00
03.01.04.04.01.01 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - LOSA DE FONDO m3 18.72 479.07 8,968.19 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.72 8968.19 100.00%
03.01.04.04.01.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 1,406.37 4.03 5,667.67 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1406.37 5667.67 100.00%
03.01.04.04.01.03 ENCOFRADO Y DESENCOFRADO - LOSA DE FONDO m2 12.40 53.05 657.82 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.40 657.82 100.00%
03.01.04.04.02 MUROS 0.00 0.00
03.01.04.04.02.01 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL m3 56.55 510.96 28,894.79 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 56.55 28894.79 100.00%
03.01.04.04.02.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 5,870.31 4.03 23,657.35 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5870.31 23657.35 100.00%
03.01.04.04.02.03 ENCOFRADO Y DESENCOFRADO DE MUROS (2 CARAS) m2 403.73 59.94 24,199.58 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 403.73 24199.58 100.00%
03.01.04.04.03 MURO SEDIMENTADOR 0.00 0.00
03.01.04.04.03.01 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - TECHO m3 10.00 510.96 5,109.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.00 5109.60 100.00%
03.01.04.04.03.02 ACERO DE REFUERZO FY=4200 KG/CM2 - TECHO kg 699.81 4.03 2,820.23 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 699.81 2820.23 100.00%
03.01.04.04.03.03 ENCOFRADO Y DESENCOFRADO DE MUROS - TECHO m2 102.79 59.94 6,161.23 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 102.79 6161.23 100.00%
03.01.04.04.03 TECHO DE CONCRETO 0.00 0.00
03.01.04.04.03.01 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - TECHO m3 5.85 536.50 3,138.53 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.85 3138.53 100.00%
03.01.04.04.03.02 ACERO DE REFUERZO FY=4200 KG/CM2 - TECHO kg 648.62 4.08 2,646.37 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 648.62 2646.37 100.00%
03.01.04.04.03.03 ENCOFRADO Y DESENCOFRADO DE MUROS - TECHO m2 26.08 73.76 1,923.66 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 26.08 1923.66 100.00%
03.01.04.05 REVOQUES Y ENLUCIDOS 0.00 0.00
03.01.04.05.01 TARRAJEO CON IMPERMEABILIZANTE MEZCLA E=1.5CM m2 300.44 33.83 10,163.89 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 300.44 10163.89 100.00%
03.01.04.05.02 TARRAJEO EXTERIOR C/MORTERO 1:5 X1.5CM. m2 69.17 33.48 2,315.81 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 69.17 2315.81 100.00%
03.01.04.05.03 PINTURA EXTERIOR AL LATEX m2 69.17 17.24 1,192.49 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 69.17 1192.49 100.00%
03.01.04.06 OTROS EN TANQUE IMHOFF 0.00 0.00
03.01.04.06.01 TAPA DE CONCRETO PARA CAJA DE SALIDA DE LODOS DE 0.55 x 1.30 M und 4.00 63.21 252.84 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 252.84 100.00%
03.01.04.06.02 INSTALACIONES HIDRAULICAS EN TANQUE IMHOFF GLB 1.00 2,923.68 2,923.68 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 2923.68 100.00%
03.01.04.06.03 MADERA TRATADA EN TANQUE IMHOFF p2 19.69 14.03 276.25 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.69 276.25 100.00%
03.01.04.06.04 CERCO PERIMETRICO DE F° G°, h=1.20 M m 21.80 157.90 3,442.22 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 21.80 3442.22 100.00%
03.01.04.06.05 WATER STOP DE NEOPRENO DE 6", PROVISION Y COLOCADO DE JUNTA m 65.40 25.18 1,646.77 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 65.40 1646.77 100.00%
03.01.05 LECHO DE SECADO (01 und.) 0.00 0.00
03.01.05.01 TRABAJOS PRELIMINARES 0.00 0.00
03.01.05.01.01 LIMPIEZA DE TERRENO MANUAL m2 98.02 1.35 132.33 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.02 132.33 100.00%
03.01.05.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 98.02 2.25 220.55 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.02 220.55 100.00%
03.01.05.02 MOVIMIENTO DE TIERRAS 0.00 0.00
03.01.05.02.01 EXCAVACION TERRENO SEMI ROCA - Maquinaria HASTA 2.0 m m3 174.66 17.47 3,051.31 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 174.66 3051.31 100.00%
03.01.05.02.02 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 98.90 3.46 342.19 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.90 342.19 100.00%
03.01.05.02.03 ELIMINACION MATERIAL EXCEDENTE HASTA 30m m3 164.17 20.34 3,339.22 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 164.17 3339.22 100.00%
03.01.05.02.04 RELLENO CON MATERIAL PROPIO m3 37.85 27.13 1,026.87 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.85 1026.87 100.00%
03.01.05.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
03.01.05.03.01 CONCRETO F'C=100 KG/CM2 PARA SOLADO m3 4.65 388.39 1,806.01 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.65 1806.01 100.00%
03.01.05.03.02 ENCOFRADO Y DESENCOFRADO - LOSA FONDO m2 11.48 53.05 609.01 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.48 609.01 100.00%
03.01.05.03.03 CONCRETO F'C=140 KG/CM2 P/LOSA DE FONDO m3 7.33 445.77 3,267.49 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.33 3267.49 100.00%
03.01.05.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
03.01.05.04.01 LOSA MACIZA DE FONDO 0.00 0.00
03.01.05.04.01.01 CONCRETO F'C=175 KG/CM2 - LOSA DE FONDO m3 13.95 461.09 6,432.21 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.95 6432.21 100.00%
03.01.05.04.01.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 518.42 4.03 2,089.23 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 518.42 2089.23 100.00%
03.01.05.04.01.03 ENCOFRADO Y DESENCOFRADO - LOSA FONDO m2 29.64 53.05 1,572.40 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 29.64 1572.40 100.00%
