TOTAL
RESUMEN ACUMULADO EDP S/. 73,265.60
4 IO-003 REUBICACION DE SEGUNDA CAMPANA COLECTORA Y DUCTOS CAP17140 Glb 0.00 S/. 10,780.68 S/. 0.00 0.36 3,934.06 0.36 S/. 3,934.06
CONTRATISTA ADMINISTRADOR DEL CONTRATO CONTROL TOTALES S/. 7,009.56 S/. 66,256.04 S/. 73,265.60
RETENCION S/. 0.00 S/. 0.00
SUB - TOTAL S/. 7,009.56 S/. 66,256.04 S/. 73,265.60
DEBITOS S/. 0.00 S/. 0.00
SUB-TOTAL S/. 7,009.56 S/. 66,256.04 S/. 73,265.60
FECHA: / / FECHA: / / FECHA: / / PAGOS ANTICIP. S/. 0.00 S/. 0.00
APROBACION SUPERINTENDENCIA/ GERENCIA SENIOR PLAN Y CONTROL NETO S/. 7,009.56 S/. 66,256.04 S/. 73,265.60
DESCUENTO ESPECIAL S/. 0.00 S/. 0.00
TOTAL A PAGAR S/. 7,009.56 S/. 66,256.04 S/. 73,265.60
cc:
Carpeta del contrato
Sociedad Minera ESTADO DE PAGO N. 747-19 Rev 1 Formulario 9P CONTRATO N. 37031700337-001
Cerro Verde FECHA DE EMISION : 8/19/2021 ESTADO DE PAGO ORDEN DE SERVICIO: ZV00000GWH
PERIODO HASTA 3 CONTRATISTA: IMCO SERVICIOS S.A.C
MONEDA CONTRATO: SOLES
CONTRATO ANTERIOR HASTA LA FECHA
ITEM DESCRIPCION O/T, Proyecto Naturaleza PRECIO PRECIO
Centro Costo Gasto UNID. CANT. UNITARIO TOTAL CANT COSTO CANT. COSTO
GPIC-00000000-1700337-OTM-662
1 MIP17C86 GLB 0.02 S/. 102,990.37 S/. 1,943.38 0.54 S/. 56,005.05 0.56 S/. 57,948.43
MONTAJE DE INTERRUPTOR DE MT – SALA 67
2 LEVANTAMIENTO DE OBSERVACIONES DEL PROYECTO Y AMPLIACIÓN MIP17C86 GLB - S/. 14,933.91 S/. 0.00 0.42 S/. 6,316.93 0.42 S/. 6,316.93
DE PLAZO (IO-001)
3 AMPLIACION DE PLAZO POR REPROGRAMACION DE FECHA DE PARADA MIP17C86 GLB S/. 1,741.31 S/. 1,484.99 - S/. 0.00 - S/. 1,484.99
DE IO-002 PLANTA
3 MIP17C86 GLB S/. 15,576.49 S/. 5,226.03 - S/. 0.00 - S/. 5,226.03
PERSONAL DE SOPORTE PARA PRUEBAS ELECTRICAS (IO-003)
CONTRATISTA ADM. PROYECTO PLANEAMIENTO Y CONTROL TOTALES S/. 8,654.39 S/. 62,321.98 S/. 70,976.37
RETENCION S/. 0.00 S/. 0.00 S/. 0.00
SUB - TOTAL S/. 8,654.39 S/. 62,321.98 S/. 70,976.37
DEBITOS S/. 0.00 S/. 0.00 S/. 0.00
FECHA FECHA FECHA SUB-TOTAL S/. 8,654.39 S/. 62,321.98 S/. 70,976.37
CONTROL DE CONTRATOS SUPERINTENDENCIA GERENCIA PAGOS ANTICIP. S/. 0.00 S/. 0.00 S/. 0.00
NETO S/. 8,654.39 S/. 62,321.98 S/. 70,976.37
c.costo: FECHA FECHA FECHA TOTAL A PAGAR S/. 8,654.39 S/. 62,321.98 S/. 70,976.37
cc:
Carpeta del contrato
VALORIZACION No. 3
No. 747-19
Obra MONTAJE DE INTERRUPTOR DE MT – SALA 67
Ubicación HMA - C1
Fecha 11/16/2018
Valorizacion No. 3 Rev : 01
PRESUPUESTO VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO SALDO POR VALORIZAR
COD
ITEM DESCRIPCION DE PARTIDAS UND % VALOR
PARTIDA
