OBRA: MODIFICACIÓN DE TRAZO EN EL TRAMO DE LA PROGRESIVA 148+000 AL 152+114 POR LA TROCHA CARROZABLE EXISTENTE DE MARJANI
PROGRESIVA
# DE VIAJES VOLUMEN VOL. NETO VOL. MAT VOL. R. % DE
INICIO FIN # DE VIAJES VOL. % MAT. % R.
FECHA TOTAL CONTRACTUAL SUELTO SUELTA SUELTO SUELTA AVANCE
(km) (km) EXC. EXC. CARG. (m3) (1.3) m3 (m3) (m3) TRAMO
(JULIO) (FREDY) ( ELISBAN)
6/1/2021 148+740 148+750 21 21 15 383.63 242.31 80% 20% 193.85 48.46 63.16%
6/2/2021 148+750 148+850 115 115 15 1407.74 1,326.92 60% 40% 796.15 530.77 94.26%
6/3/2021 148+840 148+960 85 85 15 989.88 980.77 70% 30% 686.54 294.23 99.08%
6/3/2021 149+270 149+300 8 8 15 98.19 92.31 40% 60% 36.92 55.38 94.01%
6/4/2021 150+080 150+160 13 13 15 1084.4 150.00 80% 20% 120.00 30.00 13.83%
6/4/2021 148+960 149+300 90 90 15 1224.03 1,038.46 70% 30% 726.92 311.54 84.84%
6/5/2021 149+300 149+330 33 33 15 472.97 380.77 40% 60% 152.31 228.46 80.51%
6/7/2021 149+300 149+320 6 6 15 300.75 69.23 40% 60% 27.69 41.54 23.02%
6/8/2021 149+300 149+320 5 5 15 300.75 57.69 40% 60% 23.08 34.62 19.18%
6/8/2021 150+080 150+160 6 6 15 1084.4 69.23 80% 20% 55.38 13.85 6.38%
6/9/2021 149+320 149+380 67 67 15 1608.53 773.08 40% 60% 309.23 463.85 48.06%
6/9/2021 150+080 150+160 23 23 15 1084.4 265.38 80% 20% 212.31 53.08 24.47%
6/9/2021 149+320 149+350 67 67 15 832.36 773.08 40% 60% 309.23 463.85 92.88%
6/9/2021 150+080 150+160 23 23 15 1084.4 265.38 80% 20% 212.31 53.08 24.47%
6/10/2021 149+320 149+400 67 67 15 1634.69 773.08 40% 60% 309.23 463.85 47.29%
6/10/2021 150+080 150+160 24 24 15 1084.4 276.92 80% 20% 221.54 55.38 25.54%
6/11/2021 149+350 149+470 112 112 15 1827.78 1,292.31 80% 20% 1,033.85 258.46 71%
6/11/2021 150+080 150+160 28 28 15 1084.40 323.08 80% 20% 258.46 64.62 30%
6/12/2021 149+400 149+490 41 20 21 15 480.52 473.08 40% 60% 189.23 283.85 98%
6/14/2021 150+080 149+530 50 50 15 948.64 576.92 40% 60% 230.77 346.15 61%
6/15/2021 149+480 149+530 28 28 15 948.64 323.08 40% 60% 129.23 193.85 34%
6/15/2021 149+530 149+550 21 21 15 411.90 242.31 40% 60% 96.92 145.38 59%
6/15/2021 149+730 149+660 43 23 20 15 596.86 496.15 40% 60% 198.46 297.69 83%
6/16/2021 149+640 149+690 43 43 15 668.30 496.15 40% 60% 198.46 297.69 74%
6/16/2021 149+640 149+690 28 28 15 668.30 323.08 40% 60% 129.23 193.85 48%
6/17/2021 149+640 149+600 28 28 15 633.86 323.08 40% 60% 129.23 193.85 51%
6/17/2021 149+750 149+710 22 22 15 266.23 253.85 40% 60% 101.54 152.31 95%
6/18/2021 149+850 149+950 49 49 15 1031.4 565.38 40% 60% 226.15 339.23 55%
6/18/2021 149+540 149+620 28 28 15 1132.13 323.08 40% 60% 129.23 193.85 29%
6/19/2021 149+580 149+620 27 27 15 577.33 311.54 40% 60% 124.62 186.92 54%
6/19/2021 149+850 149+950 29 29 15 1036.1 334.62 40% 60% 133.85 200.77 32%
6/21/2021 149+850 149+950 48 48 15 1036.1 553.85 40% 60% 221.54 332.31 53%
6/21/2021 149+580 149+620 27 27 15 577.33 311.54 40% 60% 124.62 186.92 54%