03.01.05.04.02 MUROS 0.00 0.00
03.01.05.04.02.01 CONCRETO F'C=175 KG/CM2 - MUROS m3 13.49 492.98 6,650.30 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.49 6650.30 100.00%
03.01.05.04.02.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 991.76 4.03 3,996.79 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 991.76 3996.79 100.00%
03.01.05.04.02.03 ENCOFRADO Y DESENCOFRADO DE MUROS (2 CARAS) m2 158.00 59.94 9,470.52 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 158.00 9470.52 100.00%
03.01.05.04.03 COLUMNAS 0.00 0.00
03.01.05.04.03.01 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - COLUMNAS m3 1.77 527.98 934.52 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.77 934.52 100.00%
03.01.05.04.03.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 265.67 4.03 1,070.65 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 265.67 1070.65 100.00%
03.01.05.04.03.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 35.36 63.72 2,253.14 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 35.36 2253.14 100.00%
03.01.05.04.04 LOSA MACIZA DE SALPICADURA 0.00 0.00
03.01.05.04.04.01 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL m3 0.52 510.96 265.70 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.52 265.70 100.00%
03.01.05.04.04.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 54.64 4.03 220.20 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 54.64 220.20 100.00%
03.01.05.04.04.03 ENCOFRADO Y DESENCOFRADO DE MUROS - TECHO m2 7.33 73.76 540.66 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.33 540.66 100.00%
03.01.05.05 REVOQUES Y ENLUCIDOS 0.00 0.00
03.01.05.05.01 TARRAJEO CON IMPERMEABILIZANTE MEZCLA E=1.5CM m2 195.12 33.83 6,600.91 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 195.12 6600.91 100.00%
03.01.05.05.02 TARRAJEO EXTERIOR C/MORTERO 1:5 X1.5CM. m2 41.52 33.48 1,390.09 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 41.52 1390.09 100.00%
03.01.05.05.03 PINTURA EXTERIOR AL LATEX m2 41.52 17.24 715.80 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 41.52 715.80 100.00%
03.01.05.06 CUBIERTAS 0.00 0.00
03.01.05.06.01 Cobertura de techo con calamina de PVC Trasparente m2 136.87 23.47 3,212.34 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 136.87 3212.34 100.00%
03.01.05.06.02 MADERA PARA COBERTURA DE CASETA p2 546.86 7.04 3,849.89 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 546.86 3849.89 100.00%
03.01.05.06.03 CUMBRERAS PARA TECHO m 15.14 23.37 353.82 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.14 353.82 100.00%
03.01.05.06.04 Planchas metalicas e=3/8" m2 7.78 151.99 1,182.48 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.78 1182.48 100.00%
03.01.05.06.05 PERNOS PARA CARTELAS DE 4"x 1/2" und 430.00 1.83 786.90 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 430.00 786.90 100.00%
03.01.05.07 MAMPOSTERIA 0.00 0.00
03.01.05.07.01 SUMINISTRO Y COLOCACION DE GRAVA 1/2" PARA LECHO DE SECADO m3 7.20 134.66 969.55 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.20 969.55 100.00%
03.01.05.07.02 SUMINISTRO Y COLOCACION DE GRAVA 1" PARA LECHO DE SECADO m3 7.20 134.66 969.55 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.20 969.55 100.00%
03.01.05.07.03 SUMINISTRO Y COLOCACION DE ARENA GRUESA PARA LECHO DE SECADO m3 7.20 206.06 1,483.63 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.20 1483.63 100.00%
03.01.05.07.04 LADRILLO PARA LECHO DE SECADO m2 72.00 13.18 948.96 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 72.00 948.96 100.00%
03.01.05.08 INSTALACIONES HIDRAULICAS 0.00 0.00
03.01.05.08.01 ACCESORIO DE PVC PARA LECHO DE SECADO GLB 1.00 1,760.24 1,760.24 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1760.24 100.00%
03.01.05.08.02 TUBERIA PVC SAP DE D=8" PARA LECHO DE SECADO m 10.40 29.95 311.48 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.40 311.48 100.00%
03.01.06 FILTRO BIOLOGICO (02 und.) 0.00 0.00
03.01.06.01 TRABAJOS PRELIMINARES 0.00 0.00
03.01.06.01.01 LIMPIEZA DE TERRENO MANUAL m2 64.64 1.35 87.26 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 64.64 87.26 100.00%
03.01.06.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 64.64 2.25 145.44 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 64.64 145.44 100.00%
03.01.06.02 MOVIMIENTO DE TIERRAS 0.00 0.00
03.01.06.02.01 EXCAVACION TERRENO SEMI ROCA - Maquinaria HASTA 2.0 m m3 190.74 17.47 3,332.23 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 190.74 3332.23 100.00%
03.01.06.02.02 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 65.32 3.46 226.01 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 65.32 226.01 100.00%
03.01.06.02.03 ELIMINACION MATERIAL EXCEDENTE HASTA 30m m3 162.43 20.34 3,303.83 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 162.43 3303.83 100.00%
03.01.06.02.04 RELLENO CON MATERIAL PROPIO m3 55.38 27.13 1,502.46 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 55.38 1502.46 100.00%
03.01.06.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
03.01.06.03.01 CONCRETO F'C=100 KG/CM2 PARA SOLADO m3 6.60 388.39 2,563.37 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.60 2563.37 100.00%
03.01.06.03.02 ENCOFRADO Y DESENCOFRADO - LOSA DE FONDO m2 5.90 53.05 313.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.90 313.00 100.00%
03.01.06.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
03.01.06.04.01 LOSA MACIZA DE FONDO 0.00 0.00
03.01.06.04.01.01 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - LOSA DE FONDO m3 15.72 479.07 7,530.98 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.72 7530.98 100.00%