CANT P.U. S/. PARCIAL CANT P.U. PARCIAL CANT P.U. PARCIAL CANT PARCIAL CANT PARCIAL
SUB TOTAL MANO DE OBRA, Y EQUIPOS EN SOLES S/. 575.40 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0%
PRESUPUESTO VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO SALDO POR VALORIZAR
COD
ITEM DESCRIPCION DE PARTIDAS UND % VALOR
PARTIDA
CANT P.U. S/. PARCIAL CANT P.U. PARCIAL CANT P.U. PARCIAL CANT PARCIAL CANT PARCIAL
08 REUBICACION DE PARARRAYOS -
08.01 REF 02.11.08 Reubicacion de Pararrayos und 1.00 480.47 S/. 480.47 - 480.47 - 480.47 S/. 0.00 - S/. 0.00 0%
08.02 02.08.04- Cableado Cable de Cobre desnudo 2/0 AWG, expuesta m 30.00 9.38 S/. 281.40 - 9.38 - 9.38 S/. 0.00 - S/. 0.00 0%
08.03 02.07.03 Terminales de compresión de Cu estañado 1/0 AWG - 4/0 AWG und 2.00 13.86 S/. 27.72 - 13.86 - 13.86 S/. 0.00 - S/. 0.00 0%
09 ATERRAMIENTO DE EQUIPOS Y ESTRUCTURAS -
09.01 02.08.04- Cableado Cable de Cobre desnudo 2/0 AWG, expuesta m 25.00 9.38 S/. 234.50 15.00 9.38 140.70 9.38 S/. 0.00 15.00 S/. 140.70 60%
09.02 02.07.03 Terminales de compresión de Cu estañado 1/0 AWG - 4/0 AWG und 8.00 13.86 S/. 110.88 8.00 13.86 110.88 13.86 S/. 0.00 8.00 S/. 110.88 100%
09.03 02.03.05 Montaje tuberia PVC SAP - SCH 40, de diámetro igual o menor a 2" expuesta m 6.00 22.93 S/. 137.58 6.00 22.93 137.58 22.93 S/. 0.00 6.00 S/. 137.58 100%
09.04 02.03.10 Sellado con Firestop de tubos de diámetro menor o igual a 2" und 12.00 12.73 S/. 152.76 2.00 12.73 25.46 12.73 S/. 0.00 2.00 S/. 25.46 17%
10 PRUEBAS Y PUESTA EN MARCHA -
10.01 Nueva Pruebas Operacionales día 2.00 1,212.04 S/. 2,424.08 2.00 1,212.04 2,424.08 1,212.04 S/. 0.00 2.00 S/. 2,424.08 100%
-
SUB TOTAL MANO DE OBRA, Y EQUIPOS EN SOLES S/. 39,137.24 S/. 30,135.61 S/. 720.87 S/. 30,856.48 S/. 0.00 79%
MATERIALES UND CANT P.U. TOTAL CANT P.U. PARCIAL CANT P.U. PARCIAL CANT PARCIAL CANT PARCIAL
1.24 TUBO PVC SEL SCH-40 DE 1" X 3 MTS CONDUIT PESADO UND 6.00 24.25 S/. 145.51 24.25 S/. 0.00 - S/. 0.00 0%
1.25 CONDUCTOR TECK GLB 1.00 SMCV SMCV
1.26 EQUIPOS A INSTALARSE GLB 1.00 SMCV SMCV
1.27 BOLSA DE BENTONITA BOLSA 6.00 48.43 S/. 290.57 48.43 S/. 0.00 - S/. 0.00 0%
1.28 BOLSA DE CEMENTO CONDUCTIVO BOLSA 6.00 172.43 S/. 1,034.57 172.43 S/. 0.00 - S/. 0.00 0%
1.29 PERNO BURNDY PARA CABLE 2/0 (BANDEJAS) UND 12.00 22.68 S/. 272.18 22.68 S/. 0.00 - S/. 0.00 0%
1.30 CINTA DE SEÑALIZACION (RIESGO ELECTRICO) (MALLA A TIERRA) ROLLO 1.00 45.61 S/. 45.61 45.61 S/. 0.00 - S/. 0.00 0%
1.31 DOSIS DE SOLDADURA CADWELL 150 UND 6.00 20.40 S/. 122.41 20.40 S/. 0.00 - S/. 0.00 0%