6/23/2021 149+960 149+940 47 47 15 4800.24 542.31 30% 70% 162.69 379.62 11%
6/24/2021 149+960 149+940 98 85 13 15 4800.24 1,130.77 30% 70% 339.23 791.54 24%
6/24/2021 149+200 149+820 52 29 23 15 8487.04 600.00 40% 60% 240.00 360.00 7%
6/25/2021 149+760 149+810 56 26 30 15 845.87 646.15 40% 60% 258.46 387.69 76%
6/25/2021 149+960 149+940 90 90 15 4800.24 1,038.46 40% 60% 415.38 623.08 22%
6/26/2021 149+760 149+810 44 44 15 845.87 507.69 40% 60% 203.08 304.62 60%
6/26/2021 149+960 149+940 74 74 15 4800.24 853.85 40% 60% 341.54 512.31 18%
6/29/2021 149+960 149+940 38 38 15 4800.24 438.46 40% 60% 175.38 263.08 9%
6/30/2021 149+800 149+850 20 20 15 1797.91 230.77 40% 60% 92.31 138.46 13%
7/1/2021 149+900 149+700 113 113 15 7120.32 1,303.85 40% 60% 521.54 782.31 18%
7/2/2021 149+950 149+990 52 52 15 6655.15 600.00 40% 60% 240.00 360.00 9%
7/2/2021 149+630 149+610 11 11 15 402.4 126.92 40% 60% 50.77 76.15 32%
7/3/2021 149+910 149+990 33 33 15 12968.58 380.77 40% 60% 152.31 228.46 3%
7/3/2021 149+860 149+910 12 12 15 5992.24 138.46 40% 60% 55.38 83.08 2%
7/5/2021 149+860 149+910 35 35 15 5992.24 403.85 40% 60% 161.54 242.31 7%
7/5/2021 149+910 149+990 8 8 15 12968.58 92.31 40% 60% 36.92 55.38 1%
7/6/2021 149+910 149+990 62 31 31 15 12968.58 715.38 40% 60% 286.15 429.23 6%
7/6/2021 149+910 149+990 18 12 6 15 12968.58 207.69 40% 60% 83.08 124.62 2%
7/6/2021 149+910 149+990 6 5 1 15 12968.58 69.23 40% 60% 27.69 41.54 1%
7/7/2021 149+860 149+990 86 42 44 15 17599.38 992.31 40% 60% 396.92 595.38 6%
7/7/2021 149+860 149+990 9 9 15 17599.38 103.85 40% 60% 41.54 62.31 1%
7/8/2021 149+860 149+990 114 40 74 15 17599.38 1,315.38 40% 60% 526.15 789.23 7%
7/8/2021 149+860 149+990 18 18 15 17599.38 207.69 40% 60% 83.08 124.62 1%
7/9/2021 149+860 149+990 95 5 90 15 17599.38 1,096.15 40% 60% 438.46 657.69 6%
7/9/2021 149+860 149+990 30 30 15 17599.38 346.15 40% 60% 138.46 207.69 2%
7/10/2021 149+860 149+990 88 76 12 15 17599.38 1,015.38 40% 60% 406.15 609.23 6%
7/12/2021 149+860 149+990 68 59 9 15 17599.38 784.62 40% 60% 313.85 470.77 4%
GRUPO ALBI E.I.R.L.
OBRA: MODIFICACIÓN DE TRAZO EN EL TRAMO DE LA PROGRESIVA 148+000 AL 152+114 POR LA TROCHA CARROZABLE EXISTENTE DE MARJANI
OBSERVACIONES
D<=1KM D>1KM
315.00 131.36
1,725.00 52.61
1,275.00 715.28
120.00 61.86
195.00 414.67
1,350.00 1,067.85
495.00 42.17
90.00 8.12
75.00 40.54
41.24 -
1,005.00 1,016.06
89.70 -
1,005.00 1,000.98
89.70 -
1,005.00 1,026.11
93.60 -
756.00 -
109.20 -
615.00 1,722.92
750.00 1,290.00
420.00 596.40
315.00 852.55
558.75 765.45
486.98 -
317.10 -
354.90 -
235.95 -
400.58 -
363.30 -
87.08 -
119.63 -
198.00 -
87.08 -
229.13 -
510.90 -
540.23 1,190.38
329.40 -
668.25 -
468.60 -
360.75 -
282.15 -
60.00 -
1,093.28 -
370.50 -
32.18 -
245.03 -
100.80 -
294.00 -
59.40 -
381.30 -
224.55 333.36
39.38 30.53
532.20 -
135.00 278.10
757.20 -
270.00 556.20
1,372.50 2,781.00
450.00 927.00
772.80 370.80
460.23 3.75
26,183.49 17,276.02
GRUPO ALBI E.I.R.L.
