PRESUPUESTO GENERAL

LP Nº 003-2015-EF/43
:"AMPLIACIÓN Y MEJORAMIENTO DE LOS SERVICIOS COMPLEMENTARIOS DE LA SEDE CENTRAL DEL MINISTERIO DE ECONOMÍA Y FINANZAS, CERCADO DE
OBRA
LIMA - LIMA"
ENTIDAD :MINISTERIO DE ECONOMÍA Y FINANZAS
LUGAR :LIMA - LIMA - LIMA
CONTRATISTA :CONSORCIO T y M
PRECIO
ITEM DESCRIPCION UND METRADO PARCIAL TOTAL
UNITARIO
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD 327,766.50
01 ESTRUCTURAS 4,216,407.71
01 ARQUITECTURA 2,418,990.26
01 INSTALACIONES SANITARIAS 515,926.71
01 INSTALACIONES ELECTRICAS Y MECANICAS 2,715,773.53
01 INSTALACIONES DE COMUNICACIONES 2,185,157.88
01 IMPACTO AMBIENTAL 109,695.44
01 IMPACTO VIAL 44,212.51

TOTAL COSTO DIRECTO 12,533,930.54


GASTOS GENERALES (8%) 1,002,714.44
UTILIDAD (8%) 1,002,714.44
PARCIAL 14,539,359.42
FACTOR DE RELACION (0.900) 13,085,423.48
I.G.V. ( 18% ) 2,355,376.22
PRESUPUESTO TOTAL 15,440,799.70

1 de 114
CONSORCIO RIMAC
FICHA DE IDENTIFICACION DE LA OBRA
OBRA:
"MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BÁSICO DEL CASERÍO DE SANTA CATALINA - DISTRITO DE HUARAZ, PROVINCIA DE HUARAZ –
ANCASH"

I. GENERALIDADES:
UBICACIÓN:
Región : Ancash
Departame: Ancash
Provincia : Huaraz
Distrito : Huaraz
Localidad : Santa Catalina

II. DATOS GENERALES:

DEL PROYECTO
1 CUI 2128043
2 Área Geográfica 2
3 Presupuesto Base S/. 1,701,129.56
4 ADJUDICACION SIMPLIFICADA N° 018-2019-MPH/CS I. CONVOCATORIA
Proceso de Selección
5 Modalidad COSTOS UNITARIOS
6 Monto de Contrato S/. 1,701,129.56
7 Fecha de Contrato 12/20/2019
8 Factor de Relación 1.0000
9 Entrega de Terreno 1/17/2020
10 Acta de Inicio de Obra 1/20/2020
11 Inicio de Obra 1/20/2020
12 Supervisor de Obra ING. OSKAR YVAN PEREZ SAL Y ROSAS CIP N° 163288
13 Fecha de término de obra 6/2/2020
14 Acta de observaciones
15 Fecha de Recepción de Obra
DEL CONTRATISTA
16 Contratista CONSORCIO RIMAC
17 N° de Empresas del Consorcio 2
18 Empresas que componen el Consorcio: 1. COSAVI S.R.L.
2. MACRO CENTRO INGENIEROS S.A.C.

19 Razon Social que Factura RUC Nº 20602102051 MACRO CENTRO INGENIEROS S.A.C.
20 Representante legal RICARDO ZENON MACEDO ESPADA
21 Domicilio Legal Av. Raymondi N° 619 Distrito de Huaraz, Provincia de Huaraz - Ancash
22 Residente de Obra ING. DAVID ROGELIO AQUINO CONDEZO CIP. N° 83091
DEL PRESUPUESTO
23 Valor Referencial S/. 1,701,129.56
24 Presupuesto Contractual (Inc. IGV) S/. 1,701,129.56 26-Jul-19
25 Presupuesto Contractual (Sin. IGV) S/. 1,441,635.22 26-Jul-19
26 Factor de Relación 1.0000
27 Monto Adicional N° 01 (Inc. IGV) S/. 0.00 0.000%

28 Documento que Aprueba el Adicional de obra N° 01


29 Monto deductivos de obra (Inc. IGV) S/. 0.00
30 Monto de Penalidades al contratista (Inc. IGV) S/. 0.00
31 Monto de Reajuste de Precios (Inc. IGV)
32 Monto de Mayores Gastos Generales (Inc. IGV)
33 Monto de Intereses por demora en pago de valorizaciones (Inc. IGV)
34 Monto de deducciones que no corresponden (Inc. IGV)
35 Presupuesto Real de Obra S/. 1,701,129.56
DEL PLAZO DE EJECUCIÓN
36 Plazo de Ejecución Contractual 135 Días Calendarios
37 Fecha de Inicio de Obra 1/20/2020
38 Fecha de término Programado 6/2/2020
39 Paralización de Obra
40 Reinicio de Ejecución de Obra
41 N° de días de Paralización
42 Ampliación de Plazo N° 01. (Por paralización de obra) Días Calendarios
43 Documento que Aprueba La ampliación de Plazo de obra N° 01
44 Fecha de término con ampliación N° 01
45 Ampliación de Plazo N° 02. (Por adicional de obra) Días Calendarios
46 Fecha de término con ampliación N° 02
47 Fecha de término real de Obra
48 Fecha de Acta de observaciones
49 Fecha de Acta de Recepción de Obra
50 Plazo total de ejecución Días Calendarios
DE LOS ADELANTOS, RETENCIONES Y GARANTÍAS
51 Monto del Adelanto Directo. Inc. IGV 0.00%
52 Fecha de pago de adelanto en efectivo.
53 Monto de Adelanto para materiales, Inc IGV 0.00%
54 Fecha de pago adelanto materiales
55 Total monto bruto por adelantos S/. 0.00 0.00%
56 Total monto NETO por adelantos S/. 0.00

57 Carta Fianza de Adelantos

58 Retención del 10% por Garantía de Fiel Cumplimiento Contractual S/. 170,112.96
59 Retención del 10% por Garantía de Fiel Cumplimiento del Adicional
60 Total Retención por Garantía de Fiel Cumplimiento S/. 170,112.96

III. SITUACIÓN DE LA OBRA:


A. ASPECTOS TÉCNICOS:
61 Valorizacion Mensual de Obra 274,602.74
62 Valorizacion Acumulada de Obra 555,312.03
63 Avance físico Mensual de Obra 16.14%
64 Avance físico Acumulado de Obra 32.64% Adelantada 8.36%
65 Situación Actual de la Obra EN EJECUCION
CONSORCIO RIMAC

OBRA :
MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASICO DEL CASERIO DE SANTA CATALINA ,
DISTRITO DE HUARAZ, PROVINCIA DE HUARAZ - ANCASH

CONTRATISTA : CONSORCIO RIMAC PLAZO 135 D.C.

CONSULTOR : CONSORCIO SUERVISOR SANTA CATALINA FECHA INICIO 20-Jan-20

RESIDENTE DE OBRA : ING. DAVID ROGELIO AQUINO CONDEZO CIP N° 83021 FECHA TERMINO 2-Jun-20

JEFE DE SUPERVISION: ING. OSKAR YVAN PEREZ SAL Y ROSAS CIP N° 163288

VALOR REFERENCIAL : 1,701,129.56

MONTO CONTRATADO : 1,701,129.56

MES VALORIZADO: 29-Feb-20

RESUMEN DE VALORIZACION MENSUAL N° 02

DESCRIPCION MONTO VAL. ACUM. VALORIZACION VAL. ACUM. % SALDO

CONTRATADO ANTERIOR ACTUAL ACTUAL AVANCE DE OBRA

VALORIZACION CONTRACTUAL (V)


01. PRESUPUESTO GENERAL 1,441,635.22 237,889.23 232,714.19 470,603.42 32.64% 971,031.80

TOTAL CONTRACTUAL 1,441,635.22 237,889.23 232,714.19 470,603.42 971,031.80


PORCENTAJE DE AVANCE A LA FECHA 16.50% 16.14% 32.64% 32.64% 67.36%
REAJUSTES(S)
01. FORMULA UNICA 0.00 0.00 0.00

TOTAL REAJUSTES 0.00 0.00 0.00


VALORIZACION BRUTA(VB=V+S) 237,889.23 232,714.19 470,603.42
AMORTIZACIONES(A)
ADELANTO EN EFECTIVO 0.00 0.00 0.00 0.00 0.00
ADELANTO DE MATERIALES N° 01 0.00 0.00 0.00 0.00 0.00

TOTAL AMORTIZACIONES S/IGV 0.00 0.00 0.00 0.00 0.00


DEDUCTIVOS (D)
DEDUCCIONES ADELANTO DE MATERIALES 01 0.00 0.00 0.00
DEDUCCIONES ADELANTO DIRECTO 0.00 0.00 0.00
TOTAL DEDUCTIVOS S/IGV 0.00 0.00 0.00
VALORIZACION NETA(VN=VB-A-D) 237,889.23 232,714.19 470,603.42
RETENCION FIEL CUMPLIMIENTO (10.00%) 0.00 0.00 0.00
MULTA POR ATRASO DE OBRA(M) 0.00 0.00 0.00
MONTOS A PAGAR AL CONTRATISTA

- EN EFECTIVO(VN-FG-L-M) 237,889.23 232,714.19 470,603.42

MONTO TOTAL CON I.G.V. 18.00% 42,820.06 41,888.55 84,708.61


TOTAL POR FACTURAR 280,709.29 274,602.74 555,312.03
RETENCION POR FONDO DE GARANTIA (10.00%) 85,056.48 85,056.48 170,112.96
TOTAL A RECIBIR 195,652.81 189,546.26 385,199.07
HOJA DE RESUMEN DE PAGO

OBRA MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASICO DEL CASERIO DE SANTA CATALINA , DISTRITO DE
HUARAZ, PROVINCIA DE HUARAZ - ANCASH

ENTIDAD MUNICIPALIDAD PROVINCIAL DE HUARAZ


UBICACIÓN CASERIO SANTA CATALINA - HUARAZ - HUARAZ - ANCASH
CONTRATISTA CONSORCIO RIMAC
RESIDENCIA ING. DAVID ROGELIO AQUINO CONDEZO CIP N° 83021
SUPERVISIÓN ING. OSKAR YVAN PEREZ SAL Y ROSAS CIP N° 163288

CONCEPTO S/.
A. MONTOS VALORIZADOS EN EL PRESENTE MES 232,714.19
VALORIZACIÓN N° 02: FEBRERO, 2020 232,714.19

B. MONTOS POR REAJUSTE EN EL PRESENTE MES 0.00


REAJUSTES DE VALORIZACIONES 0.00

C. AMORTIZACIÓN DEL ADELANTO EN EFECTIVO EN EL PRESENTE MES 0.00


DEL ADELANTO DIRECTO 0.00
DEDUCCION QUE NO CORRESPONDE - ADELANTO DIRECTO 0.00

D. AMORTIZACIÓN DEL ADELANTO DE MATERIALES EN EL PRESENTE M 0.00


AMORTIZACION DEL MES- ADELANTO DE MATERIALES 0.00
DEDUCCION QUE NO CORRESPONDE - ADELANTO DE MATERIALES 0.00

E. OTROS 0.00
MATERIAL EN CANCHA 0.00

I. MONTO FACTURABLE (SIN I.G.V.) 232,714.19

II. MONTO LÍQUIDO A PAGAR (I - II) 232,714.19

III. I.G.V. 18% 41,888.55

IV. MONTO A FACTURAR (III + IV) 274,602.74

V. RETENCION 10% FIEL CUMPLIMIENTO 85,056.48

VI. COMPROMISO D PAGO CON EL CONTRATISTA 189,546.26


CONSORCIO RIMAC
CALCULO DE LOS "K" DE REAJUSTE MENSUAL

OBRA MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASICO DEL CASERIO DE SANTA CATALINA, DISTRITO DE HUARAZ, PROVINCIA DE HUARAZ - ANCASH

CONTRATISTA CONSORCIO RIMAC PLAZO DE EJECUCION 135 D.C.


RESIDENTE DE OBRA CONSORCIO SUERVISOR SANTA CATALINA INICIO DE PLAZO CONTRACTUAL 20-Jan-20
CONSUTORA ING. DAVID ROGELIO AQUINO CONDEZO CIP N° 83021 FIN DE PLAZO CONTRACTUAL 2-Jun-20
JEFE DE SUPERVISION ING. OSKAR YVAN PEREZ SAL Y ROSAS CIP N° 163288 FECHA DE PRESENTACION 29-Feb-20
VALOR REFERE 1,701,129.56 FACTOR DE RELACION 1.000
MONTO CONTRATADO 1,701,129.56
ADELANTOADELANTO DIRECTO: 0.00
ADELANTOADELANTO DE MATERIALES: 0.00

ÁREA GEOGRÁFICA 2

IND. BASE K= 0,418 (Mr/Mo) + 0,155 (Mr/Mo) + 0,140 (Cr/Co) + 0,108 (Pr/Po) + 0.066 (Tr/To) + 0.060 (Ar/Ao) + 0.053(Mr/Mo)
FORMULA POLINOMICA UNICA
Io Ia Ir Ir Ir Ir Ir
SIMB IU ELEMENTO % COEF.
Jul-19 Jan-20 K Feb-20 K Mar-20 K Apr-20 K May-20 K Jun-19 K

M 47 MANO DE OBRA INC. LEYES DOCIALES 100.000% 0.418 600.40 619.76 0.431 0.000 0.000 0.000 0.000 0.000

M 49 MAQUINARIA Y EQUIPO IMPORTADO 100.000% 0.155 308.84 315.38 0.158 0.000 0.000 0.000 0.000 0.000

C 21 CEMENTO PORTLAND TIPO I 100.000% 0.140 423.68 423.68 0.140 0.000 0.000 0.000 0.000 0.000

P 53 PETROLEO DIESSEL 100.000% 0.108 833.17 831.84 0.108 0.000 0.000 0.000 0.000 0.000

T 72 TUBERIA DE PVC PARA AGUA 100.000% 0.066 434.08 441.23 0.067 0.000 0.000 0.000 0.000 0.000

A 5 AGREGADO GRUESO 100.000% 0.060 215.53 215.10 0.060 0.000 0.000 0.000 0.000 0.000

M 43 MADERA NACIONAL PARA ENCOF. Y CARP. 100.000% 0.053 702.38 708.48 0.053 0.000 0.000 0.000 0.000 0.000
COEFICIENTE DE REAJUSTE MENSUAL ( K ) 1.000 1.017 0.000 0.000 0.000 0.000 0.000
CALCULO DE REINTEGRO AUTORIZADO

CONSORCIO RIMAC

OBRA :
MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASICO DEL CASERIO DE SANTA CATALINA , DISTRITO DE
HUARAZ, PROVINCIA DE HUARAZ - ANCASH
CONTRATISTA : CONSORCIO RIMAC PLAZO 135 D.C.
CONSULTOR : CONSORCIO SUERVISOR SANTA CATALINA FECHA INICIO 20-Jan-20
RESIDENTE DE OBRA : ING. DAVID ROGELIO AQUINO CONDEZO CIP NFECHA TERMINO 2-Jun-20
JEFE DE SUPERVISION: ING. OSKAR YVAN PEREZ SAL Y ROSAS CIP N° 163288
VALOR REFERENCIAL : 1,701,129.56
MONTO CONTRATADO : 1,701,129.56
MES VALORIZADO: 29-Feb-20

CALCULO DE REAJUSTES AUTORIZADO


VALORIZACION PROGRAMADO EJECUTADO REINTEGRO REINTEGRO
Nº MES VAL INDICE REAJUSTE VAL INDICE REAJUSTE BRUTO AUTORIZADO
V K R =(Vx(K-1) V K R =(Vx(K-1) AUTORIZADO
FORMULA UNICA
1 Jan-20 107,794.51 1.017 1,832.51 232,714.19 1.017 3,956.14 1,832.51 0.00
2 Feb-20 242,232.27
3 Mar-20 395,283.25
4 Apr-20 359,764.14
5 May-20 312,241.14
6 Jun-20 24,319.91

TOTAL REINTEGRO ESP. 1,441,635.22 1,832.51 232,714.19 3,956.14 1,832.51 0.00


ACUM. ANTERIOR 0.00
REINTEGRO ACTUAL 0.00

7 de 114
CONSORCIO RIMAC
RESUMEN DE VALORIZACION N° 02 CORRESPONDIENTE AL MES DE FEBRERO DEL 2020

MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASICO DEL CASERIO DE SANTA CATALINA , DISTRITO DE
OBRA :
HUARAZ, PROVINCIA DE HUARAZ - ANCASH

CONTRATISTA : CONSORCIO RIMAC PLAZO 135 D.C.


CONSULTOR : CONSORCIO SUERVISOR SANTA CATALINA FECHA INICIO 20-Jan-20
RESIDENTE DE OBRA : ING. DAVID ROGELIO AQUINO CONDEZO CIP N° 83021 FECHA TERMINO 2-Jun-20
JEFE DE SUPERVISION: ING. OSKAR YVAN PEREZ SAL Y ROSAS CIP N° 163288
VALOR REFERENCIAL : 1,701,129.56
MONO CONTRATADO : 1,701,129.56
MES VALORIZADO: 29-Feb-20

AVANCE FISICO

VAL. ANTERIOR VAL. ACTUAL INC. VAL. ACUMULADO


ESPECIALIDADES COSTO S/ INC. IGV IGV INC. IGV
SALDO REAL

S/ S/ S/ S/ %

01. VALORIZACION Nº 02 1,441,635.22 237,889.23 232,714.19 470,603.42 971,031.80 67.36%

SUBTOTAL 1,441,635.22 237,889.23 232,714.19 470,603.42 971,031.80

I.G.V. 18% 259,494.34 42,820.06 41,888.55 84,708.61 174,785.72

TOTAL PRESUPUESTO 1,701,129.56 280,709.29 274,602.74 555,312.03 1,145,817.52

AVANCE DE OBRA 100.00% 16.50% 16.14% 32.64% 67.36%

AVANCE DE OBRA ACUMULADO 100.00% 16.50% 32.64% 32.64% 67.36%


VALORIZACION Nº 02 CORRESPONDIENTE AL MES DE FEBRERO DEL 2020
OBRA MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASICO DEL CASERIO DE SANTA CATALINA , DISTRITO DE HUARAZ, PROVINCIA DE HUARAZ - ANCASH
CONTRATISTA CONSORCIO RIMAC PLAZO DE EJECUCION 135 D.C.
RESIDENTE DE OBRA ING. DAVID ROGELIO AQUINO CONDEZO CIP N° 83021 INICIO DE PLAZO CONTRACTUAL 20-Jan-20
CONSUTORA CONSORCIO SUPERVISOR SANTA CATALINA FIN DE PLAZO CONTRACTUAL 2-Jun-20
JEFE DE SUPERVISION ING. OSKAR YVAN PEREZ SAL Y ROSAS CIP N° 163288 FECHA DE PRESENTACION 29-Feb-20
VALOR REFERENCIAL S/. 1,701,129.56 FACTOR DE RELACION 1.0000
MONTO CONTRATADO S/. 1,701,129.56
ADELANTO DIRECTO S/. -
ADELANTO DE MATERIALES N° 01 S/. -

AVANCE FISICO
PRESUPUESTO SALDO
Partida DESCRIPCION ANTERIOR ACTUAL ACUMULADO
Unid Metrado Precio PARCIAL Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %

INSTALACION DEL SISTEMA DE SANEAMIENTO BASICO EN EL CASERIO DE SANTA


01 1,211,458.17 199,906.92 195,558.14 395,465.06 815,993.11
CATALINA
01.01 OBRAS PRELIMINARES
01.01.01 ALMACEN Y OFICINA mes 4.00 900.00 3,600.00 1.00 900.00 25.00% 1.00 900.00 25.00% 2.00 1,800.00 50.00% 2.00 1,800.00 50.00%
01.01.02 CARTEL DE IDENTIFICACION DE OBRA DE 3.60 X 2.4 M glb 1.00 516.32 516.32 1.00 516.32 100.00% 0.00 0.00 0.00% 1.00 516.32 100.00% 0.00 0.00 0.00%
01.01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS glb 1.00 5,249.14 5,249.14 0.50 2,624.57 50.00% 0.00 0.00 0.00% 0.50 2,624.57 50.00% 0.50 2,624.57 50.00%
01.02 SEGURIDAD Y SALUD
01.02.01 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 1,800.00 1,800.00 1.00 1,800.00 100.00% 0.00 0.00 0.00% 1.00 1,800.00 100.00% 0.00 0.00 0.00%
01.02.02 EQUIPOS DE PROTECCION PERSONAL glb 1.00 3,947.50 3,947.50 1.00 3,947.50 100.00% 0.00 0.00 0.00% 1.00 3,947.50 100.00% 0.00 0.00 0.00%
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y
01.02.03 glb 1.00 3,100.00 3,100.00 1.00 3,100.00 100.00% 0.00 0.00 0.00% 1.00 3,100.00 100.00% 0.00 0.00 0.00%
SALUD EN LA OBRA

01.02.04 IMPLEMENTACION PARA LAS FUNCIONES DEL INGENIERO DE SEGURIDAD glb 1.00 2,000.00 2,000.00 1.00 2,000.00 100.00% 0.00 0.00 0.00% 1.00 2,000.00 100.00% 0.00 0.00 0.00%

01.03 SISTEMA DE AGUA POTABLE


01.03.01 CAPTACION TIPO C-1 ( 2 UNIDADES)
01.03.01.01 OBRAS PRELIMINARES
01.03.01.01.01 DESBROCE Y LIMPIEZA DE TERRENO m2 8.00 3.28 26.24 8.00 26.24 100.00% 0.00 0.00 0.00% 8.00 26.24 100.00% 0.00 0.00 0.00%
01.03.01.01.02 DEMOLICION DE ESTRUCTURAS DE CONCRETO m3 1.32 742.10 979.57 0.66 489.79 50.00% 0.66 489.78 50.00% 1.32 979.57 100.00% 0.00 0.00 0.00%
01.03.01.01.03 ELIMINACION DE MATERIAL DE DEMOLICIONES HASTA 2 km m3 1.72 159.59 274.49 0.86 137.25 50.00% 0.86 137.24 50.00% 1.72 274.49 100.00% 0.00 0.00 0.00%
01.03.01.01.04 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 8.00 1.42 11.36 8.00 11.36 100.00% 0.00 0.00 0.00% 8.00 11.36 100.00% 0.00 0.00 0.00%
01.03.01.02 MOVIMIENTO DE TIERRAS

01.03.01.02.01 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 4.81 127.93 615.34 2.40 307.03 49.90% 2.41 308.31 50.10% 4.81 615.34 100.00% 0.00 0.00 0.00%

01.03.01.02.02 REFINE, NIVELACION INTERIOR Y COMPACTACION m2 6.00 4.85 29.10 3.00 14.55 50.00% 3.00 14.55 50.00% 6.00 29.10 100.00% 0.00 0.00 0.00%
01.03.01.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO m3 0.91 11.08 10.08 0.46 5.10 50.60% 0.45 4.98 49.40% 0.91 10.08 100.00% 0.00 0.00 0.00%
01.03.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 4.67 13.08 61.08 2.33 30.48 49.90% 2.34 30.60 50.10% 4.67 61.08 100.00% 0.00 0.00 0.00%
01.03.01.02.05 MATERIAL GRANULAR FILTRANTE EN CAPTACION, GRAVA ARENA m3 1.37 100.32 137.44 0.70 70.22 51.09% 0.67 67.22 48.91% 1.37 137.44 100.00% 0.00 0.00 0.00%
01.03.01.03 OBRAS DE CONCRETO SIMPLE
01.03.01.03.01 CONCRETO f´c = 140 kg/cm2 m3 0.25 311.48 77.87 0.13 40.49 52.00% 0.00 0.00 0.00% 0.13 40.49 52.00% 0.12 37.38 48.00%
01.03.01.03.02 CONCRETO CICLOPEO C:H 1:8 m3 0.33 297.41 98.15 0.16 47.59 48.49% 0.00 0.00 0.00% 0.16 47.59 48.49% 0.17 50.56 51.51%
01.03.01.04 OBRAS DE CONCRETO ARMADO
01.03.01.04.01 CONCRETO f'c=210 Kg/cm2 m3 5.07 457.73 2,320.69 2.60 1,190.10 51.28% 0.00 0.00 0.00% 2.60 1,190.10 51.28% 2.47 1,130.59 48.72%
01.03.01.04.02 ENCOFRADO Y DESENCOFRADO m2 32.27 39.88 1,286.93 16.12 642.87 49.95% 0.00 0.00 0.00% 16.12 642.87 49.95% 16.15 644.06 50.05%
01.03.01.04.03 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 112.11 4.38 491.04 56.50 247.47 50.40% 0.00 0.00 0.00% 56.50 247.47 50.40% 55.61 243.57 49.60%
01.03.01.05 REVOQUES ENLUCIDOS
01.03.01.05.01 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 1:2 , e=1.0 cm m2 11.86 26.49 314.17 0.00 0.00 0.00% 5.80 153.64 48.90% 5.80 153.64 48.90% 6.06 160.53 51.10%
01.03.01.05.02 TARRAJEO DE EXTERIOR DE MUROS, e= 1 cm, 1:4 m2 11.22 24.94 279.83 0.00 0.00 0.00% 5.60 139.66 49.91% 5.60 139.66 49.91% 5.62 140.17 50.09%
01.03.01.06 ACCESORIOS SANITARIOS

01.03.01.06.01 TAPA SANITARIA METALICA DE 0.60 X 0.60 m CON LLAVE TIPO BUJIA und 4.00 206.50 826.00 0.00 0.00 0.00% 2.00 413.00 50.00% 2.00 413.00 50.00% 2.00 413.00 50.00%

01.03.01.06.02 ACCESORIOS EN CAPTACION und 2.00 166.32 332.64 1.00 166.32 50.00% 0.00 0.00 0.00% 1.00 166.32 50.00% 1.00 166.32 50.00%
AVANCE FISICO
PRESUPUESTO SALDO
Partida DESCRIPCION ANTERIOR ACTUAL ACUMULADO
Unid Metrado Precio PARCIAL Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
01.03.01.06.03 GRAVA m3 2.32 109.35 253.69 0.00 0.00 0.00% 1.16 126.85 50.00% 1.16 126.85 50.00% 1.16 126.84 50.00%
01.03.01.07 PINTURAS
01.03.01.07.01 PINTURA ESMALTE EN EXTERIORES m2 12.92 12.43 160.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.92 160.60 100.00%
01.03.01.08 CERCO PERIMETRICO DE CAPTACION Y RESERVORIO

01.03.01.08.01 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 1.08 127.93 138.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.08 138.16 100.00%

01.03.01.08.02 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 1.35 13.08 17.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.35 17.66 100.00%
01.03.01.08.03 CONCRETO f´c = 140 kg/cm2 PARA DADOS m3 1.08 275.42 297.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.08 297.45 100.00%
01.03.01.08.04 POSTE DE F° G° INCL. COLOCACION und 30.00 110.00 3,300.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.00 3,300.00 100.00%

01.03.01.08.05 CERCO PERIMETRICO CON MALLA OLIMPICA INC/PINTURA - COLOCACION m 69.40 98.00 6,801.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 69.40 6,801.20 100.00%

01.03.01.08.06 PUERTA GALVANIZADA CON MALLA OLIMPICA INC/ PINTUTA - COLOCACION und 2.00 159.46 318.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 318.92 100.00%

01.03.01.08.07 ALAMBRE DE PUAS m 71.10 3.56 253.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 71.10 253.12 100.00%
01.03.02 LINEAS DE CONDUCCION, ADUCCION Y RED (L=2,243.53 m)
01.03.02.01 TRABAJOS PRELIMINARES
01.03.02.01.01 DESBROCE Y ELIMINACION DE ARBUSTOS PEQUEÑOS m 2,243.53 7.85 17,611.71 1,280.00 10,048.00 57.05% 450.53 3,536.66 20.08% 1,730.53 13,584.66 77.13% 513.00 4,027.05 22.87%
01.03.02.01.02 TRAZO, NIVELES Y REPLANTEO m 2,243.53 2.29 5,137.68 900.00 2,061.00 40.12% 450.53 1,031.71 20.08% 1,350.53 3,092.71 60.20% 893.00 2,044.97 39.80%
01.03.02.02 MOVIMIENTO DE TIERRAS
01.03.02.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL (AGUA) m 404.73 16.36 6,621.38 200.00 3,272.00 49.42% 112.19 1,835.43 27.72% 312.19 5,107.43 77.14% 92.54 1,513.95 22.86%
01.03.02.02.02 EXCAVACION DE ZANJA EN TERRENO CONGLOMERADO (AGUA) m 1,690.15 31.27 52,850.99 654.50 20,466.22 38.72% 253.49 7,926.63 15.00% 907.99 28,392.85 53.72% 782.16 24,458.14 46.28%
01.03.02.02.03 EXCAVACION DE ZANJA EN TERRENO ROCOSO (AGUA) m 148.65 84.56 12,569.84 45.50 3,847.48 30.61% 69.16 5,848.17 46.53% 114.66 9,695.65 77.13% 33.99 2,874.19 22.87%
01.03.02.02.04 REFINE, NIVELACION DE FONDOS PARA TUBERIA DE AGUA m2 897.41 7.32 6,569.04 340.00 2,488.80 37.89% 352.21 2,578.18 39.25% 692.21 5,066.98 77.13% 205.20 1,502.06 22.87%
01.03.02.02.05 CAMA DE APOYO PARA TUBERIA DE AGUA E=10 CM m 2,243.53 2.98 6,685.72 845.50 2,519.59 37.69% 885.03 2,637.39 39.45% 1,730.53 5,156.98 77.13% 513.00 1,528.74 22.87%
01.03.02.02.06 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 269.22 13.81 3,717.93 120.00 1,657.20 44.57% 87.66 1,210.58 32.56% 207.66 2,867.78 77.13% 61.56 850.15 22.87%
01.03.02.02.07 RELLENO COMPACTADO CON MATERIAL PROPIO m3 269.22 11.08 2,982.96 120.00 1,329.60 44.57% 87.66 971.27 32.56% 207.66 2,300.87 77.13% 61.56 682.09 22.87%
01.03.02.02.08 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 112.19 13.08 1,467.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 112.19 1,467.45 100.00%
01.03.02.03 TENDIDO DE TUBERIAS
01.03.02.03.01 TUBERIA DE PVC SAP CLASE - 10, D=1 1/2" X 5 M m 357.55 7.30 2,610.12 186.00 1,357.80 52.02% 90.50 660.65 25.31% 276.50 2,018.45 77.33% 81.05 591.67 22.67%
01.03.02.03.02 TUBERIA DE PVC SAP CLASE - 10, D=1" X 5 M m 1,414.60 4.64 6,563.74 659.50 3,060.08 46.62% 420.50 1,951.12 29.73% 1,080.00 5,011.20 76.35% 334.60 1,552.54 23.65%
01.03.02.03.03 TUBERIA DE PVC SAP CLASE - 10, D=3/4" X 5 M m 471.38 4.09 1,927.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 471.38 1,927.94 100.00%

01.03.02.03.04 PRUEBA HIDRAULICA EN RED DE AGUA m 2,243.53 7.77 17,432.23 845.50 6,569.54 37.69% 0.00 0.00 0.00% 845.50 6,569.54 37.69% 1,398.03 10,862.69 62.31%

01.03.02.03.05 ACCESORIOS DE AGUA FRIA glb 1.00 724.11 724.11 0.50 362.06 50.00% 0.20 144.82 20.00% 0.70 506.88 70.00% 0.30 217.23 30.00%

01.03.02.03.06 DESINFECCION DE TUBERIAS m 2,243.53 1.48 3,320.42 845.50 1,251.34 37.69% 0.00 0.00 0.00% 845.50 1,251.34 37.69% 1,398.03 2,069.08 62.31%
01.03.03 CONEXIONES PRE DOMICILIARIAS (90 UND)
01.03.03.01 TRABAJOS PRELIMINARES
01.03.03.01.01 TRAZO, NIVELES Y REPLANTEO m2 216.00 2.29 494.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 216.00 494.64 100.00%
01.03.03.02 MOVIMIENTO DE TIERRAS

01.03.03.02.01 EXCAVACION DE ZANJA EN TERRENO CONGLOMERADO (AGUA) m 540.00 31.27 16,885.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 540.00 16,885.80 100.00%

01.03.03.02.02 REFINE, NIVELACION DE FONDOS PARA TUBERIA DE AGUA m2 216.00 7.32 1,581.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 216.00 1,581.12 100.00%
01.03.03.02.03 CAMA DE APOYO PARA TUBERIA DE AGUA E=10 CM m 540.00 2.98 1,609.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 540.00 1,609.20 100.00%
01.03.03.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 64.80 11.08 717.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 64.80 717.98 100.00%
01.03.03.02.05 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 64.80 13.81 894.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 64.80 894.89 100.00%
01.03.03.02.06 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 27.00 13.08 353.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.00 353.16 100.00%
01.03.03.03 SUMINISTRO E INSTALACION DE TUBERIAS
01.03.03.03.01 CONEXIONES DOMICILIARIAS DE 1 1/2" A 1/2" und 26.00 88.78 2,308.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.00 2,308.28 100.00%

01.03.03.03.02 CONEXIONES DOMICILIARIAS DE 1" A 1/2" und 48.00 84.08 4,035.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 48.00 4,035.84 100.00%

01.03.03.03.03 CONEXIONES DOMICILIARIAS DE 3/4" A 1/2" und 16.00 78.19 1,251.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 16.00 1,251.04 100.00%
01.03.03.03.04 CAJA DE VALVULA DOMICILIARIA und 90.00 71.23 6,410.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 90.00 6,410.70 100.00%
01.03.03.03.05 PRUEBA HIDRAULICA EN RED DE AGUA m 540.00 7.77 4,195.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 540.00 4,195.80 100.00%
AVANCE FISICO
PRESUPUESTO SALDO
Partida DESCRIPCION ANTERIOR ACTUAL ACUMULADO
Unid Metrado Precio PARCIAL Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
01.03.03.03.06 DESINFECCION DE TUBERIAS m 540.00 1.48 799.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 540.00 799.20 100.00%
01.03.04 RESERVORIO DE 5 M3 (2 UNIDADES)
01.03.04.01 OBRAS PRELIMINARES
01.03.04.01.01 DESBROCE Y LIMPIEZA DE TERRENO m2 14.58 3.28 47.82 14.58 47.82 100.00% 0.00 0.00 0.00% 14.58 47.82 100.00% 0.00 0.00 0.00%
01.03.04.01.02 DEMOLICION DE ESTRUCTURAS DE CONCRETO m3 7.78 742.10 5,773.54 3.90 2,894.19 50.13% 3.88 2,879.35 49.87% 7.78 5,773.54 100.00% 0.00 0.00 0.00%
01.03.04.01.03 ELIMINACION DE MATERIAL DE DEMOLICIONES HASTA 2 km m3 10.11 159.59 1,613.45 0.00 0.00 0.00% 10.11 1,613.45 100.00% 10.11 1,613.45 100.00% 0.00 0.00 0.00%

01.03.04.01.04 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 14.58 1.42 20.70 14.58 20.70 100.00% 0.00 0.00 0.00% 14.58 20.70 100.00% 0.00 0.00 0.00%

01.03.04.02 MOVIMIENTO DE TIERRAS


01.03.04.02.01 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 11.66 127.93 1,491.66 5.80 741.99 49.74% 5.86 749.67 50.26% 11.66 1,491.66 100.00% 0.00 0.00 0.00%
01.03.04.02.02 REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL A PULSO m2 14.58 3.21 46.80 7.30 23.43 50.06% 7.28 23.37 49.94% 14.58 46.80 100.00% 0.00 0.00 0.00%
01.03.04.02.03 RELLENO CON MATERIAL PROPIO m3 3.46 10.65 36.85 0.00 0.00 0.00% 3.46 36.85 100.00% 3.46 36.85 100.00% 0.00 0.00 0.00%
01.03.04.02.04 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 14.58 13.08 190.71 0.00 0.00 0.00% 14.58 190.71 100.00% 14.58 190.71 100.00% 0.00 0.00 0.00%
01.03.04.03 OBRAS DE CONCRETO SIMPLE
01.03.04.03.01 CONCRETO SOLADO MEZCLA 1:10 CEMENTO-HORMIGON e=0.05 mts. m2 14.58 14.93 217.68 7.30 108.99 50.07% 7.28 108.69 49.93% 14.58 217.68 100.00% 0.00 0.00 0.00%
01.03.04.04 OBRAS DE CONCRETO ARMADO
01.03.04.04.01 CONCRETO f'c=210 Kg/cm2 m3 8.87 457.73 4,060.07 4.40 2,014.01 49.61% 4.47 2,046.06 50.39% 8.87 4,060.07 100.00% 0.00 0.00 0.00%
01.03.04.04.02 ENCOFRADO Y DESENCOFRADO m2 70.91 39.88 2,827.89 35.45 1,413.75 49.99% 35.46 1,414.14 50.01% 70.91 2,827.89 100.00% 0.00 0.00 0.00%

01.03.04.04.03 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 432.77 4.38 1,895.53 216.00 946.08 49.91% 216.77 949.45 50.09% 432.77 1,895.53 100.00% 0.00 0.00 0.00%

01.03.04.05 REVOQUES ENLUCIDOS


01.03.04.05.01 TARRAJEO DE EXTERIOR DE MUROS, e= 1 cm, 1:4 m2 57.54 24.94 1,435.05 0.00 0.00 0.00% 57.54 1,435.05 100.00% 57.54 1,435.05 100.00% 0.00 0.00 0.00%
01.03.04.05.02 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 1:2 , e=1.0 cm m2 39.28 26.49 1,040.53 0.00 0.00 0.00% 39.28 1,040.53 100.00% 39.28 1,040.53 100.00% 0.00 0.00 0.00%
01.03.04.06 JUNTAS DE DILATACION

01.03.04.06.01 JUNTA DE WATER STOP DE 6" ESPESOR 5 MM m 17.20 5.21 89.61 8.50 44.29 49.43% 8.70 45.32 50.57% 17.20 89.61 100.00% 0.00 0.00 0.00%

01.03.04.07 ACCESORIOS SANITARIOS


01.03.04.07.01 TAPA SANITARIA METALICA DE 0.60 X 0.60 m CON LLAVE TIPO BUJIA und 4.00 268.94 1,075.76 0.00 0.00 0.00% 4.00 1,075.76 100.00% 4.00 1,075.76 100.00% 0.00 0.00 0.00%
01.03.04.07.02 ESCALERA DE TUBO F° G° MOVIL SEGUN DISEÑO und 2.00 130.00 260.00 0.00 0.00 0.00% 2.00 260.00 100.00% 2.00 260.00 100.00% 0.00 0.00 0.00%
01.03.04.07.03 ACCESORIOS EN RESERVORIO R-01 glb 1.00 500.86 500.86 0.00 0.00 0.00% 1.00 500.86 100.00% 1.00 500.86 100.00% 0.00 0.00 0.00%
01.03.04.07.04 ACCESORIOS EN RESERVORIO R-02 glb 1.00 500.86 500.86 0.00 0.00 0.00% 1.00 500.86 100.00% 1.00 500.86 100.00% 0.00 0.00 0.00%
01.03.04.07.05 SISTEMA DE CLORACION POR GOTEO und 2.00 2,700.00 5,400.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 5,400.00 100.00%
01.03.04.08 PINTURAS
01.03.04.08.01 PINTURA ESMALTE EN EXTERIORES m2 54.60 12.43 678.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 54.60 678.68 100.00%
01.03.05 VALVULA DE CONTROL (2 UNIDADES)
01.03.05.01 TRABAJOS PRELIMINARES
01.03.05.01.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 1.28 1.42 1.82 0.00 0.00 0.00% 1.28 1.82 100.00% 1.28 1.82 100.00% 0.00 0.00 0.00%
01.03.05.01.02 LIMPIEZA DEL TERRENO MANUAL m2 1.28 3.94 5.04 0.00 0.00 0.00% 1.28 5.04 100.00% 1.28 5.04 100.00% 0.00 0.00 0.00%
01.03.05.02 MOVIMIENTO DE TIERRAS
01.03.05.02.01 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 0.90 127.93 115.14 0.00 0.00 0.00% 0.90 115.14 100.00% 0.90 115.14 100.00% 0.00 0.00 0.00%
01.03.05.02.02 REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL A PULSO m2 1.28 3.21 4.11 0.00 0.00 0.00% 1.28 4.11 100.00% 1.28 4.11 100.00% 0.00 0.00 0.00%
01.03.05.02.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 2.24 13.08 29.30 0.00 0.00 0.00% 2.24 29.30 100.00% 2.24 29.30 100.00% 0.00 0.00 0.00%
01.03.05.03 OBRAS DE CONCRETO
01.03.05.03.01 CONCRETO f'c=210 Kg/cm2 m3 1.01 457.73 462.31 0.00 0.00 0.00% 1.01 462.31 100.00% 1.01 462.31 100.00% 0.00 0.00 0.00%
01.03.05.03.02 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 33.71 4.38 147.65 0.00 0.00 0.00% 33.71 147.65 100.00% 33.71 147.65 100.00% 0.00 0.00 0.00%
01.03.05.03.03 ENCOFRADO Y DESENCOFRADO m2 16.96 39.88 676.36 0.00 0.00 0.00% 16.96 676.36 100.00% 16.96 676.36 100.00% 0.00 0.00 0.00%
01.03.05.03.04 PIEDRA CHANCADA DE 1/2" PARA SUMIDERO m3 0.02 44.68 0.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.02 0.89 100.00%
01.03.05.04 REVOQUES ENLUCIDOS
01.03.05.04.01 TARRAJEO DE EXTERIOR DE MUROS, e= 1 cm, 1:4 m2 5.12 24.94 127.69 0.00 0.00 0.00% 5.12 127.69 100.00% 5.12 127.69 100.00% 0.00 0.00 0.00%
01.03.05.04.02 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 1:2 , e=1.0 cm m2 8.16 26.49 216.16 0.00 0.00 0.00% 8.16 216.16 100.00% 8.16 216.16 100.00% 0.00 0.00 0.00%
01.03.05.05 PINTURAS
01.03.05.05.01 PINTURA ESMALTE EN EXTERIORES m2 5.28 12.43 65.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.28 65.63 100.00%
01.03.05.06 EQUIPAMIENTO
AVANCE FISICO
PRESUPUESTO SALDO
Partida DESCRIPCION ANTERIOR ACTUAL ACUMULADO
Unid Metrado Precio PARCIAL Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
01.03.05.06.01 TAPA SANITARIA METALICA DE 0.60 X 0.60 m CON LLAVE TIPO BUJIA und 2.00 268.94 537.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 537.88 100.00%
01.03.05.06.02 SUMINISTRO/INSTACAION DE ACCESORIOS DE CAJA DE VALVULA DE CONT glb 1.00 233.62 233.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 233.62 100.00%
01.03.06 CAMARA ROMPE PRESION TIPO - 7 (3 UND)
01.03.06.01 TRABAJOS PRELIMINARES
01.03.06.01.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 6.30 1.42 8.95 3.00 4.26 47.60% 3.30 4.69 52.40% 6.30 8.95 100.00% 0.00 0.00 0.00%
01.03.06.01.02 LIMPIEZA DEL TERRENO MANUAL m2 6.30 3.94 24.82 3.00 11.82 47.62% 3.30 13.00 52.38% 6.30 24.82 100.00% 0.00 0.00 0.00%
01.03.06.02 MOVIMIENTO DE TIERRAS
01.03.06.02.01 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 3.96 127.93 506.60 1.90 243.07 47.98% 2.06 263.54 52.02% 3.96 506.61 100.00% 0.00 -0.01 0.00%
01.03.06.02.02 REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL A PULSO m2 6.30 3.21 20.22 3.10 9.95 49.21% 3.20 10.27 50.79% 6.30 20.22 100.00% 0.00 0.00 0.00%
01.03.06.02.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 4.36 13.08 57.03 0.00 0.00 0.00% 4.36 57.03 100.00% 4.36 57.03 100.00% 0.00 0.00 0.00%
01.03.06.03 OBRAS DE CONCRETO
01.03.06.03.01 CONCRETO f'c=210 Kg/cm2 m3 2.44 457.73 1,116.86 0.00 0.00 0.00% 1.70 778.14 69.67% 1.70 778.14 69.67% 0.74 338.72 30.33%
01.03.06.03.02 ENCOFRADO Y DESENCOFRADO m2 22.68 39.88 904.48 0.00 0.00 0.00% 16.00 638.08 70.55% 16.00 638.08 70.55% 6.68 266.40 29.45%
01.03.06.03.03 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 90.72 4.38 397.35 0.00 0.00 0.00% 67.00 293.46 73.85% 67.00 293.46 73.85% 23.72 103.89 26.15%
01.03.06.04 REVOQUES ENLUCIDOS
01.03.06.04.01 TARRAJEO DE EXTERIOR DE MUROS, e= 1 cm, 1:4 m2 12.96 24.94 323.22 0.00 0.00 0.00% 9.00 224.46 69.44% 9.00 224.46 69.44% 3.96 98.76 30.56%
01.03.06.04.02 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 1:2 , e=1.0 cm m2 11.88 26.49 314.70 0.00 0.00 0.00% 9.00 238.41 75.76% 9.00 238.41 75.76% 2.88 76.29 24.24%
01.03.06.05 PINTURAS
01.03.06.05.01 PINTURA ESMALTE EN EXTERIORES m2 6.48 12.43 80.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.48 80.55 100.00%
01.03.06.06 ACCESORIOS SANITARIOS
01.03.06.06.01 ACCESORIOS PARA CRP -7 01 glb 1.00 232.54 232.54 0.00 0.00 0.00% 0.70 162.78 70.00% 0.70 162.78 70.00% 0.30 69.76 30.00%
01.03.06.06.02 TAPA SANITARIA METALICA DE 0.60 X 0.60 m CON LLAVE TIPO BUJIA und 3.00 206.50 619.50 0.00 0.00 0.00% 2.00 413.00 66.67% 2.00 413.00 66.67% 1.00 206.50 33.33%
01.03.06.06.03 TAPA SANITARIA METALICA DE 0.30x0.30 m CON LLAVE TIPO BUJIA und 3.00 103.62 310.86 0.00 0.00 0.00% 2.00 207.24 66.67% 2.00 207.24 66.67% 1.00 103.62 33.33%
01.03.06.06.04 ACCESORIOS PARA CRP -7 02 glb 1.00 430.75 430.75 0.00 0.00 0.00% 0.70 301.53 70.00% 0.70 301.53 70.00% 0.30 129.22 30.00%
01.03.06.06.05 ACCESORIOS PARA CRP -7 03 glb 1.00 233.04 233.04 0.00 0.00 0.00% 0.70 163.13 70.00% 0.70 163.13 70.00% 0.30 69.91 30.00%
01.03.07 CAMARA DE VALVULA DE PURGA (10 UND)
01.03.07.01 TRABAJOS PRELIMINARES
01.03.07.01.01 LIMPIEZA DEL TERRENO MANUAL m2 13.00 3.94 51.22 6.00 23.64 46.15% 0.00 0.00 0.00% 6.00 23.64 46.15% 7.00 27.58 53.85%
01.03.07.01.02 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 13.00 1.42 18.46 6.00 8.52 46.15% 0.00 0.00 0.00% 6.00 8.52 46.15% 7.00 9.94 53.85%
01.03.07.02 MOVIMIENTO DE TIERRAS
01.03.07.02.01 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 6.58 127.93 841.78 3.20 409.38 48.63% 0.00 0.00 0.00% 3.20 409.38 48.63% 3.38 432.40 51.37%
01.03.07.02.02 REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL A PULSO m2 10.50 3.21 33.71 5.20 16.69 49.51% 0.00 0.00 0.00% 5.20 16.69 49.51% 5.30 17.02 50.49%
01.03.07.02.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 5.88 13.08 76.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.88 76.91 100.00%
01.03.07.03 OBRAS DE CONCRETO
01.03.07.03.01 CONCRETO f´c = 140 kg/cm2 m3 0.36 311.48 112.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.36 112.13 100.00%
01.03.07.03.02 CONCRETO CICLOPEO f´c = 140 kg/cm2 +30% P.M. PARA EMBOQUILLADO m3 0.25 264.65 66.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.25 66.16 100.00%
01.03.07.03.03 CONCRETO f'c=210 Kg/cm2 m3 1.85 457.73 846.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.85 846.80 100.00%
01.03.07.03.04 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 168.55 4.38 738.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 168.55 738.25 100.00%
01.03.07.03.05 ENCOFRADO Y DESENCOFRADO m2 47.00 39.88 1,874.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 47.00 1,874.36 100.00%
01.03.07.03.06 GRAVA m3 0.08 109.35 8.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.08 8.75 100.00%
01.03.07.04 ACABADOS
01.03.07.04.01 TARRAJEO DE EXTERIOR DE MUROS, e= 1 cm, 1:4 m2 6.40 24.94 159.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.40 159.62 100.00%
01.03.07.04.02 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 1:2 , e=1.0 cm m2 8.40 26.49 222.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.40 222.52 100.00%
01.03.07.05 PINTURAS
01.03.07.05.01 PINTURA ESMALTE EN EXTERIORES m2 6.40 12.43 79.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.40 79.55 100.00%
01.03.07.06 ACCESORIOS SANITARIOS
01.03.07.06.01 TAPA SANITARIA DE ACERO METALICA DE 0.60 X 0.60 m CON LLAVE TIPO B und 10.00 207.10 2,071.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.00 2,071.00 100.00%
01.03.07.06.02 ACCESORIOS DE VALVULA DE PURGA D=1/2" glb 1.00 445.41 445.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 445.41 100.00%
01.04 UNIDADES BASICAS DE SANEAMIENTO (26 UND.)
01.04.01 MODULO DE UBS
01.04.01.01 MOVIMIENTO DE TIERRAS
01.04.01.01.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 143.52 1.42 203.80 0.00 0.00 0.00% 66.24 94.06 46.15% 66.24 94.06 46.15% 77.28 109.74 53.85%
01.04.01.01.02 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 24.44 127.93 3,126.61 0.00 0.00 0.00% 11.28 1,443.05 46.15% 11.28 1,443.05 46.15% 13.16 1,683.56 53.85%
AVANCE FISICO
PRESUPUESTO SALDO
Partida DESCRIPCION ANTERIOR ACTUAL ACUMULADO
Unid Metrado Precio PARCIAL Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
01.04.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 41.86 13.08 547.53 0.00 0.00 0.00% 19.32 252.71 46.15% 19.32 252.71 46.15% 22.54 294.82 53.85%
01.04.01.02 CONCRETO SIMPLE
01.04.01.02.01 CONCRETO CICLOPEO C:H 1:10 + 30% P.M. EN CIMIENTOS m3 26.26 215.31 5,654.04 0.00 0.00 0.00% 12.12 2,609.56 46.15% 12.12 2,609.56 46.15% 14.14 3,044.48 53.85%
01.04.01.02.02 CONCRETO CICLOPEO C:H 1:8 m3 10.40 297.41 3,093.06 0.00 0.00 0.00% 4.80 1,427.57 46.15% 4.80 1,427.57 46.15% 5.60 1,665.49 53.85%
01.04.01.02.03 ENCOFRADO Y DESENCOFRADO m2 152.88 39.88 6,096.85 0.00 0.00 0.00% 70.56 2,813.93 46.15% 70.56 2,813.93 46.15% 82.32 3,282.92 53.85%
01.04.01.03 CONCRETO ARMADO
01.04.01.03.01 CONCRETO f'c =175 Kg/cm2 m3 4.42 399.73 1,766.81 0.00 0.00 0.00% 0.48 191.87 10.86% 0.48 191.87 10.86% 3.94 1,574.94 89.14%
01.04.01.03.02 ENCOFRADO Y DESENCOFRADO m2 87.10 39.88 3,473.55 0.00 0.00 0.00% 11.88 473.77 13.64% 11.88 473.77 13.64% 75.22 2,999.78 86.36%
01.04.01.03.03 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 395.98 4.38 1,734.39 0.00 0.00 0.00% 171.00 748.98 43.18% 171.00 748.98 43.18% 224.98 985.41 56.82%
01.04.01.04 COBERTURAS
01.04.01.04.01 CORREAS DE MADERA DE 2" X2" m 239.20 9.75 2,332.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 239.20 2,332.20 100.00%
01.04.01.04.02 VIGAS DE MADERA DE 2" X 3" m 220.48 12.51 2,758.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 220.48 2,758.20 100.00%
01.04.01.04.03 LISTON DE MADERA 1" X 3" m 119.60 7.44 889.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 119.60 889.82 100.00%
01.04.01.04.04 COBERTURA CON TEJA ANDINA m2 145.91 62.29 9,088.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 145.91 9,088.73 100.00%
01.04.01.05 ALBAÑILERIA
01.04.01.05.01 MURO DE LADRILLO DE SOGA 9X12.5X23cm m2 226.20 65.71 14,863.60 0.00 0.00 0.00% 104.40 6,860.12 46.15% 104.40 6,860.12 46.15% 121.80 8,003.48 53.85%
01.04.01.06 REVOQUES ENLUCIDOS
01.04.01.06.01 TARRAJEO DE EXTERIOR DE MUROS, e= 1 cm, 1:4 m2 43.42 24.94 1,082.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 43.42 1,082.89 100.00%
01.04.01.06.02 TARRAJEO CON IMPERMEABILISANTES, 1:2 m2 159.12 47.25 7,518.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 159.12 7,518.42 100.00%
01.04.01.06.03 VESTITURA DE DERRAMES m 93.60 13.82 1,293.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 93.60 1,293.55 100.00%
01.04.01.06.04 ZOCALO DE CEMENTO PULIDO m2 82.16 35.35 2,904.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 82.16 2,904.36 100.00%
01.04.01.06.05 PINTURA ESMALTE m2 284.70 12.43 3,538.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 284.70 3,538.82 100.00%
01.04.01.06.06 BARNIZ EN MURO DE LADRILLO m2 309.14 14.81 4,578.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 309.14 4,578.36 100.00%
01.04.01.07 PISOS Y PAVIMENTOS
01.04.01.07.01 FALSO PISO DE CONCRETO C:H 1:10 E=3" m2 53.04 29.67 1,573.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 53.04 1,573.70 100.00%
01.04.01.07.02 PISOS DE CEMENTO PULIDO:H E=1" m2 53.04 15.00 795.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 53.04 795.60 100.00%
01.04.01.07.03 VEREDAS PISO DE CONCRETO C:H 1:10 H=10 CM m2 43.68 32.29 1,410.43 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 43.68 1,410.43 100.00%
01.04.01.07.04 ENCOFRADO Y DESENCOFRADO m2 9.62 39.88 383.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.62 383.65 100.00%
01.04.01.08 CARPINTERIA DE MADERA
01.04.01.08.01 VENTANA DE MADERA CON MALLA MOSQUITERO und 26.00 40.41 1,050.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.00 1,050.66 100.00%
01.04.01.09 CERRAJERIA
01.04.01.09.01 PUERTA METALICA DE 1.80x0.60 m und 26.00 346.70 9,014.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.00 9,014.20 100.00%
01.04.01.10 APARATOS SANITARIOS
01.04.01.10.01 SUMINISTRO Y COLOCACION DE INODORO LOSA BLANCA pza 26.00 174.20 4,529.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.00 4,529.20 100.00%
01.04.01.10.02 SUMINISTRO Y COLOCACION LAVATORIO DE LOSA BLANCA pza 26.00 152.45 3,963.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.00 3,963.70 100.00%
01.04.01.10.03 SUMINISTRO Y COLOCACION DE DUCHA Y ACCESORIOS pza 26.00 60.74 1,579.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.00 1,579.24 100.00%
01.04.01.10.04 SUMINISTRO Y COLOCACION DE LAVADERO PREFABRICADO pza 26.00 137.57 3,576.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.00 3,576.82 100.00%
01.04.01.11 SISTEMA DE AGUA FRIA
01.04.01.11.01 EXCAVACION DE ZANJA EN TERRENO NORMAL (AGUA) m 10.92 16.36 178.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.92 178.65 100.00%
01.04.01.11.02 REFINE, NIVELACION DE FONDOS PARA TUBERIA DE AGUA m2 36.40 7.32 266.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 36.40 266.45 100.00%
01.04.01.11.03 CAMA DE APOYO PARA TUBERIA DE AGUA E=10 CM m 91.00 2.98 271.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 91.00 271.18 100.00%
01.04.01.11.04 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 10.92 13.81 150.81 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.92 150.81 100.00%
01.04.01.11.06 TUBERIA DE PVC SAP CLASE - 10, D=1/2" X 5 M m 231.40 3.56 823.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 231.40 823.78 100.00%
01.04.01.11.07 PRUEBA HIDRAULICA EN RED DE AGUA m 231.40 7.77 1,797.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 231.40 1,797.98 100.00%
01.04.01.11.08 ACCESORIOS DE AGUA FRIA UBS glb 1.00 2,822.16 2,822.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 2,822.16 100.00%
01.04.01.11.09 DESINFECCION DE TUBERIAS m 231.40 1.48 342.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 231.40 342.47 100.00%
01.04.01.12 SISTEMA DE DESAGUE
01.04.01.12.01 SALIDA DE DESAGUE EN PVC DE 2" y 4" pto 104.00 22.60 2,350.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 104.00 2,350.40 100.00%
01.04.01.12.02 SUMINISTRO E INSTALACION DE TUBERIA PVC SAL 4" m 78.00 17.06 1,330.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 78.00 1,330.68 100.00%
01.04.01.12.03 SUMINISTRO E INSTALACION DE TUBERIA PVC SAL 2" m 78.00 16.87 1,315.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 78.00 1,315.86 100.00%
01.04.01.12.04 SUMINISTRO Y COLOCACION DE ACCESORIOS RED DE DESAGUE und 26.00 113.59 2,953.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.00 2,953.34 100.00%
01.04.01.13 INSTALACIONES ELECTRICAS
01.04.01.13.01 SALIDA DE INTERRUPTOR SIMPLE pto 26.00 26.64 692.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.00 692.64 100.00%
AVANCE FISICO
PRESUPUESTO SALDO
Partida DESCRIPCION ANTERIOR ACTUAL ACUMULADO
Unid Metrado Precio PARCIAL Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
01.04.01.13.02 SALIDA DE TECHO PARA CENTRO DE LUZ pto 26.00 32.28 839.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.00 839.28 100.00%
01.04.01.13.03 CABLE TW #14 AWG und 26.00 16.53 429.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.00 429.78 100.00%
01.04.02 SISTEMA DE TRATAMIENTOS UBS
01.04.02.01 MOVIMIENTO DE TIERRAS
01.04.02.01.01 DESBROCE Y LIMPIEZA DE TERRENO m2 55.12 3.28 180.79 11.02 36.15 20.00% 14.42 47.30 26.16% 25.44 83.45 46.16% 29.68 97.34 53.84%
01.04.02.01.02 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 55.12 1.42 78.27 11.02 15.65 19.99% 14.42 20.48 26.17% 25.44 36.13 46.16% 29.68 42.14 53.84%
01.04.02.01.03 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 105.82 127.93 13,537.55 0.00 0.00 0.00% 48.84 6,248.10 46.15% 48.84 6,248.10 46.15% 56.98 7,289.45 53.85%
01.04.02.01.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 60.58 11.08 671.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 60.58 671.23 100.00%
01.04.02.01.05 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 56.55 13.08 739.67 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 56.55 739.67 100.00%
01.04.02.02 CAJA DE REGISTRO Y POZO DE LODOS
01.04.02.02.01 CONCRETO f'c =175 Kg/cm2 m3 7.54 399.73 3,013.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.54 3,013.96 100.00%
01.04.02.02.02 TAPA DE CONCRETO F'C= 175 Kg/cm2, 0.5 M * 0.5 M und 26.00 88.82 2,309.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.00 2,309.32 100.00%
01.04.02.02.03 ENCOFRADO Y DESENCOFRADO m2 124.80 39.88 4,977.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 124.80 4,977.02 100.00%
01.04.02.02.04 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 229.06 4.38 1,003.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 229.06 1,003.28 100.00%
01.04.02.02.05 CAJA REGISTRADORA DE CONCRETO PREFABRICADO 0.30X0.30M INC/TAP und 52.00 59.04 3,070.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 52.00 3,070.08 100.00%
01.04.02.03 INSTALACIONES DE BIODIGESTOR Y ACCESORIOS
01.04.02.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC SAL 4" m 156.00 17.06 2,661.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 156.00 2,661.36 100.00%
01.04.02.03.02 SUMINISTRO E INSTALACION DE BIODIGESTOR DE 600 L Y ACCESORIOS und 26.00 801.60 20,841.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.00 20,841.60 100.00%
01.04.02.03.03 CONCRETO f'c =175 Kg/cm2 m3 3.86 399.73 1,542.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.86 1,542.96 100.00%
AVANCE FISICO
PRESUPUESTO SALDO
Partida DESCRIPCION ANTERIOR ACTUAL ACUMULADO
Unid Metrado Precio PARCIAL Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
01.04.02.03.04 TAPA METALICA DE 0.90x0.90m und 26.00 231.00 6,006.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.00 6,006.00 100.00%
01.04.03 POZO PERCOLADOR UBS
01.04.03.01 MOVIMIENTO DE TIERRAS
01.04.03.01.01 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 100.10 127.93 12,805.79 0.00 0.00 0.00% 46.20 5,910.37 46.15% 46.20 5,910.37 46.15% 53.90 6,895.42 53.85%
01.04.03.01.02 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 125.13 13.08 1,636.70 0.00 0.00 0.00% 57.75 755.37 46.15% 57.75 755.37 46.15% 67.38 881.33 53.85%
01.04.03.02 CONCRETO
01.04.03.02.01 CONCRETO f'c =175 Kg/cm2 m3 3.38 399.73 1,351.09 0.00 0.00 0.00% 1.56 623.58 46.15% 1.56 623.58 46.15% 1.82 727.51 53.85%
01.04.03.02.02 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 28.60 4.38 125.27 0.00 0.00 0.00% 13.20 57.82 46.16% 13.20 57.82 46.16% 15.40 67.45 53.84%
01.04.03.02.03 ENCOFRADO Y DESENCOFRADO m2 107.12 39.88 4,271.95 0.00 0.00 0.00% 49.44 1,971.67 46.15% 49.44 1,971.67 46.15% 57.68 2,300.28 53.85%
01.04.03.03 TAPAS
01.04.03.03.01 TAPA DE CONCRETO F'C= 175 Kg/cm2, 1.40M DIAMETRO und 26.00 240.51 6,253.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.00 6,253.26 100.00%
01.04.03.03.02 TAPA METALICA DE 0.40 X 0.40 m und 26.00 90.42 2,350.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.00 2,350.92 100.00%
01.04.03.04 ALBAÑILERIA
01.04.03.04.01 MURO DE SOGA DE LADRILLO KK CON JUNTAS ABIERTAS m2 93.06 51.47 4,789.80 0.00 0.00 0.00% 42.95 2,210.64 46.15% 42.95 2,210.64 46.15% 50.11 2,579.16 53.85%
01.04.03.05 INSTALACIONES SANITARIAS
01.04.03.05.01 ACCESORIOS POZO PERCOLADOR und 26.00 19.43 505.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.00 505.18 100.00%
01.04.03.06 FILTROS
01.04.03.06.01 GRAVA m3 40.82 109.35 4,463.67 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 40.82 4,463.67 100.00%
01.05 SISTEMA DE ALCANTARILLADO SANITARIO
01.05.01 REDES COLECTORES (L=1,176.35 m)
01.05.01.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m 1,176.35 1.42 1,670.42 423.60 601.51 36.01% 350.00 497.00 29.75% 773.60 1,098.51 65.76% 402.75 571.91 34.24%
01.05.01.02 EXCAVACION DE ZANJA EN TERRENO CONGLOMERADO ALCANTARILLADO m 1,087.50 110.10 119,733.75 252.00 27,745.20 23.17% 150.30 16,548.03 13.82% 402.30 44,293.23 36.99% 685.20 75,440.52 63.01%
01.05.01.03 EXCAVACION DE ZANJA EN TERRENO ROCOSO m 88.85 267.35 23,754.05 30.00 8,020.50 33.76% 0.00 0.00 0.00% 30.00 8,020.50 33.76% 58.85 15,733.55 66.24%
01.05.01.04 REFINE, NIVELACION INTERIOR Y COMPACTACION m2 705.81 4.85 3,423.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 705.81 3,423.18 100.00%
01.05.01.05 CAMA DE APOYO PARA TUBERIA DE AGUA E=10 CM m 1,176.35 2.98 3,505.52 0.00 0.00 0.00% 150.00 447.00 12.75% 150.00 447.00 12.75% 1,026.35 3,058.52 87.25%
01.05.01.06 SUMINISTRO E INSTALACIONES DE TUBERIA PVC-U-UF S-25, Ø=160 mm m 1,176.35 20.75 24,409.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,176.35 24,409.26 100.00%
01.05.01.07 PRUEBA HIDRAULICA DE TUBERIA INSTALADA-DESAGUE m 1,176.35 7.04 8,281.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,176.35 8,281.50 100.00%
01.05.01.08 RELLENO CON MATERIAL PROPIO m3 776.39 10.65 8,268.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 776.39 8,268.55 100.00%
01.05.01.09 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 117.51 13.81 1,622.81 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 117.51 1,622.81 100.00%
01.05.01.10 ELIMINACION DE MATERIAL HASTA 2 km m3 252.50 166.04 41,925.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 252.50 41,925.10 100.00%
01.05.01.11 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 100.56 13.08 1,315.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 100.56 1,315.32 100.00%
01.05.02 BUZONES (54 UND)
01.05.02.01 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 157.45 127.93 20,142.58 0.00 0.00 0.00% 58.32 7,460.88 37.04% 58.32 7,460.88 37.04% 99.13 12,681.70 62.96%
01.05.02.02 BUZONES D=1.20, H=1.20, TAPA C°A° und 54.00 1,820.08 98,284.32 0.00 0.00 0.00% 20.00 36,401.60 37.04% 20.00 36,401.60 37.04% 34.00 61,882.72 62.96%
01.05.02.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 58.32 13.08 762.83 0.00 0.00 0.00% 23.33 305.16 40.00% 23.33 305.16 40.00% 34.99 457.67 60.00%
01.05.02.04 ELIMINACION DE MATERIAL HASTA 2 km m3 99.14 166.04 16,461.21 0.00 0.00 0.00% 34.99 5,809.74 35.29% 34.99 5,809.74 35.29% 64.15 10,651.47 64.71%
01.05.03 CONEXIONES PRE DOMICILIARIAS DE DESAGUE (64 UND)
01.05.03.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 164.61 1.42 233.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 164.61 233.75 100.00%
01.05.03.02 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 148.15 127.93 18,952.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 148.15 18,952.83 100.00%
01.05.03.03 REFINE, NIVELACION INTERIOR Y COMPACTACION m2 164.61 4.85 798.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 164.61 798.36 100.00%
01.05.03.04 CAMA DE APOYO PARA TUBERIA DE AGUA E=10 CM m 411.52 2.98 1,226.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 411.52 1,226.33 100.00%
01.05.03.05 SUMINISTRO E INSTALACIONES DE TUBERIA PVC-U-UF S-25, Ø=110 mm m 411.52 14.78 6,082.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 411.52 6,082.27 100.00%
01.05.03.06 CONEXIONES DOMICILIARIAS PARA DESAGUE glb 64.00 176.74 11,311.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 64.00 11,311.36 100.00%
01.05.03.07 PRUEBA HIDRAULICA PARA DESAGUE m 411.52 1.16 477.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 411.52 477.36 100.00%
01.05.03.08 RELLENO CON MATERIAL PROPIO m3 98.76 10.65 1,051.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 98.76 1,051.79 100.00%
01.05.03.09 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 49.38 13.81 681.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 49.38 681.94 100.00%
01.05.03.10 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 10.50 13.08 137.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.50 137.34 100.00%
01.06 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES
01.06.01 CAMARA DE REJAS
01.06.01.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 1.37 1.42 1.95 1.37 1.95 100.00% 0.00 0.00 0.00% 1.37 1.95 100.00% 0.00 0.00 0.00%
01.06.01.02 EXCAVACIONES TERRENO NORMAL A PULSO HASTA 1.00 M PROF. m3 0.82 49.08 40.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.82 40.25 100.00%
01.06.01.03 SOLADO DE CONCRETO F'C=140 Kg/cm2, e=4" m2 1.37 94.31 129.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.37 129.20 100.00%
01.06.01.04 ENCOFRADO Y DESENCOFRADO m2 10.26 39.88 409.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.26 409.17 100.00%
AVANCE FISICO
PRESUPUESTO SALDO
Partida DESCRIPCION ANTERIOR ACTUAL ACUMULADO
Unid Metrado Precio PARCIAL Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
01.06.01.05 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 87.39 4.38 382.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 87.39 382.77 100.00%
01.06.01.06 CONCRETO f'c=210 Kg/cm2 m3 0.56 457.73 256.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.56 256.33 100.00%
01.06.01.07 TARRAJEO CON IMPERMEABILISANTES, 1:2 m2 7.48 47.25 353.43 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.48 353.43 100.00%
01.06.01.08 TARRAJEO EN EXTERIORES m2 3.00 45.63 136.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 136.89 100.00%
01.06.01.09 PINTURA LATEX m2 3.00 4.18 12.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 12.54 100.00%
AVANCE FISICO
PRESUPUESTO SALDO
Partida DESCRIPCION ANTERIOR ACTUAL ACUMULADO
Unid Metrado Precio PARCIAL Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
01.06.01.10 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 1.03 13.08 13.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.03 13.47 100.00%
01.06.01.11 CERRAJERIA METALICA glb 1.00 239.94 239.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 239.94 100.00%
01.06.02 CAJA DE CONCRETO
01.06.02.01 CAJA DE CONCRETO VALVULA E INSPECCION und 4.00 252.47 1,009.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 1,009.88 100.00%
01.06.02.02 CAJA DE CONCRETO DISTRIBUCION und 1.00 850.76 850.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 850.76 100.00%
01.06.03 TANQUE SEPTICO
01.06.03.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 41.16 1.42 58.45 41.16 58.45 100.00% 0.00 0.00 0.00% 41.16 58.45 100.00% 0.00 0.00 0.00%
01.06.03.02 EXCAVACIONES TERRENO NORMAL A PULSO HASTA 1.00 M PROF. m3 104.96 49.08 5,151.44 32.00 1,570.56 30.49% 72.96 3,580.88 69.51% 104.96 5,151.44 100.00% 0.00 0.00 0.00%
01.06.03.03 SOLADO DE CONCRETO F'C=140 Kg/cm2, e=4" m2 41.16 94.31 3,881.80 0.00 0.00 0.00% 41.16 3,881.80 100.00% 41.16 3,881.80 100.00% 0.00 0.00 0.00%
01.06.03.04 ENCOFRADO Y DESENCOFRADO m2 196.03 39.88 7,817.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 196.03 7,817.68 100.00%
01.06.03.05 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 1,016.51 4.38 4,452.31 0.00 0.00 0.00% 350.00 1,533.00 34.43% 350.00 1,533.00 34.43% 666.51 2,919.31 65.57%
01.06.03.06 CONCRETO f'c=210 Kg/cm2 m3 49.06 457.73 22,456.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 49.06 22,456.23 100.00%
01.06.03.07 TARRAJEO CON IMPERMEABILISANTES, 1:2 m2 80.33 47.25 3,795.59 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 80.33 3,795.59 100.00%
01.06.03.08 TARRAJEO EN EXTERIORES m2 67.83 45.63 3,095.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 67.83 3,095.08 100.00%
01.06.03.09 PINTURA LATEX m2 67.83 4.18 283.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 67.83 283.53 100.00%
01.06.03.10 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 131.20 13.08 1,716.10 0.00 0.00 0.00% 91.20 1,192.90 69.51% 91.20 1,192.90 69.51% 40.00 523.20 30.49%
01.06.03.11 ACCESORIOS DE TANQUE SEPTICO glb 1.00 1,665.00 1,665.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,665.00 100.00%
01.06.04 POZOS DE PERCOLACION
01.06.04.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 27.88 1.42 39.59 0.00 0.00 0.00% 27.88 39.59 100.00% 27.88 39.59 100.00% 0.00 0.00 0.00%
01.06.04.02 EXCAVACIONES TERRENO NORMAL A PULSO HASTA 1.00 M PROF. m3 103.16 49.08 5,063.09 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 103.16 5,063.09 100.00%
01.06.04.03 ENCOFRADO Y DESENCOFRADO m2 68.44 39.88 2,729.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 68.44 2,729.39 100.00%
01.06.04.04 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 932.03 4.38 4,082.29 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 932.03 4,082.29 100.00%
01.06.04.05 CONCRETO f'c=210 Kg/cm2 m3 12.42 457.73 5,685.01 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.42 5,685.01 100.00%
01.06.04.06 GRAVA m3 24.34 109.35 2,661.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 24.34 2,661.58 100.00%
01.06.04.07 MURO DE SOGA DE LADRILLO KK CON JUNTAS ABIERTAS m2 93.06 51.47 4,789.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 93.06 4,789.80 100.00%
01.06.04.08 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 128.96 13.08 1,686.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 128.96 1,686.80 100.00%
01.06.04.09 ACCESORIOS DE POZO DE PERCOLACION glb 1.00 43.39 43.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 43.39 100.00%
01.06.05 LECHO DE SECADO
01.06.05.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 58.52 1.42 83.10 0.00 0.00 0.00% 58.52 83.10 100.00% 58.52 83.10 100.00% 0.00 0.00 0.00%
01.06.05.02 EXCAVACIONES TERRENO NORMAL A PULSO HASTA 1.00 M PROF. m3 87.78 49.08 4,308.24 0.00 0.00 0.00% 87.78 4,308.24 100.00% 87.78 4,308.24 100.00% 0.00 0.00 0.00%
01.06.05.03 SOLADO DE CONCRETO F'C=140 Kg/cm2, e=4" m2 58.52 94.31 5,519.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 58.52 5,519.02 100.00%
01.06.05.04 ENCOFRADO Y DESENCOFRADO m2 150.10 39.88 5,985.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 150.10 5,985.99 100.00%
01.06.05.05 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 588.75 4.38 2,578.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 588.75 2,578.73 100.00%
01.06.05.06 CONCRETO f'c=210 Kg/cm2 m3 24.70 457.73 11,305.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 24.70 11,305.93 100.00%
01.06.05.07 GRAVA m3 3.57 109.35 390.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.57 390.38 100.00%
01.06.05.08 MURO DE SOGA DE LADRILLO KIN KONG CON CON CEMENTO - ARENA m2 4.28 74.34 318.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.28 318.18 100.00%
01.06.05.09 ARENA DE GRUESA m3 1.37 113.58 155.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.37 155.60 100.00%
01.06.05.10 DADO DE CONCRETO und 8.00 127.69 1,021.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 1,021.52 100.00%
01.06.05.11 SOPORTE PARA TECHO glb 1.00 5,374.64 5,374.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 5,374.64 100.00%
01.06.05.12 COBERTURA CON TEJA ANDINA m2 148.11 62.29 9,225.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 148.11 9,225.77 100.00%
01.06.05.13 TARRAJEO EN EXTERIORES m2 45.90 45.63 2,094.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 45.90 2,094.42 100.00%
01.06.05.14 PINTURA LATEX m2 45.90 4.18 191.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 45.90 191.86 100.00%
01.06.05.15 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 109.73 13.08 1,435.27 0.00 0.00 0.00% 109.73 1,435.27 100.00% 109.73 1,435.27 100.00% 0.00 0.00 0.00%
01.06.05.16 ACCESORIOS DE LECHO DE SECADO glb 1.00 375.68 375.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 375.68 100.00%
01.06.06 TUBERIA PARA LA CONEXION PLANTA DE TRATAMIENTO
01.06.06.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 61.20 1.42 86.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 61.20 86.90 100.00%
01.06.06.02 EXCAVACIONES TERRENO NORMAL A PULSO HASTA 1.00 M PROF. m3 85.68 49.08 4,205.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 85.68 4,205.17 100.00%
01.06.06.03 SUMINISTRO E INSTALACIONES DE TUBERIA PVC-U-UF S-25, Ø=160 mm m 6.28 20.75 130.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.28 130.31 100.00%
01.06.06.04 SUMINISTRO E INSTALACIONES DE TUBERIA PVC-U-UF S-25, Ø=110 mm m 95.72 14.78 1,414.74 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 95.72 1,414.74 100.00%
01.06.06.05 RELLENO CON MATERIAL PROPIO m3 88.86 10.65 946.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 88.86 946.36 100.00%
01.06.06.06 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 6.12 13.08 80.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.12 80.05 100.00%
01.06.07 CERCO PERIMETRICO DE PLANTA DE TRATAMIENTO
01.06.07.01 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 0.97 127.93 124.09 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.97 124.09 100.00%
AVANCE FISICO
PRESUPUESTO SALDO
Partida DESCRIPCION ANTERIOR ACTUAL ACUMULADO
Unid Metrado Precio PARCIAL Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
01.06.07.02 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 1.21 13.08 15.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.21 15.83 100.00%
01.06.07.03 CONCRETO f´c = 140 kg/cm2 PARA DADOS m3 0.97 275.42 267.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.97 267.16 100.00%
01.06.07.04 POSTE DE F° G° INCL. COLOCACION und 27.00 110.00 2,970.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.00 2,970.00 100.00%
01.06.07.05 CERCO PERIMETRICO CON MALLA OLIMPICA INC/PINTURA - COLOCACION m 66.15 98.00 6,482.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 66.15 6,482.70 100.00%
01.06.07.06 PUERTA GALVANIZADA CON MALLA OLIMPICA INC/ PINTUTA - COLOCACION und 1.00 159.46 159.46 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 159.46 100.00%
01.06.07.07 ALAMBRE DE PUAS m 67.00 3.56 238.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 67.00 238.52 100.00%
01.07 PLAN DE EDUCACION SANITARIA
01.07.01 PLAN DE EDUCACION SANITARIA glb 1.00 5,000.00 5,000.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 5,000.00 100.00%
01.08 CAPACITACIONES
01.08.01 GASTOS DE CAPACITACION Y SERVICIO DE SANEAMIENTO - JASS glb 1.00 3,000.00 3,000.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 3,000.00 100.00%
01.08.02 MODULO DE OPERACION Y MANTENIMIENTO glb 1.00 4,000.00 4,000.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 4,000.00 100.00%
01.09 MITIGACION DE IMPACTO AMBIENTAL
01.09.01 MITIGACION DEL IMPACTO AMBIENTAL glb 1.00 8,000.00 8,000.00 0.20 1,600.00 20.00% 0.30 2,400.00 30.00% 0.50 4,000.00 50.00% 0.50 4,000.00 50.00%
01.09.02 REACONDICIONAMIENTO DE BOTADEROS m2 200.00 14.20 2,840.00 20.00 284.00 10.00% 20.00 284.00 10.00% 40.00 568.00 20.00% 160.00 2,272.00 80.00%
01.10 PRUEBAS DE CALIDAD
01.10.01 DISEÑO DE MEZCLA und 2.00 250.00 500.00 0.00 0.00 0.00% 2.00 500.00 100.00% 2.00 500.00 100.00% 0.00 0.00 0.00%
01.10.02 ROTURA DE PROBETAS und 20.00 25.00 500.00 0.00 0.00 0.00% 8.00 200.00 40.00% 8.00 200.00 40.00% 12.00 300.00 60.00%
01.10.03 TEST DE PERCOLACION und 10.00 450.00 4,500.00 0.00 0.00 0.00% 5.00 2,250.00 50.00% 5.00 2,250.00 50.00% 5.00 2,250.00 50.00%
01.11 FLETE
01.11.01 FLETE TERRESTRE glb 1.00 25,300.00 25,300.00 0.60 15,180.00 60.00% 0.15 3,795.00 15.00% 0.75 18,975.00 75.00% 0.25 6,325.00 25.00%
01.11.02 FLETE RURAL glb 1.00 95,340.68 95,340.68 0.60 57,204.41 60.00% 0.15 14,301.10 15.00% 0.75 71,505.51 75.00% 0.25 23,835.17 25.00%

COSTO DIRECTO S/. 1,211,458.17 199,906.92 195,558.14 395,465.06 815,993.11


GASTOS GENERALES 11.00% S/. 133,260.40 21,989.76 21,511.40 43,501.16 89,759.24
UTILDAD 8.00% 96,916.65 15,992.55 15,644.65 31,637.20 65,279.45
SUBTOTAL S/. 1,441,635.22 237,889.23 232,714.19 470,603.42 971,031.80
I.G.V. 18.00% S/. 259,494.34 42,820.06 41,888.55 84,708.61 174,785.73
TOTAL PRESUPUESTO S/. 1,701,129.56 280,709.29 274,602.74 555,312.03 1,145,817.53

AVANCE DE OBRA PARCIAL 100.00% 16.50% 16.14% 32.64% 0.00%


AVANCE DE OBRA ACUMULADO 100.00% 16.50% 32.64% 32.64% 67.36%
CALENDARIO DE AVANCE DE OBRA VALORIZADO PROGRAMADO VS EJECUTADO

Presupuesto MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASICO DEL CASERIO DE SANTA CATALINA , DISTRITO DE HUARAZ, PROVINCIA DE HUARAZ - ANCASH PLAZO 135 D.C.
Cliente MUNICIPALIDAD PROVINCIAL DE HUARAZ INICIO 1/20/2020
Lugar ANCASH - HUARAZ - HUARAZ TERMINO 6/2/2020
Contratista CONSORCIO RIMAC