03.01.06.04.01.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 808.73 4.03 3,259.18 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 808.73 3259.18 100.00%
03.01.06.04.01.03 ENCOFRADO Y DESENCOFRADO - LOSA DE FONDO m2 13.18 53.05 699.20 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.18 699.20 100.00%
03.01.06.04.02 MUROS 0.00 0.00
03.01.06.04.02.01 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - MUROS m3 31.06 514.82 15,990.31 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 31.06 15990.31 100.00%
03.01.06.04.02.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 1,780.75 4.03 7,176.42 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1780.75 7176.42 100.00%
03.01.06.04.02.03 ENCOFRADO Y DESENCOFRADO DE MUROS (2 CARAS) m2 266.24 59.94 15,958.43 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 266.24 15958.43 100.00%
03.01.06.04.03 TECHO DE CONCRETO 0.00 0.00
03.01.06.04.03.01 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - MUROS m3 0.40 514.82 205.93 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.40 205.93 100.00%
03.01.06.04.03.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 28.77 3.98 114.50 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.77 114.50 100.00%
03.01.06.04.03.03 ENCOFRADO Y DESENCOFRADO DE MUROS (2 CARAS) m2 2.78 59.94 166.63 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.78 166.63 100.00%
03.01.06.05 REVOQUES Y ENLUCIDOS 0.00 0.00
03.01.06.05.01 TARRAJEO CON IMPERMEABILIZANTE MEZCLA E=1.5CM m2 191.88 33.83 6,491.30 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 191.88 6491.30 100.00%
03.01.06.05.02 TARRAJEO EXTERIOR C/MORTERO 1:5 X1.5CM. m2 37.92 33.48 1,269.56 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.92 1269.56 100.00%
03.01.06.05.03 PINTURA EXTERIOR AL LATEX m2 37.92 17.24 653.74 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.92 653.74 100.00%
03.01.06.06 MAMPOSTERIA 0.00 0.00
03.01.06.06.01 LADRILLO PARA FILTRO BIOLOGICO m2 40.48 16.19 655.37 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 40.48 655.37 100.00%
03.01.06.06.02 LADRILLO PARA SOPORTE DE FILTRO BIOLOGICO und 234.00 0.46 107.64 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 234.00 107.64 100.00%
03.01.06.07 MATERIAL FILTRANTE 0.00 0.00
03.01.06.07.01 SUMINISTRO Y COLOCACION DE GRAVA 2" PARA FILTRO BIOLOGICO m3 24.28 134.66 3,269.54 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.28 3269.54 100.00%
03.01.06.07.02 SUMINISTRO Y COLOCACION DE GRAVA 3" PARA FILTRO BIOLOGICO m3 28.34 171.27 4,853.79 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.34 4853.79 100.00%
03.01.06.07.03 SUMINISTRO Y COLOCACION DE GRAVA 4" PARA FILTRO BIOLOGICO m3 28.34 171.27 4,853.79 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.34 4853.79 100.00%
03.01.06.08 OTROS EN FILTRO BIOLOGICO 0.00 0.00
03.01.06.08.01 TAPA DE CONCRETO Y MARCO DE F°F° D= 0.60 M und 2.00 323.93 647.86 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 647.86 100.00%
03.01.06.08.02 TAPA DE CONCRETO PARA CAJA DE INGRESO DE 0.45 x 0.70 M und 4.00 64.86 259.44 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 259.44 100.00%
03.01.06.08.03 TUBERIA PVC SAP DE D=4" PARA CANAL DE DISTRIBUCION m 44.00 10.89 479.16 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 44.00 479.16 100.00%
03.01.06.08.04 MADERA TRATADA EN FILTRO p2 214.93 9.25 1,988.10 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 214.93 1988.10 100.00%
03.01.06.08.05 ESCALERA F°G° TIPO GATO 3/4" m 9.00 16.23 146.07 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.00 146.07 100.00%
03.01.07 POZOS DE PERCOLACION (01 und) 0.00 0.00
03.01.07.01 TRABAJOS PRELIMINARES 0.00 0.00
03.01.07.01.01 LIMPIEZA DE TERRENO MANUAL m2 9.82 1.35 13.26 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.82 13.26 100.00%
03.01.07.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 9.82 2.25 22.10 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.82 22.10 100.00%
03.01.07.02 MOVIMIENTO DE TIERRAS 0.00 0.00
03.01.07.02.01 EXCAVACION TERRENO SEMI ROCOSO m3 27.57 48.81 1,345.69 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 27.57 1345.69 100.00%
03.01.07.02.02 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 7.07 3.46 24.46 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.07 24.46 100.00%
03.01.07.02.03 ELIMINACION MATERIAL EXCEDENTE HASTA 30m m3 28.75 20.34 584.78 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.75 584.78 100.00%
03.01.07.02.04 RELLENO CON MATERIAL PROPIO m3 3.61 27.13 97.94 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.61 97.94 100.00%
03.01.07.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
03.01.07.03.01 CONCRETO F'C=140 KG/CM2 P/LOSA DE FONDO m3 1.70 445.77 757.81 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.70 757.81 100.00%
03.01.07.03.02 ENCOFRADO Y DESENCOFRADO - LOSA DE FONDO m2 8.18 53.05 433.95 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.18 433.95 100.00%
03.01.07.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
03.01.07.04.01 COLUMNAS 0.00 0.00
03.01.07.04.01.01 CONCRETO F'C=175 KG/CM2 COLUMNA m3 0.72 510.00 367.20 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.72 367.20 100.00%
03.01.07.04.01.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 49.87 4.03 200.98 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 49.87 200.98 100.00%
03.01.07.04.01.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 11.48 63.72 731.51 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.48 731.51 100.00%
03.01.07.04.02 VIGA PERIMETRAL 0.00 0.00
03.01.07.04.02.01 CONCRETO FC=175 KG/CM2 VIGAS m3 0.34 547.87 186.28 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.34 186.28 100.00%