OBRA: MODIFICACIÓN DE TRAZO EN EL TRAMO DE LA PROGRESIVA 148+000 AL 152+114 POR LA TROCHA CARROZABLE EXISTENTE DE MARJANI
AVANCE AR AVANCE AP
FECHA REAL ACUMULADO PREVISTO ACUMULADO
Cuadro de Avance mes de junio
5/31/2021 - - - -
19,000.00
6/1/2021 193.85 193.85 - -
6/2/2021 796.15 990.00 - - 17,000.00
Volumen
6/8/2021 78.46 2,818.85 513.81 1,027.62
9,000.00 AVANCE REAL
6/9/2021 1,043.08 3,861.92 513.81 1,541.43 AVANCE PREVISTO
OBRA: MODIFICACIÓN DE TRAZO EN EL TRAMO DE LA PROGRESIVA 148+000 AL 152+114 POR LA TROCHA CARROZABLE EXISTENTE DE MARJANI
AVANCE AR AVANCE AP
FECHA
REAL ACUMULADO PREVISTO ACUMULADO
Cuadro de Avance mes de junio
5/31/2021 - - - -
17,999.00
6/1/2021 48.46 48.46 - -
6/2/2021 530.77 579.23 - - 15,999.00
6/3/2021 349.62 928.85 - -
6/4/2021 341.54 1,270.38 - - 13,999.00
Volumen
AVANCE REAL
6/9/2021 1,033.85 2,622.69 448.75 1,346.25 AVANCE PREVISTO
7,999.00
6/10/2021 519.23 3,141.92 448.75 1,795.00
6/11/2021 323.08 3,465.00 448.75 2,243.75 5,999.00
OBRA: MODIFICACIÓN DE TRAZO EN EL TRAMO DE LA PROGRESIVA 148+000 AL 152+114 POR LA TROCHA CARROZABLE EXISTENTE DE MARJANI
02.03.03 TRANSPORTE DE DESECHOS Y EXCEDENTES A DME PARA D <= 1KM 26,183.49 M3K 25.68% 101,962.24 M3K
02.03.04 TRANSPORTE DE DESECHOS Y EXCEDENTES A DME PARA D > 1KM 17,276.02 M3K 14.29% 120,919.31 M3K
GRUPO ALBI E.I.R.L.
OBRA: MODIFICACIÓN DE TRAZO EN EL TRAMO DE LA PROGRESIVA 148+000 AL 152+114 POR LA TROCHA CARROZABLE EXISTENTE DE MARJANI
CONTROL DEL AVANCE DIARIO DE 3.00 ELIMINACIÓN DE DERRUMBES - MOVIMIENTO DE TIERRAS Y TRANSPORTE
OBRA: MODIFICACIÓN DE TRAZO EN EL TRAMO DE LA PROGRESIVA 148+000 AL 152+114 POR LA TROCHA CARROZABLE EXISTENTE DE MARJANI
03.00 ELIMINACIÓN DE DERRUMBES
AVANCE AR AVANCE AP
FECHA REAL ACUMULADO PREVISTO ACUMULADO
03.02.01 TRANSPORTE DE DESECHOS Y EXCEDENTES A DME PARA D <= 1KM 1,710.00 M3K 12.74% 13419.42 M3K
03.02.02 TRANSPORTE DE DESECHOS Y EXCEDENTES A DME PARA D > 1KM 743.55 M3K 20.62% 3605.87 M3K
GRUPO ALBI E.I.R.L.
OBRA: MODIFICACIÓN DE TRAZO EN EL TRAMO DE LA PROGRESIVA 148+000 AL 152+114 POR LA TROCHA CARROZABLE EXISTENTE DE MARJANI
60.00 40.50
GRUPO ALBI E.I.R.L.
OBRA: MODIFICACIÓN DE TRAZO EN EL TRAMO DE LA PROGRESIVA 148+000 AL 152+114 POR LA TROCHA CARROZABLE EXISTENTE DE MARJANI
4.00 ALCANTARILLAS
AVANCE AR AVANCE AP
FECHA REAL ACUMULADO PREVISTO ACUMULADO
07.02.05 TRANSPORTE DE DESECHOS Y EXCEDENTES A DME PARA D <= 1KM 60.00 M3K 4.22% 1,422.00 M3K
07.02.06 TRANSPORTE DE DESECHOS Y EXCEDENTES A DME PARA D > 1KM 40.50 M3K 0.43% 9,342.54 M3K
GRUPO ALBI E.I.R.L.