MES ENERO DEL 2020 MES DE FEBRERO DEL 2020


PROGRAMADO EJECUTADO PROGRAMADO EJECUTADO
Item Descripción Und. Metrado Precio (S/.) Parcial (S/.)
20 - 31 20 - 31 DIFERENCIA 01 - 29 01 - 29 DIFERENCIA
PARCIAL % PARCIAL % PARCIAL % PARCIAL %
01 INSTALACION DEL SISTEMA DE SANEAMIENTO BASICO EN EL CASERIO DE SANTA CATALINA 1,211,458.17 90,583.62 199,906.92 203,556.53 195,558.14
01.01 OBRAS PRELIMINARES 9,365.46
01.01.01 ALMACEN Y OFICINA mes 4.00 900.00 3,600.00 600.00 16.67% 900.00 25.00% 8.33% 700.00 19.44% 900.00 25.00% 5.56%
01.01.02 CARTEL DE IDENTIFICACION DE OBRA DE 3.60 X 2.4 M glb 1.00 516.32 516.32 516.32 100.00% 516.32 100.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS glb 1.00 5,249.14 5,249.14 2,624.57 50.00% 2,624.57 50.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.02 SEGURIDDAD Y SALUD 10,847.50
01.02.01 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 1,800.00 1,800.00 1,800.00 100.00% 1,800.00 100.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.02.02 EQUIPOS DE PROTECCION PERSONAL glb 1.00 3,947.50 3,947.50 3,947.50 100.00% 3,947.50 100.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.02.03 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD EN LA OBR glb 1.00 3,100.00 3,100.00 3,100.00 100.00% 3,100.00 100.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.02.04 IMPLEMENTACION PARA LAS FUNCIONES DEL INGENIERO DE SEGURIDAD glb 1.00 2,000.00 2,000.00 2,000.00 100.00% 2,000.00 100.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03 SISTEMA DE AGUA POTABLE 255,099.48
01.03.01 CAPTACION TIPO C-1 ( 2 UNIDADES) 19,712.82
01.03.01.01 OBRAS PRELIMINARES 1,291.66
01.03.01.01.01 DESBROCE Y LIMPIEZA DE TERRENO m2 8.00 3.28 26.24 13.00 49.54% 26.24 100.00% 50.46% 13.24 50.46% 0.00 0.00% -50.46%
01.03.01.01.02 DEMOLICION DE ESTRUCTURAS DE CONCRETO m3 1.32 742.10 979.57 489.78 50.00% 489.79 50.00% 0.00% 489.79 50.00% 489.78 50.00% 0.00%
01.03.01.01.03 ELIMINACION DE MATERIAL DE DEMOLICIONES HASTA 2 km m3 1.72 159.59 274.49 137.25 50.00% 137.25 50.00% 0.00% 137.24 50.00% 137.24 50.00% 0.00%
01.03.01.01.04 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 8.00 1.42 11.36 5.68 50.00% 11.36 100.00% 50.00% 5.68 50.00% 0.00 0.00% -50.00%
01.03.01.02 MOVIMIENTO DE TIERRAS 853.04
01.03.01.02.01 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 4.81 127.93 615.34 307.67 50.00% 307.03 49.90% -0.10% 307.67 50.00% 308.31 50.10% 0.10%
01.03.01.02.02 REFINE, NIVELACION INTERIOR Y COMPACTACION m2 6.00 4.85 29.10 14.55 50.00% 14.55 50.00% 0.00% 14.55 50.00% 14.55 50.00% 0.00%
01.03.01.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO m3 0.91 11.08 10.08 5.04 50.00% 5.10 50.60% 0.60% 5.04 50.00% 4.98 49.40% -0.60%
01.03.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 4.67 13.08 61.08 30.54 50.00% 30.48 49.90% -0.10% 30.54 50.00% 30.60 50.10% 0.10%
01.03.01.02.05 MATERIAL GRANULAR FILTRANTE EN CAPTACION, GRAVA ARENA m3 1.37 100.32 137.44 68.72 50.00% 70.22 51.09% 1.09% 68.72 50.00% 67.22 48.91% -1.09%
01.03.01.03 OBRAS DE CONCRETO SIMPLE 176.02
01.03.01.03.01 CONCRETO f´c = 140 kg/cm2 m3 0.25 311.48 77.87 77.87 100.00% 40.49 52.00% -48.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.01.03.02 CONCRETO CICLOPEO C:H 1:8 m3 0.33 297.41 98.15 98.15 100.00% 47.59 48.49% -51.51% 0.00 0.00% 0.00 0.00% 0.00%
01.03.01.04 OBRAS DE CONCRETO ARMADO 4,098.66
01.03.01.04.01 CONCRETO f'c=210 Kg/cm2 m3 5.07 457.73 2,320.69 1,160.35 50.00% 1,190.10 51.28% 1.28% 1,160.34 50.00% 0.00 0.00% -50.00%
01.03.01.04.02 ENCOFRADO Y DESENCOFRADO m2 32.27 39.88 1,286.93 643.46 50.00% 642.87 49.95% -0.05% 643.47 50.00% 0.00 0.00% -50.00%
01.03.01.04.03 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 112.11 4.38 491.04 245.52 50.00% 247.47 50.40% 0.40% 245.52 50.00% 0.00 0.00% -50.00%
01.03.01.05 REVOQUES ENLUCIDOS 594.00
01.03.01.05.01 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 1:2 , e=1.0 cm m2 11.86 26.49 314.17 0.00 0.00% 0.00 0.00% 0.00% 314.17 100.00% 153.64 48.90% -51.10%
01.03.01.05.02 TARRAJEO DE EXTERIOR DE MUROS, e= 1 cm, 1:4 m2 11.22 24.94 279.83 0.00 0.00% 0.00 0.00% 0.00% 279.83 100.00% 139.66 49.91% -50.09%
01.03.01.06 ACCESORIOS SANITARIOS 1,412.33
01.03.01.06.01 TAPA SANITARIA METALICA DE 0.60 X 0.60 m CON LLAVE TIPO BUJIA und 4.00 206.50 826.00 0.00 0.00% 0.00 0.00% 0.00% 826.00 100.00% 413.00 50.00% -50.00%
01.03.01.06.02 ACCESORIOS EN CAPTACION und 2.00 166.32 332.64 0.00 0.00% 166.32 50.00% 50.00% 332.64 100.00% 0.00 0.00% -100.00%
01.03.01.06.03 GRAVA m3 2.32 109.35 253.69 0.00 0.00% 0.00 0.00% 0.00% 253.69 100.00% 126.85 50.00% -50.00%
01.03.01.07 PINTURAS 160.60
01.03.01.07.01 PINTURA ESMALTE EN EXTERIORES m2 12.92 12.43 160.60 0.00 0.00% 0.00 0.00% 0.00% 160.60 100.00% 0.00 0.00% -100.00%
01.03.01.08 CERCO PERIMETRICO DE CAPTACION Y RESERVORIO 11,126.51
01.03.01.08.01 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 1.08 127.93 138.16 0.00 0.00% 0.00 0.00% 0.00% 138.16 100.00% 0.00 0.00% -100.00%
01.03.01.08.02 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 1.35 13.08 17.66 0.00 0.00% 0.00 0.00% 0.00% 17.66 100.00% 0.00 0.00% -100.00%
01.03.01.08.03 CONCRETO f´c = 140 kg/cm2 PARA DADOS m3 1.08 275.42 297.45 0.00 0.00% 0.00 0.00% 0.00% 297.45 100.00% 0.00 0.00% -100.00%
01.03.01.08.04 POSTE DE F° G° INCL. COLOCACION und 30.00 110.00 3,300.00 0.00 0.00% 0.00 0.00% 0.00% 3,300.00 100.00% 0.00 0.00% -100.00%
01.03.01.08.05 CERCO PERIMETRICO CON MALLA OLIMPICA INC/PINTURA - COLOCACION m 69.40 98.00 6,801.20 0.00 0.00% 0.00 0.00% 0.00% 6,801.20 100.00% 0.00 0.00% -100.00%
01.03.01.08.06 PUERTA GALVANIZADA CON MALLA OLIMPICA INC/ PINTUTA - COLOCACION und 2.00 159.46 318.92 0.00 0.00% 0.00 0.00% 0.00% 318.92 100.00% 0.00 0.00% -100.00%
01.03.01.08.07 ALAMBRE DE PUAS m 71.10 3.56 253.12 0.00 0.00% 0.00 0.00% 0.00% 158.73 62.71% 0.00 0.00% -62.71%
01.03.02 LINEAS DE CONDUCCION, ADUCCION Y RED (L=2,243.53 m) 148,793.26
01.03.02.01 TRABAJOS PRELIMINARES 22,749.39
01.03.02.01.01 ROCE Y ELIMINACION DE ARBUSTOS PEQUEÑOS m 2,243.53 7.85 17,611.71 17,611.71 100.00% 10,048.00 57.05% -42.95% 0.00 0.00% 3,536.66 20.08% 20.08%
01.03.02.01.02 TRAZO, NIVELES Y REPLANTEO m2 2,243.53 2.29 5,137.68 2,250.00 43.79% 2,061.00 40.12% -3.68% 2,887.68 56.21% 1,031.71 20.08% -36.12%
01.03.02.02 MOVIMIENTO DE TIERRAS 93,465.31
01.03.02.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL (AGUA) m 404.73 16.36 6,621.38 1,500.00 22.65% 3,272.00 49.42% 26.76% 5,121.38 77.35% 1,835.43 27.72% -49.63%
01.03.02.02.02 EXCAVACION DE ZANJA EN TERRENO CONGLOMERADO (AGUA) m 1,690.15 31.27 52,850.99 1,500.00 2.84% 20,466.22 38.72% 35.89% 6,472.04 12.25% 7,926.63 15.00% 2.75%
01.03.02.02.03 EXCAVACION DE ZANJA EN TERRENO ROCOSO (AGUA) m 148.65 84.56 12,569.84 0.00 0.00% 3,847.48 30.61% 30.61% 0.00 0.00% 5,848.17 46.53% 46.53%
01.03.02.02.04 REFINE, NIVELACION DE FONDOS PARA TUBERIA DE AGUA m2 897.41 7.32 6,569.04 750.00 11.42% 2,488.80 37.89% 26.47% 2,700.30 41.11% 2,578.18 39.25% -1.86%
MES ENERO DEL 2020 MES DE FEBRERO DEL 2020
PROGRAMADO EJECUTADO PROGRAMADO EJECUTADO
Item Descripción Und. Metrado Precio (S/.) Parcial (S/.)
20 - 31 20 - 31 DIFERENCIA 01 - 29 01 - 29 DIFERENCIA
PARCIAL % PARCIAL % PARCIAL % PARCIAL %
01.03.02.02.05 CAMA DE APOYO PARA TUBERIA DE AGUA E=10 CM m 2,243.53 2.98 6,685.72 750.00 11.22% 2,519.59 37.69% 26.47% 2,355.20 35.23% 2,637.39 39.45% 4.22%
01.03.02.02.06 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 269.22 13.81 3,717.93 0.00 0.00% 1,657.20 44.57% 44.57% 250.24 6.73% 1,210.58 32.56% 25.83%
01.03.02.02.07 RELLENO COMPACTADO CON MATERIAL PROPIO m3 269.22 11.08 2,982.96 200.77 6.73% 1,329.60 44.57% 37.84% 1,111.44 37.26% 971.27 32.56% -4.70%
01.03.02.02.08 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 112.19 13.08 1,467.45 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.02.03 TENDIDO DE TUBERIAS 32,578.56
01.03.02.03.01 TUBERIA DE PVC SAP CLASE - 10, D=1 1/2" X 5 M m 357.55 7.30 2,610.12 560.00 21.45% 1,357.80 52.02% 30.57% 1,250.00 47.89% 660.65 25.31% -22.58%
01.03.02.03.02 TUBERIA DE PVC SAP CLASE - 10, D=1" X 5 M m 1,414.60 4.64 6,563.74 300.00 4.57% 3,060.08 46.62% 42.05% 2,850.00 43.42% 1,951.12 29.73% -13.69%
01.03.02.03.03 TUBERIA DE PVC SAP CLASE - 10, D=3/4" X 5 M m 471.38 4.09 1,927.94 0.00 0.00% 0.00 0.00% 0.00% 554.28 28.75% 0.00 0.00% -28.75%
01.03.02.03.04 PRUEBA HIDRAULICA EN RED DE AGUA m 2,243.53 7.77 17,432.23 0.00 0.00% 6,569.54 37.69% 37.69% 0.00 0.00% 0.00 0.00% 0.00%
01.03.02.03.05 ACCESORIOS DE AGUA FRIA glb 1.00 724.11 724.11 0.00 0.00% 362.06 50.00% 50.00% 0.00 0.00% 144.82 20.00% 20.00%
01.03.02.03.06 DESINFECCION DE TUBERIAS m 2,243.53 1.48 3,320.42 0.00 0.00% 1,251.34 37.69% 37.69% 0.00 0.00% 0.00 0.00% 0.00%
01.03.03 CONEXIONES PRE DOMICILIARIAS (90 UND) 41,537.65
01.03.03.01 TRABAJOS PRELIMINARES 494.64
01.03.03.01.01 TRAZO, NIVELES Y REPLANTEO m2 216.00 2.29 494.64 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.03.02 MOVIMIENTO DE TIERRAS 22,042.15
01.03.03.02.01 EXCAVACION DE ZANJA EN TERRENO CONGLOMERADO (AGUA) m 540.00 31.27 16,885.80 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.03.02.02 REFINE, NIVELACION DE FONDOS PARA TUBERIA DE AGUA m2 216.00 7.32 1,581.12 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.03.02.03 CAMA DE APOYO PARA TUBERIA DE AGUA E=10 CM m 540.00 2.98 1,609.20 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.03.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 64.80 11.08 717.98 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.03.02.05 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 64.80 13.81 894.89 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.03.02.06 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 27.00 13.08 353.16 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.03.03 SUMINISTRO E INSTALACION DE TUBERIAS 19,000.86
01.03.03.03.01 CONEXIONES DOMICILIARIAS DE 1 1/2" A 1/2" und 26.00 88.78 2,308.28 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.03.03.02 CONEXIONES DOMICILIARIAS DE 1" A 1/2" und 48.00 84.08 4,035.84 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.03.03.03 CONEXIONES DOMICILIARIAS DE 3/4" A 1/2" und 16.00 78.19 1,251.04 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.03.03.04 CAJA DE VALVULA DOMICILIARIA und 90.00 71.23 6,410.70 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.03.03.05 PRUEBA HIDRAULICA EN RED DE AGUA m 540.00 7.77 4,195.80 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.03.03.06 DESINFECCION DE TUBERIAS m 540.00 1.48 799.20 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.04 RESERVORIO DE 5 M3 (2 UNIDADES) 29,204.05
01.03.04.01 OBRAS PRELIMINARES 7,455.51
01.03.04.01.01 DESBROCE Y LIMPIEZA DE TERRENO m2 14.58 3.28 47.82 23.90 49.98% 47.82 100.00% 50.02% 23.92 50.02% 0.00 0.00% -50.02%
01.03.04.01.02 DEMOLICION DE ESTRUCTURAS DE CONCRETO m3 7.78 742.10 5,773.54 2,886.77 50.00% 2,894.19 50.13% 0.13% 2,886.77 50.00% 2,879.35 49.87% -0.13%
01.03.04.01.03 ELIMINACION DE MATERIAL DE DEMOLICIONES HASTA 2 km m3 10.11 159.59 1,613.45 806.73 50.00% 0.00 0.00% -50.00% 806.72 50.00% 1,613.45 100.00% 50.00%
01.03.04.01.04 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 14.58 1.42 20.70 10.35 50.00% 20.70 100.00% 50.00% 10.35 50.00% 0.00 0.00% -50.00%
01.03.04.02 MOVIMIENTO DE TIERRAS 1,766.02
01.03.04.02.01 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 11.66 127.93 1,491.66 745.83 50.00% 741.99 49.74% -0.26% 745.83 50.00% 749.67 50.26% 0.26%
01.03.04.02.02 REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL A PULSO m2 14.58 3.21 46.80 23.40 50.00% 23.43 50.06% 0.06% 23.40 50.00% 23.37 49.94% -0.06%
01.03.04.02.03 RELLENO CON MATERIAL PROPIO m3 3.46 10.65 36.85 18.42 49.99% 0.00 0.00% -49.99% 18.43 50.01% 36.85 100.00% 49.99%
01.03.04.02.04 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 14.58 13.08 190.71 95.35 50.00% 0.00 0.00% -50.00% 95.36 50.00% 190.71 100.00% 50.00%
01.03.04.03 OBRAS DE CONCRETO SIMPLE 217.68
01.03.04.03.01 CONCRETO SOLADO MEZCLA 1:10 CEMENTO-HORMIGON e=0.05 mts. m2 14.58 14.93 217.68 108.84 50.00% 108.99 50.07% 0.07% 108.84 50.00% 108.69 49.93% -0.07%
01.03.04.04 OBRAS DE CONCRETO ARMADO 8,783.49
01.03.04.04.01 CONCRETO f'c=210 Kg/cm2 m3 8.87 457.73 4,060.07 2,030.04 50.00% 2,014.01 49.61% -0.39% 2,030.03 50.00% 2,046.06 50.39% 0.39%
01.03.04.04.02 ENCOFRADO Y DESENCOFRADO m2 70.91 39.88 2,827.89 1,413.94 50.00% 1,413.75 49.99% -0.01% 1,413.95 50.00% 1,414.14 50.01% 0.01%
01.03.04.04.03 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 432.77 4.38 1,895.53 947.76 50.00% 946.08 49.91% -0.09% 947.77 50.00% 949.45 50.09% 0.09%
01.03.04.05 REVOQUES ENLUCIDOS 2,475.58
01.03.04.05.01 TARRAJEO DE EXTERIOR DE MUROS, e= 1 cm, 1:4 m2 57.54 24.94 1,435.05 0.00 0.00% 0.00 0.00% 0.00% 1,435.05 100.00% 1,435.05 100.00% 0.00%
01.03.04.05.02 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 1:2 , e=1.0 cm m2 39.28 26.49 1,040.53 0.00 0.00% 0.00 0.00% 0.00% 1,040.53 100.00% 1,040.53 100.00% 0.00%
01.03.04.06 JUNTAS DE DILATACION 89.61
01.03.04.06.01 JUNTA DE WATER STOP DE 6" ESPESOR 5 MM m 17.20 5.21 89.61 89.61 100.00% 44.29 49.43% -50.57% 0.00 0.00% 45.32 50.57% 50.57%
01.03.04.07 ACCESORIOS SANITARIOS 7,737.48
01.03.04.07.01 TAPA SANITARIA METALICA DE 0.60 X 0.60 m CON LLAVE TIPO BUJIA und 4.00 268.94 1,075.76 0.00 0.00% 0.00 0.00% 0.00% 1,075.76 100.00% 1,075.76 100.00% 0.00%
01.03.04.07.02 ESCALERA DE TUBO F° G° MOVIL SEGUN DISEÑO und 2.00 130.00 260.00 0.00 0.00% 0.00 0.00% 0.00% 260.00 100.00% 260.00 100.00% 0.00%
01.03.04.07.03 ACCESORIOS EN RESERVORIO R-01 glb 1.00 500.86 500.86 0.00 0.00% 0.00 0.00% 0.00% 500.86 100.00% 500.86 100.00% 0.00%
01.03.04.07.04 ACCESORIOS EN RESERVORIO R-02 glb 1.00 500.86 500.86 0.00 0.00% 0.00 0.00% 0.00% 500.86 100.00% 500.86 100.00% 0.00%
01.03.04.07.05 SISTEMA DE CLORACION POR GOTEO und 2.00 2,700.00 5,400.00 0.00 0.00% 0.00 0.00% 0.00% 5,400.00 100.00% 0.00 0.00% -100.00%
01.03.04.08 PINTURAS 678.68
01.03.04.08.01 PINTURA ESMALTE EN EXTERIORES m2 54.60 12.43 678.68 0.00 0.00% 0.00 0.00% 0.00% 678.68 100.00% 0.00 0.00% -100.00%
01.03.05 VALVULA DE CONTROL (2 UNIDADES) 2,623.60
01.03.05.01 TRABAJOS PRELIMINARES 6.86
01.03.05.01.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 1.28 1.42 1.82 0.00 0.00% 0.00 0.00% 0.00% 1.82 100.00% 1.82 100.00% 0.00%
01.03.05.01.02 LIMPIEZA DEL TERRENO MANUAL m2 1.28 3.94 5.04 0.00 0.00% 0.00 0.00% 0.00% 5.04 100.00% 5.04 100.00% 0.00%
01.03.05.02 MOVIMIENTO DE TIERRAS 148.55
01.03.05.02.01 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 0.90 127.93 115.14 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 115.14 100.00% 100.00%
MES ENERO DEL 2020 MES DE FEBRERO DEL 2020
PROGRAMADO EJECUTADO PROGRAMADO EJECUTADO
Item Descripción Und. Metrado Precio (S/.) Parcial (S/.)
20 - 31 20 - 31 DIFERENCIA 01 - 29 01 - 29 DIFERENCIA
PARCIAL % PARCIAL % PARCIAL % PARCIAL %
01.03.05.02.02 REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL A PULSO m2 1.28 3.21 4.11 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 4.11 100.00% 100.00%
01.03.05.02.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 2.24 13.08 29.30 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 29.30 100.00% 100.00%
01.03.05.03 OBRAS DE CONCRETO 1,287.21
01.03.05.03.01 CONCRETO f'c=210 Kg/cm2 m3 1.01 457.73 462.31 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 462.31 100.00% 100.00%
01.03.05.03.02 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 33.71 4.38 147.65 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 147.65 100.00% 100.00%
01.03.05.03.03 ENCOFRADO Y DESENCOFRADO m2 16.96 39.88 676.36 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 676.36 100.00% 100.00%
01.03.05.03.04 PIEDRA CHANCADA DE 1/2" PARA SUMIDERO m3 0.02 44.68 0.89 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.05.04 REVOQUES ENLUCIDOS 343.85
01.03.05.04.01 TARRAJEO DE EXTERIOR DE MUROS, e= 1 cm, 1:4 m2 5.12 24.94 127.69 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 127.69 100.00% 100.00%
01.03.05.04.02 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 1:2 , e=1.0 cm m2 8.16 26.49 216.16 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 216.16 100.00% 100.00%
01.03.05.05 PINTURAS 65.63
01.03.05.05.01 PINTURA ESMALTE EN EXTERIORES m2 5.28 12.43 65.63 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.05.06 EQUIPAMIENTO 771.50
01.03.05.06.01 TAPA SANITARIA METALICA DE 0.60 X 0.60 m CON LLAVE TIPO BUJIA und 2.00 268.94 537.88 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.05.06.02 SUMINISTRO/INSTACAION DE ACCESORIOS DE CAJA DE VALVULA DE CONTRO D=1" glb 1.00 233.62 233.62 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.06 CAMARA ROMPE PRESION TIPO - 7 (3 UND) 5,581.47
01.03.06.01 TRABAJOS PRELIMINARES 33.77
01.03.06.01.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 6.30 1.42 8.95 0.00 0.00% 4.26 47.60% 47.60% 8.95 100.00% 4.69 52.40% -47.60%
01.03.06.01.02 LIMPIEZA DEL TERRENO MANUAL m2 6.30 3.94 24.82 0.00 0.00% 11.82 47.62% 47.62% 24.82 100.00% 13.00 52.38% -47.62%
01.03.06.02 MOVIMIENTO DE TIERRAS 583.85
01.03.06.02.01 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 3.96 127.93 506.60 0.00 0.00% 243.07 47.98% 47.98% 506.60 100.00% 263.54 52.02% -47.98%
01.03.06.02.02 REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL A PULSO m2 6.30 3.21 20.22 0.00 0.00% 9.95 49.21% 49.21% 20.22 100.00% 10.27 50.79% -49.21%
01.03.06.02.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 4.36 13.08 57.03 0.00 0.00% 0.00 0.00% 0.00% 57.03 100.00% 57.03 100.00% 0.00%
01.03.06.03 OBRAS DE CONCRETO 2,418.69
01.03.06.03.01 CONCRETO f'c=210 Kg/cm2 m3 2.44 457.73 1,116.86 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 778.14 69.67% 69.67%
01.03.06.03.02 ENCOFRADO Y DESENCOFRADO m2 22.68 39.88 904.48 0.00 0.00% 0.00 0.00% 0.00% 507.82 56.15% 638.08 70.55% 14.40%
01.03.06.03.03 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 90.72 4.38 397.35 0.00 0.00% 0.00 0.00% 0.00% 397.35 100.00% 293.46 73.85% -26.15%
01.03.06.04 REVOQUES ENLUCIDOS 637.92
01.03.06.04.01 TARRAJEO DE EXTERIOR DE MUROS, e= 1 cm, 1:4 m2 12.96 24.94 323.22 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 224.46 69.44% 69.44%
01.03.06.04.02 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 1:2 , e=1.0 cm m2 11.88 26.49 314.70 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 238.41 75.76% 75.76%
01.03.06.05 PINTURAS 80.55
01.03.06.05.01 PINTURA ESMALTE EN EXTERIORES m2 6.48 12.43 80.55 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.06.06 ACCESORIOS SANITARIOS 1,826.69
01.03.06.06.01 ACCESORIOS PARA CRP -7 01 glb 1.00 232.54 232.54 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 162.78 70.00% 70.00%
01.03.06.06.02 TAPA SANITARIA METALICA DE 0.60 X 0.60 m CON LLAVE TIPO BUJIA und 3.00 206.50 619.50 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 413.00 66.67% 66.67%
01.03.06.06.03 TAPA SANITARIA METALICA DE 0.30x0.30 m CON LLAVE TIPO BUJIA und 3.00 103.62 310.86 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 207.24 66.67% 66.67%
01.03.06.06.04 ACCESORIOS PARA CRP -7 02 glb 1.00 430.75 430.75 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 301.53 70.00% 70.00%
01.03.06.06.05 ACCESORIOS PARA CRP -7 03 glb 1.00 233.04 233.04 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 163.13 70.00% 70.00%
01.03.07 CAMARA DE VALVULA DE PURGA (10 UND) 7,646.63
01.03.07.01 TRABAJOS PRELIMINARES 69.68
01.03.07.01.01 LIMPIEZA DEL TERRENO MANUAL m2 13.00 3.94 51.22 0.00 0.00% 23.64 46.15% 46.15% 0.00 0.00% 0.00 0.00% 0.00%
01.03.07.01.02 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 13.00 1.42 18.46 0.00 0.00% 8.52 46.15% 46.15% 0.00 0.00% 0.00 0.00% 0.00%
01.03.07.02 MOVIMIENTO DE TIERRAS 952.40
01.03.07.02.01 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 6.58 127.93 841.78 0.00 0.00% 409.38 48.63% 48.63% 0.00 0.00% 0.00 0.00% 0.00%
01.03.07.02.02 REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL A PULSO m2 10.50 3.21 33.71 0.00 0.00% 16.69 49.51% 49.51% 0.00 0.00% 0.00 0.00% 0.00%
01.03.07.02.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 5.88 13.08 76.91 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.07.03 OBRAS DE CONCRETO 3,646.45
01.03.07.03.01 CONCRETO f´c = 140 kg/cm2 m3 0.36 311.48 112.13 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.07.03.02 CONCRETO CICLOPEO f´c = 140 kg/cm2 +30% P.M. PARA EMBOQUILLADO m3 0.25 264.65 66.16 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.07.03.03 CONCRETO f'c=210 Kg/cm2 m3 1.85 457.73 846.80 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.07.03.04 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 168.55 4.38 738.25 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.07.03.05 ENCOFRADO Y DESENCOFRADO m2 47.00 39.88 1,874.36 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.07.03.06 GRAVA m3 0.08 109.35 8.75 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.07.04 ACABADOS 382.14
01.03.07.04.01 TARRAJEO DE EXTERIOR DE MUROS, e= 1 cm, 1:4 m2 6.40 24.94 159.62 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.07.04.02 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 1:2 , e=1.0 cm m2 8.40 26.49 222.52 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.07.05 PINTURAS 79.55
01.03.07.05.01 PINTURA ESMALTE EN EXTERIORES m2 6.40 12.43 79.55 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.07.06 ACCESORIOS SANITARIOS 2,516.41
01.03.07.06.01 TAPA SANITARIA DE ACERO METALICA DE 0.60 X 0.60 m CON LLAVE TIPO BUJIA und 10.00 207.10 2,071.00 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.03.07.06.02 ACCESORIOS DE VALVULA DE PURGA D=1/2" glb 1.00 445.41 445.41 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04 UNIDADES BASICAS DE SANEAMIENTO (26 UND.) 220,174.97
01.04.01 MODULO DE UBS 120,988.25
01.04.01.01 MOVIMIENTO DE TIERRAS 3,877.94
MES ENERO DEL 2020 MES DE FEBRERO DEL 2020
PROGRAMADO EJECUTADO PROGRAMADO EJECUTADO
Item Descripción Und. Metrado Precio (S/.) Parcial (S/.)
20 - 31 20 - 31 DIFERENCIA 01 - 29 01 - 29 DIFERENCIA
PARCIAL % PARCIAL % PARCIAL % PARCIAL %
01.04.01.01.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 143.52 1.42 203.80 203.80 100.00% 0.00 0.00% -100.00% 0.00 0.00% 94.06 46.15% 46.15%
01.04.01.01.02 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 24.44 127.93 3,126.61 964.04 30.83% 0.00 0.00% -30.83% 2,162.57 69.17% 1,443.05 46.15% -23.01%
01.04.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 41.86 13.08 547.53 0.00 0.00% 0.00 0.00% 0.00% 547.53 100.00% 252.71 46.15% -53.85%
01.04.01.02 CONCRETO SIMPLE 14,843.95
01.04.01.02.01 CONCRETO CICLOPEO C:H 1:10 + 30% P.M. EN CIMIENTOS m3 26.26 215.31 5,654.04 0.00 0.00% 0.00 0.00% 0.00% 5,654.04 100.00% 2,609.56 46.15% -53.85%
01.04.01.02.02 CONCRETO CICLOPEO C:H 1:8 m3 10.40 297.41 3,093.06 0.00 0.00% 0.00 0.00% 0.00% 3,093.06 100.00% 1,427.57 46.15% -53.85%
01.04.01.02.03 ENCOFRADO Y DESENCOFRADO m2 152.88 39.88 6,096.85 0.00 0.00% 0.00 0.00% 0.00% 6,096.85 100.00% 2,813.93 46.15% -53.85%
01.04.01.03 CONCRETO ARMADO 6,974.75
01.04.01.03.01 CONCRETO f'c =175 Kg/cm2 m3 4.42 399.73 1,766.81 0.00 0.00% 0.00 0.00% 0.00% 1,766.81 100.00% 191.87 10.86% -89.14%
01.04.01.03.02 ENCOFRADO Y DESENCOFRADO m2 87.10 39.88 3,473.55 0.00 0.00% 0.00 0.00% 0.00% 3,473.55 100.00% 473.77 13.64% -86.36%
01.04.01.03.03 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 395.98 4.38 1,734.39 0.00 0.00% 0.00 0.00% 0.00% 1,734.39 100.00% 748.98 43.18% -56.82%
01.04.01.04 COBERTURAS 15,068.95
01.04.01.04.01 CORREAS DE MADERA DE 2" X2" m 239.20 9.75 2,332.20 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.04.02 VIGAS DE MADERA DE 2" X 3" m 220.48 12.51 2,758.20 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.04.03 LISTON DE MADERA 1" X 3" m 119.60 7.44 889.82 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.04.04 COBERTURA CON TEJA ANDINA m2 145.91 62.29 9,088.73 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.05 ALBAÑILERIA 14,863.60
01.04.01.05.01 MURO DE LADRILLO DE SOGA 9X12.5X23cm m2 226.20 65.71 14,863.60 0.00 0.00% 0.00 0.00% 0.00% 5,480.95 36.87% 6,860.12 46.15% 9.28%
01.04.01.06 REVOQUES ENLUCIDOS 20,916.40
01.04.01.06.01 TARRAJEO DE EXTERIOR DE MUROS, e= 1 cm, 1:4 m2 43.42 24.94 1,082.89 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.06.02 TARRAJEO CON IMPERMEABILISANTES, 1:2 m2 159.12 47.25 7,518.42 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.06.03 VESTITURA DE DERRAMES m 93.60 13.82 1,293.55 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.06.04 ZOCALO DE CEMENTO PULIDO m2 82.16 35.35 2,904.36 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.06.05 PINTURA ESMALTE m2 284.70 12.43 3,538.82 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.06.06 BARNIZ EN MURO DE LADRILLO m2 309.14 14.81 4,578.36 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.07 PISOS Y PAVIMENTOS 4,163.38
01.04.01.07.01 FALSO PISO DE CONCRETO C:H 1:10 E=3" m2 53.04 29.67 1,573.70 0.00 0.00% 0.00 0.00% 0.00% 622.92 39.58% 0.00 0.00% -39.58%
01.04.01.07.02 PISOS DE CEMENTO PULIDO:H E=1" m2 53.04 15.00 795.60 0.00 0.00% 0.00 0.00% 0.00% 49.73 6.25% 0.00 0.00% -6.25%
01.04.01.07.03 VEREDAS PISO DE CONCRETO C:H 1:10 H=10 CM m2 43.68 32.29 1,410.43 0.00 0.00% 0.00 0.00% 0.00% 88.15 6.25% 0.00 0.00% -6.25%
01.04.01.07.04 ENCOFRADO Y DESENCOFRADO m2 9.62 39.88 383.65 0.00 0.00% 0.00 0.00% 0.00% 38.37 10.00% 0.00 0.00% -10.00%
01.04.01.08 CARPINTERIA DE MADERA 1,050.66
01.04.01.08.01 VENTANA DE MADERA CON MALLA MOSQUITERO und 26.00 40.41 1,050.66 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.09 CERRAJERIA 9,014.20
01.04.01.09.01 PUERTA METALICA DE 1.80x0.60 m und 26.00 346.70 9,014.20 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.10 APARATOS SANITARIOS 13,648.96
01.04.01.10.01 SUMINISTRO Y COLOCACION DE INODORO LOSA BLANCA pza 26.00 174.20 4,529.20 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.10.02 SUMINISTRO Y COLOCACION LAVATORIO DE LOSA BLANCA pza 26.00 152.45 3,963.70 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.10.03 SUMINISTRO Y COLOCACION DE DUCHA Y ACCESORIOS pza 26.00 60.74 1,579.24 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.10.04 SUMINISTRO Y COLOCACION DE LAVADERO PREFABRICADO pza 26.00 137.57 3,576.82 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.11 SISTEMA DE AGUA FRIA 6,653.48
01.04.01.11.01 EXCAVACION DE ZANJA EN TERRENO NORMAL (AGUA) m 10.92 16.36 178.65 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.11.02 REFINE, NIVELACION DE FONDOS PARA TUBERIA DE AGUA m2 36.40 7.32 266.45 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.11.03 CAMA DE APOYO PARA TUBERIA DE AGUA E=10 CM m 91.00 2.98 271.18 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.11.04 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 10.92 13.81 150.81 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.11.06 TUBERIA DE PVC SAP CLASE - 10, D=1/2" X 5 M m 231.40 3.56 823.78 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.11.07 PRUEBA HIDRAULICA EN RED DE AGUA m 231.40 7.77 1,797.98 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.11.08 ACCESORIOS DE AGUA FRIA UBS glb 1.00 2,822.16 2,822.16 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.11.09 DESINFECCION DE TUBERIAS m 231.40 1.48 342.47 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.12 SISTEMA DE DESAGUE 7,950.28
01.04.01.12.01 SALIDA DE DESAGUE EN PVC DE 2" y 4" pto 104.00 22.60 2,350.40 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.12.02 SUMINISTRO E INSTALACION DE TUBERIA PVC SAL 4" m 78.00 17.06 1,330.68 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.12.03 SUMINISTRO E INSTALACION DE TUBERIA PVC SAL 2" m 78.00 16.87 1,315.86 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.12.04 SUMINISTRO Y COLOCACION DE ACCESORIOS RED DE DESAGUE und 26.00 113.59 2,953.34 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.13 INSTALACIONES ELECTRICAS 1,961.70
01.04.01.13.01 SALIDA DE INTERRUPTOR SIMPLE pto 26.00 26.64 692.64 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.13.02 SALIDA DE TECHO PARA CENTRO DE LUZ pto 26.00 32.28 839.28 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.01.13.03 CABLE TW #14 AWG und 26.00 16.53 429.78 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.02 SISTEMA DE TRATAMIENTOS UBS 60,633.09
01.04.02.01 MOVIMIENTO DE TIERRAS 15,207.51
01.04.02.01.01 DESBROCE Y LIMPIEZA DE TERRENO m2 55.12 3.28 180.79 0.00 0.00% 36.15 20.00% 20.00% 180.79 100.00% 47.30 26.16% -73.84%
01.04.02.01.02 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 55.12 1.42 78.27 0.00 0.00% 15.65 19.99% 19.99% 78.27 100.00% 20.48 26.17% -73.83%
01.04.02.01.03 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 105.82 127.93 13,537.55 0.00 0.00% 0.00 0.00% 0.00% 13,537.55 100.00% 6,248.10 46.15% -53.85%
01.04.02.01.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 60.58 11.08 671.23 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.02.01.05 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 56.55 13.08 739.67 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
MES ENERO DEL 2020 MES DE FEBRERO DEL 2020
PROGRAMADO EJECUTADO PROGRAMADO EJECUTADO
Item Descripción Und. Metrado Precio (S/.) Parcial (S/.)
20 - 31 20 - 31 DIFERENCIA 01 - 29 01 - 29 DIFERENCIA
PARCIAL % PARCIAL % PARCIAL % PARCIAL %
01.04.02.02 CAJA DE REGISTRO Y POZO DE LODOS 14,373.66
01.04.02.02.01 CONCRETO f'c =175 Kg/cm2 m3 7.54 399.73 3,013.96 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.02.02.02 TAPA DE CONCRETO F'C= 175 Kg/cm2, 0.5 M * 0.5 M und 26.00 88.82 2,309.32 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.02.02.03 ENCOFRADO Y DESENCOFRADO m2 124.80 39.88 4,977.02 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.02.02.04 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 229.06 4.38 1,003.28 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.02.02.05 CAJA REGISTRADORA DE CONCRETO PREFABRICADO 0.30X0.30M INC/TAPA und 52.00 59.04 3,070.08 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.02.03 INSTALACIONES DE BIODIGESTOR Y ACCESORIOS 31,051.92
01.04.02.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC SAL 4" m 156.00 17.06 2,661.36 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.02.03.02 SUMINISTRO E INSTALACION DE BIODIGESTOR DE 600 L Y ACCESORIOS und 26.00 801.60 20,841.60 0.00 0.00% 0.00 0.00% 0.00% 9,899.76 47.50% 0.00 0.00% -47.50%
01.04.02.03.03 CONCRETO f'c =175 Kg/cm2 m3 3.86 399.73 1,542.96 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.02.03.04 TAPA METALICA DE 0.90x0.90m und 26.00 231.00 6,006.00 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.03 POZO PERCOLADOR UBS 38,553.63
01.04.03.01 MOVIMIENTO DE TIERRAS 14,442.49
01.04.03.01.01 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 100.10 127.93 12,805.79 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 5,910.37 46.15% 46.15%
01.04.03.01.02 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 125.13 13.08 1,636.70 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 755.37 46.15% 46.15%
01.04.03.02 CONCRETO 5,748.31
01.04.03.02.01 CONCRETO f'c =175 Kg/cm2 m3 3.38 399.73 1,351.09 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 623.58 46.15% 46.15%
01.04.03.02.02 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 28.60 4.38 125.27 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 57.82 46.16% 46.16%
01.04.03.02.03 ENCOFRADO Y DESENCOFRADO m2 107.12 39.88 4,271.95 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 1,971.67 46.15% 46.15%
01.04.03.03 TAPAS 8,604.18
01.04.03.03.01 TAPA DE CONCRETO F'C= 175 Kg/cm2, 1.40M DIAMETRO und 26.00 240.51 6,253.26 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.03.03.02 TAPA METALICA DE 0.40 X 0.40 m und 26.00 90.42 2,350.92 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.03.04 ALBAÑILERIA 4,789.80
01.04.03.04.01 MURO DE SOGA DE LADRILLO KK CON JUNTAS ABIERTAS m2 93.06 51.47 4,789.80 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 2,210.64 46.15% 46.15%
01.04.03.05 INSTALACIONES SANITARIAS 505.18
01.04.03.05.01 ACCESORIOS POZO PERCOLADOR und 26.00 19.43 505.18 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.04.03.06 FILTROS 4,463.67
01.04.03.06.01 GRAVA m3 40.82 109.35 4,463.67 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.05 SISTEMA DE ALCANTARILLADO SANITARIO 414,513.73
01.05.01 REDES COLECTORES (L=1,176.35 m) 237,909.46
01.05.01.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 1,176.35 1.42 1,670.42 0.00 0.00% 601.51 36.01% 36.01% 1,670.42 100.00% 497.00 29.75% -70.25%
01.05.01.02 EXCAVACION DE ZANJA EN TERRENO CONGLOMERADO ALCANTARILLADO m 1,087.50 110.10 119,733.75 0.00 0.00% 27,745.20 23.17% 23.17% 28,317.80 23.65% 16,548.03 13.82% -9.83%
01.05.01.03 EXCAVACION DE ZANJA EN TERRENO ROCOSO m 88.85 267.35 23,754.05 0.00 0.00% 8,020.50 33.76% 33.76% 2,672.33 11.25% 0.00 0.00% -11.25%
01.05.01.04 REFINE, NIVELACION INTERIOR Y COMPACTACION m2 705.81 4.85 3,423.18 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.05.01.05 CAMA DE APOYO PARA TUBERIA DE AGUA E=10 CM m 1,176.35 2.98 3,505.52 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 447.00 12.75% 12.75%
01.05.01.06 SUMINISTRO E INSTALACIONES DE TUBERIA PVC-U-UF S-25, Ø=160 mm m 1,176.35 20.75 24,409.26 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.05.01.07 PRUEBA HIDRAULICA DE TUBERIA INSTALADA-DESAGUE m 1,176.35 7.04 8,281.50 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.05.01.08 RELLENO CON MATERIAL PROPIO m3 776.39 10.65 8,268.55 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.05.01.09 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 117.51 13.81 1,622.81 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.05.01.10 ELIMINACION DE MATERIAL HASTA 2 km m3 252.50 166.04 41,925.10 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.05.01.11 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 100.56 13.08 1,315.32 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.05.02 BUZONES (54 UND) 135,650.94
01.05.02.01 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 157.45 127.93 20,142.58 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 7,460.88 37.04% 37.04%
01.05.02.02 BUZONES D=1.20, H=1.20, TAPA C°A° und 54.00 1,820.08 98,284.32 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 36,401.60 37.04% 37.04%
01.05.02.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 58.32 13.08 762.83 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 305.16 40.00% 40.00%
01.05.02.04 ELIMINACION DE MATERIAL HASTA 2 km m3 99.14 166.04 16,461.21 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 5,809.74 35.29% 35.29%
01.05.03 CONEXIONES PRE DOMICILIARIAS DE DESAGUE (64 UND) 40,953.33
01.05.03.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 164.61 1.42 233.75 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.05.03.02 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 148.15 127.93 18,952.83 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.05.03.03 REFINE, NIVELACION INTERIOR Y COMPACTACION m2 164.61 4.85 798.36 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.05.03.04 CAMA DE APOYO PARA TUBERIA DE AGUA E=10 CM m 411.52 2.98 1,226.33 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.05.03.05 SUMINISTRO E INSTALACIONES DE TUBERIA PVC-U-UF S-25, Ø=110 mm m 411.52 14.78 6,082.27 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.05.03.06 CONEXIONES DOMICILIARIAS PARA DESAGUE glb 64.00 176.74 11,311.36 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.05.03.07 PRUEBA HIDRAULICA PARA DESAGUE m 411.52 1.16 477.36 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.05.03.08 RELLENO CON MATERIAL PROPIO m3 98.76 10.65 1,051.79 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.05.03.09 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 49.38 13.81 681.94 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.05.03.10 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 10.50 13.08 137.34 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES 152,476.35
01.06.01 CAMARA DE REJAS 1,975.94
01.06.01.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 1.37 1.42 1.95 0.00 0.00% 1.95 100.00% 100.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.01.02 EXCAVACIONES TERRENO NORMAL A PULSO HASTA 1.00 M PROF. m3 0.82 49.08 40.25 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.01.03 SOLADO DE CONCRETO F'C=140 Kg/cm2, e=4" m2 1.37 94.31 129.20 0.00 0.00% 0.00 0.00% 0.00% 129.20 100.00% 0.00 0.00% -100.00%
01.06.01.04 ENCOFRADO Y DESENCOFRADO m2 10.26 39.88 409.17 0.00 0.00% 0.00 0.00% 0.00% 409.17 100.00% 0.00 0.00% -100.00%
01.06.01.05 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 87.39 4.38 382.77 0.00 0.00% 0.00 0.00% 0.00% 382.77 100.00% 0.00 0.00% -100.00%
MES ENERO DEL 2020 MES DE FEBRERO DEL 2020
PROGRAMADO EJECUTADO PROGRAMADO EJECUTADO
Item Descripción Und. Metrado Precio (S/.) Parcial (S/.)
20 - 31 20 - 31 DIFERENCIA 01 - 29 01 - 29 DIFERENCIA
PARCIAL % PARCIAL % PARCIAL % PARCIAL %
01.06.01.06 CONCRETO f'c=210 Kg/cm2 m3 0.56 457.73 256.33 0.00 0.00% 0.00 0.00% 0.00% 256.33 100.00% 0.00 0.00% -100.00%
01.06.01.07 TARRAJEO CON IMPERMEABILISANTES, 1:2 m2 7.48 47.25 353.43 0.00 0.00% 0.00 0.00% 0.00% 353.43 100.00% 0.00 0.00% -100.00%
01.06.01.08 TARRAJEO EN EXTERIORES m2 3.00 45.63 136.89 0.00 0.00% 0.00 0.00% 0.00% 51.05 37.29% 0.00 0.00% -37.29%
01.06.01.09 PINTURA LATEX m2 3.00 4.18 12.54 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.01.10 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 1.03 13.08 13.47 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.01.11 CERRAJERIA METALICA glb 1.00 239.94 239.94 0.00 0.00% 0.00 0.00% 0.00% 239.94 100.00% 0.00 0.00% -100.00%
01.06.02 CAJA DE CONCRETO 1,860.64
01.06.02.01 CAJA DE CONCRETO VALVULA E INSPECCION und 4.00 252.47 1,009.88 0.00 0.00% 0.00 0.00% 0.00% 1,009.88 100.00% 0.00 0.00% -100.00%
01.06.02.02 CAJA DE CONCRETO DISTRIBUCION und 1.00 850.76 850.76 0.00 0.00% 0.00 0.00% 0.00% 850.76 100.00% 0.00 0.00% -100.00%
01.06.03 TANQUE SEPTICO 54,373.21
01.06.03.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 41.16 1.42 58.45 0.00 0.00% 58.45 100.00% 100.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.03.02 EXCAVACIONES TERRENO NORMAL A PULSO HASTA 1.00 M PROF. m3 104.96 49.08 5,151.44 0.00 0.00% 1,570.56 30.49% 30.49% 0.00 0.00% 3,580.88 69.51% 69.51%
01.06.03.03 SOLADO DE CONCRETO F'C=140 Kg/cm2, e=4" m2 41.16 94.31 3,881.80 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 3,881.80 100.00% 100.00%
01.06.03.04 ENCOFRADO Y DESENCOFRADO m2 196.03 39.88 7,817.68 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.03.05 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 1,016.51 4.38 4,452.31 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 1,533.00 34.43% 34.43%
01.06.03.06 CONCRETO f'c=210 Kg/cm2 m3 49.06 457.73 22,456.23 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
MES ENERO DEL 2020 MES DE FEBRERO DEL 2020
PROGRAMADO EJECUTADO PROGRAMADO EJECUTADO
Item Descripción Und. Metrado Precio (S/.) Parcial (S/.)
20 - 31 20 - 31 DIFERENCIA 01 - 29 01 - 29 DIFERENCIA
PARCIAL % PARCIAL % PARCIAL % PARCIAL %
01.06.03.07 TARRAJEO CON IMPERMEABILISANTES, 1:2 m2 80.33 47.25 3,795.59 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.03.08 TARRAJEO EN EXTERIORES m2 67.83 45.63 3,095.08 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.03.09 PINTURA LATEX m2 67.83 4.18 283.53 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.03.10 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 131.20 13.08 1,716.10 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 1,192.90 69.51% 69.51%
01.06.03.11 ACCESORIOS DE TANQUE SEPTICO glb 1.00 1,665.00 1,665.00 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.04 POZOS DE PERCOLACION 26,780.94
01.06.04.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 27.88 1.42 39.59 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 39.59 100.00% 100.00%
01.06.04.02 EXCAVACIONES TERRENO NORMAL A PULSO HASTA 1.00 M PROF. m3 103.16 49.08 5,063.09 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.04.03 ENCOFRADO Y DESENCOFRADO m2 68.44 39.88 2,729.39 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.04.04 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 932.03 4.38 4,082.29 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.04.05 CONCRETO f'c=210 Kg/cm2 m3 12.42 457.73 5,685.01 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.04.06 GRAVA m3 24.34 109.35 2,661.58 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.04.07 MURO DE SOGA DE LADRILLO KK CON JUNTAS ABIERTAS m2 93.06 51.47 4,789.80 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.04.08 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 128.96 13.08 1,686.80 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.04.09 ACCESORIOS DE POZO DE PERCOLACION glb 1.00 43.39 43.39 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.05 LECHO DE SECADO 50,364.33
01.06.05.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 58.52 1.42 83.10 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 83.10 100.00% 100.00%
01.06.05.02 EXCAVACIONES TERRENO NORMAL A PULSO HASTA 1.00 M PROF. m3 87.78 49.08 4,308.24 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 4,308.24 100.00% 100.00%
01.06.05.03 SOLADO DE CONCRETO F'C=140 Kg/cm2, e=4" m2 58.52 94.31 5,519.02 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.05.04 ENCOFRADO Y DESENCOFRADO m2 150.10 39.88 5,985.99 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.05.05 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 588.75 4.38 2,578.73 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.05.06 CONCRETO f'c=210 Kg/cm2 m3 24.70 457.73 11,305.93 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.05.07 GRAVA m3 3.57 109.35 390.38 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.05.08 MURO DE SOGA DE LADRILLO KIN KONG CON CON CEMENTO - ARENA m2 4.28 74.34 318.18 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.05.09 ARENA DE GRUESA m3 1.37 113.58 155.60 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.05.10 DADO DE CONCRETO und 8.00 127.69 1,021.52 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.05.11 SOPORTE PARA TECHO glb 1.00 5,374.64 5,374.64 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.05.12 COBERTURA CON TEJA ANDINA m2 148.11 62.29 9,225.77 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.05.13 TARRAJEO EN EXTERIORES m2 45.90 45.63 2,094.42 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.05.14 PINTURA LATEX m2 45.90 4.18 191.86 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.05.15 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 109.73 13.08 1,435.27 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 1,435.27 100.00% 100.00%
01.06.05.16 ACCESORIOS DE LECHO DE SECADO glb 1.00 375.68 375.68 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.06 TUBERIA PARA LA CONEXION PLANTA DE TRATAMIENTO 6,863.53
01.06.06.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 61.20 1.42 86.90 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.06.02 EXCAVACIONES TERRENO NORMAL A PULSO HASTA 1.00 M PROF. m3 85.68 49.08 4,205.17 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.06.03 SUMINISTRO E INSTALACIONES DE TUBERIA PVC-U-UF S-25, Ø=160 mm m 6.28 20.75 130.31 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.06.04 SUMINISTRO E INSTALACIONES DE TUBERIA PVC-U-UF S-25, Ø=110 mm m 95.72 14.78 1,414.74 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.06.05 RELLENO CON MATERIAL PROPIO m3 88.86 10.65 946.36 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.06.06 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 6.12 13.08 80.05 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.07 CERCO PERIMETRICO DE PLANTA DE TRATAMIENTO 10,257.76
01.06.07.01 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 0.97 127.93 124.09 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.07.02 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 1.21 13.08 15.83 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.07.03 CONCRETO f´c = 140 kg/cm2 PARA DADOS m3 0.97 275.42 267.16 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.07.04 POSTE DE F° G° INCL. COLOCACION und 27.00 110.00 2,970.00 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.07.05 CERCO PERIMETRICO CON MALLA OLIMPICA INC/PINTURA - COLOCACION m 66.15 98.00 6,482.70 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.07.06 PUERTA GALVANIZADA CON MALLA OLIMPICA INC/ PINTUTA - COLOCACION und 1.00 159.46 159.46 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.06.07.07 ALAMBRE DE PUAS m 67.00 3.56 238.52 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.07 PLAN DE EDUCACION SANITARIA 5,000.00
01.07.01 PLAN DE EDUCACION SANITARIA glb 1.00 5,000.00 5,000.00 0.00 0.00% 0.00 0.00% 0.00% 2,000.00 40.00% 0.00 0.00% -40.00%
01.08 CAPACITACIONES 7,000.00
01.08.01 GASTOS DE CAPACITACION Y SERVICIO DE SANEAMIENTO - JASS glb 1.00 3,000.00 3,000.00 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.08.02 MODULO DE OPERACION Y MANTENIMIENTO glb 1.00 4,000.00 4,000.00 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00 0.00% 0.00%
01.09 MITIGACION DE IMPACTO AMBIENTAL 10,840.00
01.09.01 MITIGACION DEL IMPACTO AMBIENTAL glb 1.00 8,000.00 8,000.00 0.00 0.00% 1,600.00 20.00% 20.00% 5,381.23 67.27% 2,400.00 30.00% -37.27%
01.09.02 REACONDICIONAMIENTO DE BOTADEROS m2 200.00 14.20 2,840.00 0.00 0.00% 284.00 10.00% 10.00% 109.94 3.87% 284.00 10.00% 6.13%
01.10 PRUEBAS DE CALIDAD 5,500.00
01.10.01 DISEÑO DE MEZCLA und 2.00 250.00 500.00 500.00 100.00% 0.00 0.00% -100.00% 0.00 0.00% 500.00 100.00% 100.00%
01.10.02 ROTURA DE PROBETAS und 20.00 25.00 500.00 0.00 0.00% 0.00 0.00% 0.00% 0.00 0.00% 200.00 40.00% 40.00%
01.10.03 TEST DE PERCOLACION und 10.00 450.00 4,500.00 0.00 0.00% 0.00 0.00% 0.00% 1,818.65 40.41% 2,250.00 50.00%
01.11 FLETE 120,640.68
01.11.01 FLETE TERRESTRE glb 1.00 25,300.00 25,300.00 8,215.60 32.47% 15,180.00 60.00% 27.53% 8,866.82 35.05% 3,795.00 15.00% -20.05%
01.11.02 FLETE RURAL glb 1.00 95,340.68 95,340.68 28,190.79 29.57% 57,204.41 60.00% 30.43% 30,425.36 31.91% 14,301.10 15.00% -16.91%
COSTO DIRECTO 1,211,458.17 90,583.62 199,906.92 203,556.53 195,558.14
GASTOS GENERALES (11.00%) 133,260.40 9,964.20 21,989.76 22,391.22 21,511.40
MES ENERO DEL 2020 MES DE FEBRERO DEL 2020
PROGRAMADO EJECUTADO PROGRAMADO EJECUTADO
Item Descripción Und. Metrado Precio (S/.) Parcial (S/.)
20 - 31 20 - 31 DIFERENCIA 01 - 29 01 - 29 DIFERENCIA
PARCIAL % PARCIAL % PARCIAL % PARCIAL %
UTILIDADES (8.00%) 96,916.65 7,246.69 15,992.55 16,284.52 15,644.65
SUBTOTAL 1,441,635.22 107,794.51 237,889.23 242,232.27 232,714.19
IGV (18.00%) 259,494.34 19,403.01 42,820.06 43,601.81 41,888.55
COSTO TOTAL 1,701,129.56 127,197.52 280,709.29 285,834.08 274,602.74
% AVANCE MENSUAL 7.48% 16.50% 16.80% 16.14%
% AVANCE MENSUAL ACUMULADO 7.48% 16.50% 9.02% 16.80% 16.14% -0.66%
CONSORCIO RIMAC
AVANCE DE OBRA RESPECTO AL CALENDARIO PROGRAMADO

MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASICO DEL CASERIO DE SANTA CATALINA , DISTRITO DE
OBRA :
HUARAZ, PROVINCIA DE HUARAZ - ANCASH
CONTRATISTA : CONSORCIO RIMAC
MONTO (S/.) : S/.1,701,129.56 con I.G.V. S/.1,441,635.22 sin I.G.V.
FECHA DE INICIO DE OBRA : 1/20/2020
MES VALORIZADO : Feb-20
VALORIZACIÓN N° : 2

CURVA S
120.00%

98.31% 100.00%
100.00%

76.65%
80.00% EJECUTADOS
PROGRAMADOS

60.00% 51.70%

40.00% 32.64%
24.28%
20.00% 16.50%
7.48%
0.00%
0.00%
Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20

PROGRAMADOS EJECUTADOS

MONTOS TOTAL (inc. IGV) MONTOS TOTAL(inc. IGV)


MES PARCIAL PARCIAL ACUMUL. ACUMUL. MES PARCIAL PARCIAL ACUMUL. ACUMUL.
S/. % S/. % S/. % S/. %
Dec-19 0.00 0.00% 0.00 0.00% Dec-19 0.00 0.00% 0.00 0.00%
Jan-20 107,794.51 7.48% 107,794.51 7.48% Jan-20 237,889.23 16.50% 237,889.23 16.50%
Feb-20 242,232.27 16.80% 350,026.78 24.28% Feb-20 232,714.19 16.14% 470,603.42 32.64%
Mar-20 395,283.25 27.42% 745,310.03 51.70% Mar-20
Apr-20 359,764.14 24.96% 1,105,074.17 76.65% Apr-20
May-20 312,241.14 21.66% 1,417,315.31 98.31% May-20
Jun-20 24,319.91 1.69% 1,441,635.22 100.00% Jun-20
TOTAL 1,441,635.22 100.00% 1,441,635.22 100.00% TOTAL 470,603.42 32.64% 32.64%

Situacion de la Obra : ADELANTADA 8.36%


SE TIENE EL MAYOR AL 80.00%
CALENDARIO VALORIZADO DE OBRA ACTUALIZADO A LA FECHA DE INICIO

Presupuesto MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASICO DEL CASERIO DE SANTA CATALINA , DISTRITO DE HUARAZ, PROVINCIA DE HUARAZ - ANCASH PLAZO 135 D.C.
Cliente MUNICIPALIDAD PROVINCIAL DE HUARAZ INICIO 1/20/2020
Lugar ANCASH - HUARAZ - HUARAZ TERMINO 6/2/2020
Contratista CONSORCIO RIMAC

PLAZO DE EJCUCION DE OBRA 135 DIAS CALENDARIOS


Item Descripción Und. Metrado Precio (S/.) Parcial (S/.) ENERO FEBRERO MARZO ABRIL MAYO JUNIO
20 - 31 01 - 29 01 - 31 01 - 30 01 - 31 01 - 02
01 INSTALACION DEL SISTEMA DE SANEAMIENTO BASICO EN EL CASERIO DE SANTA CATALINA 1,211,458.17 90,583.62 203,556.53 332,170.80 302,322.81 262,387.51 20,436.90
01.01 OBRAS PRELIMINARES 9,365.46
01.01.01 ALMACEN Y OFICINA mes 4.00 900.00 3,600.00 600.00 700.00 700.00 700.00 700.00 200.00
01.01.02 CARTEL DE IDENTIFICACION DE OBRA DE 3.60 X 2.4 M glb 1.00 516.32 516.32 516.32 0.00 0.00 0.00 0.00 0.00
01.01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS glb 1.00 5,249.14 5,249.14 2,624.57 0.00 0.00 0.00 2,624.57
01.02 SEGURIDDAD Y SALUD 10,847.50
01.02.01 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 1,800.00 1,800.00 1,800.00 0.00 0.00 0.00 0.00 0.00
01.02.02 EQUIPOS DE PROTECCION PERSONAL glb 1.00 3,947.50 3,947.50 3,947.50 0.00 0.00 0.00 0.00 0.00
01.02.03 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD EN LA OBRA glb 1.00 3,100.00 3,100.00 3,100.00 0.00 0.00 0.00 0.00 0.00
01.02.04 IMPLEMENTACION PARA LAS FUNCIONES DEL INGENIERO DE SEGURIDAD glb 1.00 2,000.00 2,000.00 2,000.00 0.00 0.00 0.00 0.00 0.00
01.03 SISTEMA DE AGUA POTABLE 255,099.48
01.03.01 CAPTACION TIPO C-1 ( 2 UNIDADES) 19,712.82
01.03.01.01 OBRAS PRELIMINARES 1,291.66
01.03.01.01.01 DESBROCE Y LIMPIEZA DE TERRENO m2 8.00 3.28 26.24 13.00 13.24 0.00 0.00 0.00 0.00
01.03.01.01.02 DEMOLICION DE ESTRUCTURAS DE CONCRETO m3 1.32 742.10 979.57 489.78 489.79 0.00 0.00 0.00 0.00
01.03.01.01.03 ELIMINACION DE MATERIAL DE DEMOLICIONES HASTA 2 km m3 1.72 159.59 274.49 137.25 137.24 0.00 0.00 0.00 0.00
01.03.01.01.04 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 8.00 1.42 11.36 5.68 5.68 0.00 0.00 0.00 0.00
01.03.01.02 MOVIMIENTO DE TIERRAS 853.04
01.03.01.02.01 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 4.81 127.93 615.34 307.67 307.67 0.00 0.00 0.00 0.00
01.03.01.02.02 REFINE, NIVELACION INTERIOR Y COMPACTACION m2 6.00 4.85 29.10 14.55 14.55 0.00 0.00 0.00 0.00
01.03.01.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO m3 0.91 11.08 10.08 5.04 5.04 0.00 0.00 0.00 0.00
01.03.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 4.67 13.08 61.08 30.54 30.54 0.00 0.00 0.00 0.00
01.03.01.02.05 MATERIAL GRANULAR FILTRANTE EN CAPTACION, GRAVA ARENA m3 1.37 100.32 137.44 68.72 68.72 0.00 0.00 0.00 0.00
01.03.01.03 OBRAS DE CONCRETO SIMPLE 176.02
01.03.01.03.01 CONCRETO f´c = 140 kg/cm2 m3 0.25 311.48 77.87 77.87 0.00 0.00 0.00 0.00 0.00
01.03.01.03.02 CONCRETO CICLOPEO C:H 1:8 m3 0.33 297.41 98.15 98.15 0.00 0.00 0.00 0.00 0.00
01.03.01.04 OBRAS DE CONCRETO ARMADO 4,098.66
01.03.01.04.01 CONCRETO f'c=210 Kg/cm2 m3 5.07 457.73 2,320.69 1,160.35 1,160.34 0.00 0.00 0.00 0.00
01.03.01.04.02 ENCOFRADO Y DESENCOFRADO m2 32.27 39.88 1,286.93 643.46 643.47 0.00 0.00 0.00 0.00
01.03.01.04.03 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 112.11 4.38 491.04 245.52 245.52 0.00 0.00 0.00 0.00
01.03.01.05 REVOQUES ENLUCIDOS 594.00
01.03.01.05.01 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 1:2 , e=1.0 cm m2 11.86 26.49 314.17 0.00 314.17 0.00 0.00 0.00 0.00
01.03.01.05.02 TARRAJEO DE EXTERIOR DE MUROS, e= 1 cm, 1:4 m2 11.22 24.94 279.83 0.00 279.83 0.00 0.00 0.00 0.00
01.03.01.06 ACCESORIOS SANITARIOS 1,412.33
01.03.01.06.01 TAPA SANITARIA METALICA DE 0.60 X 0.60 m CON LLAVE TIPO BUJIA und 4.00 206.50 826.00 0.00 826.00 0.00 0.00 0.00 0.00
01.03.01.06.02 ACCESORIOS EN CAPTACION und 2.00 166.32 332.64 0.00 332.64 0.00 0.00 0.00 0.00
01.03.01.06.03 GRAVA m3 2.32 109.35 253.69 0.00 253.69 0.00 0.00 0.00 0.00
01.03.01.07 PINTURAS 160.60
01.03.01.07.01 PINTURA ESMALTE EN EXTERIORES m2 12.92 12.43 160.60 0.00 160.60 0.00 0.00 0.00 0.00
01.03.01.08 CERCO PERIMETRICO DE CAPTACION Y RESERVORIO 11,126.51
01.03.01.08.01 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 1.08 127.93 138.16 0.00 138.16 0.00 0.00 0.00 0.00
01.03.01.08.02 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 1.35 13.08 17.66 0.00 17.66 0.00 0.00 0.00 0.00
01.03.01.08.03 CONCRETO f´c = 140 kg/cm2 PARA DADOS m3 1.08 275.42 297.45 0.00 297.45 0.00 0.00 0.00 0.00
01.03.01.08.04 POSTE DE F° G° INCL. COLOCACION und 30.00 110.00 3,300.00 0.00 3,300.00 0.00 0.00 0.00 0.00
01.03.01.08.05 CERCO PERIMETRICO CON MALLA OLIMPICA INC/PINTURA - COLOCACION m 69.40 98.00 6,801.20 0.00 6,801.20 0.00 0.00 0.00 0.00
01.03.01.08.06 PUERTA GALVANIZADA CON MALLA OLIMPICA INC/ PINTUTA - COLOCACION und 2.00 159.46 318.92 0.00 318.92 0.00 0.00 0.00 0.00
01.03.01.08.07 ALAMBRE DE PUAS m 71.10 3.56 253.12 0.00 158.73 94.39 0.00 0.00 0.00
01.03.02 LINEAS DE CONDUCCION, ADUCCION Y RED (L=2,243.53 m) 148,793.26
01.03.02.01 TRABAJOS PRELIMINARES 22,749.39
01.03.02.01.01 ROCE Y ELIMINACION DE ARBUSTOS PEQUEÑOS m 2,243.53 7.85 17,611.71 17,611.71 0.00 0.00 0.00 0.00 0.00
01.03.02.01.02 TRAZO, NIVELES Y REPLANTEO m2 2,243.53 2.29 5,137.68 2,250.00 2,887.68 0.00 0.00 0.00 0.00
01.03.02.02 MOVIMIENTO DE TIERRAS 93,465.31
01.03.02.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL (AGUA) m 404.73 16.36 6,621.38 1,500.00 5,121.38 0.00 0.00 0.00 0.00
01.03.02.02.02 EXCAVACION DE ZANJA EN TERRENO CONGLOMERADO (AGUA) m 1,690.15 31.27 52,850.99 1,500.00 6,472.04 20,479.76 18,979.76 5,419.43 0.00
01.03.02.02.03 EXCAVACION DE ZANJA EN TERRENO ROCOSO (AGUA) m 148.65 84.56 12,569.84 0.00 0.00 12,569.84 0.00 0.00 0.00
01.03.02.02.04 REFINE, NIVELACION DE FONDOS PARA TUBERIA DE AGUA m2 897.41 7.32 6,569.04 750.00 2,700.30 2,828.34 290.40 0.00 0.00
01.03.02.02.05 CAMA DE APOYO PARA TUBERIA DE AGUA E=10 CM m 2,243.53 2.98 6,685.72 750.00 2,355.20 2,355.20 1,018.05 207.27 0.00
01.03.02.02.06 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 269.22 13.81 3,717.93 0.00 250.24 1,385.29 1,385.29 697.11 0.00
01.03.02.02.07 RELLENO COMPACTADO CON MATERIAL PROPIO m3 269.22 11.08 2,982.96 200.77 1,111.44 600.00 600.00 470.75 0.00
01.03.02.02.08 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 112.19 13.08 1,467.45 0.00 0.00 357.69 710.79 398.97 0.00
01.03.02.03 TENDIDO DE TUBERIAS 32,578.56
01.03.02.03.01 TUBERIA DE PVC SAP CLASE - 10, D=1 1/2" X 5 M m 357.55 7.30 2,610.12 560.00 1,250.00 800.12 0.00 0.00 0.00
01.03.02.03.02 TUBERIA DE PVC SAP CLASE - 10, D=1" X 5 M m 1,414.60 4.64 6,563.74 300.00 2,850.00 1,790.11 1,623.63 0.00 0.00
01.03.02.03.03 TUBERIA DE PVC SAP CLASE - 10, D=3/4" X 5 M m 471.38 4.09 1,927.94 0.00 554.28 1,373.66 0.00 0.00 0.00
01.03.02.03.04 PRUEBA HIDRAULICA EN RED DE AGUA m 2,243.53 7.77 17,432.23 0.00 0.00 0.00 0.00 17,432.23 0.00
01.03.02.03.05 ACCESORIOS DE AGUA FRIA glb 1.00 724.11 724.11 0.00 0.00 724.11 0.00 0.00 0.00
01.03.02.03.06 DESINFECCION DE TUBERIAS m 2,243.53 1.48 3,320.42 0.00 0.00 0.00 3,320.42 0.00 0.00
01.03.03 CONEXIONES PRE DOMICILIARIAS (90 UND) 41,537.65
01.03.03.01 TRABAJOS PRELIMINARES 494.64
01.03.03.01.01 TRAZO, NIVELES Y REPLANTEO m2 216.00 2.29 494.64 0.00 0.00 494.64 0.00 0.00 0.00
01.03.03.02 MOVIMIENTO DE TIERRAS 22,042.15
01.03.03.02.01 EXCAVACION DE ZANJA EN TERRENO CONGLOMERADO (AGUA) m 540.00 31.27 16,885.80 0.00 0.00 6,857.66 10,028.14 0.00 0.00
01.03.03.02.02 REFINE, NIVELACION DE FONDOS PARA TUBERIA DE AGUA m2 216.00 7.32 1,581.12 0.00 0.00 1,185.29 395.83 0.00 0.00
01.03.03.02.03 CAMA DE APOYO PARA TUBERIA DE AGUA E=10 CM m 540.00 2.98 1,609.20 0.00 0.00 703.61 905.59 0.00 0.00
01.03.03.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 64.80 11.08 717.98 0.00 0.00 0.00 717.98 0.00 0.00
01.03.03.02.05 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 64.80 13.81 894.89 0.00 0.00 0.00 894.89 0.00 0.00
01.03.03.02.06 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 27.00 13.08 353.16 0.00 0.00 0.00 341.94 11.22 0.00
01.03.03.03 SUMINISTRO E INSTALACION DE TUBERIAS 19,000.86
01.03.03.03.01 CONEXIONES DOMICILIARIAS DE 1 1/2" A 1/2" und 26.00 88.78 2,308.28 0.00 0.00 0.00 2,308.28 0.00 0.00
01.03.03.03.02 CONEXIONES DOMICILIARIAS DE 1" A 1/2" und 48.00 84.08 4,035.84 0.00 0.00 0.00 4,035.84 0.00 0.00
01.03.03.03.03 CONEXIONES DOMICILIARIAS DE 3/4" A 1/2" und 16.00 78.19 1,251.04 0.00 0.00 0.00 1,251.04 0.00 0.00
01.03.03.03.04 CAJA DE VALVULA DOMICILIARIA und 90.00 71.23 6,410.70 0.00 0.00 0.00 3,001.68 3,409.02 0.00
01.03.03.03.05 PRUEBA HIDRAULICA EN RED DE AGUA m 540.00 7.77 4,195.80 0.00 0.00 0.00 0.00 4,195.80 0.00
01.03.03.03.06 DESINFECCION DE TUBERIAS m 540.00 1.48 799.20 0.00 0.00 0.00 0.00 799.20 0.00
01.03.04 RESERVORIO DE 5 M3 (2 UNIDADES) 29,204.05
01.03.04.01 OBRAS PRELIMINARES 7,455.51
01.03.04.01.01 DESBROCE Y LIMPIEZA DE TERRENO m2 14.58 3.28 47.82 23.90 23.92 0.00 0.00 0.00 0.00
01.03.04.01.02 DEMOLICION DE ESTRUCTURAS DE CONCRETO m3 7.78 742.10 5,773.54 2,886.77 2,886.77 0.00 0.00 0.00 0.00
01.03.04.01.03 ELIMINACION DE MATERIAL DE DEMOLICIONES HASTA 2 km m3 10.11 159.59 1,613.45 806.73 806.72 0.00 0.00 0.00 0.00
01.03.04.01.04 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 14.58 1.42 20.70 10.35 10.35 0.00 0.00 0.00 0.00
01.03.04.02 MOVIMIENTO DE TIERRAS 1,766.02
01.03.04.02.01 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 11.66 127.93 1,491.66 745.83 745.83 0.00 0.00 0.00 0.00
01.03.04.02.02 REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL A PULSO m2 14.58 3.21 46.80 23.40 23.40 0.00 0.00 0.00 0.00
01.03.04.02.03 RELLENO CON MATERIAL PROPIO m3 3.46 10.65 36.85 18.42 18.43 0.00 0.00 0.00 0.00
01.03.04.02.04 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 14.58 13.08 190.71 95.35 95.36 0.00 0.00 0.00 0.00
01.03.04.03 OBRAS DE CONCRETO SIMPLE 217.68
01.03.04.03.01 CONCRETO SOLADO MEZCLA 1:10 CEMENTO-HORMIGON e=0.05 mts. m2 14.58 14.93 217.68 108.84 108.84 0.00 0.00 0.00 0.00
01.03.04.04 OBRAS DE CONCRETO ARMADO 8,783.49
01.03.04.04.01 CONCRETO f'c=210 Kg/cm2 m3 8.87 457.73 4,060.07 2,030.04 2,030.03 0.00 0.00 0.00 0.00
01.03.04.04.02 ENCOFRADO Y DESENCOFRADO m2 70.91 39.88 2,827.89 1,413.94 1,413.95 0.00 0.00 0.00 0.00
01.03.04.04.03 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 432.77 4.38 1,895.53 947.76 947.77 0.00 0.00 0.00 0.00
01.03.04.05 REVOQUES ENLUCIDOS 2,475.58
01.03.04.05.01 TARRAJEO DE EXTERIOR DE MUROS, e= 1 cm, 1:4 m2 57.54 24.94 1,435.05 0.00 1,435.05 0.00 0.00 0.00 0.00
01.03.04.05.02 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 1:2 , e=1.0 cm m2 39.28 26.49 1,040.53 0.00 1,040.53 0.00 0.00 0.00 0.00
01.03.04.06 JUNTAS DE DILATACION 89.61
01.03.04.06.01 JUNTA DE WATER STOP DE 6" ESPESOR 5 MM m 17.20 5.21 89.61 89.61 0.00 0.00 0.00 0.00 0.00
01.03.04.07 ACCESORIOS SANITARIOS 7,737.48
01.03.04.07.01 TAPA SANITARIA METALICA DE 0.60 X 0.60 m CON LLAVE TIPO BUJIA und 4.00 268.94 1,075.76 0.00 1,075.76 0.00 0.00 0.00 0.00
01.03.04.07.02 ESCALERA DE TUBO F° G° MOVIL SEGUN DISEÑO und 2.00 130.00 260.00 0.00 260.00 0.00 0.00 0.00 0.00
01.03.04.07.03 ACCESORIOS EN RESERVORIO R-01 glb 1.00 500.86 500.86 0.00 500.86 0.00 0.00 0.00 0.00
01.03.04.07.04 ACCESORIOS EN RESERVORIO R-02 glb 1.00 500.86 500.86 0.00 500.86 0.00 0.00 0.00 0.00
01.03.04.07.05 SISTEMA DE CLORACION POR GOTEO und 2.00 2,700.00 5,400.00 0.00 5,400.00 0.00 0.00 0.00 0.00
01.03.04.08 PINTURAS 678.68
01.03.04.08.01 PINTURA ESMALTE EN EXTERIORES m2 54.60 12.43 678.68 0.00 678.68 0.00 0.00 0.00 0.00
01.03.05 VALVULA DE CONTROL (2 UNIDADES) 2,623.60
01.03.05.01 TRABAJOS PRELIMINARES 6.86
01.03.05.01.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 1.28 1.42 1.82 0.00 1.82 0.00 0.00 0.00 0.00
01.03.05.01.02 LIMPIEZA DEL TERRENO MANUAL m2 1.28 3.94 5.04 0.00 5.04 0.00 0.00 0.00 0.00
01.03.05.02 MOVIMIENTO DE TIERRAS 148.55
01.03.05.02.01 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 0.90 127.93 115.14 0.00 0.00 115.14 0.00 0.00 0.00
01.03.05.02.02 REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL A PULSO m2 1.28 3.21 4.11 0.00 0.00 4.11 0.00 0.00 0.00
01.03.05.02.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 2.24 13.08 29.30 0.00 0.00 29.30 0.00 0.00 0.00
01.03.05.03 OBRAS DE CONCRETO 1,287.21
01.03.05.03.01 CONCRETO f'c=210 Kg/cm2 m3 1.01 457.73 462.31 0.00 0.00 462.31 0.00 0.00 0.00
01.03.05.03.02 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 33.71 4.38 147.65 0.00 0.00 147.65 0.00 0.00 0.00
01.03.05.03.03 ENCOFRADO Y DESENCOFRADO m2 16.96 39.88 676.36 0.00 0.00 676.36 0.00 0.00 0.00
01.03.05.03.04 PIEDRA CHANCADA DE 1/2" PARA SUMIDERO m3 0.02 44.68 0.89 0.00 0.00 0.89 0.00 0.00 0.00
01.03.05.04 REVOQUES ENLUCIDOS 343.85
01.03.05.04.01 TARRAJEO DE EXTERIOR DE MUROS, e= 1 cm, 1:4 m2 5.12 24.94 127.69 0.00 0.00 127.69 0.00 0.00 0.00
01.03.05.04.02 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 1:2 , e=1.0 cm m2 8.16 26.49 216.16 0.00 0.00 216.16 0.00 0.00 0.00
01.03.05.05 PINTURAS 65.63
01.03.05.05.01 PINTURA ESMALTE EN EXTERIORES m2 5.28 12.43 65.63 0.00 0.00 65.63 0.00 0.00 0.00
01.03.05.06 EQUIPAMIENTO 771.50
01.03.05.06.01 TAPA SANITARIA METALICA DE 0.60 X 0.60 m CON LLAVE TIPO BUJIA und 2.00 268.94 537.88 0.00 0.00 537.88 0.00 0.00 0.00
01.03.05.06.02 SUMINISTRO/INSTACAION DE ACCESORIOS DE CAJA DE VALVULA DE CONTRO D=1" glb 1.00 233.62 233.62 0.00 0.00 233.62 0.00 0.00 0.00
01.03.06 CAMARA ROMPE PRESION TIPO - 7 (3 UND) 5,581.47
01.03.06.01 TRABAJOS PRELIMINARES 33.77
01.03.06.01.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 6.30 1.42 8.95 0.00 8.95 0.00 0.00 0.00 0.00
01.03.06.01.02 LIMPIEZA DEL TERRENO MANUAL m2 6.30 3.94 24.82 0.00 24.82 0.00 0.00 0.00 0.00
01.03.06.02 MOVIMIENTO DE TIERRAS 583.85
01.03.06.02.01 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 3.96 127.93 506.60 0.00 506.60 0.00 0.00 0.00 0.00
01.03.06.02.02 REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL A PULSO m2 6.30 3.21 20.22 0.00 20.22 0.00 0.00 0.00 0.00
01.03.06.02.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 4.36 13.08 57.03 0.00 57.03 0.00 0.00 0.00 0.00
01.03.06.03 OBRAS DE CONCRETO 2,418.69
01.03.06.03.01 CONCRETO f'c=210 Kg/cm2 m3 2.44 457.73 1,116.86 0.00 0.00 1,116.86 0.00 0.00 0.00
01.03.06.03.02 ENCOFRADO Y DESENCOFRADO m2 22.68 39.88 904.48 0.00 507.82 396.66 0.00 0.00 0.00
01.03.06.03.03 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 90.72 4.38 397.35 0.00 397.35 0.00 0.00 0.00 0.00
01.03.06.04 REVOQUES ENLUCIDOS 637.92
01.03.06.04.01 TARRAJEO DE EXTERIOR DE MUROS, e= 1 cm, 1:4 m2 12.96 24.94 323.22 0.00 0.00 323.22 0.00 0.00 0.00
01.03.06.04.02 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 1:2 , e=1.0 cm m2 11.88 26.49 314.70 0.00 0.00 314.70 0.00 0.00 0.00
01.03.06.05 PINTURAS 80.55
01.03.06.05.01 PINTURA ESMALTE EN EXTERIORES m2 6.48 12.43 80.55 0.00 0.00 80.55 0.00 0.00 0.00
01.03.06.06 ACCESORIOS SANITARIOS 1,826.69
01.03.06.06.01 ACCESORIOS PARA CRP -7 01 glb 1.00 232.54 232.54 0.00 0.00 232.54 0.00 0.00 0.00
01.03.06.06.02 TAPA SANITARIA METALICA DE 0.60 X 0.60 m CON LLAVE TIPO BUJIA und 3.00 206.50 619.50 0.00 0.00 619.50 0.00 0.00 0.00
01.03.06.06.03 TAPA SANITARIA METALICA DE 0.30x0.30 m CON LLAVE TIPO BUJIA und 3.00 103.62 310.86 0.00 0.00 310.86 0.00 0.00 0.00
01.03.06.06.04 ACCESORIOS PARA CRP -7 02 glb 1.00 430.75 430.75 0.00 0.00 430.75 0.00 0.00 0.00
01.03.06.06.05 ACCESORIOS PARA CRP -7 03 glb 1.00 233.04 233.04 0.00 0.00 233.04 0.00 0.00 0.00
01.03.07 CAMARA DE VALVULA DE PURGA (10 UND) 7,646.63
01.03.07.01 TRABAJOS PRELIMINARES 69.68
01.03.07.01.01 LIMPIEZA DEL TERRENO MANUAL m2 13.00 3.94 51.22 0.00 0.00 0.00 51.22 0.00 0.00
01.03.07.01.02 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 13.00 1.42 18.46 0.00 0.00 0.00 18.46 0.00 0.00
01.03.07.02 MOVIMIENTO DE TIERRAS 952.40
01.03.07.02.01 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 6.58 127.93 841.78 0.00 0.00 0.00 841.78 0.00 0.00
01.03.07.02.02 REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL A PULSO m2 10.50 3.21 33.71 0.00 0.00 0.00 33.71 0.00 0.00
01.03.07.02.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 5.88 13.08 76.91 0.00 0.00 0.00 76.91 0.00 0.00
01.03.07.03 OBRAS DE CONCRETO 3,646.45
01.03.07.03.01 CONCRETO f´c = 140 kg/cm2 m3 0.36 311.48 112.13 0.00 0.00 0.00 112.13 0.00 0.00
01.03.07.03.02 CONCRETO CICLOPEO f´c = 140 kg/cm2 +30% P.M. PARA EMBOQUILLADO m3 0.25 264.65 66.16 0.00 0.00 0.00 66.16 0.00 0.00
01.03.07.03.03 CONCRETO f'c=210 Kg/cm2 m3 1.85 457.73 846.80 0.00 0.00 0.00 846.80 0.00 0.00
01.03.07.03.04 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 168.55 4.38 738.25 0.00 0.00 0.00 738.25 0.00 0.00
01.03.07.03.05 ENCOFRADO Y DESENCOFRADO m2 47.00 39.88 1,874.36 0.00 0.00 0.00 1,874.36 0.00 0.00
01.03.07.03.06 GRAVA m3 0.08 109.35 8.75 0.00 0.00 0.00 8.75 0.00 0.00
01.03.07.04 ACABADOS 382.14
01.03.07.04.01 TARRAJEO DE EXTERIOR DE MUROS, e= 1 cm, 1:4 m2 6.40 24.94 159.62 0.00 0.00 0.00 159.62 0.00 0.00
01.03.07.04.02 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 1:2 , e=1.0 cm m2 8.40 26.49 222.52 0.00 0.00 0.00 222.52 0.00 0.00
01.03.07.05 PINTURAS 79.55
01.03.07.05.01 PINTURA ESMALTE EN EXTERIORES m2 6.40 12.43 79.55 0.00 0.00 0.00 79.55 0.00 0.00
01.03.07.06 ACCESORIOS SANITARIOS 2,516.41
01.03.07.06.01 TAPA SANITARIA DE ACERO METALICA DE 0.60 X 0.60 m CON LLAVE TIPO BUJIA und 10.00 207.10 2,071.00 0.00 0.00 0.00 2,071.00 0.00 0.00
01.03.07.06.02 ACCESORIOS DE VALVULA DE PURGA D=1/2" glb 1.00 445.41 445.41 0.00 0.00 0.00 445.41 0.00 0.00
01.04 UNIDADES BASICAS DE SANEAMIENTO (26 UND.) 220,174.97
01.04.01 MODULO DE UBS 120,988.25
01.04.01.01 MOVIMIENTO DE TIERRAS 3,877.94
01.04.01.01.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 143.52 1.42 203.80 203.80 0.00 0.00 0.00 0.00 0.00
01.04.01.01.02 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 24.44 127.93 3,126.61 964.04 2,162.57 0.00 0.00 0.00 0.00
01.04.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 41.86 13.08 547.53 0.00 547.53 0.00 0.00 0.00 0.00
01.04.01.02 CONCRETO SIMPLE 14,843.95
01.04.01.02.01 CONCRETO CICLOPEO C:H 1:10 + 30% P.M. EN CIMIENTOS m3 26.26 215.31 5,654.04 0.00 5,654.04 0.00 0.00 0.00 0.00
01.04.01.02.02 CONCRETO CICLOPEO C:H 1:8 m3 10.40 297.41 3,093.06 0.00 3,093.06 0.00 0.00 0.00 0.00
01.04.01.02.03 ENCOFRADO Y DESENCOFRADO m2 152.88 39.88 6,096.85 0.00 6,096.85 0.00 0.00 0.00 0.00
01.04.01.03 CONCRETO ARMADO 6,974.75
01.04.01.03.01 CONCRETO f'c =175 Kg/cm2 m3 4.42 399.73 1,766.81 0.00 1,766.81 0.00 0.00 0.00 0.00
01.04.01.03.02 ENCOFRADO Y DESENCOFRADO m2 87.10 39.88 3,473.55 0.00 3,473.55 0.00 0.00 0.00 0.00
01.04.01.03.03 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 395.98 4.38 1,734.39 0.00 1,734.39 0.00 0.00 0.00 0.00
01.04.01.04 COBERTURAS 15,068.95
01.04.01.04.01 CORREAS DE MADERA DE 2" X2" m 239.20 9.75 2,332.20 0.00 0.00 2,332.20 0.00 0.00 0.00
01.04.01.04.02 VIGAS DE MADERA DE 2" X 3" m 220.48 12.51 2,758.20 0.00 0.00 2,758.20 0.00 0.00 0.00
01.04.01.04.03 LISTON DE MADERA 1" X 3" m 119.60 7.44 889.82 0.00 0.00 889.82 0.00 0.00 0.00
01.04.01.04.04 COBERTURA CON TEJA ANDINA m2 145.91 62.29 9,088.73 0.00 0.00 1,363.31 7,725.42 0.00 0.00
01.04.01.05 ALBAÑILERIA 14,863.60
01.04.01.05.01 MURO DE LADRILLO DE SOGA 9X12.5X23cm m2 226.20 65.71 14,863.60 0.00 5,480.95 9,382.65 0.00 0.00 0.00
01.04.01.06 REVOQUES ENLUCIDOS 20,916.40
01.04.01.06.01 TARRAJEO DE EXTERIOR DE MUROS, e= 1 cm, 1:4 m2 43.42 24.94 1,082.89 0.00 0.00 1,082.89 0.00 0.00 0.00
01.04.01.06.02 TARRAJEO CON IMPERMEABILISANTES, 1:2 m2 159.12 47.25 7,518.42 0.00 0.00 7,518.42 0.00 0.00 0.00
01.04.01.06.03 VESTITURA DE DERRAMES m 93.60 13.82 1,293.55 0.00 0.00 1,293.55 0.00 0.00 0.00
01.04.01.06.04 ZOCALO DE CEMENTO PULIDO m2 82.16 35.35 2,904.36 0.00 0.00 2,904.36 0.00 0.00 0.00
01.04.01.06.05 PINTURA ESMALTE m2 284.70 12.43 3,538.82 0.00 0.00 3,538.82 0.00 0.00 0.00
01.04.01.06.06 BARNIZ EN MURO DE LADRILLO m2 309.14 14.81 4,578.36 0.00 0.00 4,578.36 0.00 0.00 0.00
01.04.01.07 PISOS Y PAVIMENTOS 4,163.38
01.04.01.07.01 FALSO PISO DE CONCRETO C:H 1:10 E=3" m2 53.04 29.67 1,573.70 0.00 622.92 950.78 0.00 0.00 0.00
01.04.01.07.02 PISOS DE CEMENTO PULIDO:H E=1" m2 53.04 15.00 795.60 0.00 49.73 745.87 0.00 0.00 0.00
01.04.01.07.03 VEREDAS PISO DE CONCRETO C:H 1:10 H=10 CM m2 43.68 32.29 1,410.43 0.00 88.15 1,322.28 0.00 0.00 0.00
01.04.01.07.04 ENCOFRADO Y DESENCOFRADO m2 9.62 39.88 383.65 0.00 38.37 345.29 0.00 0.00 0.00
01.04.01.08 CARPINTERIA DE MADERA 1,050.66
01.04.01.08.01 VENTANA DE MADERA CON MALLA MOSQUITERO und 26.00 40.41 1,050.66 0.00 0.00 0.00 1,050.66 0.00 0.00
01.04.01.09 CERRAJERIA 9,014.20
01.04.01.09.01 PUERTA METALICA DE 1.80x0.60 m und 26.00 346.70 9,014.20 0.00 0.00 0.00 9,014.20 0.00 0.00
01.04.01.10 APARATOS SANITARIOS 13,648.96
01.04.01.10.01 SUMINISTRO Y COLOCACION DE INODORO LOSA BLANCA pza 26.00 174.20 4,529.20 0.00 0.00 4,529.20 0.00 0.00 0.00
01.04.01.10.02 SUMINISTRO Y COLOCACION LAVATORIO DE LOSA BLANCA pza 26.00 152.45 3,963.70 0.00 0.00 3,963.70 0.00 0.00 0.00
01.04.01.10.03 SUMINISTRO Y COLOCACION DE DUCHA Y ACCESORIOS pza 26.00 60.74 1,579.24 0.00 0.00 1,579.24 0.00 0.00 0.00
01.04.01.10.04 SUMINISTRO Y COLOCACION DE LAVADERO PREFABRICADO pza 26.00 137.57 3,576.82 0.00 0.00 3,576.82 0.00 0.00 0.00
01.04.01.11 SISTEMA DE AGUA FRIA 6,653.48
01.04.01.11.01 EXCAVACION DE ZANJA EN TERRENO NORMAL (AGUA) m 10.92 16.36 178.65 0.00 0.00 178.65 0.00 0.00 0.00
01.04.01.11.02 REFINE, NIVELACION DE FONDOS PARA TUBERIA DE AGUA m2 36.40 7.32 266.45 0.00 0.00 266.45 0.00 0.00 0.00
01.04.01.11.03 CAMA DE APOYO PARA TUBERIA DE AGUA E=10 CM m 91.00 2.98 271.18 0.00 0.00 271.18 0.00 0.00 0.00
01.04.01.11.04 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 10.92 13.81 150.81 0.00 0.00 150.81 0.00 0.00 0.00
01.04.01.11.06 TUBERIA DE PVC SAP CLASE - 10, D=1/2" X 5 M m 231.40 3.56 823.78 0.00 0.00 823.78 0.00 0.00 0.00
01.04.01.11.07 PRUEBA HIDRAULICA EN RED DE AGUA m 231.40 7.77 1,797.98 0.00 0.00 1,797.98 0.00 0.00 0.00
01.04.01.11.08 ACCESORIOS DE AGUA FRIA UBS glb 1.00 2,822.16 2,822.16 0.00 0.00 2,822.16 0.00 0.00 0.00
01.04.01.11.09 DESINFECCION DE TUBERIAS m 231.40 1.48 342.47 0.00 0.00 342.47 0.00 0.00 0.00
01.04.01.12 SISTEMA DE DESAGUE 7,950.28
01.04.01.12.01 SALIDA DE DESAGUE EN PVC DE 2" y 4" pto 104.00 22.60 2,350.40 0.00 0.00 2,350.40 0.00 0.00 0.00
01.04.01.12.02 SUMINISTRO E INSTALACION DE TUBERIA PVC SAL 4" m 78.00 17.06 1,330.68 0.00 0.00 1,330.68 0.00 0.00 0.00
01.04.01.12.03 SUMINISTRO E INSTALACION DE TUBERIA PVC SAL 2" m 78.00 16.87 1,315.86 0.00 0.00 1,315.86 0.00 0.00 0.00
01.04.01.12.04 SUMINISTRO Y COLOCACION DE ACCESORIOS RED DE DESAGUE und 26.00 113.59 2,953.34 0.00 0.00 2,953.34 0.00 0.00 0.00
01.04.01.13 INSTALACIONES ELECTRICAS 1,961.70
01.04.01.13.01 SALIDA DE INTERRUPTOR SIMPLE pto 26.00 26.64 692.64 0.00 0.00 0.00 692.64 0.00 0.00
01.04.01.13.02 SALIDA DE TECHO PARA CENTRO DE LUZ pto 26.00 32.28 839.28 0.00 0.00 0.00 839.28 0.00 0.00
01.04.01.13.03 CABLE TW #14 AWG und 26.00 16.53 429.78 0.00 0.00 0.00 429.78 0.00 0.00
01.04.02 SISTEMA DE TRATAMIENTOS UBS 60,633.09
01.04.02.01 MOVIMIENTO DE TIERRAS 15,207.51
01.04.02.01.01 DESBROCE Y LIMPIEZA DE TERRENO m2 55.12 3.28 180.79 0.00 180.79 0.00 0.00 0.00 0.00
01.04.02.01.02 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 55.12 1.42 78.27 0.00 78.27 0.00 0.00 0.00 0.00
01.04.02.01.03 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 105.82 127.93 13,537.55 0.00 13,537.55 0.00 0.00 0.00 0.00
01.04.02.01.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 60.58 11.08 671.23 0.00 0.00 671.23 0.00 0.00 0.00
01.04.02.01.05 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 56.55 13.08 739.67 0.00 0.00 739.67 0.00 0.00 0.00
01.04.02.02 CAJA DE REGISTRO Y POZO DE LODOS 14,373.66
01.04.02.02.01 CONCRETO f'c =175 Kg/cm2 m3 7.54 399.73 3,013.96 0.00 0.00 3,013.96 0.00 0.00 0.00
01.04.02.02.02 TAPA DE CONCRETO F'C= 175 Kg/cm2, 0.5 M * 0.5 M und 26.00 88.82 2,309.32 0.00 0.00 2,309.32 0.00 0.00 0.00
01.04.02.02.03 ENCOFRADO Y DESENCOFRADO m2 124.80 39.88 4,977.02 0.00 0.00 4,977.02 0.00 0.00 0.00
01.04.02.02.04 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 229.06 4.38 1,003.28 0.00 0.00 1,003.28 0.00 0.00 0.00
01.04.02.02.05 CAJA REGISTRADORA DE CONCRETO PREFABRICADO 0.30X0.30M INC/TAPA und 52.00 59.04 3,070.08 0.00 0.00 3,070.08 0.00 0.00 0.00
01.04.02.03 INSTALACIONES DE BIODIGESTOR Y ACCESORIOS 31,051.92
01.04.02.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC SAL 4" m 156.00 17.06 2,661.36 0.00 0.00 2,661.36 0.00 0.00 0.00
01.04.02.03.02 SUMINISTRO E INSTALACION DE BIODIGESTOR DE 600 L Y ACCESORIOS und 26.00 801.60 20,841.60 0.00 9,899.76 10,941.84 0.00 0.00 0.00
01.04.02.03.03 CONCRETO f'c =175 Kg/cm2 m3 3.86 399.73 1,542.96 0.00 0.00 1,542.96 0.00 0.00 0.00
01.04.02.03.04 TAPA METALICA DE 0.90x0.90m und 26.00 231.00 6,006.00 0.00 0.00 6,006.00 0.00 0.00 0.00
01.04.03 POZO PERCOLADOR UBS 38,553.63
01.04.03.01 MOVIMIENTO DE TIERRAS 14,442.49
01.04.03.01.01 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 100.10 127.93 12,805.79 0.00 0.00 12,805.79 0.00 0.00 0.00
01.04.03.01.02 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 125.13 13.08 1,636.70 0.00 0.00 1,636.70 0.00 0.00 0.00
01.04.03.02 CONCRETO 5,748.31
01.04.03.02.01 CONCRETO f'c =175 Kg/cm2 m3 3.38 399.73 1,351.09 0.00 0.00 1,351.09 0.00 0.00 0.00
01.04.03.02.02 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 28.60 4.38 125.27 0.00 0.00 125.27 0.00 0.00 0.00
01.04.03.02.03 ENCOFRADO Y DESENCOFRADO m2 107.12 39.88 4,271.95 0.00 0.00 4,271.95 0.00 0.00 0.00
01.04.03.03 TAPAS 8,604.18
01.04.03.03.01 TAPA DE CONCRETO F'C= 175 Kg/cm2, 1.40M DIAMETRO und 26.00 240.51 6,253.26 0.00 0.00 1,563.32 4,689.94 0.00 0.00
01.04.03.03.02 TAPA METALICA DE 0.40 X 0.40 m und 26.00 90.42 2,350.92 0.00 0.00 0.00 2,350.92 0.00 0.00
01.04.03.04 ALBAÑILERIA 4,789.80
01.04.03.04.01 MURO DE SOGA DE LADRILLO KK CON JUNTAS ABIERTAS m2 93.06 51.47 4,789.80 0.00 0.00 4,789.80 0.00 0.00 0.00
01.04.03.05 INSTALACIONES SANITARIAS 505.18
01.04.03.05.01 ACCESORIOS POZO PERCOLADOR und 26.00 19.43 505.18 0.00 0.00 0.00 505.18 0.00 0.00
01.04.03.06 FILTROS 4,463.67
01.04.03.06.01 GRAVA m3 40.82 109.35 4,463.67 0.00 0.00 4,463.67 0.00 0.00 0.00
01.05 SISTEMA DE ALCANTARILLADO SANITARIO 414,513.73
01.05.01 REDES COLECTORES (L=1,176.35 m) 237,909.46
01.05.01.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 1,176.35 1.42 1,670.42 0.00 1,670.42 0.00 0.00 0.00 0.00
01.05.01.02 EXCAVACION DE ZANJA EN TERRENO CONGLOMERADO ALCANTARILLADO m 1,087.50 110.10 119,733.75 0.00 28,317.80 34,538.58 35,689.87 21,187.50 0.00
01.05.01.03 EXCAVACION DE ZANJA EN TERRENO ROCOSO m 88.85 267.35 23,754.05 0.00 2,672.33 21,081.72 0.00 0.00 0.00
01.05.01.04 REFINE, NIVELACION INTERIOR Y COMPACTACION m2 705.81 4.85 3,423.18 0.00 0.00 0.00 0.00 3,423.18 0.00
01.05.01.05 CAMA DE APOYO PARA TUBERIA DE AGUA E=10 CM m 1,176.35 2.98 3,505.52 0.00 0.00 0.00 1,650.52 1,855.00 0.00
01.05.01.06 SUMINISTRO E INSTALACIONES DE TUBERIA PVC-U-UF S-25, Ø=160 mm m 1,176.35 20.75 24,409.26 0.00 0.00 0.00 0.00 15,764.31 8,644.95
01.05.01.07 PRUEBA HIDRAULICA DE TUBERIA INSTALADA-DESAGUE m 1,176.35 7.04 8,281.50 0.00 0.00 0.00 0.00 0.00 8,281.50
01.05.01.08 RELLENO CON MATERIAL PROPIO m3 776.39 10.65 8,268.55 0.00 0.00 0.00 2,222.17 6,046.38 0.00
01.05.01.09 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 117.51 13.81 1,622.81 0.00 0.00 0.00 436.13 1,186.68 0.00
01.05.01.10 ELIMINACION DE MATERIAL HASTA 2 km m3 252.50 166.04 41,925.10 0.00 0.00 0.00 0.00 41,925.10 0.00
01.05.01.11 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 100.56 13.08 1,315.32 0.00 0.00 0.00 0.00 1,315.32 0.00
01.05.02 BUZONES (54 UND) 135,650.94
01.05.02.01 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 157.45 127.93 20,142.58 0.00 0.00 0.00 6,766.65 13,375.93 0.00
01.05.02.02 BUZONES D=1.20, H=1.20, TAPA C°A° und 54.00 1,820.08 98,284.32 0.00 0.00 0.00 25,156.10 73,128.22 0.00
01.05.02.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 58.32 13.08 762.83 0.00 0.00 0.00 0.00 762.83 0.00
01.05.02.04 ELIMINACION DE MATERIAL HASTA 2 km m3 99.14 166.04 16,461.21 0.00 0.00 0.00 0.00 15,775.33 685.88
01.05.03 CONEXIONES PRE DOMICILIARIAS DE DESAGUE (64 UND) 40,953.33
01.05.03.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 164.61 1.42 233.75 0.00 0.00 233.75 0.00 0.00 0.00
01.05.03.02 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 148.15 127.93 18,952.83 0.00 0.00 3,481.65 15,471.18 0.00 0.00
01.05.03.03 REFINE, NIVELACION INTERIOR Y COMPACTACION m2 164.61 4.85 798.36 0.00 0.00 0.00 798.36 0.00 0.00
01.05.03.04 CAMA DE APOYO PARA TUBERIA DE AGUA E=10 CM m 411.52 2.98 1,226.33 0.00 0.00 0.00 880.79 345.54 0.00
01.05.03.05 SUMINISTRO E INSTALACIONES DE TUBERIA PVC-U-UF S-25, Ø=110 mm m 411.52 14.78 6,082.27 0.00 0.00 0.00 5,695.79 386.48 0.00
01.05.03.06 CONEXIONES DOMICILIARIAS PARA DESAGUE glb 64.00 176.74 11,311.36 0.00 0.00 0.00 0.00 11,311.36 0.00
01.05.03.07 PRUEBA HIDRAULICA PARA DESAGUE m 411.52 1.16 477.36 0.00 0.00 0.00 0.00 477.36 0.00
01.05.03.08 RELLENO CON MATERIAL PROPIO m3 98.76 10.65 1,051.79 0.00 0.00 1,051.79 0.00 0.00 0.00
01.05.03.09 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 49.38 13.81 681.94 0.00 0.00 0.00 0.00 681.94 0.00
01.05.03.10 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 10.50 13.08 137.34 0.00 0.00 0.00 0.00 137.34 0.00
01.06 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES 152,476.35
01.06.01 CAMARA DE REJAS 1,975.94
01.06.01.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 1.37 1.42 1.95 0.00 0.00 1.95 0.00 0.00 0.00
01.06.01.02 EXCAVACIONES TERRENO NORMAL A PULSO HASTA 1.00 M PROF. m3 0.82 49.08 40.25 0.00 0.00 40.25 0.00 0.00 0.00
01.06.01.03 SOLADO DE CONCRETO F'C=140 Kg/cm2, e=4" m2 1.37 94.31 129.20 0.00 129.20 0.00 0.00 0.00 0.00
01.06.01.04 ENCOFRADO Y DESENCOFRADO m2 10.26 39.88 409.17 0.00 409.17 0.00 0.00 0.00 0.00
01.06.01.05 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 87.39 4.38 382.77 0.00 382.77 0.00 0.00 0.00 0.00
01.06.01.06 CONCRETO f'c=210 Kg/cm2 m3 0.56 457.73 256.33 0.00 256.33 0.00 0.00 0.00 0.00
01.06.01.07 TARRAJEO CON IMPERMEABILISANTES, 1:2 m2 7.48 47.25 353.43 0.00 353.43 0.00 0.00 0.00 0.00
01.06.01.08 TARRAJEO EN EXTERIORES m2 3.00 45.63 136.89 0.00 51.05 85.84 0.00 0.00 0.00
01.06.01.09 PINTURA LATEX m2 3.00 4.18 12.54 0.00 0.00 12.54 0.00 0.00 0.00
01.06.01.10 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 1.03 13.08 13.47 0.00 0.00 13.47 0.00 0.00 0.00
01.06.01.11 CERRAJERIA METALICA glb 1.00 239.94 239.94 0.00 239.94 0.00 0.00 0.00 0.00
01.06.02 CAJA DE CONCRETO 1,860.64
01.06.02.01 CAJA DE CONCRETO VALVULA E INSPECCION und 4.00 252.47 1,009.88 0.00 1,009.88 0.00 0.00 0.00 0.00
01.06.02.02 CAJA DE CONCRETO DISTRIBUCION und 1.00 850.76 850.76 0.00 850.76 0.00 0.00 0.00 0.00
01.06.03 TANQUE SEPTICO 54,373.21
01.06.03.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 41.16 1.42 58.45 0.00 0.00 58.45 0.00 0.00 0.00
01.06.03.02 EXCAVACIONES TERRENO NORMAL A PULSO HASTA 1.00 M PROF. m3 104.96 49.08 5,151.44 0.00 0.00 5,151.44 0.00 0.00 0.00
01.06.03.03 SOLADO DE CONCRETO F'C=140 Kg/cm2, e=4" m2 41.16 94.31 3,881.80 0.00 0.00 2,746.91 1,134.89 0.00 0.00
01.06.03.04 ENCOFRADO Y DESENCOFRADO m2 196.03 39.88 7,817.68 0.00 0.00 0.00 7,817.68 0.00 0.00
01.06.03.05 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 1,016.51 4.38 4,452.31 0.00 0.00 0.00 4,452.31 0.00 0.00
01.06.03.06 CONCRETO f'c=210 Kg/cm2 m3 49.06 457.73 22,456.23 0.00 0.00 0.00 22,456.23 0.00 0.00
01.06.03.07 TARRAJEO CON IMPERMEABILISANTES, 1:2 m2 80.33 47.25 3,795.59 0.00 0.00 0.00 1,354.44 2,441.15 0.00
01.06.03.08 TARRAJEO EN EXTERIORES m2 67.83 45.63 3,095.08 0.00 0.00 0.00 0.00 3,095.08 0.00
01.06.03.09 PINTURA LATEX m2 67.83 4.18 283.53 0.00 0.00 0.00 0.00 283.53 0.00
01.06.03.10 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 131.20 13.08 1,716.10 0.00 0.00 0.00 0.00 1,716.10 0.00
01.06.03.11 ACCESORIOS DE TANQUE SEPTICO glb 1.00 1,665.00 1,665.00 0.00 0.00 1,665.00 0.00 0.00 0.00
01.06.04 POZOS DE PERCOLACION 26,780.94
01.06.04.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 27.88 1.42 39.59 0.00 0.00 39.59 0.00 0.00 0.00
01.06.04.02 EXCAVACIONES TERRENO NORMAL A PULSO HASTA 1.00 M PROF. m3 103.16 49.08 5,063.09 0.00 0.00 5,063.09 0.00 0.00 0.00
01.06.04.03 ENCOFRADO Y DESENCOFRADO m2 68.44 39.88 2,729.39 0.00 0.00 0.00 2,729.39 0.00 0.00
01.06.04.04 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 932.03 4.38 4,082.29 0.00 0.00 2,166.59 1,915.70 0.00 0.00
01.06.04.05 CONCRETO f'c=210 Kg/cm2 m3 12.42 457.73 5,685.01 0.00 0.00 0.00 5,685.01 0.00 0.00
01.06.04.06 GRAVA m3 24.34 109.35 2,661.58 0.00 0.00 0.00 0.00 2,661.58 0.00
01.06.04.07 MURO DE SOGA DE LADRILLO KK CON JUNTAS ABIERTAS m2 93.06 51.47 4,789.80 0.00 0.00 0.00 1,675.43 3,114.37 0.00
01.06.04.08 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 128.96 13.08 1,686.80 0.00 0.00 0.00 737.54 949.26 0.00
01.06.04.09 ACCESORIOS DE POZO DE PERCOLACION glb 1.00 43.39 43.39 0.00 0.00 43.39 0.00 0.00 0.00
01.06.05 LECHO DE SECADO 50,364.33
01.06.05.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 58.52 1.42 83.10 0.00 0.00 83.10 0.00 0.00 0.00
01.06.05.02 EXCAVACIONES TERRENO NORMAL A PULSO HASTA 1.00 M PROF. m3 87.78 49.08 4,308.24 0.00 0.00 4,308.24 0.00 0.00 0.00
01.06.05.03 SOLADO DE CONCRETO F'C=140 Kg/cm2, e=4" m2 58.52 94.31 5,519.02 0.00 0.00 3,905.47 1,613.55 0.00 0.00
01.06.05.04 ENCOFRADO Y DESENCOFRADO m2 150.10 39.88 5,985.99 0.00 0.00 0.00 5,985.99 0.00 0.00
01.06.05.05 ACERO fy=4,200 kg/cm2 (HABILITADO Y COLOCADO) kg 588.75 4.38 2,578.73 0.00 0.00 0.00 2,578.73 0.00 0.00
01.06.05.06 CONCRETO f'c=210 Kg/cm2 m3 24.70 457.73 11,305.93 0.00 0.00 0.00 11,305.93 0.00 0.00
01.06.05.07 GRAVA m3 3.57 109.35 390.38 0.00 0.00 0.00 390.38 0.00 0.00
01.06.05.08 MURO DE SOGA DE LADRILLO KIN KONG CON CON CEMENTO - ARENA m2 4.28 74.34 318.18 0.00 0.00 0.00 318.18 0.00 0.00
01.06.05.09 ARENA DE GRUESA m3 1.37 113.58 155.60 0.00 0.00 0.00 155.60 0.00 0.00
01.06.05.10 DADO DE CONCRETO und 8.00 127.69 1,021.52 0.00 0.00 0.00 1,021.52 0.00 0.00
01.06.05.11 SOPORTE PARA TECHO glb 1.00 5,374.64 5,374.64 0.00 0.00 0.00 5,374.64 0.00 0.00
01.06.05.12 COBERTURA CON TEJA ANDINA m2 148.11 62.29 9,225.77 0.00 0.00 0.00 7,686.00 1,539.77 0.00
01.06.05.13 TARRAJEO EN EXTERIORES m2 45.90 45.63 2,094.42 0.00 0.00 0.00 2,094.42 0.00 0.00
01.06.05.14 PINTURA LATEX m2 45.90 4.18 191.86 0.00 0.00 0.00 191.86 0.00 0.00
01.06.05.15 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 109.73 13.08 1,435.27 0.00 0.00 0.00 1,435.27 0.00 0.00
01.06.05.16 ACCESORIOS DE LECHO DE SECADO glb 1.00 375.68 375.68 0.00 0.00 375.68 0.00 0.00 0.00
01.06.06 TUBERIA PARA LA CONEXION PLANTA DE TRATAMIENTO 6,863.53
01.06.06.01 TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURA m2 61.20 1.42 86.90 0.00 0.00 0.00 86.90 0.00 0.00
01.06.06.02 EXCAVACIONES TERRENO NORMAL A PULSO HASTA 1.00 M PROF. m3 85.68 49.08 4,205.17 0.00 0.00 0.00 4,205.17 0.00 0.00
01.06.06.03 SUMINISTRO E INSTALACIONES DE TUBERIA PVC-U-UF S-25, Ø=160 mm m 6.28 20.75 130.31 0.00 0.00 0.00 64.88 65.43 0.00
01.06.06.04 SUMINISTRO E INSTALACIONES DE TUBERIA PVC-U-UF S-25, Ø=110 mm m 95.72 14.78 1,414.74 0.00 0.00 0.00 704.42 710.32 0.00
01.06.06.05 RELLENO CON MATERIAL PROPIO m3 88.86 10.65 946.36 0.00 0.00 0.00 0.00 946.36 0.00
01.06.06.06 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 6.12 13.08 80.05 0.00 0.00 0.00 0.00 80.05 0.00
01.06.07 CERCO PERIMETRICO DE PLANTA DE TRATAMIENTO 10,257.76
01.06.07.01 EXCAVACION MANUAL, MATERIAL CONGLOMERADO, HASTA 1.50 m m3 0.97 127.93 124.09 0.00 0.00 0.00 124.09 0.00 0.00
01.06.07.02 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30m m3 1.21 13.08 15.83 0.00 0.00 0.00 15.83 0.00 0.00
01.06.07.03 CONCRETO f´c = 140 kg/cm2 PARA DADOS m3 0.97 275.42 267.16 0.00 0.00 0.00 267.16 0.00 0.00
01.06.07.04 POSTE DE F° G° INCL. COLOCACION und 27.00 110.00 2,970.00 0.00 0.00 0.00 2,970.00 0.00 0.00
01.06.07.05 CERCO PERIMETRICO CON MALLA OLIMPICA INC/PINTURA - COLOCACION m 66.15 98.00 6,482.70 0.00 0.00 0.00 6,482.70 0.00 0.00
01.06.07.06 PUERTA GALVANIZADA CON MALLA OLIMPICA INC/ PINTUTA - COLOCACION und 1.00 159.46 159.46 0.00 0.00 0.00 139.44 20.02 0.00
01.06.07.07 ALAMBRE DE PUAS m 67.00 3.56 238.52 0.00 0.00 0.00 0.00 238.52 0.00
01.07 PLAN DE EDUCACION SANITARIA 5,000.00
01.07.01 PLAN DE EDUCACION SANITARIA glb 1.00 5,000.00 5,000.00 0.00 2,000.00 2,000.00 1,000.00 0.00 0.00
01.08 CAPACITACIONES 7,000.00
01.08.01 GASTOS DE CAPACITACION Y SERVICIO DE SANEAMIENTO - JASS glb 1.00 3,000.00 3,000.00 0.00 0.00 0.00 3,000.00 0.00 0.00
01.08.02 MODULO DE OPERACION Y MANTENIMIENTO glb 1.00 4,000.00 4,000.00 0.00 0.00 0.00 4,000.00 0.00 0.00
01.09 MITIGACION DE IMPACTO AMBIENTAL 10,840.00
01.09.01 MITIGACION DEL IMPACTO AMBIENTAL glb 1.00 8,000.00 8,000.00 0.00 5,381.23 878.78 908.08 831.91 0.00
01.09.02 REACONDICIONAMIENTO DE BOTADEROS m2 200.00 14.20 2,840.00 0.00 109.94 916.13 946.67 867.27 0.00
01.10 PRUEBAS DE CALIDAD 5,500.00
01.10.01 DISEÑO DE MEZCLA und 2.00 250.00 500.00 500.00 0.00 0.00 0.00 0.00 0.00
01.10.02 ROTURA DE PROBETAS und 20.00 25.00 500.00 0.00 0.00 250.00 250.00 0.00 0.00
01.10.03 TEST DE PERCOLACION und 10.00 450.00 4,500.00 0.00 1,818.65 2,681.35 0.00 0.00 0.00
01.11 FLETE 120,640.68
01.11.01 FLETE TERRESTRE glb 1.00 25,300.00 25,300.00 8,215.60 8,866.82 8,217.57 0.00 0.00 0.00
01.11.02 FLETE RURAL glb 1.00 95,340.68 95,340.68 28,190.79 30,425.36 31,899.54 4,825.00 0.00 0.00
COSTO DIRECTO 1,211,458.17 90,583.62 203,556.53 332,170.80 302,322.81 262,387.51 20,436.90
GASTOS GENERALES (11.00%) 133,260.40 9,964.20 22,391.22 36,538.79 33,255.51 28,862.63 2,248.05
UTILIDADES (8.00%) 96,916.65 7,246.69 16,284.52 26,573.66 24,185.82 20,991.00 1,634.96
SUBTOTAL 1,441,635.22 107,794.51 242,232.27 395,283.25 359,764.14 312,241.14 24,319.91
IGV (18.00%) 259,494.34 19,403.01 43,601.81 71,150.98 64,757.54 56,203.41 4,377.59
COSTO TOTAL 1,701,129.56 127,197.52 285,834.08 466,434.23 424,521.68 368,444.55 28,697.50
% AVANCE MENSUAL 7.48% 16.80% 27.42% 24.96% 21.66% 1.69%
% AVANCE MENSUAL ACUMULADO 7.48% 24.28% 51.70% 76.65% 98.31% 100.00%
CONSORCIO RIMAC