1.32 TIERRA DE CHACRA M3 6.00 75.00 S/. 450.00 75.00 S/. 0.00 - S/. 0.00 0%
1.33 PRUEBAS PARA TRASNFORMADOR GLB 1.00 11,500.00 S/. 11,500.00 11,500.00 S/. 0.00 - S/. 0.00 0%
1.34 TERMINACIONES TRIPOLARES PARA TRANSFORMADOR GLB 1.00 6,000.00 S/. 6,000.00 6,000.00 S/. 0.00 - S/. 0.00 0%
SUB TOTAL MATERIALES EN SOLES S/. 32,261.92 7,720.83 S/. 0.00 S/. 7,720.83 S/. 0.00
PRESUPUESTO VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO SALDO POR VALORIZAR
COD
ITEM DESCRIPCION DE PARTIDAS UND % VALOR
PARTIDA
CANT P.U. S/. PARCIAL CANT P.U. PARCIAL CANT P.U. PARCIAL CANT PARCIAL CANT PARCIAL
SUB TOTAL MANO DE OBRA, Y EQUIPOS EN SOLES S/. 755.75 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
PRESUPUESTO VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO SALDO POR VALORIZAR
COD
ITEM DESCRIPCION DE PARTIDAS UND % VALOR
PARTIDA
CANT P.U. S/. PARCIAL CANT P.U. PARCIAL CANT P.U. PARCIAL CANT PARCIAL CANT PARCIAL
01 TRABAJOS MECANICOS
3 747 MONTAJE DE INTERRUPTOR DE MT - SALA 67
01.06.13 3.01 Montaje de estructura ligera a una altura de 6 metros o menos 01.06.13 kg 64.00 2.99 S/. 191.36 2.99 S/. 0.00 - S/. 0.00 0%
4 OBRAS CIVILES
4.01 Sobrecosto por horario extendido las 2 primeras horas dia Sabado 16.03.2019
nueva 04.01.01 Sobre costo Operario Civil al 25% hr 4.00 7.52 S/. 30.06 7.52 - 7.52 S/. 0.00 - S/. 0.00 0%
nueva 04.01.02 Sobre costo Oficial Civil al 25% hr 4.00 6.40 S/. 25.60 6.40 - 6.40 S/. 0.00 - S/. 0.00 100%
nueva 04.01.03 Sobre costo Peón Civil al 25% hr 2.00 5.95 S/. 11.91 5.95 - 5.95 S/. 0.00 - S/. 0.00 100%
nueva 04.01.04 Sobre costo Operario Electrico al 25% (Vigia Electrico) hr 2.00 6.23 S/. 12.45 6.23 - 6.23 S/. 0.00 - S/. 0.00 0%
nueva 04.01.05 Sobre costo Conductor Camioneta al 25% hr 2.00 4.57 S/. 9.14 4.57 - 4.57 S/. 0.00 - S/. 0.00 0%
nueva 04.01.06 Sobre costo Supervisor Civil al 25% hr 2.00 11.20 S/. 22.41 11.20 - 11.20 S/. 0.00 - S/. 0.00 0%
4.02 Sobrecosto por horario extendido las 3ra horas hacia adelante dia Sabado 16.03.2019 -
nueva 04.02.01 Sobre costo Operario Civil al 35% hr 21.00 10.52 S/. 220.94 10.52 - 10.52 S/. 0.00 - S/. 0.00 0%
nueva 04.02.02 Sobre costo Oficial Civil al 35% hr 21.00 8.96 S/. 188.16 8.96 - 8.96 S/. 0.00 - S/. 0.00 100%
nueva 04.02.03 Sobre costo Peón Civil al 35% hr 10.50 8.33 S/. 87.50 8.33 - 8.33 S/. 0.00 - S/. 0.00 100%
nueva 04.02.04 Sobre costo Operario Electrico al 35% (Vigia Electrico) hr 10.50 8.72 S/. 91.51 8.72 - 8.72 S/. 0.00 - S/. 0.00 0%
nueva 04.02.05 Sobre costo Conductor Camioneta al 35% hr 10.50 6.39 S/. 67.14 6.39 - 6.39 S/. 0.00 - S/. 0.00 0%