03.01.07.04.02.02 ACERO DE REFUERZO FY=4200 KG/CM2 - VIGAS kg 18.24 4.08 74.42 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.24 74.42 100.00%
03.01.07.04.02.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 2.75 69.12 190.08 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.75 190.08 100.00%
03.01.07.04.03 MUROS DE CONCRETO 0.00 0.00
03.01.07.04.03.01 CONCRETO F'C=175 KG/CM2 - MUROS m3 0.91 492.98 448.61 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.91 448.61 100.00%
03.01.07.04.03.02 ENCOFRADO Y DESENCOFRADO DE MUROS (2 CARAS) m2 7.37 59.94 441.76 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.37 441.76 100.00%
03.01.07.04.04 TECHO DE CONCRETO 0.00 0.00
03.01.07.04.04.01 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - TECHO m3 0.57 536.50 305.81 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.57 305.81 100.00%
03.01.07.04.04.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 16.93 4.03 68.23 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.93 68.23 100.00%
03.01.07.04.04.03 ENCOFRADO Y DESENCOFRADO DE MUROS - TECHO m2 3.41 73.76 251.52 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.41 251.52 100.00%
03.01.07.05 REVOQUES Y ENLUCIDOS 0.00 0.00
03.01.07.05.01 TARRAJEO EXTERIOR C/MORTERO 1:5 X1.5CM. m2 4.50 33.48 150.66 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.50 150.66 100.00%
03.01.07.06 MAMPOSTERIA 0.00 0.00
03.01.07.06.01 LADRILLO PARA POZO PERCOLADOR m2 12.10 16.19 195.90 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.10 195.90 100.00%
03.01.07.07 MATERIAL FILTRANTE 0.00 0.00
03.01.07.07.01 SUMINISTRO Y COLOCACION DE GRAVA DE 1/2" - POZO PERCOLADOR m3 4.45 130.59 581.13 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.45 581.13 100.00%
03.01.07.07.02 SUMINSTRO Y COLOCACION DE GRAVA DE 1" - POZO PERCOLADOR m3 3.39 130.59 442.70 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.39 442.70 100.00%
03.01.07.08 OTROS EN POZO PERCOLADOR 0.00 0.00
03.01.07.08.01 TAPA DE CONCRETO D= 0.60 M und 1.00 90.09 90.09 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 90.09 100.00%
03.01.07.08.02 ACCESORIO DE PVC PARA POZO PERCOLADOR GLB 1.00 197.19 197.19 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 197.19 100.00%
03.01.08 TANQUE SEDIMENTADOR (02 und.) 0.00 0.00
03.01.08.01 TRABAJOS PRELIMINARES 0.00 0.00
03.01.08.01.01 LIMPIEZA DE TERRENO MANUAL m2 16.32 1.35 22.03 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.32 22.03 100.00%
03.01.08.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 16.32 2.25 36.72 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.32 36.72 100.00%
03.01.08.02 MOVIMIENTO DE TIERRAS 0.00 0.00
03.01.08.02.01 EXCAVACION PARA HASTA 2.00 M TERRENO NORMAL m3 15.16 30.51 462.53 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.16 462.53 100.00%
03.01.08.02.02 EXCAVACION PARA HASTA 4.00 M TERRENO NORMAL m3 22.50 39.49 888.53 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 22.50 888.53 100.00%
03.01.08.02.03 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 1.28 3.46 4.43 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.28 4.43 100.00%
03.01.08.02.04 RELLENO CON MATERIAL PROPIO m3 12.15 27.13 329.63 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.15 329.63 100.00%
03.01.08.02.05 ELIMINACION MATERIAL EXCEDENTE HASTA 30m m3 30.61 20.34 622.61 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 30.61 622.61 100.00%
03.01.08.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
03.01.08.03.01 CONCRETO F'C=100 KG/CM2 PARA SOLADO m3 0.13 388.39 50.49 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.13 50.49 100.00%
03.01.08.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
03.01.08.04.01 LOSA MACIZA DE FONDO 0.00 0.00
03.01.08.04.01.01 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - LOSA DE FONDO m3 0.14 479.07 67.07 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.14 67.07 100.00%
03.01.08.04.01.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 5.38 3.98 21.41 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.38 21.41 100.00%
03.01.08.04.01.03 ENCOFRADO Y DESENCOFRADO DE MUROS (2 CARAS) m2 0.64 53.05 33.95 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.64 33.95 100.00%
03.01.08.04.02 MUROS 0.00 0.00
03.01.08.04.02.01 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - MUROS m3 12.02 514.82 6,188.14 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.02 6188.14 100.00%
03.01.08.04.02.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 530.19 3.98 2,110.16 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 530.19 2110.16 100.00%
03.01.08.04.02.03 ENCOFRADO Y DESENCOFRADO DE MUROS (2 CARAS) m2 113.26 59.94 6,788.80 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 113.26 6788.80 100.00%
03.01.08.04.03 LOSA MACIZA DE TECHO 0.00 0.00
03.01.08.04.03.01 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - TECHO m3 0.46 536.50 246.79 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.46 246.79 100.00%
03.01.08.04.03.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 26.21 3.98 104.32 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 26.21 104.32 100.00%
03.01.08.04.03.03 ENCOFRADO Y DESENCOFRADO DE MUROS - TECHO m2 3.77 73.76 278.08 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.77 278.08 100.00%
03.01.08.05 REVOQUES Y ENLUCIDOS 0.00 0.00
03.01.08.05.01 TARRAJEO CON IMPERMEABILIZANTE MEZCLA E=1.5CM m2 53.63 33.83 1,814.30 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 53.63 1814.30 100.00%