OBRA: MODIFICACIÓN DE TRAZO EN EL TRAMO DE LA PROGRESIVA 148+000 AL 152+114 POR LA TROCHA CARROZABLE EXISTENTE DE MARJANI
7/1/2021 150+000 150+010 40 40 12 2882.22 369.23 100% 0% 369.23 - 13% 149+720 95 0.380 480.00 182.40 182.40 0.00 182.40 0.00 LADO IZQUIERDO
7/2/2021 150+000 150+010 52 52 12 2882.22 480.00 100% 0% 480.00 - 17% 150+400 45 0.440 624.00 274.56 274.56 0.00 274.56 0.00 LADO IZQUIERDO
7/3/2021 150+000 150+010 34 34 12 2882.22 313.85 100% 0% 313.85 - 11% 150+400 45 0.440 408.00 179.52 179.52 0.00 179.52 0.00 LADO IZQUIERDO
7/7/2021 150+000 150+010 120 120 12 2882.22 1,107.69 100% 0% 1,107.69 - 38% 149+720 95 0.380 1,440.00 547.20 547.20 0.00 547.20 0.00 LADO IZQUIERDO
7/8/2021 150+000 150+010 46 46 12 2883.22 424.62 100% 0% 424.62 - 15% 149+850 1 0.156 552.00 86.11 86.11 0.00 86.11 0.00 LADO IZQUIERDO
7/9/2021 150+000 150+010 12 12 12 2883.22 110.77 100% 0% 110.77 - 4% 149+850 1 0.156 144.00 22.46 22.46 0.00 22.46 0.00 LADO IZQUIERDO
7/10/2021 150+000 150+010 23 23 12 2883.22 212.31 100% 0% 212.31 - 7% 149+850 1 0.156 276.00 43.06 43.06 0.00 43.06 0.00 LADO IZQUIERDO
1,335.31 -
GRUPO ALBI E.I.R.L.
OBRA: MODIFICACIÓN DE TRAZO EN EL TRAMO DE LA PROGRESIVA 148+000 AL 152+114 POR LA TROCHA CARROZABLE EXISTENTE DE MARJANI
07.02.01 CORTE DE TERRENO CON MAQUINARIA MATERIAL SUELTO 3,018.46 M3 48.22% 6,259.61 M3
AVANCE AR AVANCE AP
FECHA REAL ACUMULADO PREVISTO ACUMULADO
6/28/2021 - - -
6/29/2021 - - -
6/30/2021 - - -
7/1/2021 369.23 369.23 495.00 495.00
7/2/2021 480.00 849.23 495.00 990.00
7/3/2021 313.85 1,163.08 495.00 1,485.00
7/4/2021 1,163.08 - 1,485.00
7/5/2021 1,163.08 495.00 1,980.00
7/6/2021 1,163.08 495.00 2,475.00
7/7/2021 1,107.69 2,270.77 495.00 2,970.00
7/8/2021 424.62 2,695.38 495.00 3,465.00
7/9/2021 110.77 2,806.15 495.00 3,960.00
7/10/2021 212.31 3,018.46 495.00 4,455.00
7/11/2021 3,018.46 4,455.00
7/12/2021 3,018.46 495.00 4,950.00
7/13/2021 3,018.46 495.00 5,445.00
7/14/2021 3,018.46 495.00 5,940.00
7/15/2021 3,018.46 319.61 6,259.61
7/16/2021 3,018.46 6,259.61
7/17/2021 3,018.46 6,259.61
7/18/2021 3,018.46 6,259.61
7/19/2021 3,018.46 6,259.61
7/20/2021 3,018.46 6,259.61
7/21/2021 3,018.46 6,259.61
7/22/2021 3,018.46 6,259.61
7/23/2021 3,018.46 6,259.61
7/24/2021 3,018.46 6,259.61
7/25/2021 3,018.46 6,259.61
07.02.05 TRANSPORTE DE DESECHOS Y EXCEDENTES A DME PARA D <= 1KM 1,335.31 M3K 37.79% 3,533.91 M3K
07.02.06 TRANSPORTE DE DESECHOS Y EXCEDENTES A DME PARA D > 1KM 0.00 M3K 0.00% 23,164.78 M3K