nueva 04.02.06 Sobre costo Supervisor Civil al 35% hr 10.50 15.68 S/. 164.68 15.68 - 15.68 S/. 0.00 - S/. 0.00 0%
4.02 Sobrecosto por horario extendido al 100% dia Domingo 17.03.2019 -
nueva 04.02.01 Sobre costo Operario Civil al 100% hr 22.50 30.06 S/. 676.35 30.06 - 30.06 S/. 0.00 - S/. 0.00 0%
nueva 04.02.02 Sobre costo Oficial Civil al 100% hr 15.00 25.60 S/. 384.00 25.60 - 25.60 S/. 0.00 - S/. 0.00 100%
nueva 04.02.03 Sobre costo Peón Civil al 100% hr 7.50 23.81 S/. 178.58 23.81 - 23.81 S/. 0.00 - S/. 0.00 100%
nueva 04.02.04 Sobre costo Operario Electrico al 100% (Vigia Electrico) hr 7.50 24.90 S/. 186.75 24.90 - 24.90 S/. 0.00 - S/. 0.00 0%
nueva 04.02.05 Sobre costo Conductor Camioneta al 100% hr 7.50 18.27 S/. 137.03 18.27 - 18.27 S/. 0.00 - S/. 0.00 0%
nueva 04.02.06 Sobre costo Supervisor Civil al 100% hr 7.50 44.81 S/. 336.08 44.81 - 44.81 S/. 0.00 - S/. 0.00 0%
-
OBRAS ELECTRICAS -
01 LEVANTAMIENTO DE OBSERVACIONES -
01.01 Nueva Verificacion,Amarillado de Equipos Existentes (Celda ) und 2.00 608.23 S/. 1,216.46 2.00 608.23 1,216.46 608.23 S/. 0.00 2.00 S/. 1,216.46 100%
01.02 Nueva Desmontaje de Barras exitentes en Nueva Celda und 1.00 570.80 S/. 570.80 1.00 570.80 570.80 570.80 S/. 0.00 1.00 S/. 570.80 100%
01.03 Nueva Inspeccion , Verifiacion de Cables en Barras (SUb Estacion) día 3.00 608.23 S/. 1,824.69 3.00 608.23 1,824.69 608.23 S/. 0.00 3.00 S/. 1,824.69 100%
SUB TOTAL MANO DE OBRA, Y EQUIPOS EN SOLES S/. 6,633.57 S/. 3,611.95 S/. 0.00 S/. 3,611.95 S/. 0.00 54%
MATERIALES UND CANT P.U. TOTAL CANT P.U. PARCIAL CANT P.U. PARCIAL CANT PARCIAL CANT PARCIAL
SUB TOTAL MATERIALES EN SOLES S/. 2,217.60 - S/. 0.00 S/. 0.00 S/. 0.00
PRESUPUESTO VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO SALDO POR VALORIZAR
COD
ITEM DESCRIPCION DE PARTIDAS UND % VALOR
PARTIDA
CANT P.U. S/. PARCIAL CANT P.U. PARCIAL CANT P.U. PARCIAL CANT PARCIAL CANT PARCIAL
OBRAS ELECTRICAS
01 INSTALACION DE GRUPOS ELECTROGENOS
01.01 01.02.03 Transporte interno con camión grúa de 16 tn hm 24.00 229.94 S/. 5,518.56 7.52 - 6.00 229.94 S/. 1,379.64 6.00 S/. 1,379.64 25%
01.02 REF 02.07.14++ Conexionado de Grupos Electrogenos und 3.00 424.83 S/. 1,274.49 6.40 - 1.00 424.83 S/. 424.83 1.00 S/. 424.83 100%
01.03 REF 02.05.10 Desconexionado de Grupo Electrogeno und 3.00 217.00 S/. 651.00 5.95 - 1.00 217.00 S/. 217.00 1.00 S/. 217.00 100%
02 PUESTA EN MARCHA - PRUEBAS OPERACIONALES
02.01 Nueva Puesta en Marcha día 1.00 651.18 S/. 651.18 6.23 - 1.00 651.18 S/. 651.18 1.00 S/. 651.18 100%