03.01.08.05.02 TARRAJEO EXTERIOR C/MORTERO 1:5 X1.5CM. m2 16.65 33.48 557.44 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.65 557.44 100.00%
03.01.08.05.03 PINTURA EXTERIOR AL LATEX m2 9.68 11.26 109.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.68 109.00 100.00%
03.01.08.06 VARIOS 0.00 0.00
03.01.08.06.01 ACCESORIOS HIDRAULICOS PARA SEDIMENTADOR - PTAR GLB 2.00 2,266.05 4,532.10 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 4532.10 100.00%
03.01.08.06.02 BARANDA DE TUBO F°G° P/PASAMANO 2" m 9.60 156.07 1,498.27 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.60 1498.27 100.00%
03.01.09 CASETA DE CLORACION Y CAMARA DE CONTACTO DE CLORO (01 UND) 0.00 0.00
03.01.09.01 TRABAJOS PRELIMINARES 0.00 0.00
03.01.09.01.01 LIMPIEZA DE TERRENO MANUAL m2 12.26 1.35 16.55 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.26 16.55 100.00%
03.01.09.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 12.26 2.25 27.59 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.26 27.59 100.00%
03.01.09.02 MOVIMIENTO DE TIERRAS 0.00 0.00
03.01.09.02.01 EXCAVACION TERRENO SEMI ROCOSO m3 13.03 48.81 635.99 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.03 635.99 100.00%
03.01.09.02.02 REFINE Y NIVELACON EN TERRENO SEMI ROCA m2 12.26 3.46 42.42 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.26 42.42 100.00%
03.01.09.02.03 ELIMINACION MATERIAL EXCEDENTE HASTA 30m m3 9.85 20.34 200.35 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.85 200.35 100.00%
03.01.09.02.04 RELLENO CON MATERIAL PROPIO m3 4.83 27.13 131.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.83 131.04 100.00%
03.01.09.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
03.01.09.03.01 CONCRETO F'C=100 KG/CM2 PARA SOLADO m3 1.92 388.39 745.71 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.92 745.71 100.00%
03.01.09.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
03.01.09.04.01 LOSA MACIZA DE FONDO 0.00 0.00
03.01.09.04.01.01 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - LOSA DE FONDO m3 1.41 479.07 675.49 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.41 675.49 100.00%
03.01.09.04.01.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 51.87 3.98 206.44 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 51.87 206.44 100.00%
03.01.09.04.01.03 ENCOFRADO Y DESENCOFRADO - LOSA DE FONDO m2 2.63 53.05 139.52 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.63 139.52 100.00%
03.01.09.04.02 MUROS 0.00 0.00
03.01.09.04.02.01 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - MUROS m3 1.67 514.82 859.75 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.67 859.75 100.00%
03.01.09.04.02.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 58.98 3.98 234.74 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 58.98 234.74 100.00%
03.01.09.04.02.03 ENCOFRADO Y DESENCOFRADO DE MUROS (2 CARAS) m2 26.20 59.94 1,570.43 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 26.20 1570.43 100.00%
03.01.09.04.03 LOSA MACIZA DE TECHO 0.00 0.00
03.01.09.04.03.01 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - TECHO m3 0.36 536.50 193.14 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.36 193.14 100.00%
03.01.09.04.03.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 21.32 3.98 84.85 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 21.32 84.85 100.00%
03.01.09.04.03.03 ENCOFRADO Y DESENCOFRADO DE MUROS - TECHO m2 4.36 73.76 321.59 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.36 321.59 100.00%
03.01.09.05 REVOQUES Y ENLUCIDOS 0.00 0.00
03.01.09.05.01 TARRAJEO CON IMPERMEABILIZANTE MEZCLA E=1.5CM m2 12.61 33.83 426.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.61 426.60 100.00%
03.01.09.05.02 TARRAJEO EXTERIOR C/MORTERO 1:5 X1.5CM. m2 19.76 33.48 661.56 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.76 661.56 100.00%
03.01.09.05.03 PINTURA EXTERIOR AL LATEX m2 19.76 11.26 222.50 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.76 222.50 100.00%
03.01.09.06 VARIOS 0.00 0.00
03.01.09.06.01 ACCESORIOS HIDRAULICOS PARA CASETA DE CLORACION GLB 1.00 2,014.16 2,014.16 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 2014.16 100.00%
03.01.10 CAJA REPARTIDORA DE CAUDAL (1 und) 0.00 0.00
03.01.10.01 TRABAJOS PRELIMINARES 0.00 0.00
03.01.10.01.01 LIMPIEZA DE TERRENO MANUAL m2 1.76 1.35 2.38 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.76 2.38 100.00%
03.01.10.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 1.76 2.25 3.96 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.76 3.96 100.00%
03.01.10.02 MOVIMIENTO DE TIERRAS 0.00 0.00
03.01.10.02.01 EXCAVACION TERRENO SEMI ROCOSO m3 3.57 48.81 174.25 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.57 174.25 100.00%
03.01.10.02.02 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 1.76 3.46 6.09 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.76 6.09 100.00%
03.01.10.02.03 ELIMINACION MATERIAL EXCEDENTE HASTA 30m m3 2.53 20.34 51.46 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.53 51.46 100.00%
03.01.10.02.04 RELLENO CON MATERIAL PROPIO m3 1.46 27.13 39.61 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.46 39.61 100.00%
03.01.10.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
03.01.10.03.01 CONCRETO F'C=100 KG/CM2 PARA SOLADO m3 0.18 388.39 69.91 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.18 69.91 100.00%
03.01.10.03.02 ENCOFRADO Y DESENCOFRADO - LOSA DE FONDO m2 0.53 53.05 28.12 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.53 28.12 100.00%
03.01.10.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
03.01.10.04.01 LOSA MACIZA DE FONDO 0.00 0.00