CONTROL DE VALORIZACION MENSUAL

OBRA "MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASICO DEL CASERIO DE SANTA CATALINA, DISTRITO DE HUARAZ - PROVINCIA DE HUARAZ - ANCASH"

MODALIDAD Contrato a Costos Unitarios

ENTIDAD MUNICIPALIDAD PROVINCIAL DE HUARAZ


FEBRERO DEL 2020
CONTRATISTA CONSORCIO RIMAC CORRESPONDIENTE AL MES DE:

PRESUPUESTO 1,701,129.56 (01/02/20 AL 29/02/2020)


RESIDENTE ING. DAVID ROGELIO AQUINO CONDEZO CIP N° 83021
SUPERVISOR ING. OSKAR YVAN PEREZ SAL Y ROSAS CIP N° 163288

.
AMORTIZ. DEL ADELANTO DEDUCCIONES DEDUCCIONES 10% DE
VALORIZ. MONTO VALORIZ. MONTO A NETO A
PERIODO VALORIZADO REAJUSTES I.G.V. FONDO DE
N° BRUTO EN EFECTIVO MATERIALES ADEL. EFECTIVO ADEL. MATERIALES NETA FACTURAR PAGAR
GARANTIA
VALORIZ. 01 (Del 20 al 31 de Enero del 2020) 01 237,889.23 0.00 0.00 0.00 0.00 0.00 237,889.23 42,820.06 280,709.29 85,056.48 195,652.81
VALORIZ. 02 (Del 01 al 29 de Febrero del 2020) 02 232,714.19 0.00 0.00 0.00 0.00 0.00 232,714.19 41,888.55 274,602.74 85,056.48 189,546.26
VALORIZ. 03 0.00
VALORIZ. 04 0.00
VALORIZ. 05 0.00
VALORIZ. 06 0.00
CONSORCIO T y M
#REF!
OBRA : #REF!
CONSULTOR : CONSORCIO SUERVISOR SANTA CATALINA
CONTRATISTA : #REF!
RESIDENTE DE OBRAING. DAVID ROGELIO AQUINO CONDEZO CIP N° 83021
JEFE DE SUPERVISIING. OSKAR YVAN PEREZ SAL Y ROSAS CIP N° 163288
ESPECIALIDAD : ARQUITECTURA
PRESUPUESTO AVANCE FISICO
Item DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO Saldo de Val.
Und. Metrado Precio S/. Parcial S/.
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
001 ARQUITECTURA 2,418,990.26 S/. - S/. - S/. - S/. 310,761.49
01.01 MUROS Y TABIQUES DE ALBAÑILERIA 283,745.06 0.00 0.00% 0.00 0.00% 0.00 283,745.06
01.01.01 MUROS Y TABIQUES DE ALBAÑILERIA 131,689.23 0.00 0.00% 0.00 0.00% 0.00 0.00% 131,689.23
MUROS DE LADRILLO KING KONG DE ARCILLA ( A MAQUINA )
01.01.01.01 m2 1,745.90 52.19 91,118.52 0.00 0.00 0.00 91,118.52
DE SOGA MEZCLA C:A 1:4; TIPO IV PARA TARRAJEO - 0.00% - 0.00% - 0.00% 1,745.90 100.00%
MUROS DE LADRILLO KING KONG DE ARCILLA ( A MAQUINA )
01.01.01.02 m2 467.62 86.76 40,570.71 0.00 0.00 0.00 40,570.71
DE CABEZA MEZCLA C:A 1:4; TIPO IV PARA TARRAJEO - 0.00% - 0.00% - 0.00% 467.62 100.00%
MUROS Y TABIQUES CON EL SISTEMA DE CONSTRUCCION EN
01.01.02 137,798.37 0.00 0.00 0.00 137,798.37
SECO 0.00% 0.00% 0.00%
TABIQUE UNA CARA DE DRYWALL, PLACA DE FIBROCEMENTO
01.01.02.01 m2 28.57 61.23 1,749.34 0.00 0.00 0.00 1,749.34
12mm - 0.00% - 0.00% - 0.00% 28.57 100.00%
01.01.02.02 PANEL ACUSTICO DE MDF TIPO FRESADO m2 256.02 531.40 136,049.03 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 256.02 136,049.03 100.00%
01.01.03 TABIQUES CON ELEMENTOS LEVES ( MELAMINA ) 5,540.69 0.00 0.00% 0.00 0.00% 0.00 0.00% 5,540.69
TABIQUE DE MELAMINA, H = 1.50 M, CON CRISTAL TEMPLADO
01.01.03.01 m 27.53 201.26 5,540.69 0.00 0.00 0.00 5,540.69
DE 6 mm - 0.00% - 0.00% - 0.00% 27.53 100.00%
01.01.04 BARANDAS Y PARAPETOS 8,716.77 0.00 0.00% 0.00 0.00% 0.00 0.00% 8,716.77
PARAPETO DE LADRILLO KING KONG DE ARCILLA ( A MAQUINA
01.01.04.01 m2 167.02 52.19 8,716.77 0.00 0.00 0.00 8,716.77
) DE SOGA MEZCLA C:A 1:4; TIPO IV PARA TARRAJEO - 0.00% - 0.00% - 0.00% 167.02 100.00%
01.02 REVOQUES Y REVESTIMIENTOS 380,986.01 0.00 0.00% 0.00 0.00% 0.00 0.00% 380,986.01
01.02.01 REVOQUES, ENLUCIDOS Y MOLDURAS 282,754.54 0.00 0.00% 0.00 0.00% 0.00 0.00% 282,754.54
TARRAJEO PRIMARIO Y RAYADO DE MUROS INTERIORES
01.02.01.01 m2 628.42 18.66 11,726.32 0.00 0.00 0.00 11,726.32
MEZC. C:A 1:5 - 0.00% - 0.00% - 0.00% 628.42 100.00%
TARRAJEO FROTACHADO DE MUROS INTERIORES MEZC. C:A
01.02.01.02 m2 4,109.96 17.30 71,102.31 0.00 0.00 0.00 71,102.31
1:5, E = 1.5 cm - 0.00% - 0.00% - 0.00% 4,109.96 100.00%
TARRAJEO FROTACHADO DE MUROS EXTERIORES MEZC. C:A
01.02.01.03 m2 1,233.14 22.59 27,856.63 0.00 0.00 0.00 27,856.63
1:5, E = 1.5 cm - 0.00% - 0.00% - 0.00% 1,233.14 100.00%
01.02.01.04 TARRAJEO EN COLUMNAS MEZC. C:A 1:5, E = 1.5 cm m2 303.36 26.58 8,063.31 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 303.36 8,063.31 100.00%
01.02.01.05 TARRAJEO DE VIGAS MEZC. C:A 1:5, E = 1.5 cm m2 991.66 35.56 35,263.43 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 991.66 35,263.43 100.00%
TARRAJEO DE MUROS DE CONCRETO MEZC. C:A 1:5, E = 1.5
01.02.01.06 m2 1,029.42 28.99 29,842.89 0.00 0.00 0.00 29,842.89
cm - 0.00% - 0.00% - 0.00% 1,029.42 100.00%

01.02.01.07 TARRAJEO CON IMPERMEABILIZANTE MEZC. C:A 1:4, E = 1.5 cm m2 690.45 58.93 40,688.22 0.00 0.00 0.00 40,688.22
- 0.00% - 0.00% - 0.00% 690.45 100.00%
01.02.01.08 VESTIDURA DE DERRAMES, ANCHO = 0.15 M m 679.96 15.00 10,199.40 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 679.96 10,199.40 100.00%
01.02.01.09 VESTIDURA DE DERRAMES, ANCHO = 0.25 M m 32.40 18.49 599.08 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 32.40 599.08 100.00%
01.02.01.10 BRUÑAS DE 1 cm x 1 cm m 2,416.15 6.68 16,139.88 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2,416.15 16,139.88 100.00%
01.02.01.11 TARRAJEO EN FONDO DE ESCALERA m2 77.76 33.80 2,628.29 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 77.76 2,628.29 100.00%
FORJADO DE GRADAS Y ESCALERAS DE CEMENTO
01.02.01.12 m2 76.28 26.96 2,056.51 0.00 0.00 0.00 2,056.51
FROTACHADO - 0.00% - 0.00% - 0.00% 76.28 100.00%
01.02.01.13 FORJADO DE DESCANSO CON CEMENTO FROTACHADO m2 25.92 23.13 599.53 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 25.92 599.53 100.00%
01.02.01.14 SOLAQUEO DE MUROS DE CONCRETO, COLUMNAS m2 1,549.00 8.49 13,151.01 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1,549.00 13,151.01 100.00%
01.02.01.15 SOLAQUEO DE VIGAS m2 1,512.10 8.49 12,837.73 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1,512.10 12,837.73 100.00%
01.02.02 REVESTIMIENTOS 98,231.47 0.00 0.00% 0.00 0.00% 0.00 0.00% 98,231.47
REVESTIMIENTO DE SARDINEL DE CONCRETO CON
01.02.02.01 m2 31.06 109.43 3,398.90 0.00 0.00 0.00 3,398.90
PORCELANATO 60 cm x 60 cm - 0.00% - 0.00% - 0.00% 31.06 100.00%

36 de 114
PRESUPUESTO AVANCE FISICO
Item DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO Saldo de Val.
Und. Metrado Precio S/. Parcial S/.
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
REVESTIMIENTO DE CANALETA CON CEMENTO PULIDO CON
01.02.02.02 m2 16.46 26.12 429.94 0.00 0.00 0.00 429.94
IMPERMEABILIZANTE - 0.00% - 0.00% - 0.00% 16.46 100.00%
REVESTIMIENTO DE TABLERO DE CONCRETO CON TERRAZO
01.02.02.03 m 10.96 30.41 333.29 0.00 0.00 0.00 333.29
PULIDO, ANCHO = 0.60 m ( SEGUN DISEÑO ) - 0.00% - 0.00% - 0.00% 10.96 100.00%
REVESTIMIENTO DE TABLERO DE CONCRETO CON
01.02.02.04 m2 12.75 102.54 1,307.39 0.00 0.00 0.00 1,307.39
PORCELANATO 60 cm x 60 cm - 0.00% - 0.00% - 0.00% 12.75 100.00%
REVESTIMIENTO DE BANCA DE CONCRETO CON LISTONES DE
01.02.02.05 m2 11.04 147.28 1,625.97 0.00 0.00 0.00 1,625.97
MADERA CEDRO 4" x 1" - 0.00% - 0.00% - 0.00% 11.04 100.00%
REVESTIMIENTO DE POYO DE CONCRETO PARA INODORO
01.02.02.06 m2 0.79 96.27 76.05 0.00 0.00 0.00 76.05
CON PORCELANATO 60 cm x 60 cm - 0.00% - 0.00% - 0.00% 0.79 100.00%
REVESTIMIENTO DE CUNETA CON CEMENTO PULIDO E
01.02.02.07 m 5.21 15.70 81.80 0.00 0.00 0.00 81.80
IMPERMEABILIZANTE - 0.00% - 0.00% - 0.00% 5.21 100.00%
01.02.02.08 REVESTIMIENTO DE MURO CON FACHALETA m2 109.60 65.79 7,210.58 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 109.60 7,210.58 100.00%
REVESTIMIENTO CON PANEL DE ALUMINIO COMPUESTO, E = 4
01.02.02.09 m2 98.84 761.40 75,256.78 0.00 0.00 0.00 75,256.78
mm, INC. SISTEMA DE FIJACION - 0.00% - 0.00% - 0.00% 98.84 100.00%
REVESTIMIENTO DE GRADAS Y ESCALERAS CON TERRAZO
01.02.02.10 m2 76.28 91.99 7,017.00 0.00 0.00 0.00 7,017.00
PULIDO - 0.00% - 0.00% - 0.00% 76.28 100.00%
REVESTIMIENTO DE DESCANSO DE ESCALERA CON TERRAZO
01.02.02.11 m2 25.92 57.63 1,493.77 0.00 0.00 0.00 1,493.77
PULIDO - 0.00% - 0.00% - 0.00% 25.92 100.00%
01.03 CIELORRASOS 392,567.68 0.00 0.00% 0.00 0.00% 0.00 0.00% 392,567.68
01.03.01 CIELORRASO CON MEZC. C:A 1:5, E = 1.5 cm m2 646.86 29.27 18,933.59 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 646.86 18,933.59 100.00%
01.03.02 VESTIDURA DE FONDO DE TABLERO m2 18.35 23.14 424.62 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 18.35 424.62 100.00%
01.03.03 SOLAQUEO DE CIELORRASOS m2 2,244.73 11.66 26,173.55 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2,244.73 26,173.55 100.00%
FALSO CIELORRASO CON BALDOSAS ACUSTICAS DE FIBRA
01.03.04 m2 421.68 120.52 50,820.87 0.00 0.00 0.00 50,820.87
MINERAL 0.61 m x 0.61 m, E = 5/8", TIPO A - 0.00% - 0.00% - 0.00% 421.68 100.00%
FALSO CIELORRASO CON BALDOSAS ACUSTICAS DE FIBRA
01.03.05 m2 542.89 148.19 80,450.87 0.00 0.00 0.00 80,450.87
MINERAL 0.61 m x 0.61 m, E = 5/8", TIPO B - 0.00% - 0.00% - 0.00% 542.89 100.00%
FALSO CIELORRASO CON BALDOSAS ACUSTICAS DE FIBRA
01.03.06 m2 26.14 166.10 4,341.85 0.00 0.00 0.00 4,341.85
MINERAL 0.61 m x 0.61 m, E = 5/8", TIPO C - 0.00% - 0.00% - 0.00% 26.14 100.00%
FALSO CIELORRASO CON BALDOSAS ACUSTICAS DE FIBRA
01.03.07 m2 98.61 345.55 34,074.69 0.00 0.00 0.00 34,074.69
MINERAL 0.61 m x 0.61 m, E = 5/8", TIPO D - 0.00% - 0.00% - 0.00% 98.61 100.00%
FALSO CIELORRASO CON BALDOSAS ACUSTICAS DE FIBRA
01.03.08 m2 221.02 735.98 162,666.30 0.00 0.00 0.00 162,666.30
MINERAL 0.61 m x 0.61 m, E = 5/8", TIPO E - 0.00% - 0.00% - 0.00% 221.02 100.00%
FALSO CIELORRASO CON PLANCHA YESO GYPLAC STANDARD
01.03.09 m2 262.12 56.01 14,681.34 0.00 0.00 0.00 14,681.34
ST 1/2" ( 12.7 mm ) SIST. DRYWALL SUSPENDIDO - 0.00% - 0.00% - 0.00% 262.12 100.00%
01.04 PISOS Y PAVIMENTOS 349,439.81 0.00 0.00% 0.00 0.00% 0.00 0.00% 349,439.81
01.04.01 CONTRAPISOS 71,904.83 0.00 0.00% 0.00 0.00% 0.00 0.00% 71,904.83
CONTRAPISO, E = 4.00 cm, BASE 3.00 cm, MEZC.1:5, ACABADO
01.04.01.01 m2 2,501.17 25.21 63,054.50 0.00 0.00 0.00 63,054.50
1.00 cm, PASTA 1:2 - 0.00% - 0.00% - 0.00% 2,501.17 100.00%
CONTRAPISO, E = 3.80 cm, BASE 2.80 cm, MEZC.1:5, ACABADO
01.04.01.02 m2 290.27 30.49 8,850.33 0.00 0.00 0.00 8,850.33
1.00 cm, PASTA 1:2, ACABADO SEMI - PULIDO - 0.00% - 0.00% - 0.00% 290.27 100.00%
01.04.02 PISOS 182,449.64 0.00 0.00% 0.00 0.00% 0.00 0.00% 182,449.64
01.04.02.01 PISO DE PORCELANATO 60 x 60 cm, ALTO TRANSITO m2 1,525.17 96.69 147,468.69 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1,525.17 147,468.69 100.00%
01.04.02.02 PISO DE ALFOMBRA ALTO TRANSITO, E = 12 mm m2 239.23 88.52 21,176.64 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 239.23 21,176.64 100.00%
01.04.02.03 PISO DE TERRAZO PULIDO m2 117.12 98.65 11,553.89 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 117.12 11,553.89 100.00%
01.04.02.04 PISO DE MADERA MACHIHEMBRADA PUMAQUIRO 3/4" x 4" m2 51.03 44.10 2,250.42 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 51.03 2,250.42 100.00%
01.04.03 PISOS DE CONCRETO 90,020.23 0.00 0.00% 0.00 0.00% 0.00 0.00% 90,020.23
01.04.03.01 PISO DE CEMENTO FROTACHADO Y BRUÑADO, E = 2" m2 1,922.46 35.14 67,555.24 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1,922.46 67,555.24 100.00%
01.04.03.02 PISO DE CEMENTO SEMI - PULIDO Y BRUÑADO, E = 2" m2 617.17 36.40 22,464.99 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 617.17 22,464.99 100.00%
01.04.04 SARDINELES 2,528.25 0.00 0.00% 0.00 0.00% 0.00 0.00% 2,528.25
SARDINEL PERALTADO DE CONCRETO F'C = 140 Kg/cm2, H =
01.04.04.01 m 59.20 34.00 2,012.80 0.00 0.00 0.00 2,012.80
0.15 M; ANCHO = 0.15 M - 0.00% - 0.00% - 0.00% 59.20 100.00%
SARDINEL PERALTADO DE CONCRETO F'C = 140 Kg/cm2, H =
01.04.04.02 m 9.85 52.33 515.45 0.00 0.00 0.00 515.45
0.45 M; ANCHO = 0.15 M - 0.00% - 0.00% - 0.00% 9.85 100.00%

37 de 114
PRESUPUESTO AVANCE FISICO
Item DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO Saldo de Val.
Und. Metrado Precio S/. Parcial S/.
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
01.04.05 VEREDAS Y RAMPAS 2,536.86 0.00 0.00% 0.00 0.00% 0.00 0.00% 2,536.86
VEREDA DE CONCRETO F'C = 175 Kg/cm2, E = 4", ACABADO EN
01.04.05.01 m2 4.53 47.41 214.77 0.00 0.00 0.00 214.77
CEMENTO SEMI - PULIDO Y BRUÑADO, INC. BASE GRANULAR - 0.00% - 0.00% - 0.00% 4.53 100.00%
RAMPA DE CONCRETO F'C = 175 Kg/cm2, E = 2"; ACABADO EN
01.04.05.02 m2 32.02 72.52 2,322.09 0.00 0.00 0.00 2,322.09
CEMENTO FORTACHADO Y BRUÑADO - 0.00% - 0.00% - 0.00% 32.02 100.00%
01.05 ZOCALOS Y CONTRAZOCALOS 73,975.88 0.00 0.00% 0.00 0.00% 0.00 0.00% 73,975.88
01.05.01 ZOCALOS 42,453.64 0.00 0.00% 0.00 0.00% 0.00 0.00% 42,453.64
01.05.01.01 ZOCALO DE PORCELANATO 60 x 60 cm m2 498.17 84.50 42,095.37 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 498.17 42,095.37 100.00%
01.05.01.02 ZOCALO DE CEMENTO PULIDO m2 15.55 23.04 358.27 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 15.55 358.27 100.00%
01.05.02 CONTRAZOCALOS 31,522.24 0.00 0.00% 0.00 0.00% 0.00 0.00% 31,522.24
01.05.02.01 CONTRAZOCALO DE CEMENTO PULIDO, H = 0.10 M m 977.42 10.63 10,389.97 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 977.42 10,389.97 100.00%
CONTRAZOCALO DE CEMENTO PULIDO CON
01.05.02.02 m 106.42 9.38 998.22 0.00 0.00 0.00 998.22
IMPERMEABILIZANTE, H = 0.10 M - 0.00% - 0.00% - 0.00% 106.42 100.00%
01.05.02.03 CONTRAZOCALO DE PORCELANATO 60 x 60 cm, H = 0.10 M m 626.65 21.46 13,447.91 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 626.65 13,447.91 100.00%
01.05.02.04 CONTRAZOCALO DE TERRAZO PULIDO, H = 0.10 M m 166.52 19.24 3,203.84 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 166.52 3,203.84 100.00%
01.05.02.05 CONTRAZOCALO DE MADERA TORNILLO 3/4" x 4", H = 0.10 M m 79.64 16.47 1,311.67 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 79.64 1,311.67 100.00%
CONTRAZOCALO RECTO EN GRADAS Y ESCALERAS DE
01.05.02.06 m 106.77 20.33 2,170.63 0.00 0.00 0.00 2,170.63
TERRAZO PULIDO, H = 0.10 M - 0.00% - 0.00% - 0.00% 106.77 100.00%
01.06 COBERTURAS Y CUBIERTAS 46,089.28 0.00 0.00% 0.00 0.00% 0.00 0.00% 46,089.28
01.06.01 COBERTURAS 21,580.56 0.00 0.00% 0.00 0.00% 0.00 0.00% 21,580.56
COBERTURA DE POLICARBONATO CELULAR 8 mm
01.06.01.01 m2 92.44 87.53 8,091.27 0.00 0.00 0.00 8,091.27
TRASLUCIDO - 0.00% - 0.00% - 0.00% 92.44 100.00%
COBERTURA DE PANEL TERMOACUSTICO CON PLANCHA DE
01.06.01.02 m2 379.98 35.50 13,489.29 0.00 0.00 0.00 13,489.29
ACERO ALUMINIZADA, ESPUMA DE POLIURETANO - 0.00% - 0.00% - 0.00% 379.98 100.00%
01.06.02 CUBIERTAS 24,508.72 0.00 0.00% 0.00 0.00% 0.00 0.00% 24,508.72
CUBIERTA DE MORTERO IMPERMEABILIZADO MEZC. C:A 1:4, E
01.06.02.01 m2 538.18 45.54 24,508.72 0.00 0.00 0.00 24,508.72
= 2", ACABADO EN CEMENTO PULIDO Y BRUÑADO - 0.00% - 0.00% - 0.00% 538.18 100.00%
01.07 CARPINTERIA DE MADERA 325,564.68 0.00 0.00% 0.00 0.00% 0.00 0.00% 325,564.68
01.07.01 PUERTAS 286,774.18 0.00 0.00% 0.00 0.00% 0.00 0.00% 286,774.18
PUERTA CONTRAPLACADA, E = 50.1 mm CON MDF 6 mm
01.07.01.01 m2 97.65 202.97 19,820.02 0.00 0.00 0.00 19,820.02
LAMINADO - 0.00% - 0.00% - 0.00% 97.65 100.00%
PUERTA CONTRAPLACADA, E = 50.1 mm CON MDF 6 mm
01.07.01.02 m2 3.36 265.73 892.85 0.00 0.00 0.00 892.85
LAMINADO Y PANEL ACUSTICO DE MDF TIPO FRESADO - 0.00% - 0.00% - 0.00% 3.36 100.00%
01.07.01.03 SUMINISTRO E INSTALACION DE PARTICIONES ACUSTICAS m2 127.60 2,085.12 266,061.31 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 127.60 266,061.31 100.00%
01.07.02 MARCOS 7,945.05 0.00 0.00% 0.00 0.00% 0.00 0.00% 7,945.05
01.07.02.01 MARCO DE MADERA CEDRO 4" x 2" m 270.70 29.35 7,945.05 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 270.70 7,945.05 100.00%
01.07.03 MUEBLES DE ATENCION, COCINA Y SIMILARES 8,411.28 0.00 0.00% 0.00 0.00% 0.00 0.00% 8,411.28
MUEBLE FIJO CON TABLERO AGLOMERADO DE 18 mm
01.07.03.01 m 12.65 320.00 4,048.00 0.00 0.00 0.00 4,048.00
LAMINADO, EN BASE DE CONCRETO - 0.00% - 0.00% - 0.00% 12.65 100.00%
MUEBLE FIJO CON TABLERO AGLOMERADO DE 18 mm
01.07.03.02 LAMINADO CON PLANCHA MELAMINICA O SIMILAR POSTFORMADO, m 5.30 357.00 1,892.10 0.00 0.00 0.00 1,892.10
H=0.90m , CON SOPORTES METALICOS - 0.00% - 0.00% - 0.00% 5.30 100.00%
MUEBLE FIJO CON TABLERO AGLOMERADO DE 18 mm
01.07.03.03 LAMINADO CON PLANCHA MELAMINICA O SIMILAR POSTFORMADO, m 5.23 472.50 2,471.18 0.00 0.00 0.00 2,471.18
H=1.10 m - 0.00% - 0.00% - 0.00% 5.23 100.00%
01.07.04 VARIOS 22,434.17 0.00 0.00% 0.00 0.00% 0.00 0.00% 22,434.17
01.07.04.01 REJILLA DE MADERA CEDRO EN PUERTA m2 3.51 152.00 533.52 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.51 533.52 100.00%
01.07.04.02 DIVISIONES DE MELAMINA EN SS.HH. m2 53.33 390.88 20,845.63 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 53.33 20,845.63 100.00%
01.07.04.03 DIVISIONES DE MELAMINA EN URINARIOS m2 1.80 127.68 229.82 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.80 229.82 100.00%
REFUERZO DE MADERA TORNILLO 2" x 3 1/2" EN TABIQUE
01.07.04.04 m 40.00 20.63 825.20 0.00 0.00 0.00 825.20
DRYWALL - 0.00% - 0.00% - 0.00% 40.00 100.00%
01.08 CARPINTERIA METALICA Y HERRERIA 187,286.54 0.00 0.00% 0.00 0.00% 0.00 0.00% 187,286.54
01.08.01 VENTANAS 3,439.02 0.00 0.00% 0.00 0.00% 0.00 0.00% 3,439.02
01.08.01.01 VENTANA METALICA DE INSPECCION und 2.00 198.76 397.52 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 397.52 100.00%

38 de 114
PRESUPUESTO AVANCE FISICO
Item DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO Saldo de Val.
Und. Metrado Precio S/. Parcial S/.
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
VENTANA METALICA TIPO REJILLA CON PLATINA DE Fe 1 1/2" x
01.08.01.02 m2 5.96 342.68 2,042.37 0.00 0.00 0.00 2,042.37
1/8" - 0.00% - 0.00% - 0.00% 5.96 100.00%
01.08.01.03 VENTANA DE MALLA ELECTRO SOLDADA m2 4.44 225.03 999.13 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 4.44 999.13 100.00%
01.08.02 PUERTAS 141,694.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 141,694.00
PUERTA CORTAFUEGO CON UNA HOJA BATIENTE CON
01.08.02.01 pza 4.00 6,010.43 24,041.72 0.00 0.00 0.00 24,041.72
PLANCHA 1/20" RESISTENTE AL FUEGO 90 MIN. ( 1.00 m x 2.10 m ) - 0.00% - 0.00% - 0.00% 4.00 100.00%
PUERTA CORTAFUEGO CON UNA HOJA BATIENTE CON
01.08.02.02 pza 9.00 6,158.43 55,425.87 0.00 0.00 0.00 55,425.87
PLANCHA 1/20" RESISTENTE AL FUEGO 90 MIN. ( 1.20 m x 2.10 m ) - 0.00% - 0.00% - 0.00% 9.00 100.00%
PUERTA CORTAFUEGO CON DOS HOJAS BATIENTES CON
01.08.02.03 pza 2.00 7,922.93 15,845.86 0.00 0.00 0.00 15,845.86
PLANCHA 1/20" RESISTENTE AL FUEGO 90 MIN. ( 1.80 m x 2.10 m ) - 0.00% - 0.00% - 0.00% 2.00 100.00%
PUERTA METALICA UNA HOJA BATIENTE CON PLANCHA DE Fe,
01.08.02.04 pza 8.00 1,488.43 11,907.44 0.00 0.00 0.00 11,907.44
E = 2 mm ( 0.90 m x 2.10 m ) - 0.00% - 0.00% - 0.00% 8.00 100.00%
PUERTA METALICA DOS HOJAS BATIENTES CON PLANCHA DE
01.08.02.05 pza 1.00 2,738.43 2,738.43 0.00 0.00 0.00 2,738.43
Fe, E = 2 mm ( 1.80 m x 2.10 m ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
PUERTA METALICA DOS HOJAS BATIENTES CON REJILLA, CON
01.08.02.06 pza 2.00 2,738.43 5,476.86 0.00 0.00 0.00 5,476.86
PLANCHA DE Fe, E = 2 mm ( 1.80 m x 2.10 m ) - 0.00% - 0.00% - 0.00% 2.00 100.00%
SUMINISTRO E INSTALACION DE PUERTA METALICA
01.08.02.07 pza 1.00 12,500.00 12,500.00 0.00 0.00 0.00 12,500.00
SECCIONABLE PARA ACCESO A ESTACIONAMIENTOS - 0.00% - 0.00% - 0.00% 1.00 100.00%
PUERTA METALICA CON PLANCHA 1/20" ACANALADA Y
01.08.02.08 PLANCHA DE ACERO 1/32" CON DOS HOJAS CORREDIZAS, 3.00 m x pza 1.00 6,929.19 6,929.19 0.00 0.00 0.00 6,929.19
2.10 m - 0.00% - 0.00% - 0.00% 1.00 100.00%
PUERTA METALICA, TIPO REJA CON BARRAS DE FIERRO ( 1.00
01.08.02.09 pza 1.00 1,197.77 1,197.77 0.00 0.00 0.00 1,197.77
m x 2.10 m ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
PUERTA METALICA, TIPO REJA CON BARRAS DE FIERRO ( 1.80
01.08.02.10 pza 1.00 1,739.78 1,739.78 0.00 0.00 0.00 1,739.78
x 2.10 M ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
PUERTA METALICA, TIPO REJA CON BARRAS DE FIERRO ( 1.90
01.08.02.11 pza 2.00 1,945.54 3,891.08 0.00 0.00 0.00 3,891.08
x 2.50 M ) - 0.00% - 0.00% - 0.00% 2.00 100.00%
01.08.03 BARANDAS METALICAS 25,355.94 0.00 0.00% 0.00 0.00% 0.00 0.00% 25,355.94
01.08.03.01 BARANDA METALICA Ø 2", H = 0.90 M m 20.01 133.54 2,672.14 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 20.01 2,672.14 100.00%
01.08.03.02 BARANDA METALICA CENTRAL EN ESCALERA Ø 2", H = 0.90 M m 53.33 142.90 7,620.86 0.00 0.00 0.00 7,620.86
- 0.00% - 0.00% - 0.00% 53.33 100.00%
BARANDA METALICA CON CRISTAL TEMPLADO INCOLORO 8
01.08.03.03 m 61.65 244.33 15,062.94 0.00 0.00 0.00 15,062.94
mm Ø 2", H = 0.90 M - 0.00% - 0.00% - 0.00% 61.65 100.00%
01.08.04 PASAMANOS METALICOS 7,270.75 0.00 0.00% 0.00 0.00% 0.00 0.00% 7,270.75
01.08.04.01 PASAMANOS DE FIERRO Ø 2" m 87.19 72.69 6,337.84 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 87.19 6,337.84 100.00%
AGARRADERA PARA DISCAPACITADOS EN LAVATORIOS, Ø 1
01.08.04.02 und 3.00 158.23 474.69 0.00 0.00 0.00 474.69
1/2" - 0.00% - 0.00% - 0.00% 3.00 100.00%
01.08.04.03 AGARRADERA PARA MINUSVALIDOS EN INODOROS, Ø 1 1/2" und 3.00 152.74 458.22 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 458.22 100.00%
01.08.05 ELEMENTOS METALICOS ESPECIALES 9,526.83 0.00 0.00% 0.00 0.00% 0.00 0.00% 9,526.83
TAPA METALICA DE INSPECCION CON PLANCHA DE FIERRO
01.08.05.01 und 2.00 204.14 408.28 0.00 0.00 0.00 408.28
1.50 mm x 1200 mm x 2400 mm ( 1/16" ); 0.90 M x 0.75 M - 0.00% - 0.00% - 0.00% 2.00 100.00%
ESCALERA TIPO GATO DE FIERRO ( ANCHO = 0.50 M, ALTURA =
01.08.05.02 und 2.00 469.31 938.62 0.00 0.00 0.00 938.62
1.00 m) - 0.00% - 0.00% - 0.00% 2.00 100.00%
ESCALERA TIPO GATO DE FIERRO ( ANCHO = 0.50 M, ALTURA =
01.08.05.03 und 1.00 1,325.46 1,325.46 0.00 0.00 0.00 1,325.46
3.40 m) - 0.00% - 0.00% - 0.00% 1.00 100.00%
01.08.05.04 REJILLA METALICA EN CUNETA, ANCHO = 0.25 M m 29.17 161.60 4,713.87 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 29.17 4,713.87 100.00%
PROTECTOR DE ESQUINAS CON ANGULO "L" DE FIERRO 2" x 2"
01.08.05.05 pza 140.00 15.29 2,140.60 0.00 0.00 0.00 2,140.60
x 1/8" x 6 m, H = 1.00 m - 0.00% - 0.00% - 0.00% 140.00 100.00%
01.09 CARPINTERIA DE ALUMINIO 49,636.36 0.00 0.00% 0.00 0.00% 0.00 0.00% 49,636.36
01.09.01 VENTANAS 31,030.78 0.00 0.00% 0.00 0.00% 0.00 0.00% 31,030.78
VENTANA DE ALUMINIO, TIPO PIVOTANTE CON CRISTAL
01.09.01.01 m2 93.50 331.88 31,030.78 0.00 0.00 0.00 31,030.78
TEMPLADO REFLEJANTE GRIS 6 mm - 0.00% - 0.00% - 0.00% 93.50 100.00%
01.09.02 VARIOS 18,605.58 0.00 0.00% 0.00 0.00% 0.00 0.00% 18,605.58
01.09.02.01 PLATINA DE ALUMINIO 5/8" x 3/16", EN ENCUENTRO DE PISOS m 209.30 10.43 2,183.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 209.30 2,183.00 100.00%

39 de 114
PRESUPUESTO AVANCE FISICO
Item DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO Saldo de Val.
Und. Metrado Precio S/. Parcial S/.
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
01.09.02.02 PLATINA DE ALUMINIO 6" x 5/16", EN ENCUENTRO DE PISOS m 73.90 134.49 9,938.81 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 73.90 9,938.81 100.00%
01.09.02.03 PLATINA DE ALUMINIO 3.1/2" x 3/32", ENCUENTRO DE MUROS m 58.20 77.96 4,537.27 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 58.20 4,537.27 100.00%
01.09.02.04 PLATINA DE ALUMINIO 4" x 3/32", ENCUENTRO DE MUROS m 17.35 112.19 1,946.50 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 17.35 1,946.50 100.00%
01.10 CERRAJERIA 22,751.75 0.00 0.00% 0.00 0.00% 0.00 0.00% 22,751.75
01.10.01 BISAGRAS 8,657.16 0.00 0.00% 0.00 0.00% 0.00 0.00% 8,657.16
01.10.01.01 BISAGRA CAPUCHINA 3 1/2" x 3 1/2" pza 228.00 37.97 8,657.16 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 228.00 8,657.16 100.00%
01.10.02 CERRADURAS 5,164.77 0.00 0.00% 0.00 0.00% 0.00 0.00% 5,164.77
CERRADURA CILINDRICA EXT. FIJA CON LLAVE E INT. SIEMPRE
01.10.02.01 pza 1.00 50.00 50.00 0.00 0.00 0.00 50.00
LIBRE SE FIJA CON LLAVE ( TIPO A ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
CERRADURA CILINDRICA EXT. SIEMPRE LIBRE ABRE CON
01.10.02.02 pza 12.00 60.08 720.96 0.00 0.00 0.00 720.96
LLAVE E INT. SIEMPRE LIBRE BOTON DE SEGURIDAD ( TIPO B ) - 0.00% - 0.00% - 0.00% 12.00 100.00%
CERRADURA CILINDRICA EXT. TRABA O LIBERA UNA VUELTA
01.10.02.03 pza 18.00 32.50 585.00 0.00 0.00 0.00 585.00
DE LLAVE E INT. SIEMPRE LIBRE ( TIPO C ) - 0.00% - 0.00% - 0.00% 18.00 100.00%
CERRADURA CILINDRICA EXT. SIEMPRE LIBRE CON
01.10.02.04 PERFORACION DE EMERGENCIA E INT. SIEMPRE LIBRE BOTON DE pza 8.00 26.66 213.28 0.00 0.00 0.00 213.28
SEGURIDAD ( TIPO F ) - 0.00% - 0.00% - 0.00% 8.00 100.00%
CERRADURA CILINDRICA EXT. SIEMPRE LIBRE SIN LLAVE NI
01.10.02.05 pza 3.00 45.82 137.46 0.00 0.00 0.00 137.46
SEGURO E INT. SIEMPRE LIBRE SIN LLAVE NI SEGURO ( TIPO G ) - 0.00% - 0.00% - 0.00% 3.00 100.00%
CERRADURA CILINDRICA EXT. ABRE CON LLAVE TRES
01.10.02.06 pza 18.00 45.92 826.56 0.00 0.00 0.00 826.56
GOLPES E INT. ABRE CON LLAVE TRES GOLPES ( TIPO I ) - 0.00% - 0.00% - 0.00% 18.00 100.00%
CERRADURA CON MANIJA EXT. SIEMPRE LIBRE, ABRE
01.10.02.07 C/DESARMADOR E INT. LIBRE C/BOTON DE SEG. FIJA MANIJA EXT. pza 3.00 88.20 264.60 0.00 0.00 0.00 264.60
( TIPO K ) - 0.00% - 0.00% - 0.00% 3.00 100.00%
01.10.02.08 COLOCACION DE CERRADURAS pza 63.00 37.57 2,366.91 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 63.00 2,366.91 100.00%
01.10.03 CIERRAPUERTAS Y OTROS 8,929.82 0.00 0.00% 0.00 0.00% 0.00 0.00% 8,929.82
01.10.03.01 CIERRAPUERTAS AEREO ( TIPO O ) pza 38.00 130.21 4,947.98 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 38.00 4,947.98 100.00%
01.10.03.02 FRENO HIDRAULICO DE PISO ( TIPO P ) pza 5.00 321.48 1,607.40 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 5.00 1,607.40 100.00%
01.10.03.03 BARRA ANTIPANICO ( TIPO Q ) pza 2.00 478.34 956.68 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 956.68 100.00%
01.10.03.04 CERROJO SIMPLE ( TIPO R ) pza 16.00 14.35 229.60 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 16.00 229.60 100.00%
01.10.03.05 TIRADOR DE ACERO INOXIDABLE DE Ø 1 1/2, L= 0.90 m pza 8.00 148.52 1,188.16 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 8.00 1,188.16 100.00%
01.11 VIDRIOS, CRISTALES Y SIMILARES 61,480.28 0.00 0.00% 0.00 0.00% 0.00 0.00% 61,480.28
01.11.01 VENTANAS 19,020.45 0.00 0.00% 0.00 0.00% 0.00 0.00% 19,020.45
VENTANA DE CRISTAL TEMPLADO COLOR BRONCE 6 mm CON
01.11.01.01 m2 4.83 277.42 1,339.94 0.00 0.00 0.00 1,339.94
PERFILES DE ALUMINIO, SISTEMA FIJO - 0.00% - 0.00% - 0.00% 4.83 100.00%
VENTANA DE CRISTAL TEMPLADO INCOLORO 6 mm CON
01.11.01.02 m2 88.82 199.06 17,680.51 0.00 0.00 0.00 17,680.51
PERFILES DE ALUMINIO, SISTEMA FIJO - CORREDIZO - 0.00% - 0.00% - 0.00% 88.82 100.00%
01.11.02 MAMPARAS 34,899.25 0.00 0.00% 0.00 0.00% 0.00 0.00% 34,899.25
MAMPARA DE CRISTAL TEMPLADO INCOLORO 10 mm,
01.11.02.01 m2 69.96 466.43 32,631.44 0.00 0.00 0.00 32,631.44
SOBRELUZ FIJA C/ACCES. Y ZOCALO DE ALUMINIO - 0.00% - 0.00% - 0.00% 69.96 100.00%
MAMPARA CON DOS HOJAS BATIENTES Y SOBRELUCES FIJAS
01.11.02.02 DE CRISTAL TEMPLADO INCOLORO 10 mm C/ACCES. Y ZOCALO DE m2 4.14 547.78 2,267.81 0.00 0.00 0.00 2,267.81
ALUMINIO - 0.00% - 0.00% - 0.00% 4.14 100.00%
01.11.03 VARIOS 7,560.58 0.00 0.00% 0.00 0.00% 0.00 0.00% 7,560.58
01.11.03.01 CRISTAL TEMPLADO INCOLORO 6 mm m2 32.00 147.51 4,720.32 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 32.00 4,720.32 100.00%
01.11.03.02 ESPEJO INCOLORO 6 mm ( SOBREPUESTO ) m2 16.31 157.85 2,574.53 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 16.31 2,574.53 100.00%
01.11.03.03 ESPEJO INCOLORO 6 mm ( INCLINADO ) m2 1.62 164.03 265.73 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.62 265.73 100.00%
01.12 PINTURA 180,927.42 0.00 0.00% 0.00 0.00% 0.00 0.00% 180,927.42
01.12.01 PINTURA DE CIELORRASOS, VIGAS 60,258.83 0.00 0.00% 0.00 0.00% 0.00 0.00% 60,258.83
PINTURA DE CIELORRASOS, VIGAS C/ LATEX - 2 MANOS, C/
01.12.01.01 m2 5,473.10 11.01 60,258.83 0.00 0.00 0.00 60,258.83
IMPRIMANTE - 0.00% - 0.00% - 0.00% 5,473.10 100.00%
PINTURA DE MUROS INTERIORES, COLUMNAS, MUROS DE
01.12.02 73,913.17 0.00 0.00 0.00 73,913.17
CONCRETO, DERRAMES 0.00% 0.00% 0.00%
PINTURA DE MUROS INTERIORES, COLUMNAS, MUROS DE
01.12.02.01 m2 7,101.84 9.96 70,734.33 0.00 0.00 0.00 70,734.33
CONCRETO, DERRAMES C/ LATEX - 2 MANOS, C/ IMPRIMANTE - 0.00% - 0.00% - 0.00% 7,101.84 100.00%

40 de 114
PRESUPUESTO AVANCE FISICO
Item DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO Saldo de Val.
Und. Metrado Precio S/. Parcial S/.
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
PINTURA DE MUROS INTERIORES, COLUMNAS, MUROS DE
01.12.02.02 m2 268.71 11.83 3,178.84 0.00 0.00 0.00 3,178.84
CONCRETO, DERRAMES C/ OLEO - 2 MANOS, C/ IMPRIMANTE - 0.00% - 0.00% - 0.00% 268.71 100.00%
PINTURA DE MUROS EXTERIORES, COLUMNAS, MUROS DE
01.12.03 13,135.70 0.00 0.00 0.00 13,135.70
CONCRETO 0.00% 0.00% 0.00%
PINTURA DE MUROS EXTERIORES, COLUMNAS, MUROS DE
01.12.03.01 m2 1,245.09 10.55 13,135.70 0.00 0.00 0.00 13,135.70
CONCRETO C/ LATEX - 2 MANOS, C/ IMPRIMANTE - 0.00% - 0.00% - 0.00% 1,245.09 100.00%
01.12.04 PINTURA DE ESTRUCTURAS ESPECIALES 8,941.33 0.00 0.00% 0.00 0.00% 0.00 0.00% 8,941.33
PINTURA DE ESTRUCTURAS ESPECIALES C/ PINTURA
01.12.04.01 IMPERMEABILIZANTE DE CONCRETO - 2 MANOS - CHEMA SEAL O m2 690.45 12.95 8,941.33 0.00 0.00 0.00 8,941.33
SIMILAR - 0.00% - 0.00% - 0.00% 690.45 100.00%
01.12.05 PINTURA EN PISOS Y PAVIMENTOS 24,678.39 0.00 0.00% 0.00 0.00% 0.00 0.00% 24,678.39
PINTURA DE FRANJAS EN PISOS, ANCHO = 0.10 M C/ TRAFICO -
01.12.05.01 m 910.40 16.93 15,413.07 0.00 0.00 0.00 15,413.07
2 MANOS - 0.00% - 0.00% - 0.00% 910.40 100.00%
PINTURA DE SEÑAL DE ESTACIONAMIENTO DE
01.12.05.02 und 4.00 180.00 720.00 0.00 0.00 0.00 720.00
DISCAPACITADOS C/ TRAFICO - 2 MANOS - 0.00% - 0.00% - 0.00% 4.00 100.00%
PINTURA DE SEÑAL DE NUMERO DE ESTACIONAMIENTO C/
01.12.05.03 und 61.00 19.74 1,204.14 0.00 0.00 0.00 1,204.14
TRAFICO - 2 MANOS - 0.00% - 0.00% - 0.00% 61.00 100.00%
PINTURA DE FRANJAS EN PISOS, ANCHO = 0.30 M C/ TRAFICO -
01.12.05.04 und 462.00 15.89 7,341.18 0.00 0.00 0.00 7,341.18
2 MANOS - 0.00% - 0.00% - 0.00% 462.00 100.00%
01.13 VARIOS 39,251.07 0.00 0.00% 0.00 0.00% 0.00 0.00% 39,251.07
01.13.01 LIMPIEZA PERMANENTE DE OBRA glb 1.00 6,551.16 6,551.16 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 6,551.16 100.00%
01.13.02 LIMPIEZA FINAL DE OBRA glb 1.00 1,207.87 1,207.87 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 1,207.87 100.00%
01.13.03 LIMPIEZA DE VIDRIOS m2 315.32 5.45 1,718.49 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 315.32 1,718.49 100.00%
01.13.04 LIMPIEZA DE PISOS DE PORCELANATO m2 1,525.17 5.10 7,778.37 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1,525.17 7,778.37 100.00%
01.13.05 PROVISION Y SEMBRIO DE PLANTAS ORNAMENTALES m2 37.12 27.48 1,020.06 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 37.12 1,020.06 100.00%
01.13.06 CINTA EN MAMPARAS m 154.25 1.24 191.27 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 154.25 191.27 100.00%
SELLO DE ASFALTO CON RELLENO DE POLIESTIRENO
01.13.07 m 13.20 7.30 96.36 0.00 0.00 0.00 96.36
EXPANDIDO, E = 1"; H = 0.20 M - 0.00% - 0.00% - 0.00% 13.20 100.00%
01.13.08 FALSA COLUMNA DE DRYWALL H = 3.65 M und 26.00 208.91 5,431.66 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 26.00 5,431.66 100.00%
01.13.09 PASE PARA MANGUERA CON PLANCHA FIBROCEMENTO 20 mm und 9.00 61.87 556.83 0.00 0.00 0.00 556.83
- 0.00% - 0.00% - 0.00% 9.00 100.00%
01.13.10 TOPE DE LLANTAS DE HULE, 1.83 m x 0.15 m x 0.10 m und 61.00 142.59 8,697.99 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 61.00 8,697.99 100.00%
01.13.11 CANTONERA DE TERRAZO LAVADO m 592.40 10.13 6,001.01 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 592.40 6,001.01 100.00%
01.14 OTROS 6,429.36 0.00 0.00% 0.00 0.00% 0.00 0.00% 6,429.36
BANCA DE CONCRETO F'C = 140 Kg/cm2, H = 0.10 M ( TIPO
01.14.01 m 32.50 27.14 882.05 0.00 0.00 0.00 882.05
TABLERO ) - 0.00% - 0.00% - 0.00% 32.50 100.00%
TABLERO DE CONCRETO F'C = 140 Kg/cm2, H = 0.075 M ( CON
01.14.02 m2 22.41 96.40 2,160.32 0.00 0.00 0.00 2,160.32
COLGAJO ) - 0.00% - 0.00% - 0.00% 22.41 100.00%
01.14.03 TABLERO DE CONCRETO F'C = 140 Kg/cm2, H = 0.075 M m2 35.65 80.70 2,876.96 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 35.65 2,876.96 100.00%
POYO DE CONCRETO F'C = 140 Kg/cm2, PARA INODORO ( 0.60 x
01.14.04 und 3.00 9.86 29.58 0.00 0.00 0.00 29.58
0.25 x 0.10 M ) - 0.00% - 0.00% - 0.00% 3.00 100.00%
01.14.05 BASE DE CONCRETO F'C = 140 Kg/cm2, H = 0.10 M m2 12.65 37.98 480.45 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 12.65 480.45 100.00%
01.15 SEÑALIZACION DE SEGURIDAD 3,932.72 0.00 0.00% 0.00 0.00% 0.00 0.00% 3,932.72
01.15.01 SEÑALES DE SEGURIDAD AUTOADHESIVAS und 872.00 4.51 3,932.72 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 872.00 3,932.72 100.00%
01.16 SEÑALIZACION DE NORMATIVIDAD 14,926.36 0.00 0.00% 0.00 0.00% 0.00 0.00% 14,926.36
01.16.01 SEÑAL INDICATIVA 11,870.56 0.00 0.00% 0.00 0.00% 0.00 0.00% 11,870.56
01.16.01.01 IN 1 - ADOSADO und 14.00 100.00 1,400.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 14.00 1,400.00 100.00%
01.16.01.02 IN 2 - ADOSADO und 30.00 170.00 5,100.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 30.00 5,100.00 100.00%
01.16.01.03 IN 3 - ADOSADO und 2.00 140.00 280.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 280.00 100.00%
01.16.01.04 IN 4 - COLGADO und 1.00 170.00 170.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 170.00 100.00%
01.16.01.05 IN 5 - ADOSADO und 2.00 100.00 200.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 200.00 100.00%
01.16.01.06 IN 5 - COLGADO und 4.00 100.00 400.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 4.00 400.00 100.00%
01.16.01.07 IN 5 - BANDERA und 1.00 100.00 100.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 100.00 100.00%
01.16.01.08 IN 6 - ADOSADO und 2.00 100.00 200.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 200.00 100.00%

41 de 114
PRESUPUESTO AVANCE FISICO
Item DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO Saldo de Val.
Und. Metrado Precio S/. Parcial S/.
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
01.16.01.09 IN 6A - ADOSADO und 6.00 100.00 600.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 6.00 600.00 100.00%
01.16.01.10 IN 6B - ADOSADO und 6.00 100.00 600.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 6.00 600.00 100.00%
01.16.01.11 IN 6C - ADOSADO und 3.00 100.00 300.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 300.00 100.00%
01.16.01.12 IN 6D - ADOSADO und 6.00 100.00 600.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 6.00 600.00 100.00%
01.16.01.13 IN 7 - ADOSADO und 1.00 220.00 220.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 220.00 100.00%
01.16.01.14 IN 8 - ADOSADO und 1.00 220.00 220.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 220.00 100.00%
01.16.01.15 COLOCACION DE SEÑAL INDICATIVA und 124.00 11.94 1,480.56 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 124.00 1,480.56 100.00%
01.16.02 SEÑAL REGLAMENTARIA 3,055.80 0.00 0.00% 0.00 0.00% 0.00 0.00% 3,055.80
01.16.02.01 ISR 1 - ADOSADO und 20.00 140.00 2,800.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 20.00 2,800.00 100.00%
01.16.02.02 COLOCACION DE SEÑAL REGLAMENTARIA und 20.00 12.79 255.80 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 20.00 255.80 100.00%

TOTAL COSTO DIRECTO 2,418,990.26 0.00 0.00% 0.00 0.00% 0.00 0.00% 310,761.49 12.85%
GASTOS GENERALES 7.25% 0.08 193,519.22 0.00 0.00% 0.00 0.00% 0.00 0.00% 24,860.92 12.85%
UTILIDAD 8.00% 0.08 193,519.22 0.00 0.00% 0.00 0.00% 0.00 0.00% 24,860.92 12.85%
SUB TOTAL 2,806,028.70 0.00 0.00% 0.00 0.00% 0.00 0.00% 360,483.33 12.85%
FACTOR DE RELACION (0.90) 0.90 2,525,425.83 0.00 0.00% 0.00 0.00% 0.00 0.00% 324,435.00 12.85%
SUB TOTAL FACTORIZADO 2,525,425.83 0.00 0.00 0.00 324,435.00
IGV 0.18 454,576.65 0.00 0.00% 0.00 0.00% 0.00 0.00% 58,398.30 12.85%
PRESUPUESTO TOTAL 2,980,002.48 0.00 0.00% 0.00 0.00% 0.00 0.00% 382,833.30 12.85%
AVANCE DE OBRA 100.00% 0.00% 0.00% 0.00% 12.85%
AVANCE DE OBRA ACUMULADO 100.00% 0.00% 0.00% 0.00% 12.85%

42 de 114
CONSORCIO T y M
#REF!
OBRA : #REF!
CONSULTOR : CONSORCIO SUERVISOR SANTA CATALINA
CONTRATISTA : #REF!
RESIDENTE DE OBRING. DAVID ROGELIO AQUINO CONDEZO CIP N° 83021
JEFE DE SUPERVISING. OSKAR YVAN PEREZ SAL Y ROSAS CIP N° 163288
ESPECIALIDAD : INSTALACIONES SANITARIAS
PRESUPUESTO AVANCE FISICO
Item DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO Saldo de Val.
Und. Metrado Precio S/. Parcial S/.
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
001 INSTALACIONES SANITARIAS 519,904.79 S/. - S/. - S/. - S/. 519,904.79
01.01 APARATOS Y ACCESORIOS SANITARIOS 34,753.68 0.00 0.00% 0.00 0.00% 0.00 34,753.68
01.01.01 SUMINISTRO DE APARATOS SANITARIOS 30,346.83 0.00 0.00% 0.00 0.00% 0.00 0.00% 30,346.83
01.01.01.01 LAVATORIO MANANTIAL O SIMILAR, INC. GRIFERIA pza 11.00 178.70 1,965.70 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 11.00 1,965.70 100.00%
01.01.01.02 LAVATORIO OVALIN SONNET O SIMILAR C/ GRIFERIA pza 16.00 261.92 4,190.72 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 16.00 4,190.72 100.00%
01.01.01.03 TAZA NOVARA FLUX O SIMILAR, INC. FLUXOMETRO pza 27.00 552.06 14,905.62 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 27.00 14,905.62 100.00%
01.01.01.04 URINARIO CADET O SIMILAR, INC. FLUXOMETRO pza 11.00 517.69 5,694.59 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 11.00 5,694.59 100.00%
LAVADERO DE CONCRETO REVESTIDO CON PORCELANATO 1
01.01.01.05 und 2.00 718.04 1,436.08 0.00 0.00 0.00 1,436.08
POZA,INC. GRIFERIA - 0.00% - 0.00% - 0.00% 2.00 100.00%
LAVADERO DE CONCRETO REVESTIDO CON PORCELANATO 2
01.01.01.06 und 3.00 718.04 2,154.12 0.00 0.00 0.00 2,154.12
POZAS,INC. GRIFERIA - 0.00% - 0.00% - 0.00% 3.00 100.00%
01.01.02 SUMINISTRO DE ACCESORIOS SANITARIOS Y GRIFERIA 4,406.85 0.00 0.00% 0.00 0.00% 0.00 0.00% - 4,406.85
DISPENSADOR DE POLICARBONATO PARA JABON ESPUMA
01.01.02.01 pza 21.00 29.43 618.03 0.00 0.00 0.00 618.03
( MOD. HD4F10 O SIMILAR ) - 0.00% - 0.00% - 0.00% 21.00 100.00%
DISPENSADOR PARA PAPEL HIGIENICO JUMBO ROLL ( MOD.
01.01.02.02 pza 27.00 56.23 1,518.21 0.00 0.00 0.00 1,518.21
HD1W00 KIMBERLY O SIMILAR ) - 0.00% - 0.00% - 0.00% 27.00 100.00%
DISPENSADOR PARA PAPEL TOALLA ( MOD. HD2W5
01.01.02.03 pza 7.00 55.68 389.76 0.00 0.00 0.00 389.76
KIMBERLY O SIMILAR ) - 0.00% - 0.00% - 0.00% 7.00 100.00%
01.01.02.04 GANCHO COLGADOR pza 20.00 76.95 1,539.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 20.00 1,539.00 100.00%
01.01.02.05 GRIFERIA P/DUCHA CROMADA 2 LLAVES INC. ACCESORIOS pza 3.00 113.95 341.85 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 341.85 100.00%
01.02 SISTEMA DE AGUA FRIA 68,871.83 0.00 0.00% 0.00 0.00% 0.00 0.00% - 68,871.83
01.02.01 SALIDAS DE AGUA FRIA 7,509.80 0.00 0.00% 0.00 0.00% 0.00 0.00% - 7,509.80
SALIDA AGUA FRIA CON TUBERIA DE PVC CLASE 10 C/ ROSCA
01.02.01.01 pto 45.00 80.54 3,624.30 0.00 0.00 0.00 3,624.30
1/2" - 0.00% - 0.00% - 0.00% 45.00 100.00%
SALIDA AGUA FRIA CON TUBERIA DE PVC CLASE 10 C/ ROSCA
01.02.01.02 pto 38.00 102.25 3,885.50 0.00 0.00 0.00 3,885.50
1" - 0.00% - 0.00% - 0.00% 38.00 100.00%
01.02.02 REDES DE DISTRIBUCION 10,905.81 0.00 0.00% 0.00 0.00% 0.00 0.00% - 10,905.81
01.02.02.01 TUBERIA PVC CLASE 10 C/ ROSCA 1/2" m 218.53 14.16 3,094.38 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 218.53 3,094.38 100.00%
01.02.02.02 TUBERIA PVC CLASE 10 C/ ROSCA 3/4" m 7.98 15.91 126.96 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 7.98 126.96 100.00%
01.02.02.03 TUBERIA PVC CLASE 10 C/ ROSCA 1" m 24.16 16.70 403.47 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 24.16 403.47 100.00%
01.02.02.04 TUBERIA PVC CLASE 10 C/ ROSCA 1 1/4" m 91.40 18.74 1,712.84 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 91.40 1,712.84 100.00%
01.02.02.05 TUBERIA PVC CLASE 10 C/ ROSCA 1 1/2" m 36.17 20.72 749.44 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 36.17 749.44 100.00%
01.02.02.06 TUBERIA PVC CLASE 10 C/ ROSCA 2" m 41.33 24.71 1,021.26 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 41.33 1,021.26 100.00%
01.02.02.07 TUBERIA PVC CLASE 10 C/ ROSCA 2 1/2" m 127.56 29.77 3,797.46 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 127.56 3,797.46 100.00%
01.02.03 REDES DE ALIMENTACION 157.80 0.00 0.00% 0.00 0.00% 0.00 0.00% - 157.80
TUBERIA PVC CLASE 10 S/ PRESION 1 1/2" ( CON CAMA DE
01.02.03.01 m 6.90 22.87 157.80 0.00 0.00 0.00 157.80
ARENA ) - 0.00% - 0.00% - 0.00% 6.90 100.00%
01.02.04 ACCESORIOS DE REDES 2,957.56 0.00 0.00% 0.00 0.00% 0.00 0.00% - 2,957.56
01.02.04.01 CODO PVC C/ ROSCA 1/2" x 90º pza 114.00 2.93 334.02 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 114.00 334.02 100.00%
01.02.04.02 CODO PVC C/ ROSCA 3/4" x 90º pza 8.00 3.10 24.80 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 8.00 24.80 100.00%
01.02.04.03 CODO PVC C/ ROSCA 1" x 90º pza 42.00 4.97 208.74 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 42.00 208.74 100.00%
01.02.04.04 CODO PVC C/ ROSCA 1 1/4" x 90º pza 78.00 6.90 538.20 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 78.00 538.20 100.00%