02.02 Nueva Pruebas Operacionales und 2.00 911.28 S/. 1,822.56 4.57 - 1.00 911.28 S/. 911.28 1.00 S/. 911.28 50%
02.03 Nueva Sobretiempos (Estimado 02 OP , 01 CAP) día 1.00 764.33 S/. 764.33 11.20 - 764.33 S/. 0.00 - S/. 0.00 0%
SUB TOTAL MANO DE OBRA, Y EQUIPOS EN SOLES S/. 10,682.12 S/. 0.00 S/. 3,583.93 S/. 3,583.93 S/. 0.00 34%
MATERIALES UND CANT P.U. TOTAL CANT P.U. PARCIAL CANT P.U. PARCIAL CANT PARCIAL CANT PARCIAL
SUB TOTAL MATERIALES EN SOLES S/. 0.00 - S/. 0.00 S/. 0.00 S/. 0.00
PRESUPUESTO VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO SALDO POR VALORIZAR
COD
ITEM DESCRIPCION DE PARTIDAS UND % VALOR
PARTIDA
CANT P.U. S/. PARCIAL CANT P.U. PARCIAL CANT P.U. PARCIAL CANT PARCIAL CANT PARCIAL
PRESUPUESTO VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO SALDO POR VALORIZAR
COD
ITEM DESCRIPCION DE PARTIDAS UND % VALOR
PARTIDA
CANT P.U. S/. PARCIAL CANT P.U. PARCIAL CANT P.U. PARCIAL CANT PARCIAL CANT PARCIAL
OBRAS ELECTRICAS
01 LEVANTAMIENTO DE OBSERVACIONES
01.01 Nueva Modificacion e instalacion de Tapa entre Celdas und 1.00 649.16 S/. 649.16 1.00 649.16 S/. 649.16 1.00 S/. 649.16 100%
SUB TOTAL MANO DE OBRA, Y EQUIPOS EN SOLES S/. 649.16 S/. 0.00 S/. 649.16 S/. 649.16 0.00 100%
MATERIALES UND CANT P.U. TOTAL CANT P.U. PARCIAL CANT P.U. PARCIAL CANT PARCIAL CANT PARCIAL
SUB TOTAL MATERIALES EN SOLES S/. 232.00 - S/. 0.00 S/. 0.00 S/. 0.00
PRESUPUESTO VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO SALDO POR VALORIZAR
COD
ITEM DESCRIPCION DE PARTIDAS UND % VALOR
PARTIDA
CANT P.U. S/. PARCIAL CANT P.U. PARCIAL CANT P.U. PARCIAL CANT PARCIAL CANT PARCIAL
SUB TOTAL MANO DE OBRA, Y EQUIPOS EN SOLES S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0.00
PRESUPUESTO VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO SALDO POR VALORIZAR
COD
ITEM DESCRIPCION DE PARTIDAS UND % VALOR
PARTIDA
CANT P.U. S/. PARCIAL CANT P.U. PARCIAL CANT P.U. PARCIAL CANT PARCIAL CANT PARCIAL
01.02.01 01.01.01 Transporte interno con camión grúa de 7 tn (Para traslado de materiales, equipos y herramientas a punto de trabajo) hm S/. 1,390.48 8.00 173.81 1,390.48 173.81 S/. 0.00 8.00 S/. 1,390.48 100%
8.00 173.81
NUEVA 01.01.02 Reubicación de campana metálica y conexionado de ductos und 1.00 1,470.94 S/. 1,470.94 1.00 1,470.94 1,470.94 1,470.94 S/. 0.00 1.00 S/. 1,470.94 100%
01.02 SERVICIO DE ANDAMIOS PARA TRABAJOS EN ALTURA
02.13.01 01.02.01 Alquiler de andamios Tn/d 40.00 49.76 S/. 1,990.40 49.76 S/. 0.00 - S/. 0.00 0%