03.01.10.04.01.01 CONCRETO FC=175 KG/CM2 ZAPATAS m3 0.26 511.05 132.87 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.26 132.87 100.00%
03.01.10.04.01.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 12.22 3.98 48.64 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.22 48.64 100.00%
03.01.10.04.01.03 ENCOFRADO Y DESENCOFRADO - LOSA DE FONDO m2 0.80 53.05 42.44 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.80 42.44 100.00%
03.01.10.04.02 MUROS 0.00 0.00
03.01.10.04.02.01 CONCRETO FC=175 KG/CM2 PARA MUROS m3 0.62 530.07 328.64 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.62 328.64 100.00%
03.01.10.04.02.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 37.24 3.98 148.22 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.24 148.22 100.00%
03.01.10.04.02.03 ENCOFRADO Y DESENCOFRADO DE MUROS (2 CARAS) m2 10.19 59.94 610.79 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.19 610.79 100.00%
03.01.10.04.03 TECHO DE CONCRETO 0.00 0.00
03.01.10.04.03.01 CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - TECHO m3 0.07 536.50 37.56 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.07 37.56 100.00%
03.01.10.04.03.02 ACERO ESTRUCTURAL FY=4200 KG/CM2 kg 10.10 4.03 40.70 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.10 40.70 100.00%
03.01.10.04.03.03 ENCOFRADO Y DESENCOFRADO DE MUROS - TECHO m2 1.85 73.76 136.46 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.85 136.46 100.00%
03.01.10.05 REVOQUES Y ENLUCIDOS 0.00 0.00
03.01.10.05.01 TARRAJEO CON IMPERMEABILIZANTE MEZCLA E=1.5CM m2 8.52 33.83 288.23 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.52 288.23 100.00%
03.01.10.05.02 TARRAJEO EXTERIOR C/MORTERO 1:5 X1.5CM. m2 2.97 33.48 99.44 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.97 99.44 100.00%
03.01.10.05.03 PINTURA EXTERIOR AL LATEX m2 2.97 11.26 33.44 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.97 33.44 100.00%
03.01.11 INTERCONEXION Y EMISOR 0.00 0.00
03.01.11.01 OBRAS PRELIMINAR 0.00 0.00
03.01.11.01.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR/ML KM 0.21 775.07 162.76 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.21 162.76 100.00%
03.01.11.01.02 LIMPIEZA DE TERRENO MANUAL m 206.40 1.60 330.24 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 206.40 330.24 100.00%
03.01.11.02 EXCAVACION DE ZANJA 0.00 0.00
03.01.11.02.01 EXCAVACION DE ZANJA, PARA TUBERIA APROM 0.60 M, h=1.00M, TERRENO NORMAL - Manual m 86.60 15.89 1,376.07 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 86.60 1376.07 100.00%
03.01.11.02.02 EXCAVACION DE ZANJA, PARA TUBERIA APROM 0.60 M, h=1.00M, TERRENO SEMI ROCOSO - Manual m 119.80 26.22 3,141.16 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 119.80 3141.16 100.00%
03.01.11.02.03 ELIMINACION MATERIAL EXCEDENTE HASTA 100m m3 46.44 30.51 1,416.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 46.44 1416.88 100.00%
03.01.11.03 RELLENO Y COMPACTACION DE ZANJA 0.00 0.00
03.01.11.03.01 REFINE Y NIVELACION DE ZANJA EN TERRENO NORMAL - SEMI ROCA m 206.40 1.94 400.42 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 206.40 400.42 100.00%
03.01.11.03.02 CAMA DE APOYO PARA TUBERIA TODA PROFUNDIDAD TERRENO NORMAL/SEMI ROCA - ALCANTA. m 206.40 2.86 590.30 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 206.40 590.30 100.00%
03.01.11.03.03 PRIMER RELLENO 0.30 CM SOBRE LA TUBERIA m 206.40 33.73 6,961.87 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 206.40 6961.87 100.00%
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE 0.20 M. EN TERRENO
03.01.11.03.04 m 206.40 32.10 6,625.44 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 206.40 6625.44 100.00%
NORMAL/SEMI ROCA - HASTA 1m
03.01.11.04 SUMINISTRO E INSTALACION DE TUBERIAS 0.00 0.00
03.01.11.04.01 SUMINISTRO E INSTAL. TUBERIA DE PVC-U SN-2 D=160 mm, ISO 4435 m 206.40 32.62 6,732.77 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 206.40 6732.77 100.00%
03.01.11.04.02 PRUEBA HIDRAULICA A ZANJA ABIERTA Y NIVELACION DE TUBERIA DE ALCANTARILLADO m 206.40 3.77 778.13 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 206.40 778.13 100.00%
03.01.11.04.03 PRUEBA HIDRAULICA A ZANJA TAPADA DE TUBERIAS DE ALCANTARILLADO m 206.40 2.16 445.82 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 206.40 445.82 100.00%
03.01.11.05 CONSTRUCCIONES DE BUZONETES ( 08 und BUZONETES) 0.00 0.00
03.01.11.05.01 TRABAJOS PRELIMINARES 0.00 0.00
03.01.11.05.01.01 LIMPIEZA DE TERRENO MANUAL m2 25.13 1.35 33.93 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 25.13 33.93 100.00%
03.01.11.05.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 25.13 2.25 56.54 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 25.13 56.54 100.00%
03.01.11.05.02 MOVIMIENTO DE TIERRAS 0.00 0.00
03.01.11.05.02.01 EXCAVACION TERRENO SEMI ROCOSO m3 19.30 48.81 942.03 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.30 942.03 100.00%
03.01.11.05.02.02 REFINE Y NIVELACION EN TERRENO SEMI ROCA m2 9.05 3.46 31.31 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.05 31.31 100.00%
03.01.11.05.02.03 RELLENO CON MATERIAL PROPIO m3 7.54 24.41 184.05 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.54 184.05 100.00%
03.01.11.05.02.04 ELIMINACION MATERIAL EXCEDENTE HASTA 30m m3 9.80 20.34 199.33 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.80 199.33 100.00%
03.01.11.05.03 CONCRETO SIMPLE 0.00 0.00
03.01.11.05.03.01 SOLADO DE CONCRETO f'c=100 kg/cm2, e=4" m2 9.05 41.05 371.50 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.05 371.50 100.00%
03.01.11.05.03.02 CONCRETO f'c=140kg/cm2 +30% PM - PARA RELLENO m3 0.38 417.28 158.57 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.38 158.57 100.00%