43 de 114
PRESUPUESTO AVANCE FISICO
Item DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO Saldo de Val.
Und. Metrado Precio S/. Parcial S/.
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
01.02.04.05 CODO PVC C/ ROSCA 1 1/2" x 90º pza 26.00 8.89 231.14 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 26.00 231.14 100.00%
01.02.04.06 CODO PVC C/ ROSCA 2" x 90º pza 13.00 11.10 144.30 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 13.00 144.30 100.00%
01.02.04.07 CODO PVC C/ ROSCA 2 1/2" x 90º pza 6.00 16.92 101.52 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 6.00 101.52 100.00%
01.02.04.08 TEE PVC C/ ROSCA 1/2" pza 18.00 3.10 55.80 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 18.00 55.80 100.00%
01.02.04.09 TEE PVC C/ ROSCA 1" pza 5.00 4.69 23.45 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 5.00 23.45 100.00%
01.02.04.10 TEE PVC C/ ROSCA 1 1/4" pza 26.00 9.58 249.08 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 26.00 249.08 100.00%
01.02.04.11 TEE PVC C/ ROSCA 1 1/2" pza 9.00 10.00 90.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 9.00 90.00 100.00%
01.02.04.12 TEE PVC C/ ROSCA 2" pza 8.00 12.87 102.96 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 8.00 102.96 100.00%
01.02.04.13 TEE PVC C/ ROSCA 2 1/2" pza 15.00 14.11 211.65 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 15.00 211.65 100.00%
01.02.04.14 REDUCCION PVC C/ ROSCA 3/4" - 1/2" pza 2.00 3.51 7.02 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 7.02 100.00%
01.02.04.15 REDUCCION PVC C/ ROSCA 1" - 1/2" pza 2.00 3.66 7.32 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 7.32 100.00%
01.02.04.16 REDUCCION PVC C/ ROSCA 1 1/4" - 1/2" pza 11.00 6.00 66.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 11.00 66.00 100.00%
01.02.04.17 REDUCCION PVC C/ ROSCA 1 1/4" - 1" pza 26.00 6.20 161.20 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 26.00 161.20 100.00%
01.02.04.18 REDUCCION PVC C/ ROSCA 1 1/2" - 1/2" pza 8.00 9.02 72.16 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 8.00 72.16 100.00%
01.02.04.19 REDUCCION PVC C/ ROSCA 1 1/2" - 3/4" pza 1.00 9.22 9.22 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 9.22 100.00%
01.02.04.20 REDUCCION PVC C/ ROSCA 1 1/2" - 1" pza 1.00 7.00 7.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 7.00 100.00%
01.02.04.21 REDUCCION PVC C/ ROSCA 1 1/2" - 1 1/4" pza 9.00 7.20 64.80 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 9.00 64.80 100.00%
01.02.04.22 REDUCCION PVC C/ ROSCA 2" - 1/2" pza 5.00 7.40 37.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 5.00 37.00 100.00%
01.02.04.23 REDUCCION PVC C/ ROSCA 2" - 3/4" pza 1.00 10.22 10.22 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 10.22 100.00%
01.02.04.24 REDUCCION PVC C/ ROSCA 2" - 1 1/4" pza 6.00 8.00 48.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 6.00 48.00 100.00%
01.02.04.25 REDUCCION PVC C/ ROSCA 2" - 1 1/2" pza 3.00 8.20 24.60 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 24.60 100.00%
01.02.04.26 REDUCCION PVC C/ ROSCA 2 1/2" - 1 1/4" pza 2.00 8.80 17.60 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 17.60 100.00%
01.02.04.27 REDUCCION PVC C/ ROSCA 2 1/2" - 1 1/2" pza 8.00 11.42 91.36 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 8.00 91.36 100.00%
01.02.04.28 REDUCCION PVC C/ ROSCA 2 1/2" - 2" pza 2.00 9.20 18.40 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 18.40 100.00%
01.02.05 LLAVES Y VALVULAS 4,375.54 0.00 0.00% 0.00 0.00% 0.00 0.00% - 4,375.54
01.02.05.01 VALVULA COMPUERTA DE BRONCE DE 1/2" pza 10.00 90.58 905.80 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 10.00 905.80 100.00%
01.02.05.02 VALVULA COMPUERTA DE BRONCE DE 3/4" pza 3.00 92.64 277.92 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 277.92 100.00%
01.02.05.03 VALVULA COMPUERTA DE BRONCE DE 1 1/4" pza 16.00 131.83 2,109.28 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 16.00 2,109.28 100.00%
01.02.05.04 VALVULA COMPUERTA DE BRONCE DE 1 1/2" pza 4.00 150.50 602.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 4.00 602.00 100.00%
01.02.05.05 MEDIDOR DE AGUA Ø 1 1/2" und 1.00 480.54 480.54 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 480.54 100.00%
01.02.06 PIEZAS VARIAS 10,106.22 0.00 0.00% 0.00 0.00% 0.00 0.00% - 10,106.22
01.02.06.01 CAJA P/ VALVULA 20 x 20 cm pza 13.00 71.69 931.97 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 13.00 931.97 100.00%
01.02.06.02 CAJA P/ VALVULA 30 x 30 cm pza 20.00 72.27 1,445.40 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 20.00 1,445.40 100.00%
01.02.06.03 COLGADOR PARA 1 TUBERIA pza 331.00 23.35 7,728.85 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 331.00 7,728.85 100.00%
01.02.07 PRUEBAS HIDRAULICAS 2,127.48 0.00 0.00% 0.00 0.00% 0.00 0.00% - 2,127.48
01.02.07.01 PRUEBA HIDRÁULICA Y DESINFECCIÓN DE TUBERÍAS m 554.03 3.84 2,127.48 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 554.03 2,127.48 100.00%
01.02.08 ALMACENAMIENTO DE AGUA - CISTERNA 30,731.62 0.00 0.00% 0.00 0.00% 0.00 0.00% - 30,731.62
01.02.08.01 REDES DE DISTRIBUCION 704.62 0.00 0.00% 0.00 0.00% 0.00 0.00% - 704.62
01.02.08.01.01 TUBERIA PVC CLASE 10 C/ ROSCA 3/4" m 19.25 15.91 306.27 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 19.25 306.27 100.00%
01.02.08.01.02 TUBERIA PVC CLASE 10 C/ ROSCA 1/2" m 6.40 14.16 90.62 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 6.40 90.62 100.00%
01.02.08.01.03 TUBERIA PVC CLASE 10 C/ ROSCA 1 1/2" m 0.80 20.72 16.58 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 0.80 16.58 100.00%
01.02.08.01.04 TUBERIA PVC CLASE 10 C/ ROSCA 2 1/2" m 9.78 29.77 291.15 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 9.78 291.15 100.00%
01.02.08.02 ACCESORIOS DE REDES 170.80 0.00 0.00% 0.00 0.00% 0.00 0.00% - 170.80
01.02.08.02.01 CODO PVC C/ ROSCA 1/2" x 90º pza 1.00 2.93 2.93 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 2.93 100.00%
01.02.08.02.02 CODO PVC C/ ROSCA 3/4" x 90º pza 7.00 3.10 21.70 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 7.00 21.70 100.00%
01.02.08.02.03 CODO PVC C/ ROSCA 1 1/2" x 90º pza 1.00 8.89 8.89 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 8.89 100.00%
01.02.08.02.04 CODO PVC C/ ROSCA 2 1/2" x 90º pza 7.00 16.92 118.44 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 7.00 118.44 100.00%
01.02.08.02.05 TEE PVC C/ ROSCA 3/4" pza 2.00 9.42 18.84 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 18.84 100.00%
01.02.08.03 LLAVES Y VALVULAS 1,839.04 0.00 0.00% 0.00 0.00% 0.00 0.00% - 1,839.04
01.02.08.03.01 VALVULA CONTROL DE BRONCE DE 3/4" pza 3.00 87.00 261.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 261.00 100.00%
01.02.08.03.02 VALVULA CONTROL DE BRONCE DE 1 1/2" pza 1.00 144.11 144.11 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 144.11 100.00%
01.02.08.03.03 VALVULA DE COMPUERTA BRONCE DE 2 1/2" pza 2.00 265.35 530.70 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 530.70 100.00%

44 de 114
PRESUPUESTO AVANCE FISICO
Item DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO Saldo de Val.
Und. Metrado Precio S/. Parcial S/.
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
01.02.08.03.04 VALVULA CHECK 1 1/2" pza 1.00 187.78 187.78 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 187.78 100.00%
01.02.08.03.05 VALVULA FLOTADORA C/ BOLLA DE COBRE DE 3/4" pza 3.00 101.13 303.39 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 303.39 100.00%
01.02.08.03.06 VALVULA DE PIE C/ CANASTILLA DE BRONCE 2 1/2" pza 2.00 206.03 412.06 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 412.06 100.00%
01.02.08.04 PIEZAS VARIAS 937.16 0.00 0.00% 0.00 0.00% 0.00 0.00% - 937.16
01.02.08.04.01 PASE EN MURO 1" und 3.00 26.87 80.61 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 80.61 100.00%
01.02.08.04.02 PASE EN MURO 3" und 2.00 36.87 73.74 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 73.74 100.00%
01.02.08.04.03 COLGADOR PARA UNA TUBERIA Ø 3/4" pza 10.00 45.45 454.50 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 10.00 454.50 100.00%
01.02.08.04.04 COLGADOR PARA UNA TUBERIA Ø 2 1/2" pza 3.00 60.25 180.75 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 180.75 100.00%
01.02.08.04.05 BRIDA ROMPE AGUA Ø 2 1/2" und 2.00 44.24 88.48 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 88.48 100.00%
01.02.08.04.06 ELECTRONIVEL und 1.00 59.08 59.08 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 59.08 100.00%
01.02.08.05 EQUIPOS Y OTRAS INSTALACIONES 27,080.00 0.00 0.00% 0.00 0.00% 0.00 0.00% - 27,080.00
SUMINISTRO E INSTALACION DE CUARTO DE BOMBAS,
01.02.08.05.01 glb 1.00 27,080.00 27,080.00 0.00 0.00 0.00 27,080.00
SISTEMA COMPACTO DE AGUA FRIA - 0.00% - 0.00% - 0.00% 1.00 100.00%
01.03 SISTEMA DE AGUA CONTRA INCENDIO 321,023.98 0.00 0.00% 0.00 0.00% 0.00 0.00% - 321,023.98
01.03.01 REDES DE DISTRIBUCION 52,874.81 0.00 0.00% 0.00 0.00% 0.00 0.00% - 52,874.81
01.03.01.01 TUBERIA SCH - 40 1" m 685.35 29.31 20,087.61 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 685.35 20,087.61 100.00%
01.03.01.02 TUBERIA SCH - 40 1 1/4" m 115.11 34.87 4,013.89 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 115.11 4,013.89 100.00%
01.03.01.03 TUBERIA SCH - 40 1 1/2" m 38.37 36.32 1,393.60 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 38.37 1,393.60 100.00%
01.03.01.04 TUBERIA SCH - 40 2" m 67.07 40.37 2,707.62 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 67.07 2,707.62 100.00%
01.03.01.05 TUBERIA SCH - 40 2 1/2" m 145.03 53.40 7,744.60 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 145.03 7,744.60 100.00%
01.03.01.06 TUBERIA SCH - 40 3" m 20.85 55.73 1,161.97 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 20.85 1,161.97 100.00%
01.03.01.07 TUBERIA SCH - 40 4" m 229.25 68.77 15,765.52 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 229.25 15,765.52 100.00%
01.03.02 REDES DE ALIMENTACION 1,510.38 0.00 0.00% 0.00 0.00% 0.00 0.00% - 1,510.38
01.03.02.01 TUBERIA HDPE Ø 4" ( CON PROTECCION ) m 11.15 135.46 1,510.38 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 11.15 1,510.38 100.00%
01.03.03 ACCESORIOS DE REDES 62,777.88 0.00 0.00% 0.00 0.00% 0.00 0.00% - 62,777.88
01.03.03.01 CODO SCH - 40 1" x 90º - RANURADO pza 160.00 55.96 8,953.60 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 160.00 8,953.60 100.00%
01.03.03.02 CODO SCH - 40 1 1/4" x 90º - RANURADO pza 3.00 59.06 177.18 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 177.18 100.00%
01.03.03.03 CODO SCH - 40 2 1/2" x 90º - RANURADO pza 13.00 81.86 1,064.18 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 13.00 1,064.18 100.00%
01.03.03.04 CODO SCH - 40 4" x 90º - RANURADO pza 33.00 150.26 4,958.58 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 33.00 4,958.58 100.00%
01.03.03.05 TEE SCH - 40 1" - RANURADO pza 70.00 57.56 4,029.20 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 70.00 4,029.20 100.00%
01.03.03.06 TEE SCH - 40 1 1/4" - RANURADO pza 50.00 65.16 3,258.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 50.00 3,258.00 100.00%
01.03.03.07 TEE SCH - 40 1 1/2" - RANURADO pza 13.00 69.16 899.08 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 13.00 899.08 100.00%
01.03.03.08 TEE SCH - 40 2" - RANURADO pza 21.00 78.86 1,656.06 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 21.00 1,656.06 100.00%
01.03.03.09 TEE SCH - 40 2 1/2" - RANURADO pza 30.00 89.86 2,695.80 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 30.00 2,695.80 100.00%
01.03.03.10 TEE SCH - 40 3" - RANURADO pza 10.00 170.46 1,704.60 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 10.00 1,704.60 100.00%
01.03.03.11 TEE SCH - 40 4" - RANURADO pza 23.00 210.46 4,840.58 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 23.00 4,840.58 100.00%
01.03.03.12 CRUZ SCH - 40 1 1/4" - RANURADO pza 1.00 141.06 141.06 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 141.06 100.00%
01.03.03.13 CRUZ SCH - 40 1 1/2" - RANURADO pza 3.00 151.06 453.18 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 453.18 100.00%
01.03.03.14 CRUZ SCH - 40 2" - RANURADO pza 6.00 172.16 1,032.96 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 6.00 1,032.96 100.00%
01.03.03.15 CRUZ SCH - 40 2 1/2" - RANURADO pza 16.00 200.16 3,202.56 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 16.00 3,202.56 100.00%
01.03.03.16 CRUZ SCH - 40 3" - RANURADO pza 2.00 205.86 411.72 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 411.72 100.00%
01.03.03.17 REDUCCION SCH - 40 1 1/4" - 1" - RANURADO pza 52.00 78.36 4,074.72 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 52.00 4,074.72 100.00%
01.03.03.18 REDUCCION SCH - 40 1 1/2" - 1" - RANURADO pza 8.00 79.36 634.88 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 8.00 634.88 100.00%
01.03.03.19 REDUCCION SCH - 40 1 1/2" - 1 1/4" - RANURADO pza 12.00 87.87 1,054.44 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 12.00 1,054.44 100.00%
01.03.03.20 REDUCCION SCH - 40 2" - 1" - RANURADO pza 31.00 91.36 2,832.16 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 31.00 2,832.16 100.00%
01.03.03.21 REDUCCION SCH - 40 2" - 1 1/4" - RANURADO pza 8.00 93.86 750.88 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 8.00 750.88 100.00%
01.03.03.22 REDUCCION SCH - 40 2" - 1 1/2" - RANURADO pza 8.00 97.06 776.48 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 8.00 776.48 100.00%
01.03.03.23 REDUCCION SCH - 40 2 1/2" - 1" - RANURADO pza 42.00 100.36 4,215.12 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 42.00 4,215.12 100.00%
01.03.03.24 REDUCCION SCH - 40 2 1/2" - 1 1/4" RANURADO pza 22.00 102.86 2,262.92 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 22.00 2,262.92 100.00%
01.03.03.25 REDUCCION SCH - 40 2 1/2" - 1 1/2" - RANURADO pza 3.00 103.86 311.58 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 311.58 100.00%
01.03.03.26 REDUCCION SCH - 40 2 1/2" - 2" RANURADO pza 9.00 109.46 985.14 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 9.00 985.14 100.00%
01.03.03.27 REDUCCION SCH - 40 3" - 1" - RANURADO pza 8.00 101.66 813.28 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 8.00 813.28 100.00%

45 de 114
PRESUPUESTO AVANCE FISICO
Item DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO Saldo de Val.
Und. Metrado Precio S/. Parcial S/.
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
01.03.03.28 REDUCCION SCH - 40 3" - 1 1/4" - RANURADO pza 4.00 105.86 423.44 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 4.00 423.44 100.00%
01.03.03.29 REDUCCION SCH - 40 3" - 2" - RANURADO pza 3.00 126.56 379.68 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 379.68 100.00%
01.03.03.30 REDUCCION SCH - 40 3" - 2 1/2" - RANURADO pza 6.00 132.56 795.36 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 6.00 795.36 100.00%
01.03.03.31 REDUCCION SCH - 40 4" - 1" - RANURADO pza 6.00 134.51 807.06 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 6.00 807.06 100.00%
01.03.03.32 REDUCCION SCH - 40 4" - 2" - RANURADO pza 1.00 130.56 130.56 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 130.56 100.00%
01.03.03.33 REDUCCION SCH - 40 4" - 2 1/2" - RANURADO pza 14.00 146.56 2,051.84 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 14.00 2,051.84 100.00%
01.03.04 LLAVES Y VALVULAS 1,283.38 0.00 0.00% 0.00 0.00% 0.00 0.00% - 1,283.38
01.03.04.01 VALVULA SIAMESA TIPO POSTE Ø 4" x 2 1/2" x 2 1/2" pza 1.00 819.20 819.20 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 819.20 100.00%
01.03.04.02 VALVULA CHECK 4" pza 1.00 464.18 464.18 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 464.18 100.00%
01.03.05 PIEZAS VARIAS 84,906.36 0.00 0.00% 0.00 0.00% 0.00 0.00% - 84,906.36
01.03.05.01 COLGADOR PARA 1 TUBERIA pza 522.00 23.35 12,188.70 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 522.00 12,188.70 100.00%
01.03.05.02 ROCIADOR AUTOMATICO TIPO COLGANTE 1/2" und 125.00 236.95 29,618.75 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 125.00 29,618.75 100.00%
01.03.05.03 ROCIADOR AUTOMATICO TIPO MONTANTE 1/2" und 146.00 251.95 36,784.70 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 146.00 36,784.70 100.00%
01.03.05.04 ESTACION CONTROLADORA DE ROCIADORES und 3.00 2,000.07 6,000.21 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 6,000.21 100.00%
01.03.05.05 JUNTA DE EXPANSION UL METRAFLEX und 8.00 39.25 314.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 8.00 314.00 100.00%
01.03.06 PRUEBAS HIDRAULICAS 6,206.61 0.00 0.00% 0.00 0.00% 0.00 0.00% - 6,206.61
01.03.06.01 PRUEBA HIDRAULICA DE AGUA CONTRA INCENDIO m 1,312.18 4.73 6,206.61 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1,312.18 6,206.61 100.00%
01.03.07 PIEZAS VARIAS - GABINETE CONTRA INCENDIO 12,831.20 0.00 0.00% 0.00 0.00% 0.00 0.00% - 12,831.20
01.03.07.01 LLAVES Y VALVULAS 5,753.42 0.00 0.00% 0.00 0.00% 0.00 0.00% - 5,753.42
01.03.07.01.01 VALVULA ANGULAR 1 1/2" pza 9.00 197.26 1,775.34 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 9.00 1,775.34 100.00%
01.03.07.01.02 VALVULA ANGULAR 2 1/2" pza 8.00 497.26 3,978.08 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 8.00 3,978.08 100.00%
01.03.07.02 PIEZAS VARIAS 7,077.78 0.00 0.00% 0.00 0.00% 0.00 0.00% - 7,077.78
GABINETE METALICO, AGUA CONTRA INCENDIO 100 x 80 x
01.03.07.02.01 pza 9.00 434.36 3,909.24 0.00 0.00 0.00 3,909.24
18 cm, 1/24" - 0.00% - 0.00% - 0.00% 9.00 100.00%
01.03.07.02.02 PITON DE BRONCE PARA CHORRO NIEBLA 1 1/2" pza 9.00 61.69 555.21 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 9.00 555.21 100.00%
01.03.07.02.03 MANGUERA DE FIBRA SINTETICA 1 1/2" x 30 M und 9.00 255.67 2,301.03 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 9.00 2,301.03 100.00%
01.03.07.02.04 HACHA und 9.00 34.70 312.30 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 9.00 312.30 100.00%
INSTALACIONES ESPECIALES - SISTEMA CONTRA INCENDIO -
01.03.08 98,633.36 0.00 0.00 0.00 98,633.36
CTO. DE BOMBAS 0.00% 0.00% 0.00% -
01.03.08.01 REDES DE DISTRIBUCION 16,944.24 0.00 0.00% 0.00 0.00% 0.00 0.00% - 16,944.24
TUBO DE ACERO AL CARBONO SOLDABLE SCH - 40 DE 2", 6
01.03.08.01.01 m 2.65 124.25 329.26 0.00 0.00 0.00 329.26
M - 0.00% - 0.00% - 0.00% 2.65 100.00%
TUBO DE ACERO AL CARBONO SOLDABLE SCH - 40 DE 4", 6
01.03.08.01.02 m 5.86 293.10 1,717.57 0.00 0.00 0.00 1,717.57
M - 0.00% - 0.00% - 0.00% 5.86 100.00%
TUBO DE ACERO AL CARBONO SOLDABLE SCH - 40 DE 8", 6
01.03.08.01.03 m 17.45 853.72 14,897.41 0.00 0.00 0.00 14,897.41
M - 0.00% - 0.00% - 0.00% 17.45 100.00%
01.03.08.02 ACCESORIOS DE REDES 3,739.09 0.00 0.00% 0.00 0.00% 0.00 0.00% - 3,739.09
01.03.08.02.01 CODO SCH - 40 2" x 90º - RANURADO pza 3.00 54.75 164.25 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 164.25 100.00%
01.03.08.02.02 CODO SCH - 40 4" x 90º - RANURADO pza 1.00 150.26 150.26 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 150.26 100.00%
01.03.08.02.03 CODO SCH - 40 8" x 90º - RANURADO pza 10.00 226.06 2,260.60 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 10.00 2,260.60 100.00%
01.03.08.02.04 TEE SCH - 40 8" - RANURADO pza 3.00 282.82 848.46 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 848.46 100.00%
01.03.08.02.05 REDUCCION SCH - 40 8" - 2" - RANURADO pza 1.00 150.41 150.41 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 150.41 100.00%
01.03.08.02.06 REDUCCION SCH - 40 8" - 4" - RANURADO pza 1.00 165.11 165.11 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 165.11 100.00%
01.03.08.03 LLAVES Y VALVULAS 25,458.57 0.00 0.00% 0.00 0.00% 0.00 0.00% - 25,458.57
01.03.08.03.01 VALVULA CONTROL DE BRONCE DE 8" pza 1.00 2,109.70 2,109.70 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 2,109.70 100.00%
01.03.08.03.02 VALVULA OS & Y - Ø 2" pza 1.00 310.62 310.62 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 310.62 100.00%
01.03.08.03.03 VALVULA OS & Y - Ø 8" pza 1.00 9,174.00 9,174.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 9,174.00 100.00%
01.03.08.03.04 VALVULA MARIPOSA 8" ( FIRE BALL ) pza 1.00 411.56 411.56 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 411.56 100.00%
01.03.08.03.05 VALVULA CHECK 2" pza 1.00 241.62 241.62 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 241.62 100.00%
01.03.08.03.06 VALVULA CHECK SILENCIOSA Ø 8" pza 1.00 1,486.28 1,486.28 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 1,486.28 100.00%
01.03.08.03.07 MEDIDOR DE PRESION Ø 2" und 2.00 1,242.86 2,485.72 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 2,485.72 100.00%
01.03.08.03.08 MEDIDOR DE PRUEBA Ø 8" ( ESTILO 735 VITAULIC ) und 3.00 2,800.58 8,401.74 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 8,401.74 100.00%

46 de 114
PRESUPUESTO AVANCE FISICO
Item DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO Saldo de Val.
Und. Metrado Precio S/. Parcial S/.
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
01.03.08.03.09 MEDIDOR DE FLUJO Ø 2" und 1.00 837.33 837.33 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 837.33 100.00%
01.03.08.04 PIEZAS VARIAS 694.71 0.00 0.00% 0.00 0.00% 0.00 0.00% - 694.71 100.00%
01.03.08.04.01 UNION VITAULIC Ø 8" pza 1.00 512.18 512.18 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 512.18 100.00%
01.03.08.04.02 PLATO VORTEX 60 x 60 x cm, 3/16" und 1.00 182.53 182.53 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 182.53 100.00%
01.03.08.05 ADITAMENTOS VARIOS 171.75 0.00 0.00% 0.00 0.00% 0.00 0.00% - 171.75 100.00%
01.03.08.05.01 BRIDA ROMPE AGUA Ø 8" und 1.00 48.01 48.01 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 48.01 100.00%
01.03.08.05.02 PASE EN MURO 9" und 2.00 61.87 123.74 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 123.74 100.00%
01.03.08.06 EQUIPOS Y OTRAS INSTALACIONES 51,625.00 0.00 0.00% 0.00 0.00% 0.00 0.00% - 51,625.00 100.00%
01.03.08.06.01 EQUIPOS DE BOMBEO DE SISTEMA CONTRA INCENDIO und 1.00 51,625.00 51,625.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 51,625.00 100.00%
01.04 SISTEMA DE AGUAS PLUVIALES 1,744.06 0.00 0.00% 0.00 0.00% 0.00 0.00% - 1,744.06
01.04.01 REDES DE DISTRIBUCION 1,479.94 0.00 0.00% 0.00 0.00% 0.00 0.00% - 1,479.94
01.04.01.01 TUBERIA PVC DS - CP Ø 4" m 2.97 25.35 75.29 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.97 75.29 100.00%
01.04.01.02 MONTANTE DE PVC DS - CP Ø 4" m 50.40 27.87 1,404.65 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 50.40 1,404.65 100.00%
01.04.02 ACCESORIOS DE REDES 91.20 0.00 0.00% 0.00 0.00% 0.00 0.00% - 91.20
01.04.02.01 CODO PVC DS - CP 4" x 90º pza 10.00 9.12 91.20 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 10.00 91.20 100.00%
01.04.03 ADITAMENTOS VARIOS 172.92 0.00 0.00% 0.00 0.00% 0.00 0.00% - 172.92
01.04.03.01 SUMIDERO DE BRONCE 4" pza 4.00 43.23 172.92 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 4.00 172.92 100.00%
01.05 SISTEMA DE DESAGÜE 70,375.32 0.00 0.00% 0.00 0.00% 0.00 0.00% - 70,375.32
01.05.01 SALIDAS DE DESAGÜE Y VENTILACION 5,518.57 0.00 0.00% 0.00 0.00% 0.00 0.00% - 5,518.57
01.05.01.01 SALIDA DE DESAGUE PVC DS - CP 2" pto 39.00 74.31 2,898.09 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 39.00 2,898.09 100.00%
01.05.01.02 SALIDA DE DESAGUE PVC DS - CP 4" pto 26.00 75.83 1,971.58 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 26.00 1,971.58 100.00%
01.05.01.03 SALIDA DE VENTILACION PVC DS - CP 3" pto 3.00 61.90 185.70 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 185.70 100.00%
01.05.01.04 SALIDA DE VENTILACION PVC DS - CP 4" pto 6.00 77.20 463.20 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 6.00 463.20 100.00%
01.05.02 REDES DE RECOLECCION 26,466.45 0.00 0.00% 0.00 0.00% 0.00 0.00% - 26,466.45
01.05.02.01 TUBERIA PVC DS - CP Ø 2" m 368.81 20.29 7,483.15 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 368.81 7,483.15 100.00%
01.05.02.02 TUBERIA PVC DS - CP Ø 3" m 233.87 22.29 5,212.96 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 233.87 5,212.96 100.00%
01.05.02.03 TUBERIA PVC DS - CP Ø 4" m 325.25 25.35 8,245.09 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 325.25 8,245.09 100.00%
01.05.02.04 TUBERIA PVC DS - CP Ø 6" m 40.63 36.60 1,487.06 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 40.63 1,487.06 100.00%
01.05.02.05 TUBERIA PVC CLASE 10 C/ ROSCA 1" m 25.00 16.70 417.50 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 25.00 417.50 100.00%
01.05.02.06 MONTANTE DE PVC DS - CP Ø 2" m 11.70 22.78 266.53 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 11.70 266.53 100.00%
01.05.02.07 MONTANTE DE PVC DS - CP Ø 3" m 45.25 25.16 1,138.49 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 45.25 1,138.49 100.00%
01.05.02.08 MONTANTE DE PVC DS - CP Ø 4" m 79.50 27.87 2,215.67 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 79.50 2,215.67 100.00%
01.05.03 REDES COLECTORAS 923.25 0.00 0.00% 0.00 0.00% 0.00 0.00% - 923.25
01.05.03.01 TUBERIA PVC DS - CP Ø 4" m 36.42 25.35 923.25 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 36.42 923.25 100.00%
01.05.04 ACCESORIOS DE REDES 4,955.08 0.00 0.00% 0.00 0.00% 0.00 0.00% - 4,955.08
01.05.04.01 CODO PVC DS - CP 2" x 90º pza 162.00 3.81 617.22 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 162.00 617.22 100.00%
01.05.04.02 CODO PVC DS - CP 3" x 90º pza 96.00 6.12 587.52 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 96.00 587.52 100.00%
01.05.04.03 CODO PVC DS - CP 4" x 90º pza 17.00 9.12 155.04 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 17.00 155.04 100.00%
01.05.04.04 CODO PVC C/ ROSCA 1" x 90º pza 3.00 4.97 14.91 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 14.91 100.00%
01.05.04.05 CODO PVC DS - CP 2" x 45° pza 79.00 3.60 284.40 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 79.00 284.40 100.00%
01.05.04.06 CODO PVC DS - CP 3" x 45° pza 17.00 7.02 119.34 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 17.00 119.34 100.00%
01.05.04.07 CODO PVC DS - CP 4" x 45° pza 21.00 9.02 189.42 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 21.00 189.42 100.00%
01.05.04.08 CODO PVC C/ ROSCA 1" x 45º pza 4.00 4.90 19.60 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 4.00 19.60 100.00%
01.05.04.09 CODO SANITARIO PVC DS - CP 4" - 2" pza 27.00 9.28 250.56 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 27.00 250.56 100.00%
01.05.04.10 TEE PVC DS - CP 2" pza 6.00 4.80 28.80 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 6.00 28.80 100.00%
01.05.04.11 TEE PVC DS - CP 3" pza 2.00 112.34 224.68 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 224.68 100.00%
01.05.04.12 TEE PVC DS - CP 4" pza 13.00 12.53 162.89 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 13.00 162.89 100.00%
01.05.04.13 TEE DOBLE PVC DS - CP 2" pza 10.00 7.62 76.20 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 10.00 76.20 100.00%
01.05.04.14 TEE SANITARIA PVC DS - CP 2" pza 26.00 12.42 322.92 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 26.00 322.92 100.00%
01.05.04.15 YEE PVC DS - CP 2" pza 63.00 7.17 451.71 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 63.00 451.71 100.00%
01.05.04.16 YEE PVC DS - CP 4" pza 44.00 12.90 567.60 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 44.00 567.60 100.00%
01.05.04.17 YEE PVC DS-CP 6" pza 7.00 15.34 107.38 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 7.00 107.38 100.00%

47 de 114
PRESUPUESTO AVANCE FISICO
Item DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO Saldo de Val.
Und. Metrado Precio S/. Parcial S/.
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
01.05.04.18 YEE C/ REDUCCION PVC DS - CP 3" - 2" pza 2.00 11.01 22.02 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 22.02 100.00%
01.05.04.19 YEE C/ REDUCCION PVC DS - CP 4" - 2" pza 33.00 10.49 346.17 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 33.00 346.17 100.00%
01.05.04.20 YEE C/ REDUCCION PVC DS - CP 4" - 3" pza 3.00 11.96 35.88 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 35.88 100.00%
01.05.04.21 REDUCCION PVC DS - CP DE 3" - 2" pza 4.00 5.33 21.32 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 4.00 21.32 100.00%
01.05.04.22 REDUCCION PVC DS - CP DE 4" - 2" pza 2.00 5.94 11.88 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 11.88 100.00%
01.05.04.23 REDUCCION PVC DS - CP DE 4" - 3" pza 12.00 16.34 196.08 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 12.00 196.08 100.00%
01.05.04.24 REDUCCION PVC DSCP DE 6" - 4" pza 7.00 20.22 141.54 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 7.00 141.54 100.00%
01.05.05 ADITAMENTOS VARIOS 2,429.27 0.00 0.00% 0.00 0.00% 0.00 0.00% - 2,429.27
01.05.05.01 SUMIDERO DE BRONCE 2" pza 14.00 26.48 370.72 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 14.00 370.72 100.00%
01.05.05.02 SUMIDERO DE BRONCE 3" pza 22.00 34.85 766.70 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 22.00 766.70 100.00%
01.05.05.03 SUMIDERO DE BRONCE 4" pza 2.00 43.23 86.46 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 86.46 100.00%
01.05.05.04 REGISTRO DE BRONCE 2" pza 17.00 27.82 472.94 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 17.00 472.94 100.00%
01.05.05.05 REGISTRO DE BRONCE 4" pza 13.00 33.75 438.75 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 13.00 438.75 100.00%
01.05.05.06 REGISTRO DE BRONCE 6" pza 3.00 42.13 126.39 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 126.39 100.00%
01.05.05.07 SOMBRERO DE VENTILACION PVC DS - CP DE 3" pza 3.00 18.59 55.77 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 55.77 100.00%
01.05.05.08 SOMBRERO DE VENTILACION PVC DS - CP DE 4" pza 6.00 18.59 111.54 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 6.00 111.54 100.00%
01.05.06 PIEZAS VARIAS 15,637.29 0.00 0.00% 0.00 0.00% 0.00 0.00% - 15,637.29
01.05.06.01 COLGADOR PARA UNA TUBERIA Ø 1" pza 8.00 43.10 344.80 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 8.00 344.80 100.00%
01.05.06.02 COLGADOR PARA UNA TUBERIA Ø 2" pza 87.00 48.68 4,235.16 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 87.00 4,235.16 100.00%
01.05.06.03 COLGADOR PARA UNA TUBERIA Ø 3" pza 53.00 61.09 3,237.77 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 53.00 3,237.77 100.00%
01.05.06.04 COLGADOR PARA UNA TUBERIA Ø 4" pza 104.00 62.94 6,545.76 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 104.00 6,545.76 100.00%
01.05.06.05 COLGADOR PARA UNA TUBERIA Ø 6" pza 20.00 63.69 1,273.80 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 20.00 1,273.80 100.00%
01.05.07 CAMARAS DE INSPECCION 865.95 0.00 0.00% 0.00 0.00% 0.00 0.00% - 865.95
01.05.07.01 CAJA DE REG. CONCR. - 12" x 24" TAPA CONCRETO pza 5.00 173.19 865.95 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 5.00 865.95 100.00%
01.05.08 PRUEBA HIDRAULICA DE DESAGUE 1,803.46 0.00 0.00% 0.00 0.00% 0.00 0.00% - 1,803.46
01.05.08.01 PRUEBA HIDRAULICA DE DESAGUE m 1,141.43 1.58 1,803.46 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1,141.43 1,803.46 100.00%
01.05.09 INSTALACIONES ESPECIALES - POZO DE SUMIDERO 5,962.77 0.00 0.00% 0.00 0.00% 0.00 0.00% - 5,962.77
01.05.09.01 REDES DE DISTRIBUCION 548.19 0.00 0.00% 0.00 0.00% 0.00 0.00% - 548.19
01.05.09.01.01 TUBERIA PVC CLASE 10 C/ ROSCA 2" m 3.18 24.71 78.58 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.18 78.58 100.00%
01.05.09.01.02 TUBERIA PVC SAL Ø 6" m 9.92 47.34 469.61 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 9.92 469.61 100.00%
01.05.09.02 ACCESORIOS DE REDES 312.49 0.00 0.00% 0.00 0.00% 0.00 0.00% - 312.49
01.05.09.02.01 CODO PVC SAL 6" x 90° pza 8.00 26.28 210.24 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 8.00 210.24 100.00%
01.05.09.02.02 CODO PVC SAP 6" X 45º pza 3.00 16.33 48.99 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 48.99 100.00%
01.05.09.02.03 YEE PVC SAL 6" pza 1.00 18.19 18.19 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 18.19 100.00%
01.05.09.02.04 CODO PVC C/ ROSCA 2" x 90º pza 2.00 11.10 22.20 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 22.20 100.00%
01.05.09.02.05 TEE PVC C/ ROSCA 2" pza 1.00 12.87 12.87 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 12.87 100.00%
01.05.09.03 LLAVES Y VALVULAS 429.42 0.00 0.00% 0.00 0.00% 0.00 0.00% - 429.42
01.05.09.03.01 VALVULA DE COMPUERTA BRONCE DE 2" pza 1.00 187.80 187.80 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 187.80 100.00%
01.05.09.03.02 VALVULA CHECK 2" pza 1.00 241.62 241.62 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 241.62 100.00%
01.05.09.04 PIEZAS VARIAS 157.71 0.00 0.00% 0.00 0.00% 0.00 0.00% - 157.71
01.05.09.04.01 ELECTRONIVEL und 1.00 59.08 59.08 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 59.08 100.00%
01.05.09.04.02 BRIDA ROMPE AGUA 55 cm x 55 cm - Ø 6" und 1.00 98.63 98.63 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 98.63 100.00%
01.05.09.05 ADITAMENTOS VARIOS 86.46 0.00 0.00% 0.00 0.00% 0.00 0.00% - 86.46
01.05.09.05.01 SUMIDERO DE BRONCE 4" pza 2.00 43.23 86.46 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 86.46 100.00%
01.05.09.06 EQUIPOS Y OTRAS INSTALACIONES 4,428.50 0.00 0.00% 0.00 0.00% 0.00 0.00% - 4,428.50
ELECTROBOMBA SUMERGIBLE, Q = 2.33 lps, HDT = 13.11 M,
01.05.09.06.01 und 2.00 2,214.25 4,428.50 0.00 0.00 0.00 4,428.50
POT. = 0.86 HP - 0.00% - 0.00% - 0.00% 2.00 100.00%
01.05.10 INSTALACIONES ESPECIALES - CAMARA DE BOMBEO 5,813.23 0.00 0.00% 0.00 0.00% 0.00 0.00% - 5,813.23
01.05.10.01 REDES DE DISTRIBUCION 136.27 0.00 0.00% 0.00 0.00% 0.00 0.00% - 136.27
01.05.10.01.01 TUBERIA DE FIERRO GALVANIZADO DE 1" pza 4.39 31.04 136.27 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 4.39 136.27 100.00%
01.05.10.02 ACCESORIOS DE REDES 110.88 0.00 0.00% 0.00 0.00% 0.00 0.00% - 110.88
01.05.10.02.01 CODO DE FIERRO GALVANIZADO 1" x 90º pza 6.00 17.65 105.90 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 6.00 105.90 100.00%

48 de 114
PRESUPUESTO AVANCE FISICO
Item DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO Saldo de Val.
Und. Metrado Precio S/. Parcial S/.
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
01.05.10.02.02 TEE DE FIERRO GALVANIZADO 1" pza 1.00 4.98 4.98 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 4.98 100.00%
01.05.10.03 LLAVES Y VALVULAS 1,137.58 0.00 0.00% 0.00 0.00% 0.00 0.00% - 1,137.58
01.05.10.03.01 VALVULA CHECK DE BRONCE 1" P/TUB. FIERRO GALV. pza 2.00 119.63 239.26 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 239.26 100.00%
01.05.10.03.02 VALVULA ESFERICA DE BRONCE DE 1" P/TUB. FIERRO GALV. pza 2.00 449.16 898.32 0.00 0.00 0.00 898.32
- 0.00% - 0.00% - 0.00% 2.00 100.00%
01.05.10.04 EQUIPOS Y OTRAS INSTALACIONES 4,428.50 0.00 0.00% 0.00 0.00% 0.00 0.00% - 4,428.50
ELECTROBOMBA SUMERGIBLE, Q = 0.83 lps, HDT = 17.94 M,
01.05.10.04.01 und 2.00 2,214.25 4,428.50 0.00 0.00 0.00 4,428.50
POT. = 0.31 HP - 0.00% - 0.00% - 0.00% 2.00 100.00%
01.06 SISTEMA DE DRENAJE DE EQUIPOS DE AIRE ACONDICIONADO 21,709.38 0.00 0.00% 0.00 0.00% 0.00 0.00% - 21,709.38
01.06.01 SALIDAS DE DRENAJE DE EQUIPOS 7,070.06 0.00 0.00% 0.00 0.00% 0.00 0.00% - 7,070.06
01.06.01.01 SALIDA DESAGUE PVC CLASE 10 C/ ROSCA 1 1/4" pto 86.00 82.21 7,070.06 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 86.00 7,070.06 100.00%
01.06.02 REDES DE DISTRIBUCION 8,751.53 0.00 0.00% 0.00 0.00% 0.00 0.00% - 8,751.53
01.06.02.01 TUBERIA PVC CLASE 10 C/ ROSCA 1 1/4" m 422.08 18.74 7,909.78 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 422.08 7,909.78 100.00%
01.06.02.02 MONTANTE DE PVC SAL Ø 4" m 32.40 25.98 841.75 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 32.40 841.75 100.00%
01.06.03 ACCESORIOS DE REDES 1,894.94 0.00 0.00% 0.00 0.00% 0.00 0.00% - 1,894.94
01.06.03.01 CODO PVC C/ ROSCA 1 1/4" x 90º pza 28.00 6.90 193.20 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 28.00 193.20 100.00%
01.06.03.02 CODO PVC C/ ROSCA 4" x 90º pza 3.00 24.34 73.02 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 73.02 100.00%
01.06.03.03 CODO PVC C/ ROSCA 1 1/4" x 45º pza 71.00 6.90 489.90 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 71.00 489.90 100.00%
01.06.03.04 TEE PVC C/ ROSCA 4" pza 8.00 32.27 258.16 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 8.00 258.16 100.00%
01.06.03.05 YEE PVC C/ ROSCA 1 1/4" pza 77.00 8.21 632.17 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 77.00 632.17 100.00%
01.06.03.06 REDUCCION PVC C/ ROSCA 4" - 1 1/4" pza 9.00 27.61 248.49 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 9.00 248.49 100.00%
01.06.04 VARIOS 3,992.85 0.00 0.00% 0.00 0.00% 0.00 0.00% - 3,992.85
01.06.04.01 COLGADOR PARA 1 TUBERIA pza 171.00 23.35 3,992.85 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 171.00 3,992.85 100.00%
01.07 VARIOS 1,426.54 0.00 0.00% 0.00 0.00% 0.00 0.00% - 1,426.54
01.07.01 MOVIMIENTO DE TIERRAS 1,426.54 0.00 0.00% 0.00 0.00% 0.00 0.00% - 1,426.54
EXCAVACION MANUAL PARA REDES SANITARIAS, H = 0.60 M,
01.07.01.01 m 47.51 8.39 398.61 0.00 0.00 0.00 398.61
ANCHO = 0.50 M - 0.00% - 0.00% - 0.00% 47.51 100.00%
REFINE Y NIVELACION DE ZANJAS, T. NORMAL P/ TUB. D = 4" -
01.07.01.02 m 47.51 9.02 428.54 0.00 0.00 0.00 428.54
6" - 0.00% - 0.00% - 0.00% 47.51 100.00%
RELLENO COMPACTADO A MANO, CON MATERIAL PROPIO H =
01.07.01.03 m 47.51 4.47 212.37 0.00 0.00 0.00 212.37
0.60 M, ANCHO = 0.50 M - 0.00% - 0.00% - 0.00% 47.51 100.00%
ELIMINACION DE MATERIAL, CARGADOR 125 HP / VOLQUETE
01.07.01.04 m3 9.98 38.78 387.02 0.00 0.00 0.00 387.02
6 M3, D = 30 KM - 0.00% - 0.00% - 0.00% 9.98 100.00%
TOTAL COSTO DIRECTO 519,904.79 0.00 0.00% 0.00 0.00% 0.00 0.00% 519,904.79 100.00%
GASTOS GENERALES 7.25% 0.08 41,592.38 0.00 0.00% 0.00 0.00% 0.00 0.00% 41,592.38 100.00%
UTILIDAD 8.00% 0.08 41,592.38 0.00 0.00% 0.00 0.00% 0.00 0.00% 41,592.38 100.00%
PARCIAL 603,089.56 0.00 0.00% 0.00 0.00% 0.00 0.00% 603,089.55 100.00%
FACTOR DE RELACION (0.90) 0.90 542,780.60 0.00 0.00% 0.00 0.00% 0.00 0.00% 542,780.60 100.00%
SUB TOTAL FACTORIZADO 542,780.60 0.00 0.00 0.00 542,780.60
IGV 0.18 97,700.51 0.00 0.00% 0.00 0.00% 0.00 0.00% 97,700.51 100.00%
PRESUPUESTO TOTAL 640,481.11 0.00 0.00% 0.00 0.00% 0.00 0.00% 640,481.11 100.00%
AVANCE DE OBRA 100.00% 0.00% 0.00% 0.00% 100.00%
AVANCE DE OBRA ACUMULADO 100.00% 0.00% 0.00% 0.00% 100.00%

49 de 114
CONSORCIO T y M
#REF!
OBRA : #REF!
CONSULTOR : CONSORCIO SUERVISOR SANTA CATALINA
CONTRATISTA : #REF!
RESIDENTE DE OBRA ING.
: DAVID ROGELIO AQUINO CONDEZO CIP N° 83021
JEFE DE SUPERVISIO ING. OSKAR YVAN PEREZ SAL Y ROSAS CIP N° 163288
ESPECIALIDAD : INSTALACIONES ELECTRICAS
PRESUPUESTO AVANCE FISICO
Item DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO Saldo de Val.
Und. Metrado Precio S/. Parcial S/.
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
001 INSTALACIONES ELECTRICAS 2,714,694.76 S/. - S/. - S/. - S/. 2,714,694.76
01.01 INSTALACIONES ELECTRICAS 1,097,780.63 0.00 0.00% 0.00 0.00% 0.00 1,097,780.63
01.01.01 CONEXION A LA RED EXTERNA - TRABAJO PRELIMINARES 2,343.11 0.00 0.00% 0.00 0.00% 0.00 0.00% 2,343.11
EXCAVACION MANUAL PARA REDES ELECTRICAS, H = 0.60 M,
01.01.01.01 m 130.10 8.39 1,091.54 0.00 0.00 0.00 1,091.54
ANCHO = 0.50 M - 0.00% - 0.00% - 0.00% 130.10 100.00%
RELLENO COMPACTADO A MANO, CON MATERIAL PROPIO H =
01.01.01.02 m 130.10 4.47 581.55 0.00 0.00 0.00 581.55
0.60 M, ANCHO = 0.50 M - 0.00% - 0.00% - 0.00% 130.10 100.00%
01.01.01.03 CINTA SEÑALIZADORA m 130.10 5.15 670.02 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 130.10 670.02 100.00%
01.01.02 SALIDAS PARA ALUMBRADO, TOMACORRIENTES Y FUERZA 356,995.22 0.00 0.00% 0.00 0.00% 0.00 0.00% 356,995.22
01.01.02.01 SALIDAS PARA ALUMBRADO 26,664.66 0.00 0.00% 0.00 0.00% 0.00 0.00% 26,664.66
SALIDA PARA ALUMBRADO EN TECHO DE PVC SAP 20 mm
01.01.02.01.01 pto 333.00 74.13 24,685.29 0.00 0.00 0.00 24,685.29
( LSOH 4 mm2 ) - 0.00% - 0.00% - 0.00% 333.00 100.00%
SALIDA PARA ALUMBRADO EN PARED DE PVC SAP 20 mm
01.01.02.01.02 pto 27.00 73.31 1,979.37 0.00 0.00 0.00 1,979.37
( LSOH 4 mm2 ) - 0.00% - 0.00% - 0.00% 27.00 100.00%
01.01.02.02 SALIDAS PARA INTERRUPTORES 5,474.28 0.00 0.00% 0.00 0.00% 0.00 0.00% 5,474.28
INTERRUPTOR UNIPOLAR SIMPLE PVC SAP 20 mm ( LSOH 4
01.01.02.02.01 pto 110.00 47.53 5,228.30 0.00 0.00 0.00 5,228.30
mm2 ) - 0.00% - 0.00% - 0.00% 110.00 100.00%
INTERRUPTOR UNIPOLAR DOBLE PVC SAP 20 mm ( LSOH 4
01.01.02.02.02 pto 1.00 59.34 59.34 0.00 0.00 0.00 59.34
mm2 ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
INTERRUPTOR UNIPOLAR TRIPLE PVC SAP 20 mm ( LSOH 4
01.01.02.02.03 pto 1.00 69.30 69.30 0.00 0.00 0.00 69.30
mm2 ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
INTERRUPTOR DE CONMUTACION SIMPLE ( 3 VIAS ) PVC SAP
01.01.02.02.04 pto 2.00 58.67 117.34 0.00 0.00 0.00 117.34
20 mm ( LSOH 4 mm2 ) - 0.00% - 0.00% - 0.00% 2.00 100.00%
01.01.02.03 SALIDAS PARA TOMACORRIENTES 39,913.52 0.00 0.00% 0.00 0.00% 0.00 0.00% 39,913.52
TOMACORRIENTE BIPOLAR DOBLE C/ LINEA A TIERRA PVC
01.01.02.03.01 pto 142.00 88.26 12,532.92 0.00 0.00 0.00 12,532.92
SAP 20 mm EN PARED ( LSOH 4 mm2 ) - 0.00% - 0.00% - 0.00% 142.00 100.00%
TOMACORRIENTE BIPOLAR DOBLE C/ LINEA A TIERRA PVC
01.01.02.03.02 pto 1.00 85.70 85.70 0.00 0.00 0.00 85.70
SAP 20 mm EN PISO ( LSOH 4 mm2 ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
TOMACORRIENTE BIPOLAR DOBLE C/ LINEA A TIERRA PVC
01.01.02.03.03 pto 2.00 88.54 177.08 0.00 0.00 0.00 177.08
SAP 20 mm EN TECHO ( LSOH 4 mm2 ) - 0.00% - 0.00% - 0.00% 2.00 100.00%
TOMACORRIENTE BIPOLAR DOBLE C/ LINEA A TIERRA PVC
01.01.02.03.04 pto 98.00 87.54 8,578.92 0.00 0.00 0.00 8,578.92
SAP 20 mm PARA LUCES DE EMERGENCIA - 0.00% - 0.00% - 0.00% 98.00 100.00%
TOMACORRIENTE BIPOLAR DOBLE A PRUEBA DE AGUA C/
01.01.02.03.05 pto 19.00 115.70 2,198.30 0.00 0.00 0.00 2,198.30
LINEA A TIERRA PVC SAP 20 mm EN PARED ( LSOH 4 mm2 ) - 0.00% - 0.00% - 0.00% 19.00 100.00%
TOMACORRIENTE ESTABILIZADO DOBLE C/ LINEA A TIERRA
01.01.02.03.06 pto 20.00 88.26 1,765.20 0.00 0.00 0.00 1,765.20
PVC SAP 20 mm EN PARED ( LSOH 4 mm2 ) - 0.00% - 0.00% - 0.00% 20.00 100.00%
TOMACORRIENTE ESTABILIZADO DOBLE C/ LINEA A TIERRA
01.01.02.03.07 pto 168.00 85.70 14,397.60 0.00 0.00 0.00 14,397.60
PVC SAP 20 mm EN PISO ( LSOH 4 mm2 ) - 0.00% - 0.00% - 0.00% 168.00 100.00%
TOMACORRIENTE ESTABILIZADO DOBLE C/ LINEA A TIERRA
01.01.02.03.08 pto 2.00 88.90 177.80 0.00 0.00 0.00 177.80
PVC SAP 20 mm EN TECHO ( LSOH 4 mm2 ) - 0.00% - 0.00% - 0.00% 2.00 100.00%
01.01.02.04 SALIDAS DE FUERZA 17,653.02 0.00 0.00% 0.00 0.00% 0.00 0.00% 17,653.02
SALIDA DE FUERZA, PARA EQUIPOS DE AIRE
01.01.02.04.01 ACONDICIONADO, TUBERIA PVC SAP 20 mm ( 2 x 4 mm2 LSOH + 1 x 4 pto 87.00 111.47 9,697.89 0.00 0.00 0.00 9,697.89
mm2 LSOH ) - 0.00% - 0.00% - 0.00% 87.00 100.00%
SALIDA DE FUERZA, PARA EQUIPOS DE AIRE
01.01.02.04.02 ACONDICIONADO, TUBERIA PVC SAP 20 mm ( 3 x 4 mm2 LSOH + 1 x 4 pto 15.00 111.47 1,672.05 0.00 0.00 0.00 1,672.05
mm2 LSOH ) - 0.00% - 0.00% - 0.00% 15.00 100.00%

50 de 114
PRESUPUESTO AVANCE FISICO
Item DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO Saldo de Val.
Und. Metrado Precio S/. Parcial S/.
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
SALIDA DE FUERZA, PARA EQUIPOS DE AIRE
01.01.02.04.03 ACONDICIONADO, TUBERIA PVC SAP 20 mm ( 3 x 6 mm2 LSOH + 1 x 6 pto 5.00 130.75 653.75 0.00 0.00 0.00 653.75
mm2 LSOH ) - 0.00% - 0.00% - 0.00% 5.00 100.00%
SALIDA DE FUERZA, PARA EQUIPOS DE AIRE
01.01.02.04.04 ACONDICIONADO, TUBERIA PVC SAP 35 mm ( 3 x 25 mm2 LSOH + 1 x pto 3.00 305.02 915.06 0.00 0.00 0.00 915.06
10 mm2 LSOH ) - 0.00% - 0.00% - 0.00% 3.00 100.00%
SALIDA DE FUERZA, PARA EQUIPOS DE AIRE
01.01.02.04.05 ACONDICIONADO, TUBERIA METALICA 20 mm ( 3 x 4 mm2 LSOH + 1 x pto 2.00 154.44 308.88 0.00 0.00 0.00 308.88
4 mm2 LSOH ) - 0.00% - 0.00% - 0.00% 2.00 100.00%
SALIDA DE FUERZA, PARA EQUIPOS DE AIRE
01.01.02.04.06 ACONDICIONADO, TUBERIA METALICA 35 mm ( 3 x 16 mm2 LSOH + 1 pto 2.00 303.22 606.44 0.00 0.00 0.00 606.44
x 10 mm2 LSOH ) - 0.00% - 0.00% - 0.00% 2.00 100.00%
SALIDA DE FUERZA, PARA EQUIPOS DE AIRE
01.01.02.04.07 ACONDICIONADO, TUBERIA METALICA 50 mm ( 3 x 25 mm2 LSOH + 1 pto 3.00 445.30 1,335.90 0.00 0.00 0.00 1,335.90
x 10 mm2 LSOH ) - 0.00% - 0.00% - 0.00% 3.00 100.00%
SALIDA DE FUERZA, PARA EQUIPOS DE AIRE
01.01.02.04.08 ACONDICIONADO, TUBERIA METALICA 65 mm ( 3 x 70 mm2 LSOH + 1 pto 1.00 836.53 836.53 0.00 0.00 0.00 836.53
x 35 mm2 LSOH ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
SALIDA DE FUERZA, PARA BOMBA DE AGUA, TUBERIA PVC
01.01.02.04.09 pto 3.00 131.65 394.95 0.00 0.00 0.00 394.95
SAP 20 mm ( 3 x 6 mm2 LSOH + 1 x 6 mm2 LSOH ) - 0.00% - 0.00% - 0.00% 3.00 100.00%

SALIDA DE FUERZA, PARA BOMBA SUMIDERO DE DESAGUE,


01.01.02.04.10 pto 2.00 112.37 224.74 0.00 0.00 0.00 224.74
TUBERIA PVC SAP 20 mm ( 3 x 4 mm2 LSOH + 1 x 4 mm2 LSOH )
- 0.00% - 0.00% - 0.00% 2.00 100.00%
SALIDA DE FUERZA, PARA BOMBA DE DESAGUE, TUBERIA
01.01.02.04.11 pto 2.00 112.37 224.74 0.00 0.00 0.00 224.74
PVC SAP 20 mm ( 3 x 4 mm2 LSOH + 1 x 4 mm2 LSOH ) - 0.00% - 0.00% - 0.00% 2.00 100.00%
SALIDA DE FUERZA, PARA BOMBA DE AGUA CONTRA
01.01.02.04.12 INCENDIO, TUBERIA PVC SAP 65 mm ( 3 x 70 mm2 N2XH + 1 x 35 mm2 pto 1.00 782.09 782.09 0.00 0.00 0.00 782.09
LSOH ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
01.01.02.05 CAJAS DE PASE 2,024.95 0.00 0.00% 0.00 0.00% 0.00 0.00% 2,024.95
01.01.02.05.01 CAJA DE PASE 100 x 100 x 50 mm pza 83.00 15.42 1,279.86 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 83.00 1,279.86 100.00%
01.01.02.05.02 CAJA DE PASE 100 x 100 x 100 mm pza 19.00 16.61 315.59 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 19.00 315.59 100.00%
01.01.02.05.03 CAJA DE PASE 150 x 150 x 75 mm pza 1.00 18.74 18.74 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 18.74 100.00%
01.01.02.05.04 CAJA DE PASE 150 x 150 x 100 mm pza 8.00 18.74 149.92 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 8.00 149.92 100.00%
01.01.02.05.05 CAJA DE PASE 200 x 200 x 100 mm pza 4.00 20.61 82.44 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 4.00 82.44 100.00%
01.01.02.05.06 CAJA DE PASE 250 x 250 x 100 mm pza 8.00 22.30 178.40 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 8.00 178.40 100.00%
01.01.02.06 CANALIZACIONES, CONDUCTOS O TUBERIAS 48,785.92 0.00 0.00% 0.00 0.00% 0.00 0.00% 48,785.92
01.01.02.06.01 TUBERIA PVC SAP ( ELECTRICAS ) D = 25 mm m 571.01 6.90 3,939.97 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 571.01 3,939.97 100.00%
01.01.02.06.02 TUBERIA PVC SAP ( ELECTRICAS ) D = 35 mm m 10.45 7.88 82.35 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 10.45 82.35 100.00%
01.01.02.06.03 TUBERIA PVC SAP ( ELECTRICAS ) D = 40 mm m 5.95 11.11 66.10 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 5.95 66.10 100.00%
01.01.02.06.04 TUBERIA PVC SAP ( ELECTRICAS ) D = 65 mm m 19.22 20.41 392.28 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 19.22 392.28 100.00%
01.01.02.06.05 TUBERIA PVC SAP ( ELECTRICAS ) D = 100 mm m 24.88 44.95 1,118.36 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 24.88 1,118.36 100.00%
BANDEJA METALICA CERRADA LISA CON TAPA, COLGADO
01.01.02.06.06 m 6.40 96.62 618.37 0.00 0.00 0.00 618.37
DE TECHO 150 x 80 mm - 0.00% - 0.00% - 0.00% 6.40 100.00%
BANDEJA METALICA CERRADA LISA CON TAPA, COLGADO
01.01.02.06.07 m 198.24 101.09 20,040.08 0.00 0.00 0.00 20,040.08
DE TECHO 200 x 60 mm - 0.00% - 0.00% - 0.00% 198.24 100.00%
BANDEJA METALICA CERRADA LISA CON TAPA, COLGADO
01.01.02.06.08 m 36.56 129.84 4,746.95 0.00 0.00 0.00 4,746.95
DE TECHO 300 x 80 mm - 0.00% - 0.00% - 0.00% 36.56 100.00%
BANDEJA METALICA CERRADA LISA CON TAPA, COLGADO
01.01.02.06.09 m 18.38 155.85 2,864.52 0.00 0.00 0.00 2,864.52
DE TECHO 500 x 80 mm - 0.00% - 0.00% - 0.00% 18.38 100.00%
BANDEJA METALICA CERRADA LISA CON TAPA, COLGADO
01.01.02.06.10 m 54.62 194.23 10,608.84 0.00 0.00 0.00 10,608.84
DE TECHO 600 x 100 mm - 0.00% - 0.00% - 0.00% 54.62 100.00%
01.01.02.06.11 BANDEJA METALICA TIPO ESCALERA DE 300 x 80 mm m 15.75 98.28 1,547.91 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 15.75 1,547.91 100.00%
CODO PARA BANDEJA METALICA DE FIERRO GALVANIZADO,
01.01.02.06.12 pza 2.00 59.63 119.26 0.00 0.00 0.00 119.26
300 x 80 mm - 0.00% - 0.00% - 0.00% 2.00 100.00%
CODO PARA BANDEJA METALICA DE FIERRO GALVANIZADO,
01.01.02.06.13 pza 25.00 55.13 1,378.25 0.00 0.00 0.00 1,378.25
150 x 80 mm - 0.00% - 0.00% - 0.00% 25.00 100.00%
TEE PARA BANDEJA METALICA DE FIERRO GALVANIZADO,
01.01.02.06.14 pza 6.00 59.63 357.78 0.00 0.00 0.00 357.78
300 x 80 mm - 0.00% - 0.00% - 0.00% 6.00 100.00%

51 de 114
PRESUPUESTO AVANCE FISICO
Item DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO Saldo de Val.
Und. Metrado Precio S/. Parcial S/.
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
TEE PARA BANDEJA METALICA DE FIERRO GALVANIZADO,
01.01.02.06.15 pza 9.00 55.13 496.17 0.00 0.00 0.00 496.17
150 x 80 mm - 0.00% - 0.00% - 0.00% 9.00 100.00%
CANALETA DE PVC ( ELECTRICAS ) 30 x 15 mm C/
01.01.02.06.16 m 100.18 4.08 408.73 0.00 0.00 0.00 408.73
COMPARTIMIENTOS - 0.00% - 0.00% - 0.00% 100.18 100.00%
01.01.02.07 CONDUCTORES Y CABLES DE ENERGIA EN CONDUCTOS 71,381.31 0.00 0.00% 0.00 0.00% 0.00 0.00% 71,381.31
01.01.02.07.01 CABLE ELECTRICO LSOH 4 mm2 m 53.78 2.55 137.14 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 53.78 137.14 100.00%
01.01.02.07.02 CABLE ELECTRICO LSOH 6 mm2 m 517.59 3.41 1,764.98 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 517.59 1,764.98 100.00%
01.01.02.07.03 CABLE ELECTRICO LSOH 10 mm2 m 396.38 3.87 1,533.99 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 396.38 1,533.99 100.00%
01.01.02.07.04 CABLE ELECTRICO LSOH 16 mm2 m 61.19 6.07 371.42 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 61.19 371.42 100.00%
01.01.02.07.05 CABLE ELECTRICO LSOH 35 mm2 m 150.27 10.96 1,646.96 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 150.27 1,646.96 100.00%
01.01.02.07.06 CABLE ELECTRICO LSOH 95 mm2 m 4.32 20.56 88.82 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 4.32 88.82 100.00%
01.01.02.07.07 CABLE ELECTRICO N2XH 6 mm2 m 572.04 3.65 2,087.95 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 572.04 2,087.95 100.00%
01.01.02.07.08 CABLE ELECTRICO N2XH 95 mm2 m 334.68 23.03 7,707.68 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 334.68 7,707.68 100.00%
01.01.02.07.09 CABLE ELECTRICO N2XOH 6 mm2 m 892.26 4.65 4,149.01 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 892.26 4,149.01 100.00%
01.01.02.07.10 CABLE ELECTRICO N2XOH 10 mm2 m 1,289.59 5.64 7,273.29 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1,289.59 7,273.29 100.00%
01.01.02.07.11 CABLE ELECTRICO N2XOH 16 mm2 m 41.80 9.32 389.58 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 41.80 389.58 100.00%
01.01.02.07.12 CABLE ELECTRICO N2XOH 25 mm2 m 183.57 10.48 1,923.81 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 183.57 1,923.81 100.00%
01.01.02.07.13 CABLE ELECTRICO N2XOH 70 mm2 m 204.30 23.61 4,823.52 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 204.30 4,823.52 100.00%
01.01.02.07.14 CABLE ELECTRICO N2XOH 185 mm2 m 158.13 68.74 10,869.86 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 158.13 10,869.86 100.00%
01.01.02.07.15 CABLE ELECTRICO N2XOH 300 mm2 m 12.96 95.01 1,231.33 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 12.96 1,231.33 100.00%
01.01.02.07.16 CABLE ELECTRICO N2XY 6 mm2 m 878.63 4.61 4,050.48 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 878.63 4,050.48 100.00%
01.01.02.07.17 CABLE ELECTRICO N2XY 10 mm2 m 96.09 5.55 533.30 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 96.09 533.30 100.00%
01.01.02.07.18 CABLE ELECTRICO N2XY 70 mm2 m 72.85 30.06 2,189.87 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 72.85 2,189.87 100.00%
01.01.02.07.19 CABLE ELECTRICO N2XY 185 mm2 m 218.55 58.30 12,741.47 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 218.55 12,741.47 100.00%
01.01.02.07.20 CABLE ELECTRICO DESNUDO 35 mm2 m 79.04 4.89 386.51 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 79.04 386.51 100.00%
01.01.02.07.21 CABLE ELECTRICO DESNUDO 50 mm2 m 231.14 10.74 2,482.44 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 231.14 2,482.44 100.00%
01.01.02.07.22 CABLE ELECTRICO DESNUDO 70 mm2 m 250.87 11.95 2,997.90 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 250.87 2,997.90 100.00%
01.01.02.08 TABLEROS PRINCIPALES 31,978.86 0.00 0.00% 0.00 0.00% 0.00 0.00% 31,978.86
TABLERO PRINCIPAL CAJA METALICA 2000 x 600 x 300 mm
01.01.02.08.01 pza 6.00 5,329.81 31,978.86 0.00 0.00 0.00 31,978.86
( DEL TIPO AUTOSOPORTADO ) - 0.00% - 0.00% - 0.00% 6.00 100.00%
01.01.02.09 TABLEROS DE DISTRIBUCION 10,775.30 0.00 0.00% 0.00 0.00% 0.00 0.00% 10,775.30
TABLERO DISTRIBUCION CAJA METALICA CON 54 POLOS
01.01.02.09.01 pza 1.00 644.91 644.91 0.00 0.00 0.00 644.91
( DEL TIPO P/ EMPOTRAR ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
TABLERO DISTRIBUCION CAJA METALICA CON 42 POLOS
01.01.02.09.02 pza 3.00 594.91 1,784.73 0.00 0.00 0.00 1,784.73
( DEL TIPO P/ EMPOTRAR ) - 0.00% - 0.00% - 0.00% 3.00 100.00%
TABLERO DISTRIBUCION CAJA METALICA CON 36 POLOS
01.01.02.09.03 pza 2.00 501.91 1,003.82 0.00 0.00 0.00 1,003.82
( DEL TIPO P/ EMPOTRAR ) - 0.00% - 0.00% - 0.00% 2.00 100.00%
TABLERO DISTRIBUCION CAJA METALICA CON 30 POLOS
01.01.02.09.04 pza 2.00 455.72 911.44 0.00 0.00 0.00 911.44
( DEL TIPO P/ EMPOTRAR ) - 0.00% - 0.00% - 0.00% 2.00 100.00%
TABLERO DISTRIBUCION CAJA METALICA CON 24 POLOS
01.01.02.09.05 pza 3.00 406.72 1,220.16 0.00 0.00 0.00 1,220.16
( DEL TIPO P/ EMPOTRAR ) - 0.00% - 0.00% - 0.00% 3.00 100.00%
TABLERO DISTRIBUCION CAJA METALICA CON 18 POLOS
01.01.02.09.06 pza 11.00 384.91 4,234.01 0.00 0.00 0.00 4,234.01
( DEL TIPO P/ EMPOTRAR ) - 0.00% - 0.00% - 0.00% 11.00 100.00%
TABLERO DISTRIBUCION CAJA METALICA CON 12 POLOS
01.01.02.09.07 pza 3.00 325.41 976.23 0.00 0.00 0.00 976.23
( DEL TIPO P/ EMPOTRAR ) - 0.00% - 0.00% - 0.00% 3.00 100.00%
01.01.02.10 DISPOSITIVOS DE MANIOBRA Y PROTECCION 102,343.40 0.00 0.00% 0.00 0.00% 0.00 0.00% 102,343.40
INTERRUPTOR TERMOMAGNETICO TETRAPOLAR REG. 4 x
01.01.02.10.01 pza 1.00 672.87 672.87 0.00 0.00 0.00 672.87
200 A, 50 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
INTERRUPTOR TERMOMAGNETICO TETRAPOLAR REG. 4 x 80
01.01.02.10.02 pza 1.00 255.61 255.61 0.00 0.00 0.00 255.61
A, 18 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
INTERRUPTOR TERMOMAGNETICO TETRAPOLAR REG. 4 x 40
01.01.02.10.03 pza 3.00 255.61 766.83 0.00 0.00 0.00 766.83
A, 18 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 3.00 100.00%
INTERRUPTOR TERMOMAGNETICO TETRAPOLAR 4 x 80 A, 40
01.01.02.10.04 pza 1.00 225.79 225.79 0.00 0.00 0.00 225.79
KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
INTERRUPTOR TERMOMAGNETICO TETRAPOLAR 4 x 40 A, 40
01.01.02.10.05 pza 1.00 220.09 220.09 0.00 0.00 0.00 220.09
KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR C. M. 3 x 400 A,
01.01.02.10.06 pza 1.00 1,668.79 1,668.79 0.00 0.00 0.00 1,668.79
10 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 1.00 100.00%

52 de 114
PRESUPUESTO AVANCE FISICO
Item DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO Saldo de Val.
Und. Metrado Precio S/. Parcial S/.
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
INTERRUPTOR TERMOMAGNETICO TRIPOLAR C. M. 3 x 160 A,
01.01.02.10.07 pza 2.00 558.79 1,117.58 0.00 0.00 0.00 1,117.58
10 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 2.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR C. M. 3 x 100 A,
01.01.02.10.08 pza 3.00 256.40 769.20 0.00 0.00 0.00 769.20
10 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 3.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR C. M. 3 x 60 A,
01.01.02.10.09 pza 1.00 137.10 137.10 0.00 0.00 0.00 137.10
10 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR C. M. 3 x 50 A,
01.01.02.10.10 pza 1.00 137.10 137.10 0.00 0.00 0.00 137.10
10 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR C. M. 3 x 40 A,
01.01.02.10.11 pza 1.00 137.10 137.10 0.00 0.00 0.00 137.10
10 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR C. M. 3 x 32 A,
01.01.02.10.12 pza 5.00 130.10 650.50 0.00 0.00 0.00 650.50
10 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 5.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR C. M. 3 x 30 A,
01.01.02.10.13 pza 1.00 94.10 94.10 0.00 0.00 0.00 94.10
10 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 1250
01.01.02.10.14 pza 1.00 8,011.18 8,011.18 0.00 0.00 0.00 8,011.18
A, 85 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 800 A,
01.01.02.10.15 pza 1.00 2,581.79 2,581.79 0.00 0.00 0.00 2,581.79
85 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 630 A,
01.01.02.10.16 pza 1.00 1,868.79 1,868.79 0.00 0.00 0.00 1,868.79
85 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 630 A,
01.01.02.10.17 pza 1.00 1,818.79 1,818.79 0.00 0.00 0.00 1,818.79
65 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 630 A,
01.01.02.10.18 pza 2.00 1,718.79 3,437.58 0.00 0.00 0.00 3,437.58
50 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 2.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 400 A,
01.01.02.10.19 pza 4.00 1,654.79 6,619.16 0.00 0.00 0.00 6,619.16
50 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 4.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 400 A,
01.01.02.10.20 pza 1.00 1,618.79 1,618.79 0.00 0.00 0.00 1,618.79
36 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 250 A,
01.01.02.10.21 pza 1.00 1,003.79 1,003.79 0.00 0.00 0.00 1,003.79
50 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 160 A,
01.01.02.10.22 pza 1.00 437.10 437.10 0.00 0.00 0.00 437.10
50 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 125 A,
01.01.02.10.23 pza 1.00 437.10 437.10 0.00 0.00 0.00 437.10
50 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 63 A,
01.01.02.10.24 pza 1.00 156.10 156.10 0.00 0.00 0.00 156.10
18 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 50 A,
01.01.02.10.25 pza 1.00 156.10 156.10 0.00 0.00 0.00 156.10
18 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 40 A,
01.01.02.10.26 pza 1.00 151.10 151.10 0.00 0.00 0.00 151.10
50 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 40 A,
01.01.02.10.27 pza 1.00 146.10 146.10 0.00 0.00 0.00 146.10
36 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 40 A,
01.01.02.10.28 pza 3.00 137.10 411.30 0.00 0.00 0.00 411.30
18 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 3.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 32 A,
01.01.02.10.29 pza 5.00 137.10 685.50 0.00 0.00 0.00 685.50
18 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 5.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 25 A,
01.01.02.10.30 pza 1.00 136.03 136.03 0.00 0.00 0.00 136.03
18 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 20 A,
01.01.02.10.31 pza 1.00 120.03 120.03 0.00 0.00 0.00 120.03
50 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 20 A,
01.01.02.10.32 pza 8.00 115.03 920.24 0.00 0.00 0.00 920.24
18 KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 8.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR 3 x 630 A, 65
01.01.02.10.33 pza 1.00 764.79 764.79 0.00 0.00 0.00 764.79
KA ( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR 3 x 50 A, 10 KA
01.01.02.10.34 pza 1.00 126.10 126.10 0.00 0.00 0.00 126.10
( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR 3 x 40 A, 10 KA
01.01.02.10.35 pza 1.00 126.10 126.10 0.00 0.00 0.00 126.10
( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 1.00 100.00%

53 de 114
PRESUPUESTO AVANCE FISICO
Item DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO Saldo de Val.
Und. Metrado Precio S/. Parcial S/.
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
INTERRUPTOR TERMOMAGNETICO TRIPOLAR 3 x 32 A, 30 KA
01.01.02.10.36 pza 6.00 167.10 1,002.60 0.00 0.00 0.00 1,002.60
( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 6.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR 3 x 25 A, 25 KA
01.01.02.10.37 pza 1.00 158.10 158.10 0.00 0.00 0.00 158.10
( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR 3 x 20 A, 18 KA
01.01.02.10.38 pza 9.00 150.03 1,350.27 0.00 0.00 0.00 1,350.27
( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 9.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR 3 x 20 A, 10 KA
01.01.02.10.39 pza 14.00 125.03 1,750.42 0.00 0.00 0.00 1,750.42
( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 14.00 100.00%
INTERRUPTOR TERMOMAGNETICO TRIPOLAR 3 x 15 A, 10 KA
01.01.02.10.40 pza 4.00 120.03 480.12 0.00 0.00 0.00 480.12
( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 4.00 100.00%
INTERRUPTOR TERMOMAGNETICO BIPOLAR 2 x 20 A, 10 KA
01.01.02.10.41 pza 148.00 47.09 6,969.32 0.00 0.00 0.00 6,969.32
( DEL TIPO ENGRAMPE ) - 0.00% - 0.00% - 0.00% 148.00 100.00%
01.01.02.10.42 INTERRUPTOR DIFERENCIAL 30 mA ( 4 x 25 A ) pza 6.00 329.39 1,976.34 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 6.00 1,976.34 100.00%
01.01.02.10.43 INTERRUPTOR DIFERENCIAL 30 mA ( 2 x 25 A ) pza 155.00 263.39 40,825.45 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 155.00 40,825.45 100.00%
CONTACTOR AC - 3 2 x 20 A CONTROLADO POR
01.01.02.10.44 pza 24.00 385.19 9,244.56 0.00 0.00 0.00 9,244.56
INTERRUPTOR HORARIO 16A, 220 V - 0.00% - 0.00% - 0.00% 24.00 100.00%
01.01.03 INSTALACION DEL SISTEMA PUESTA A TIERRA 10,440.43 0.00 0.00% 0.00 0.00% 0.00 0.00% 10,440.43
01.01.03.01 POZO DE TIERRA ( PARA EQUIPOS DE FUERZA ) und 2.00 1,289.70 2,579.40 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 2,579.40 100.00%
01.01.03.02 POZO DE TIERRA ( PARA ASCENSOR ) und 2.00 1,289.70 2,579.40 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 2,579.40 100.00%
01.01.03.03 POZO DE TIERRA ( PARA SISTEMA DE COMPUTO ) und 2.00 1,289.70 2,579.40 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 2,579.40 100.00%
01.01.03.04 EXCAVACIONES SIMPLES m3 33.75 33.53 1,131.64 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 33.75 1,131.64 100.00%
ELIMINACION DE MATERIAL, CARGADOR 125 HP / VOLQUETE 6
01.01.03.05 m3 40.50 38.78 1,570.59 0.00 0.00 0.00 1,570.59
M3, D = 30 KM - 0.00% - 0.00% - 0.00% 40.50 100.00%
01.01.04 ARTEFACTOS 78,628.58 0.00 0.00% 0.00 0.00% 0.00 0.00% 78,628.58
ARTEFACTO EMPOTRADO A TECHO C/ 2 LAMP. TIPO SPOT 18
01.01.04.01 pza 19.00 98.00 1,862.00 0.00 0.00 0.00 1,862.00
W ( MOD. SPOT 2x18W PHILIPS O SIMILAR ) - 0.00% - 0.00% - 0.00% 19.00 100.00%
ARTEFACTO EMPOTRADO A TECHO C/ 2 LAMP. 26 W ( MOD.
01.01.04.02 pza 70.00 102.00 7,140.00 0.00 0.00 0.00 7,140.00
FBS 120 2x26W PHILIPS O SIMILAR ) - 0.00% - 0.00% - 0.00% 70.00 100.00%
ARTEFACTO EMPOTRADO A TECHO C/ 2 LAMP. 26 W ( MOD.
01.01.04.03 pza 14.00 145.00 2,030.00 0.00 0.00 0.00 2,030.00
FCS 291 2x26 W PHILIPS O SIMILAR ) - 0.00% - 0.00% - 0.00% 14.00 100.00%
ARTEFACTO EMPOTRADO A TECHO C/ 2 LAMP. 35 W ( MOD.
01.01.04.04 pza 6.00 120.00 720.00 0.00 0.00 0.00 720.00
2x35 W TBS 416 PHILIPS O SIMILAR ) - 0.00% - 0.00% - 0.00% 6.00 100.00%
ARTEFACTO EMPOTRADO A TECHO C/ 3 LAMP. 20 W ( MOD.
01.01.04.05 pza 71.00 145.00 10,295.00 0.00 0.00 0.00 10,295.00
3x20 W TBS 460 PHILIPS O SIMILAR ) - 0.00% - 0.00% - 0.00% 71.00 100.00%
ARTEFACTO EMPOTRADO A TECHO C/ 4 LAMP. 20 W ( MOD.
01.01.04.06 pza 32.00 220.00 7,040.00 0.00 0.00 0.00 7,040.00
4x20 W TBS 460 PHILIPS O SIMILAR ) - 0.00% - 0.00% - 0.00% 32.00 100.00%
ARTEFACTO ADOSADO A TECHO C/ 2 LAMP. 16 W TIPO
01.01.04.07 pza 24.00 110.00 2,640.00 0.00 0.00 0.00 2,640.00
SPOT( MOD. 2x16 W PHILIPS O SIMILAR ) - 0.00% - 0.00% - 0.00% 24.00 100.00%
ARTEFACTO ADOSADO A TECHO C/ 2 LAMP. 36 W ( MOD. TCW
01.01.04.08 pza 89.00 143.00 12,727.00 0.00 0.00 0.00 12,727.00
215 2x36 W PHILIPS O SIMILAR ) - 0.00% - 0.00% - 0.00% 89.00 100.00%
ARTEFACTO ADOSADO A TECHO C/ 2 LAMP. 36 W ( MOD. TSC
01.01.04.09 pza 8.00 175.00 1,400.00 0.00 0.00 0.00 1,400.00
398 2x36 W PHILIPS O SIMILAR ) - 0.00% - 0.00% - 0.00% 8.00 100.00%
ARTEFACTO ADOSADO A PARED C/ 1 LAMP. 50 W ( MOD. TL5
01.01.04.10 pza 27.00 72.00 1,944.00 0.00 0.00 0.00 1,944.00
1x50 W PHILIPS O SIMILAR ) - 0.00% - 0.00% - 0.00% 27.00 100.00%
01.01.04.11 COLOCACION DE ARTEFACTOS DE ALUMBRADO pza 360.00 38.31 13,791.60 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 360.00 13,791.60 100.00%
LUZ DE EMERGENCIA A BATERIA DEL TIPO SECO
01.01.04.12 RECARGABLE CON AUTONOMIA DE 2 HORAS Y 2 REFLECTORES pza 98.00 143.77 14,089.46 0.00 0.00 0.00 14,089.46
DIRECCIONALES DE 25 W - 0.00% - 0.00% - 0.00% 98.00 100.00%
LUZ DE EMERGENCIA CON BALASTRO ELECTRONICO PARA
01.01.04.13 pza 23.00 128.24 2,949.52 0.00 0.00 0.00 2,949.52
LAMPARAS FLUORESCENTES DE 12 W - 0.00% - 0.00% - 0.00% 23.00 100.00%
01.01.05 EQUIPOS ELECTRICOS Y MECANICOS 647,870.36 0.00 0.00% 0.00 0.00% 0.00 0.00% 647,870.36
SUMINISTRO E INSTALACION DE GRUPO ELECTROGENO 182
01.01.05.01 und 1.00 100,624.50 100,624.50 0.00 0.00 0.00 100,624.50
KW, 228 KVA, 230 V, 3 FASES - 0.00% - 0.00% - 0.00% 1.00 100.00%
01.01.05.02 ASCENSOR 10 PERSONAS, 750 KILOS, 6 PARADAS und 1.00 120,657.95 120,657.95 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 120,657.95 100.00%
01.01.05.03 ASCENSOR 12 PERSONAS, 900 KILOS, 6 PARADAS und 1.00 121,398.40 121,398.40 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 121,398.40 100.00%
TABLERO DE TRANSFERENCIA AUTOMATICA 1 (SEGUN
01.01.05.04 pza 1.00 7,834.63 7,834.63 0.00 0.00 0.00 7,834.63
DISEÑO) - 0.00% - 0.00% - 0.00% 1.00 100.00%

54 de 114
PRESUPUESTO AVANCE FISICO
Item DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO Saldo de Val.
Und. Metrado Precio S/. Parcial S/.
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
TABLERO DE TRANSFERENCIA AUTOMATICA 2 (SEGUN
01.01.05.05 pza 1.00 3,674.63 3,674.63 0.00 0.00 0.00 3,674.63
DISEÑO) - 0.00% - 0.00% - 0.00% 1.00 100.00%
01.01.05.06 UPS 150 KVA 3Ø, 380 V, 60 Hz ( INC. BANCO DE BATERIAS ) und 1.00 263,314.56 263,314.56 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 263,314.56 100.00%
TRANSFORMADOR DE AISLAMIENTO 150 KVA, 3 Ø, 220 / 380 V,
01.01.05.07 und 1.00 27,933.74 27,933.74 0.00 0.00 0.00 27,933.74
60 Hz - 0.00% - 0.00% - 0.00% 1.00 100.00%
01.01.05.08 MEDIDOR MULTIFUNCION 3 x 5 A pza 3.00 810.65 2,431.95 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 2,431.95 100.00%
01.01.06 PRUEBAS ELECTRICAS 1,502.93 0.00 0.00% 0.00 0.00% 0.00 0.00% 1,502.93
01.01.06.01 PRUEBAS DE AISLAMIENTO Y RESISTIVIDAD glb 1.00 1,502.93 1,502.93 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 1,502.93 100.00%
01.02 INSTALACIONES MECANICAS 1,314,393.89 0.00 0.00% 0.00 0.00% 0.00 0.00% 1,314,393.89
01.02.01 SISTEMA DE AIRE ACONDICIONADO 1,170,593.22 0.00 0.00% 0.00 0.00% 0.00 0.00% 1,170,593.22
01.02.01.01 SISTEMA MULTI - SPLIT 1,037,146.92 0.00 0.00% 0.00 0.00% 0.00 0.00% 1,037,146.92
01.02.01.01.01 EQUIPO MULTI - SPLIT ( UC - 265,030 BTU/h ) und 1.00 258,077.12 258,077.12 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 258,077.12 100.00%
01.02.01.01.02 EQUIPO MULTI - SPLIT ( UC - 420,495 BTU/h ) und 1.00 369,707.32 369,707.32 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 369,707.32 100.00%
01.02.01.01.03 EQUIPO MULTI - SPLIT ( UC - 503,840 BTU/h ) und 1.00 409,362.48 409,362.48 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 409,362.48 100.00%
01.02.01.02 SISTEMA SPLIT 26,231.76 0.00 0.00% 0.00 0.00% 0.00 0.00% 26,231.76
01.02.01.02.01 EQUIPO SPLIT ( TIPO DECORATIVO 18,000 BTU ) und 1.00 26,231.76 26,231.76 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 26,231.76 100.00%
01.02.01.03 TUBERIAS Y ACCESORIOS DE GAS PARA AIRE ACOND. 18,352.32 0.00 0.00% 0.00 0.00% 0.00 0.00% 18,352.32
01.02.01.03.01 TUBERIA DE COBRE TIPO L 15.9 mm m 321.36 31.54 10,135.69 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 321.36 10,135.69 100.00%
01.02.01.03.02 TUBERIA DE COBRE TIPO L 19.1 mm m 17.16 36.96 634.23 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 17.16 634.23 100.00%
01.02.01.03.03 TUBERIA DE COBRE TIPO L 22.2 mm m 18.10 42.97 777.76 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 18.10 777.76 100.00%
01.02.01.03.04 TUBERIA DE COBRE TIPO L 28.6 mm m 50.00 60.45 3,022.50 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 50.00 3,022.50 100.00%
01.02.01.03.05 CODO DE COBRE 15.9 mm x 90º pza 34.00 21.21 721.14 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 34.00 721.14 100.00%
01.02.01.03.06 CODO DE COBRE 19.1 mm x 90º pza 3.00 22.07 66.21 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 66.21 100.00%
01.02.01.03.07 CODO DE COBRE 22.2 mm x 90º pza 3.00 24.48 73.44 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 73.44 100.00%
01.02.01.03.08 CODO DE COBRE 28.6 mm x 90º pza 15.00 28.32 424.80 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 15.00 424.80 100.00%
01.02.01.03.09 TEE DE COBRE 15.9 mm pza 39.00 32.31 1,260.09 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 39.00 1,260.09 100.00%
01.02.01.03.10 TEE DE COBRE 19.1 mm pza 2.00 32.92 65.84 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 65.84 100.00%
01.02.01.03.11 TEE DE COBRE 22.2 mm pza 3.00 36.39 109.17 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 109.17 100.00%
01.02.01.03.12 TEE DE COBRE 28.6 mm pza 11.00 42.78 470.58 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 11.00 470.58 100.00%
01.02.01.03.13 REDUCCION DE COBRE 19.1 mm - 15.9 mm pza 5.00 21.83 109.15 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 5.00 109.15 100.00%
01.02.01.03.14 REDUCCION DE COBRE 22.2 mm - 15.9 mm pza 5.00 24.78 123.90 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 5.00 123.90 100.00%
01.02.01.03.15 REDUCCION DE COBRE 28.6 mm - 15.9 mm pza 10.00 24.68 246.80 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 10.00 246.80 100.00%
01.02.01.03.16 REDUCCION DE COBRE 28.6 mm - 19.1 mm pza 1.00 26.93 26.93 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 26.93 100.00%
01.02.01.03.17 REDUCCION DE COBRE 28.6 mm - 22.2 mm pza 3.00 28.03 84.09 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 84.09 100.00%
01.02.01.04 TUBERIAS Y ACCESORIOS DE LIQUIDO PARA AIRE ACOND. 13,095.81 0.00 0.00% 0.00 0.00% 0.00 0.00% 13,095.81
01.02.01.04.01 TUBERIA DE COBRE TIPO L 9.5 mm m 355.56 24.18 8,597.44 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 355.56 8,597.44 100.00%
01.02.01.04.02 TUBERIA DE COBRE TIPO L 12.7 mm m 34.60 28.70 993.02 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 34.60 993.02 100.00%
01.02.01.04.03 TUBERIA DE COBRE TIPO L 15.9 mm m 15.43 31.54 486.66 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 15.43 486.66 100.00%
01.02.01.04.04 CODO DE COBRE 9.5 mm x 90º pza 40.00 20.39 815.60 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 40.00 815.60 100.00%
01.02.01.04.05 CODO DE COBRE 12.7 mm x 90º pza 6.00 20.59 123.54 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 6.00 123.54 100.00%
01.02.01.04.06 CODO DE COBRE 15.9 mm x 90º pza 5.00 21.21 106.05 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 5.00 106.05 100.00%
01.02.01.04.07 TEE DE COBRE 9.5 mm pza 45.00 29.62 1,332.90 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 45.00 1,332.90 100.00%
01.02.01.04.08 TEE DE COBRE 12.7 mm pza 9.00 30.27 272.43 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 9.00 272.43 100.00%
01.02.01.04.09 TEE DE COBRE 15.9 mm pza 3.00 32.31 96.93 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 96.93 100.00%
01.02.01.04.10 REDUCCION DE COBRE 12.7 mm - 9.5 mm pza 7.00 20.65 144.55 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 7.00 144.55 100.00%
01.02.01.04.11 REDUCCION DE COBRE 15..9 mm - 9.5 mm pza 3.00 20.87 62.61 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 62.61 100.00%
01.02.01.04.12 REDUCCION DE COBRE 15.9 mm - 12.7 mm pza 3.00 21.36 64.08 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 64.08 100.00%
01.02.01.05 SISTEMA DE EQUIPOS DE INYECTORES 28,249.15 0.00 0.00% 0.00 0.00% 0.00 0.00% 28,249.15
01.02.01.05.01 INYECTOR CENTRIFUGO 450 CFM und 2.00 666.24 1,332.48 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 1,332.48 100.00%
01.02.01.05.02 INYECTOR CENTRIFUGO 542 CFM und 2.00 723.44 1,446.88 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 1,446.88 100.00%
01.02.01.05.03 INYECTOR CENTRIFUGO 600 CFM und 2.00 798.24 1,596.48 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 1,596.48 100.00%
01.02.01.05.04 INYECTOR CENTRIFUGO 721 CFM und 1.00 941.24 941.24 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 941.24 100.00%
01.02.01.05.05 INYECTOR CENTRIFUGO 1,698 CFM und 1.00 2,151.24 2,151.24 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 2,151.24 100.00%
01.02.01.05.06 INYECTOR CENTRIFUGO 5,724 CFM und 1.00 6,992.34 6,992.34 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 6,992.34 100.00%
01.02.01.05.07 INYECTOR CENTRIFUGO 6,726 CFM und 1.00 9,413.77 9,413.77 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 9,413.77 100.00%
01.02.01.05.08 INYECTOR HELICOCENTRIFUGO 665 CFM und 1.00 754.24 754.24 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 754.24 100.00%
01.02.01.05.09 INYECTOR HELICOCENTRIFUGO 714 CFM und 1.00 754.24 754.24 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 754.24 100.00%
01.02.01.05.10 INYECTOR HELICOIDAL 11,557 CFM und 1.00 2,866.24 2,866.24 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 2,866.24 100.00%