02.13.02 01.02.02 Instalación de andamios Tn 7.80 152.20 S/. 1,187.16 152.20 S/. 0.00 - S/. 0.00 0%
02.13.03 01.02.03 Desinstalación de andamios Tn 7.80 140.49 S/. 1,095.82 140.49 S/. 0.00 - S/. 0.00 0%
SUB TOTAL MANO DE OBRA, Y EQUIPOS EN SOLES S/. 7,134.80 S/. 2,861.42 S/. 0.00 S/. 2,861.42 0.00 40%
MATERIALES UND CANT P.U. TOTAL CANT P.U. PARCIAL CANT P.U. PARCIAL CANT PARCIAL CANT PARCIAL
SUB TOTAL MATERIALES EN SOLES S/. 883.00 - S/. 0.00 S/. 0.00 S/. 0.00
PRESUPUESTO VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO SALDO POR VALORIZAR
COD
ITEM DESCRIPCION DE PARTIDAS UND % VALOR
PARTIDA
CANT P.U. S/. PARCIAL CANT P.U. PARCIAL CANT P.U. PARCIAL CANT PARCIAL CANT PARCIAL
SUB TOTAL MANO DE OBRA, Y EQUIPOS EN SOLES S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 0.00
PRESUPUESTO VALORIZACION ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADO SALDO POR VALORIZAR
COD
ITEM DESCRIPCION DE PARTIDAS UND % VALOR
PARTIDA
CANT P.U. S/. PARCIAL CANT P.U. PARCIAL CANT P.U. PARCIAL CANT PARCIAL CANT PARCIAL
SUB TOTAL MANO DE OBRA, Y EQUIPOS EN SOLES S/. 2,455.93 S/. 0.00 S/. 2,455.93 S/. 2,455.93 0.00 100%
MATERIALES UND CANT P.U. TOTAL CANT P.U. PARCIAL CANT P.U. PARCIAL CANT PARCIAL CANT PARCIAL
SUB TOTAL MATERIALES EN SOLES S/. 62.19 - S/. 0.00 S/. 0.00 S/. 0.00
PESO PESO
ITEM
1 TAPAS 39.59 kg
PLANO A4-MIP17C86-XXXX-69-100
PLANCHA 747PL1 2.50 980 460.00 1 8.85 8.85
PLANCHA 747PL2 2.50 70 150.00 4 0.21 0.82
PLANO A4-MIP17C86-XXXX-69-101
PLANCHA 747PL3 2.50 840 1,815.00 1 29.92 29.92
39.59
CLIENTE : Sociedad Minera Cerro Verde S.A.A.
FECHA : 8/19/2021
ELAB. POR :
PESO PESO
ITEM
405SP2
L2"x2"x1/4" 550.00 6 2.63 15.78
L2"x2"x1/4" 400.00 6 1.91 11.46
Pt 2"x1/4" 494.00 6 1.25 7.50
405SP3
L2"x2"x1/4" 145.00 2 0.69 1.38
Pt 2"x1/4" 170 130.00 2 1.56 3.12
405SP4
L2"x2"x1/4" 450.00 1 2.15 2.15
Pl 9 170 130.00 3 1.56 4.68
405RED1
Tubo Ø3" sch40 100.00 1 1.13 1.13
Tubo Ø2" sch40 100.00 1 0.54 0.54
Brida 3" so 150 1 0.00
Reduccion Ø3" -2" 1 0.00
PLANO A1-CAP17140-860-33-102
POS 01
L2 1/2"x2 1/2"x1/4" 110.00 2 0.67 1.34
Pl 9 190 190.00 1 2.55 2.55
Pl 9 171 171.00 1 2.07 2.07
Pl 9 214 171.00 1 2.59 2.59
Pl 9 192 162.00 1 2.20 2.20
W6x15 2,057.00 1 45.67 45.67
POS 02
L2 1/2"x2 1/2"x1/4" 110.00 2 0.67 1.34
Pl 9 190 190.00 1 2.55 2.55
Pl 9 171 171.00 1 2.07 2.07
Pl 9 374 162.00 1 4.28 4.28
W6x15 2,057.00 1 45.67 45.67
POS 03
L2 1/2"x2 1/2"x1/4" 110.00 3 0.67 2.01
Pl 9 190 190.00 1 2.55 2.55
Pl 9 171 171.00 1 2.07 2.07
Pl 9 214 171.00 1 2.59 2.59
Pl 9 192 162.00 1 2.20 2.20
W6x15 2,057.00 1 45.67 45.67