03.01.11.05.03.03 CONCRETO F'C=175 KG/CM2 - LOSA DE FONDO m3 0.77 461.09 355.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.77 355.04 100.00%
03.01.11.05.04 CONCRETO ARMADO 0.00 0.00
03.01.11.05.04.01 LOSA MACIZA DE FONDO 0.00 0.00
03.01.11.05.04.01
ENCOFRADO Y DESENCOFRADO - LOSA FONDO m2 4.52 53.05 239.79 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.52 239.79 100.00%
.01
03.01.11.05.04.01
CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - LOSA DE FONDO m3 1.36 479.07 651.54 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.36 651.54 100.00%
.02
03.01.11.05.04.02 MUROS DE CONCRETO 0.00 0.00
03.01.11.05.04.02
ENCOFRADO METALICO PARA BUZONETE INTERNO Y EXTERNO und 8.00 100.28 802.24 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 802.24 100.00%
.01
03.01.11.05.04.02
CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - MUROS m3 3.36 514.82 1,729.80 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.36 1729.80 100.00%
.02
03.01.11.05.04.03 CONCRETO EN TECHOS 0.00 0.00
03.01.11.05.04.03
ENCOFRADO Y DESENCOFRADO DE MUROS - TECHO m2 2.83 73.76 208.74 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.83 208.74 100.00%
.01
03.01.11.05.04.03
CONCRETO F'C=210 KG/CM2 - ESTRUCTURAL - TECHO m3 1.36 536.50 729.64 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.36 729.64 100.00%
.02
03.01.11.05.05 REVOQUES ENLUCIDOS 0.00 0.00
03.01.11.05.05.01 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 1:2, e=2.0 cm m2 16.40 27.09 444.28 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.40 444.28 100.00%
03.01.11.05.06 MARCO Y TAPA DE HIERRO DUCTIL 0.00 0.00
03.01.11.05.06.01 MARCO Y TAPA PARA BUZON und 8.00 440.20 3,521.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 3521.60 100.00%
03.01.12 CERCO PERIMETRICO (01 und.) 0.00 0.00
03.01.12.01 TRABAJOS PRELIMINARES 0.00 0.00
03.01.12.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 1,250.00 2.25 2,812.50 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1250.00 2812.50 100.00%
03.01.12.01.02 LIMPIEZA DE TERRENO MANUAL m2 1,250.00 1.35 1,687.50 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1250.00 1687.50 100.00%
03.01.12.02 MOVIMIENTO DE TIERRAS 0.00 0.00
03.01.12.02.01 EXCAVACION DE HOYO DE 0.40X0.40.X0.50M EN MATERIAL CONGLOMERADO m3 12.03 30.51 367.04 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.03 367.04 100.00%
03.01.12.02.02 ELIMINACION MATERIAL EXCEDENTE HASTA 100m m3 18.32 20.34 372.63 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.32 372.63 100.00%
03.01.12.02.03 REFINE, NIVELACION Y APISONADO DE TERRENO m2 18.32 2.30 42.14 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.32 42.14 100.00%
03.01.12.03 OBRAS DE COCNRETO SIMPLE 0.00 0.00
03.01.12.03.01 CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS (SIN AGREGADOS) m3 7.72 245.30 1,893.72 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.72 1893.72 100.00%
03.01.12.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
03.01.12.04.01 CONCRETO FC=175 KG/CM2 COLUMNA m3 1.26 510.00 642.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.26 642.60 100.00%
03.01.12.04.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 6.20 63.72 395.06 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.20 395.06 100.00%
03.01.12.04.03 ACERO DE REFUERZO DE REFUERZO FY=4200 KG/CM2 kg 62.88 4.03 253.41 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 62.88 253.41 100.00%
03.01.12.05 VARIOS 0.00 0.00
03.01.12.05.01 PUERTA METALICA DE 1.20X2.20m UNA HOJA CON TUBO DE 2" Y MALLA ROMBO 1/2"x1/2" N°12 und 1.00 306.44 306.44 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 306.44 100.00%
03.01.12.05.02 MALLA METALICA PROTECTORA CON ALAMBRE N° 12 m2 657.60 35.32 23,226.43 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 657.60 23226.43 100.00%
03.01.12.05.03 CERCO DE ALAMBRE TIPO PUAS m 1,140.00 2.90 3,306.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1140.00 3306.00 100.00%
03.01.12.05.04 POSTES DE TUBO DE 2" und 120.00 47.80 5,736.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 120.00 5736.00 100.00%
3.02 FLETES TERRESTRE Y RURAL EN PLANTA DE TRATAMIENTO Y UBS 0.00 0.00
03.02.01 FLETE TERRESTRE EN PLANTA DE TRATAMIENTO Y UBS GLB 1.00 35,015.06 35,015.06 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 35015.06 100.00%
03.02.02 FLETE RURAL EN PLANTA DE TRATAMIENTO Y UBS GLB 1.00 32,643.52 32,643.52 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 32643.52 100.00%
CD 2,577,233.54 0.00 26,078.50 1.01% 99,279.97 3.85% 125,358.47 4.86% 2,451,875.05 95.14%
GG (08%) 206,283.74 2,087.34 7,946.44 10,033.79 196,249.95
UTI (07%) 180,406.35 1,825.50 6,949.60 8,775.09 171,631.25
FR 0.90 0.90 0.90 0.90 0.90
ST 2,963,923.63 29,991.34 114,176.01 144,167.35 2,819,756.25
ST 2,667,531.27 26,992.21 102,758.41 129,750.61 2,537,780.63
I.G.V. (18%) 480,155.63 4,858.60 18,496.51 23,355.11 456,800.51
PT 3,147,686.90 31,850.81 121,254.92 153,105.72 2,994,581.14
PROCENTAJE Err:522 1.01% 3.85% 4.86% 95.14%
CURVA "S" DE AVANCE DE OBRA %
“AMPLIACION, MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DE ALCANTARILLADO DEL ANEXO DE SAN MIGUEL DE CURIS, DISTRITO DE SANTIAGO DE
OBRA
CHOCORVOS - HUAYTARA - HUANCAVELICA’’
SANTIAGO DE
DISTRITO CHOCORVOS
ENTIDAD CONTRATANTE MUNICIPALIDAD PROVINCIAL DE HUAYTARA
CONTRATISTA
100.00% 100.00%
90.00%
87.14%
80.00%
70.00%
60.00%
58.14%
50.00%
40.00%
30.00%
24.57%
20.00%
10.00%
7.30%
4.86%
0.00% 1.01%
0.85%
MONTOS TOTAL (Inc/ IGV) PORCENTAJES MONTOS TOTAL (Inc/ IGV) PORCENTAJES
MES PARCIAL ACUMUL. PARCIAL ACUMUL. MES PARCIAL ACUMUL. PARCIAL ACUMUL.