55 de 114
PRESUPUESTO AVANCE FISICO
Item DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO Saldo de Val.
Und. Metrado Precio S/. Parcial S/.
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
01.02.01.06 DIFUSORES Y REJILLAS 2,921.44 0.00 0.00% 0.00 0.00% 0.00 0.00% 2,921.44
01.02.01.06.01 DIFUSORES pg2 2,916.00 0.76 2,216.16 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2,916.00 2,216.16 100.00%
01.02.01.06.02 REJILLA DE AIRE FRESCO pg2 928.00 0.76 705.28 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 928.00 705.28 100.00%
01.02.01.07 DUCTOS 11,380.55 0.00 0.00% 0.00 0.00% 0.00 0.00% 11,380.55
01.02.01.07.01 DUCTOS METALICOS kg 889.27 8.73 7,763.33 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 889.27 7,763.33 100.00%
01.02.01.07.02 AISLAMIENTO ACUSTICO PARA DUCTOS m2 180.41 20.05 3,617.22 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 180.41 3,617.22 100.00%
01.02.01.08 VARIOS 31,709.41 0.00 0.00% 0.00 0.00% 0.00 0.00% 31,709.41
01.02.01.08.01 BOTONERA DE ARRANQUE Y PARADA ON - OFF und 13.00 72.48 942.24 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 13.00 942.24 100.00%
01.02.01.08.02 TERMOSTATO DE AMBIENTE und 63.00 80.44 5,067.72 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 63.00 5,067.72 100.00%
01.02.01.08.03 DAMPER DE GRAVEDAD pg2 1,048.00 0.81 848.88 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1,048.00 848.88 100.00%
01.02.01.08.04 CAJA DE CONTROL und 76.00 44.68 3,395.68 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 76.00 3,395.68 100.00%
01.02.01.08.05 UNION FLEXIBLE DE LONA PARA DUCTOS ( A.A. ) und 26.00 262.31 6,820.06 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 26.00 6,820.06 100.00%
01.02.01.08.06 SOPORTE METALICO PARA DUCTOS EN TECHO pza 105.00 48.31 5,072.55 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 105.00 5,072.55 100.00%
01.02.01.08.07 SOPORTE METALICO PARA TUBERIAS EN TECHO pza 258.00 31.33 8,083.14 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 258.00 8,083.14 100.00%
01.02.01.08.08 SOPORTE METALICO PARA TUBERIAS EN PARED pza 8.00 33.02 264.16 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 8.00 264.16 100.00%
01.02.01.08.09 SOPORTE METALICO PARA TUBERIAS EN PISO pza 6.00 35.83 214.98 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 6.00 214.98 100.00%
TRANSPORTE, IZAJE, DESPLAZAMIENTO E INSTALACION DE
01.02.01.08.10 est 1.00 1,000.00 1,000.00 0.00 0.00 0.00 1,000.00
EQUIPOS DE AIRE ACONDICIONADO - 0.00% - 0.00% - 0.00% 1.00 100.00%
PRUEBAS Y BALANCEO DEL SISTEMA DE AIRE
01.02.01.09 1,505.86 0.00 0.00 0.00 1,505.86
ACONDICIONADO 0.00% 0.00% 0.00%
01.02.01.09.01 PRUEBAS Y BALANCEO DE AIRE ACONDICIONADO glb 1.00 1,505.86 1,505.86 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 1,505.86 100.00%
01.02.02 SISTEMA DE EXTRACCION 80,753.98 0.00 0.00% 0.00 0.00% 0.00 0.00% 80,753.98
01.02.02.01 EXTRACTORES E INYECTORES 12,816.10 0.00 0.00% 0.00 0.00% 0.00 0.00% 12,816.10
01.02.02.01.01 EXTRACTOR HELICOCENTRIFUGO 70 CFM und 1.00 159.39 159.39 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 159.39 100.00%
01.02.02.01.02 EXTRACTOR HELICOCENTRIFUGO 75 CFM und 1.00 159.39 159.39 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 159.39 100.00%
01.02.02.01.03 EXTRACTOR HELICOCENTRIFUGO 88 CFM und 1.00 159.39 159.39 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 159.39 100.00%
01.02.02.01.04 EXTRACTOR HELICOCENTRIFUGO 90 CFM und 2.00 159.39 318.78 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 318.78 100.00%
01.02.02.01.05 EXTRACTOR HELICOCENTRIFUGO 99 CFM und 2.00 159.39 318.78 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 318.78 100.00%
01.02.02.01.06 EXTRACTOR HELICOCENTRIFUGO 106 CFM und 1.00 181.39 181.39 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 181.39 100.00%
01.02.02.01.07 EXTRACTOR HELICOCENTRIFUGO 117 CFM und 1.00 181.39 181.39 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 181.39 100.00%
01.02.02.01.08 EXTRACTOR HELICOCENTRIFUGO 120 CFM und 1.00 192.39 192.39 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 192.39 100.00%
01.02.02.01.09 EXTRACTOR HELICOCENTRIFUGO 129 CFM und 1.00 181.39 181.39 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 181.39 100.00%
01.02.02.01.10 EXTRACTOR HELICOCENTRIFUGO 133 CFM und 1.00 214.39 214.39 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 214.39 100.00%
01.02.02.01.11 EXTRACTOR HELICOCENTRIFUGO 140 CFM und 1.00 214.39 214.39 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 214.39 100.00%
01.02.02.01.12 EXTRACTOR HELICOCENTRIFUGO 177 CFM und 2.00 214.39 428.78 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 428.78 100.00%
01.02.02.01.13 EXTRACTOR HELICOCENTRIFUGO 184 CFM und 1.00 247.39 247.39 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 247.39 100.00%
01.02.02.01.14 EXTRACTOR HELICOCENTRIFUGO 188 CFM und 1.00 247.39 247.39 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 247.39 100.00%
01.02.02.01.15 EXTRACTOR HELICOCENTRIFUGO 368 CFM und 1.00 489.39 489.39 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 489.39 100.00%
01.02.02.01.16 EXTRACTOR HELICOCENTRIFUGO 405 CFM und 1.00 489.39 489.39 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 489.39 100.00%
01.02.02.01.17 EXTRACTOR HELICOCENTRIFUGO 650 CFM und 1.00 632.39 632.39 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 632.39 100.00%
01.02.02.01.18 EXTRACTOR HELICOCENTRIFUGO 665 CFM und 1.00 632.39 632.39 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 632.39 100.00%
01.02.02.01.19 EXTRACTOR HELICOCENTRIFUGO 714 CFM und 1.00 632.39 632.39 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 632.39 100.00%
01.02.02.01.20 EXTRACTOR CENTRIFUGO 1000 CFM und 1.00 1,624.59 1,624.59 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 1,624.59 100.00%
01.02.02.01.21 EXTRACTOR CENTRIFUGO 1074 CFM und 1.00 1,624.59 1,624.59 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 1,624.59 100.00%
01.02.02.01.22 EXTRACTOR AXIAL 90 CFM und 1.00 159.39 159.39 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 159.39 100.00%
01.02.02.01.23 EXTRACTOR AXIAL 120 CFM und 1.00 797.39 797.39 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 797.39 100.00%
01.02.02.01.24 EXTRACTOR AXIAL 430 CFM und 2.00 632.39 1,264.78 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 1,264.78 100.00%
01.02.02.01.25 EXTRACTOR AXIAL 448 CFM und 1.00 632.39 632.39 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 632.39 100.00%
01.02.02.01.26 EXTRACTOR AXIAL 452 CFM und 1.00 632.39 632.39 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 632.39 100.00%
01.02.02.02 EXTRACTORES E INYECTORES DE MONOXIDO 13,847.35 0.00 0.00% 0.00 0.00% 0.00 0.00% 13,847.35
01.02.02.02.01 EXTRACTOR CENTRIFUGO DOBLE ENTRADA 19,722 CFM und 1.00 13,847.35 13,847.35 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 13,847.35 100.00%
01.02.02.03 DIFUSORES Y REJILLAS 7,432.81 0.00 0.00% 0.00 0.00% 0.00 0.00% 7,432.81
01.02.02.03.01 REJILLA DE EXTRACCION pg2 2,963.00 0.77 2,281.51 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2,963.00 2,281.51 100.00%
01.02.02.03.02 REJILLA DE EXPULSION pg2 1,290.00 0.77 993.30 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1,290.00 993.30 100.00%
01.02.02.03.03 REJILLA DE EXTRACCION DE MONOXIDO pg2 5,400.00 0.77 4,158.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 5,400.00 4,158.00 100.00%
01.02.02.04 DUCTOS 20,025.88 0.00 0.00% 0.00 0.00% 0.00 0.00% 20,025.88
01.02.02.04.01 DUCTOS METALICOS kg 1,628.82 8.73 14,219.60 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1,628.82 14,219.60 100.00%
01.02.02.04.02 AISLAMIENTO ACUSTICO PARA DUCTOS m2 289.59 20.05 5,806.28 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 289.59 5,806.28 100.00%

56 de 114
PRESUPUESTO AVANCE FISICO
Item DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO Saldo de Val.
Und. Metrado Precio S/. Parcial S/.
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
01.02.02.05 VARIOS 25,631.84 0.00 0.00% 0.00 0.00% 0.00 0.00% 25,631.84
01.02.02.05.01 BOTONERA DE ARRANQUE Y PARADA ON - OFF und 30.00 72.48 2,174.40 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 30.00 2,174.40 100.00%
01.02.02.05.02 CAJA DE CONTROL und 30.00 44.68 1,340.40 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 30.00 1,340.40 100.00%
01.02.02.05.03 DAMPER DE GRAVEDAD pg2 1,290.00 0.81 1,044.90 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1,290.00 1,044.90 100.00%
01.02.02.05.04 UNION FLEXIBLE DE LONA PARA DUCTOS und 50.00 262.31 13,115.50 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 50.00 13,115.50 100.00%
01.02.02.05.05 SOPORTE METALICO PARA DUCTOS EN TECHO pza 144.00 48.31 6,956.64 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 144.00 6,956.64 100.00%
TRANSPORTE, IZAJE, DESPLAZAMIENTO E INSTALACION DE
01.02.02.05.06 est 1.00 1,000.00 1,000.00 0.00 0.00 0.00 1,000.00
EQUIPOS DE VENTILACION - 0.00% - 0.00% - 0.00% 1.00 100.00%
01.02.02.06 PRUEBAS Y BALANCEO DEL SISTEMA DE EXTRACCION 1,000.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1,000.00
01.02.02.06.01 PRUEBAS Y BALANCEO DEL SISTEMA DE EXTRACCION glb 1.00 1,000.00 1,000.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 1,000.00 100.00%
01.02.03 SISTEMA DE PRESURIZACION 22,718.10 0.00 0.00% 0.00 0.00% 0.00 0.00% 22,718.10
01.02.03.01 VENTILADORES 13,584.78 0.00 0.00% 0.00 0.00% 0.00 0.00% 13,584.78
01.02.03.01.01 VENTILADOR CENTRIFUGO DE SIMPLE ENTRADA 18,714 CFM und 1.00 6,737.39 6,737.39 0.00 0.00 0.00 6,737.39
- 0.00% - 0.00% - 0.00% 1.00 100.00%

01.02.03.01.02 VENTILADOR CENTRIFUGO DE SIMPLE ENTRADA 19,359 CFM und 1.00 6,847.39 6,847.39 0.00 0.00 0.00 6,847.39
- 0.00% - 0.00% - 0.00% 1.00 100.00%
01.02.03.02 DIFUSORES Y REJILLAS 4,028.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 4,028.00
01.02.03.02.01 REJILLA DE SUMINISTRO pg2 5,300.00 0.76 4,028.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 5,300.00 4,028.00 100.00%
01.02.03.03 DUCTOS 797.54 0.00 0.00% 0.00 0.00% 0.00 0.00% 797.54
01.02.03.03.01 DUCTOS METALICOS kg 66.07 8.73 576.79 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 66.07 576.79 100.00%
01.02.03.03.02 AISLAMIENTO ACUSTICO PARA DUCTOS m2 11.01 20.05 220.75 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 11.01 220.75 100.00%
01.02.03.04 VARIOS 3,307.78 0.00 0.00% 0.00 0.00% 0.00 0.00% 3,307.78
01.02.03.04.01 CAJA DE CONTROL und 2.00 44.68 89.36 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 89.36 100.00%
01.02.03.04.02 SENSOR DE HUMO und 2.00 49.50 99.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 99.00 100.00%
01.02.03.04.03 DAMPER DE ALIVIO pg2 2,196.00 0.81 1,778.76 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2,196.00 1,778.76 100.00%
01.02.03.04.04 UNION FLEXIBLE DE LONA PARA DUCTOS und 2.00 262.31 524.62 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 524.62 100.00%
01.02.03.04.05 SOPORTE METALICO PARA DUCTOS EN PISO pza 4.00 29.01 116.04 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 4.00 116.04 100.00%
TRANSPORTE, IZAJE, DESPLAZAMIENTO E INSTALACION DE
01.02.03.04.06 est 1.00 700.00 700.00 0.00 0.00 0.00 700.00
EQUIPOS DE PRESURIZACION - 0.00% - 0.00% - 0.00% 1.00 100.00%
01.02.03.05 PRUEBAS Y BALANCEO DEL SISTEMA DE PRESURIZACION 1,000.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1,000.00
01.02.03.05.01 PRUEBAS Y BALANCEO DEL SISTEMA DE PRESURIZACION glb 1.00 1,000.00 1,000.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 1,000.00 100.00%
01.02.04 SISTEMA DE PRECISION 40,328.59 0.00 0.00% 0.00 0.00% 0.00 0.00% 40,328.59
01.02.04.01 VENTILADOR DE PRECISION 33,371.32 0.00 0.00% 0.00 0.00% 0.00 0.00% 33,371.32
01.02.04.01.01 EQUIPO TIPO PRECISION 60,000 BTU und 2.00 16,685.66 33,371.32 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 33,371.32 100.00%
01.02.04.02 TUBERIAS Y ACCESORIOS DE GAS PARA AIRE ACOND. 2,611.54 0.00 0.00% 0.00 0.00% 0.00 0.00% 2,611.54
01.02.04.02.01 TUBERIA DE COBRE TIPO L 22.2 mm m 52.80 42.97 2,268.82 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 52.80 2,268.82 100.00%
01.02.04.02.02 CODO DE COBRE 22.2 mm x 90º pza 14.00 24.48 342.72 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 14.00 342.72 100.00%
01.02.04.03 TUBERIAS Y ACCESORIOS DE LIQUIDO PARA AIRE ACOND. 1,803.62 0.00 0.00% 0.00 0.00% 0.00 0.00% 1,803.62
01.02.04.03.01 TUBERIA DE COBRE TIPO L 12.7 mm m 52.80 28.70 1,515.36 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 52.80 1,515.36 100.00%
01.02.04.03.02 CODO DE COBRE 12.7 mm x 90º pza 14.00 20.59 288.26 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 14.00 288.26 100.00%
01.02.04.04 VARIOS 1,854.61 0.00 0.00% 0.00 0.00% 0.00 0.00% 1,854.61
01.02.04.04.01 CAJA DE CONTROL und 4.00 44.68 178.72 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 4.00 178.72 100.00%
01.02.04.04.02 SOPORTE METALICO PARA TUBERIAS EN TECHO pza 22.00 31.33 689.26 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 22.00 689.26 100.00%
01.02.04.04.03 SOPORTE METALICO PARA TUBERIAS EN PARED pza 8.00 33.02 264.16 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 8.00 264.16 100.00%
01.02.04.04.04 SOPORTE METALICO PARA TUBERIAS EN PISO pza 9.00 35.83 322.47 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 9.00 322.47 100.00%
TRANSPORTE, IZAJE, DESPLAZAMIENTO E INSTALACION DE
01.02.04.04.05 est 1.00 400.00 400.00 0.00 0.00 0.00 400.00
EQUIPOS DE PRECISION - 0.00% - 0.00% - 0.00% 1.00 100.00%
01.02.04.05 PRUEBAS Y BALANCEO DEL SISTEMA DE PRECISION 687.50 0.00 0.00% 0.00 0.00% 0.00 0.00% 687.50 100.00%
01.02.04.05.01 PRUEBAS Y BALANCEO DEL SISTEMA DE PRECISION glb 1.00 687.50 687.50 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 687.50 100.00%
01.03 SUB ESTACION 302,520.24 0.00 0.00% 0.00 0.00% 0.00 0.00% 302,520.24
01.03.01 ROTURA Y REPARACION 10,631.26 0.00 0.00% 0.00 0.00% 0.00 0.00% 10,631.26
PERFILADO DE SARDINEL DE CONCRETO EXIST. C/ DISCO DE
01.03.01.01 m 6.60 4.43 29.24 0.00 0.00 0.00 29.24
CORTE P/ REDES ELECTRICAS - 0.00% - 0.00% - 0.00% 6.60 100.00%
PERFILADO DE PAVIMENTO DE ASFALTO EXIST. C/ DISCO DE
01.03.01.02 m 14.60 6.40 93.44 0.00 0.00 0.00 93.44
CORTE - 0.00% - 0.00% - 0.00% 14.60 100.00%
01.03.01.03 REMOCION DE ADOQUIN DE CONCRETO m2 163.05 3.35 546.22 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 163.05 546.22 100.00%
REPOSICION DE VEREDA DE ADOQUIN DE CONCRETO 21 x
01.03.01.04 m2 163.05 61.10 9,962.36 0.00 0.00 0.00 9,962.36
10.5 x 4 cm ( INC. BASE Y CONFINAMIENTO ) - 0.00% - 0.00% - 0.00% 163.05 100.00%

57 de 114
PRESUPUESTO AVANCE FISICO
Item DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO Saldo de Val.
Und. Metrado Precio S/. Parcial S/.
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
01.03.02 TRAZOS, NIVELES Y REPLANTEO 198.36 0.00 0.00% 0.00 0.00% 0.00 0.00% 198.36
01.03.02.01 TRAZOS, NIVELES Y REPLANTEO PRELIMINAR CON EQUIPO m 116.00 1.71 198.36 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 116.00 198.36 100.00%
01.03.03 CONEXION A LA RED EXTERNA - TRABAJO PRELIMINARES 2,773.44 0.00 0.00% 0.00 0.00% 0.00 0.00% 2,773.44
EXCAVACION MANUAL PARA REDES ELECTRICAS, H = 1.10 M,
01.03.03.01 m 116.00 10.31 1,195.96 0.00 0.00 0.00 1,195.96
ANCHO = 0.60 M - 0.00% - 0.00% - 0.00% 116.00 100.00%
RELLENO COMPACTADO A MANO, CON MATERIAL PROPIO H =
01.03.03.02 m 116.00 5.37 622.92 0.00 0.00 0.00 622.92
1.10 M, ANCHO = 0.60 M - 0.00% - 0.00% - 0.00% 116.00 100.00%
01.03.03.03 CINTA SEÑALIZADORA m 116.00 5.15 597.40 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 116.00 597.40 100.00%
ELIMINACION DE MATERIAL, CARGADOR 125 HP / VOLQUETE 6
01.03.03.04 m3 9.21 38.78 357.16 0.00 0.00 0.00 357.16
M3, D = 30 KM - 0.00% - 0.00% - 0.00% 9.21 100.00%
01.03.04 CRUZADAS Y VEREDAS 2,600.13 0.00 0.00% 0.00 0.00% 0.00 0.00% 2,600.13
01.03.04.01 CONCRETO C:H 1:8 E = 2" SOLADOS m2 69.60 21.11 1,469.26 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 69.60 1,469.26 100.00%
01.03.04.02 DUCTO DE CONCRETO DE 2 VIAS m 14.40 51.98 748.51 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 14.40 748.51 100.00%
01.03.04.03 LADRILLO CORRIENTE DE ARCILLA und 484.00 0.79 382.36 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 484.00 382.36 100.00%
01.03.05 CABLE SUBTERRANEO Y ACCESORIOS 60,628.72 0.00 0.00% 0.00 0.00% 0.00 0.00% 60,628.72
BANDEJA METALICA CERRADA LISA CON TAPA, COLGADO DE
01.03.05.01 m 56.80 155.02 8,805.14 0.00 0.00 0.00 8,805.14
TECHO 250 x 100 mm - 0.00% - 0.00% - 0.00% 56.80 100.00%
01.03.05.02 BANDEJA METALICA TIPO ESCALERA DE 250 x 100 mm m 6.90 198.22 1,367.72 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 6.90 1,367.72 100.00%
01.03.05.03 TUBERIA PVC SAP ( ELECTRICAS ) D = 100 mm m 203.20 44.95 9,133.84 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 203.20 9,133.84 100.00%
01.03.05.04 CABLE ELECTRICO N2XSY 50 mm2 - UNIPOLAR m 539.10 76.65 41,322.02 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 539.10 41,322.02 100.00%
01.03.06 SUB ESTACION PARTICULAR 207,610.80 0.00 0.00% 0.00 0.00% 0.00 0.00% 207,610.80
01.03.06.01 CELDA DE SALIDA DE S.E. und 1.00 4,417.44 4,417.44 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 4,417.44 100.00%
01.03.06.02 CELDA DE REMONTE DE CABLES und 1.00 3,686.84 3,686.84 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 3,686.84 100.00%
CELDA DE SALIDA, MEDICION Y PROTECCION PRINCIPAL
01.03.06.03 und 1.00 12,035.82 12,035.82 0.00 0.00 0.00 12,035.82
( CABLE N2XSY 50 mm2 - 18 / 30 KV ) - 0.00% - 0.00% - 0.00% 1.00 100.00%
TRANSFORMADOR TRIFASICO SECO - 400 KVA, Yyn6, Dyn5,
01.03.06.04 und 1.00 187,470.70 187,470.70 0.00 0.00 0.00 187,470.70
22.9 - 10 / 0.23 kV - 0.00% - 0.00% - 0.00% 1.00 100.00%
01.03.07 PUESTA A TIERRA 5,391.96 0.00 0.00% 0.00 0.00% 0.00 0.00% 5,391.96
01.03.07.01 POZO DE TIERRA ( PARA SUBESTACION ELECTRICA ) und 3.00 1,607.59 4,822.77 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 4,822.77 100.00%
01.03.07.02 EXCAVACIONES SIMPLES m3 7.11 33.53 238.40 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 7.11 238.40 100.00%
ELIMINACION DE MATERIAL, CARGADOR 125 HP / VOLQUETE 6
01.03.07.03 m3 8.53 38.78 330.79 0.00 0.00 0.00 330.79
M3, D = 30 KM - 0.00% - 0.00% - 0.00% 8.53 100.00%
01.03.08 VARIOS 8,935.57 0.00 0.00% 0.00 0.00% 0.00 0.00% 8,935.57
DIVISIONES METALICAS CON MALLA OLIMPICA TEJIDA Y
01.03.08.01 m2 12.24 115.31 1,411.39 0.00 0.00 0.00 1,411.39
PERFILES Y ANGULOS DE FIERRO - 0.00% - 0.00% - 0.00% 12.24 100.00%
01.03.08.02 BUZON DE CONCRETO PARA CONEXIONES ELECTRICAS und 3.00 2,508.06 7,524.18 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 7,524.18 100.00%
01.03.09 SEGURIDAD Y SALUD 1,500.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1,500.00
01.03.09.01 EQUIPOS DE PROTECCION Y MANIOBRA glb 1.00 1,500.00 1,500.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 1,500.00 100.00%
01.03.10 PRUEBAS ELECTRICAS PARA MEDIA TENSION 2,250.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 2,250.00
01.03.10.01 DETERMINACION DE LA SECUENCIA DE FASES est 1.00 250.00 250.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 250.00 100.00%
01.03.10.02 PRUEBAS DE CONTINUIDAD Y RESISTENCIA ELECTRICA est 1.00 150.00 150.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 150.00 100.00%
01.03.10.03 PRUEBAS DE AISLAMIENTO est 1.00 400.00 400.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 400.00 100.00%
01.03.10.04 PRUEBAS DE PUESTA A TIERRA est 1.00 250.00 250.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 250.00 100.00%
01.03.10.05 INSPECCION DE PRUEBAS est 1.00 450.00 450.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 450.00 100.00%
01.03.10.06 PRUEBAS DE PROCTOR EN EXCAVACIONES est 1.00 750.00 750.00 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 750.00 100.00%
TOTAL COSTO DIRECTO 2,714,694.76 0.00 0.00% 0.00 0.00% 0.00 0.00% 2,714,694.76 100.00%
GASTOS GENERALES 7.25% 0.08 217,175.58 0.00 0.00% 0.00 0.00% 0.00 0.00% 217,175.58 100.00%
UTILIDAD 8.00% 0.08 217,175.58 0.00 0.00% 0.00 0.00% 0.00 0.00% 217,175.58 100.00%
PARCIAL 3,149,045.92 0.00 0.00% 0.00 0.00% 0.00 0.00% 3,149,045.92 100.00%
FACTOR DE RELACION (0.90) 0.90 2,834,141.33 0.00 0.00% 0.00 0.00% 0.00 0.00% 2,834,141.33 100.00%
SUB TOTAL FACTORIZADO 2,834,141.33 0.00 0.00 0.00 2,834,141.33
IGV 0.18 510,145.44 0.00 0.00% 0.00 0.00% 0.00 0.00% 510,145.44 100.00%
PRESUPUESTO TOTAL 3,344,286.77 0.00 0.00% 0.00 0.00% 0.00 0.00% 3,344,286.77 100.00%
AVANCE DE OBRA 100.00% 0.00% 0.00% 0.00% 100.00%
AVANCE DE OBRA ACUMULADO 100.00% 0.00% 0.00% 0.00% 100.00%

58 de 114
CONSORCIO T y M
#REF!
OBRA : #REF!
CONSULTOR : CONSORCIO SUERVISOR SANTA CATALINA
CONTRATISTA : #REF!
RESIDENTE DE OBRAING. DAVID ROGELIO AQUINO CONDEZO CIP N° 83021
JEFE DE SUPERVISI ING. OSKAR YVAN PEREZ SAL Y ROSAS CIP N° 163288
ESPECIALIDAD : COMUNICACIONES
PRESUPUESTO AVANCE FISICO
Item DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO Saldo de Val.
Und. Metrado Precio S/. Parcial S/.
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
001 COMUNICACIONES 2,185,157.88 S/. - S/. - S/. - S/. 2,185,157.88
01.01 CABLEADO ESTRUCTURADO EN INTERIORES DE EDIFICIOS 331,459.20 0.00 0.00% 0.00 0.00% 0.00 0.00 331,459.20
SALIDAS PARA SISTEMA DE CONTROL DE ACCESO Y
01.01.01 15,185.91 0.00 0.00 0.00 15,185.91
SEGURIDAD 0.00% 0.00% 0.00%
SALIDA PARA CONTROL DE ACCESO RDFI CON TUBERIA PVC
01.01.01.01 pto 7.00 1,090.81 7,635.67 0.00 0.00 0.00 7,635.67
SAP 25 mm, EN PARED 0.00% - 0.00% - 0.00% 7.00 100.00%
SALIDA PARA MARCADOR BIOMETRICO CON TUBERIA PVC
01.01.01.02 pto 4.00 1,887.56 7,550.24 0.00 0.00 0.00 7,550.24
SAP 25 mm, EN PARED 0.00% - 0.00% - 0.00% 4.00 100.00%
01.01.02 SALIDAS PARA SISTEMA DE VIDEO SEGURIDAD 81,441.44 0.00 0.00% 0.00 0.00% 0.00 0.00% 81,441.44
SALIDA PARA UNA CAMARA IP, TIPO FIJA, PARA INTERIOR CON
01.01.02.01 pto 22.00 1,877.66 41,308.52 0.00 0.00 0.00 41,308.52
TUBERIA PVC SAP 25 mm, EN PARED 0.00% - 0.00% - 0.00% 22.00 100.00%
SALIDA PARA DOS CAMARAS IP, TIPO FIJAS, PARA INTERIOR
01.01.02.02 pto 6.00 3,678.88 22,073.28 0.00 0.00 0.00 22,073.28
CON TUBERIA PVC SAP 25 mm, EN PARED 0.00% - 0.00% - 0.00% 6.00 100.00%
SALIDA PARA UNA CAMARA IP, INTEGRADA, PARA EXTERIOR
01.01.02.03 pto 2.00 9,029.82 18,059.64 0.00 0.00 0.00 18,059.64
CON TUBERIA PVC SAP 25 mm, EN PARED 0.00% - 0.00% - 0.00% 2.00 100.00%
01.01.03 SALIDAS PARA SISTEMA DE DATA Y VOZ 126,328.26 0.00 0.00% 0.00 0.00% 0.00 0.00% 126,328.26
01.01.03.01 SALIDA SIMPLE PARA VOZ Y DATA PVC SAP 25 mm EN PARED pto 7.00 114.72 803.04 0.00 0.00 0.00 803.04
0.00% - 0.00% - 0.00% 7.00 100.00%

01.01.03.02 SALIDA DOBLE PARA VOZ Y DATA PVC SAP 25 mm EN PARED pto 33.00 138.16 4,559.28 0.00 0.00 0.00 4,559.28
0.00% - 0.00% - 0.00% 33.00 100.00%

01.01.03.03 SALIDA SIMPLE PARA VOZ Y DATA PVC SAP 25 mm EN MUEBLE pto 40.00 122.60 4,904.00 0.00 0.00 0.00 4,904.00
0.00% - 0.00% - 0.00% 40.00 100.00%

01.01.03.04 SALIDA DOBLE PARA VOZ Y DATA PVC SAP 25 mm EN MUEBLE pto 53.00 138.21 7,325.13 0.00 0.00 0.00 7,325.13
0.00% - 0.00% - 0.00% 53.00 100.00%
01.01.03.05 SALIDA PARA EQUIPO WIRELESS PVC SAP 25 mm EN TECHO pto 6.00 1,111.51 6,669.06 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 6.00 6,669.06 100.00%

01.01.03.06 SALIDA PARA TELEFONO PUBLICO PVC SAP 25 mm EN PARED pto 2.00 138.16 276.32 0.00 0.00 0.00 276.32
0.00% - 0.00% - 0.00% 2.00 100.00%
SALIDA PARA CAJERO AUTOMATICO PVC SAP 25 mm EN
01.01.03.07 pto 2.00 138.16 276.32 0.00 0.00 0.00 276.32
PARED 0.00% - 0.00% - 0.00% 2.00 100.00%
01.01.03.08 CAJA DE PASE 100 x 100 x 55 mm pza 18.00 16.98 305.64 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 18.00 305.64 100.00%
01.01.03.09 CAJA DE PASE 150 x 150 x 75 mm pza 41.00 18.74 768.34 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 41.00 768.34 100.00%
01.01.03.10 CAJA DE PASE 200 x 200 x 100 mm pza 13.00 20.61 267.93 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 13.00 267.93 100.00%
01.01.03.11 TUBERIA PVC SAP ( ELECTRICAS ) D = 25 mm m 392.33 6.90 2,707.08 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 392.33 2,707.08 100.00%
01.01.03.12 TUBERIA PVC SAP ( ELECTRICAS ) D = 35 mm m 41.71 7.88 328.67 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 41.71 328.67 100.00%
01.01.03.13 TUBERIA METALICA ( ELECTRICAS ) D = 20 mm m 136.44 21.91 2,989.40 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 136.44 2,989.40 100.00%
01.01.03.14 TUBERIA METALICA ( ELECTRICAS ) D = 25 mm m 861.73 23.73 20,448.85 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 861.73 20,448.85 100.00%
01.01.03.15 TUBERIA METALICA ( ELECTRICAS ) D = 35 mm m 11.00 32.49 357.39 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 11.00 357.39 100.00%
01.01.03.16 CABLE UTP CATEGORIA 6a m 9,857.77 7.44 73,341.81 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 9,857.77 73,341.81 100.00%
01.01.04 GABINETES DE COMUNICACION 71,055.04 0.00 0.00% 0.00 0.00% 0.00 0.00% 71,055.04
01.01.04.01 GABINETE DE COMUNICACIONES - GDS0 und 1.00 7,635.38 7,635.38 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 7,635.38 100.00%
01.01.04.02 GABINETE DE COMUNICACIONES - GA und 1.00 7,335.38 7,335.38 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 7,335.38 100.00%
01.01.04.03 GABINETE DE COMUNICACIONES - GDS1 und 1.00 8,835.38 8,835.38 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 8,835.38 100.00%
01.01.04.04 GABINETE DE COMUNICACIONES - GDP und 1.00 9,859.38 9,859.38 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 9,859.38 100.00%
01.01.04.05 GABINETE DE COMUNICACIONES - GS1 und 1.00 9,859.38 9,859.38 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 9,859.38 100.00%
01.01.04.06 GABINETE DE COMUNICACIONES - GS2 und 1.00 9,859.38 9,859.38 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 9,859.38 100.00%
01.01.04.07 GABINETE DE COMUNICACIONES - GDS2 und 1.00 8,835.38 8,835.38 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 8,835.38 100.00%
01.01.04.08 GABINETE DE COMUNICACIONES - GDS3 und 1.00 8,835.38 8,835.38 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 8,835.38 100.00%
01.01.05 SALIDAS PARA SISTEMA DE PERIFONEO Y MUSICA 3,670.25 0.00 0.00% 0.00 0.00% 0.00 0.00% 3,670.25
01.01.05.01 SALIDA PARA CONTROL DE VOLUMEN pto 1.00 137.80 137.80 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 137.80 100.00%
01.01.05.02 SALIDA DE ALTAVOZ PARA EMPOTRAR pto 16.00 175.94 2,815.04 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 16.00 2,815.04 100.00%
01.01.05.03 CABLE AMPLIFICADOR 2 x 18 m 367.90 1.95 717.41 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 367.90 717.41 100.00%
01.01.06 SALIDAS PARA SISTEMA DE COLAS Y GESTION AL USUARIO 211.43 0.00 0.00% 0.00 0.00% 0.00 0.00% 211.43

59 de 114
PRESUPUESTO AVANCE FISICO
Item DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO Saldo de Val.
Und. Metrado Precio S/. Parcial S/.
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
SALIDA PARA DISPENSADOR DE ATENCION AL USUARIO CON
01.01.06.01 pto 1.00 96.71 96.71 0.00 0.00 0.00 96.71
TUBERIA PVC SAP 25 mm, EN PARED 0.00% - 0.00% - 0.00% 1.00 100.00%
SALIDA PARA KIOSKO MULTIMEDIA CON TUBERIA PVC SAP 25
01.01.06.02 pto 1.00 114.72 114.72 0.00 0.00 0.00 114.72
mm, EN PARED 0.00% - 0.00% - 0.00% 1.00 100.00%
01.01.07 SALIDAS PARA SISTEMA DE TV Y VIDEO 8,773.68 0.00 0.00% 0.00 0.00% 0.00 0.00% 8,773.68
SALIDA PARA TERMINAL TV-IP CON TUBERIA PVC SAP 25 mm,
01.01.07.01 pto 8.00 1,096.71 8,773.68 0.00 0.00 0.00 8,773.68
EN PARED 0.00% - 0.00% - 0.00% 8.00 100.00%
01.01.08 SISTEMA DE BANDEJAS Y BUZONES 24,793.19 0.00 0.00% 0.00 0.00% 0.00 0.00% 24,793.19
BANDEJA METALICA CERRADA LISA CON TAPA, COLGADO DE
01.01.08.01 m 149.06 135.53 20,202.10 0.00 0.00 0.00 20,202.10
TECHO 400 x 100 mm 0.00% - 0.00% - 0.00% 149.06 100.00%
01.01.08.02 BANDEJA METALICA TIPO ESCALERA DE 200 x 100 mm m 15.00 114.48 1,717.20 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 15.00 1,717.20 100.00%
CODO PARA BANDEJA METALICA DE FIERRO GALVANIZADO,
01.01.08.03 pza 7.00 97.39 681.73 0.00 0.00 0.00 681.73
400 x 100 mm 0.00% - 0.00% - 0.00% 7.00 100.00%
TEE PARA BANDEJA METALICA DE FIERRO GALVANIZADO, 400
01.01.08.04 pza 3.00 97.39 292.17 0.00 0.00 0.00 292.17
x 100 mm 0.00% - 0.00% - 0.00% 3.00 100.00%
BUZON DE CONCRETO PARA ACOMETIDA DE
01.01.08.05 und 1.00 1,899.99 1,899.99 0.00 0.00 0.00 1,899.99
TELECOMUNICACIONES 0.00% - 0.00% - 0.00% 1.00 100.00%
01.02 SISTEMA DE SEGURIDAD CONTRA INCENDIOS 239,148.66 0.00 0.00% 0.00 0.00% 0.00 0.00% 239,148.66
01.02.01 SALIDAS PARA ALARMAS CONTRA INCENDIO 239,148.66 0.00 0.00% 0.00 0.00% 0.00 0.00% 239,148.66
SALIDA PARA DETECTOR DE HUMO FOTOELECTRICO ( INC.
01.02.01.01 pto 78.00 296.14 23,098.92 0.00 0.00 0.00 23,098.92
APARATO ) 0.00% - 0.00% - 0.00% 78.00 100.00%
SALIDA PARA DETECTOR DE ELEVACION DE TEMPERATURA
01.02.01.02 pto 14.00 296.14 4,145.96 0.00 0.00 0.00 4,145.96
( INC. APARATO ) 0.00% - 0.00% - 0.00% 14.00 100.00%
SALIDA PARA DETECTOR PHOTOBEAM CONVENCIONAL ( INC.
01.02.01.03 pto 5.00 1,700.89 8,504.45 0.00 0.00 0.00 8,504.45
APARATO ) 0.00% - 0.00% - 0.00% 5.00 100.00%
01.02.01.04 SALIDA PARA MODULO DE CONTROL, NACS, OFF/ON pto 2.00 4,153.13 8,306.26 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 2.00 8,306.26 100.00%
01.02.01.05 SALIDA PARA MODULO AISLADOR DE FALLAS pto 6.00 4,153.13 24,918.78 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 6.00 24,918.78 100.00%
SALIDA PARA SISTEMA DE CONTROL DE ZONA DE
01.02.01.06 pto 24.00 4,252.63 102,063.12 0.00 0.00 0.00 102,063.12
ROCIADORES MONITOREO VALVULA Y FLUJO 0.00% - 0.00% - 0.00% 24.00 100.00%
01.02.01.07 PANEL DE ALARMA CONTRAINCENDIOS und 1.00 5,284.47 5,284.47 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 5,284.47 100.00%
01.02.01.08 SALIDA PARA PARLANTE CON LUZ ESTROBOSCOPICA pto 16.00 339.74 5,435.84 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 16.00 5,435.84 100.00%
01.02.01.09 SALIDA PARA ESTACION MANUAL DIRECCIONABLE pto 16.00 600.34 9,605.44 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 16.00 9,605.44 100.00%
01.02.01.10 SALIDA PARA TELEFONO DE BOMBEROS pto 8.00 143.05 1,144.40 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 8.00 1,144.40 100.00%
01.02.01.11 SALIDA PARA DETECTOR DE MONOXIDO DE CARBONO pto 20.00 221.36 4,427.20 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 20.00 4,427.20 100.00%
01.02.01.12 SALIDA PARA SENSOR DE ANIEGO pto 16.00 221.36 3,541.76 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 16.00 3,541.76 100.00%
01.02.01.13 SALIDA PARA PANEL DE CONTROL DE EXTINCION - PX pto 1.00 158.36 158.36 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 158.36 100.00%
01.02.01.14 SALIDA PARA SISTEMA DE AGENTE LIMPIO pto 1.00 8,203.72 8,203.72 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 8,203.72 100.00%
01.02.01.15 SALIDA PARA CARTEL DE EXTINCION DISPARADA - ED pto 1.00 227.41 227.41 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 227.41 100.00%
01.02.01.16 RESISTENCIA FINAL DE LAZO und 3.00 35.88 107.64 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.00 107.64 100.00%
01.02.01.17 TUBERIA METALICA ( ELECTRICAS ) D = 20 mm m 1,098.56 21.91 24,069.45 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1,098.56 24,069.45 100.00%
01.02.01.18 CABLE CONDUCTOR #18 AWG CON RECUBRIMIENTO LSZH m 1,531.46 3.46 5,298.85 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1,531.46 5,298.85 100.00%
01.02.01.19 CABLE PARA TELEFONO DE BOMBEROS m 277.00 2.19 606.63 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 277.00 606.63 100.00%
01.03 EQUIPAMIENTO 1,614,550.02 0.00 0.00% 0.00 0.00% 0.00 0.00% 1,614,550.02 100.00%
01.03.01 SWITCH CORE und 1.00 500,000.00 500,000.00 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 500,000.00 100.00%
01.03.02 SWITCH DE DISTRIBUCION DE 24 PUNTOS und 4.00 38,250.00 153,000.00 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 4.00 153,000.00 100.00%
01.03.03 SWITCH DE BORDE DE 48 PUNTOS und 7.00 23,042.86 161,300.02 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 7.00 161,300.02 100.00%
01.03.04 SERVIDORES APLICATIVOS DE 1 RU und 4.00 116,400.00 465,600.00 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 4.00 465,600.00 100.00%
01.03.05 CAJAS DE ALMACENAMIENTO und 1.00 116,400.00 116,400.00 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 116,400.00 100.00%
01.03.06 SERVIDOR DE RESPALDO und 1.00 43,650.00 43,650.00 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 43,650.00 100.00%
01.03.07 INSTALACION Y CONFIGURACION und 1.00 174,600.00 174,600.00 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 174,600.00 100.00%
TOTAL COSTO DIRECTO 2,185,157.88 0.00 0.00% 0.00 0.00% 0.00 0.00% 2,185,157.88 100.00%
GASTOS GENERALES 7.25% 0.08 174,812.63 0.00 0.00% 0.00 0.00% 0.00 0.00% 174,812.63 100.00%
UTILIDAD 8.00% 0.08 174,812.63 0.00 0.00% 0.00 0.00% 0.00 0.00% 174,812.63 100.00%
PARCIAL 2,534,783.14 0.00 0.00% 0.00 0.00% 0.00 0.00% 2,534,783.14 100.00%
FACTOR DE RELACION (0.90) 0.90 2,281,304.83 0.00 0.00% 0.00 0.00% 0.00 0.00% 2,281,304.83 100.00%
SUB TOTAL FACTORIZADO 2,281,304.83 0.00 0.00 0.00 2,281,304.83
IGV 0.18 410,634.87 0.00 0.00% 0.00 0.00% 0.00 0.00% 410,634.87 100.00%
PRESUPUESTO TOTAL 2,691,939.70 0.00 0.00% 0.00 0.00% 0.00 0.00% 2,691,939.70 100.00%
AVANCE DE OBRA 100.00% 0.00% 0.00% 0.00% 100.00%
AVANCE DE OBRA ACUMULADO 100.00% 0.00% 0.00% 0.00% 100.00%

60 de 114
CONSORCIO T y M
#REF!
OBRA #REF!
CONSULTORCONSORCIO SUERVISOR SANTA CATALINA
CONTRATISTA#REF!
RESIDENTE DING. DAVID ROGELIO AQUINO CONDEZO CIP N° 83021
JEFE DE SUPING. OSKAR YVAN PEREZ SAL Y ROSAS CIP N° 163288
ESPECIALIDAD
ESTUDIO DE IMPACTO VIAL
PRESUPUESTO AVANCE FISICO
Item DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO Saldo de Val.
Und. Metrado Precio S/. Parcial S/.
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
001 ESTUDIO DE IMPACTO VIAL 44,212.51 S/. - S/. - S/. - S/. 44,212.51
01.01 TRABAJOS PRELIMINARES 6,369.77 0.00 0.00% 0.00 0.00% 0.00 0.00% 6,369.77 100.00%
01.01.01 CORTE DE PAVIMENTO DE ASFALTO EXIST. C/ DISCO DE CORTE m 12.04 6.40 77.06 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 12.04 77.06 100.00%
01.01.02 DEMOLICION DE PAVIMENTO EXISTENTE m2 180.60 19.72 3,561.43 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 180.60 3,561.43 100.00%
ELIMINACION DE MATERIAL, CARGADOR 125 HP / VOLQUETE 6 M3, D
01.01.03 m3 70.43 38.78 2,731.28 0.00 0.00 0.00 2,731.28
= 30 KM - 0.00% - 0.00% - 0.00% 70.43 100.00%
01.02 MITIGACION PARA EL AREA DE IMPACTO INMEDIATA 832.53 0.00 0.00% 0.00 0.00% 0.00 0.00% 832.53 100.00%
01.02.01 TRAZOS, NIVELES Y REPLANTEO PRELIMINAR CON EQUIPO m2 9.70 1.71 16.59 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 9.70 16.59 100.00%
01.02.02 BASE GRANULAR PARA VEREDA, E = 0.10 M m2 9.70 13.64 132.31 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 9.70 132.31 100.00%
VEREDA DE ADOQUIN DE CONCRETO 21 x 10.5 x 4 cm ( INC.
01.02.03 m2 9.70 61.10 592.67 0.00 0.00 0.00 592.67
CONFINAMIENTO ) - 0.00% - 0.00% - 0.00% 9.70 100.00%
01.02.04 ESPEJO CIRCULAR PARA ESTACIONAMIENTO, TIPO CONVEXOS und 1.00 90.96 90.96 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 90.96 100.00%
01.03 MITIGACION PARA EL AREA DE IMPACTO DIRECTA E INDIRECTA 37,010.21 0.00 0.00% 0.00 0.00% 0.00 0.00% 37,010.21 100.00%
01.03.01 SEÑAL DE NO DETENERSE pza 1.00 376.35 376.35 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 376.35 100.00%
01.03.02 SEÑAL DE RESALTO pza 1.00 376.35 376.35 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 376.35 100.00%
01.03.03 MARCAS EN EL PAVIMENTO - PINTADO DE LINEAS, ANCHO = 0.10 m m 184.99 10.00 1,849.90 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 184.99 1,849.90 100.00%
MARCAS EN BORDE DE VEREDA - PINTADO DE LINEAS, ANCHO = 0.10
01.03.04 m 708.00 16.21 11,476.68 0.00 0.00 0.00 11,476.68
m - 0.00% - 0.00% - 0.00% 708.00 100.00%
PINTURA DE SEÑALIZACION EN PAVIMENTO EN CRUCES, C/ TRAFICO
01.03.05 m2 183.32 30.99 5,681.09 0.00 0.00 0.00 5,681.09
- 2 MANOS - 0.00% - 0.00% - 0.00% 183.32 100.00%
01.03.06 PINTURA DE SEÑAL DE DIRECCION DE 1 VIA C/ TRAFICO - 2 MANOS und 16.00 25.93 414.88 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 16.00 414.88 100.00%
01.03.07 PINTURA DE SEÑAL DE DIRECCION DE 2 VIA C/ TRAFICO - 2 MANOS und 7.00 27.94 195.58 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 7.00 195.58 100.00%
01.03.08 CADENA DE HIERRO ESLABON 30 mm, PARA BOLARDOS m 18.03 48.12 867.60 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 18.03 867.60 100.00%
01.03.09 TRAZOS, NIVELES Y REPLANTEO PRELIMINAR CON EQUIPO m2 180.60 1.71 308.83 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 180.60 308.83 100.00%
01.03.10 SELLO DE ASFALTO C/ MEZCLA EN CALIENTE, E = 1"; H = 0.20 M m 12.04 5.15 62.01 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 12.04 62.01 100.00%
SARDINEL DE CONCRETO F'C = 210 Kg/cm2, H = 0.15 M; ANCHO = 0.15
01.03.11 m 63.47 30.91 1,961.86 0.00 0.00 0.00 1,961.86
M - 0.00% - 0.00% - 0.00% 63.47 100.00%
01.03.12 CONCRETO F'C = 210 Kg/cm2 RAMPAS m3 3.97 306.10 1,215.22 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 3.97 1,215.22 100.00%
01.03.13 ENCOFRADO Y DESENCOFRADO NORMAL RAMPAS m2 7.83 45.28 354.54 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 7.83 354.54 100.00%
01.03.14 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 112.74 3.94 444.20 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 112.74 444.20 100.00%
01.03.15 CURADO DE CONCRETO EN PAVIMENTO m2 24.08 4.11 98.97 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 24.08 98.97 100.00%
01.03.16 RESALTO DE ADOQUIN DE CONCRETO 20 x 10 x 6 cm m2 156.52 34.12 5,340.46 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 156.52 5,340.46 100.00%
01.03.17 BASE GRANULAR PARA RESALTO DE ADOQUIN, E = 0.20 M m2 156.52 18.33 2,869.01 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 156.52 2,869.01 100.00%
01.03.18 SEÑALIZACIONES TEMPORALES DE DESVIOS DE VIAS est 1.00 3,116.68 3,116.68 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1.00 3,116.68 100.00%
TOTAL COSTO DIRECTO 44,212.51 0.00 0.00% 0.00 0.00% 0.00 0.00% 44,212.51 100.00%
GASTOS GENERALES 7.25% 0.08 3,537.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 3,537.00 100.00%
UTILIDAD 8.00% 0.08 3,537.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 3,537.00 100.00%
PARCIAL 51,286.51 0.00 0.00% 0.00 0.00% 0.00 0.00% 51,286.51 100.00%
FACTOR DE RELACION (0.90) 0.90 46,157.86 0.00 0.00% 0.00 0.00% 0.00 0.00% 46,157.86 100.00%
SUB TOTAL FACTORIZADO 46,157.86 0.00 0.00 0.00 46,157.86
IGV 0.18 8,308.41 0.00 0.00% 0.00 0.00% 0.00 0.00% 8,308.41 100.00%

61 de 114
PRESUPUESTO AVANCE FISICO
Item DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO Saldo de Val.
Und. Metrado Precio S/. Parcial S/.
Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
PRESUPUESTO TOTAL 54,466.27 0.00 0.00% 0.00 0.00% 0.00 0.00% 54,466.27 100.00%
AVANCE DE OBRA 100.00% 0.00% 0.00% 0.00% 100.00%
AVANCE DE OBRA ACUMULADO 100.00% 0.00% 0.00% 0.00% 100.00%

62 de 114
RESUMEN DE METRADOS ARQUITECTURA

RESUMEN DE METRADOS DE ARQUITECTURA


:"AMPLIACIÓN Y MEJORAMIENTO DE LOS SERVICIOS COMPLEMENTARIOS DE LA SEDE CENTRAL DEL MINISTERIO DE
OBRA
ECONOMÍA Y FINANZAS, CERCADO DE LIMA - LIMA"
UBICACIÓN :LIMA - LIMA - LIMA
PROPIETARIO :MINISTERIO DE ECONOMÍA Y FINANZAS
SUPERVISION :CONSORCIO SUPERVISOR SGL
FECHA BASE :31/11/2014
FECHA INICIO DE OBRA :02 DE DICIEMBRE DEL 2015

METRADOS
Item DESCRIPCION
Und. EJECUTADOS

01 ARQUITECTURA
01.01 MUROS Y TABIQUES DE ALBAÑILERIA
01.01.01 MUROS Y TABIQUES DE ALBAÑILERIA
MUROS DE LADRILLO KING KONG DE ARCILLA ( A MAQUINA ) DE SOGA MEZCLA C:A 1:4; TIPO
01.01.01.01 m2
IV PARA TARRAJEO
MUROS DE LADRILLO KING KONG DE ARCILLA ( A MAQUINA ) DE CABEZA MEZCLA C:A 1:4;
01.01.01.02 m2
TIPO IV PARA TARRAJEO
01.01.02 MUROS Y TABIQUES CON EL SISTEMA DE CONSTRUCCION EN SECO
01.01.02.01 TABIQUE UNA CARA DE DRYWALL, PLACA DE FIBROCEMENTO 12mm m2
01.01.02.02 PANEL ACUSTICO DE MDF TIPO FRESADO m2
01.01.03 TABIQUES CON ELEMENTOS LEVES ( MELAMINA )
01.01.03.01 TABIQUE DE MELAMINA, H = 1.50 M, CON CRISTAL TEMPLADO DE 6 mm m
01.01.04 BARANDAS Y PARAPETOS
PARAPETO DE LADRILLO KING KONG DE ARCILLA ( A MAQUINA ) DE SOGA MEZCLA C:A 1:4;
01.01.04.01 m2
TIPO IV PARA TARRAJEO
01.02 REVOQUES Y REVESTIMIENTOS
01.02.01 REVOQUES, ENLUCIDOS Y MOLDURAS
01.02.01.01 TARRAJEO PRIMARIO Y RAYADO DE MUROS INTERIORES MEZC. C:A 1:5 m2
01.02.01.02 TARRAJEO FROTACHADO DE MUROS INTERIORES MEZC. C:A 1:5, E = 1.5 cm m2
01.02.01.03 TARRAJEO FROTACHADO DE MUROS EXTERIORES MEZC. C:A 1:5, E = 1.5 cm m2
01.02.01.04 TARRAJEO EN COLUMNAS MEZC. C:A 1:5, E = 1.5 cm m2
01.02.01.05 TARRAJEO DE VIGAS MEZC. C:A 1:5, E = 1.5 cm m2
01.02.01.06 TARRAJEO DE MUROS DE CONCRETO MEZC. C:A 1:5, E = 1.5 cm m2
01.02.01.07 TARRAJEO CON IMPERMEABILIZANTE MEZC. C:A 1:4, E = 1.5 cm m2
01.02.01.08 VESTIDURA DE DERRAMES, ANCHO = 0.15 M m
01.02.01.09 VESTIDURA DE DERRAMES, ANCHO = 0.25 M m
01.02.01.10 BRUÑAS DE 1 cm x 1 cm m
01.02.01.11 TARRAJEO EN FONDO DE ESCALERA m2
01.02.01.12 FORJADO DE GRADAS Y ESCALERAS DE CEMENTO FROTACHADO m2
01.02.01.13 FORJADO DE DESCANSO CON CEMENTO FROTACHADO m2
01.02.01.14 SOLAQUEO DE MUROS DE CONCRETO, COLUMNAS m2
01.02.01.15 SOLAQUEO DE VIGAS m2
01.02.02 REVESTIMIENTOS
01.02.02.01 REVESTIMIENTO DE SARDINEL DE CONCRETO CON PORCELANATO 60 cm x 60 cm m2
01.02.02.02 REVESTIMIENTO DE CANALETA CON CEMENTO PULIDO CON IMPERMEABILIZANTE m2
REVESTIMIENTO DE TABLERO DE CONCRETO CON TERRAZO PULIDO, ANCHO = 0.60 m
01.02.02.03 m
( SEGUN DISEÑO )
01.02.02.04 REVESTIMIENTO DE TABLERO DE CONCRETO CON PORCELANATO 60 cm x 60 cm m2
01.02.02.05 REVESTIMIENTO DE BANCA DE CONCRETO CON LISTONES DE MADERA CEDRO 4" x 1" m2
REVESTIMIENTO DE POYO DE CONCRETO PARA INODORO CON PORCELANATO 60 cm x 60
01.02.02.06 m2
cm
01.02.02.07 REVESTIMIENTO DE CUNETA CON CEMENTO PULIDO E IMPERMEABILIZANTE m
01.02.02.08 REVESTIMIENTO DE MURO CON FACHALETA m2
REVESTIMIENTO CON PANEL DE ALUMINIO COMPUESTO, E = 4 mm, INC. SISTEMA DE
01.02.02.09 m2
FIJACION
01.02.02.10 REVESTIMIENTO DE GRADAS Y ESCALERAS CON TERRAZO PULIDO m2

63 de 114
RESUMEN DE METRADOS ARQUITECTURA

METRADOS
Item DESCRIPCION
Und. EJECUTADOS

01 ARQUITECTURA
01.02.02.11 REVESTIMIENTO DE DESCANSO DE ESCALERA CON TERRAZO PULIDO m2
01.03 CIELORRASOS
01.03.01 CIELORRASO CON MEZC. C:A 1:5, E = 1.5 cm m2
01.03.02 VESTIDURA DE FONDO DE TABLERO m2
01.03.03 SOLAQUEO DE CIELORRASOS m2
FALSO CIELORRASO CON BALDOSAS ACUSTICAS DE FIBRA MINERAL 0.61 m x 0.61 m, E = 5/8",
01.03.04 m2
TIPO A
FALSO CIELORRASO CON BALDOSAS ACUSTICAS DE FIBRA MINERAL 0.61 m x 0.61 m, E = 5/8",
01.03.05 m2
TIPO B
FALSO CIELORRASO CON BALDOSAS ACUSTICAS DE FIBRA MINERAL 0.61 m x 0.61 m, E = 5/8",
01.03.06 m2
TIPO C
FALSO CIELORRASO CON BALDOSAS ACUSTICAS DE FIBRA MINERAL 0.61 m x 0.61 m, E = 5/8",
01.03.07 m2
TIPO D
FALSO CIELORRASO CON BALDOSAS ACUSTICAS DE FIBRA MINERAL 0.61 m x 0.61 m, E = 5/8",
01.03.08 m2
TIPO E
FALSO CIELORRASO CON PLANCHA YESO GYPLAC STANDARD ST 1/2" ( 12.7 mm ) SIST.
01.03.09 m2
DRYWALL SUSPENDIDO
01.04 PISOS Y PAVIMENTOS
01.04.01 CONTRAPISOS
01.04.01.01 CONTRAPISO, E = 4.00 cm, BASE 3.00 cm, MEZC.1:5, ACABADO 1.00 cm, PASTA 1:2 m2
CONTRAPISO, E = 3.80 cm, BASE 2.80 cm, MEZC.1:5, ACABADO 1.00 cm, PASTA 1:2, ACABADO
01.04.01.02 m2
SEMI - PULIDO
01.04.02 PISOS
01.04.02.01 PISO DE PORCELANATO 60 x 60 cm, ALTO TRANSITO m2
01.04.02.02 PISO DE ALFOMBRA ALTO TRANSITO, E = 12 mm m2
01.04.02.03 PISO DE TERRAZO PULIDO m2
01.04.02.04 PISO DE MADERA MACHIHEMBRADA PUMAQUIRO 3/4" x 4" m2
01.04.03 PISOS DE CONCRETO
01.04.03.01 PISO DE CEMENTO FROTACHADO Y BRUÑADO, E = 2" m2
01.04.03.02 PISO DE CEMENTO SEMI - PULIDO Y BRUÑADO, E = 2" m2
01.04.04 SARDINELES
01.04.04.01 SARDINEL PERALTADO DE CONCRETO F'C = 140 Kg/cm2, H = 0.15 M; ANCHO = 0.15 M m
01.04.04.02 SARDINEL PERALTADO DE CONCRETO F'C = 140 Kg/cm2, H = 0.45 M; ANCHO = 0.15 M m
01.04.05 VEREDAS Y RAMPAS
VEREDA DE CONCRETO F'C = 175 Kg/cm2, E = 4", ACABADO EN CEMENTO SEMI - PULIDO Y
01.04.05.01 m2
BRUÑADO, INC. BASE GRANULAR
RAMPA DE CONCRETO F'C = 175 Kg/cm2, E = 2"; ACABADO EN CEMENTO FORTACHADO Y
01.04.05.02 m2
BRUÑADO
01.05 ZOCALOS Y CONTRAZOCALOS
01.05.01 ZOCALOS
01.05.01.01 ZOCALO DE PORCELANATO 60 x 60 cm m2
01.05.01.02 ZOCALO DE CEMENTO PULIDO m2
01.05.02 CONTRAZOCALOS
01.05.02.01 CONTRAZOCALO DE CEMENTO PULIDO, H = 0.10 M m
01.05.02.02 CONTRAZOCALO DE CEMENTO PULIDO CON IMPERMEABILIZANTE, H = 0.10 M m
01.05.02.03 CONTRAZOCALO DE PORCELANATO 60 x 60 cm, H = 0.10 M m
01.05.02.04 CONTRAZOCALO DE TERRAZO PULIDO, H = 0.10 M m
01.05.02.05 CONTRAZOCALO DE MADERA TORNILLO 3/4" x 4", H = 0.10 M m
01.05.02.06 CONTRAZOCALO RECTO EN GRADAS Y ESCALERAS DE TERRAZO PULIDO, H = 0.10 M m
01.06 COBERTURAS Y CUBIERTAS
01.06.01 COBERTURAS
01.06.01.01 COBERTURA DE POLICARBONATO CELULAR 8 mm TRASLUCIDO m2
COBERTURA DE PANEL TERMOACUSTICO CON PLANCHA DE ACERO ALUMINIZADA, ESPUMA
01.06.01.02 m2
DE POLIURETANO
01.06.02 CUBIERTAS

64 de 114
RESUMEN DE METRADOS ARQUITECTURA

METRADOS
Item DESCRIPCION
Und. EJECUTADOS

01 ARQUITECTURA
CUBIERTA DE MORTERO IMPERMEABILIZADO MEZC. C:A 1:4, E = 2", ACABADO EN CEMENTO
01.06.02.01 m2
PULIDO Y BRUÑADO
01.07 CARPINTERIA DE MADERA
01.07.01 PUERTAS
01.07.01.01 PUERTA CONTRAPLACADA, E = 50.1 mm CON MDF 6 mm LAMINADO m2
PUERTA CONTRAPLACADA, E = 50.1 mm CON MDF 6 mm LAMINADO Y PANEL ACUSTICO DE
01.07.01.02 m2
MDF TIPO FRESADO
01.07.01.03 SUMINISTRO E INSTALACION DE PARTICIONES ACUSTICAS m2
01.07.02 MARCOS
01.07.02.01 MARCO DE MADERA CEDRO 4" x 2" m
01.07.03 MUEBLES DE ATENCION, COCINA Y SIMILARES

01.07.03.01 MUEBLE FIJO CON TABLERO AGLOMERADO DE 18 mm LAMINADO, EN BASE DE CONCRETO m

MUEBLE FIJO CON TABLERO AGLOMERADO DE 18 mm LAMINADO CON PLANCHA


01.07.03.02 m
MELAMINICA O SIMILAR POSTFORMADO, H=0.90m , CON SOPORTES METALICOS
MUEBLE FIJO CON TABLERO AGLOMERADO DE 18 mm LAMINADO CON PLANCHA
01.07.03.03 m
MELAMINICA O SIMILAR POSTFORMADO, H=1.10 m
01.07.04 VARIOS
01.07.04.01 REJILLA DE MADERA CEDRO EN PUERTA m2
01.07.04.02 DIVISIONES DE MELAMINA EN SS.HH. m2
01.07.04.03 DIVISIONES DE MELAMINA EN URINARIOS m2
01.07.04.04 REFUERZO DE MADERA TORNILLO 2" x 3 1/2" EN TABIQUE DRYWALL m
01.08 CARPINTERIA METALICA Y HERRERIA
01.08.01 VENTANAS
01.08.01.01 VENTANA METALICA DE INSPECCION und
01.08.01.02 VENTANA METALICA TIPO REJILLA CON PLATINA DE Fe 1 1/2" x 1/8" m2
01.08.01.03 VENTANA DE MALLA ELECTRO SOLDADA m2
01.08.02 PUERTAS
PUERTA CORTAFUEGO CON UNA HOJA BATIENTE CON PLANCHA 1/20" RESISTENTE AL
01.08.02.01 pza
FUEGO 90 MIN. ( 1.00 m x 2.10 m )
PUERTA CORTAFUEGO CON UNA HOJA BATIENTE CON PLANCHA 1/20" RESISTENTE AL
01.08.02.02 pza
FUEGO 90 MIN. ( 1.20 m x 2.10 m )
PUERTA CORTAFUEGO CON DOS HOJAS BATIENTES CON PLANCHA 1/20" RESISTENTE AL
01.08.02.03 pza
FUEGO 90 MIN. ( 1.80 m x 2.10 m )

01.08.02.04 PUERTA METALICA UNA HOJA BATIENTE CON PLANCHA DE Fe, E = 2 mm ( 0.90 m x 2.10 m ) pza

01.08.02.05 PUERTA METALICA DOS HOJAS BATIENTES CON PLANCHA DE Fe, E = 2 mm ( 1.80 m x 2.10 m ) pza

PUERTA METALICA DOS HOJAS BATIENTES CON REJILLA, CON PLANCHA DE Fe, E = 2 mm
01.08.02.06 pza
( 1.80 m x 2.10 m )
SUMINISTRO E INSTALACION DE PUERTA METALICA SECCIONABLE PARA ACCESO A
01.08.02.07 pza
ESTACIONAMIENTOS
PUERTA METALICA CON PLANCHA 1/20" ACANALADA Y PLANCHA DE ACERO 1/32" CON DOS
01.08.02.08 pza
HOJAS CORREDIZAS, 3.00 m x 2.10 m
01.08.02.09 PUERTA METALICA, TIPO REJA CON BARRAS DE FIERRO ( 1.00 m x 2.10 m ) pza
01.08.02.10 PUERTA METALICA, TIPO REJA CON BARRAS DE FIERRO ( 1.80 x 2.10 M ) pza
01.08.02.11 PUERTA METALICA, TIPO REJA CON BARRAS DE FIERRO ( 1.90 x 2.50 M ) pza
01.08.03 BARANDAS METALICAS
01.08.03.01 BARANDA METALICA Ø 2", H = 0.90 M m
01.08.03.02 BARANDA METALICA CENTRAL EN ESCALERA Ø 2", H = 0.90 M m
01.08.03.03 BARANDA METALICA CON CRISTAL TEMPLADO INCOLORO 8 mm Ø 2", H = 0.90 M m
01.08.04 PASAMANOS METALICOS
01.08.04.01 PASAMANOS DE FIERRO Ø 2" m
01.08.04.02 AGARRADERA PARA DISCAPACITADOS EN LAVATORIOS, Ø 1 1/2" und
01.08.04.03 AGARRADERA PARA MINUSVALIDOS EN INODOROS, Ø 1 1/2" und

65 de 114
RESUMEN DE METRADOS ARQUITECTURA

METRADOS
Item DESCRIPCION
Und. EJECUTADOS

01 ARQUITECTURA
01.08.05 ELEMENTOS METALICOS ESPECIALES
TAPA METALICA DE INSPECCION CON PLANCHA DE FIERRO 1.50 mm x 1200 mm x 2400 mm
01.08.05.01 und
( 1/16" ); 0.90 M x 0.75 M
01.08.05.02 ESCALERA TIPO GATO DE FIERRO ( ANCHO = 0.50 M, ALTURA = 1.00 m) und
01.08.05.03 ESCALERA TIPO GATO DE FIERRO ( ANCHO = 0.50 M, ALTURA = 3.40 m) und
01.08.05.04 REJILLA METALICA EN CUNETA, ANCHO = 0.25 M m
01.08.05.05 PROTECTOR DE ESQUINAS CON ANGULO "L" DE FIERRO 2" x 2" x 1/8" x 6 m, H = 1.00 m pza
01.09 CARPINTERIA DE ALUMINIO
01.09.01 VENTANAS

01.09.01.01 VENTANA DE ALUMINIO, TIPO PIVOTANTE CON CRISTAL TEMPLADO REFLEJANTE GRIS 6 mm m2

01.09.02 VARIOS
01.09.02.01 PLATINA DE ALUMINIO 5/8" x 3/16", EN ENCUENTRO DE PISOS m
01.09.02.02 PLATINA DE ALUMINIO 6" x 5/16", EN ENCUENTRO DE PISOS m
01.09.02.03 PLATINA DE ALUMINIO 3.1/2" x 3/32", ENCUENTRO DE MUROS m
01.09.02.04 PLATINA DE ALUMINIO 4" x 3/32", ENCUENTRO DE MUROS m
01.10 CERRAJERIA
01.10.01 BISAGRAS
01.10.01.01 BISAGRA CAPUCHINA 3 1/2" x 3 1/2" pza
01.10.02 CERRADURAS
CERRADURA CILINDRICA EXT. FIJA CON LLAVE E INT. SIEMPRE LIBRE SE FIJA CON LLAVE
01.10.02.01 pza
( TIPO A )
CERRADURA CILINDRICA EXT. SIEMPRE LIBRE ABRE CON LLAVE E INT. SIEMPRE LIBRE
01.10.02.02 pza
BOTON DE SEGURIDAD ( TIPO B )
CERRADURA CILINDRICA EXT. TRABA O LIBERA UNA VUELTA DE LLAVE E INT. SIEMPRE
01.10.02.03 pza
LIBRE ( TIPO C )
CERRADURA CILINDRICA EXT. SIEMPRE LIBRE CON PERFORACION DE EMERGENCIA E INT.
01.10.02.04 pza
SIEMPRE LIBRE BOTON DE SEGURIDAD ( TIPO F )
CERRADURA CILINDRICA EXT. SIEMPRE LIBRE SIN LLAVE NI SEGURO E INT. SIEMPRE LIBRE
01.10.02.05 pza
SIN LLAVE NI SEGURO ( TIPO G )
CERRADURA CILINDRICA EXT. ABRE CON LLAVE TRES GOLPES E INT. ABRE CON LLAVE
01.10.02.06 pza
TRES GOLPES ( TIPO I )
CERRADURA CON MANIJA EXT. SIEMPRE LIBRE, ABRE C/DESARMADOR E INT. LIBRE
01.10.02.07 pza
C/BOTON DE SEG. FIJA MANIJA EXT. ( TIPO K )
01.10.02.08 COLOCACION DE CERRADURAS pza
01.10.03 CIERRAPUERTAS Y OTROS
01.10.03.01 CIERRAPUERTAS AEREO ( TIPO O ) pza
01.10.03.02 FRENO HIDRAULICO DE PISO ( TIPO P ) pza
01.10.03.03 BARRA ANTIPANICO ( TIPO Q ) pza
01.10.03.04 CERROJO SIMPLE ( TIPO R ) pza
01.10.03.05 TIRADOR DE ACERO INOXIDABLE DE Ø 1 1/2, L= 0.90 m pza
01.11 VIDRIOS, CRISTALES Y SIMILARES
01.11.01 VENTANAS
VENTANA DE CRISTAL TEMPLADO COLOR BRONCE 6 mm CON PERFILES DE ALUMINIO,
01.11.01.01 m2
SISTEMA FIJO
VENTANA DE CRISTAL TEMPLADO INCOLORO 6 mm CON PERFILES DE ALUMINIO, SISTEMA
01.11.01.02 m2
FIJO - CORREDIZO
01.11.02 MAMPARAS
MAMPARA DE CRISTAL TEMPLADO INCOLORO 10 mm, SOBRELUZ FIJA C/ACCES. Y ZOCALO
01.11.02.01 m2
DE ALUMINIO
MAMPARA CON DOS HOJAS BATIENTES Y SOBRELUCES FIJAS DE CRISTAL TEMPLADO
01.11.02.02 m2
INCOLORO 10 mm C/ACCES. Y ZOCALO DE ALUMINIO
01.11.03 VARIOS
01.11.03.01 CRISTAL TEMPLADO INCOLORO 6 mm m2
01.11.03.02 ESPEJO INCOLORO 6 mm ( SOBREPUESTO ) m2

66 de 114
RESUMEN DE METRADOS ARQUITECTURA

METRADOS
Item DESCRIPCION
Und. EJECUTADOS

01 ARQUITECTURA
01.11.03.03 ESPEJO INCOLORO 6 mm ( INCLINADO ) m2
01.12 PINTURA
01.12.01 PINTURA DE CIELORRASOS, VIGAS
01.12.01.01 PINTURA DE CIELORRASOS, VIGAS C/ LATEX - 2 MANOS, C/ IMPRIMANTE m2
01.12.02 PINTURA DE MUROS INTERIORES, COLUMNAS, MUROS DE CONCRETO, DERRAMES
PINTURA DE MUROS INTERIORES, COLUMNAS, MUROS DE CONCRETO, DERRAMES C/
01.12.02.01 m2
LATEX - 2 MANOS, C/ IMPRIMANTE
PINTURA DE MUROS INTERIORES, COLUMNAS, MUROS DE CONCRETO, DERRAMES C/ OLEO
01.12.02.02 m2
- 2 MANOS, C/ IMPRIMANTE
01.12.03 PINTURA DE MUROS EXTERIORES, COLUMNAS, MUROS DE CONCRETO
PINTURA DE MUROS EXTERIORES, COLUMNAS, MUROS DE CONCRETO C/ LATEX - 2 MANOS,
01.12.03.01 m2
C/ IMPRIMANTE
01.12.04 PINTURA DE ESTRUCTURAS ESPECIALES
PINTURA DE ESTRUCTURAS ESPECIALES C/ PINTURA IMPERMEABILIZANTE DE CONCRETO -
01.12.04.01 m2
2 MANOS - CHEMA SEAL O SIMILAR
01.12.05 PINTURA EN PISOS Y PAVIMENTOS
01.12.05.01 PINTURA DE FRANJAS EN PISOS, ANCHO = 0.10 M C/ TRAFICO - 2 MANOS m
01.12.05.02 PINTURA DE SEÑAL DE ESTACIONAMIENTO DE DISCAPACITADOS C/ TRAFICO - 2 MANOS und
01.12.05.03 PINTURA DE SEÑAL DE NUMERO DE ESTACIONAMIENTO C/ TRAFICO - 2 MANOS und
01.12.05.04 PINTURA DE FRANJAS EN PISOS, ANCHO = 0.30 M C/ TRAFICO - 2 MANOS und
01.13 VARIOS
01.13.01 LIMPIEZA PERMANENTE DE OBRA glb
01.13.02 LIMPIEZA FINAL DE OBRA glb
01.13.03 LIMPIEZA DE VIDRIOS m2
01.13.04 LIMPIEZA DE PISOS DE PORCELANATO m2
01.13.05 PROVISION Y SEMBRIO DE PLANTAS ORNAMENTALES m2
01.13.06 CINTA EN MAMPARAS m
01.13.07 SELLO DE ASFALTO CON RELLENO DE POLIESTIRENO EXPANDIDO, E = 1"; H = 0.20 M m
01.13.08 FALSA COLUMNA DE DRYWALL H = 3.65 M und
01.13.09 PASE PARA MANGUERA CON PLANCHA FIBROCEMENTO 20 mm und
01.13.10 TOPE DE LLANTAS DE HULE, 1.83 m x 0.15 m x 0.10 m und
01.13.11 CANTONERA DE TERRAZO LAVADO m
01.14 OTROS
01.14.01 BANCA DE CONCRETO F'C = 140 Kg/cm2, H = 0.10 M ( TIPO TABLERO ) m
01.14.02 TABLERO DE CONCRETO F'C = 140 Kg/cm2, H = 0.075 M ( CON COLGAJO ) m2
01.14.03 TABLERO DE CONCRETO F'C = 140 Kg/cm2, H = 0.075 M m2
01.14.04 POYO DE CONCRETO F'C = 140 Kg/cm2, PARA INODORO ( 0.60 x 0.25 x 0.10 M ) und
01.14.05 BASE DE CONCRETO F'C = 140 Kg/cm2, H = 0.10 M m2
01.15 SEÑALIZACION DE SEGURIDAD
01.15.01 SEÑALES DE SEGURIDAD AUTOADHESIVAS und
01.16 SEÑALIZACION DE NORMATIVIDAD
01.16.01 SEÑAL INDICATIVA
01.16.01.01 IN 1 - ADOSADO und
01.16.01.02 IN 2 - ADOSADO und
01.16.01.03 IN 3 - ADOSADO und
01.16.01.04 IN 4 - COLGADO und
01.16.01.05 IN 5 - ADOSADO und
01.16.01.06 IN 5 - COLGADO und
01.16.01.07 IN 5 - BANDERA und
01.16.01.08 IN 6 - ADOSADO und
01.16.01.09 IN 6A - ADOSADO und
01.16.01.10 IN 6B - ADOSADO und
01.16.01.11 IN 6C - ADOSADO und
01.16.01.12 IN 6D - ADOSADO und
01.16.01.13 IN 7 - ADOSADO und

67 de 114
RESUMEN DE METRADOS ARQUITECTURA

METRADOS
Item DESCRIPCION
Und. EJECUTADOS

01 ARQUITECTURA
01.16.01.14 IN 8 - ADOSADO und
01.16.01.15 COLOCACION DE SEÑAL INDICATIVA und
01.16.02 SEÑAL REGLAMENTARIA
01.16.02.01 ISR 1 - ADOSADO und
01.16.02.02 COLOCACION DE SEÑAL REGLAMENTARIA und

68 de 114
RESUMEN DE METRADOS INSTALACIONES SANITARIAS

RESUMEN DE METRADOS DE INSTALACIONES SANITARIAS


:"AMPLIACIÓN Y MEJORAMIENTO DE LOS SERVICIOS COMPLEMENTARIOS DE LA SEDE CENTRAL DEL MINISTERIO DE ECONOMÍA
OBRA
Y FINANZAS, CERCADO DE LIMA - LIMA"
UBICACIÓN :LIMA - LIMA - LIMA
PROPIETARIO :MINISTERIO DE ECONOMÍA Y FINANZAS
SUPERVISION :CONSORCIO SUPERVISOR SGL
FECHA BASE :31/11/2014
FECHA INICIO DE OBRA :02 DE DICIEMBRE DEL 2015

METRADOS
Item DESCRIPCION
Und. EJECUTADOS

01 INSTALACIONES SANITARIAS
01.01 APARATOS Y ACCESORIOS SANITARIOS
01.01.01 SUMINISTRO DE APARATOS SANITARIOS
01.01.01.01 LAVATORIO MANANTIAL O SIMILAR, INC. GRIFERIA pza
01.01.01.02 LAVATORIO OVALIN SONNET O SIMILAR C/ GRIFERIA pza
01.01.01.03 TAZA NOVARA FLUX O SIMILAR, INC. FLUXOMETRO pza
01.01.01.04 URINARIO CADET O SIMILAR, INC. FLUXOMETRO pza
01.01.01.05 LAVADERO DE CONCRETO REVESTIDO CON PORCELANATO 1 POZA,INC. GRIFERIA und
01.01.01.06 LAVADERO DE CONCRETO REVESTIDO CON PORCELANATO 2 POZAS,INC. GRIFERIA und
01.01.02 SUMINISTRO DE ACCESORIOS SANITARIOS Y GRIFERIA
01.01.02.01 DISPENSADOR DE POLICARBONATO PARA JABON ESPUMA ( MOD. HD4F10 O SIMILAR ) pza
01.01.02.02 DISPENSADOR PARA PAPEL HIGIENICO JUMBO ROLL ( MOD. HD1W00 KIMBERLY O SIMILAR ) pza
01.01.02.03 DISPENSADOR PARA PAPEL TOALLA ( MOD. HD2W5 KIMBERLY O SIMILAR ) pza
01.01.02.04 GANCHO COLGADOR pza
01.01.02.05 GRIFERIA P/DUCHA CROMADA 2 LLAVES INC. ACCESORIOS pza
01.02 SISTEMA DE AGUA FRIA
01.02.01 SALIDAS DE AGUA FRIA
01.02.01.01 SALIDA AGUA FRIA CON TUBERIA DE PVC CLASE 10 C/ ROSCA 1/2" pto
01.02.01.02 SALIDA AGUA FRIA CON TUBERIA DE PVC CLASE 10 C/ ROSCA 1" pto
01.02.02 REDES DE DISTRIBUCION
01.02.02.01 TUBERIA PVC CLASE 10 C/ ROSCA 1/2" m
01.02.02.02 TUBERIA PVC CLASE 10 C/ ROSCA 3/4" m
01.02.02.03 TUBERIA PVC CLASE 10 C/ ROSCA 1" m
01.02.02.04 TUBERIA PVC CLASE 10 C/ ROSCA 1 1/4" m
01.02.02.05 TUBERIA PVC CLASE 10 C/ ROSCA 1 1/2" m
01.02.02.06 TUBERIA PVC CLASE 10 C/ ROSCA 2" m
01.02.02.07 TUBERIA PVC CLASE 10 C/ ROSCA 2 1/2" m
01.02.03 REDES DE ALIMENTACION
01.02.03.01 TUBERIA PVC CLASE 10 S/ PRESION 1 1/2" ( CON CAMA DE ARENA ) m
01.02.04 ACCESORIOS DE REDES
01.02.04.01 CODO PVC C/ ROSCA 1/2" x 90º pza
01.02.04.02 CODO PVC C/ ROSCA 3/4" x 90º pza
01.02.04.03 CODO PVC C/ ROSCA 1" x 90º pza
01.02.04.04 CODO PVC C/ ROSCA 1 1/4" x 90º pza
01.02.04.05 CODO PVC C/ ROSCA 1 1/2" x 90º pza
01.02.04.06 CODO PVC C/ ROSCA 2" x 90º pza
01.02.04.07 CODO PVC C/ ROSCA 2 1/2" x 90º pza
01.02.04.08 TEE PVC C/ ROSCA 1/2" pza
01.02.04.09 TEE PVC C/ ROSCA 1" pza
01.02.04.10 TEE PVC C/ ROSCA 1 1/4" pza
01.02.04.11 TEE PVC C/ ROSCA 1 1/2" pza
01.02.04.12 TEE PVC C/ ROSCA 2" pza
01.02.04.13 TEE PVC C/ ROSCA 2 1/2" pza
01.02.04.14 REDUCCION PVC C/ ROSCA 3/4" - 1/2" pza
01.02.04.15 REDUCCION PVC C/ ROSCA 1" - 1/2" pza
01.02.04.16 REDUCCION PVC C/ ROSCA 1 1/4" - 1/2" pza
01.02.04.17 REDUCCION PVC C/ ROSCA 1 1/4" - 1" pza
01.02.04.18 REDUCCION PVC C/ ROSCA 1 1/2" - 1/2" pza
01.02.04.19 REDUCCION PVC C/ ROSCA 1 1/2" - 3/4" pza
01.02.04.20 REDUCCION PVC C/ ROSCA 1 1/2" - 1" pza
01.02.04.21 REDUCCION PVC C/ ROSCA 1 1/2" - 1 1/4" pza