POS 04
L2 1/2"x2 1/2"x1/4" 110.00 3 0.67 2.01
Pl 9 190 190.00 1 2.55 2.55
Pl 9 171 171.00 1 2.07 2.07
Pl 9 374 162.00 1 4.28 4.28
W6x15 2,057.00 1 45.67 45.67
PLANO A1-CAP17140-860-33-103
POS 05
L2 1/2"x2 1/2"x1/4" 110.00 2 0.67 1.34
Pl 9 190 190.00 1 2.55 2.55
W6x15 906.00 1 20.11 20.11
POS 06
L2 1/2"x2 1/2"x1/4" 110.00 4 0.67 2.68
Pl 9 190 190.00 2 2.55 5.10
W6x15 906.00 2 20.11 40.22
POS 07
L2 1/2"x2 1/2"x1/4" 110.00 6 0.67 4.02
Pl 9 190 190.00 2 2.55 5.10
W6x15 906.00 2 20.11 40.22
POS 08
L2 1/2"x2 1/2"x1/4" 110.00 4 0.67 2.68
Pl 9 190 190.00 1 2.55 2.55
W6x15 906.00 1 20.11 20.11
POS 09
L2 1/2"x2 1/2"x1/4" 110.00 4 0.67 2.68
Pl 9 190 190.00 1 2.55 2.55
W6x15 906.00 1 20.11 20.11
PLANO A1-CAP17140-860-33-104
POS 10
C6x8.2 2,653.00 1 32.37 32.37
L2 1/2"x2 1/2"x1/4" 110.00 3 0.67 2.01
Pl 9 171 171.00 2 2.07 4.14
POS 11
C6x8.2 2,653.00 1 32.37 32.37
L2 1/2"x2 1/2"x1/4" 110.00 3 0.67 2.01
Pl 9 171 171.00 2 2.07 4.14
POS 12
C6x8.2 2,653.00 1 32.37 32.37
L2 1/2"x2 1/2"x1/4" 110.00 3 0.67 2.01
POS 13
C6x8.2 2,653.00 1 32.37 32.37
L2 1/2"x2 1/2"x1/4" 110.00 3 0.67 2.01
PLANO A1-CAP17140-860-33-105
POS 14
C6x8.2 2,238.00 1 27.30 27.30
L2 1/2"x2 1/2"x1/4" 110.00 2 0.67 1.34
POS 15
C6x8.2 1,452.00 1 17.71 17.71
L2 1/2"x2 1/2"x1/4" 110.00 2 0.67 1.34
POS 16
C6x8.2 884.00 1 10.78 10.78
Pl 9 159 134.00 1 1.51 1.51
POS 17
C6x8.2 758.00 1 9.25 9.25
Pl 9 114 80.00 1 0.64 0.64
POS 18
C6x8.2 1,249.00 2 15.24 30.48
C6x8.2 167.00 2 2.04 4.08
C6x8.2 139.00 2 1.70 3.40
Pl 9 175 90.00 2 1.11 2.22
PLANO A1-CAP17140-860-33-108
BR-01
Tubo Ø1 1/2" 5,156.00 2 20.85 41.70
Pt 4x1/4" 966.00 2 4.89 9.78
Pl 9 154 110.00 4 1.20 4.80
BR-02
Tubo Ø1 1/2" 6,156.00 3 24.87 74.61
Pt 4x1/4" 1,463.00 3 7.40 22.20
Pl 9 154 110.00 6 1.20 7.20
BR-03
Tubo Ø1 1/2" 6,124.00 1 24.87 24.87
Pt 4x1/4" 1,447.00 1 7.32 7.32
Pl 9 154 110.00 2 1.20 2.40
BR-04
Tubo Ø1 1/2" 6,662.00 1 26.91 26.91
Pt 4x1/4" 1,668.00 1 8.44 8.44
Pl 9 154 110.00 2 1.20 2.40
BR-05
Tubo Ø1 1/2" 4,400.00 1 17.78 17.78
Pt 4x1/4" 786.00 1 3.98 3.98
Pl 9 154 110.00 2 1.20 2.40
BR-06
Tubo Ø1 1/2" 6,332.00 1 25.58 25.58
Pt 4x1/4" 1,503.00 1 7.61 7.61
Pl 9 154 110.00 2 1.20 2.40
Pl 12 90 64.00 1 0.54 0.54
PLANO A1-CAP17140-860-33-109
BR-07
Tubo Ø1 1/2" 1,265.00 1 5.11 5.11
Pl 12 90 54.00 1 0.54 0.54
Pl 9 120 90.00 1 0.76 0.76
BR-08
Tubo Ø1 1/2" 5,650.00 2 22.83 45.66
Pl 9 210 50.00 4 0.74 2.96
GRATING
GR01 1446 858.00 2 61.41 122.82
GR02 740 858.00 2 31.43 62.86
GR03 701 858.00 2 29.77 59.54
GR04 1525 1,204.00 1 80.90 80.90
GR05 1592 1,002.00 1 78.96 78.96