S/ S/ % % S/ S/ % %
Inicio 0.00 0 0 0.00 Inicio 0 0.00 0 0.00
21/10/20 -31/10/20 26,804.43 26,804.43 0.85% 0.85% 21/10/20 -31/10/20 31,850.81 31,850.81 1.01% 1.01%
1/11/20-30/11/20 202,875.05 229,679.48 6.45% 7.30% 1/11/20-30/11/20 121,254.92 153,105.73 3.85% 4.86%
01/12/20-31/12/20 543,672.37 773,351.85 17.27% 24.57% 01/12/20-31/12/20 0.00 - 0.00% 4.86%
01/01/21-31/01/21 1,056,683.47 1,830,035.31 33.57% 58.14% 01/01/21-31/01/21 0.00 - 0.00% 4.86%
01/02/21-28/02/21 912,812.20 2,742,847.52 29.00% 87.14% 01/02/21-28/02/21 0.00 - 0.00% 4.86%
01/03/20-19/03/21 404,839.37 3,147,686.88 12.86% 100.00% 01/03/20-19/03/21 0.00 - 0.00% 4.86%
3,147,686.90 100.00% TOTAL 153,105.73 4.86%
CUADRO RESUMEN DE METRADOS EJECUTADOS
: 01/11/2020 AL 30/11/2020
“AMPLIACION, MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DE ALCANTARILLADO DEL ANEXO DE SAN MIGUEL DE CURIS,
OBRA:
DISTRITO DE SANTIAGO DE CHOCORVOS - HUAYTARA - HUANCAVELICA’’
ACTUAL
METRADO
PARCIAL
UNID
PARTIDA DESCRIPCION : 01/11/2020 AL
30/11/2020
: 21/10/2020 AL 31/10/2020
“AMPLIACION, MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DE ALCANTARILLADO DEL ANEXO DE SAN MIGUEL DE CURIS,
OBRA:
DISTRITO DE SANTIAGO DE CHOCORVOS - HUAYTARA - HUANCAVELICA’’
2 2 Del 01 al 30 de Noviembre 2020 S/. 202,875.05 6.45% S/. 121,254.92 3.85% 7.30% 4.86%
3 3 Del 01 al 31 de Diciembre 2020 S/. 543,672.37 17.27% S/. - 0.00% 24.57% 4.86%
4 4 Del 01 al 31 de Enero 2021 S/. 1,056,683.47 33.57% S/. - 0.00% 58.14% 4.86%
5 5 Del 01 al 28 de Febrero 2020 S/. 912,812.20 29.00% S/. - 0.00% 87.14% 4.86%
6 6 Del 01 al 19 de Marzo 2021 S/. 404,839.37 12.86% S/. - 0.00% 100.00% 4.86%
3,147,686.90 100.00% 153,105.73 4.86%
CUADRO RESUMEN DE VALORIZACIÓN DE OBRA
: 01/11/2020 AL 30/11/2020
“AMPLIACION, MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DE ALCANTARILLADO DEL ANEXO DE SAN MIGUEL DE CURIS,
OBRA:
DISTRITO DE SANTIAGO DE CHOCORVOS - HUAYTARA - HUANCAVELICA’’
VALORIZACIÓN
SALDO POR
DESCRIPCIÓN MONTO CONTRATADO SIN IGV (S/.) ANTERIOR ACTUAL ACUMULADO VALORIZAR
(S/.) (S/.) (S/.) (S/.)
AMORTIZACION (A):
POR ADELANTO EN EFECTIVO (10%) 0.00 - - - -
POR ADELANTO PARA MATERIALES 0.00 - - -
POR ADELANTO EQUIPAMIENTO (20%) 0.00 - - -
TOTAL (A) - - - - -
VALORIZACION NETA (VN = VB - A): 2,667,531.30 26,992.20 102,758.41 129,750.61 2,537,780.69
RETENCIONES
FONDOS DE GARANTIA (10% X VB) - - - -
PENALIDADES O DESCUENTOS - - - -
TOTAL (C): - - - -
MONTO REAL A FAVOR DEL CONTRATISTA PARA FACTURAR:
EN EFECTIVO (VN - C) 26,992.20 102,758.41 129,750.61 2,537,780.69
MONTO POR I.G.V. (18 %) - 4,858.60 18,496.51 23,355.11 456,800.52