69 de 114
RESUMEN DE METRADOS INSTALACIONES SANITARIAS

METRADOS
Item DESCRIPCION
Und. EJECUTADOS

01 INSTALACIONES SANITARIAS
01.02.04.22 REDUCCION PVC C/ ROSCA 2" - 1/2" pza
01.02.04.23 REDUCCION PVC C/ ROSCA 2" - 3/4" pza
01.02.04.24 REDUCCION PVC C/ ROSCA 2" - 1 1/4" pza
01.02.04.25 REDUCCION PVC C/ ROSCA 2" - 1 1/2" pza
01.02.04.26 REDUCCION PVC C/ ROSCA 2 1/2" - 1 1/4" pza
01.02.04.27 REDUCCION PVC C/ ROSCA 2 1/2" - 1 1/2" pza
01.02.04.28 REDUCCION PVC C/ ROSCA 2 1/2" - 2" pza
01.02.05 LLAVES Y VALVULAS
01.02.05.01 VALVULA COMPUERTA DE BRONCE DE 1/2" pza
01.02.05.02 VALVULA COMPUERTA DE BRONCE DE 3/4" pza
01.02.05.03 VALVULA COMPUERTA DE BRONCE DE 1 1/4" pza
01.02.05.04 VALVULA COMPUERTA DE BRONCE DE 1 1/2" pza
01.02.05.05 MEDIDOR DE AGUA Ø 1 1/2" und
01.02.06 PIEZAS VARIAS
01.02.06.01 CAJA P/ VALVULA 20 x 20 cm pza
01.02.06.02 CAJA P/ VALVULA 30 x 30 cm pza
01.02.06.03 COLGADOR PARA 1 TUBERIA pza
01.02.07 PRUEBAS HIDRAULICAS
01.02.07.01 PRUEBA HIDRÁULICA Y DESINFECCIÓN DE TUBERÍAS m
01.02.08 ALMACENAMIENTO DE AGUA - CISTERNA
01.02.08.01 REDES DE DISTRIBUCION
01.02.08.01.01 TUBERIA PVC CLASE 10 C/ ROSCA 3/4" m
01.02.08.01.02 TUBERIA PVC CLASE 10 C/ ROSCA 1/2" m
01.02.08.01.03 TUBERIA PVC CLASE 10 C/ ROSCA 1 1/2" m
01.02.08.01.04 TUBERIA PVC CLASE 10 C/ ROSCA 2 1/2" m
01.02.08.02 ACCESORIOS DE REDES
01.02.08.02.01 CODO PVC C/ ROSCA 1/2" x 90º pza
01.02.08.02.02 CODO PVC C/ ROSCA 3/4" x 90º pza
01.02.08.02.03 CODO PVC C/ ROSCA 1 1/2" x 90º pza
01.02.08.02.04 CODO PVC C/ ROSCA 2 1/2" x 90º pza
01.02.08.02.05 TEE PVC C/ ROSCA 3/4" pza
01.02.08.03 LLAVES Y VALVULAS
01.02.08.03.01 VALVULA CONTROL DE BRONCE DE 3/4" pza
01.02.08.03.02 VALVULA CONTROL DE BRONCE DE 1 1/2" pza
01.02.08.03.03 VALVULA DE COMPUERTA BRONCE DE 2 1/2" pza
01.02.08.03.04 VALVULA CHECK 1 1/2" pza
01.02.08.03.05 VALVULA FLOTADORA C/ BOLLA DE COBRE DE 3/4" pza
01.02.08.03.06 VALVULA DE PIE C/ CANASTILLA DE BRONCE 2 1/2" pza
01.02.08.04 PIEZAS VARIAS
01.02.08.04.01 PASE EN MURO 1" und
01.02.08.04.02 PASE EN MURO 3" und
01.02.08.04.03 COLGADOR PARA UNA TUBERIA Ø 3/4" pza
01.02.08.04.04 COLGADOR PARA UNA TUBERIA Ø 2 1/2" pza
01.02.08.04.05 BRIDA ROMPE AGUA Ø 2 1/2" und
01.02.08.04.06 ELECTRONIVEL und
01.02.08.05 EQUIPOS Y OTRAS INSTALACIONES
01.02.08.05.01 SUMINISTRO E INSTALACION DE CUARTO DE BOMBAS, SISTEMA COMPACTO DE AGUA FRIA glb
01.03 SISTEMA DE AGUA CONTRA INCENDIO
01.03.01 REDES DE DISTRIBUCION
01.03.01.01 TUBERIA SCH - 40 1" m
01.03.01.02 TUBERIA SCH - 40 1 1/4" m
01.03.01.03 TUBERIA SCH - 40 1 1/2" m
01.03.01.04 TUBERIA SCH - 40 2" m
01.03.01.05 TUBERIA SCH - 40 2 1/2" m
01.03.01.06 TUBERIA SCH - 40 3" m
01.03.01.07 TUBERIA SCH - 40 4" m
01.03.02 REDES DE ALIMENTACION
01.03.02.01 TUBERIA HDPE Ø 4" ( CON PROTECCION ) m
01.03.03 ACCESORIOS DE REDES

70 de 114
RESUMEN DE METRADOS INSTALACIONES SANITARIAS

METRADOS
Item DESCRIPCION
Und. EJECUTADOS

01 INSTALACIONES SANITARIAS
01.03.03.01 CODO SCH - 40 1" x 90º - RANURADO pza
01.03.03.02 CODO SCH - 40 1 1/4" x 90º - RANURADO pza
01.03.03.03 CODO SCH - 40 2 1/2" x 90º - RANURADO pza
01.03.03.04 CODO SCH - 40 4" x 90º - RANURADO pza
01.03.03.05 TEE SCH - 40 1" - RANURADO pza
01.03.03.06 TEE SCH - 40 1 1/4" - RANURADO pza
01.03.03.07 TEE SCH - 40 1 1/2" - RANURADO pza
01.03.03.08 TEE SCH - 40 2" - RANURADO pza
01.03.03.09 TEE SCH - 40 2 1/2" - RANURADO pza
01.03.03.10 TEE SCH - 40 3" - RANURADO pza
01.03.03.11 TEE SCH - 40 4" - RANURADO pza
01.03.03.12 CRUZ SCH - 40 1 1/4" - RANURADO pza
01.03.03.13 CRUZ SCH - 40 1 1/2" - RANURADO pza
01.03.03.14 CRUZ SCH - 40 2" - RANURADO pza
01.03.03.15 CRUZ SCH - 40 2 1/2" - RANURADO pza
01.03.03.16 CRUZ SCH - 40 3" - RANURADO pza
01.03.03.17 REDUCCION SCH - 40 1 1/4" - 1" - RANURADO pza
01.03.03.18 REDUCCION SCH - 40 1 1/2" - 1" - RANURADO pza
01.03.03.19 REDUCCION SCH - 40 1 1/2" - 1 1/4" - RANURADO pza
01.03.03.20 REDUCCION SCH - 40 2" - 1" - RANURADO pza
01.03.03.21 REDUCCION SCH - 40 2" - 1 1/4" - RANURADO pza
01.03.03.22 REDUCCION SCH - 40 2" - 1 1/2" - RANURADO pza
01.03.03.23 REDUCCION SCH - 40 2 1/2" - 1" - RANURADO pza
01.03.03.24 REDUCCION SCH - 40 2 1/2" - 1 1/4" RANURADO pza
01.03.03.25 REDUCCION SCH - 40 2 1/2" - 1 1/2" - RANURADO pza
01.03.03.26 REDUCCION SCH - 40 2 1/2" - 2" RANURADO pza
01.03.03.27 REDUCCION SCH - 40 3" - 1" - RANURADO pza
01.03.03.28 REDUCCION SCH - 40 3" - 1 1/4" - RANURADO pza
01.03.03.29 REDUCCION SCH - 40 3" - 2" - RANURADO pza
01.03.03.30 REDUCCION SCH - 40 3" - 2 1/2" - RANURADO pza
01.03.03.31 REDUCCION SCH - 40 4" - 1" - RANURADO pza
01.03.03.32 REDUCCION SCH - 40 4" - 2" - RANURADO pza
01.03.03.33 REDUCCION SCH - 40 4" - 2 1/2" - RANURADO pza
01.03.04 LLAVES Y VALVULAS
01.03.04.01 VALVULA SIAMESA TIPO POSTE Ø 4" x 2 1/2" x 2 1/2" pza
01.03.04.02 VALVULA CHECK 4" pza
01.03.05 PIEZAS VARIAS
01.03.05.01 COLGADOR PARA 1 TUBERIA pza
01.03.05.02 ROCIADOR AUTOMATICO TIPO COLGANTE 1/2" und
01.03.05.03 ROCIADOR AUTOMATICO TIPO MONTANTE 1/2" und
01.03.05.04 ESTACION CONTROLADORA DE ROCIADORES und
01.03.05.05 JUNTA DE EXPANSION UL METRAFLEX und
01.03.06 PRUEBAS HIDRAULICAS
01.03.06.01 PRUEBA HIDRAULICA DE AGUA CONTRA INCENDIO m
01.03.07 PIEZAS VARIAS - GABINETE CONTRA INCENDIO
01.03.07.01 LLAVES Y VALVULAS
01.03.07.01.01 VALVULA ANGULAR 1 1/2" pza
01.03.07.01.02 VALVULA ANGULAR 2 1/2" pza
01.03.07.02 PIEZAS VARIAS
01.03.07.02.01 GABINETE METALICO, AGUA CONTRA INCENDIO 100 x 80 x 18 cm, 1/24" pza
01.03.07.02.02 PITON DE BRONCE PARA CHORRO NIEBLA 1 1/2" pza
01.03.07.02.03 MANGUERA DE FIBRA SINTETICA 1 1/2" x 30 M und
01.03.07.02.04 HACHA und
01.03.08 INSTALACIONES ESPECIALES - SISTEMA CONTRA INCENDIO - CTO. DE BOMBAS
01.03.08.01 REDES DE DISTRIBUCION
01.03.08.01.01 TUBO DE ACERO AL CARBONO SOLDABLE SCH - 40 DE 2", 6 M m
01.03.08.01.02 TUBO DE ACERO AL CARBONO SOLDABLE SCH - 40 DE 4", 6 M m
01.03.08.01.03 TUBO DE ACERO AL CARBONO SOLDABLE SCH - 40 DE 8", 6 M m
01.03.08.02 ACCESORIOS DE REDES

71 de 114
RESUMEN DE METRADOS INSTALACIONES SANITARIAS

METRADOS
Item DESCRIPCION
Und. EJECUTADOS

01 INSTALACIONES SANITARIAS
01.03.08.02.01 CODO SCH - 40 2" x 90º - RANURADO pza
01.03.08.02.02 CODO SCH - 40 4" x 90º - RANURADO pza
01.03.08.02.03 CODO SCH - 40 8" x 90º - RANURADO pza
01.03.08.02.04 TEE SCH - 40 8" - RANURADO pza
01.03.08.02.05 REDUCCION SCH - 40 8" - 2" - RANURADO pza
01.03.08.02.06 REDUCCION SCH - 40 8" - 4" - RANURADO pza
01.03.08.03 LLAVES Y VALVULAS
01.03.08.03.01 VALVULA CONTROL DE BRONCE DE 8" pza
01.03.08.03.02 VALVULA OS & Y - Ø 2" pza
01.03.08.03.03 VALVULA OS & Y - Ø 8" pza
01.03.08.03.04 VALVULA MARIPOSA 8" ( FIRE BALL ) pza
01.03.08.03.05 VALVULA CHECK 2" pza
01.03.08.03.06 VALVULA CHECK SILENCIOSA Ø 8" pza
01.03.08.03.07 MEDIDOR DE PRESION Ø 2" und
01.03.08.03.08 MEDIDOR DE PRUEBA Ø 8" ( ESTILO 735 VITAULIC ) und
01.03.08.03.09 MEDIDOR DE FLUJO Ø 2" und
01.03.08.04 PIEZAS VARIAS
01.03.08.04.01 UNION VITAULIC Ø 8" pza
01.03.08.04.02 PLATO VORTEX 60 x 60 x cm, 3/16" und
01.03.08.05 ADITAMENTOS VARIOS
01.03.08.05.01 BRIDA ROMPE AGUA Ø 8" und
01.03.08.05.02 PASE EN MURO 9" und
01.03.08.06 EQUIPOS Y OTRAS INSTALACIONES
01.03.08.06.01 EQUIPOS DE BOMBEO DE SISTEMA CONTRA INCENDIO und
01.04 SISTEMA DE AGUAS PLUVIALES
01.04.01 REDES DE DISTRIBUCION
01.04.01.01 TUBERIA PVC DS - CP Ø 4" m
01.04.01.02 MONTANTE DE PVC DS - CP Ø 4" m
01.04.02 ACCESORIOS DE REDES
01.04.02.01 CODO PVC DS - CP 4" x 90º pza
01.04.03 ADITAMENTOS VARIOS
01.04.03.01 SUMIDERO DE BRONCE 4" pza
01.05 SISTEMA DE DESAGÜE
01.05.01 SALIDAS DE DESAGÜE Y VENTILACION
01.05.01.01 SALIDA DE DESAGUE PVC DS - CP 2" pto
01.05.01.02 SALIDA DE DESAGUE PVC DS - CP 4" pto
01.05.01.03 SALIDA DE VENTILACION PVC DS - CP 3" pto
01.05.01.04 SALIDA DE VENTILACION PVC DS - CP 4" pto
01.05.02 REDES DE RECOLECCION
01.05.02.01 TUBERIA PVC DS - CP Ø 2" m
01.05.02.02 TUBERIA PVC DS - CP Ø 3" m
01.05.02.03 TUBERIA PVC DS - CP Ø 4" m
01.05.02.04 TUBERIA PVC DS - CP Ø 6" m
01.05.02.05 TUBERIA PVC CLASE 10 C/ ROSCA 1" m
01.05.02.06 MONTANTE DE PVC DS - CP Ø 2" m
01.05.02.07 MONTANTE DE PVC DS - CP Ø 3" m
01.05.02.08 MONTANTE DE PVC DS - CP Ø 4" m
01.05.03 REDES COLECTORAS
01.05.03.01 TUBERIA PVC DS - CP Ø 4" m
01.05.04 ACCESORIOS DE REDES
01.05.04.01 CODO PVC DS - CP 2" x 90º pza
01.05.04.02 CODO PVC DS - CP 3" x 90º pza
01.05.04.03 CODO PVC DS - CP 4" x 90º pza
01.05.04.04 CODO PVC C/ ROSCA 1" x 90º pza
01.05.04.05 CODO PVC DS - CP 2" x 45° pza
01.05.04.06 CODO PVC DS - CP 3" x 45° pza
01.05.04.07 CODO PVC DS - CP 4" x 45° pza
01.05.04.08 CODO PVC C/ ROSCA 1" x 45º pza
01.05.04.09 CODO SANITARIO PVC DS - CP 4" - 2" pza

72 de 114
RESUMEN DE METRADOS INSTALACIONES SANITARIAS

METRADOS
Item DESCRIPCION
Und. EJECUTADOS

01 INSTALACIONES SANITARIAS
01.05.04.10 TEE PVC DS - CP 2" pza
01.05.04.11 TEE PVC DS - CP 3" pza
01.05.04.12 TEE PVC DS - CP 4" pza
01.05.04.13 TEE DOBLE PVC DS - CP 2" pza
01.05.04.14 TEE SANITARIA PVC DS - CP 2" pza
01.05.04.15 YEE PVC DS - CP 2" pza
01.05.04.16 YEE PVC DS - CP 4" pza
01.05.04.17 YEE PVC DS-CP 6" pza
01.05.04.18 YEE C/ REDUCCION PVC DS - CP 3" - 2" pza
01.05.04.19 YEE C/ REDUCCION PVC DS - CP 4" - 2" pza
01.05.04.20 YEE C/ REDUCCION PVC DS - CP 4" - 3" pza
01.05.04.21 REDUCCION PVC DS - CP DE 3" - 2" pza
01.05.04.22 REDUCCION PVC DS - CP DE 4" - 2" pza
01.05.04.23 REDUCCION PVC DS - CP DE 4" - 3" pza
01.05.04.24 REDUCCION PVC DSCP DE 6" - 4" pza
01.05.05 ADITAMENTOS VARIOS
01.05.05.01 SUMIDERO DE BRONCE 2" pza
01.05.05.02 SUMIDERO DE BRONCE 3" pza
01.05.05.03 SUMIDERO DE BRONCE 4" pza
01.05.05.04 REGISTRO DE BRONCE 2" pza
01.05.05.05 REGISTRO DE BRONCE 4" pza
01.05.05.06 REGISTRO DE BRONCE 6" pza
01.05.05.07 SOMBRERO DE VENTILACION PVC DS - CP DE 3" pza
01.05.05.08 SOMBRERO DE VENTILACION PVC DS - CP DE 4" pza
01.05.06 PIEZAS VARIAS
01.05.06.01 COLGADOR PARA UNA TUBERIA Ø 1" pza
01.05.06.02 COLGADOR PARA UNA TUBERIA Ø 2" pza
01.05.06.03 COLGADOR PARA UNA TUBERIA Ø 3" pza
01.05.06.04 COLGADOR PARA UNA TUBERIA Ø 4" pza
01.05.06.05 COLGADOR PARA UNA TUBERIA Ø 6" pza
01.05.07 CAMARAS DE INSPECCION
01.05.07.01 CAJA DE REG. CONCR. - 12" x 24" TAPA CONCRETO pza
01.05.08 PRUEBA HIDRAULICA DE DESAGUE
01.05.08.01 PRUEBA HIDRAULICA DE DESAGUE m
01.05.09 INSTALACIONES ESPECIALES - POZO DE SUMIDERO
01.05.09.01 REDES DE DISTRIBUCION
01.05.09.01.01 TUBERIA PVC CLASE 10 C/ ROSCA 2" m
01.05.09.01.02 TUBERIA PVC SAL Ø 6" m
01.05.09.02 ACCESORIOS DE REDES
01.05.09.02.01 CODO PVC SAL 6" x 90° pza
01.05.09.02.02 CODO PVC SAP 6" X 45º pza
01.05.09.02.03 YEE PVC SAL 6" pza
01.05.09.02.04 CODO PVC C/ ROSCA 2" x 90º pza
01.05.09.02.05 TEE PVC C/ ROSCA 2" pza
01.05.09.03 LLAVES Y VALVULAS
01.05.09.03.01 VALVULA DE COMPUERTA BRONCE DE 2" pza
01.05.09.03.02 VALVULA CHECK 2" pza
01.05.09.04 PIEZAS VARIAS
01.05.09.04.01 ELECTRONIVEL und
01.05.09.04.02 BRIDA ROMPE AGUA 55 cm x 55 cm - Ø 6" und
01.05.09.05 ADITAMENTOS VARIOS
01.05.09.05.01 SUMIDERO DE BRONCE 4" pza
01.05.09.06 EQUIPOS Y OTRAS INSTALACIONES
01.05.09.06.01 ELECTROBOMBA SUMERGIBLE, Q = 2.33 lps, HDT = 13.11 M, POT. = 0.86 HP und
01.05.10 INSTALACIONES ESPECIALES - CAMARA DE BOMBEO
01.05.10.01 REDES DE DISTRIBUCION
01.05.10.01.01 TUBERIA DE FIERRO GALVANIZADO DE 1" pza
01.05.10.02 ACCESORIOS DE REDES
01.05.10.02.01 CODO DE FIERRO GALVANIZADO 1" x 90º pza

73 de 114
RESUMEN DE METRADOS INSTALACIONES SANITARIAS

METRADOS
Item DESCRIPCION
Und. EJECUTADOS

01 INSTALACIONES SANITARIAS
01.05.10.02.02 TEE DE FIERRO GALVANIZADO 1" pza
01.05.10.03 LLAVES Y VALVULAS
01.05.10.03.01 VALVULA CHECK DE BRONCE 1" P/TUB. FIERRO GALV. pza
01.05.10.03.02 VALVULA ESFERICA DE BRONCE DE 1" P/TUB. FIERRO GALV. pza
01.05.10.04 EQUIPOS Y OTRAS INSTALACIONES
01.05.10.04.01 ELECTROBOMBA SUMERGIBLE, Q = 0.83 lps, HDT = 17.94 M, POT. = 0.31 HP und
01.06 SISTEMA DE DRENAJE DE EQUIPOS DE AIRE ACONDICIONADO
01.06.01 SALIDAS DE DRENAJE DE EQUIPOS
01.06.01.01 SALIDA DESAGUE PVC CLASE 10 C/ ROSCA 1 1/4" pto
01.06.02 REDES DE DISTRIBUCION
01.06.02.01 TUBERIA PVC CLASE 10 C/ ROSCA 1 1/4" m
01.06.02.02 MONTANTE DE PVC SAL Ø 4" m
01.06.03 ACCESORIOS DE REDES
01.06.03.01 CODO PVC C/ ROSCA 1 1/4" x 90º pza
01.06.03.02 CODO PVC C/ ROSCA 4" x 90º pza
01.06.03.03 CODO PVC C/ ROSCA 1 1/4" x 45º pza
01.06.03.04 TEE PVC C/ ROSCA 4" pza
01.06.03.05 YEE PVC C/ ROSCA 1 1/4" pza
01.06.03.06 REDUCCION PVC C/ ROSCA 4" - 1 1/4" pza
01.06.04 VARIOS
01.06.04.01 COLGADOR PARA 1 TUBERIA pza
01.07 VARIOS
01.07.01 MOVIMIENTO DE TIERRAS
01.07.01.01 EXCAVACION MANUAL PARA REDES SANITARIAS, H = 0.60 M, ANCHO = 0.50 M m
01.07.01.02 REFINE Y NIVELACION DE ZANJAS, T. NORMAL P/ TUB. D = 4" - 6" m
01.07.01.03 RELLENO COMPACTADO A MANO, CON MATERIAL PROPIO H = 0.60 M, ANCHO = 0.50 M m
01.07.01.04 ELIMINACION DE MATERIAL, CARGADOR 125 HP / VOLQUETE 6 M3, D = 30 KM m3

74 de 114
RESUMEN DE METRADOS INSTALACIONES ELECTRICAS

RESUMEN DE METRADOS DE INSTALACIONES ELECTRICAS

OBRA :"AMPLIACIÓN Y MEJORAMIENTO DE LOS SERVICIOS COMPLEMENTARIOS DE LA SEDE CENTRAL DEL MINISTERIO DE ECONOMÍA Y FINANZAS, CERCADO DE LIMA - LIMA"
UBICACIÓN :LIMA - LIMA - LIMA
PROPIETARIO :MINISTERIO DE ECONOMÍA Y FINANZAS
SUPERVISION :CONSORCIO SUPERVISOR SGL
FECHA BASE :31/11/2014
FECHA INICIO DE OBRA :02 DE DICIEMBRE DEL 2015

METRADOS
Item DESCRIPCION
Und. EJECUTADOS

01 INSTALACIONES ELECTRICAS Y MECANICAS


01.01 INSTALACIONES ELECTRICAS
01.01.01 CONEXION A LA RED EXTERNA - TRABAJO PRELIMINARES
01.01.01.01 EXCAVACION MANUAL PARA REDES ELECTRICAS, H = 0.60 M, ANCHO = 0.50 M m
01.01.01.02 RELLENO COMPACTADO A MANO, CON MATERIAL PROPIO H = 0.60 M, ANCHO = 0.50 M m
01.01.01.03 CINTA SEÑALIZADORA m
01.01.02 SALIDAS PARA ALUMBRADO, TOMACORRIENTES Y FUERZA
01.01.02.01 SALIDAS PARA ALUMBRADO
01.01.02.01.01 SALIDA PARA ALUMBRADO EN TECHO DE PVC SAP 20 mm ( LSOH 4 mm2 ) pto
01.01.02.01.02 SALIDA PARA ALUMBRADO EN PARED DE PVC SAP 20 mm ( LSOH 4 mm2 ) pto
01.01.02.02 SALIDAS PARA INTERRUPTORES
01.01.02.02.01 INTERRUPTOR UNIPOLAR SIMPLE PVC SAP 20 mm ( LSOH 4 mm2 ) pto
01.01.02.02.02 INTERRUPTOR UNIPOLAR DOBLE PVC SAP 20 mm ( LSOH 4 mm2 ) pto
01.01.02.02.03 INTERRUPTOR UNIPOLAR TRIPLE PVC SAP 20 mm ( LSOH 4 mm2 ) pto
01.01.02.02.04 INTERRUPTOR DE CONMUTACION SIMPLE ( 3 VIAS ) PVC SAP 20 mm ( LSOH 4 mm2 ) pto
01.01.02.03 SALIDAS PARA TOMACORRIENTES
01.01.02.03.01 TOMACORRIENTE BIPOLAR DOBLE C/ LINEA A TIERRA PVC SAP 20 mm EN PARED ( LSOH 4 mm2 ) pto
01.01.02.03.02 TOMACORRIENTE BIPOLAR DOBLE C/ LINEA A TIERRA PVC SAP 20 mm EN PISO ( LSOH 4 mm2 ) pto
01.01.02.03.03 TOMACORRIENTE BIPOLAR DOBLE C/ LINEA A TIERRA PVC SAP 20 mm EN TECHO ( LSOH 4 mm2 ) pto
01.01.02.03.04 TOMACORRIENTE BIPOLAR DOBLE C/ LINEA A TIERRA PVC SAP 20 mm PARA LUCES DE EMERGENCIA pto
01.01.02.03.05 TOMACORRIENTE BIPOLAR DOBLE A PRUEBA DE AGUA C/ LINEA A TIERRA PVC SAP 20 mm EN PARED ( LSOH 4 mm2 ) pto
01.01.02.03.06 TOMACORRIENTE ESTABILIZADO DOBLE C/ LINEA A TIERRA PVC SAP 20 mm EN PARED ( LSOH 4 mm2 ) pto
01.01.02.03.07 TOMACORRIENTE ESTABILIZADO DOBLE C/ LINEA A TIERRA PVC SAP 20 mm EN PISO ( LSOH 4 mm2 ) pto
01.01.02.03.08 TOMACORRIENTE ESTABILIZADO DOBLE C/ LINEA A TIERRA PVC SAP 20 mm EN TECHO ( LSOH 4 mm2 ) pto
01.01.02.04 SALIDAS DE FUERZA
01.01.02.04.01 SALIDA DE FUERZA, PARA EQUIPOS DE AIRE ACONDICIONADO, TUBERIA PVC SAP 20 mm ( 2 x 4 mm2 LSOH + 1 x 4 mm2 LSOH ) pto
01.01.02.04.02 SALIDA DE FUERZA, PARA EQUIPOS DE AIRE ACONDICIONADO, TUBERIA PVC SAP 20 mm ( 3 x 4 mm2 LSOH + 1 x 4 mm2 LSOH ) pto
01.01.02.04.03 SALIDA DE FUERZA, PARA EQUIPOS DE AIRE ACONDICIONADO, TUBERIA PVC SAP 20 mm ( 3 x 6 mm2 LSOH + 1 x 6 mm2 LSOH ) pto
01.01.02.04.04 SALIDA DE FUERZA, PARA EQUIPOS DE AIRE ACONDICIONADO, TUBERIA PVC SAP 35 mm ( 3 x 25 mm2 LSOH + 1 x 10 mm2 LSOH ) pto
01.01.02.04.05 SALIDA DE FUERZA, PARA EQUIPOS DE AIRE ACONDICIONADO, TUBERIA METALICA 20 mm ( 3 x 4 mm2 LSOH + 1 x 4 mm2 LSOH ) pto
01.01.02.04.06 SALIDA DE FUERZA, PARA EQUIPOS DE AIRE ACONDICIONADO, TUBERIA METALICA 35 mm ( 3 x 16 mm2 LSOH + 1 x 10 mm2 LSOH ) pto
01.01.02.04.07 SALIDA DE FUERZA, PARA EQUIPOS DE AIRE ACONDICIONADO, TUBERIA METALICA 50 mm ( 3 x 25 mm2 LSOH + 1 x 10 mm2 LSOH ) pto
01.01.02.04.08 SALIDA DE FUERZA, PARA EQUIPOS DE AIRE ACONDICIONADO, TUBERIA METALICA 65 mm ( 3 x 70 mm2 LSOH + 1 x 35 mm2 LSOH ) pto
01.01.02.04.09 SALIDA DE FUERZA, PARA BOMBA DE AGUA, TUBERIA PVC SAP 20 mm ( 3 x 6 mm2 LSOH + 1 x 6 mm2 LSOH ) pto
01.01.02.04.10 SALIDA DE FUERZA, PARA BOMBA SUMIDERO DE DESAGUE, TUBERIA PVC SAP 20 mm ( 3 x 4 mm2 LSOH + 1 x 4 mm2 LSOH ) pto
01.01.02.04.11 SALIDA DE FUERZA, PARA BOMBA DE DESAGUE, TUBERIA PVC SAP 20 mm ( 3 x 4 mm2 LSOH + 1 x 4 mm2 LSOH ) pto
01.01.02.04.12 SALIDA DE FUERZA, PARA BOMBA DE AGUA CONTRA INCENDIO, TUBERIA PVC SAP 65 mm ( 3 x 70 mm2 N2XH + 1 x 35 mm2 LSOH ) pto
01.01.02.05 CAJAS DE PASE
01.01.02.05.01 CAJA DE PASE 100 x 100 x 50 mm pza
01.01.02.05.02 CAJA DE PASE 100 x 100 x 100 mm pza
01.01.02.05.03 CAJA DE PASE 150 x 150 x 75 mm pza
01.01.02.05.04 CAJA DE PASE 150 x 150 x 100 mm pza
01.01.02.05.05 CAJA DE PASE 200 x 200 x 100 mm pza
01.01.02.05.06 CAJA DE PASE 250 x 250 x 100 mm pza
01.01.02.06 CANALIZACIONES, CONDUCTOS O TUBERIAS
01.01.02.06.01 TUBERIA PVC SAP ( ELECTRICAS ) D = 25 mm m
01.01.02.06.02 TUBERIA PVC SAP ( ELECTRICAS ) D = 35 mm m
01.01.02.06.03 TUBERIA PVC SAP ( ELECTRICAS ) D = 40 mm m
01.01.02.06.04 TUBERIA PVC SAP ( ELECTRICAS ) D = 65 mm m
01.01.02.06.05 TUBERIA PVC SAP ( ELECTRICAS ) D = 100 mm m
01.01.02.06.06 BANDEJA METALICA CERRADA LISA CON TAPA, COLGADO DE TECHO 150 x 80 mm m
01.01.02.06.07 BANDEJA METALICA CERRADA LISA CON TAPA, COLGADO DE TECHO 200 x 60 mm m
01.01.02.06.08 BANDEJA METALICA CERRADA LISA CON TAPA, COLGADO DE TECHO 300 x 80 mm m
01.01.02.06.09 BANDEJA METALICA CERRADA LISA CON TAPA, COLGADO DE TECHO 500 x 80 mm m
01.01.02.06.10 BANDEJA METALICA CERRADA LISA CON TAPA, COLGADO DE TECHO 600 x 100 mm m
01.01.02.06.11 BANDEJA METALICA TIPO ESCALERA DE 300 x 80 mm m
01.01.02.06.12 CODO PARA BANDEJA METALICA DE FIERRO GALVANIZADO, 300 x 80 mm pza
01.01.02.06.13 CODO PARA BANDEJA METALICA DE FIERRO GALVANIZADO, 150 x 80 mm pza
01.01.02.06.14 TEE PARA BANDEJA METALICA DE FIERRO GALVANIZADO, 300 x 80 mm pza
01.01.02.06.15 TEE PARA BANDEJA METALICA DE FIERRO GALVANIZADO, 150 x 80 mm pza
01.01.02.06.16 CANALETA DE PVC ( ELECTRICAS ) 30 x 15 mm C/ COMPARTIMIENTOS m
01.01.02.07 CONDUCTORES Y CABLES DE ENERGIA EN CONDUCTOS
01.01.02.07.01 CABLE ELECTRICO LSOH 4 mm2 m
01.01.02.07.02 CABLE ELECTRICO LSOH 6 mm2 m
01.01.02.07.03 CABLE ELECTRICO LSOH 10 mm2 m
01.01.02.07.04 CABLE ELECTRICO LSOH 16 mm2 m
01.01.02.07.05 CABLE ELECTRICO LSOH 35 mm2 m
01.01.02.07.06 CABLE ELECTRICO LSOH 95 mm2 m
01.01.02.07.07 CABLE ELECTRICO N2XH 6 mm2 m
01.01.02.07.08 CABLE ELECTRICO N2XH 95 mm2 m
01.01.02.07.09 CABLE ELECTRICO N2XOH 6 mm2 m
01.01.02.07.10 CABLE ELECTRICO N2XOH 10 mm2 m

75 de 114
RESUMEN DE METRADOS INSTALACIONES ELECTRICAS

METRADOS
Item DESCRIPCION
Und. EJECUTADOS

01 INSTALACIONES ELECTRICAS Y MECANICAS


01.01.02.07.11 CABLE ELECTRICO N2XOH 16 mm2 m
01.01.02.07.12 CABLE ELECTRICO N2XOH 25 mm2 m
01.01.02.07.13 CABLE ELECTRICO N2XOH 70 mm2 m
01.01.02.07.14 CABLE ELECTRICO N2XOH 185 mm2 m
01.01.02.07.15 CABLE ELECTRICO N2XOH 300 mm2 m
01.01.02.07.16 CABLE ELECTRICO N2XY 6 mm2 m
01.01.02.07.17 CABLE ELECTRICO N2XY 10 mm2 m
01.01.02.07.18 CABLE ELECTRICO N2XY 70 mm2 m
01.01.02.07.19 CABLE ELECTRICO N2XY 185 mm2 m
01.01.02.07.20 CABLE ELECTRICO DESNUDO 35 mm2 m
01.01.02.07.21 CABLE ELECTRICO DESNUDO 50 mm2 m
01.01.02.07.22 CABLE ELECTRICO DESNUDO 70 mm2 m
01.01.02.08 TABLEROS PRINCIPALES
01.01.02.08.01 TABLERO PRINCIPAL CAJA METALICA 2000 x 600 x 300 mm ( DEL TIPO AUTOSOPORTADO ) pza
01.01.02.09 TABLEROS DE DISTRIBUCION
01.01.02.09.01 TABLERO DISTRIBUCION CAJA METALICA CON 54 POLOS ( DEL TIPO P/ EMPOTRAR ) pza
01.01.02.09.02 TABLERO DISTRIBUCION CAJA METALICA CON 42 POLOS ( DEL TIPO P/ EMPOTRAR ) pza
01.01.02.09.03 TABLERO DISTRIBUCION CAJA METALICA CON 36 POLOS ( DEL TIPO P/ EMPOTRAR ) pza
01.01.02.09.04 TABLERO DISTRIBUCION CAJA METALICA CON 30 POLOS ( DEL TIPO P/ EMPOTRAR ) pza
01.01.02.09.05 TABLERO DISTRIBUCION CAJA METALICA CON 24 POLOS ( DEL TIPO P/ EMPOTRAR ) pza
01.01.02.09.06 TABLERO DISTRIBUCION CAJA METALICA CON 18 POLOS ( DEL TIPO P/ EMPOTRAR ) pza
01.01.02.09.07 TABLERO DISTRIBUCION CAJA METALICA CON 12 POLOS ( DEL TIPO P/ EMPOTRAR ) pza
01.01.02.10 DISPOSITIVOS DE MANIOBRA Y PROTECCION
01.01.02.10.01 INTERRUPTOR TERMOMAGNETICO TETRAPOLAR REG. 4 x 200 A, 50 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.02 INTERRUPTOR TERMOMAGNETICO TETRAPOLAR REG. 4 x 80 A, 18 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.03 INTERRUPTOR TERMOMAGNETICO TETRAPOLAR REG. 4 x 40 A, 18 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.04 INTERRUPTOR TERMOMAGNETICO TETRAPOLAR 4 x 80 A, 40 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.05 INTERRUPTOR TERMOMAGNETICO TETRAPOLAR 4 x 40 A, 40 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.06 INTERRUPTOR TERMOMAGNETICO TRIPOLAR C. M. 3 x 400 A, 10 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.07 INTERRUPTOR TERMOMAGNETICO TRIPOLAR C. M. 3 x 160 A, 10 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.08 INTERRUPTOR TERMOMAGNETICO TRIPOLAR C. M. 3 x 100 A, 10 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.09 INTERRUPTOR TERMOMAGNETICO TRIPOLAR C. M. 3 x 60 A, 10 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.10 INTERRUPTOR TERMOMAGNETICO TRIPOLAR C. M. 3 x 50 A, 10 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.11 INTERRUPTOR TERMOMAGNETICO TRIPOLAR C. M. 3 x 40 A, 10 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.12 INTERRUPTOR TERMOMAGNETICO TRIPOLAR C. M. 3 x 32 A, 10 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.13 INTERRUPTOR TERMOMAGNETICO TRIPOLAR C. M. 3 x 30 A, 10 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.14 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 1250 A, 85 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.15 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 800 A, 85 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.16 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 630 A, 85 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.17 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 630 A, 65 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.18 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 630 A, 50 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.19 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 400 A, 50 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.20 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 400 A, 36 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.21 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 250 A, 50 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.22 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 160 A, 50 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.23 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 125 A, 50 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.24 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 63 A, 18 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.25 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 50 A, 18 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.26 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 40 A, 50 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.27 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 40 A, 36 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.28 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 40 A, 18 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.29 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 32 A, 18 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.30 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 25 A, 18 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.31 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 20 A, 50 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.32 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 20 A, 18 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.33 INTERRUPTOR TERMOMAGNETICO TRIPOLAR 3 x 630 A, 65 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.34 INTERRUPTOR TERMOMAGNETICO TRIPOLAR 3 x 50 A, 10 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.35 INTERRUPTOR TERMOMAGNETICO TRIPOLAR 3 x 40 A, 10 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.36 INTERRUPTOR TERMOMAGNETICO TRIPOLAR 3 x 32 A, 30 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.37 INTERRUPTOR TERMOMAGNETICO TRIPOLAR 3 x 25 A, 25 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.38 INTERRUPTOR TERMOMAGNETICO TRIPOLAR 3 x 20 A, 18 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.39 INTERRUPTOR TERMOMAGNETICO TRIPOLAR 3 x 20 A, 10 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.40 INTERRUPTOR TERMOMAGNETICO TRIPOLAR 3 x 15 A, 10 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.41 INTERRUPTOR TERMOMAGNETICO BIPOLAR 2 x 20 A, 10 KA ( DEL TIPO ENGRAMPE ) pza
01.01.02.10.42 INTERRUPTOR DIFERENCIAL 30 mA ( 4 x 25 A ) pza
01.01.02.10.43 INTERRUPTOR DIFERENCIAL 30 mA ( 2 x 25 A ) pza
01.01.02.10.44 CONTACTOR AC - 3 2 x 20 A CONTROLADO POR INTERRUPTOR HORARIO 16A, 220 V pza
01.01.03 INSTALACION DEL SISTEMA PUESTA A TIERRA
01.01.03.01 POZO DE TIERRA ( PARA EQUIPOS DE FUERZA ) und
01.01.03.02 POZO DE TIERRA ( PARA ASCENSOR ) und
01.01.03.03 POZO DE TIERRA ( PARA SISTEMA DE COMPUTO ) und
01.01.03.04 EXCAVACIONES SIMPLES m3
01.01.03.05 ELIMINACION DE MATERIAL, CARGADOR 125 HP / VOLQUETE 6 M3, D = 30 KM m3
01.01.04 ARTEFACTOS
01.01.04.01 ARTEFACTO EMPOTRADO A TECHO C/ 2 LAMP. TIPO SPOT 18 W ( MOD. SPOT 2x18W PHILIPS O SIMILAR ) pza
01.01.04.02 ARTEFACTO EMPOTRADO A TECHO C/ 2 LAMP. 26 W ( MOD. FBS 120 2x26W PHILIPS O SIMILAR ) pza
01.01.04.03 ARTEFACTO EMPOTRADO A TECHO C/ 2 LAMP. 26 W ( MOD. FCS 291 2x26 W PHILIPS O SIMILAR ) pza
01.01.04.04 ARTEFACTO EMPOTRADO A TECHO C/ 2 LAMP. 35 W ( MOD. 2x35 W TBS 416 PHILIPS O SIMILAR ) pza
01.01.04.05 ARTEFACTO EMPOTRADO A TECHO C/ 3 LAMP. 20 W ( MOD. 3x20 W TBS 460 PHILIPS O SIMILAR ) pza
01.01.04.06 ARTEFACTO EMPOTRADO A TECHO C/ 4 LAMP. 20 W ( MOD. 4x20 W TBS 460 PHILIPS O SIMILAR ) pza

76 de 114
RESUMEN DE METRADOS INSTALACIONES ELECTRICAS

METRADOS
Item DESCRIPCION
Und. EJECUTADOS

01 INSTALACIONES ELECTRICAS Y MECANICAS


01.01.04.07 ARTEFACTO ADOSADO A TECHO C/ 2 LAMP. 16 W TIPO SPOT( MOD. 2x16 W PHILIPS O SIMILAR ) pza
01.01.04.08 ARTEFACTO ADOSADO A TECHO C/ 2 LAMP. 36 W ( MOD. TCW 215 2x36 W PHILIPS O SIMILAR ) pza
01.01.04.09 ARTEFACTO ADOSADO A TECHO C/ 2 LAMP. 36 W ( MOD. TSC 398 2x36 W PHILIPS O SIMILAR ) pza
01.01.04.10 ARTEFACTO ADOSADO A PARED C/ 1 LAMP. 50 W ( MOD. TL5 1x50 W PHILIPS O SIMILAR ) pza
01.01.04.11 COLOCACION DE ARTEFACTOS DE ALUMBRADO pza
01.01.04.12 LUZ DE EMERGENCIA A BATERIA DEL TIPO SECO RECARGABLE CON AUTONOMIA DE 2 HORAS Y 2 REFLECTORES DIRECCIONALES DE 25 W pza
01.01.04.13 LUZ DE EMERGENCIA CON BALASTRO ELECTRONICO PARA LAMPARAS FLUORESCENTES DE 12 W pza
01.01.05 EQUIPOS ELECTRICOS Y MECANICOS
01.01.05.01 SUMINISTRO E INSTALACION DE GRUPO ELECTROGENO 182 KW, 228 KVA, 230 V, 3 FASES und
01.01.05.02 ASCENSOR 10 PERSONAS, 750 KILOS, 6 PARADAS und
01.01.05.03 ASCENSOR 12 PERSONAS, 900 KILOS, 6 PARADAS und
01.01.05.04 TABLERO DE TRANSFERENCIA AUTOMATICA 1 (SEGUN DISEÑO) pza
01.01.05.05 TABLERO DE TRANSFERENCIA AUTOMATICA 2 (SEGUN DISEÑO) pza
01.01.05.06 UPS 150 KVA 3Ø, 380 V, 60 Hz ( INC. BANCO DE BATERIAS ) und
01.01.05.07 TRANSFORMADOR DE AISLAMIENTO 150 KVA, 3 Ø, 220 / 380 V, 60 Hz und
01.01.05.08 MEDIDOR MULTIFUNCION 3 x 5 A pza
01.01.06 PRUEBAS ELECTRICAS
01.01.06.01 PRUEBAS DE AISLAMIENTO Y RESISTIVIDAD glb
01.02 INSTALACIONES MECANICAS
01.02.01 SISTEMA DE AIRE ACONDICIONADO
01.02.01.01 SISTEMA MULTI - SPLIT
01.02.01.01.01 EQUIPO MULTI - SPLIT ( UC - 265,030 BTU/h ) und
01.02.01.01.02 EQUIPO MULTI - SPLIT ( UC - 420,495 BTU/h ) und
01.02.01.01.03 EQUIPO MULTI - SPLIT ( UC - 503,840 BTU/h ) und
01.02.01.02 SISTEMA SPLIT
01.02.01.02.01 EQUIPO SPLIT ( TIPO DECORATIVO 18,000 BTU ) und
01.02.01.03 TUBERIAS Y ACCESORIOS DE GAS PARA AIRE ACOND.
01.02.01.03.01 TUBERIA DE COBRE TIPO L 15.9 mm m
01.02.01.03.02 TUBERIA DE COBRE TIPO L 19.1 mm m
01.02.01.03.03 TUBERIA DE COBRE TIPO L 22.2 mm m
01.02.01.03.04 TUBERIA DE COBRE TIPO L 28.6 mm m
01.02.01.03.05 CODO DE COBRE 15.9 mm x 90º pza
01.02.01.03.06 CODO DE COBRE 19.1 mm x 90º pza
01.02.01.03.07 CODO DE COBRE 22.2 mm x 90º pza
01.02.01.03.08 CODO DE COBRE 28.6 mm x 90º pza
01.02.01.03.09 TEE DE COBRE 15.9 mm pza
01.02.01.03.10 TEE DE COBRE 19.1 mm pza
01.02.01.03.11 TEE DE COBRE 22.2 mm pza
01.02.01.03.12 TEE DE COBRE 28.6 mm pza
01.02.01.03.13 REDUCCION DE COBRE 19.1 mm - 15.9 mm pza
01.02.01.03.14 REDUCCION DE COBRE 22.2 mm - 15.9 mm pza
01.02.01.03.15 REDUCCION DE COBRE 28.6 mm - 15.9 mm pza
01.02.01.03.16 REDUCCION DE COBRE 28.6 mm - 19.1 mm pza
01.02.01.03.17 REDUCCION DE COBRE 28.6 mm - 22.2 mm pza
01.02.01.04 TUBERIAS Y ACCESORIOS DE LIQUIDO PARA AIRE ACOND.
01.02.01.04.01 TUBERIA DE COBRE TIPO L 9.5 mm m
01.02.01.04.02 TUBERIA DE COBRE TIPO L 12.7 mm m
01.02.01.04.03 TUBERIA DE COBRE TIPO L 15.9 mm m
01.02.01.04.04 CODO DE COBRE 9.5 mm x 90º pza
01.02.01.04.05 CODO DE COBRE 12.7 mm x 90º pza
01.02.01.04.06 CODO DE COBRE 15.9 mm x 90º pza
01.02.01.04.07 TEE DE COBRE 9.5 mm pza
01.02.01.04.08 TEE DE COBRE 12.7 mm pza
01.02.01.04.09 TEE DE COBRE 15.9 mm pza
01.02.01.04.10 REDUCCION DE COBRE 12.7 mm - 9.5 mm pza
01.02.01.04.11 REDUCCION DE COBRE 15..9 mm - 9.5 mm pza
01.02.01.04.12 REDUCCION DE COBRE 15.9 mm - 12.7 mm pza
01.02.01.05 SISTEMA DE EQUIPOS DE INYECTORES
01.02.01.05.01 INYECTOR CENTRIFUGO 450 CFM und
01.02.01.05.02 INYECTOR CENTRIFUGO 542 CFM und
01.02.01.05.03 INYECTOR CENTRIFUGO 600 CFM und
01.02.01.05.04 INYECTOR CENTRIFUGO 721 CFM und
01.02.01.05.05 INYECTOR CENTRIFUGO 1,698 CFM und
01.02.01.05.06 INYECTOR CENTRIFUGO 5,724 CFM und
01.02.01.05.07 INYECTOR CENTRIFUGO 6,726 CFM und
01.02.01.05.08 INYECTOR HELICOCENTRIFUGO 665 CFM und
01.02.01.05.09 INYECTOR HELICOCENTRIFUGO 714 CFM und
01.02.01.05.10 INYECTOR HELICOIDAL 11,557 CFM und
01.02.01.06 DIFUSORES Y REJILLAS
01.02.01.06.01 DIFUSORES pg2
01.02.01.06.02 REJILLA DE AIRE FRESCO pg2
01.02.01.07 DUCTOS
01.02.01.07.01 DUCTOS METALICOS kg
01.02.01.07.02 AISLAMIENTO ACUSTICO PARA DUCTOS m2
01.02.01.08 VARIOS
01.02.01.08.01 BOTONERA DE ARRANQUE Y PARADA ON - OFF und
01.02.01.08.02 TERMOSTATO DE AMBIENTE und
01.02.01.08.03 DAMPER DE GRAVEDAD pg2
01.02.01.08.04 CAJA DE CONTROL und
01.02.01.08.05 UNION FLEXIBLE DE LONA PARA DUCTOS ( A.A. ) und

77 de 114
RESUMEN DE METRADOS INSTALACIONES ELECTRICAS

METRADOS
Item DESCRIPCION
Und. EJECUTADOS

01 INSTALACIONES ELECTRICAS Y MECANICAS


01.02.01.08.06 SOPORTE METALICO PARA DUCTOS EN TECHO pza
01.02.01.08.07 SOPORTE METALICO PARA TUBERIAS EN TECHO pza
01.02.01.08.08 SOPORTE METALICO PARA TUBERIAS EN PARED pza
01.02.01.08.09 SOPORTE METALICO PARA TUBERIAS EN PISO pza
01.02.01.08.10 TRANSPORTE, IZAJE, DESPLAZAMIENTO E INSTALACION DE EQUIPOS DE AIRE ACONDICIONADO est
01.02.01.09 PRUEBAS Y BALANCEO DEL SISTEMA DE AIRE ACONDICIONADO
01.02.01.09.01 PRUEBAS Y BALANCEO DE AIRE ACONDICIONADO glb
01.02.02 SISTEMA DE EXTRACCION
01.02.02.01 EXTRACTORES E INYECTORES
01.02.02.01.01 EXTRACTOR HELICOCENTRIFUGO 70 CFM und
01.02.02.01.02 EXTRACTOR HELICOCENTRIFUGO 75 CFM und
01.02.02.01.03 EXTRACTOR HELICOCENTRIFUGO 88 CFM und
01.02.02.01.04 EXTRACTOR HELICOCENTRIFUGO 90 CFM und
01.02.02.01.05 EXTRACTOR HELICOCENTRIFUGO 99 CFM und
01.02.02.01.06 EXTRACTOR HELICOCENTRIFUGO 106 CFM und
01.02.02.01.07 EXTRACTOR HELICOCENTRIFUGO 117 CFM und
01.02.02.01.08 EXTRACTOR HELICOCENTRIFUGO 120 CFM und
01.02.02.01.09 EXTRACTOR HELICOCENTRIFUGO 129 CFM und
01.02.02.01.10 EXTRACTOR HELICOCENTRIFUGO 133 CFM und
01.02.02.01.11 EXTRACTOR HELICOCENTRIFUGO 140 CFM und
01.02.02.01.12 EXTRACTOR HELICOCENTRIFUGO 177 CFM und
01.02.02.01.13 EXTRACTOR HELICOCENTRIFUGO 184 CFM und
01.02.02.01.14 EXTRACTOR HELICOCENTRIFUGO 188 CFM und
01.02.02.01.15 EXTRACTOR HELICOCENTRIFUGO 368 CFM und
01.02.02.01.16 EXTRACTOR HELICOCENTRIFUGO 405 CFM und
01.02.02.01.17 EXTRACTOR HELICOCENTRIFUGO 650 CFM und
01.02.02.01.18 EXTRACTOR HELICOCENTRIFUGO 665 CFM und
01.02.02.01.19 EXTRACTOR HELICOCENTRIFUGO 714 CFM und
01.02.02.01.20 EXTRACTOR CENTRIFUGO 1000 CFM und
01.02.02.01.21 EXTRACTOR CENTRIFUGO 1074 CFM und
01.02.02.01.22 EXTRACTOR AXIAL 90 CFM und
01.02.02.01.23 EXTRACTOR AXIAL 120 CFM und
01.02.02.01.24 EXTRACTOR AXIAL 430 CFM und
01.02.02.01.25 EXTRACTOR AXIAL 448 CFM und
01.02.02.01.26 EXTRACTOR AXIAL 452 CFM und
01.02.02.02 EXTRACTORES E INYECTORES DE MONOXIDO
01.02.02.02.01 EXTRACTOR CENTRIFUGO DOBLE ENTRADA 19,722 CFM und
01.02.02.03 DIFUSORES Y REJILLAS
01.02.02.03.01 REJILLA DE EXTRACCION pg2
01.02.02.03.02 REJILLA DE EXPULSION pg2
01.02.02.03.03 REJILLA DE EXTRACCION DE MONOXIDO pg2
01.02.02.04 DUCTOS
01.02.02.04.01 DUCTOS METALICOS kg
01.02.02.04.02 AISLAMIENTO ACUSTICO PARA DUCTOS m2
01.02.02.05 VARIOS
01.02.02.05.01 BOTONERA DE ARRANQUE Y PARADA ON - OFF und
01.02.02.05.02 CAJA DE CONTROL und
01.02.02.05.03 DAMPER DE GRAVEDAD pg2
01.02.02.05.04 UNION FLEXIBLE DE LONA PARA DUCTOS und
01.02.02.05.05 SOPORTE METALICO PARA DUCTOS EN TECHO pza
01.02.02.05.06 TRANSPORTE, IZAJE, DESPLAZAMIENTO E INSTALACION DE EQUIPOS DE VENTILACION est
01.02.02.06 PRUEBAS Y BALANCEO DEL SISTEMA DE EXTRACCION
01.02.02.06.01 PRUEBAS Y BALANCEO DEL SISTEMA DE EXTRACCION glb
01.02.03 SISTEMA DE PRESURIZACION
01.02.03.01 VENTILADORES
01.02.03.01.01 VENTILADOR CENTRIFUGO DE SIMPLE ENTRADA 18,714 CFM und
01.02.03.01.02 VENTILADOR CENTRIFUGO DE SIMPLE ENTRADA 19,359 CFM und
01.02.03.02 DIFUSORES Y REJILLAS
01.02.03.02.01 REJILLA DE SUMINISTRO pg2
01.02.03.03 DUCTOS
01.02.03.03.01 DUCTOS METALICOS kg
01.02.03.03.02 AISLAMIENTO ACUSTICO PARA DUCTOS m2
01.02.03.04 VARIOS
01.02.03.04.01 CAJA DE CONTROL und
01.02.03.04.02 SENSOR DE HUMO und
01.02.03.04.03 DAMPER DE ALIVIO pg2
01.02.03.04.04 UNION FLEXIBLE DE LONA PARA DUCTOS und
01.02.03.04.05 SOPORTE METALICO PARA DUCTOS EN PISO pza
01.02.03.04.06 TRANSPORTE, IZAJE, DESPLAZAMIENTO E INSTALACION DE EQUIPOS DE PRESURIZACION est
01.02.03.05 PRUEBAS Y BALANCEO DEL SISTEMA DE PRESURIZACION
01.02.03.05.01 PRUEBAS Y BALANCEO DEL SISTEMA DE PRESURIZACION glb
01.02.04 SISTEMA DE PRECISION
01.02.04.01 VENTILADOR DE PRECISION
01.02.04.01.01 EQUIPO TIPO PRECISION 60,000 BTU und
01.02.04.02 TUBERIAS Y ACCESORIOS DE GAS PARA AIRE ACOND.
01.02.04.02.01 TUBERIA DE COBRE TIPO L 22.2 mm m
01.02.04.02.02 CODO DE COBRE 22.2 mm x 90º pza
01.02.04.03 TUBERIAS Y ACCESORIOS DE LIQUIDO PARA AIRE ACOND.
01.02.04.03.01 TUBERIA DE COBRE TIPO L 12.7 mm m
01.02.04.03.02 CODO DE COBRE 12.7 mm x 90º pza

78 de 114
RESUMEN DE METRADOS INSTALACIONES ELECTRICAS

METRADOS
Item DESCRIPCION
Und. EJECUTADOS

01 INSTALACIONES ELECTRICAS Y MECANICAS


01.02.04.04 VARIOS
01.02.04.04.01 CAJA DE CONTROL und
01.02.04.04.02 SOPORTE METALICO PARA TUBERIAS EN TECHO pza
01.02.04.04.03 SOPORTE METALICO PARA TUBERIAS EN PARED pza
01.02.04.04.04 SOPORTE METALICO PARA TUBERIAS EN PISO pza
01.02.04.04.05 TRANSPORTE, IZAJE, DESPLAZAMIENTO E INSTALACION DE EQUIPOS DE PRECISION est
01.02.04.05 PRUEBAS Y BALANCEO DEL SISTEMA DE PRECISION
01.02.04.05.01 PRUEBAS Y BALANCEO DEL SISTEMA DE PRECISION glb
01.03 SUB ESTACION
01.03.01 ROTURA Y REPARACION
01.03.01.01 PERFILADO DE SARDINEL DE CONCRETO EXIST. C/ DISCO DE CORTE P/ REDES ELECTRICAS m
01.03.01.02 PERFILADO DE PAVIMENTO DE ASFALTO EXIST. C/ DISCO DE CORTE m
01.03.01.03 REMOCION DE ADOQUIN DE CONCRETO m2
01.03.01.04 REPOSICION DE VEREDA DE ADOQUIN DE CONCRETO 21 x 10.5 x 4 cm ( INC. BASE Y CONFINAMIENTO ) m2
01.03.02 TRAZOS, NIVELES Y REPLANTEO
01.03.02.01 TRAZOS, NIVELES Y REPLANTEO PRELIMINAR CON EQUIPO m
01.03.03 CONEXION A LA RED EXTERNA - TRABAJO PRELIMINARES
01.03.03.01 EXCAVACION MANUAL PARA REDES ELECTRICAS, H = 1.10 M, ANCHO = 0.60 M m
01.03.03.02 RELLENO COMPACTADO A MANO, CON MATERIAL PROPIO H = 1.10 M, ANCHO = 0.60 M m
01.03.03.03 CINTA SEÑALIZADORA m
01.03.03.04 ELIMINACION DE MATERIAL, CARGADOR 125 HP / VOLQUETE 6 M3, D = 30 KM m3
01.03.04 CRUZADAS Y VEREDAS
01.03.04.01 CONCRETO C:H 1:8 E = 2" SOLADOS m2
01.03.04.02 DUCTO DE CONCRETO DE 2 VIAS m
01.03.04.03 LADRILLO CORRIENTE DE ARCILLA und
01.03.05 CABLE SUBTERRANEO Y ACCESORIOS
01.03.05.01 BANDEJA METALICA CERRADA LISA CON TAPA, COLGADO DE TECHO 250 x 100 mm m
01.03.05.02 BANDEJA METALICA TIPO ESCALERA DE 250 x 100 mm m
01.03.05.03 TUBERIA PVC SAP ( ELECTRICAS ) D = 100 mm m
01.03.05.04 CABLE ELECTRICO N2XSY 50 mm2 - UNIPOLAR m
01.03.06 SUB ESTACION PARTICULAR
01.03.06.01 CELDA DE SALIDA DE S.E. und
01.03.06.02 CELDA DE REMONTE DE CABLES und
01.03.06.03 CELDA DE SALIDA, MEDICION Y PROTECCION PRINCIPAL ( CABLE N2XSY 50 mm2 - 18 / 30 KV ) und
01.03.06.04 TRANSFORMADOR TRIFASICO SECO - 400 KVA, Yyn6, Dyn5, 22.9 - 10 / 0.23 kV und
01.03.07 PUESTA A TIERRA
01.03.07.01 POZO DE TIERRA ( PARA SUBESTACION ELECTRICA ) und
01.03.07.02 EXCAVACIONES SIMPLES m3
01.03.07.03 ELIMINACION DE MATERIAL, CARGADOR 125 HP / VOLQUETE 6 M3, D = 30 KM m3
01.03.08 VARIOS
01.03.08.01 DIVISIONES METALICAS CON MALLA OLIMPICA TEJIDA Y PERFILES Y ANGULOS DE FIERRO m2
01.03.08.02 BUZON DE CONCRETO PARA CONEXIONES ELECTRICAS und
01.03.09 SEGURIDAD Y SALUD
01.03.09.01 EQUIPOS DE PROTECCION Y MANIOBRA glb
01.03.10 PRUEBAS ELECTRICAS PARA MEDIA TENSION
01.03.10.01 DETERMINACION DE LA SECUENCIA DE FASES est
01.03.10.02 PRUEBAS DE CONTINUIDAD Y RESISTENCIA ELECTRICA est
01.03.10.03 PRUEBAS DE AISLAMIENTO est
01.03.10.04 PRUEBAS DE PUESTA A TIERRA est
01.03.10.05 INSPECCION DE PRUEBAS est
01.03.10.06 PRUEBAS DE PROCTOR EN EXCAVACIONES est

79 de 114
RESUMEN DE METRADOS INSTALACIONES DE COMUNICACIONES

RESUMEN DE METRADOS DE COMUNICACIONES


:"AMPLIACIÓN Y MEJORAMIENTO DE LOS SERVICIOS COMPLEMENTARIOS DE LA SEDE CENTRAL DEL MINISTERIO DE ECONOMÍA Y
OBRA
FINANZAS, CERCADO DE LIMA - LIMA"
UBICACIÓN :LIMA - LIMA - LIMA
PROPIETARIO :MINISTERIO DE ECONOMÍA Y FINANZAS
SUPERVISION :CONSORCIO SUPERVISOR SGL
FECHA BASE :31/11/2014
FECHA INICIO DE OBRA :02 DE DICIEMBRE DEL 2015

METRADOS
Item DESCRIPCION
Und. EJECUTADOS

01 INSTALACIONES DE COMUNICACIONES
01.01 CABLEADO ESTRUCTURADO EN INTERIORES DE EDIFICIOS
01.01.01 SALIDAS PARA SISTEMA DE CONTROL DE ACCESO Y SEGURIDAD
01.01.01.01 SALIDA PARA CONTROL DE ACCESO RDFI CON TUBERIA PVC SAP 25 mm, EN PARED pto
01.01.01.02 SALIDA PARA MARCADOR BIOMETRICO CON TUBERIA PVC SAP 25 mm, EN PARED pto
01.01.02 SALIDAS PARA SISTEMA DE VIDEO SEGURIDAD
01.01.02.01 SALIDA PARA UNA CAMARA IP, TIPO FIJA, PARA INTERIOR CON TUBERIA PVC SAP 25 mm, EN PARED pto
01.01.02.02 SALIDA PARA DOS CAMARAS IP, TIPO FIJAS, PARA INTERIOR CON TUBERIA PVC SAP 25 mm, EN PARED pto
01.01.02.03 SALIDA PARA UNA CAMARA IP, INTEGRADA, PARA EXTERIOR CON TUBERIA PVC SAP 25 mm, EN PARED pto
01.01.03 SALIDAS PARA SISTEMA DE DATA Y VOZ
01.01.03.01 SALIDA SIMPLE PARA VOZ Y DATA PVC SAP 25 mm EN PARED pto
01.01.03.02 SALIDA DOBLE PARA VOZ Y DATA PVC SAP 25 mm EN PARED pto
01.01.03.03 SALIDA SIMPLE PARA VOZ Y DATA PVC SAP 25 mm EN MUEBLE pto
01.01.03.04 SALIDA DOBLE PARA VOZ Y DATA PVC SAP 25 mm EN MUEBLE pto
01.01.03.05 SALIDA PARA EQUIPO WIRELESS PVC SAP 25 mm EN TECHO pto
01.01.03.06 SALIDA PARA TELEFONO PUBLICO PVC SAP 25 mm EN PARED pto
01.01.03.07 SALIDA PARA CAJERO AUTOMATICO PVC SAP 25 mm EN PARED pto
01.01.03.08 CAJA DE PASE 100 x 100 x 55 mm pza
01.01.03.09 CAJA DE PASE 150 x 150 x 75 mm pza
01.01.03.10 CAJA DE PASE 200 x 200 x 100 mm pza
01.01.03.11 TUBERIA PVC SAP ( ELECTRICAS ) D = 25 mm m
01.01.03.12 TUBERIA PVC SAP ( ELECTRICAS ) D = 35 mm m
01.01.03.13 TUBERIA METALICA ( ELECTRICAS ) D = 20 mm m
01.01.03.14 TUBERIA METALICA ( ELECTRICAS ) D = 25 mm m
01.01.03.15 TUBERIA METALICA ( ELECTRICAS ) D = 35 mm m
01.01.03.16 CABLE UTP CATEGORIA 6a m
01.01.04 GABINETES DE COMUNICACION
01.01.04.01 GABINETE DE COMUNICACIONES - GDS0 und
01.01.04.02 GABINETE DE COMUNICACIONES - GA und
01.01.04.03 GABINETE DE COMUNICACIONES - GDS1 und
01.01.04.04 GABINETE DE COMUNICACIONES - GDP und
01.01.04.05 GABINETE DE COMUNICACIONES - GS1 und
01.01.04.06 GABINETE DE COMUNICACIONES - GS2 und
01.01.04.07 GABINETE DE COMUNICACIONES - GDS2 und
01.01.04.08 GABINETE DE COMUNICACIONES - GDS3 und
01.01.05 SALIDAS PARA SISTEMA DE PERIFONEO Y MUSICA
01.01.05.01 SALIDA PARA CONTROL DE VOLUMEN pto
01.01.05.02 SALIDA DE ALTAVOZ PARA EMPOTRAR pto
01.01.05.03 CABLE AMPLIFICADOR 2 x 18 m
01.01.06 SALIDAS PARA SISTEMA DE COLAS Y GESTION AL USUARIO
01.01.06.01 SALIDA PARA DISPENSADOR DE ATENCION AL USUARIO CON TUBERIA PVC SAP 25 mm, EN PARED pto
01.01.06.02 SALIDA PARA KIOSKO MULTIMEDIA CON TUBERIA PVC SAP 25 mm, EN PARED pto
01.01.07 SALIDAS PARA SISTEMA DE TV Y VIDEO
01.01.07.01 SALIDA PARA TERMINAL TV-IP CON TUBERIA PVC SAP 25 mm, EN PARED pto
01.01.08 SISTEMA DE BANDEJAS Y BUZONES
01.01.08.01 BANDEJA METALICA CERRADA LISA CON TAPA, COLGADO DE TECHO 400 x 100 mm m
01.01.08.02 BANDEJA METALICA TIPO ESCALERA DE 200 x 100 mm m
01.01.08.03 CODO PARA BANDEJA METALICA DE FIERRO GALVANIZADO, 400 x 100 mm pza
01.01.08.04 TEE PARA BANDEJA METALICA DE FIERRO GALVANIZADO, 400 x 100 mm pza
01.01.08.05 BUZON DE CONCRETO PARA ACOMETIDA DE TELECOMUNICACIONES und
01.02 SISTEMA DE SEGURIDAD CONTRA INCENDIOS
01.02.01 SALIDAS PARA ALARMAS CONTRA INCENDIO
01.02.01.01 SALIDA PARA DETECTOR DE HUMO FOTOELECTRICO ( INC. APARATO ) pto
01.02.01.02 SALIDA PARA DETECTOR DE ELEVACION DE TEMPERATURA ( INC. APARATO ) pto
01.02.01.03 SALIDA PARA DETECTOR PHOTOBEAM CONVENCIONAL ( INC. APARATO ) pto

80 de 114
RESUMEN DE METRADOS INSTALACIONES DE COMUNICACIONES

METRADOS
Item DESCRIPCION
Und. EJECUTADOS

01 INSTALACIONES DE COMUNICACIONES
01.02.01.04 SALIDA PARA MODULO DE CONTROL, NACS, OFF/ON pto
01.02.01.05 SALIDA PARA MODULO AISLADOR DE FALLAS pto
01.02.01.06 SALIDA PARA SISTEMA DE CONTROL DE ZONA DE ROCIADORES MONITOREO VALVULA Y FLUJO pto
01.02.01.07 PANEL DE ALARMA CONTRAINCENDIOS und
01.02.01.08 SALIDA PARA PARLANTE CON LUZ ESTROBOSCOPICA pto
01.02.01.09 SALIDA PARA ESTACION MANUAL DIRECCIONABLE pto
01.02.01.10 SALIDA PARA TELEFONO DE BOMBEROS pto
01.02.01.11 SALIDA PARA DETECTOR DE MONOXIDO DE CARBONO pto
01.02.01.12 SALIDA PARA SENSOR DE ANIEGO pto
01.02.01.13 SALIDA PARA PANEL DE CONTROL DE EXTINCION - PX pto
01.02.01.14 SALIDA PARA SISTEMA DE AGENTE LIMPIO pto
01.02.01.15 SALIDA PARA CARTEL DE EXTINCION DISPARADA - ED pto
01.02.01.16 RESISTENCIA FINAL DE LAZO und
01.02.01.17 TUBERIA METALICA ( ELECTRICAS ) D = 20 mm m
01.02.01.18 CABLE CONDUCTOR #18 AWG CON RECUBRIMIENTO LSZH m
01.02.01.19 CABLE PARA TELEFONO DE BOMBEROS m
01.03 EQUIPAMIENTO
01.03.01 SWITCH CORE und
01.03.02 SWITCH DE DISTRIBUCION DE 24 PUNTOS und
01.03.03 SWITCH DE BORDE DE 48 PUNTOS und
01.03.04 SERVIDORES APLICATIVOS DE 1 RU und
01.03.05 CAJAS DE ALMACENAMIENTO und
01.03.06 SERVIDOR DE RESPALDO und
01.03.07 INSTALACION Y CONFIGURACION und

81 de 114
RESUMEN DE METRADOS IMPACTO VIAL

RESUMEN DE METRADOS DE IMPACTO VIAL


:"AMPLIACIÓN Y MEJORAMIENTO DE LOS SERVICIOS COMPLEMENTARIOS DE LA SEDE CENTRAL DEL MINISTERIO DE ECONOMÍA Y FINANZAS,
OBRA
CERCADO DE LIMA - LIMA"
UBICACIÓN :LIMA - LIMA - LIMA
PROPIETARIO :MINISTERIO DE ECONOMÍA Y FINANZAS
SUPERVISION :CONSORCIO SUPERVISOR SGL
FECHA BASE :31/11/2014
FECHA INICIO DE OBRA :02 DE DICIEMBRE DEL 2015

METRADOS
Item DESCRIPCION
Und. EJECUTADOS

01 IMPACTO VIAL
01.01 TRABAJOS PRELIMINARES
01.01.01 CORTE DE PAVIMENTO DE ASFALTO EXIST. C/ DISCO DE CORTE m
01.01.02 DEMOLICION DE PAVIMENTO EXISTENTE m2
01.01.03 ELIMINACION DE MATERIAL, CARGADOR 125 HP / VOLQUETE 6 M3, D = 30 KM m3
01.02 MITIGACION PARA EL AREA DE IMPACTO INMEDIATA
01.02.01 TRAZOS, NIVELES Y REPLANTEO PRELIMINAR CON EQUIPO m2
01.02.02 BASE GRANULAR PARA VEREDA, E = 0.10 M m2
01.02.03 VEREDA DE ADOQUIN DE CONCRETO 21 x 10.5 x 4 cm ( INC. CONFINAMIENTO ) m2
01.02.04 ESPEJO CIRCULAR PARA ESTACIONAMIENTO, TIPO CONVEXOS und
01.03 MITIGACION PARA EL AREA DE IMPACTO DIRECTA E INDIRECTA
01.03.01 SEÑAL DE NO DETENERSE pza
01.03.02 SEÑAL DE RESALTO pza
01.03.03 MARCAS EN EL PAVIMENTO - PINTADO DE LINEAS, ANCHO = 0.10 m m
01.03.04 MARCAS EN BORDE DE VEREDA - PINTADO DE LINEAS, ANCHO = 0.10 m m
01.03.05 PINTURA DE SEÑALIZACION EN PAVIMENTO EN CRUCES, C/ TRAFICO - 2 MANOS m2
01.03.06 PINTURA DE SEÑAL DE DIRECCION DE 1 VIA C/ TRAFICO - 2 MANOS und
01.03.07 PINTURA DE SEÑAL DE DIRECCION DE 2 VIA C/ TRAFICO - 2 MANOS und
01.03.08 CADENA DE HIERRO ESLABON 30 mm, PARA BOLARDOS m
01.03.09 TRAZOS, NIVELES Y REPLANTEO PRELIMINAR CON EQUIPO m2
01.03.10 SELLO DE ASFALTO C/ MEZCLA EN CALIENTE, E = 1"; H = 0.20 M m
01.03.11 SARDINEL DE CONCRETO F'C = 210 Kg/cm2, H = 0.15 M; ANCHO = 0.15 M m
01.03.12 CONCRETO F'C = 210 Kg/cm2 RAMPAS m3
01.03.13 ENCOFRADO Y DESENCOFRADO NORMAL RAMPAS m2
01.03.14 ACERO CORRUGADO FY = 4200 Kg/cm2 kg
01.03.15 CURADO DE CONCRETO EN PAVIMENTO m2
01.03.16 RESALTO DE ADOQUIN DE CONCRETO 20 x 10 x 6 cm m2
01.03.17 BASE GRANULAR PARA RESALTO DE ADOQUIN, E = 0.20 M m2
01.03.18 SEÑALIZACIONES TEMPORALES DE DESVIOS DE VIAS est

82 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD

CONSORCIO RIMAC
CALENDARIO DE ACTIVIDADES VALORIZADO DE OBRAS PROVISIONALES ACTUALIZADO A LA FECHA DE INICIO DE OBRA
LP Nº 003-2015-EF/43
: "AMPLIACIÓN Y MEJORAMIENTO DE LOS SERVICIOS COMPLEMENTARIOS DE LA SEDE CENTRAL DEL MINISTERIO DE ECONOMÍA Y FINANZAS,
OBRA
CERCADO DE LIMA - LIMA"
UBICACIÓN : LIMA - LIMA - LIMA
FECHA BASE : 31/11/2014
PROPIETARIO : MINISTERIO DE ECONOMÍA Y FINANZAS 12/31/2015
CONTRATISTA : CONSORCIO T y M 34.35% 57.60% 1.43% 1.36% 1.41% 1.40% 0.72% 0.73% 0.66% 0.35%
FECHA DE INICIO : 02/12/2015 12.93% 12.94% 12.94% 12.95% 12.96% 12.97% 12.98% 12.99% 13.00% 12.90%
112,575.74 188,785.31 4,670.71 4,450.37 4,622.81 4,586.60 2,365.69 2,402.28 2,165.68 1,141.31
02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD 327,766.50 112,575.74 188,785.31 4,670.71 4,450.37 4,622.81 4,586.60 2,365.69 2,402.28 2,165.68 1,141.31
01.01 OBRAS PROVISIONALES 57,366.36
01.01.01 CONSTRUCCIONES PROVISIONALES 28,078.12
01.01.01.01 OFICINA DE OBRA m2 50.00 147.28 7,364.00 7,364.00
01.01.01.02 ALMACEN DE OBRA m2 50.00 147.28 7,364.00 7,364.00
01.01.01.03 CASETA PARA GUARDIANIA m2 12.00 147.28 1,767.36 1,767.36
01.01.01.04 VESTUARIOS m2 32.00 147.28 4,712.96 4,712.96
01.01.01.05 SERVICIOS HIGIENICOS und 10.00 244.11 2,441.10 2,441.10
01.01.01.06 CERCO PERIMETRICO PROVISIONAL CON TRIPLAY 6mm m 50.00 44.17 2,208.50 2,208.50
01.01.01.07 CARTEL DE IDENTIFICACION DE OBRA und 1.00 2,220.20 2,220.20 2,220.20
01.01.02 INSTALACIONES PROVISIONALES 29,288.24
01.01.02.01 AGUA PARA LA CONSTRUCCION 5,768.45
01.01.02.01.01 SALIDA AGUA FRIA CON TUBERIA DE PVC CLASE 10 C/ ROSCA 1/2" pto 4.00 48.48 193.92 58.18 135.74
01.01.02.01.02 TUBERIA PVC CLASE 10 C/ ROSCA 1/2" ( CON CAMA DE ARENA ) m 25.00 16.06 401.50 120.45 281.05
01.01.02.01.03 TUBERIA PVC CLASE 10 C/ ROSCA 3/4" ( CON CAMA DE ARENA ) m 8.90 18.20 161.98 48.59 113.39
01.01.02.01.04 VALVULA COMPUERTA DE BRONCE DE 1/2" pza 4.00 84.19 336.76 101.03 235.73
01.01.02.01.05 VALVULA COMPUERTA DE BRONCE DE 3/4" pza 1.00 87.00 87.00 26.10 60.90
01.01.02.01.06 TANQUE DE POLIETILENO DE 2.500 Lt. und 1.00 4,587.29 4,587.29 1,376.19 3,211.10
01.01.02.02 DESAGUE PARA LA CONSTRUCCION 2,909.36
01.01.02.02.01 SALIDA DE DESAGUE PVC SAL 2" pto 4.00 86.08 344.32 103.30 241.02
01.01.02.02.02 SALIDA DE DESAGUE PVC SAL 4" pto 4.00 98.94 395.76 118.73 277.03
01.01.02.02.03 TUBERIA PVC SAL Ø 4" m 54.00 27.04 1,460.16 438.05 1,022.11
01.01.02.02.04 TUBERIA PVC SAL Ø 2" m 32.00 22.16 709.12 212.74 496.38
01.01.02.03 ENERGIA ELETRICA PROVISIONAL 19,359.13
SALIDA PARA ALUMBRADO PROVISIONAL EN PARED Y/O TECHO CON TUB. PVC
01.01.02.03.01 pto 75.00 80.87 6,065.25 1,819.58 4,245.67
SAP 20 mm ( LSOH 4 mm2 )
SALIDA DE FUERZA, PARA EQUIPOS ESPECIALES CON TUB. PVC SAP 20 mm ( 2 x
01.01.02.03.02 pto 25.00 178.67 4,466.75 1,340.03 3,126.72
4mm2 LSOH )
01.01.02.03.03 TUBERIA PVC SAP ( ELECTRICAS ) D = 20 mm m 550.00 4.01 2,205.50 661.65 1,543.85
01.01.02.03.04 CABLE ELECTRICO LSOH 4 mm2 m 945.00 2.77 2,617.65 785.30 1,832.35
TABLERO DISTRIBUCION CAJA METALICA CON 12 POLOS ( DEL TIPO PARA
01.01.02.03.05 pza 6.00 667.33 4,003.98 1,201.19 2,802.79
ADOSAR )
01.01.02.04 INSTALACIONES TELEFONICA Y COMUNICACION PROVISIONAL 1,251.30
01.01.02.04.01 SALIDA PARA TELEFONO PUBLICO pto 1.00 477.01 477.01 143.10 333.91

83 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD

02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD 327,766.50 112,575.74 188,785.31 4,670.71 4,450.37 4,622.81 4,586.60 2,365.69 2,402.28 2,165.68 1,141.31
01.01.02.04.02 SALIDA PARA TELEFONO EXTERNO - INTERNO pto 4.00 68.51 274.04 82.21 191.83
01.01.02.04.03 TUBERIA PVC SAP ( ELECTRICAS ) D = 25 mm m 72.50 6.90 500.25 150.08 350.17
01.02 TRABAJOS PRELIMINARES 111,065.54
01.02.01 LIMPIEZA DEL TERRENO 3,665.50
01.02.01.01 LIMPIEZA DE TERRENO A MANO m2 1,094.18 3.35 3,665.50 1,099.65 2,565.85
01.02.02 DESMONTAJES 4,252.65
01.02.02.01 DESMONTAJE DE APARATOS SANITARIOS pza 8.00 23.97 191.76 191.76
01.02.02.02 DESMONTAJE DE ARTEFACTOS DE ILUMINACION pza 13.00 32.97 428.61 428.61
01.02.02.03 DESMONTAJE DE PUERTA DE MADERA m2 24.36 17.99 438.24 438.24
01.02.02.04 DESMONTAJE DE VENTANA DE ALUMINIO m2 13.25 10.27 136.08 136.08
01.02.02.05 DESMONTAJE DE TABIQUERIA DE MADERA m2 37.80 17.50 661.50 661.50
01.02.02.06 DESMONTAJE DE PUERTA DE FIERRO m2 15.98 26.97 430.98 430.98
01.02.02.07 DESMONTAJE DE COBERTURA DE PLANCHA ONDULADA GALVANIZADA m2 417.30 4.71 1,965.48 1,965.48
01.02.03 REMOCIONES 309.63
01.02.03.01 REMOCION DE PISO DE CERAMICO m2 53.08 3.35 177.82 177.82
01.02.03.02 REMOCION DE ZOCALO DE CERAMICO m2 24.50 5.38 131.81 131.81
01.02.04 DEMOLICIONES 52,697.64
01.02.04.01 DEMOLICION DE MURO DE ANCHO 0.15 M m2 70.73 11.44 809.15 242.75 566.40
01.02.04.02 DEMOLICION DE MURO DE ANCHO 0.40 M m2 51.85 14.62 758.05 227.42 530.63
01.02.04.03 DEMOLICION DE MURO DE ANCHO 0.70 M m2 20.72 18.80 389.54 116.86 272.68
01.02.04.04 DEMOLICION DE MURO DE ANCHO 0.90 M m2 38.99 21.92 854.66 256.40 598.26
01.02.04.05 DEMOLICION DE FALSO PISO INC. CONTRAPISO m2 1,086.25 26.82 29,133.23 5,739.97 23,393.26
01.02.04.06 DEMOLICION DE SOBRECIMIENTO C/ EQUIPO m3 32.65 92.95 3,034.82 910.45 2,124.37
01.02.04.07 DEMOLICION DE CIMIENTOS C/ EQUIPO m3 181.39 83.31 15,111.60 2,533.48 12,578.12
01.02.04.08 DEMOLICION DE COLUMNA DE CONCRETO m3 17.22 151.37 2,606.59 781.98 1,824.61
01.02.05 ELIMINACION DE MATERIAL PROCEDENTE DE DEMOLICIONES 24,465.91
01.02.05.01 ELIMINACION DE MATERIAL, CARGADOR 125 HP / VOLQUETE 6 M3, D = 30 KM m3 630.89 38.78 24,465.91 7,339.77 17,126.14
01.02.06 MOVILIZACION DE CAMPAMENTO, MAQUINARIA Y HERRAMIENTAS 16,162.36
01.02.06.01 MOVILIZACION Y DESMOLIZACION DE EQUIPOS est 1.00 11,092.96 11,092.96 861.64 1,220.12 1,220.12 1,267.21 1,220.12 1,293.66 1,220.12 1,293.66 1,020.11 476.20
01.02.06.02 TRANSPORTE VERTICAL DE MATERIALES mes 6.00 844.90 5,069.40 980.08 1,047.68 980.08 1,047.68 1,013.88
01.02.07 TRAZOS, NIVELES Y REPLANTEO 9,511.85
01.02.07.01 TRAZOS, NIVELES Y REPLANTEO PRELIMINAR CON EQUIPO m2 1,086.25 1.71 1,857.49 1,809.59 47.90
01.02.07.02 REPLANTEO DURANTE EL PROCESO m2 5,546.64 1.38 7,654.36 2,933.63 1,209.44 1,131.41 1,209.44 1,170.44
01.03 SEGURIDAD Y SALUD 159,334.60
ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y
01.03.01 glb 1.00 23,722.50 23,722.50 7,489.00 16,233.50
SALUD EN EL TRABAJO
01.03.02 EQUIPOS DE PROTECCION INDIVIDUAL und 80.00 429.02 34,321.60 10,728.64 23,592.96
01.03.03 EQUIPOS DE PROTECCION COLECTIVA und 1.00 31,633.00 31,633.00 10,653.20 20,979.80
01.03.04 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 16,340.00 16,340.00 6,536.00 9,804.00
01.03.05 CAPACITACION EN SEGURIDAD Y SALUD glb 1.00 9,977.50 9,977.50 295.63 1,145.57 1,145.57 1,071.67 1,145.57 1,108.62 1,145.57 1,108.62 1,145.57 665.11
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD
01.03.06 glb 1.00 43,340.00 43,340.00 15,336.00 28,004.00
DURANTE EL TRABAJO

TOTAL COSTO DIRECTO 327,766.50 112,575.74 188,785.31 4,670.71 4,450.37 4,622.81 4,586.60 2,365.69 2,402.28 2,165.68 1,141.31
GASTOS GENERALES 8% 8.00% 26,221.32 9,006.06 15,102.82 373.66 356.03 369.82 366.93 189.26 192.18 173.25 91.30

84 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD

02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD 327,766.50 112,575.74 188,785.31 4,670.71 4,450.37 4,622.81 4,586.60 2,365.69 2,402.28 2,165.68 1,141.31
UTILIDAD 8% 8.00% 26,221.32 9,006.06 15,102.82 373.66 356.03 369.82 366.93 189.26 192.18 173.25 91.30
PARCIAL 380,209.14 130,587.86 218,990.95 5,418.03 5,162.43 5,362.45 5,320.46 2,744.21 2,786.64 2,512.18 1,323.91
FACTOR DE RELACION (0.90000) 0.90000 342,188.23 117,529.07 197,091.86 4,876.23 4,646.19 4,826.21 4,788.41 2,469.79 2,507.98 2,260.96 1,191.51
IGV 18.00% 61,593.87 21,155.23 35,476.53 877.72 836.31 868.72 861.91 444.56 451.44 406.97 214.45
PRESUPUESTO TOTAL 403,782.10 138,684.30 232,568.39 5,753.95 5,482.50 5,694.93 5,650.32 2,914.35 2,959.42 2,667.93 1,405.96
AVANCE PARCIAL - 34.35% 57.60% 1.43% 1.36% 1.41% 1.40% 0.72% 0.73% 0.66% 0.35%
AVANCE ACUMULADO 0.0% 34.35% 91.94% 93.37% 94.73% 96.14% 97.54% 98.26% 98.99% 99.65% 100.00%