PLANO A1-CAP17140-860-33-111
PRT 01
Tubo Ø1 1/2" 2,272.00 1 9.18 9.18
Pl 6 100 100.00 2 0.47 0.94
Pl 6 130 40.00 1 0.24 0.24
Pl 6 25 20.00 2 0.02 0.04
Pl 6 150 130.00 1 0.92 0.92
Fe 3/4" 55.00 2 0.12 0.24
Fe 3/4" 32.00 2 0.07 0.14
Fe 1/4" 40.00 2 0.01 0.02
Fe 3/8 95.00 6 0.05 0.30
PLANO A1-CAP17140-860-33-110
Pt 2 1/2"x3/8" 2,296.00 2 10.88 21.76
Pt 2 1/2"x3/8" 270.00 2 1.28 2.56
Pt 3 x1/2" 351.00 2 2.66 5.32
Fe 3/4" 413.00 4 0.92 3.68
1505.77
PARTIDA 01.08.02/01.08.03
2 TUBERIAS Ø1" 8.55 kg
111.50
PESO PESO
ITEM
1674.69
RESUMEN PLATAFORMA INSPECCION
PRESUPUESTO CONTRACTUAL 1544.69 kg
IO-001 130.00 kg
2 SOPORTES AEREOS kg
PLANO A1-CAP17140-860-33-119
461.55
3 SOPORTES TUBERIAS kg
PLANO A1-CAP17140-860-55-101
405SP1
L2"x2"x1/4" 830.00 1 3.97 3.97
L2"x2"x1/4" 130.00 1 0.62 0.62
Pl 9 170 100.00 1 1.20 1.20
405SP2
L2"x2"x1/4" 550.00 6 2.63 15.78
L2"x2"x1/4" 400.00 6 1.91 11.46
Pt 2"x1/4" 494.00 6 1.25 7.50
405SP3
L2"x2"x1/4" 145.00 2 0.69 1.38
Pt 2"x1/4" 170 130.00 2 1.56 3.12
405SP4
L2"x2"x1/4" 450.00 1 2.15 2.15
Pl 9 170 130.00 3 1.56 4.68
405RED1
Tubo Ø3" sch40 100.00 1 1.13 1.13
Tubo Ø2" sch40 100.00 1 0.54 0.54
Brida 3" so 150 1 0.00
Reduccion Ø3" -2" 1 0.00
53.53
4 BARANDAS SUPERIORES kg
PLANO A1-CAP17140-860-33-113
BAR 10
Tb 1 1/2" sch40 4,874.00 1 19.69 19.69
Pl 6 1061 349.00 1 6.44 6.44
Pl 12 90 64.00 1 0.54 0.54
BAR 11
Tb 1 1/2" sch40 3,098.00 1 12.52 12.52
Pl 6 553 349.00 1 4.05 4.05
BAR 12
Tb 1 1/2" sch40 4,114.00 2 16.62 33.24
Pl 6 1061 349.00 2 6.44 12.88
BAR 13
Tb 1 1/2" sch40 4,722.00 1 19.08 19.08
Pl 6 454 349.00 1 3.43 3.43
BAR 14
Tb 1 1/2" sch40 4,114.00 1 16.62 16.62
Pl 6 1061 339.00 1 5.94 5.94
Pl 6 202 90.00 2 0.86 1.72
BAR 15
Tb 1 1/2" sch40 3,822.00 1 15.44 15.44
Pl 6 202 90.00 2 0.86 1.72
Pl 6 916 339.00 1 5.18 5.18
Pl 9 157 63.00 1 0.70 0.70
159.19
4 BOLARDOS kg
PLANO A1-CAP17140-860-33-118
231.72
5 TUBERIAS Ø1" kg
Codo 1"x90 1
Unión universal 1" 11
Reduccion campana 2"x1" 10
Reduccion conce 3"x2" 1
brida 1" 1
Brida 1" 1
Válvula 1" bola 2
6 ESCALERA 2 kg
PLANO A1-CAP17140-860-33-115
ESC 02
Pt 2 1/2"x3/8" 2,984.00 2 14.14 28.28
Pt 2 1/2"x3/8" 270.00 2 1.28 2.56
Pl 12 293 170.00 1 4.69 4.69
Pl 12 355 170.00 1 5.68 5.68
Barra lisa 3/4" 413.00 6 0.92 5.52
PLANO A1-CAP17140-860-33-116
Tb 1 1 /2" sch40 2,272.00 1 9.18 9.18
Pl 6 100 100.00 2 0.47 0.94
Pl 6 130 40.00 1 0.24 0.24
Pl 6 20 20.00 2 0.02 0.04
Pl 6 150 13.00 1 0.92 0.92
Fe liso 3/4" 55.00 2 0.12 0.24
Fe liso 3/4" 32.00 2 0.07 0.14
Fe liso 1/4" 40.00 2 0.01 0.02
Fe liso 3/8" 95.00 8 0.05 0.40
58.85