85 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO ESTRUCTURAS

CONSORCIO RIMAC
CALENDARIO DE ACTIVIDADES VALORIZADO DE ESTRUCTURAS ACTUALIZADO A LA FECHA DE INICIO DE OBRA
LP Nº 003-2015-EF/43
: "AMPLIACIÓN Y MEJORAMIENTO DE LOS SERVICIOS COMPLEMENTARIOS DE LA SEDE CENTRAL DEL MINISTERIO DE ECONOMÍA Y FINANZAS, CERCADO
OBRA
DE LIMA - LIMA"
UBICACIÓN : LIMA - LIMA - LIMA
FECHA BASE :31/11/2014
PROPIETARIO : MINISTERIO DE ECONOMÍA Y FINANZAS 12/31/2015
CONTRATISTA : CONSORCIO T y M 0.00% 1.26% 10.45% 13.51% 19.97% 26.51% 15.38% 10.39% 2.52% 0.00%
FECHA DE INICIO : 02/12/2015 1.00% 1.01% 1.01% 1.01% 1.01% 1.01% 1.01% 1.01% 1.01% 1.00%
- 53,239.41 440,769.08 569,813.84 842,065.66 1,117,907.57 648,533.26 438,022.07 106,056.82 -
02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 ###
31/12/2015
01 ESTRUCTURAS 4,216,407.71 - 53,239.41 440,769.08 569,813.84 842,065.66 1,117,907.57 648,533.26 438,022.07 106,056.82 -
01.01 MOVIMIENTO DE TIERRAS 627,349.24
01.01.01 NIVELACION DEL TERRENO 4,420.49
01.01.01.01 REFINE, NIVEL. Y COMPACT./ TERRENO NORMAL / CON COMPACTADORA m2 1,094.18 4.04 4,420.49 885.19 1,353.02 1,309.37 872.91
01.01.02 EXCAVACIONES 130,723.50
01.01.02.01 EXCAVACIONES MASIVAS m3 10,557.98 12.14 128,173.88 6,179.70 24,148.78 19,300.47 78,544.93
01.01.02.02 EXCAVACIONES SIMPLES m3 76.04 33.53 2,549.62 679.90 878.20 821.54 169.98
01.01.03 RELLENOS 3,095.21
01.01.03.01 RELLENO COMPACTADO A MANO CON MATERIAL PROPIO m3 123.66 25.03 3,095.21 1,120.77 987.22 987.22
01.01.04 ELIMINACION DE MATERIAL EXCEDENTE 489,110.04
01.01.04.01 ELIMINACION DE MATERIAL, CARGADOR 125 HP / VOLQUETE 6 M3, D = 30 KM m3 12,612.43 38.78 489,110.04 30,429.34 98,471.24 167,602.12 192,607.34
01.02 OBRAS DE CONCRETO SIMPLE 44,199.95
01.02.01 SOLADOS 17,924.02
01.02.01.01 CONCRETO F'C = 100 Kg/cm2 E = 2" - SOLADOS m2 411.29 43.58 17,924.02 6,848.48 4,238.79 3,965.32 2,871.43
01.02.02 CIMIENTOS 3,008.54
01.02.02.01 CONCRETO CICLOPEO F'C = 100 Kg/cm2 + 30% P.G. - CIMIENTOS CORRIDOS m3 9.25 242.79 2,245.81 1,087.33 417.59 390.65 350.24
01.02.02.02 ENCOFRADO Y DESENCOFRADO NORMAL CIMIENTOS CORRIDOS m2 36.99 20.62 762.73 399.66 130.87 122.43 109.77
01.02.03 SOBRECIMIENTOS 1,496.43
01.02.03.01 CONCRETO F'C = 140 Kg/cm2 + 25% P.M. - SOBRECIMIENTOS m3 1.95 246.27 480.23 259.95 103.47 100.13 16.68
01.02.03.02 ENCOFRADO Y DESENCOFRADO NORMAL SOBRECIMIENTOS m2 22.29 45.59 1,016.20 507.94 238.73 231.03 38.50
01.02.04 CALZADURAS 21,770.96
01.02.04.01 CONCRETO CICLOPEO F'C = 100 Kg/cm2 + 40% P.G. - CALZADURAS m3 61.53 278.81 17,155.18 5,044.79 4,541.16 4,312.70 3,256.53
01.02.04.02 ENCOFRADO Y DESENCOFRADO NORMAL CALZADURAS m2 102.55 45.01 4,615.78 2,570.21 893.14 835.52 316.91
01.03 OBRAS DE CONCRETO ARMADO 3,352,641.68
01.03.01 CIMIENTOS ARMADOS 4,981.05
01.03.01.01 CONCRETO F'C = 210 Kg/cm2 CIMIENTOS REFORZADOS m3 8.72 276.66 2,412.48 1,690.10 322.29 344.52 55.57
01.03.01.02 ENCOFRADO Y DESENCOFRADO NORMAL CIMIENTOS REFORZADOS m2 58.15 25.62 1,489.80 848.42 286.15 305.89 49.34
01.03.01.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 273.80 3.94 1,078.77 359.59 347.60 371.58
01.03.02 ZAPATAS AISLADAS 26,194.97
01.03.02.01 CONCRETO F'C = 245 Kg/cm2 ZAPATAS AISLADAS m3 49.44 311.46 15,398.58 10,987.79 1,827.33 1,953.35 630.11
01.03.02.02 ENCOFRADO Y DESENCOFRADO NORMAL ZAPATAS AISLADAS m2 75.12 57.29 4,303.62 2,108.83 909.27 971.98 313.54
01.03.02.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 1,647.91 3.94 6,492.77 1,803.55 2,092.11 2,236.40 360.71
01.03.03 ZAPATAS COMBINADAS 118,337.03
01.03.03.01 CONCRETO F'C = 245 Kg/cm2 ZAPATAS COMBINADAS m3 239.42 311.46 74,569.75 53,209.90 8,849.08 9,459.36 3,051.41
01.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL ZAPATAS COMBINADAS m2 258.37 57.29 14,802.02 7,253.16 3,127.38 3,343.06 1,078.42
01.03.03.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 7,351.59 3.94 28,965.26 8,045.91 9,333.25 9,976.92 1,609.18
01.03.04 MURO ANCLADOS 179,346.73
01.03.04.01 CONCRETO F'C = 245 Kg/cm2 MUROS ANCLADOS m3 194.06 479.04 92,962.50 41,225.62 17,651.41 18,868.74 15,216.73
01.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL MUROS ANCLADOS m2 646.85 51.06 33,028.16 14,224.84 6,415.25 6,857.68 5,530.39
01.03.04.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 13,542.15 3.94 53,356.07 5,928.45 17,192.51 18,378.20 11,856.91

86 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO ESTRUCTURAS

02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 ###
31/12/2015
01.03.05 MUROS DE CONCRETO, TABIQUES DE CONCRETO Y PLACAS 825,133.65
01.03.05.01 CONCRETO F'C = 245 Kg/cm2 MUROS DE CONCRETO, TABIQUES DE CONCRETO Y PLACAS m3 704.32 539.85 380,227.15 44,688.39 86,718.74 49,940.72 98,329.73 59,940.72 40,608.85
ENCOFRADO Y DESENCOFRADO NORMAL MUROS DE CONCRETO, TABIQUES DE CONCRETO Y
01.03.05.02 m2 3,334.90 51.06 170,279.99 14,478.10 19,844.68 31,213.28 70,528.98 21,213.28 13,001.67
PLACAS
01.03.05.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 69,702.16 3.94 274,626.51 27,462.65 53,094.46 56,756.15 54,925.30 56,756.15 25,631.80
01.03.06 COLUMNAS 174,829.68
01.03.06.01 CONCRETO F'C = 245 Kg/cm2 COLUMNAS m3 90.68 479.04 43,439.35 20,401.50 4,948.87 5,290.17 5,119.52 5,290.17 2,389.12
01.03.06.02 ENCOFRADO Y DESENCOFRADO NORMAL COLUMNAS m2 383.70 51.92 19,921.70 9,292.24 2,283.37 2,440.84 2,362.10 2,440.84 1,102.31
01.03.06.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 28,291.53 3.94 111,468.63 14,862.48 21,550.60 23,036.85 22,293.73 23,036.85 6,688.12
01.03.07 COLUMNAS DE AMARRE 80,462.34
01.03.07.01 CONCRETO F'C = 175 Kg/cm2 COLUMNAS DE AMARRE m3 53.73 431.27 23,172.14 9,731.61 5,040.20 5,208.20 3,192.13
01.03.07.02 ENCOFRADO Y DESENCOFRADO NORMAL COLUMNAS DE AMARRE m2 674.75 51.92 35,033.02 16,571.50 6,923.07 7,153.84 4,384.61
01.03.07.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 5,649.03 3.94 22,257.18 3,709.53 7,419.06 7,666.36 3,462.23
01.03.08 VIGAS F'C = 210 Kg/cm2 519,364.00
01.03.08.01 CONCRETO F'C = 210 Kg/cm2 VIGAS m3 536.21 319.88 171,522.85 85,660.30 29,167.70 28,226.81 28,468.04
01.03.08.02 ENCOFRADO Y DESENCOFRADO NORMAL VIGAS m2 1,919.60 61.77 118,573.69 73,536.80 23,269.06 21,767.83
01.03.08.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 58,189.71 3.94 229,267.46 63,685.41 78,969.90 76,422.49 10,189.66
01.03.09 VIGAS F'C = 245 Kg/cm2 200,473.26
01.03.09.01 CONCRETO F'C = 245 Kg/cm2 VIGAS m3 195.00 354.73 69,172.35 48,293.32 10,610.65 10,268.38
01.03.09.02 ENCOFRADO Y DESENCOFRADO NORMAL VIGAS m2 689.86 61.77 42,612.65 19,683.59 7,822.86 8,362.36 6,743.84
01.03.09.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 22,509.71 3.94 88,688.26 28,577.33 30,548.18 29,562.75
01.03.10 VIGAS DE AMARRE 70,719.24
01.03.10.01 CONCRETO F'C = 210 Kg/cm2 VIGAS DE AMARRE m3 37.14 308.31 11,450.63 7,826.91 1,872.26 1,751.46
01.03.10.02 ENCOFRADO Y DESENCOFRADO NORMAL VIGAS DE AMARRE m2 726.88 60.22 43,772.71 27,470.05 8,423.04 7,879.62
01.03.10.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 3,932.97 3.94 15,495.90 860.88 5,165.30 5,337.48 4,132.24
01.03.11 LOSA SOLIDA 66,071.11
01.03.11.01 CONCRETO F'C = 245 Kg/cm2 LOSA SOLIDA m3 79.41 354.73 28,169.11 19,666.53 4,320.98 4,181.60
01.03.11.02 ENCOFRADO Y DESENCOFRADO NORMAL LOSA SOLIDA m2 397.06 45.28 17,978.88 8,494.20 3,235.95 3,459.12 2,789.61
01.03.11.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 5,056.63 3.94 19,923.12 6,419.67 6,862.41 6,641.04

01.03.12 LOSA ALIGERADA CONVENCIONAL, H = 0.20 M CONCRETO F'C = 210 Kg/cm2 ( EN 1 DIRECCION ) 60,337.47

01.03.12.01 CONCRETO F'C = 210 Kg/cm2 LOSA ALIGERADA CONVENCIONAL, H = 0.20 M ( EN 1 DIRECCION ) m3 62.21 300.54 18,696.59 11,991.13 2,969.56 2,873.77 862.13

ENCOFRADO Y DESENCOFRADO NORMAL LOSA ALIGERADA CONVENCIONAL, H = 0.20 M ( EN 1


01.03.12.02 m2 711.08 37.46 26,637.06 17,031.79 4,962.72 4,642.55
DIRECCION )
01.03.12.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 260.29 3.94 1,025.54 284.87 353.24 341.85 45.58
01.03.12.04 LADRILLO ARCILLA PARA TECHO 15 x 30 x 30 cm und 5,923.00 2.36 13,978.28 3,882.86 4,814.74 4,659.43 621.25

01.03.13 LOSA ALIGERADA CONVENCIONAL, H = 0.20 M CONCRETO F'C = 245 Kg/cm2 ( EN 1 DIRECCION ) 30,791.04

01.03.13.01 CONCRETO F'C = 245 Kg/cm2 LOSA ALIGERADA CONVENCIONAL, H = 0.20 M ( EN 1 DIRECCION ) m3 31.57 300.54 9,488.05 6,085.20 1,506.98 1,458.37 437.50

ENCOFRADO Y DESENCOFRADO NORMAL LOSA ALIGERADA CONVENCIONAL, H = 0.20 M ( EN 1


01.03.13.02 m2 360.81 37.46 13,515.94 8,642.12 2,518.14 2,355.68
DIRECCION )
01.03.13.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 175.86 3.94 692.89 192.47 238.66 230.96 30.80
01.03.13.04 LADRILLO ARCILLA PARA TECHO 15 x 30 x 30 cm und 3,006.00 2.36 7,094.16 1,970.60 2,443.54 2,364.72 315.30

01.03.14 LOSA ALIGERADA CONVENCIONAL, H = 0.20 M CONCRETO F'C = 210 Kg/cm2 ( EN 2 DIRECCION ) 126,401.24

01.03.14.01 CONCRETO F'C = 210 Kg/cm2 LOSA ALIGERADA CONVENCIONAL, H = 0.20 M ( EN 2 DIRECCION ) m3 81.97 362.94 29,750.19 21,566.67 3,624.13 3,507.22 1,052.17

ENCOFRADO Y DESENCOFRADO NORMAL LOSA ALIGERADA CONVENCIONAL, H = 0.20 M ( EN 2


01.03.14.02 m2 709.09 40.01 28,370.69 18,789.47 4,950.30 4,630.92
DIRECCION )
01.03.14.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 14,675.34 3.94 57,820.84 16,061.34 19,916.07 19,273.61 2,569.82

87 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO ESTRUCTURAS

02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 ###
31/12/2015
01.03.14.04 LADRILLO ARCILLA PARA TECHO 15 x 30 x 30 cm und 4,432.00 2.36 10,459.52 2,905.42 3,602.72 3,486.51 464.87

01.03.15 LOSA ALIGERADA CONVENCIONAL, H = 0.20 M CONCRETO F'C = 245 Kg/cm2 ( EN 2 DIRECCION ) 51,116.87

01.03.15.01 CONCRETO F'C = 245 Kg/cm2 LOSA ALIGERADA CONVENCIONAL, H = 0.20 M ( EN 2 DIRECCION ) m3 30.79 335.77 10,338.36 7,009.26 1,474.32 1,426.76 428.02

ENCOFRADO Y DESENCOFRADO NORMAL LOSA ALIGERADA CONVENCIONAL, H = 0.20 M ( EN 2


01.03.15.02 m2 266.35 40.01 10,656.66 7,057.74 1,859.44 1,739.48
DIRECCION )
01.03.15.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 6,647.83 3.94 26,192.45 7,275.68 9,021.84 8,730.82 1,164.11
01.03.15.04 LADRILLO ARCILLA PARA TECHO 15 x 30 x 30 cm und 1,665.00 2.36 3,929.40 1,091.50 1,353.46 1,309.80 174.64
01.03.16 ESCALERAS 21,226.63
01.03.16.01 CONCRETO F'C = 210 Kg/cm2 ESCALERAS m3 15.53 456.24 7,085.41 3,530.78 1,574.19 1,523.41 457.03
01.03.16.02 ENCOFRADO Y DESENCOFRADO NORMAL ESCALERAS m2 92.04 78.25 7,202.13 4,113.64 1,595.72 1,492.77
01.03.16.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 1,761.19 3.94 6,939.09 1,927.53 2,390.13 2,313.03 308.40
01.03.17 CISTERNAS SUBTERRANEAS 61,251.23
01.03.17.01 CONCRETO F'C = 280 Kg/cm2 CISTERNAS SUBTERRANEAS m3 60.21 518.04 31,191.19 17,208.22 5,992.70 6,192.46 1,797.81
01.03.17.02 ENCOFRADO Y DESENCOFRADO NORMAL CISTERNAS SUBTERRANEAS m2 188.22 41.89 7,884.54 4,070.99 1,634.38 1,688.86 490.31
01.03.17.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 5,628.30 3.94 22,175.50 6,159.86 7,391.83 7,638.23 985.58
01.03.18 RAMPA APOYADA EN TERRENO 232.71
01.03.18.01 CONCRETO F'C = 175 Kg/cm2 RAMPAS APOYADA EN TERRENO m3 0.48 265.92 127.64 86.06 25.78 15.80
01.03.18.02 ENCOFRADO Y DESENCOFRADO NORMAL RAMPAS m2 1.27 45.28 57.51 30.74 16.60 10.17
01.03.18.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 12.07 3.94 47.56 11.89 24.57 11.10
01.03.19 RAMPA DE CONCRETO F'C = 210 Kg/cm2 36,379.81
01.03.19.01 CONCRETO F'C = 210 Kg/cm2 RAMPA DE CONCRETO ARMADO m3 49.40 298.33 14,737.50 11,448.05 1,672.60 1,616.85
01.03.19.02 ENCOFRADO Y DESENCOFRADO NORMAL RAMPAS m2 247.92 45.28 11,225.82 5,303.69 2,159.84 2,090.16 1,672.13
01.03.19.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 2,643.78 3.94 10,416.49 3,587.90 3,472.16 3,356.43
01.03.20 RAMPA DE CONCRETO F'C = 245 Kg/cm2 52,308.94
01.03.20.01 CONCRETO F'C = 245 Kg/cm2 RAMPA DE CONCRETO ARMADO m3 70.84 298.33 21,133.70 16,416.60 2,398.53 2,318.57
01.03.20.02 ENCOFRADO Y DESENCOFRADO NORMAL RAMPAS m2 354.19 45.28 16,037.72 7,577.09 3,085.64 2,986.10 2,388.89
01.03.20.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 3,842.01 3.94 15,137.52 5,214.03 5,045.84 4,877.65
01.03.21 DINTELES 798.03
01.03.21.01 CONCRETO F'C = 210 Kg/cm2 DINTELES m3 0.58 325.34 188.70 120.26 32.64 31.59 4.21
01.03.21.02 ENCOFRADO Y DESENCOFRADO NORMAL DINTELES m2 6.37 49.94 318.12 218.91 51.26 47.95
01.03.21.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 73.91 3.94 291.21 80.89 100.31 97.07 12.94
01.03.22 COLGAJOS 4,448.37
01.03.22.01 CONCRETO F'C = 210 Kg/cm2 COLGAJOS m3 3.75 343.22 1,287.08 720.63 234.13 226.58 105.74
01.03.22.02 ENCOFRADO Y DESENCOFRADO NORMAL COLGAJOS m2 68.46 35.24 2,412.53 1,398.48 449.08 434.59 130.38
01.03.22.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 190.04 3.94 748.76 124.79 257.91 249.59 116.47
01.03.23 CANALETA DE CONCRETO 26,086.06
01.03.23.01 CONCRETO F'C = 210 Kg/cm2 CANALETA DE CONCRETO m3 38.12 360.21 13,731.21 6,929.51 3,778.72 3,022.98
01.03.23.02 ENCOFRADO Y DESENCOFRADO NORMAL CANALETA DE CONCRETO m2 103.99 41.89 4,356.14 1,918.10 1,354.47 1,083.57
01.03.23.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 2,030.13 3.94 7,998.71 1,466.43 3,999.36 2,532.92
01.03.24 CAMARAS SUMIDERO 1,307.84
01.03.24.01 CONCRETO F'C = 280 Kg/cm2 CAMARA SUMIDERO m3 1.41 437.01 616.18 366.43 154.85 94.90
01.03.24.02 ENCOFRADO Y DESENCOFRADO NORMAL CAMARA SUMIDERO m2 9.68 41.89 405.50 216.37 130.29 58.84
01.03.24.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 72.63 3.94 286.16 47.69 147.85 90.62
01.03.25 CAMARA DE BOMBEO 2,048.85
01.03.25.01 CONCRETO F'C = 280 Kg/cm2 CAMARA DE BOMBEO m3 2.47 437.01 1,079.41 598.14 271.26 210.01
01.03.25.02 ENCOFRADO Y DESENCOFRADO NORMAL CAMARA DE BOMBEO m2 17.97 33.52 602.35 349.01 157.07 96.27
01.03.25.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 93.17 3.94 367.09 30.59 189.66 146.84
01.03.26 SUMINISTRO DE ANCLAJE POSTENSADO 535,513.71
01.03.26.01 ANCLAJE TEMPORALES CARGA ( ton ) 30 - 90 und 123.00 3,968.52 488,127.96 153,386.65 244,063.98 90,677.33
01.03.26.02 TENSADO ( ton ) 30 - 90 und 123.00 385.25 47,385.75 19,744.06 23,692.88 3,948.81

88 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO ESTRUCTURAS

02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 ###
31/12/2015
01.03.27 LOSA DE CONCRETO PARA ESTACIONAMIENTO 76,479.82
01.03.27.01 CONCRETO F'C = 210 Kg/cm2 PAVIMENTO DE CONCRETO ARMADO m3 107.39 395.28 42,449.12 18,784.49 8,352.22 8,630.63 6,681.78
01.03.27.02 ENCOFRADO Y DESENCOFRADO NORMAL PAVIMENTO DE CONCRETO m2 30.00 32.84 985.20 78.48 320.02 330.69 256.01
01.03.27.03 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 3,278.17 3.94 12,915.99 1,435.11 4,305.33 4,448.84 2,726.71
01.03.27.04 JUNTA DE POLIESTIRENO EXPANDIDO, E = 1/2"; H = 0.15 M m 87.20 7.63 665.34 221.78 229.17 214.39
01.03.27.05 JUNTA DE CONTRACCION C/ DISCO DE CORTE m 225.60 4.43 999.41 333.14 344.24 322.03
01.03.27.06 SELLO ELASTOMERICO DE POLIURETANO, E = 1/2"; H = 1/2" m 312.80 13.44 4,204.03 1,401.34 1,448.05 1,354.64
01.03.27.07 TRATAMIENTO Y COMPACTACION DE SUBRASANTE ( INC. RIEGO ) m2 715.90 1.59 1,138.28 345.42 317.14 327.71 148.01
01.03.27.08 MATERIAL GRANULAR PARA PAVIMENTO DE CONCRETO, E = 0.20 M m2 715.90 18.33 13,122.45 3,026.35 4,326.90 4,471.13 1,298.07
01.04 VARIOS 72,160.52
01.04.01 JUNTAS 72,160.52
01.04.01.01 JUNTA DE POLIESTIRENO EXPANDIDO, ANCHO = 0.15 M ( E = 2 cm ) m 897.57 1.68 1,507.92 368.60 1,005.28 134.04
01.04.01.02 JUNTA DE POLIESTIRENO EXPANDIDO, ANCHO = 0.25 M ( E = 2 cm ) m 232.71 2.54 591.08 144.49 394.05 52.54
01.04.01.03 JUNTA DE DILATACION SISMICA, E = 2" m 1,849.94 24.08 44,546.56 10,889.16 29,697.71 3,959.69
01.04.01.04 JUNTA DE DILATACION SISMICA, E = 4" m 365.63 28.44 10,398.52 2,541.86 6,932.35 924.31
01.04.01.05 JUNTA DE PVC, TIPO WATER STOP 9" O SIMILAR m 151.27 50.35 7,616.44 1,861.80 5,077.63 677.01
01.04.01.06 PRUEBAS DE RESISTENCIA DE CONCRETO est 1.00 7,500.00 7,500.00 1,833.33 5,000.00 666.67
01.05 ESTRUCTURAS METALICAS 120,056.32
01.05.01 TIJERALES METALICOS 20,496.67
01.05.01.01 TIJERAL METALICO T-1 kg 1,141.24 17.96 20,496.67 3,074.50 6,353.97 6,149.00 4,919.20
01.05.02 VIGAS METALICAS 81,295.58
01.05.02.01 VIGUETA METALICA VIG- 1 kg 2,336.52 17.96 41,963.90 6,294.59 13,008.81 12,589.17 10,071.33
01.05.02.02 VIGUETA METALICA VIG- 2 kg 2,189.96 17.96 39,331.68 5,899.75 12,192.82 11,799.50 9,439.61
01.05.03 ARRIOSTRES METALICOS 8,705.93
01.05.03.01 ARRIOSTRE METALICO Ø 3/8" kg 256.28 17.96 4,602.79 690.42 1,426.86 1,380.84 1,104.67
01.05.03.02 ARRIOSTRE METALICO Ø 5/8" kg 228.46 17.96 4,103.14 615.47 1,271.97 1,230.94 984.76
01.05.04 VARIOS 9,558.14
01.05.04.01 ANCLAJE DE ARRIOSTRE EN BRIDA SUPERIOR - x1 PLANCHA TRIANGULAR 100 x 100 x 6 mm kg 169.56 17.96 3,045.30 456.80 944.04 913.59 730.87
01.05.04.02 ANCLAJE DE VIGUETAS EN PARAPETO - x1 PLANCHA 100 x 100 x 4.5 mm kg 170.86 17.96 3,068.65 460.30 951.28 920.60 736.47
01.05.04.03 ANCLAJE EN APOYO DE TIJERAL - x1 PLANCHA 450 x 750 x 9.5 mm kg 184.46 17.96 3,312.90 496.94 1,027.00 993.87 795.09
01.05.04.04 PLATINA 3" x 3/16" kg 7.31 17.96 131.29 19.69 40.70 39.39 31.51

TOTAL COSTO DIRECTO 4,216,407.71 0.00 53,239.41 440,769.08 569,813.84 842,065.66 1,117,907.57 648,533.26 438,022.07 106,056.82 0.00
GASTOS GENERALES 8.00% 8.00% 337,312.62 - 4,259.15 35,261.53 45,585.11 67,365.25 89,432.61 51,882.66 35,041.77 8,484.55 -
UTILIDAD 8.00% 8.00% 337,312.62 - 4,259.15 35,261.53 45,585.11 67,365.25 89,432.61 51,882.66 35,041.77 8,484.55 -
PARCIAL 4,891,032.95 - 61,757.71 511,292.14 660,984.06 976,796.16 1,296,772.79 752,298.58 508,105.61 123,025.92 -
FACTOR DE RELACION (0.90000) 0.90000 4,401,929.66 - 55,581.94 460,162.93 594,885.65 879,116.54 1,167,095.51 677,068.72 457,295.05 110,723.33 -0.01
IGV 18.00% 792,347.33 - 10,004.75 82,829.33 107,079.42 158,240.98 210,077.19 121,872.37 82,313.11 19,930.20 -0.02
PRESUPUESTO TOTAL 5,194,276.99 - 65,586.69 542,992.26 701,965.07 1,037,357.52 1,377,172.70 798,941.09 539,608.16 130,653.53 -0.03
AVANCE PARCIAL - 0.00% 1.26% 10.45% 13.51% 19.97% 26.51% 15.38% 10.39% 2.52% 0.00%
AVANCE ACUMULADO 0.0% 0.00% 1.26% 11.72% 25.23% 45.20% 71.72% 87.10% 97.49% 100.00% 100.00%

89 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO ARQUITECTURA

CALENDARIO DE ACTIVIDADES VALORIZADO DE ARQUITECTURA ACTUALIZADO A LA FECHA DE INICIO DE OBRA


LP Nº 003-2015-EF/43
: "AMPLIACIÓN Y MEJORAMIENTO DE LOS SERVICIOS COMPLEMENTARIOS DE LA SEDE CENTRAL DEL MINISTERIO DE ECONOMÍA Y FINANZAS, CERCADO DE
OBRA
LIMA - LIMA"
UBICACIÓN : LIMA - LIMA - LIMA
FECHA BASE :31/11/2014
PROPIETARIO : MINISTERIO DE ECONOMÍA Y FINANZAS 12/31/2015
CONTRATISTA : CONSORCIO T y M 0.01% 0.03% 0.03% 0.86% 4.40% 14.19% 24.11% 31.28% 19.13% 5.95%
FECHA DE INICIO : 02/12/2015 1.75% 1.75% 1.75% 1.76% 1.76% 1.76% 1.76% 1.76% 1.76% 1.75%
194.11 752.17 752.17 20,890.62 106,436.82 343,365.58 583,260.21 756,765.99 462,661.55 143,911.04
02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015
01 ARQUITECTURA 2,418,990.26 194.11 752.17 752.17 20,890.62 106,436.82 343,365.58 583,260.21 756,765.99 462,661.55 143,911.04
01.01 MUROS Y TABIQUES DE ALBAÑILERIA 283,745.06
01.01.01 MUROS Y TABIQUES DE ALBAÑILERIA 131,689.23
MUROS DE LADRILLO KING KONG DE ARCILLA ( A MAQUINA ) DE SOGA MEZCLA C:A 1:4; TIPO
01.01.01.01 m2 1,745.90 52.19 91,118.52 12,301.24 28,410.88 27,494.40 22,912.00
IV PARA TARRAJEO
MUROS DE LADRILLO KING KONG DE ARCILLA ( A MAQUINA ) DE CABEZA MEZCLA C:A 1:4;
01.01.01.02 m2 467.62 86.76 40,570.71 6,708.95 12,205.98 11,812.24 9,843.54
TIPO IV PARA TARRAJEO
01.01.02 MUROS Y TABIQUES CON EL SISTEMA DE CONSTRUCCION EN SECO 137,798.37
01.01.02.01 TABIQUE UNA CARA DE DRYWALL, PLACA DE FIBROCEMENTO 12mm m2 28.57 61.23 1,749.34 97.19 602.55 583.11 466.49
01.01.02.02 PANEL ACUSTICO DE MDF TIPO FRESADO m2 256.02 531.40 136,049.03 7,558.28 16,861.33 85,349.68 26,279.74
01.01.03 TABIQUES CON ELEMENTOS LEVES ( MELAMINA ) 5,540.69
01.01.03.01 TABIQUE DE MELAMINA, H = 1.50 M, CON CRISTAL TEMPLADO DE 6 mm m 27.53 201.26 5,540.69 1,169.66 1,594.14 1,542.72 1,234.17
01.01.04 BARANDAS Y PARAPETOS 8,716.77
PARAPETO DE LADRILLO KING KONG DE ARCILLA ( A MAQUINA ) DE SOGA MEZCLA C:A 1:4;
01.01.04.01 m2 167.02 52.19 8,716.77 1,176.79 2,717.90 2,630.23 2,191.85
TIPO IV PARA TARRAJEO
01.02 REVOQUES Y REVESTIMIENTOS 380,986.01
01.02.01 REVOQUES, ENLUCIDOS Y MOLDURAS 282,754.54
01.02.01.01 TARRAJEO PRIMARIO Y RAYADO DE MUROS INTERIORES MEZC. C:A 1:5 m2 628.42 18.66 11,726.32 1,706.04 3,269.78 3,164.30 3,269.78 316.42
01.02.01.02 TARRAJEO FROTACHADO DE MUROS INTERIORES MEZC. C:A 1:5, E = 1.5 cm m2 4,109.96 17.30 71,102.31 10,954.27 19,627.26 18,994.12 19,627.26 1,899.40
01.02.01.03 TARRAJEO FROTACHADO DE MUROS EXTERIORES MEZC. C:A 1:5, E = 1.5 cm m2 1,233.14 22.59 27,856.63 3,672.95 7,891.52 7,636.95 7,891.52 763.69
01.02.01.04 TARRAJEO EN COLUMNAS MEZC. C:A 1:5, E = 1.5 cm m2 303.36 26.58 8,063.31 933.93 2,326.43 2,251.38 2,326.43 225.14
01.02.01.05 TARRAJEO DE VIGAS MEZC. C:A 1:5, E = 1.5 cm m2 991.66 35.56 35,263.43 3,498.22 10,365.49 10,031.12 10,365.49 1,003.11
01.02.01.06 TARRAJEO DE MUROS DE CONCRETO MEZC. C:A 1:5, E = 1.5 cm m2 1,029.42 28.99 29,842.89 3,293.24 8,663.57 8,384.10 8,663.57 838.41
01.02.01.07 TARRAJEO CON IMPERMEABILIZANTE MEZC. C:A 1:4, E = 1.5 cm m2 690.45 58.93 40,688.22 21,784.22 18,904.00
01.02.01.08 VESTIDURA DE DERRAMES, ANCHO = 0.15 M m 679.96 15.00 10,199.40 698.25 3,100.38 3,000.36 3,100.38 300.03
01.02.01.09 VESTIDURA DE DERRAMES, ANCHO = 0.25 M m 32.40 18.49 599.08 92.54 165.29 159.96 165.29 16.00
01.02.01.10 BRUÑAS DE 1 cm x 1 cm m 2,416.15 6.68 16,139.88 806.99 5,003.36 4,841.96 5,003.36 484.21
01.02.01.11 TARRAJEO EN FONDO DE ESCALERA m2 77.76 33.80 2,628.29 1,428.59 1,199.70
01.02.01.12 FORJADO DE GRADAS Y ESCALERAS DE CEMENTO FROTACHADO m2 76.28 26.96 2,056.51 1,130.52 925.99
01.02.01.13 FORJADO DE DESCANSO CON CEMENTO FROTACHADO m2 25.92 23.13 599.53 332.86 266.67
01.02.01.14 SOLAQUEO DE MUROS DE CONCRETO, COLUMNAS m2 1,549.00 8.49 13,151.01 2,292.86 3,832.29 3,960.03 3,065.83
01.02.01.15 SOLAQUEO DE VIGAS m2 1,512.10 8.49 12,837.73 2,238.24 3,741.00 3,865.70 2,992.79
01.02.02 REVESTIMIENTOS 98,231.47
01.02.02.01 REVESTIMIENTO DE SARDINEL DE CONCRETO CON PORCELANATO 60 cm x 60 cm m2 31.06 109.43 3,398.90 345.41 1,069.56 1,035.05 948.88
01.02.02.02 REVESTIMIENTO DE CANALETA CON CEMENTO PULIDO CON IMPERMEABILIZANTE m2 16.46 26.12 429.94 90.25 129.03 124.87 85.79
REVESTIMIENTO DE TABLERO DE CONCRETO CON TERRAZO PULIDO, ANCHO = 0.60 m
01.02.02.03 m 10.96 30.41 333.29 37.04 111.17 107.58 77.50
( SEGUN DISEÑO )
01.02.02.04 REVESTIMIENTO DE TABLERO DE CONCRETO CON PORCELANATO 60 cm x 60 cm m2 12.75 102.54 1,307.39 135.54 419.66 406.12 346.07
01.02.02.05 REVESTIMIENTO DE BANCA DE CONCRETO CON LISTONES DE MADERA CEDRO 4" x 1" m2 11.04 147.28 1,625.97 176.33 532.08 514.92 402.64

01.02.02.06 REVESTIMIENTO DE POYO DE CONCRETO PARA INODORO CON PORCELANATO 60 cm x 60 cm m2 0.79 96.27 76.05 8.41 26.02 25.18 16.44

01.02.02.07 REVESTIMIENTO DE CUNETA CON CEMENTO PULIDO E IMPERMEABILIZANTE m 5.21 15.70 81.80 16.27 27.68 26.79 11.06
01.02.02.08 REVESTIMIENTO DE MURO CON FACHALETA m2 109.60 65.79 7,210.58 727.76 2,256.06 2,183.28 2,043.48
REVESTIMIENTO CON PANEL DE ALUMINIO COMPUESTO, E = 4 mm, INC. SISTEMA DE
01.02.02.09 m2 98.84 761.40 75,256.78 7,549.21 23,402.55 22,647.63 21,657.39
FIJACION

90 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO ARQUITECTURA

02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015
01.02.02.10 REVESTIMIENTO DE GRADAS Y ESCALERAS CON TERRAZO PULIDO m2 76.28 91.99 7,017.00 1,299.25 1,994.09 1,929.76 1,793.90
01.02.02.11 REVESTIMIENTO DE DESCANSO DE ESCALERA CON TERRAZO PULIDO m2 25.92 57.63 1,493.77 196.71 461.66 446.76 388.64
01.03 CIELORRASOS 392,567.68
01.03.01 CIELORRASO CON MEZC. C:A 1:5, E = 1.5 cm m2 646.86 29.27 18,933.59 2,987.59 5,492.51 5,315.33 5,138.16
01.03.02 VESTIDURA DE FONDO DE TABLERO m2 18.35 23.14 424.62 91.96 117.41 121.32 93.93
01.03.03 SOLAQUEO DE CIELORRASOS m2 2,244.73 11.66 26,173.55 5,671.44 7,688.29 7,944.57 4,869.25
FALSO CIELORRASO CON BALDOSAS ACUSTICAS DE FIBRA MINERAL 0.61 m x 0.61 m, E = 5/8",
01.03.04 m2 421.68 120.52 50,820.87 7,623.13 15,246.26 15,754.47 12,197.01
TIPO A
FALSO CIELORRASO CON BALDOSAS ACUSTICAS DE FIBRA MINERAL 0.61 m x 0.61 m, E = 5/8",
01.03.05 m2 542.89 148.19 80,450.87 12,067.63 24,135.26 24,939.77 19,308.21
TIPO B
FALSO CIELORRASO CON BALDOSAS ACUSTICAS DE FIBRA MINERAL 0.61 m x 0.61 m, E = 5/8",
01.03.06 m2 26.14 166.10 4,341.85 651.28 1,302.55 1,345.97 1,042.05
TIPO C
FALSO CIELORRASO CON BALDOSAS ACUSTICAS DE FIBRA MINERAL 0.61 m x 0.61 m, E = 5/8",
01.03.07 m2 98.61 345.55 34,074.69 5,111.20 10,222.41 10,563.15 8,177.93
TIPO D
FALSO CIELORRASO CON BALDOSAS ACUSTICAS DE FIBRA MINERAL 0.61 m x 0.61 m, E = 5/8",
01.03.08 m2 221.02 735.98 162,666.30 24,399.95 48,799.89 50,426.55 39,039.91
TIPO E
FALSO CIELORRASO CON PLANCHA YESO GYPLAC STANDARD ST 1/2" ( 12.7 mm ) SIST.
01.03.09 m2 262.12 56.01 14,681.34 2,202.20 4,404.40 4,551.22 3,523.52
DRYWALL SUSPENDIDO
01.04 PISOS Y PAVIMENTOS 349,439.81
01.04.01 CONTRAPISOS 71,904.83
01.04.01.01 CONTRAPISO, E = 4.00 cm, BASE 3.00 cm, MEZC.1:5, ACABADO 1.00 cm, PASTA 1:2 m2 2,501.17 25.21 63,054.50 14,055.50 14,982.82 34,016.18
CONTRAPISO, E = 3.80 cm, BASE 2.80 cm, MEZC.1:5, ACABADO 1.00 cm, PASTA 1:2, ACABADO
01.04.01.02 m2 290.27 30.49 8,850.33 4,660.19 2,164.90 2,025.24
SEMI - PULIDO
01.04.02 PISOS 182,449.64
01.04.02.01 PISO DE PORCELANATO 60 x 60 cm, ALTO TRANSITO m2 1,525.17 96.69 147,468.69 36,881.59 45,709.34 44,234.84 20,642.92
01.04.02.02 PISO DE ALFOMBRA ALTO TRANSITO, E = 12 mm m2 239.23 88.52 21,176.64 5,294.16 6,564.76 6,352.99 2,964.73
01.04.02.03 PISO DE TERRAZO PULIDO m2 117.12 98.65 11,553.89 3,643.88 3,269.47 3,164.00 1,476.54
01.04.02.04 PISO DE MADERA MACHIHEMBRADA PUMAQUIRO 3/4" x 4" m2 51.03 44.10 2,250.42 1,131.35 462.55 447.63 208.89
01.04.03 PISOS DE CONCRETO 90,020.23
01.04.03.01 PISO DE CEMENTO FROTACHADO Y BRUÑADO, E = 2" m2 1,922.46 35.14 67,555.24 42,162.11 9,261.02 8,962.28 7,169.83
01.04.03.02 PISO DE CEMENTO SEMI - PULIDO Y BRUÑADO, E = 2" m2 617.17 36.40 22,464.99 8,510.88 5,089.15 4,924.98 3,939.98
01.04.04 SARDINELES 2,528.25
01.04.04.01 SARDINEL PERALTADO DE CONCRETO F'C = 140 Kg/cm2, H = 0.15 M; ANCHO = 0.15 M m 59.20 34.00 2,012.80 996.48 1,016.32
01.04.04.02 SARDINEL PERALTADO DE CONCRETO F'C = 140 Kg/cm2, H = 0.45 M; ANCHO = 0.15 M m 9.85 52.33 515.45 278.50 236.95
01.04.05 VEREDAS Y RAMPAS 2,536.86
VEREDA DE CONCRETO F'C = 175 Kg/cm2, E = 4", ACABADO EN CEMENTO SEMI - PULIDO Y
01.04.05.01 m2 4.53 47.41 214.77 161.76 53.01
BRUÑADO, INC. BASE GRANULAR
RAMPA DE CONCRETO F'C = 175 Kg/cm2, E = 2"; ACABADO EN CEMENTO FORTACHADO Y
01.04.05.02 m2 32.02 72.52 2,322.09 1,738.01 584.08
BRUÑADO
01.05 ZOCALOS Y CONTRAZOCALOS 73,975.88
01.05.01 ZOCALOS 42,453.64
01.05.01.01 ZOCALO DE PORCELANATO 60 x 60 cm m2 498.17 84.50 42,095.37 4,214.38 13,047.90 12,627.00 12,206.09
01.05.01.02 ZOCALO DE CEMENTO PULIDO m2 15.55 23.04 358.27 77.17 96.82 93.70 90.58
01.05.02 CONTRAZOCALOS 31,522.24
01.05.02.01 CONTRAZOCALO DE CEMENTO PULIDO, H = 0.10 M m 977.42 10.63 10,389.97 1,250.05 3,148.20 3,046.64 2,945.08
01.05.02.02 CONTRAZOCALO DE CEMENTO PULIDO CON IMPERMEABILIZANTE, H = 0.10 M m 106.42 9.38 998.22 122.80 301.53 291.81 282.08
01.05.02.03 CONTRAZOCALO DE PORCELANATO 60 x 60 cm, H = 0.10 M m 626.65 21.46 13,447.91 1,351.90 4,166.40 4,032.00 3,897.61
01.05.02.04 CONTRAZOCALO DE TERRAZO PULIDO, H = 0.10 M m 166.52 19.24 3,203.84 323.35 992.17 960.16 928.16
01.05.02.05 CONTRAZOCALO DE MADERA TORNILLO 3/4" x 4", H = 0.10 M m 79.64 16.47 1,311.67 140.27 403.48 390.47 377.45
01.05.02.06 CONTRAZOCALO RECTO EN GRADAS Y ESCALERAS DE TERRAZO PULIDO, H = 0.10 M m 106.77 20.33 2,170.63 218.97 672.24 650.55 628.87
01.06 COBERTURAS Y CUBIERTAS 46,089.28
01.06.01 COBERTURAS 21,580.56
01.06.01.01 COBERTURA DE POLICARBONATO CELULAR 8 mm TRASLUCIDO m2 92.44 87.53 8,091.27 1,294.60 2,427.38 2,508.29 1,861.00
COBERTURA DE PANEL TERMOACUSTICO CON PLANCHA DE ACERO ALUMINIZADA, ESPUMA
01.06.01.02 m2 379.98 35.50 13,489.29 1,753.61 4,046.79 4,181.68 3,507.21
DE POLIURETANO

91 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO ARQUITECTURA

02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015
01.06.02 CUBIERTAS 24,508.72
CUBIERTA DE MORTERO IMPERMEABILIZADO MEZC. C:A 1:4, E = 2", ACABADO EN CEMENTO
01.06.02.01 m2 538.18 45.54 24,508.72 9,121.16 5,962.68 5,770.34 3,654.54
PULIDO Y BRUÑADO
01.07 CARPINTERIA DE MADERA 325,564.68
01.07.01 PUERTAS 286,774.18
01.07.01.01 PUERTA CONTRAPLACADA, E = 50.1 mm CON MDF 6 mm LAMINADO m2 97.65 202.97 19,820.02 6,306.32 5,875.52 6,071.37 1,566.81
PUERTA CONTRAPLACADA, E = 50.1 mm CON MDF 6 mm LAMINADO Y PANEL ACUSTICO DE
01.07.01.02 m2 3.36 265.73 892.85 282.36 265.43 274.28 70.78
MDF TIPO FRESADO
01.07.01.03 SUMINISTRO E INSTALACION DE PARTICIONES ACUSTICAS m2 127.60 2,085.12 266,061.31 32,479.01 159,818.39 52,479.01 21,284.90
01.07.02 MARCOS 7,945.05
01.07.02.01 MARCO DE MADERA CEDRO 4" x 2" m 270.70 29.35 7,945.05 2,504.53 2,365.45 2,444.29 630.78
01.07.03 MUEBLES DE ATENCION, COCINA Y SIMILARES 8,411.28

01.07.03.01 MUEBLE FIJO CON TABLERO AGLOMERADO DE 18 mm LAMINADO, EN BASE DE CONCRETO m 12.65 320.00 4,048.00 1,254.88 1,214.40 1,254.88 323.84

MUEBLE FIJO CON TABLERO AGLOMERADO DE 18 mm LAMINADO CON PLANCHA


01.07.03.02 m 5.30 357.00 1,892.10 586.55 567.63 586.55 151.37
MELAMINICA O SIMILAR POSTFORMADO, H=0.90m , CON SOPORTES METALICOS
MUEBLE FIJO CON TABLERO AGLOMERADO DE 18 mm LAMINADO CON PLANCHA
01.07.03.03 m 5.23 472.50 2,471.18 766.07 741.35 766.07 197.69
MELAMINICA O SIMILAR POSTFORMADO, H=1.10 m
01.07.04 VARIOS 22,434.17
01.07.04.01 REJILLA DE MADERA CEDRO EN PUERTA m2 3.51 152.00 533.52 190.72 168.43 174.04 0.33
01.07.04.02 DIVISIONES DE MELAMINA EN SS.HH. m2 53.33 390.88 20,845.63 6,482.03 6,272.93 6,482.03 1,608.64
01.07.04.03 DIVISIONES DE MELAMINA EN URINARIOS m2 1.80 127.68 229.82 75.60 73.17 75.60 5.45
01.07.04.04 REFUERZO DE MADERA TORNILLO 2" x 3 1/2" EN TABIQUE DRYWALL m 40.00 20.63 825.20 521.70 140.84 145.60 17.06
01.08 CARPINTERIA METALICA Y HERRERIA 187,286.54
01.08.01 VENTANAS 3,439.02
01.08.01.01 VENTANA METALICA DE INSPECCION und 2.00 198.76 397.52 123.23 119.26 123.23 31.80
01.08.01.02 VENTANA METALICA TIPO REJILLA CON PLATINA DE Fe 1 1/2" x 1/8" m2 5.96 342.68 2,042.37 633.13 612.71 633.13 163.40
01.08.01.03 VENTANA DE MALLA ELECTRO SOLDADA m2 4.44 225.03 999.13 309.73 299.74 309.73 79.93
01.08.02 PUERTAS 141,694.00
PUERTA CORTAFUEGO CON UNA HOJA BATIENTE CON PLANCHA 1/20" RESISTENTE AL
01.08.02.01 pza 4.00 6,010.43 24,041.72 6,250.85 7,212.52 7,452.93 3,125.42
FUEGO 90 MIN. ( 1.00 m x 2.10 m )
PUERTA CORTAFUEGO CON UNA HOJA BATIENTE CON PLANCHA 1/20" RESISTENTE AL
01.08.02.02 pza 9.00 6,158.43 55,425.87 14,410.73 16,627.76 17,182.02 7,205.36
FUEGO 90 MIN. ( 1.20 m x 2.10 m )
PUERTA CORTAFUEGO CON DOS HOJAS BATIENTES CON PLANCHA 1/20" RESISTENTE AL
01.08.02.03 pza 2.00 7,922.93 15,845.86 4,119.92 4,753.76 4,912.22 2,059.96
FUEGO 90 MIN. ( 1.80 m x 2.10 m )

01.08.02.04 PUERTA METALICA UNA HOJA BATIENTE CON PLANCHA DE Fe, E = 2 mm ( 0.90 m x 2.10 m ) pza 8.00 1,488.43 11,907.44 3,095.93 3,572.23 3,691.31 1,547.97

01.08.02.05 PUERTA METALICA DOS HOJAS BATIENTES CON PLANCHA DE Fe, E = 2 mm ( 1.80 m x 2.10 m ) pza 1.00 2,738.43 2,738.43 711.99 821.53 848.91 356.00

PUERTA METALICA DOS HOJAS BATIENTES CON REJILLA, CON PLANCHA DE Fe, E = 2 mm
01.08.02.06 pza 2.00 2,738.43 5,476.86 1,423.98 1,643.06 1,697.83 711.99
( 1.80 m x 2.10 m )
SUMINISTRO E INSTALACION DE PUERTA METALICA SECCIONABLE PARA ACCESO A
01.08.02.07 pza 1.00 12,500.00 12,500.00 3,250.00 3,750.00 3,875.00 1,625.00
ESTACIONAMIENTOS
PUERTA METALICA CON PLANCHA 1/20" ACANALADA Y PLANCHA DE ACERO 1/32" CON DOS
01.08.02.08 pza 1.00 6,929.19 6,929.19 1,801.59 2,078.76 2,148.05 900.79
HOJAS CORREDIZAS, 3.00 m x 2.10 m
01.08.02.09 PUERTA METALICA, TIPO REJA CON BARRAS DE FIERRO ( 1.00 m x 2.10 m ) pza 1.00 1,197.77 1,197.77 311.42 359.33 371.31 155.71
01.08.02.10 PUERTA METALICA, TIPO REJA CON BARRAS DE FIERRO ( 1.80 x 2.10 M ) pza 1.00 1,739.78 1,739.78 452.34 521.93 539.33 226.18
01.08.02.11 PUERTA METALICA, TIPO REJA CON BARRAS DE FIERRO ( 1.90 x 2.50 M ) pza 2.00 1,945.54 3,891.08 1,011.68 1,167.32 1,206.23 505.85
01.08.03 BARANDAS METALICAS 25,355.94
01.08.03.01 BARANDA METALICA Ø 2", H = 0.90 M m 20.01 133.54 2,672.14 694.76 801.64 828.36 347.38
01.08.03.02 BARANDA METALICA CENTRAL EN ESCALERA Ø 2", H = 0.90 M m 53.33 142.90 7,620.86 1,981.42 2,286.26 2,362.47 990.71
01.08.03.03 BARANDA METALICA CON CRISTAL TEMPLADO INCOLORO 8 mm Ø 2", H = 0.90 M m 61.65 244.33 15,062.94 3,916.36 4,518.88 4,669.51 1,958.19
01.08.04 PASAMANOS METALICOS 7,270.75
01.08.04.01 PASAMANOS DE FIERRO Ø 2" m 87.19 72.69 6,337.84 1,647.84 1,901.35 1,964.73 823.92
01.08.04.02 AGARRADERA PARA DISCAPACITADOS EN LAVATORIOS, Ø 1 1/2" und 3.00 158.23 474.69 123.42 142.41 147.15 61.71

92 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO ARQUITECTURA

02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015
01.08.04.03 AGARRADERA PARA MINUSVALIDOS EN INODOROS, Ø 1 1/2" und 3.00 152.74 458.22 119.14 137.47 142.05 59.56
01.08.05 ELEMENTOS METALICOS ESPECIALES 9,526.83
TAPA METALICA DE INSPECCION CON PLANCHA DE FIERRO 1.50 mm x 1200 mm x 2400 mm
01.08.05.01 und 2.00 204.14 408.28 110.87 120.57 124.59 52.25
( 1/16" ); 0.90 M x 0.75 M
01.08.05.02 ESCALERA TIPO GATO DE FIERRO ( ANCHO = 0.50 M, ALTURA = 1.00 m) und 2.00 469.31 938.62 244.04 281.59 290.97 122.02
01.08.05.03 ESCALERA TIPO GATO DE FIERRO ( ANCHO = 0.50 M, ALTURA = 3.40 m) und 1.00 1,325.46 1,325.46 344.62 397.64 410.89 172.31
01.08.05.04 REJILLA METALICA EN CUNETA, ANCHO = 0.25 M m 29.17 161.60 4,713.87 1,225.61 1,414.16 1,461.30 612.80
01.08.05.05 PROTECTOR DE ESQUINAS CON ANGULO "L" DE FIERRO 2" x 2" x 1/8" x 6 m, H = 1.00 m pza 140.00 15.29 2,140.60 556.56 642.18 663.59 278.27
01.09 CARPINTERIA DE ALUMINIO 49,636.36
01.09.01 VENTANAS 31,030.78

01.09.01.01 VENTANA DE ALUMINIO, TIPO PIVOTANTE CON CRISTAL TEMPLADO REFLEJANTE GRIS 6 mm m2 93.50 331.88 31,030.78 8,068.00 9,309.23 9,619.54 4,034.01

01.09.02 VARIOS 18,605.58


01.09.02.01 PLATINA DE ALUMINIO 5/8" x 3/16", EN ENCUENTRO DE PISOS m 209.30 10.43 2,183.00 567.58 654.90 676.73 283.79
01.09.02.02 PLATINA DE ALUMINIO 6" x 5/16", EN ENCUENTRO DE PISOS m 73.90 134.49 9,938.81 2,584.09 2,981.64 3,081.03 1,292.05
01.09.02.03 PLATINA DE ALUMINIO 3.1/2" x 3/32", ENCUENTRO DE MUROS m 58.20 77.96 4,537.27 1,179.69 1,361.18 1,406.55 589.85
01.09.02.04 PLATINA DE ALUMINIO 4" x 3/32", ENCUENTRO DE MUROS m 17.35 112.19 1,946.50 506.09 583.95 603.42 253.04
01.10 CERRAJERIA 22,751.75
01.10.01 BISAGRAS 8,657.16
01.10.01.01 BISAGRA CAPUCHINA 3 1/2" x 3 1/2" pza 228.00 37.97 8,657.16 4,155.44 4,501.72
01.10.02 CERRADURAS 5,164.77
CERRADURA CILINDRICA EXT. FIJA CON LLAVE E INT. SIEMPRE LIBRE SE FIJA CON LLAVE
01.10.02.01 pza 1.00 50.00 50.00 24.00 26.00
( TIPO A )
CERRADURA CILINDRICA EXT. SIEMPRE LIBRE ABRE CON LLAVE E INT. SIEMPRE LIBRE
01.10.02.02 pza 12.00 60.08 720.96 346.06 374.90
BOTON DE SEGURIDAD ( TIPO B )
CERRADURA CILINDRICA EXT. TRABA O LIBERA UNA VUELTA DE LLAVE E INT. SIEMPRE
01.10.02.03 pza 18.00 32.50 585.00 280.80 304.20
LIBRE ( TIPO C )
CERRADURA CILINDRICA EXT. SIEMPRE LIBRE CON PERFORACION DE EMERGENCIA E INT.
01.10.02.04 pza 8.00 26.66 213.28 102.37 110.91
SIEMPRE LIBRE BOTON DE SEGURIDAD ( TIPO F )
CERRADURA CILINDRICA EXT. SIEMPRE LIBRE SIN LLAVE NI SEGURO E INT. SIEMPRE LIBRE
01.10.02.05 pza 3.00 45.82 137.46 65.98 71.48
SIN LLAVE NI SEGURO ( TIPO G )
CERRADURA CILINDRICA EXT. ABRE CON LLAVE TRES GOLPES E INT. ABRE CON LLAVE
01.10.02.06 pza 18.00 45.92 826.56 396.75 429.81
TRES GOLPES ( TIPO I )
CERRADURA CON MANIJA EXT. SIEMPRE LIBRE, ABRE C/DESARMADOR E INT. LIBRE
01.10.02.07 pza 3.00 88.20 264.60 127.01 137.59
C/BOTON DE SEG. FIJA MANIJA EXT. ( TIPO K )
01.10.02.08 COLOCACION DE CERRADURAS pza 63.00 37.57 2,366.91 1,136.12 1,230.79
01.10.03 CIERRAPUERTAS Y OTROS 8,929.82
01.10.03.01 CIERRAPUERTAS AEREO ( TIPO O ) pza 38.00 130.21 4,947.98 1,385.43 3,562.55
01.10.03.02 FRENO HIDRAULICO DE PISO ( TIPO P ) pza 5.00 321.48 1,607.40 450.07 1,157.33
01.10.03.03 BARRA ANTIPANICO ( TIPO Q ) pza 2.00 478.34 956.68 267.87 688.81
01.10.03.04 CERROJO SIMPLE ( TIPO R ) pza 16.00 14.35 229.60 64.29 165.31
01.10.03.05 TIRADOR DE ACERO INOXIDABLE DE Ø 1 1/2, L= 0.90 m pza 8.00 148.52 1,188.16 332.68 855.48
01.11 VIDRIOS, CRISTALES Y SIMILARES 61,480.28
01.11.01 VENTANAS 19,020.45
VENTANA DE CRISTAL TEMPLADO COLOR BRONCE 6 mm CON PERFILES DE ALUMINIO,
01.11.01.01 m2 4.83 277.42 1,339.94 214.39 401.98 415.38 308.19
SISTEMA FIJO
VENTANA DE CRISTAL TEMPLADO INCOLORO 6 mm CON PERFILES DE ALUMINIO, SISTEMA
01.11.01.02 m2 88.82 199.06 17,680.51 2,828.88 5,304.15 5,480.96 4,066.52
FIJO - CORREDIZO
01.11.02 MAMPARAS 34,899.25
MAMPARA DE CRISTAL TEMPLADO INCOLORO 10 mm, SOBRELUZ FIJA C/ACCES. Y ZOCALO
01.11.02.01 m2 69.96 466.43 32,631.44 5,221.03 9,789.43 10,115.75 7,505.23
DE ALUMINIO
MAMPARA CON DOS HOJAS BATIENTES Y SOBRELUCES FIJAS DE CRISTAL TEMPLADO
01.11.02.02 m2 4.14 547.78 2,267.81 362.85 680.34 703.02 521.60
INCOLORO 10 mm C/ACCES. Y ZOCALO DE ALUMINIO
01.11.03 VARIOS 7,560.58
01.11.03.01 CRISTAL TEMPLADO INCOLORO 6 mm m2 32.00 147.51 4,720.32 755.25 1,416.10 1,463.30 1,085.67

93 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO ARQUITECTURA

02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015
01.11.03.02 ESPEJO INCOLORO 6 mm ( SOBREPUESTO ) m2 16.31 157.85 2,574.53 411.92 772.36 798.10 592.15
01.11.03.03 ESPEJO INCOLORO 6 mm ( INCLINADO ) m2 1.62 164.03 265.73 34.54 79.72 82.38 69.09
01.12 PINTURA 180,927.42
01.12.01 PINTURA DE CIELORRASOS, VIGAS 60,258.83
01.12.01.01 PINTURA DE CIELORRASOS, VIGAS C/ LATEX - 2 MANOS, C/ IMPRIMANTE m2 5,473.10 11.01 60,258.83 10,003.89 26,319.57 16,863.55 7,071.82
01.12.02 PINTURA DE MUROS INTERIORES, COLUMNAS, MUROS DE CONCRETO, DERRAMES 73,913.17
PINTURA DE MUROS INTERIORES, COLUMNAS, MUROS DE CONCRETO, DERRAMES C/
01.12.02.01 m2 7,101.84 9.96 70,734.33 24,004.70 18,944.44 19,575.92 8,209.27
LATEX - 2 MANOS, C/ IMPRIMANTE
PINTURA DE MUROS INTERIORES, COLUMNAS, MUROS DE CONCRETO, DERRAMES C/ OLEO
01.12.02.02 m2 268.71 11.83 3,178.84 843.40 946.80 978.36 410.28
- 2 MANOS, C/ IMPRIMANTE
01.12.03 PINTURA DE MUROS EXTERIORES, COLUMNAS, MUROS DE CONCRETO 13,135.70
PINTURA DE MUROS EXTERIORES, COLUMNAS, MUROS DE CONCRETO C/ LATEX - 2 MANOS,
01.12.03.01 m2 1,245.09 10.55 13,135.70 4,399.49 3,541.71 3,659.77 1,534.73
C/ IMPRIMANTE
01.12.04 PINTURA DE ESTRUCTURAS ESPECIALES 8,941.33
PINTURA DE ESTRUCTURAS ESPECIALES C/ PINTURA IMPERMEABILIZANTE DE CONCRETO -
01.12.04.01 m2 690.45 12.95 8,941.33 2,368.18 2,664.79 2,753.62 1,154.74
2 MANOS - CHEMA SEAL O SIMILAR
01.12.05 PINTURA EN PISOS Y PAVIMENTOS 24,678.39
01.12.05.01 PINTURA DE FRANJAS EN PISOS, ANCHO = 0.10 M C/ TRAFICO - 2 MANOS m 910.40 16.93 15,413.07 342.51 10,617.89 4,452.67
01.12.05.02 PINTURA DE SEÑAL DE ESTACIONAMIENTO DE DISCAPACITADOS C/ TRAFICO - 2 MANOS und 4.00 180.00 720.00 16.00 496.00 208.00
01.12.05.03 PINTURA DE SEÑAL DE NUMERO DE ESTACIONAMIENTO C/ TRAFICO - 2 MANOS und 61.00 19.74 1,204.14 26.76 829.52 347.86
01.12.05.04 PINTURA DE FRANJAS EN PISOS, ANCHO = 0.30 M C/ TRAFICO - 2 MANOS und 462.00 15.89 7,341.18 163.14 5,057.26 2,120.78
01.13 VARIOS 39,251.07
01.13.01 LIMPIEZA PERMANENTE DE OBRA glb 1.00 6,551.16 6,551.16 194.11 752.17 752.17 703.64 752.17 727.91 752.17 727.91 752.17 436.74
01.13.02 LIMPIEZA FINAL DE OBRA glb 1.00 1,207.87 1,207.87 724.72 483.15
01.13.03 LIMPIEZA DE VIDRIOS m2 315.32 5.45 1,718.49 1,031.09 687.40
01.13.04 LIMPIEZA DE PISOS DE PORCELANATO m2 1,525.17 5.10 7,778.37 4,667.02 3,111.35
01.13.05 PROVISION Y SEMBRIO DE PLANTAS ORNAMENTALES m2 37.12 27.48 1,020.06 618.72 401.34
01.13.06 CINTA EN MAMPARAS m 154.25 1.24 191.27 114.76 76.51
01.13.07 SELLO DE ASFALTO CON RELLENO DE POLIESTIRENO EXPANDIDO, E = 1"; H = 0.20 M m 13.20 7.30 96.36 57.93 38.43
01.13.08 FALSA COLUMNA DE DRYWALL H = 3.65 M und 26.00 208.91 5,431.66 3,259.00 2,172.66
01.13.09 PASE PARA MANGUERA CON PLANCHA FIBROCEMENTO 20 mm und 9.00 61.87 556.83 334.10 222.73
01.13.10 TOPE DE LLANTAS DE HULE, 1.83 m x 0.15 m x 0.10 m und 61.00 142.59 8,697.99 5,218.79 3,479.20
01.13.11 CANTONERA DE TERRAZO LAVADO m 592.40 10.13 6,001.01 3,803.99 2,197.02
01.14 OTROS 6,429.36
01.14.01 BANCA DE CONCRETO F'C = 140 Kg/cm2, H = 0.10 M ( TIPO TABLERO ) m 32.50 27.14 882.05 675.20 206.85
01.14.02 TABLERO DE CONCRETO F'C = 140 Kg/cm2, H = 0.075 M ( CON COLGAJO ) m2 22.41 96.40 2,160.32 1,655.62 504.70
01.14.03 TABLERO DE CONCRETO F'C = 140 Kg/cm2, H = 0.075 M m2 35.65 80.70 2,876.96 2,205.81 671.15
01.14.04 POYO DE CONCRETO F'C = 140 Kg/cm2, PARA INODORO ( 0.60 x 0.25 x 0.10 M ) und 3.00 9.86 29.58 20.24 9.34
01.14.05 BASE DE CONCRETO F'C = 140 Kg/cm2, H = 0.10 M m2 12.65 37.98 480.45 423.67 56.78
01.15 SEÑALIZACION DE SEGURIDAD 3,932.72
01.15.01 SEÑALES DE SEGURIDAD AUTOADHESIVAS und 872.00 4.51 3,932.72 2,359.63 1,573.09
01.16 SEÑALIZACION DE NORMATIVIDAD 14,926.36
01.16.01 SEÑAL INDICATIVA 11,870.56
01.16.01.01 IN 1 - ADOSADO und 14.00 100.00 1,400.00 840.00 560.00
01.16.01.02 IN 2 - ADOSADO und 30.00 170.00 5,100.00 3,060.00 2,040.00
01.16.01.03 IN 3 - ADOSADO und 2.00 140.00 280.00 168.00 112.00
01.16.01.04 IN 4 - COLGADO und 1.00 170.00 170.00 102.00 68.00
01.16.01.05 IN 5 - ADOSADO und 2.00 100.00 200.00 120.00 80.00
01.16.01.06 IN 5 - COLGADO und 4.00 100.00 400.00 240.00 160.00
01.16.01.07 IN 5 - BANDERA und 1.00 100.00 100.00 60.00 40.00
01.16.01.08 IN 6 - ADOSADO und 2.00 100.00 200.00 120.00 80.00
01.16.01.09 IN 6A - ADOSADO und 6.00 100.00 600.00 360.00 240.00
01.16.01.10 IN 6B - ADOSADO und 6.00 100.00 600.00 360.00 240.00
01.16.01.11 IN 6C - ADOSADO und 3.00 100.00 300.00 180.00 120.00
01.16.01.12 IN 6D - ADOSADO und 6.00 100.00 600.00 360.00 240.00

94 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO ARQUITECTURA

02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015
01.16.01.13 IN 7 - ADOSADO und 1.00 220.00 220.00 132.00 88.00
01.16.01.14 IN 8 - ADOSADO und 1.00 220.00 220.00 132.00 88.00
01.16.01.15 COLOCACION DE SEÑAL INDICATIVA und 124.00 11.94 1,480.56 888.34 592.22
01.16.02 SEÑAL REGLAMENTARIA 3,055.80
01.16.02.01 ISR 1 - ADOSADO und 20.00 140.00 2,800.00 1,680.00 1,120.00
01.16.02.02 COLOCACION DE SEÑAL REGLAMENTARIA und 20.00 12.79 255.80 153.48 102.32

TOTAL COSTO DIRECTO 2,418,990.26 194.11 752.17 752.17 20,890.62 106,436.82 343,365.58 583,260.21 756,765.99 462,661.55 143,911.04
GASTOS GENERALES 8.00% 8.00% 193,519.22 15.53 60.17 60.17 1,671.25 8,514.95 27,469.25 46,660.82 60,541.28 37,012.92 11,512.88
UTILIDAD 8.00% 8.00% 193,519.22 15.53 60.17 60.17 1,671.25 8,514.95 27,469.25 46,660.82 60,541.28 37,012.92 11,512.88
PARCIAL 2,806,028.70 225.17 872.51 872.51 24,233.12 123,466.72 398,304.08 676,581.85 877,848.55 536,687.39 166,936.80
FACTOR DE RELACION (0.90000) 0.90000 2,525,425.83 202.65 785.26 785.26 21,809.81 111,120.05 358,473.67 608,923.67 790,063.70 483,018.65 150,243.11
IGV 18.00% 454,576.64 36.48 141.35 141.35 3,925.77 20,001.61 64,525.26 109,606.26 142,211.47 86,943.36 27,043.74
PRESUPUESTO TOTAL 2,980,002.47 239.13 926.61 926.61 25,735.58 131,121.66 422,998.93 718,529.93 932,275.17 569,962.01 177,286.85
AVANCE PARCIAL - 0.01% 0.03% 0.03% 0.86% 4.40% 14.20% 24.11% 31.28% 19.13% 5.95%
AVANCE ACUMULADO 0.0% 0.01% 0.04% 0.07% 0.93% 5.33% 19.53% 43.64% 74.93% 94.05% 100.00%
0 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

95 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO INSTALACIONES SANITARIAS

CALENDARIO DE ACTIVIDADES VALORIZADO DE INSTALACIONES SANITARIAS ACTUALIZADO A LA FECHA DE INICIO DE OBRA


LP Nº 003-2015-EF/43
: "AMPLIACIÓN Y MEJORAMIENTO DE LOS SERVICIOS COMPLEMENTARIOS DE LA SEDE CENTRAL DEL MINISTERIO DE ECONOMÍA Y FINANZAS, CERCADO DE
OBRA
LIMA - LIMA"
UBICACIÓN : LIMA - LIMA - LIMA
FECHA BASE :31/11/2014
PROPIETARIO : MINISTERIO DE ECONOMÍA Y FINANZAS 12/31/2015
CONTRATISTA : CONSORCIO T y M 0.00% 0.00% 0.00% 0.85% 0.87% 1.95% 8.89% 23.80% 43.78% 19.86%
FECHA DE INICIO : 02/12/2015 8.15% 8.16% 8.16% 8.17% 8.17% 8.18% 8.18% 8.19% 8.20% 8.13%
- - - 4,434.13 4,523.29 10,134.49 46,206.06 123,732.02 227,624.22 103,250.58
02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015
01 INSTALACIONES SANITARIAS 519,904.79 - - - 4,434.13 4,523.29 10,134.49 46,206.06 123,732.02 227,624.22 103,250.58
01.01 APARATOS Y ACCESORIOS SANITARIOS 34,753.68
01.01.01 SUMINISTRO DE APARATOS SANITARIOS 30,346.83
01.01.01.01 LAVATORIO MANANTIAL O SIMILAR, INC. GRIFERIA pza 11.00 178.70 1,965.70 43.68 1,354.15 567.87
01.01.01.02 LAVATORIO OVALIN SONNET O SIMILAR C/ GRIFERIA pza 16.00 261.92 4,190.72 93.13 2,886.94 1,210.65
01.01.01.03 TAZA NOVARA FLUX O SIMILAR, INC. FLUXOMETRO pza 27.00 552.06 14,905.62 331.24 10,268.32 4,306.06
01.01.01.04 URINARIO CADET O SIMILAR, INC. FLUXOMETRO pza 11.00 517.69 5,694.59 126.55 3,922.94 1,645.10
01.01.01.05 LAVADERO DE CONCRETO REVESTIDO CON PORCELANATO 1 POZA,INC. GRIFERIA und 2.00 718.04 1,436.08 244.30 839.66 352.12
01.01.01.06 LAVADERO DE CONCRETO REVESTIDO CON PORCELANATO 2 POZAS,INC. GRIFERIA und 3.00 718.04 2,154.12 366.45 1,259.50 528.17
01.01.02 SUMINISTRO DE ACCESORIOS SANITARIOS Y GRIFERIA 4,406.85
01.01.02.01 DISPENSADOR DE POLICARBONATO PARA JABON ESPUMA ( MOD. HD4F10 O SIMILAR ) pza 21.00 29.43 618.03 13.73 425.75 178.55

01.01.02.02 DISPENSADOR PARA PAPEL HIGIENICO JUMBO ROLL ( MOD. HD1W00 KIMBERLY O SIMILAR ) pza 27.00 56.23 1,518.21 33.74 1,045.88 438.59

01.01.02.03 DISPENSADOR PARA PAPEL TOALLA ( MOD. HD2W5 KIMBERLY O SIMILAR ) pza 7.00 55.68 389.76 8.66 268.50 112.60
01.01.02.04 GANCHO COLGADOR pza 20.00 76.95 1,539.00 34.20 1,060.20 444.60
01.01.02.05 GRIFERIA P/DUCHA CROMADA 2 LLAVES INC. ACCESORIOS pza 3.00 113.95 341.85 7.60 235.50 98.75
01.02 SISTEMA DE AGUA FRIA 68,871.83
01.02.01 SALIDAS DE AGUA FRIA 7,509.80
01.02.01.01 SALIDA AGUA FRIA CON TUBERIA DE PVC CLASE 10 C/ ROSCA 1/2" pto 45.00 80.54 3,624.30 783.63 698.90 676.35 698.90 676.35 90.17
01.02.01.02 SALIDA AGUA FRIA CON TUBERIA DE PVC CLASE 10 C/ ROSCA 1" pto 38.00 102.25 3,885.50 632.85 800.25 774.44 800.25 774.44 103.27
01.02.02 REDES DE DISTRIBUCION 10,905.81
01.02.02.01 TUBERIA PVC CLASE 10 C/ ROSCA 1/2" m 218.53 14.16 3,094.38 843.31 532.70 515.51 532.70 515.51 154.65
01.02.02.02 TUBERIA PVC CLASE 10 C/ ROSCA 3/4" m 7.98 15.91 126.96 45.33 19.32 18.69 19.32 18.69 5.61
01.02.02.03 TUBERIA PVC CLASE 10 C/ ROSCA 1" m 24.16 16.70 403.47 53.32 82.86 80.19 82.86 80.19 24.05
01.02.02.04 TUBERIA PVC CLASE 10 C/ ROSCA 1 1/4" m 91.40 18.74 1,712.84 225.34 352.00 340.65 352.00 340.65 102.20
01.02.02.05 TUBERIA PVC CLASE 10 C/ ROSCA 1 1/2" m 36.17 20.72 749.44 98.25 154.10 149.13 154.10 149.13 44.73
01.02.02.06 TUBERIA PVC CLASE 10 C/ ROSCA 2" m 41.33 24.71 1,021.26 149.57 206.28 199.62 206.28 199.62 59.89
01.02.02.07 TUBERIA PVC CLASE 10 C/ ROSCA 2 1/2" m 127.56 29.77 3,797.46 558.99 766.35 741.63 766.35 741.63 222.51
01.02.03 REDES DE ALIMENTACION 157.80
01.02.03.01 TUBERIA PVC CLASE 10 S/ PRESION 1 1/2" ( CON CAMA DE ARENA ) m 6.90 22.87 157.80 28.65 30.56 29.58 30.56 29.58 8.87
01.02.04 ACCESORIOS DE REDES 2,957.56
01.02.04.01 CODO PVC C/ ROSCA 1/2" x 90º pza 114.00 2.93 334.02 56.25 65.73 63.61 65.73 63.61 19.09
01.02.04.02 CODO PVC C/ ROSCA 3/4" x 90º pza 8.00 3.10 24.80 4.12 4.89 4.74 4.89 4.74 1.42
01.02.04.03 CODO PVC C/ ROSCA 1" x 90º pza 42.00 4.97 208.74 31.58 41.92 40.57 41.92 40.57 12.18
01.02.04.04 CODO PVC C/ ROSCA 1 1/4" x 90º pza 78.00 6.90 538.20 77.71 108.97 105.46 108.97 105.46 31.63
01.02.04.05 CODO PVC C/ ROSCA 1 1/2" x 90º pza 26.00 8.89 231.14 32.46 47.02 45.50 47.02 45.50 13.64
01.02.04.06 CODO PVC C/ ROSCA 2" x 90º pza 13.00 11.10 144.30 19.87 29.45 28.50 29.45 28.50 8.53
01.02.04.07 CODO PVC C/ ROSCA 2 1/2" x 90º pza 6.00 16.92 101.52 13.59 20.81 20.14 20.81 20.14 6.03
01.02.04.08 TEE PVC C/ ROSCA 1/2" pza 18.00 3.10 55.80 26.56 6.92 6.70 6.92 6.70 2.00
01.02.04.09 TEE PVC C/ ROSCA 1" pza 5.00 4.69 23.45 3.58 4.70 4.55 4.70 4.55 1.37
01.02.04.10 TEE PVC C/ ROSCA 1 1/4" pza 26.00 9.58 249.08 34.73 50.72 49.09 50.72 49.09 14.73
01.02.04.11 TEE PVC C/ ROSCA 1 1/2" pza 9.00 10.00 90.00 12.50 18.34 17.75 18.34 17.75 5.32
01.02.04.12 TEE PVC C/ ROSCA 2" pza 8.00 12.87 102.96 18.91 19.89 19.25 19.89 19.25 5.77
01.02.04.13 TEE PVC C/ ROSCA 2 1/2" pza 15.00 14.11 211.65 40.56 40.49 39.18 40.49 39.18 11.75
01.02.04.14 REDUCCION PVC C/ ROSCA 3/4" - 1/2" pza 2.00 3.51 7.02 2.72 1.02 0.98 1.02 0.98 0.30
01.02.04.15 REDUCCION PVC C/ ROSCA 1" - 1/2" pza 2.00 3.66 7.32 2.76 1.08 1.04 1.08 1.04 0.32
01.02.04.16 REDUCCION PVC C/ ROSCA 1 1/4" - 1/2" pza 11.00 6.00 66.00 9.70 13.32 12.89 13.32 12.89 3.88

96 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO INSTALACIONES SANITARIAS

02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015
01.02.04.17 REDUCCION PVC C/ ROSCA 1 1/4" - 1" pza 26.00 6.20 161.20 23.60 32.56 31.51 32.56 31.51 9.46
01.02.04.18 REDUCCION PVC C/ ROSCA 1 1/2" - 1/2" pza 8.00 9.02 72.16 16.48 13.18 12.75 13.18 12.75 3.82
01.02.04.19 REDUCCION PVC C/ ROSCA 1 1/2" - 3/4" pza 1.00 9.22 9.22 2.08 1.69 1.63 1.69 1.63 0.50
01.02.04.20 REDUCCION PVC C/ ROSCA 1 1/2" - 1" pza 1.00 7.00 7.00 1.01 1.42 1.37 1.42 1.37 0.41
01.02.04.21 REDUCCION PVC C/ ROSCA 1 1/2" - 1 1/4" pza 9.00 7.20 64.80 9.31 13.13 12.71 13.13 12.71 3.81
01.02.04.22 REDUCCION PVC C/ ROSCA 2" - 1/2" pza 5.00 7.40 37.00 5.30 7.50 7.26 7.50 7.26 2.18
01.02.04.23 REDUCCION PVC C/ ROSCA 2" - 3/4" pza 1.00 10.22 10.22 2.21 1.90 1.83 1.90 1.83 0.55
01.02.04.24 REDUCCION PVC C/ ROSCA 2" - 1 1/4" pza 6.00 8.00 48.00 6.81 9.75 9.43 9.75 9.43 2.83
01.02.04.25 REDUCCION PVC C/ ROSCA 2" - 1 1/2" pza 3.00 8.20 24.60 3.48 5.00 4.84 5.00 4.84 1.44
01.02.04.26 REDUCCION PVC C/ ROSCA 2 1/2" - 1 1/4" pza 2.00 8.80 17.60 2.47 3.58 3.46 3.58 3.46 1.05
01.02.04.27 REDUCCION PVC C/ ROSCA 2 1/2" - 1 1/2" pza 8.00 11.42 91.36 18.91 17.15 16.59 17.15 16.59 4.97
01.02.04.28 REDUCCION PVC C/ ROSCA 2 1/2" - 2" pza 2.00 9.20 18.40 2.58 3.74 3.62 3.74 3.62 1.10
01.02.05 LLAVES Y VALVULAS 4,375.54
01.02.05.01 VALVULA COMPUERTA DE BRONCE DE 1/2" pza 10.00 90.58 905.80 571.01 257.53 77.26
01.02.05.02 VALVULA COMPUERTA DE BRONCE DE 3/4" pza 3.00 92.64 277.92 172.28 81.26 24.38
01.02.05.03 VALVULA COMPUERTA DE BRONCE DE 1 1/4" pza 16.00 131.83 2,109.28 379.55 1,330.56 399.17
01.02.05.04 VALVULA COMPUERTA DE BRONCE DE 1 1/2" pza 4.00 150.50 602.00 104.85 382.43 114.72
01.02.05.05 MEDIDOR DE AGUA Ø 1 1/2" und 1.00 480.54 480.54 75.30 311.73 93.51
01.02.06 PIEZAS VARIAS 10,106.22
01.02.06.01 CAJA P/ VALVULA 20 x 20 cm pza 13.00 71.69 931.97 124.26 621.31 186.40
01.02.06.02 CAJA P/ VALVULA 30 x 30 cm pza 20.00 72.27 1,445.40 192.72 963.60 289.08
01.02.06.03 COLGADOR PARA 1 TUBERIA pza 331.00 23.35 7,728.85 1,030.51 5,152.57 1,545.77
01.02.07 PRUEBAS HIDRAULICAS 2,127.48
01.02.07.01 PRUEBA HIDRÁULICA Y DESINFECCIÓN DE TUBERÍAS m 554.03 3.84 2,127.48 326.88 1,385.08 415.52
01.02.08 ALMACENAMIENTO DE AGUA - CISTERNA 30,731.62
01.02.08.01 REDES DE DISTRIBUCION 704.62
01.02.08.01.01 TUBERIA PVC CLASE 10 C/ ROSCA 3/4" m 19.25 15.91 306.27 99.59 116.49 90.19
01.02.08.01.02 TUBERIA PVC CLASE 10 C/ ROSCA 1/2" m 6.40 14.16 90.62 21.43 39.00 30.19
01.02.08.01.03 TUBERIA PVC CLASE 10 C/ ROSCA 1 1/2" m 0.80 20.72 16.58 1.46 8.52 6.60
01.02.08.01.04 TUBERIA PVC CLASE 10 C/ ROSCA 2 1/2" m 9.78 29.77 291.15 30.54 146.89 113.72
01.02.08.02 ACCESORIOS DE REDES 170.80
01.02.08.02.01 CODO PVC C/ ROSCA 1/2" x 90º pza 1.00 2.93 2.93 0.37 1.44 1.12
01.02.08.02.02 CODO PVC C/ ROSCA 3/4" x 90º pza 7.00 3.10 21.70 2.71 10.71 8.28
01.02.08.02.03 CODO PVC C/ ROSCA 1 1/2" x 90º pza 1.00 8.89 8.89 0.87 4.52 3.50
01.02.08.02.04 CODO PVC C/ ROSCA 2 1/2" x 90º pza 7.00 16.92 118.44 10.77 60.69 46.98
01.02.08.02.05 TEE PVC C/ ROSCA 3/4" pza 2.00 9.42 18.84 3.88 8.43 6.53
01.02.08.03 LLAVES Y VALVULAS 1,839.04
01.02.08.03.01 VALVULA CONTROL DE BRONCE DE 3/4" pza 3.00 87.00 261.00 52.78 208.22
01.02.08.03.02 VALVULA CONTROL DE BRONCE DE 1 1/2" pza 1.00 144.11 144.11 6.44 137.67
01.02.08.03.03 VALVULA DE COMPUERTA BRONCE DE 2 1/2" pza 2.00 265.35 530.70 22.57 508.13
01.02.08.03.04 VALVULA CHECK 1 1/2" pza 1.00 187.78 187.78 8.18 179.60
01.02.08.03.05 VALVULA FLOTADORA C/ BOLLA DE COBRE DE 3/4" pza 3.00 101.13 303.39 25.96 277.43
01.02.08.03.06 VALVULA DE PIE C/ CANASTILLA DE BRONCE 2 1/2" pza 2.00 206.03 412.06 29.92 382.14
01.02.08.04 PIEZAS VARIAS 937.16
01.02.08.04.01 PASE EN MURO 1" und 3.00 26.87 80.61 3.22 77.39
01.02.08.04.02 PASE EN MURO 3" und 2.00 36.87 73.74 2.95 70.79
01.02.08.04.03 COLGADOR PARA UNA TUBERIA Ø 3/4" pza 10.00 45.45 454.50 18.18 436.32
01.02.08.04.04 COLGADOR PARA UNA TUBERIA Ø 2 1/2" pza 3.00 60.25 180.75 7.23 173.52
01.02.08.04.05 BRIDA ROMPE AGUA Ø 2 1/2" und 2.00 44.24 88.48 3.54 84.94
01.02.08.04.06 ELECTRONIVEL und 1.00 59.08 59.08 36.83 22.25
01.02.08.05 EQUIPOS Y OTRAS INSTALACIONES 27,080.00
SUMINISTRO E INSTALACION DE CUARTO DE BOMBAS, SISTEMA COMPACTO DE AGUA
01.02.08.05.01 glb 1.00 27,080.00 27,080.00 8,124.00 11,992.57 6,963.43
FRIA
01.03 SISTEMA DE AGUA CONTRA INCENDIO 321,023.98
01.03.01 REDES DE DISTRIBUCION 52,874.81
01.03.01.01 TUBERIA SCH - 40 1" m 685.35 29.31 20,087.61 1,004.38 6,227.16 6,026.28 6,227.16 602.63

97 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO INSTALACIONES SANITARIAS

02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015
01.03.01.02 TUBERIA SCH - 40 1 1/4" m 115.11 34.87 4,013.89 200.69 1,244.31 1,204.17 1,244.31 120.41
01.03.01.03 TUBERIA SCH - 40 1 1/2" m 38.37 36.32 1,393.60 69.68 432.02 418.08 432.02 41.80
01.03.01.04 TUBERIA SCH - 40 2" m 67.07 40.37 2,707.62 135.38 839.36 812.29 839.36 81.23
01.03.01.05 TUBERIA SCH - 40 2 1/2" m 145.03 53.40 7,744.60 387.23 2,400.83 2,323.38 2,400.83 232.33
01.03.01.06 TUBERIA SCH - 40 3" m 20.85 55.73 1,161.97 58.10 360.21 348.59 360.21 34.86
01.03.01.07 TUBERIA SCH - 40 4" m 229.25 68.77 15,765.52 788.28 4,887.31 4,729.66 4,887.31 472.96
01.03.02 REDES DE ALIMENTACION 1,510.38
01.03.02.01 TUBERIA HDPE Ø 4" ( CON PROTECCION ) m 11.15 135.46 1,510.38 87.50 464.31 449.33 464.31 44.93
01.03.03 ACCESORIOS DE REDES 62,777.88
01.03.03.01 CODO SCH - 40 1" x 90º - RANURADO pza 160.00 55.96 8,953.60 447.68 2,775.62 2,686.08 2,775.62 268.60
01.03.03.02 CODO SCH - 40 1 1/4" x 90º - RANURADO pza 3.00 59.06 177.18 8.86 54.93 53.15 54.93 5.31
01.03.03.03 CODO SCH - 40 2 1/2" x 90º - RANURADO pza 13.00 81.86 1,064.18 53.21 329.90 319.25 329.90 31.92
01.03.03.04 CODO SCH - 40 4" x 90º - RANURADO pza 33.00 150.26 4,958.58 247.93 1,537.16 1,487.57 1,537.16 148.76
01.03.03.05 TEE SCH - 40 1" - RANURADO pza 70.00 57.56 4,029.20 201.46 1,249.05 1,208.76 1,249.05 120.88
01.03.03.06 TEE SCH - 40 1 1/4" - RANURADO pza 50.00 65.16 3,258.00 162.90 1,009.98 977.40 1,009.98 97.74
01.03.03.07 TEE SCH - 40 1 1/2" - RANURADO pza 13.00 69.16 899.08 44.95 278.71 269.72 278.71 26.99
01.03.03.08 TEE SCH - 40 2" - RANURADO pza 21.00 78.86 1,656.06 82.80 513.38 496.82 513.38 49.68
01.03.03.09 TEE SCH - 40 2 1/2" - RANURADO pza 30.00 89.86 2,695.80 134.79 835.70 808.74 835.70 80.87
01.03.03.10 TEE SCH - 40 3" - RANURADO pza 10.00 170.46 1,704.60 85.23 528.43 511.38 528.43 51.13
01.03.03.11 TEE SCH - 40 4" - RANURADO pza 23.00 210.46 4,840.58 242.03 1,500.58 1,452.17 1,500.58 145.22
01.03.03.12 CRUZ SCH - 40 1 1/4" - RANURADO pza 1.00 141.06 141.06 7.05 43.73 42.32 43.73 4.23
01.03.03.13 CRUZ SCH - 40 1 1/2" - RANURADO pza 3.00 151.06 453.18 22.66 140.49 135.95 140.49 13.59
01.03.03.14 CRUZ SCH - 40 2" - RANURADO pza 6.00 172.16 1,032.96 51.65 320.22 309.89 320.21 30.99
01.03.03.15 CRUZ SCH - 40 2 1/2" - RANURADO pza 16.00 200.16 3,202.56 160.13 992.79 960.77 992.79 96.08
01.03.03.16 CRUZ SCH - 40 3" - RANURADO pza 2.00 205.86 411.72 20.59 127.63 123.52 127.63 12.35
01.03.03.17 REDUCCION SCH - 40 1 1/4" - 1" - RANURADO pza 52.00 78.36 4,074.72 203.74 1,263.16 1,222.42 1,263.16 122.24
01.03.03.18 REDUCCION SCH - 40 1 1/2" - 1" - RANURADO pza 8.00 79.36 634.88 31.74 196.81 190.46 196.81 19.06
01.03.03.19 REDUCCION SCH - 40 1 1/2" - 1 1/4" - RANURADO pza 12.00 87.87 1,054.44 52.72 326.88 316.33 326.88 31.63
01.03.03.20 REDUCCION SCH - 40 2" - 1" - RANURADO pza 31.00 91.36 2,832.16 141.61 877.97 849.65 877.97 84.96
01.03.03.21 REDUCCION SCH - 40 2" - 1 1/4" - RANURADO pza 8.00 93.86 750.88 37.54 232.77 225.26 232.77 22.54
01.03.03.22 REDUCCION SCH - 40 2" - 1 1/2" - RANURADO pza 8.00 97.06 776.48 38.82 240.71 232.94 240.71 23.30
01.03.03.23 REDUCCION SCH - 40 2 1/2" - 1" - RANURADO pza 42.00 100.36 4,215.12 210.76 1,306.69 1,264.54 1,306.69 126.44
01.03.03.24 REDUCCION SCH - 40 2 1/2" - 1 1/4" RANURADO pza 22.00 102.86 2,262.92 113.15 701.51 678.88 701.51 67.87
01.03.03.25 REDUCCION SCH - 40 2 1/2" - 1 1/2" - RANURADO pza 3.00 103.86 311.58 15.58 96.59 93.47 96.59 9.35
01.03.03.26 REDUCCION SCH - 40 2 1/2" - 2" RANURADO pza 9.00 109.46 985.14 49.26 305.39 295.54 305.39 29.56
01.03.03.27 REDUCCION SCH - 40 3" - 1" - RANURADO pza 8.00 101.66 813.28 40.66 252.12 243.98 252.12 24.40
01.03.03.28 REDUCCION SCH - 40 3" - 1 1/4" - RANURADO pza 4.00 105.86 423.44 21.17 131.27 127.03 131.27 12.70
01.03.03.29 REDUCCION SCH - 40 3" - 2" - RANURADO pza 3.00 126.56 379.68 18.98 117.70 113.90 117.70 11.40
01.03.03.30 REDUCCION SCH - 40 3" - 2 1/2" - RANURADO pza 6.00 132.56 795.36 39.77 246.56 238.61 246.56 23.86
01.03.03.31 REDUCCION SCH - 40 4" - 1" - RANURADO pza 6.00 134.51 807.06 40.35 250.19 242.12 250.19 24.21
01.03.03.32 REDUCCION SCH - 40 4" - 2" - RANURADO pza 1.00 130.56 130.56 6.53 40.47 39.17 40.47 3.92
01.03.03.33 REDUCCION SCH - 40 4" - 2 1/2" - RANURADO pza 14.00 146.56 2,051.84 102.59 636.07 615.55 636.07 61.56
01.03.04 LLAVES Y VALVULAS 1,283.38
01.03.04.01 VALVULA SIAMESA TIPO POSTE Ø 4" x 2 1/2" x 2 1/2" pza 1.00 819.20 819.20 407.65 411.55
01.03.04.02 VALVULA CHECK 4" pza 1.00 464.18 464.18 226.93 237.25
01.03.05 PIEZAS VARIAS 84,906.36
01.03.05.01 COLGADOR PARA 1 TUBERIA pza 522.00 23.35 12,188.70 6,229.78 5,958.92
01.03.05.02 ROCIADOR AUTOMATICO TIPO COLGANTE 1/2" und 125.00 236.95 29,618.75 15,138.47 14,480.28
01.03.05.03 ROCIADOR AUTOMATICO TIPO MONTANTE 1/2" und 146.00 251.95 36,784.70 18,801.07 17,983.63
01.03.05.04 ESTACION CONTROLADORA DE ROCIADORES und 3.00 2,000.07 6,000.21 3,066.77 2,933.44
01.03.05.05 JUNTA DE EXPANSION UL METRAFLEX und 8.00 39.25 314.00 160.49 153.51
01.03.06 PRUEBAS HIDRAULICAS 6,206.61
01.03.06.01 PRUEBA HIDRAULICA DE AGUA CONTRA INCENDIO m 1,312.18 4.73 6,206.61 3,230.00 2,976.61
01.03.07 PIEZAS VARIAS - GABINETE CONTRA INCENDIO 12,831.20
01.03.07.01 LLAVES Y VALVULAS 5,753.42
01.03.07.01.01 VALVULA ANGULAR 1 1/2" pza 9.00 197.26 1,775.34 907.40 867.94

98 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO INSTALACIONES SANITARIAS

02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015
01.03.07.01.02 VALVULA ANGULAR 2 1/2" pza 8.00 497.26 3,978.08 2,033.24 1,944.84
01.03.07.02 PIEZAS VARIAS 7,077.78
01.03.07.02.01 GABINETE METALICO, AGUA CONTRA INCENDIO 100 x 80 x 18 cm, 1/24" pza 9.00 434.36 3,909.24 1,998.06 1,911.18
01.03.07.02.02 PITON DE BRONCE PARA CHORRO NIEBLA 1 1/2" pza 9.00 61.69 555.21 283.77 271.44
01.03.07.02.03 MANGUERA DE FIBRA SINTETICA 1 1/2" x 30 M und 9.00 255.67 2,301.03 1,176.08 1,124.95
01.03.07.02.04 HACHA und 9.00 34.70 312.30 131.86 180.44
01.03.08 INSTALACIONES ESPECIALES - SISTEMA CONTRA INCENDIO - CTO. DE BOMBAS 98,633.36
01.03.08.01 REDES DE DISTRIBUCION 16,944.24
01.03.08.01.01 TUBO DE ACERO AL CARBONO SOLDABLE SCH - 40 DE 2", 6 M m 2.65 124.25 329.26 32.93 164.63 131.70
01.03.08.01.02 TUBO DE ACERO AL CARBONO SOLDABLE SCH - 40 DE 4", 6 M m 5.86 293.10 1,717.57 171.76 858.79 687.02
01.03.08.01.03 TUBO DE ACERO AL CARBONO SOLDABLE SCH - 40 DE 8", 6 M m 17.45 853.72 14,897.41 1,489.74 7,448.71 5,958.96
01.03.08.02 ACCESORIOS DE REDES 3,739.09
01.03.08.02.01 CODO SCH - 40 2" x 90º - RANURADO pza 3.00 54.75 164.25 16.43 82.13 65.69
01.03.08.02.02 CODO SCH - 40 4" x 90º - RANURADO pza 1.00 150.26 150.26 15.03 75.13 60.10
01.03.08.02.03 CODO SCH - 40 8" x 90º - RANURADO pza 10.00 226.06 2,260.60 226.06 1,130.30 904.24
01.03.08.02.04 TEE SCH - 40 8" - RANURADO pza 3.00 282.82 848.46 84.85 424.23 339.38
01.03.08.02.05 REDUCCION SCH - 40 8" - 2" - RANURADO pza 1.00 150.41 150.41 15.04 75.21 60.16
01.03.08.02.06 REDUCCION SCH - 40 8" - 4" - RANURADO pza 1.00 165.11 165.11 16.51 82.56 66.04
01.03.08.03 LLAVES Y VALVULAS 25,458.57
01.03.08.03.01 VALVULA CONTROL DE BRONCE DE 8" pza 1.00 2,109.70 2,109.70 738.40 1,090.01 281.29
01.03.08.03.02 VALVULA OS & Y - Ø 2" pza 1.00 310.62 310.62 108.72 160.49 41.41
01.03.08.03.03 VALVULA OS & Y - Ø 8" pza 1.00 9,174.00 9,174.00 3,210.90 4,739.90 1,223.20
01.03.08.03.04 VALVULA MARIPOSA 8" ( FIRE BALL ) pza 1.00 411.56 411.56 144.05 212.64 54.87
01.03.08.03.05 VALVULA CHECK 2" pza 1.00 241.62 241.62 84.57 124.84 32.21
01.03.08.03.06 VALVULA CHECK SILENCIOSA Ø 8" pza 1.00 1,486.28 1,486.28 520.20 767.91 198.17
01.03.08.03.07 MEDIDOR DE PRESION Ø 2" und 2.00 1,242.86 2,485.72 870.00 1,284.29 331.43
01.03.08.03.08 MEDIDOR DE PRUEBA Ø 8" ( ESTILO 735 VITAULIC ) und 3.00 2,800.58 8,401.74 2,940.61 4,340.90 1,120.23
01.03.08.03.09 MEDIDOR DE FLUJO Ø 2" und 1.00 837.33 837.33 293.07 432.62 111.64
01.03.08.04 PIEZAS VARIAS 694.71
01.03.08.04.01 UNION VITAULIC Ø 8" pza 1.00 512.18 512.18 179.26 264.63 68.29
01.03.08.04.02 PLATO VORTEX 60 x 60 x cm, 3/16" und 1.00 182.53 182.53 63.89 94.31 24.33
01.03.08.05 ADITAMENTOS VARIOS 171.75
01.03.08.05.01 BRIDA ROMPE AGUA Ø 8" und 1.00 48.01 48.01 16.80 24.81 6.40
01.03.08.05.02 PASE EN MURO 9" und 2.00 61.87 123.74 43.31 63.93 16.50
01.03.08.06 EQUIPOS Y OTRAS INSTALACIONES 51,625.00
01.03.08.06.01 EQUIPOS DE BOMBEO DE SISTEMA CONTRA INCENDIO und 1.00 51,625.00 51,625.00 15,487.50 22,862.50 13,275.00
01.04 SISTEMA DE AGUAS PLUVIALES 1,744.06
01.04.01 REDES DE DISTRIBUCION 1,479.94
01.04.01.01 TUBERIA PVC DS - CP Ø 4" m 2.97 25.35 75.29 39.78 32.37 3.14
01.04.01.02 MONTANTE DE PVC DS - CP Ø 4" m 50.40 27.87 1,404.65 706.17 636.85 61.63
01.04.02 ACCESORIOS DE REDES 91.20
01.04.02.01 CODO PVC DS - CP 4" x 90º pza 10.00 9.12 91.20 73.52 16.12 1.56
01.04.03 ADITAMENTOS VARIOS 172.92
01.04.03.01 SUMIDERO DE BRONCE 4" pza 4.00 43.23 172.92 42.27 119.12 11.53
01.05 SISTEMA DE DESAGÜE 70,375.32
01.05.01 SALIDAS DE DESAGÜE Y VENTILACION 5,518.57
01.05.01.01 SALIDA DE DESAGUE PVC DS - CP 2" pto 39.00 74.31 2,898.09 819.54 1,895.15 183.40
01.05.01.02 SALIDA DE DESAGUE PVC DS - CP 4" pto 26.00 75.83 1,971.58 585.83 1,263.48 122.27
01.05.01.03 SALIDA DE VENTILACION PVC DS - CP 3" pto 3.00 61.90 185.70 51.51 122.35 11.84
01.05.01.04 SALIDA DE VENTILACION PVC DS - CP 4" pto 6.00 77.20 463.20 137.20 297.24 28.76
01.05.02 REDES DE RECOLECCION 26,466.45
01.05.02.01 TUBERIA PVC DS - CP Ø 2" m 368.81 20.29 7,483.15 3,074.81 4,019.37 388.97
01.05.02.02 TUBERIA PVC DS - CP Ø 3" m 233.87 22.29 5,212.96 1,433.31 3,446.15 333.50
01.05.02.03 TUBERIA PVC DS - CP Ø 4" m 325.25 25.35 8,245.09 4,356.80 3,545.21 343.08
01.05.02.04 TUBERIA PVC DS - CP Ø 6" m 40.63 36.60 1,487.06 391.13 999.23 96.70
01.05.02.05 TUBERIA PVC CLASE 10 C/ ROSCA 1" m 25.00 16.70 417.50 104.04 285.80 27.66

99 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO INSTALACIONES SANITARIAS

02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015
01.05.02.06 MONTANTE DE PVC DS - CP Ø 2" m 11.70 22.78 266.53 104.67 147.58 14.28
01.05.02.07 MONTANTE DE PVC DS - CP Ø 3" m 45.25 25.16 1,138.49 309.07 756.24 73.18
01.05.02.08 MONTANTE DE PVC DS - CP Ø 4" m 79.50 27.87 2,215.67 1,113.89 1,004.56 97.22
01.05.03 REDES COLECTORAS 923.25
01.05.03.01 TUBERIA PVC DS - CP Ø 4" m 36.42 25.35 923.25 487.85 396.98 38.42
01.05.04 ACCESORIOS DE REDES 4,955.08
01.05.04.01 CODO PVC DS - CP 2" x 90º pza 162.00 3.81 617.22 389.56 207.58 20.08
01.05.04.02 CODO PVC DS - CP 3" x 90º pza 96.00 6.12 587.52 163.20 386.88 37.44
01.05.04.03 CODO PVC DS - CP 4" x 90º pza 17.00 9.12 155.04 124.98 27.40 2.66
01.05.04.04 CODO PVC C/ ROSCA 1" x 90º pza 3.00 4.97 14.91 3.96 9.98 0.97
01.05.04.05 CODO PVC DS - CP 2" x 45° pza 79.00 3.60 284.40 85.64 181.23 17.53
01.05.04.06 CODO PVC DS - CP 3" x 45° pza 17.00 7.02 119.34 32.64 79.05 7.65
01.05.04.07 CODO PVC DS - CP 4" x 45° pza 21.00 9.02 189.42 50.59 126.58 12.25
01.05.04.08 CODO PVC C/ ROSCA 1" x 45º pza 4.00 4.90 19.60 5.21 13.12 1.27
01.05.04.09 CODO SANITARIO PVC DS - CP 4" - 2" pza 27.00 9.28 250.56 66.76 167.59 16.21
01.05.04.10 TEE PVC DS - CP 2" pza 6.00 4.80 28.80 8.26 18.72 1.82
01.05.04.11 TEE PVC DS - CP 3" pza 2.00 112.34 224.68 55.33 154.41 14.94
01.05.04.12 TEE PVC DS - CP 4" pza 13.00 12.53 162.89 42.47 109.80 10.62
01.05.04.13 TEE DOBLE PVC DS - CP 2" pza 10.00 7.62 76.20 20.67 50.63 4.90
01.05.04.14 TEE SANITARIA PVC DS - CP 2" pza 26.00 12.42 322.92 96.62 206.34 19.96
01.05.04.15 YEE PVC DS - CP 2" pza 63.00 7.17 451.71 123.27 299.46 28.98
01.05.04.16 YEE PVC DS - CP 4" pza 44.00 12.90 567.60 147.72 382.83 37.05
01.05.04.17 YEE PVC DS-CP 6" pza 7.00 15.34 107.38 35.77 65.29 6.32
01.05.04.18 YEE C/ REDUCCION PVC DS - CP 3" - 2" pza 2.00 11.01 22.02 5.79 14.80 1.43
01.05.04.19 YEE C/ REDUCCION PVC DS - CP 4" - 2" pza 33.00 10.49 346.17 91.35 232.33 22.49
01.05.04.20 YEE C/ REDUCCION PVC DS - CP 4" - 3" pza 3.00 11.96 35.88 9.38 24.16 2.34
01.05.04.21 REDUCCION PVC DS - CP DE 3" - 2" pza 4.00 5.33 21.32 6.03 13.94 1.35
01.05.04.22 REDUCCION PVC DS - CP DE 4" - 2" pza 2.00 5.94 11.88 3.31 7.81 0.76
01.05.04.23 REDUCCION PVC DS - CP DE 4" - 3" pza 12.00 16.34 196.08 50.38 132.85 12.85
01.05.04.24 REDUCCION PVC DSCP DE 6" - 4" pza 7.00 20.22 141.54 S. 41.74 91.00 8.80
01.05.05 ADITAMENTOS VARIOS 2,429.27
01.05.05.01 SUMIDERO DE BRONCE 2" pza 14.00 26.48 370.72 90.62 255.38 24.72
01.05.05.02 SUMIDERO DE BRONCE 3" pza 22.00 34.85 766.70 187.42 528.17 51.11
01.05.05.03 SUMIDERO DE BRONCE 4" pza 2.00 43.23 86.46 21.13 59.56 5.77
01.05.05.04 REGISTRO DE BRONCE 2" pza 17.00 27.82 472.94 121.00 320.88 31.06
01.05.05.05 REGISTRO DE BRONCE 4" pza 13.00 33.75 438.75 114.13 295.98 28.64
01.05.05.06 REGISTRO DE BRONCE 6" pza 3.00 42.13 126.39 32.16 85.91 8.32
01.05.05.07 SOMBRERO DE VENTILACION PVC DS - CP DE 3" pza 3.00 18.59 55.77 14.65 37.49 3.63
01.05.05.08 SOMBRERO DE VENTILACION PVC DS - CP DE 4" pza 6.00 18.59 111.54 29.31 74.98 7.25
01.05.06 PIEZAS VARIAS 15,637.29
01.05.06.01 COLGADOR PARA UNA TUBERIA Ø 1" pza 8.00 43.10 344.80 84.28 237.53 22.99
01.05.06.02 COLGADOR PARA UNA TUBERIA Ø 2" pza 87.00 48.68 4,235.16 1,035.26 2,917.55 282.35
01.05.06.03 COLGADOR PARA UNA TUBERIA Ø 3" pza 53.00 61.09 3,237.77 791.45 2,230.46 215.86
01.05.06.04 COLGADOR PARA UNA TUBERIA Ø 4" pza 104.00 62.94 6,545.76 1,600.07 4,509.30 436.39
01.05.06.05 COLGADOR PARA UNA TUBERIA Ø 6" pza 20.00 63.69 1,273.80 311.37 877.51 84.92
01.05.07 CAMARAS DE INSPECCION 865.95
01.05.07.01 CAJA DE REG. CONCR. - 12" x 24" TAPA CONCRETO pza 5.00 173.19 865.95 353.34 467.38 45.23
01.05.08 PRUEBA HIDRAULICA DE DESAGUE 1,803.46
01.05.08.01 PRUEBA HIDRAULICA DE DESAGUE m 1,141.43 1.58 1,803.46 518.46 1,171.61 113.39
01.05.09 INSTALACIONES ESPECIALES - POZO DE SUMIDERO 5,962.77
01.05.09.01 REDES DE DISTRIBUCION 548.19
01.05.09.01.01 TUBERIA PVC CLASE 10 C/ ROSCA 2" m 3.18 24.71 78.58 46.15 32.43
01.05.09.01.02 TUBERIA PVC SAL Ø 6" m 9.92 47.34 469.61 275.10 194.51
01.05.09.02 ACCESORIOS DE REDES 312.49
01.05.09.02.01 CODO PVC SAL 6" x 90° pza 8.00 26.28 210.24 99.26 110.98
01.05.09.02.02 CODO PVC SAP 6" X 45º pza 3.00 16.33 48.99 23.29 25.70

100 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO INSTALACIONES SANITARIAS

02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015
01.05.09.02.03 YEE PVC SAL 6" pza 1.00 18.19 18.19 9.21 8.98
01.05.09.02.04 CODO PVC C/ ROSCA 2" x 90º pza 2.00 11.10 22.20 10.51 11.69
01.05.09.02.05 TEE PVC C/ ROSCA 2" pza 1.00 12.87 12.87 6.45 6.42
01.05.09.03 LLAVES Y VALVULAS 429.42
01.05.09.03.01 VALVULA DE COMPUERTA BRONCE DE 2" pza 1.00 187.80 187.80 67.22 120.58
01.05.09.03.02 VALVULA CHECK 2" pza 1.00 241.62 241.62 85.91 155.71
01.05.09.04 PIEZAS VARIAS 157.71
01.05.09.04.01 ELECTRONIVEL und 1.00 59.08 59.08 44.14 14.94
01.05.09.04.02 BRIDA ROMPE AGUA 55 cm x 55 cm - Ø 6" und 1.00 98.63 98.63 35.07 63.56
01.05.09.05 ADITAMENTOS VARIOS 86.46
01.05.09.05.01 SUMIDERO DE BRONCE 4" pza 2.00 43.23 86.46 30.74 55.72
01.05.09.06 EQUIPOS Y OTRAS INSTALACIONES 4,428.50
01.05.09.06.01 ELECTROBOMBA SUMERGIBLE, Q = 2.33 lps, HDT = 13.11 M, POT. = 0.86 HP und 2.00 2,214.25 4,428.50 1,328.55 1,961.19 1,138.76
01.05.10 INSTALACIONES ESPECIALES - CAMARA DE BOMBEO 5,813.23
01.05.10.01 REDES DE DISTRIBUCION 136.27
01.05.10.01.01 TUBERIA DE FIERRO GALVANIZADO DE 1" pza 4.39 31.04 136.27 48.45 87.82
01.05.10.02 ACCESORIOS DE REDES 110.88
01.05.10.02.01 CODO DE FIERRO GALVANIZADO 1" x 90º pza 6.00 17.65 105.90 37.65 68.25
01.05.10.02.02 TEE DE FIERRO GALVANIZADO 1" pza 1.00 4.98 4.98 1.86 3.12
01.05.10.03 LLAVES Y VALVULAS 1,137.58
01.05.10.03.01 VALVULA CHECK DE BRONCE 1" P/TUB. FIERRO GALV. pza 2.00 119.63 239.26 86.42 152.84
01.05.10.03.02 VALVULA ESFERICA DE BRONCE DE 1" P/TUB. FIERRO GALV. pza 2.00 449.16 898.32 319.40 578.92
01.05.10.04 EQUIPOS Y OTRAS INSTALACIONES 4,428.50
01.05.10.04.01 ELECTROBOMBA SUMERGIBLE, Q = 0.83 lps, HDT = 17.94 M, POT. = 0.31 HP und 2.00 2,214.25 4,428.50 822.44 1,961.19 1,644.87
01.06 SISTEMA DE DRENAJE DE EQUIPOS DE AIRE ACONDICIONADO 21,709.38
01.06.01 SALIDAS DE DRENAJE DE EQUIPOS 7,070.06
01.06.01.01 SALIDA DESAGUE PVC CLASE 10 C/ ROSCA 1 1/4" pto 86.00 82.21 7,070.06 755.77 3,624.87 2,689.42
01.06.02 REDES DE DISTRIBUCION 8,751.53
01.06.02.01 TUBERIA PVC CLASE 10 C/ ROSCA 1 1/4" m 422.08 18.74 7,909.78 830.86 4,063.82 3,015.10
01.06.02.02 MONTANTE DE PVC SAL Ø 4" m 32.40 25.98 841.75 243.10 343.67 254.98
01.06.03 ACCESORIOS DE REDES 1,894.94
01.06.03.01 CODO PVC C/ ROSCA 1 1/4" x 90º pza 28.00 6.90 193.20 22.85 97.79 72.56
01.06.03.02 CODO PVC C/ ROSCA 4" x 90º pza 3.00 24.34 73.02 10.33 35.99 26.70
01.06.03.03 CODO PVC C/ ROSCA 1 1/4" x 45º pza 71.00 6.90 489.90 57.94 247.98 183.98
01.06.03.04 TEE PVC C/ ROSCA 4" pza 8.00 32.27 258.16 37.91 126.44 93.81
01.06.03.05 YEE PVC C/ ROSCA 1 1/4" pza 77.00 8.21 632.17 135.98 284.85 211.34
01.06.03.06 REDUCCION PVC C/ ROSCA 4" - 1 1/4" pza 9.00 27.61 248.49 33.35 123.50 91.64
01.06.04 VARIOS 3,992.85
01.06.04.01 COLGADOR PARA 1 TUBERIA pza 171.00 23.35 3,992.85 199.64 2,062.97 1,730.24
01.07 VARIOS 1,426.54
01.07.01 MOVIMIENTO DE TIERRAS 1,426.54
01.07.01.01 EXCAVACION MANUAL PARA REDES SANITARIAS, H = 0.60 M, ANCHO = 0.50 M m 47.51 8.39 398.61 256.88 141.73
01.07.01.02 REFINE Y NIVELACION DE ZANJAS, T. NORMAL P/ TUB. D = 4" - 6" m 47.51 9.02 428.54 276.17 152.37
01.07.01.03 RELLENO COMPACTADO A MANO, CON MATERIAL PROPIO H = 0.60 M, ANCHO = 0.50 M m 47.51 4.47 212.37 75.51 136.86
01.07.01.04 ELIMINACION DE MATERIAL, CARGADOR 125 HP / VOLQUETE 6 M3, D = 30 KM m3 9.98 38.78 387.02 94.60 266.61 25.81

TOTAL COSTO DIRECTO 519,904.79 0.00 0.00 0.00 4,434.13 4,523.29 10,134.49 46,206.06 123,732.02 227,624.22 103,250.58
GASTOS GENERALES 8.00% 8.00% 41,592.38 - - - 354.73 361.86 810.76 3,696.48 9,898.56 18,209.94 8,260.05
UTILIDAD 8.00% 8.00% 41,592.38 - - - 354.73 361.86 810.76 3,696.48 9,898.56 18,209.94 8,260.05
PARCIAL 603,089.55 - - - 5,143.59 5,247.01 11,756.01 53,599.02 143,529.14 264,044.10 119,770.68
FACTOR DE RELACION (0.90000) 0.90000 542,780.60 - - - 4,629.23 4,722.31 10,580.41 48,239.12 129,176.23 237,639.69 107,793.60
IGV 18.00% 97,700.50 - - - 833.26 850.02 1,904.47 8,683.04 23,251.72 42,775.14 19,402.83
PRESUPUESTO TOTAL 640,481.10 - - - 5,462.49 5,572.33 12,484.88 56,922.16 152,427.95 280,414.83 127,196.43
AVANCE PARCIAL - 0.00% 0.00% 0.00% 0.85% 0.87% 1.95% 8.89% 23.80% 43.78% 19.86%
AVANCE ACUMULADO 0.0% 0.00% 0.00% 0.00% 0.85% 1.72% 3.67% 12.56% 36.36% 80.14% 100.00%
0 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

101 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO INSTALACIONES ELECTRICAS

CALENDARIO DE ACTIVIDADES VALORIZADO ACTUALIZADO DE INSTALACIONES ELECTRICAS A LA FECHA DE INICIO DE OBRA


LP Nº 003-2015-EF/43
: "AMPLIACIÓN Y MEJORAMIENTO DE LOS SERVICIOS COMPLEMENTARIOS DE LA SEDE CENTRAL DEL MINISTERIO DE ECONOMÍA Y FINANZAS, CERCADO DE
OBRA
LIMA - LIMA"
UBICACIÓN : LIMA - LIMA - LIMA
FECHA BASE :31/11/2014
PROPIETARIO : MINISTERIO DE ECONOMÍA Y FINANZAS 12/31/2015
CONTRATISTA : CONSORCIO T y M 0.00% 0.00% 0.02% 2.16% 1.07% 1.24% 21.54% 27.65% 31.91% 14.41%
FECHA DE INICIO : 02/12/2015 1.56% 1.56% 1.56% 1.56% 1.57% 1.57% 1.57% 1.57% 1.57% 1.56%
- - 533.29 58,601.11 28,958.59 33,653.76 584,677.62 750,689.61 866,322.79 391,257.99
02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015
01 INSTALACIONES ELECTRICAS Y MECANICAS 2,714,694.76 - - 533.29 58,601.11 28,958.59 33,653.76 584,677.62 750,689.61 866,322.79 391,257.99
01.01 INSTALACIONES ELECTRICAS 1,097,780.63
01.01.01 CONEXION A LA RED EXTERNA - TRABAJO PRELIMINARES 2,343.11
01.01.01.01 EXCAVACION MANUAL PARA REDES ELECTRICAS, H = 0.60 M, ANCHO = 0.50 M m 130.10 8.39 1,091.54 248.97 722.03 120.54
01.01.01.02 RELLENO COMPACTADO A MANO, CON MATERIAL PROPIO H = 0.60 M, ANCHO = 0.50 M m 130.10 4.47 581.55 135.39 392.63 53.53
01.01.01.03 CINTA SEÑALIZADORA m 130.10 5.15 670.02 148.93 431.90 89.19
01.01.02 SALIDAS PARA ALUMBRADO, TOMACORRIENTES Y FUERZA 356,995.22
01.01.02.01 SALIDAS PARA ALUMBRADO 26,664.66
01.01.02.01.01 SALIDA PARA ALUMBRADO EN TECHO DE PVC SAP 20 mm ( LSOH 4 mm2 ) pto 333.00 74.13 24,685.29 10,667.15 3,609.30 3,492.87 3,609.30 3,306.67
01.01.02.01.02 SALIDA PARA ALUMBRADO EN PARED DE PVC SAP 20 mm ( LSOH 4 mm2 ) pto 27.00 73.31 1,979.37 871.47 299.66 290.00 299.66 218.58
01.01.02.02 SALIDAS PARA INTERRUPTORES 5,474.28
01.01.02.02.01 INTERRUPTOR UNIPOLAR SIMPLE PVC SAP 20 mm ( LSOH 4 mm2 ) pto 110.00 47.53 5,228.30 2,197.27 789.73 764.25 789.73 687.32
01.01.02.02.02 INTERRUPTOR UNIPOLAR DOBLE PVC SAP 20 mm ( LSOH 4 mm2 ) pto 1.00 59.34 59.34 26.97 10.04 9.72 10.04 2.57
01.01.02.02.03 INTERRUPTOR UNIPOLAR TRIPLE PVC SAP 20 mm ( LSOH 4 mm2 ) pto 1.00 69.30 69.30 33.44 10.94 10.59 10.94 3.39
01.01.02.02.04 INTERRUPTOR DE CONMUTACION SIMPLE ( 3 VIAS ) PVC SAP 20 mm ( LSOH 4 mm2 ) pto 2.00 58.67 117.34 51.21 20.95 20.27 20.95 3.96
01.01.02.03 SALIDAS PARA TOMACORRIENTES 39,913.52
TOMACORRIENTE BIPOLAR DOBLE C/ LINEA A TIERRA PVC SAP 20 mm EN PARED ( LSOH 4
01.01.02.03.01 pto 142.00 88.26 12,532.92 7,480.89 1,310.93 1,268.64 1,310.93 1,161.53
mm2 )
TOMACORRIENTE BIPOLAR DOBLE C/ LINEA A TIERRA PVC SAP 20 mm EN PISO ( LSOH 4
01.01.02.03.02 pto 1.00 85.70 85.70 53.30 9.90 9.58 9.90 3.02
mm2 )
TOMACORRIENTE BIPOLAR DOBLE C/ LINEA A TIERRA PVC SAP 20 mm EN TECHO ( LSOH 4
01.01.02.03.03 pto 2.00 88.54 177.08 107.97 21.25 20.56 21.25 6.05
mm2 )
TOMACORRIENTE BIPOLAR DOBLE C/ LINEA A TIERRA PVC SAP 20 mm PARA LUCES DE
01.01.02.03.04 pto 98.00 87.54 8,578.92 5,235.40 873.97 845.78 873.97 749.80
EMERGENCIA
TOMACORRIENTE BIPOLAR DOBLE A PRUEBA DE AGUA C/ LINEA A TIERRA PVC SAP 20 mm
01.01.02.03.05 pto 19.00 115.70 2,198.30 1,112.66 294.81 285.30 294.81 210.72
EN PARED ( LSOH 4 mm2 )
TOMACORRIENTE ESTABILIZADO DOBLE C/ LINEA A TIERRA PVC SAP 20 mm EN PARED
01.01.02.03.06 pto 20.00 88.26 1,765.20 1,065.12 196.91 190.55 196.91 115.71
( LSOH 4 mm2 )
TOMACORRIENTE ESTABILIZADO DOBLE C/ LINEA A TIERRA PVC SAP 20 mm EN PISO
01.01.02.03.07 pto 168.00 85.70 14,397.60 8,765.29 1,459.74 1,412.65 1,459.74 1,300.18
( LSOH 4 mm2 )
TOMACORRIENTE ESTABILIZADO DOBLE C/ LINEA A TIERRA PVC SAP 20 mm EN TECHO
01.01.02.03.08 pto 2.00 88.90 177.80 108.14 21.43 20.74 21.43 6.06
( LSOH 4 mm2 )
01.01.02.04 SALIDAS DE FUERZA 17,653.02
SALIDA DE FUERZA, PARA EQUIPOS DE AIRE ACONDICIONADO, TUBERIA PVC SAP 20 mm
01.01.02.04.01 pto 87.00 111.47 9,697.89 5,673.69 1,047.95 1,014.15 1,047.95 914.15
( 2 x 4 mm2 LSOH + 1 x 4 mm2 LSOH )
SALIDA DE FUERZA, PARA EQUIPOS DE AIRE ACONDICIONADO, TUBERIA PVC SAP 20 mm
01.01.02.04.02 pto 15.00 111.47 1,672.05 989.26 192.48 186.27 192.48 111.56
( 3 x 4 mm2 LSOH + 1 x 4 mm2 LSOH )
SALIDA DE FUERZA, PARA EQUIPOS DE AIRE ACONDICIONADO, TUBERIA PVC SAP 20 mm
01.01.02.04.03 pto 5.00 130.75 653.75 214.02 130.21 126.01 130.21 53.30
( 3 x 6 mm2 LSOH + 1 x 6 mm2 LSOH )
SALIDA DE FUERZA, PARA EQUIPOS DE AIRE ACONDICIONADO, TUBERIA PVC SAP 35 mm
01.01.02.04.04 pto 3.00 305.02 915.06 194.49 195.14 188.84 195.14 141.45
( 3 x 25 mm2 LSOH + 1 x 10 mm2 LSOH )
SALIDA DE FUERZA, PARA EQUIPOS DE AIRE ACONDICIONADO, TUBERIA METALICA 20 mm
01.01.02.04.05 pto 2.00 154.44 308.88 128.71 53.18 51.46 53.18 22.35
( 3 x 4 mm2 LSOH + 1 x 4 mm2 LSOH )
SALIDA DE FUERZA, PARA EQUIPOS DE AIRE ACONDICIONADO, TUBERIA METALICA 35 mm
01.01.02.04.06 pto 2.00 303.22 606.44 123.67 123.69 119.70 123.69 115.69
( 3 x 16 mm2 LSOH + 1 x 10 mm2 LSOH )

102 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO INSTALACIONES ELECTRICAS

02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015
SALIDA DE FUERZA, PARA EQUIPOS DE AIRE ACONDICIONADO, TUBERIA METALICA 50 mm
01.01.02.04.07 pto 3.00 445.30 1,335.90 267.91 273.62 264.79 273.62 255.96
( 3 x 25 mm2 LSOH + 1 x 10 mm2 LSOH )
SALIDA DE FUERZA, PARA EQUIPOS DE AIRE ACONDICIONADO, TUBERIA METALICA 65 mm
01.01.02.04.08 pto 1.00 836.53 836.53 164.94 172.06 166.51 172.06 160.96
( 3 x 70 mm2 LSOH + 1 x 35 mm2 LSOH )
SALIDA DE FUERZA, PARA BOMBA DE AGUA, TUBERIA PVC SAP 20 mm ( 3 x 6 mm2 LSOH + 1
01.01.02.04.09 pto 3.00 131.65 394.95 123.17 69.63 67.38 69.63 65.14
x 6 mm2 LSOH )
SALIDA DE FUERZA, PARA BOMBA SUMIDERO DE DESAGUE, TUBERIA PVC SAP 20 mm ( 3 x
01.01.02.04.10 pto 2.00 112.37 224.74 131.94 23.78 23.01 23.78 22.23
4 mm2 LSOH + 1 x 4 mm2 LSOH )
SALIDA DE FUERZA, PARA BOMBA DE DESAGUE, TUBERIA PVC SAP 20 mm ( 3 x 4 mm2
01.01.02.04.11 pto 2.00 112.37 224.74 131.94 23.78 23.01 23.78 22.23
LSOH + 1 x 4 mm2 LSOH )
SALIDA DE FUERZA, PARA BOMBA DE AGUA CONTRA INCENDIO, TUBERIA PVC SAP 65 mm (
01.01.02.04.12 pto 1.00 782.09 782.09 157.49 160.02 154.86 160.02 149.70
3 x 70 mm2 N2XH + 1 x 35 mm2 LSOH )
01.01.02.05 CAJAS DE PASE 2,024.95
01.01.02.05.01 CAJA DE PASE 100 x 100 x 50 mm pza 83.00 15.42 1,279.86 247.44 264.50 255.97 264.50 247.45
01.01.02.05.02 CAJA DE PASE 100 x 100 x 100 mm pza 19.00 16.61 315.59 61.01 65.22 63.12 65.22 61.02
01.01.02.05.03 CAJA DE PASE 150 x 150 x 75 mm pza 1.00 18.74 18.74 10.24 2.18 2.11 2.18 2.03
01.01.02.05.04 CAJA DE PASE 150 x 150 x 100 mm pza 8.00 18.74 149.92 28.98 30.98 29.98 30.98 29.00
01.01.02.05.05 CAJA DE PASE 200 x 200 x 100 mm pza 4.00 20.61 82.44 15.94 17.04 16.49 17.04 15.93
01.01.02.05.06 CAJA DE PASE 250 x 250 x 100 mm pza 8.00 22.30 178.40 34.49 36.87 35.68 36.87 34.49
01.01.02.06 CANALIZACIONES, CONDUCTOS O TUBERIAS 48,785.92
01.01.02.06.01 TUBERIA PVC SAP ( ELECTRICAS ) D = 25 mm m 571.01 6.90 3,939.97 1,766.04 556.96 538.99 556.96 521.02
01.01.02.06.02 TUBERIA PVC SAP ( ELECTRICAS ) D = 35 mm m 10.45 7.88 82.35 18.60 19.39 18.76 19.39 6.21
01.01.02.06.03 TUBERIA PVC SAP ( ELECTRICAS ) D = 40 mm m 5.95 11.11 66.10 32.32 10.39 10.06 10.39 2.94
01.01.02.06.04 TUBERIA PVC SAP ( ELECTRICAS ) D = 65 mm m 19.22 20.41 392.28 81.63 86.33 83.55 86.33 54.44
01.01.02.06.05 TUBERIA PVC SAP ( ELECTRICAS ) D = 100 mm m 24.88 44.95 1,118.36 228.10 242.64 234.81 242.64 170.17
01.01.02.06.06 BANDEJA METALICA CERRADA LISA CON TAPA, COLGADO DE TECHO 150 x 80 mm m 6.40 96.62 618.37 125.45 134.10 129.78 134.10 94.94
01.01.02.06.07 BANDEJA METALICA CERRADA LISA CON TAPA, COLGADO DE TECHO 200 x 60 mm m 198.24 101.09 20,040.08 3,885.17 4,153.11 4,019.14 4,153.11 3,829.55
01.01.02.06.08 BANDEJA METALICA CERRADA LISA CON TAPA, COLGADO DE TECHO 300 x 80 mm m 36.56 129.84 4,746.95 927.85 991.84 959.85 991.84 875.57
01.01.02.06.09 BANDEJA METALICA CERRADA LISA CON TAPA, COLGADO DE TECHO 500 x 80 mm m 18.38 155.85 2,864.52 563.97 602.87 583.42 602.87 511.39
01.01.02.06.10 BANDEJA METALICA CERRADA LISA CON TAPA, COLGADO DE TECHO 600 x 100 mm m 54.62 194.23 10,608.84 2,061.64 2,203.83 2,132.73 2,203.83 2,006.81
01.01.02.06.11 BANDEJA METALICA TIPO ESCALERA DE 300 x 80 mm m 15.75 98.28 1,547.91 307.97 329.21 318.59 329.21 262.93
01.01.02.06.12 CODO PARA BANDEJA METALICA DE FIERRO GALVANIZADO, 300 x 80 mm pza 2.00 59.63 119.26 25.76 27.54 26.65 27.54 11.77
01.01.02.06.13 CODO PARA BANDEJA METALICA DE FIERRO GALVANIZADO, 150 x 80 mm pza 25.00 55.13 1,378.25 283.39 302.93 293.16 302.93 195.84
01.01.02.06.14 TEE PARA BANDEJA METALICA DE FIERRO GALVANIZADO, 300 x 80 mm pza 6.00 59.63 357.78 77.29 82.62 79.96 82.62 35.29
01.01.02.06.15 TEE PARA BANDEJA METALICA DE FIERRO GALVANIZADO, 150 x 80 mm pza 9.00 55.13 496.17 108.11 115.57 111.84 115.57 45.08
01.01.02.06.16 CANALETA DE PVC ( ELECTRICAS ) 30 x 15 mm C/ COMPARTIMIENTOS m 100.18 4.08 408.73 85.65 91.56 88.61 91.56 51.35
01.01.02.07 CONDUCTORES Y CABLES DE ENERGIA EN CONDUCTOS 71,381.31
01.01.02.07.01 CABLE ELECTRICO LSOH 4 mm2 m 53.78 2.55 137.14 86.15 44.76 6.23
01.01.02.07.02 CABLE ELECTRICO LSOH 6 mm2 m 517.59 3.41 1,764.98 40.56 1,257.46 466.96
01.01.02.07.03 CABLE ELECTRICO LSOH 10 mm2 m 396.38 3.87 1,533.99 35.12 1,088.59 410.28
01.01.02.07.04 CABLE ELECTRICO LSOH 16 mm2 m 61.19 6.07 371.42 8.65 268.11 94.66
01.01.02.07.05 CABLE ELECTRICO LSOH 35 mm2 m 150.27 10.96 1,646.96 37.57 1,164.65 444.74
01.01.02.07.06 CABLE ELECTRICO LSOH 95 mm2 m 4.32 20.56 88.82 2.01 62.34 24.47
01.01.02.07.07 CABLE ELECTRICO N2XH 6 mm2 m 572.04 3.65 2,087.95 47.88 1,484.32 555.75
01.01.02.07.08 CABLE ELECTRICO N2XH 95 mm2 m 334.68 23.03 7,707.68 172.72 5,354.39 2,180.57
01.01.02.07.09 CABLE ELECTRICO N2XOH 6 mm2 m 892.26 4.65 4,149.01 93.75 2,906.32 1,148.94
01.01.02.07.10 CABLE ELECTRICO N2XOH 10 mm2 m 1,289.59 5.64 7,273.29 162.97 5,051.93 2,058.39
01.01.02.07.11 CABLE ELECTRICO N2XOH 16 mm2 m 41.80 9.32 389.58 8.93 276.74 103.91
01.01.02.07.12 CABLE ELECTRICO N2XOH 25 mm2 m 183.57 10.48 1,923.81 43.94 1,362.04 517.83
01.01.02.07.13 CABLE ELECTRICO N2XOH 70 mm2 m 204.30 23.61 4,823.52 108.70 3,369.67 1,345.15
01.01.02.07.14 CABLE ELECTRICO N2XOH 185 mm2 m 158.13 68.74 10,869.86 245.49 7,610.05 3,014.32
01.01.02.07.15 CABLE ELECTRICO N2XOH 300 mm2 m 12.96 95.01 1,231.33 28.25 875.67 327.41
01.01.02.07.16 CABLE ELECTRICO N2XY 6 mm2 m 878.63 4.61 4,050.48 91.53 2,837.39 1,121.56
01.01.02.07.17 CABLE ELECTRICO N2XY 10 mm2 m 96.09 5.55 533.30 12.35 382.82 138.13
01.01.02.07.18 CABLE ELECTRICO N2XY 70 mm2 m 72.85 30.06 2,189.87 49.20 1,525.27 615.40

103 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO INSTALACIONES ELECTRICAS

02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015
01.01.02.07.19 CABLE ELECTRICO N2XY 185 mm2 m 218.55 58.30 12,741.47 289.11 8,962.35 3,490.01
01.01.02.07.20 CABLE ELECTRICO DESNUDO 35 mm2 m 79.04 4.89 386.51 8.99 278.72 98.80
01.01.02.07.21 CABLE ELECTRICO DESNUDO 50 mm2 m 231.14 10.74 2,482.44 56.00 1,736.09 690.35
01.01.02.07.22 CABLE ELECTRICO DESNUDO 70 mm2 m 250.87 11.95 2,997.90 67.53 2,093.40 836.97
01.01.02.08 TABLEROS PRINCIPALES 31,978.86

01.01.02.08.01 TABLERO PRINCIPAL CAJA METALICA 2000 x 600 x 300 mm ( DEL TIPO AUTOSOPORTADO ) pza 6.00 5,329.81 31,978.86 640.67 19,860.82 11,477.37

01.01.02.09 TABLEROS DE DISTRIBUCION 10,775.30


01.01.02.09.01 TABLERO DISTRIBUCION CAJA METALICA CON 54 POLOS ( DEL TIPO P/ EMPOTRAR ) pza 1.00 644.91 644.91 12.90 399.84 232.17
01.01.02.09.02 TABLERO DISTRIBUCION CAJA METALICA CON 42 POLOS ( DEL TIPO P/ EMPOTRAR ) pza 3.00 594.91 1,784.73 35.69 1,106.53 642.51
01.01.02.09.03 TABLERO DISTRIBUCION CAJA METALICA CON 36 POLOS ( DEL TIPO P/ EMPOTRAR ) pza 2.00 501.91 1,003.82 20.08 622.37 361.37
01.01.02.09.04 TABLERO DISTRIBUCION CAJA METALICA CON 30 POLOS ( DEL TIPO P/ EMPOTRAR ) pza 2.00 455.72 911.44 18.23 565.09 328.12
01.01.02.09.05 TABLERO DISTRIBUCION CAJA METALICA CON 24 POLOS ( DEL TIPO P/ EMPOTRAR ) pza 3.00 406.72 1,220.16 24.40 756.50 439.26
01.01.02.09.06 TABLERO DISTRIBUCION CAJA METALICA CON 18 POLOS ( DEL TIPO P/ EMPOTRAR ) pza 11.00 384.91 4,234.01 84.68 2,625.09 1,524.24
01.01.02.09.07 TABLERO DISTRIBUCION CAJA METALICA CON 12 POLOS ( DEL TIPO P/ EMPOTRAR ) pza 3.00 325.41 976.23 19.52 605.26 351.45
01.01.02.10 DISPOSITIVOS DE MANIOBRA Y PROTECCION 102,343.40
INTERRUPTOR TERMOMAGNETICO TETRAPOLAR REG. 4 x 200 A, 50 KA ( DEL TIPO
01.01.02.10.01 pza 1.00 672.87 672.87 13.56 420.26 239.05
ENGRAMPE )
INTERRUPTOR TERMOMAGNETICO TETRAPOLAR REG. 4 x 80 A, 18 KA ( DEL TIPO
01.01.02.10.02 pza 1.00 255.61 255.61 5.11 158.48 92.02
ENGRAMPE )
INTERRUPTOR TERMOMAGNETICO TETRAPOLAR REG. 4 x 40 A, 18 KA ( DEL TIPO
01.01.02.10.03 pza 3.00 255.61 766.83 15.34 475.43 276.06
ENGRAMPE )

01.01.02.10.04 INTERRUPTOR TERMOMAGNETICO TETRAPOLAR 4 x 80 A, 40 KA ( DEL TIPO ENGRAMPE ) pza 1.00 225.79 225.79 4.52 139.99 81.28

01.01.02.10.05 INTERRUPTOR TERMOMAGNETICO TETRAPOLAR 4 x 40 A, 40 KA ( DEL TIPO ENGRAMPE ) pza 1.00 220.09 220.09 4.40 136.46 79.23

01.01.02.10.06 INTERRUPTOR TERMOMAGNETICO TRIPOLAR C. M. 3 x 400 A, 10 KA ( DEL TIPO ENGRAMPE ) pza 1.00 1,668.79 1,668.79 33.38 1,034.65 600.76

01.01.02.10.07 INTERRUPTOR TERMOMAGNETICO TRIPOLAR C. M. 3 x 160 A, 10 KA ( DEL TIPO ENGRAMPE ) pza 2.00 558.79 1,117.58 22.35 692.90 402.33

01.01.02.10.08 INTERRUPTOR TERMOMAGNETICO TRIPOLAR C. M. 3 x 100 A, 10 KA ( DEL TIPO ENGRAMPE ) pza 3.00 256.40 769.20 15.38 476.90 276.92

01.01.02.10.09 INTERRUPTOR TERMOMAGNETICO TRIPOLAR C. M. 3 x 60 A, 10 KA ( DEL TIPO ENGRAMPE ) pza 1.00 137.10 137.10 2.74 85.00 49.36

01.01.02.10.10 INTERRUPTOR TERMOMAGNETICO TRIPOLAR C. M. 3 x 50 A, 10 KA ( DEL TIPO ENGRAMPE ) pza 1.00 137.10 137.10 2.74 85.00 49.36

01.01.02.10.11 INTERRUPTOR TERMOMAGNETICO TRIPOLAR C. M. 3 x 40 A, 10 KA ( DEL TIPO ENGRAMPE ) pza 1.00 137.10 137.10 2.74 85.00 49.36

01.01.02.10.12 INTERRUPTOR TERMOMAGNETICO TRIPOLAR C. M. 3 x 32 A, 10 KA ( DEL TIPO ENGRAMPE ) pza 5.00 130.10 650.50 13.01 403.31 234.18

01.01.02.10.13 INTERRUPTOR TERMOMAGNETICO TRIPOLAR C. M. 3 x 30 A, 10 KA ( DEL TIPO ENGRAMPE ) pza 1.00 94.10 94.10 1.88 58.34 33.88

INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 1250 A, 85 KA ( DEL TIPO


01.01.02.10.14 pza 1.00 8,011.18 8,011.18 160.22 4,966.93 2,884.03
ENGRAMPE )

01.01.02.10.15 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 800 A, 85 KA ( DEL TIPO ENGRAMPE ) pza 1.00 2,581.79 2,581.79 51.64 1,600.71 929.44

01.01.02.10.16 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 630 A, 85 KA ( DEL TIPO ENGRAMPE ) pza 1.00 1,868.79 1,868.79 37.38 1,158.65 672.76

01.01.02.10.17 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 630 A, 65 KA ( DEL TIPO ENGRAMPE ) pza 1.00 1,818.79 1,818.79 36.38 1,127.65 654.76

01.01.02.10.18 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 630 A, 50 KA ( DEL TIPO ENGRAMPE ) pza 2.00 1,718.79 3,437.58 68.75 2,131.30 1,237.53

01.01.02.10.19 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 400 A, 50 KA ( DEL TIPO ENGRAMPE ) pza 4.00 1,654.79 6,619.16 132.38 4,103.88 2,382.90

104 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO INSTALACIONES ELECTRICAS

02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015

01.01.02.10.20 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 400 A, 36 KA ( DEL TIPO ENGRAMPE ) pza 1.00 1,618.79 1,618.79 32.38 1,003.65 582.76

01.01.02.10.21 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 250 A, 50 KA ( DEL TIPO ENGRAMPE ) pza 1.00 1,003.79 1,003.79 20.08 622.35 361.36

01.01.02.10.22 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 160 A, 50 KA ( DEL TIPO ENGRAMPE ) pza 1.00 437.10 437.10 8.74 271.00 157.36

01.01.02.10.23 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 125 A, 50 KA ( DEL TIPO ENGRAMPE ) pza 1.00 437.10 437.10 8.74 271.00 157.36

01.01.02.10.24 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 63 A, 18 KA ( DEL TIPO ENGRAMPE ) pza 1.00 156.10 156.10 3.12 96.78 56.20

01.01.02.10.25 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 50 A, 18 KA ( DEL TIPO ENGRAMPE ) pza 1.00 156.10 156.10 3.12 96.78 56.20

01.01.02.10.26 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 40 A, 50 KA ( DEL TIPO ENGRAMPE ) pza 1.00 151.10 151.10 3.02 93.68 54.40

01.01.02.10.27 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 40 A, 36 KA ( DEL TIPO ENGRAMPE ) pza 1.00 146.10 146.10 2.92 90.58 52.60

01.01.02.10.28 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 40 A, 18 KA ( DEL TIPO ENGRAMPE ) pza 3.00 137.10 411.30 8.23 255.01 148.06

01.01.02.10.29 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 32 A, 18 KA ( DEL TIPO ENGRAMPE ) pza 5.00 137.10 685.50 13.71 425.01 246.78

01.01.02.10.30 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 25 A, 18 KA ( DEL TIPO ENGRAMPE ) pza 1.00 136.03 136.03 2.72 84.34 48.97

01.01.02.10.31 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 20 A, 50 KA ( DEL TIPO ENGRAMPE ) pza 1.00 120.03 120.03 2.40 74.42 43.21

01.01.02.10.32 INTERRUPTOR TERMOMAGNETICO TRIPOLAR REG. 3 x 20 A, 18 KA ( DEL TIPO ENGRAMPE ) pza 8.00 115.03 920.24 18.40 570.55 331.29

01.01.02.10.33 INTERRUPTOR TERMOMAGNETICO TRIPOLAR 3 x 630 A, 65 KA ( DEL TIPO ENGRAMPE ) pza 1.00 764.79 764.79 15.30 474.17 275.32
01.01.02.10.34 INTERRUPTOR TERMOMAGNETICO TRIPOLAR 3 x 50 A, 10 KA ( DEL TIPO ENGRAMPE ) pza 1.00 126.10 126.10 2.52 78.18 45.40
01.01.02.10.35 INTERRUPTOR TERMOMAGNETICO TRIPOLAR 3 x 40 A, 10 KA ( DEL TIPO ENGRAMPE ) pza 1.00 126.10 126.10 2.52 78.18 45.40
01.01.02.10.36 INTERRUPTOR TERMOMAGNETICO TRIPOLAR 3 x 32 A, 30 KA ( DEL TIPO ENGRAMPE ) pza 6.00 167.10 1,002.60 20.05 621.61 360.94
01.01.02.10.37 INTERRUPTOR TERMOMAGNETICO TRIPOLAR 3 x 25 A, 25 KA ( DEL TIPO ENGRAMPE ) pza 1.00 158.10 158.10 3.16 98.02 56.92
01.01.02.10.38 INTERRUPTOR TERMOMAGNETICO TRIPOLAR 3 x 20 A, 18 KA ( DEL TIPO ENGRAMPE ) pza 9.00 150.03 1,350.27 27.01 837.16 486.10
01.01.02.10.39 INTERRUPTOR TERMOMAGNETICO TRIPOLAR 3 x 20 A, 10 KA ( DEL TIPO ENGRAMPE ) pza 14.00 125.03 1,750.42 35.01 1,085.26 630.15
01.01.02.10.40 INTERRUPTOR TERMOMAGNETICO TRIPOLAR 3 x 15 A, 10 KA ( DEL TIPO ENGRAMPE ) pza 4.00 120.03 480.12 9.60 297.67 172.85
01.01.02.10.41 INTERRUPTOR TERMOMAGNETICO BIPOLAR 2 x 20 A, 10 KA ( DEL TIPO ENGRAMPE ) pza 148.00 47.09 6,969.32 139.39 4,320.98 2,508.95
01.01.02.10.42 INTERRUPTOR DIFERENCIAL 30 mA ( 4 x 25 A ) pza 6.00 329.39 1,976.34 39.53 1,225.33 711.48
01.01.02.10.43 INTERRUPTOR DIFERENCIAL 30 mA ( 2 x 25 A ) pza 155.00 263.39 40,825.45 816.51 25,311.78 14,697.16
01.01.02.10.44 CONTACTOR AC - 3 2 x 20 A CONTROLADO POR INTERRUPTOR HORARIO 16A, 220 V pza 24.00 385.19 9,244.56 184.89 5,731.63 3,328.04
01.01.03 INSTALACION DEL SISTEMA PUESTA A TIERRA 10,440.43
01.01.03.01 POZO DE TIERRA ( PARA EQUIPOS DE FUERZA ) und 2.00 1,289.70 2,579.40 859.80 1,289.70 429.90
01.01.03.02 POZO DE TIERRA ( PARA ASCENSOR ) und 2.00 1,289.70 2,579.40 859.80 1,289.70 429.90
01.01.03.03 POZO DE TIERRA ( PARA SISTEMA DE COMPUTO ) und 2.00 1,289.70 2,579.40 859.80 1,289.70 429.90
01.01.03.04 EXCAVACIONES SIMPLES m3 33.75 33.53 1,131.64 471.52 565.82 94.30
01.01.03.05 ELIMINACION DE MATERIAL, CARGADOR 125 HP / VOLQUETE 6 M3, D = 30 KM m3 40.50 38.78 1,570.59 654.41 785.30 130.88
01.01.04 ARTEFACTOS 78,628.58
ARTEFACTO EMPOTRADO A TECHO C/ 2 LAMP. TIPO SPOT 18 W ( MOD. SPOT 2x18W PHILIPS
01.01.04.01 pza 19.00 98.00 1,862.00 37.24 1,154.44 670.32
O SIMILAR )
ARTEFACTO EMPOTRADO A TECHO C/ 2 LAMP. 26 W ( MOD. FBS 120 2x26W PHILIPS O
01.01.04.02 pza 70.00 102.00 7,140.00 142.80 4,426.80 2,570.40
SIMILAR )
ARTEFACTO EMPOTRADO A TECHO C/ 2 LAMP. 26 W ( MOD. FCS 291 2x26 W PHILIPS O
01.01.04.03 pza 14.00 145.00 2,030.00 40.60 1,258.60 730.80
SIMILAR )
ARTEFACTO EMPOTRADO A TECHO C/ 2 LAMP. 35 W ( MOD. 2x35 W TBS 416 PHILIPS O
01.01.04.04 pza 6.00 120.00 720.00 14.40 446.40 259.20
SIMILAR )
ARTEFACTO EMPOTRADO A TECHO C/ 3 LAMP. 20 W ( MOD. 3x20 W TBS 460 PHILIPS O
01.01.04.05 pza 71.00 145.00 10,295.00 205.90 6,382.90 3,706.20
SIMILAR )

105 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO INSTALACIONES ELECTRICAS

02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015
ARTEFACTO EMPOTRADO A TECHO C/ 4 LAMP. 20 W ( MOD. 4x20 W TBS 460 PHILIPS O
01.01.04.06 pza 32.00 220.00 7,040.00 140.80 4,364.80 2,534.40
SIMILAR )
ARTEFACTO ADOSADO A TECHO C/ 2 LAMP. 16 W TIPO SPOT( MOD. 2x16 W PHILIPS O
01.01.04.07 pza 24.00 110.00 2,640.00 52.80 1,636.80 950.40
SIMILAR )

01.01.04.08 ARTEFACTO ADOSADO A TECHO C/ 2 LAMP. 36 W ( MOD. TCW 215 2x36 W PHILIPS O SIMILAR ) pza 89.00 143.00 12,727.00 254.54 7,890.74 4,581.72

01.01.04.09 ARTEFACTO ADOSADO A TECHO C/ 2 LAMP. 36 W ( MOD. TSC 398 2x36 W PHILIPS O SIMILAR ) pza 8.00 175.00 1,400.00 28.00 868.00 504.00

01.01.04.10 ARTEFACTO ADOSADO A PARED C/ 1 LAMP. 50 W ( MOD. TL5 1x50 W PHILIPS O SIMILAR ) pza 27.00 72.00 1,944.00 38.88 1,205.28 699.84
01.01.04.11 COLOCACION DE ARTEFACTOS DE ALUMBRADO pza 360.00 38.31 13,791.60 275.83 8,550.79 4,964.98
LUZ DE EMERGENCIA A BATERIA DEL TIPO SECO RECARGABLE CON AUTONOMIA DE 2
01.01.04.12 pza 98.00 143.77 14,089.46 281.79 8,735.47 5,072.20
HORAS Y 2 REFLECTORES DIRECCIONALES DE 25 W
LUZ DE EMERGENCIA CON BALASTRO ELECTRONICO PARA LAMPARAS FLUORESCENTES
01.01.04.13 pza 23.00 128.24 2,949.52 1,415.77 1,533.75
DE 12 W
01.01.05 EQUIPOS ELECTRICOS Y MECANICOS 647,870.36

01.01.05.01 SUMINISTRO E INSTALACION DE GRUPO ELECTROGENO 182 KW, 228 KVA, 230 V, 3 FASES und 1.00 100,624.50 100,624.50 16,162.37 40,187.35 31,193.60 13,081.18

01.01.05.02 ASCENSOR 10 PERSONAS, 750 KILOS, 6 PARADAS und 1.00 120,657.95 120,657.95 31,371.07 36,197.39 37,403.96 15,685.53
01.01.05.03 ASCENSOR 12 PERSONAS, 900 KILOS, 6 PARADAS und 1.00 121,398.40 121,398.40 31,563.58 36,419.52 37,633.50 15,781.80
01.01.05.04 TABLERO DE TRANSFERENCIA AUTOMATICA 1 (SEGUN DISEÑO) pza 1.00 7,834.63 7,834.63 2,051.23 2,366.80 2,445.70 970.90
01.01.05.05 TABLERO DE TRANSFERENCIA AUTOMATICA 2 (SEGUN DISEÑO) pza 1.00 3,674.63 3,674.63 969.63 1,118.80 1,156.10 430.10
01.01.05.06 UPS 150 KVA 3Ø, 380 V, 60 Hz ( INC. BANCO DE BATERIAS ) und 1.00 263,314.56 263,314.56 48,472.43 119,006.65 61,640.21 34,195.27
01.01.05.07 TRANSFORMADOR DE AISLAMIENTO 150 KVA, 3 Ø, 220 / 380 V, 60 Hz und 1.00 27,933.74 27,933.74 7,266.32 8,384.22 8,663.69 3,619.51
01.01.05.08 MEDIDOR MULTIFUNCION 3 x 5 A pza 3.00 810.65 2,431.95 638.22 736.41 760.96 296.36
01.01.06 PRUEBAS ELECTRICAS 1,502.93
01.01.06.01 PRUEBAS DE AISLAMIENTO Y RESISTIVIDAD glb 1.00 1,502.93 1,502.93 421.77 486.66 502.89 91.61
01.02 INSTALACIONES MECANICAS 1,314,393.89
01.02.01 SISTEMA DE AIRE ACONDICIONADO 1,170,593.22
01.02.01.01 SISTEMA MULTI - SPLIT 1,037,146.92
01.02.01.01.01 EQUIPO MULTI - SPLIT ( UC - 265,030 BTU/h ) und 1.00 258,077.12 258,077.12 67,101.05 77,424.29 80,005.10 33,546.68
01.02.01.01.02 EQUIPO MULTI - SPLIT ( UC - 420,495 BTU/h ) und 1.00 369,707.32 369,707.32 96,124.90 110,913.35 114,610.46 48,058.61
01.02.01.01.03 EQUIPO MULTI - SPLIT ( UC - 503,840 BTU/h ) und 1.00 409,362.48 409,362.48 106,435.24 122,809.90 126,903.56 53,213.78
01.02.01.02 SISTEMA SPLIT 26,231.76
01.02.01.02.01 EQUIPO SPLIT ( TIPO DECORATIVO 18,000 BTU ) und 1.00 26,231.76 26,231.76 6,820.26 7,869.53 8,131.85 3,410.12
01.02.01.03 TUBERIAS Y ACCESORIOS DE GAS PARA AIRE ACOND. 18,352.32
01.02.01.03.01 TUBERIA DE COBRE TIPO L 15.9 mm m 321.36 31.54 10,135.69 2,652.31 3,060.36 3,162.37 1,260.65
01.02.01.03.02 TUBERIA DE COBRE TIPO L 19.1 mm m 17.16 36.96 634.23 177.63 204.96 211.79 39.85
01.02.01.03.03 TUBERIA DE COBRE TIPO L 22.2 mm m 18.10 42.97 777.76 215.64 248.82 257.11 56.19
01.02.01.03.04 TUBERIA DE COBRE TIPO L 28.6 mm m 50.00 60.45 3,022.50 798.21 921.02 951.72 351.55
01.02.01.03.05 CODO DE COBRE 15.9 mm x 90º pza 34.00 21.21 721.14 193.66 223.46 230.91 73.11
01.02.01.03.06 CODO DE COBRE 19.1 mm x 90º pza 3.00 22.07 66.21 18.30 21.12 21.82 4.97
01.02.01.03.07 CODO DE COBRE 22.2 mm x 90º pza 3.00 24.48 73.44 20.18 23.29 24.06 5.91
01.02.01.03.08 CODO DE COBRE 28.6 mm x 90º pza 15.00 28.32 424.80 115.89 133.72 138.18 37.01
01.02.01.03.09 TEE DE COBRE 15.9 mm pza 39.00 32.31 1,260.09 339.13 391.31 404.35 125.30
01.02.01.03.10 TEE DE COBRE 19.1 mm pza 2.00 32.92 65.84 18.30 21.11 21.82 4.61
01.02.01.03.11 TEE DE COBRE 22.2 mm pza 3.00 36.39 109.17 30.16 34.79 35.95 8.27
01.02.01.03.12 TEE DE COBRE 28.6 mm pza 11.00 42.78 470.58 128.84 148.67 153.62 39.45
01.02.01.03.13 REDUCCION DE COBRE 19.1 mm - 15.9 mm pza 5.00 21.83 109.15 30.15 34.79 35.95 8.26
01.02.01.03.14 REDUCCION DE COBRE 22.2 mm - 15.9 mm pza 5.00 24.78 123.90 33.99 39.22 40.53 10.16
01.02.01.03.15 REDUCCION DE COBRE 28.6 mm - 15.9 mm pza 10.00 24.68 246.80 67.72 78.14 80.74 20.20
01.02.01.03.16 REDUCCION DE COBRE 28.6 mm - 19.1 mm pza 1.00 26.93 26.93 7.36 8.49 8.77 2.31
01.02.01.03.17 REDUCCION DE COBRE 28.6 mm - 22.2 mm pza 3.00 28.03 84.09 22.93 26.46 27.34 7.36
01.02.01.04 TUBERIAS Y ACCESORIOS DE LIQUIDO PARA AIRE ACOND. 13,095.81
01.02.01.04.01 TUBERIA DE COBRE TIPO L 9.5 mm m 355.56 24.18 8,597.44 2,252.92 2,599.52 2,686.17 1,058.83
01.02.01.04.02 TUBERIA DE COBRE TIPO L 12.7 mm m 34.60 28.70 993.02 271.02 312.71 323.14 86.15

106 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO INSTALACIONES ELECTRICAS

02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015
01.02.01.04.03 TUBERIA DE COBRE TIPO L 15.9 mm m 15.43 31.54 486.66 137.98 159.21 164.51 24.96
01.02.01.04.04 CODO DE COBRE 9.5 mm x 90º pza 40.00 20.39 815.60 219.31 253.05 261.49 81.75
01.02.01.04.05 CODO DE COBRE 12.7 mm x 90º pza 6.00 20.59 123.54 34.30 39.57 40.89 8.78
01.02.01.04.06 CODO DE COBRE 15.9 mm x 90º pza 5.00 21.21 106.05 29.39 33.91 35.04 7.71
01.02.01.04.07 TEE DE COBRE 9.5 mm pza 45.00 29.62 1,332.90 355.41 410.09 423.76 143.64
01.02.01.04.08 TEE DE COBRE 12.7 mm pza 9.00 30.27 272.43 76.14 87.86 90.79 17.64
01.02.01.04.09 TEE DE COBRE 15.9 mm pza 3.00 32.31 96.93 26.97 31.12 32.16 6.68
01.02.01.04.10 REDUCCION DE COBRE 12.7 mm - 9.5 mm pza 7.00 20.65 144.55 40.07 46.23 47.77 10.48
01.02.01.04.11 REDUCCION DE COBRE 15..9 mm - 9.5 mm pza 3.00 20.87 62.61 17.34 20.01 20.68 4.58
01.02.01.04.12 REDUCCION DE COBRE 15.9 mm - 12.7 mm pza 3.00 21.36 64.08 17.73 20.45 21.13 4.77
01.02.01.05 SISTEMA DE EQUIPOS DE INYECTORES 28,249.15
01.02.01.05.01 INYECTOR CENTRIFUGO 450 CFM und 2.00 666.24 1,332.48 346.44 399.74 413.07 173.23
01.02.01.05.02 INYECTOR CENTRIFUGO 542 CFM und 2.00 723.44 1,446.88 376.19 434.06 448.53 188.10
01.02.01.05.03 INYECTOR CENTRIFUGO 600 CFM und 2.00 798.24 1,596.48 415.08 478.94 494.91 207.55
01.02.01.05.04 INYECTOR CENTRIFUGO 721 CFM und 1.00 941.24 941.24 244.72 282.37 291.78 122.37
01.02.01.05.05 INYECTOR CENTRIFUGO 1,698 CFM und 1.00 2,151.24 2,151.24 559.32 645.37 666.88 279.67
01.02.01.05.06 INYECTOR CENTRIFUGO 5,724 CFM und 1.00 6,992.34 6,992.34 1,818.01 2,097.70 2,167.63 909.00
01.02.01.05.07 INYECTOR CENTRIFUGO 6,726 CFM und 1.00 9,413.77 9,413.77 2,447.58 2,824.13 2,918.27 1,223.79
01.02.01.05.08 INYECTOR HELICOCENTRIFUGO 665 CFM und 1.00 754.24 754.24 196.10 226.27 233.81 98.06
01.02.01.05.09 INYECTOR HELICOCENTRIFUGO 714 CFM und 1.00 754.24 754.24 196.10 226.27 233.81 98.06
01.02.01.05.10 INYECTOR HELICOIDAL 11,557 CFM und 1.00 2,866.24 2,866.24 745.22 859.87 888.53 372.62
01.02.01.06 DIFUSORES Y REJILLAS 2,921.44
01.02.01.06.01 DIFUSORES pg2 2,916.00 0.76 2,216.16 576.20 664.85 687.01 288.10
01.02.01.06.02 REJILLA DE AIRE FRESCO pg2 928.00 0.76 705.28 183.37 211.58 218.64 91.69
01.02.01.07 DUCTOS 11,380.55
01.02.01.07.01 DUCTOS METALICOS kg 889.27 8.73 7,763.33 2,018.47 2,329.00 2,406.63 1,009.23
01.02.01.07.02 AISLAMIENTO ACUSTICO PARA DUCTOS m2 180.41 20.05 3,617.22 940.48 1,085.17 1,121.34 470.23
01.02.01.08 VARIOS 31,709.41
01.02.01.08.01 BOTONERA DE ARRANQUE Y PARADA ON - OFF und 13.00 72.48 942.24 244.98 282.67 292.09 122.50
01.02.01.08.02 TERMOSTATO DE AMBIENTE und 63.00 80.44 5,067.72 1,317.61 1,520.32 1,570.99 658.80
01.02.01.08.03 DAMPER DE GRAVEDAD pg2 1,048.00 0.81 848.88 220.71 254.66 263.15 110.36
01.02.01.08.04 CAJA DE CONTROL und 76.00 44.68 3,395.68 882.88 1,018.70 1,052.66 441.44
01.02.01.08.05 UNION FLEXIBLE DE LONA PARA DUCTOS ( A.A. ) und 26.00 262.31 6,820.06 1,773.22 2,046.02 2,114.22 886.60
01.02.01.08.06 SOPORTE METALICO PARA DUCTOS EN TECHO pza 105.00 48.31 5,072.55 1,328.18 1,532.51 1,583.60 628.26
01.02.01.08.07 SOPORTE METALICO PARA TUBERIAS EN TECHO pza 258.00 31.33 8,083.14 2,111.60 2,436.47 2,517.68 1,017.39
01.02.01.08.08 SOPORTE METALICO PARA TUBERIAS EN PARED pza 8.00 33.02 264.16 72.94 84.16 86.97 20.09
01.02.01.08.09 SOPORTE METALICO PARA TUBERIAS EN PISO pza 6.00 35.83 214.98 60.15 69.41 71.72 13.70
TRANSPORTE, IZAJE, DESPLAZAMIENTO E INSTALACION DE EQUIPOS DE AIRE
01.02.01.08.10 est 1.00 1,000.00 1,000.00 260.00 300.00 310.00 130.00
ACONDICIONADO
01.02.01.09 PRUEBAS Y BALANCEO DEL SISTEMA DE AIRE ACONDICIONADO 1,505.86
01.02.01.09.01 PRUEBAS Y BALANCEO DE AIRE ACONDICIONADO glb 1.00 1,505.86 1,505.86 391.52 451.76 466.82 195.76
01.02.02 SISTEMA DE EXTRACCION 80,753.98
01.02.02.01 EXTRACTORES E INYECTORES 12,816.10
01.02.02.01.01 EXTRACTOR HELICOCENTRIFUGO 70 CFM und 1.00 159.39 159.39 41.44 47.82 49.41 20.72
01.02.02.01.02 EXTRACTOR HELICOCENTRIFUGO 75 CFM und 1.00 159.39 159.39 41.44 47.82 49.41 20.72
01.02.02.01.03 EXTRACTOR HELICOCENTRIFUGO 88 CFM und 1.00 159.39 159.39 41.44 47.82 49.41 20.72
01.02.02.01.04 EXTRACTOR HELICOCENTRIFUGO 90 CFM und 2.00 159.39 318.78 82.88 95.63 98.82 41.45
01.02.02.01.05 EXTRACTOR HELICOCENTRIFUGO 99 CFM und 2.00 159.39 318.78 82.88 95.63 98.82 41.45
01.02.02.01.06 EXTRACTOR HELICOCENTRIFUGO 106 CFM und 1.00 181.39 181.39 47.16 54.42 56.23 23.58
01.02.02.01.07 EXTRACTOR HELICOCENTRIFUGO 117 CFM und 1.00 181.39 181.39 47.16 54.42 56.23 23.58
01.02.02.01.08 EXTRACTOR HELICOCENTRIFUGO 120 CFM und 1.00 192.39 192.39 50.02 57.72 59.64 25.01
01.02.02.01.09 EXTRACTOR HELICOCENTRIFUGO 129 CFM und 1.00 181.39 181.39 47.16 54.42 56.23 23.58
01.02.02.01.10 EXTRACTOR HELICOCENTRIFUGO 133 CFM und 1.00 214.39 214.39 55.74 64.32 66.46 27.87
01.02.02.01.11 EXTRACTOR HELICOCENTRIFUGO 140 CFM und 1.00 214.39 214.39 55.74 64.32 66.46 27.87
01.02.02.01.12 EXTRACTOR HELICOCENTRIFUGO 177 CFM und 2.00 214.39 428.78 111.48 128.63 132.92 55.75

107 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO INSTALACIONES ELECTRICAS

02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015
01.02.02.01.13 EXTRACTOR HELICOCENTRIFUGO 184 CFM und 1.00 247.39 247.39 64.32 74.22 76.69 32.16
01.02.02.01.14 EXTRACTOR HELICOCENTRIFUGO 188 CFM und 1.00 247.39 247.39 64.32 74.22 76.69 32.16
01.02.02.01.15 EXTRACTOR HELICOCENTRIFUGO 368 CFM und 1.00 489.39 489.39 127.24 146.82 151.71 63.62
01.02.02.01.16 EXTRACTOR HELICOCENTRIFUGO 405 CFM und 1.00 489.39 489.39 127.24 146.82 151.71 63.62
01.02.02.01.17 EXTRACTOR HELICOCENTRIFUGO 650 CFM und 1.00 632.39 632.39 164.42 189.72 196.04 82.21
01.02.02.01.18 EXTRACTOR HELICOCENTRIFUGO 665 CFM und 1.00 632.39 632.39 164.42 189.72 196.04 82.21
01.02.02.01.19 EXTRACTOR HELICOCENTRIFUGO 714 CFM und 1.00 632.39 632.39 164.42 189.72 196.04 82.21
01.02.02.01.20 EXTRACTOR CENTRIFUGO 1000 CFM und 1.00 1,624.59 1,624.59 422.39 487.38 503.62 211.20
01.02.02.01.21 EXTRACTOR CENTRIFUGO 1074 CFM und 1.00 1,624.59 1,624.59 422.39 487.38 503.62 211.20
01.02.02.01.22 EXTRACTOR AXIAL 90 CFM und 1.00 159.39 159.39 41.44 47.82 49.41 20.72
01.02.02.01.23 EXTRACTOR AXIAL 120 CFM und 1.00 797.39 797.39 207.32 239.22 247.19 103.66
01.02.02.01.24 EXTRACTOR AXIAL 430 CFM und 2.00 632.39 1,264.78 328.84 379.43 392.08 164.43
01.02.02.01.25 EXTRACTOR AXIAL 448 CFM und 1.00 632.39 632.39 164.42 189.72 196.04 82.21
01.02.02.01.26 EXTRACTOR AXIAL 452 CFM und 1.00 632.39 632.39 164.42 189.72 196.04 82.21
01.02.02.02 EXTRACTORES E INYECTORES DE MONOXIDO 13,847.35
01.02.02.02.01 EXTRACTOR CENTRIFUGO DOBLE ENTRADA 19,722 CFM und 1.00 13,847.35 13,847.35 3,600.31 4,154.21 4,292.68 1,800.15
01.02.02.03 DIFUSORES Y REJILLAS 7,432.81
01.02.02.03.01 REJILLA DE EXTRACCION pg2 2,963.00 0.77 2,281.51 593.19 684.45 707.27 296.60
01.02.02.03.02 REJILLA DE EXPULSION pg2 1,290.00 0.77 993.30 258.26 297.99 307.92 129.13
01.02.02.03.03 REJILLA DE EXTRACCION DE MONOXIDO pg2 5,400.00 0.77 4,158.00 1,081.08 1,247.40 1,288.98 540.54
01.02.02.04 DUCTOS 20,025.88
01.02.02.04.01 DUCTOS METALICOS kg 1,628.82 8.73 14,219.60 3,697.10 4,265.88 4,408.08 1,848.54
01.02.02.04.02 AISLAMIENTO ACUSTICO PARA DUCTOS m2 289.59 20.05 5,806.28 1,509.63 1,741.88 1,799.95 754.82
01.02.02.05 VARIOS 25,631.84
01.02.02.05.01 BOTONERA DE ARRANQUE Y PARADA ON - OFF und 30.00 72.48 2,174.40 565.34 652.32 674.06 282.68
01.02.02.05.02 CAJA DE CONTROL und 30.00 44.68 1,340.40 348.50 402.12 415.52 174.26
01.02.02.05.03 DAMPER DE GRAVEDAD pg2 1,290.00 0.81 1,044.90 271.67 313.47 323.92 135.84
01.02.02.05.04 UNION FLEXIBLE DE LONA PARA DUCTOS und 50.00 262.31 13,115.50 3,410.03 3,934.65 4,065.81 1,705.01
01.02.02.05.05 SOPORTE METALICO PARA DUCTOS EN TECHO pza 144.00 48.31 6,956.64 1,818.31 2,098.05 2,167.98 872.30
01.02.02.05.06 TRANSPORTE, IZAJE, DESPLAZAMIENTO E INSTALACION DE EQUIPOS DE VENTILACION est 1.00 1,000.00 1,000.00 260.00 300.00 310.00 130.00
01.02.02.06 PRUEBAS Y BALANCEO DEL SISTEMA DE EXTRACCION 1,000.00
01.02.02.06.01 PRUEBAS Y BALANCEO DEL SISTEMA DE EXTRACCION glb 1.00 1,000.00 1,000.00 260.00 300.00 310.00 130.00
01.02.03 SISTEMA DE PRESURIZACION 22,718.10
01.02.03.01 VENTILADORES 13,584.78
01.02.03.01.01 VENTILADOR CENTRIFUGO DE SIMPLE ENTRADA 18,714 CFM und 1.00 6,737.39 6,737.39 1,751.72 2,021.22 2,088.59 875.86
01.02.03.01.02 VENTILADOR CENTRIFUGO DE SIMPLE ENTRADA 19,359 CFM und 1.00 6,847.39 6,847.39 1,780.32 2,054.22 2,122.69 890.16
01.02.03.02 DIFUSORES Y REJILLAS 4,028.00
01.02.03.02.01 REJILLA DE SUMINISTRO pg2 5,300.00 0.76 4,028.00 1,047.28 1,208.40 1,248.68 523.64
01.02.03.03 DUCTOS 797.54
01.02.03.03.01 DUCTOS METALICOS kg 66.07 8.73 576.79 149.97 173.04 178.80 74.98
01.02.03.03.02 AISLAMIENTO ACUSTICO PARA DUCTOS m2 11.01 20.05 220.75 57.40 66.23 68.42 28.70
01.02.03.04 VARIOS 3,307.78
01.02.03.04.01 CAJA DE CONTROL und 2.00 44.68 89.36 23.23 26.81 27.70 11.62
01.02.03.04.02 SENSOR DE HUMO und 2.00 49.50 99.00 25.74 29.70 30.69 12.87
01.02.03.04.03 DAMPER DE ALIVIO pg2 2,196.00 0.81 1,778.76 462.48 533.63 551.42 231.23
01.02.03.04.04 UNION FLEXIBLE DE LONA PARA DUCTOS und 2.00 262.31 524.62 136.40 157.39 162.63 68.20
01.02.03.04.05 SOPORTE METALICO PARA DUCTOS EN PISO pza 4.00 29.01 116.04 32.30 37.27 38.51 7.96

01.02.03.04.06 TRANSPORTE, IZAJE, DESPLAZAMIENTO E INSTALACION DE EQUIPOS DE PRESURIZACION est 1.00 700.00 700.00 182.00 210.00 217.00 91.00

01.02.03.05 PRUEBAS Y BALANCEO DEL SISTEMA DE PRESURIZACION 1,000.00


01.02.03.05.01 PRUEBAS Y BALANCEO DEL SISTEMA DE PRESURIZACION glb 1.00 1,000.00 1,000.00 260.00 300.00 310.00 130.00
01.02.04 SISTEMA DE PRECISION 40,328.59
01.02.04.01 VENTILADOR DE PRECISION 33,371.32
01.02.04.01.01 EQUIPO TIPO PRECISION 60,000 BTU und 2.00 16,685.66 33,371.32 8,676.54 10,011.40 10,345.11 4,338.27
01.02.04.02 TUBERIAS Y ACCESORIOS DE GAS PARA AIRE ACOND. 2,611.54

108 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO INSTALACIONES ELECTRICAS

02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015
01.02.04.02.01 TUBERIA DE COBRE TIPO L 22.2 mm m 52.80 42.97 2,268.82 602.95 695.71 718.90 251.26
01.02.04.02.02 CODO DE COBRE 22.2 mm x 90º pza 14.00 24.48 342.72 94.19 108.68 112.30 27.55
01.02.04.03 TUBERIAS Y ACCESORIOS DE LIQUIDO PARA AIRE ACOND. 1,803.62
01.02.04.03.01 TUBERIA DE COBRE TIPO L 12.7 mm m 52.80 28.70 1,515.36 407.05 469.67 485.33 153.31
01.02.04.03.02 CODO DE COBRE 12.7 mm x 90º pza 14.00 20.59 288.26 80.03 92.34 95.42 20.47
01.02.04.04 VARIOS 1,854.61
01.02.04.04.01 CAJA DE CONTROL und 4.00 44.68 178.72 46.47 53.62 55.40 23.23
01.02.04.04.02 SOPORTE METALICO PARA TUBERIAS EN TECHO pza 22.00 31.33 689.26 188.58 217.59 224.84 58.25
01.02.04.04.03 SOPORTE METALICO PARA TUBERIAS EN PARED pza 8.00 33.02 264.16 72.94 84.16 86.97 20.09
01.02.04.04.04 SOPORTE METALICO PARA TUBERIAS EN PISO pza 9.00 35.83 322.47 90.23 104.11 107.58 20.55
01.02.04.04.05 TRANSPORTE, IZAJE, DESPLAZAMIENTO E INSTALACION DE EQUIPOS DE PRECISION est 1.00 400.00 400.00 104.00 120.00 124.00 52.00
01.02.04.05 PRUEBAS Y BALANCEO DEL SISTEMA DE PRECISION 687.50
01.02.04.05.01 PRUEBAS Y BALANCEO DEL SISTEMA DE PRECISION glb 1.00 687.50 687.50 178.75 206.25 213.13 89.37
01.03 SUB ESTACION 302,520.24
01.03.01 ROTURA Y REPARACION 10,631.26

01.03.01.01 PERFILADO DE SARDINEL DE CONCRETO EXIST. C/ DISCO DE CORTE P/ REDES ELECTRICAS m 6.60 4.43 29.24 9.49 8.91 8.32 2.52

01.03.01.02 PERFILADO DE PAVIMENTO DE ASFALTO EXIST. C/ DISCO DE CORTE m 14.60 6.40 93.44 25.92 30.05 33.05 4.42
01.03.01.03 REMOCION DE ADOQUIN DE CONCRETO m2 163.05 3.35 546.22 148.78 171.67 177.40 48.37
REPOSICION DE VEREDA DE ADOQUIN DE CONCRETO 21 x 10.5 x 4 cm ( INC. BASE Y
01.03.01.04 m2 163.05 61.10 9,962.36 3,677.16 2,569.33 2,654.98 1,060.89
CONFINAMIENTO )
01.03.02 TRAZOS, NIVELES Y REPLANTEO 198.36
01.03.02.01 TRAZOS, NIVELES Y REPLANTEO PRELIMINAR CON EQUIPO m 116.00 1.71 198.36 94.54 57.28 34.11 12.43
01.03.03 CONEXION A LA RED EXTERNA - TRABAJO PRELIMINARES 2,773.44
01.03.03.01 EXCAVACION MANUAL PARA REDES ELECTRICAS, H = 1.10 M, ANCHO = 0.60 M m 116.00 10.31 1,195.96 319.24 368.35 380.63 127.74
01.03.03.02 RELLENO COMPACTADO A MANO, CON MATERIAL PROPIO H = 1.10 M, ANCHO = 0.60 M m 116.00 5.37 622.92 169.66 195.76 202.29 55.21
01.03.03.03 CINTA SEÑALIZADORA m 116.00 5.15 597.40 155.37 179.28 185.25 77.50
01.03.03.04 ELIMINACION DE MATERIAL, CARGADOR 125 HP / VOLQUETE 6 M3, D = 30 KM m3 9.21 38.78 357.16 116.06 133.62 76.38 31.10
01.03.04 CRUZADAS Y VEREDAS 2,600.13
01.03.04.01 CONCRETO C:H 1:8 E = 2" SOLADOS m2 69.60 21.11 1,469.26 853.30 338.88 208.11 68.97
01.03.04.02 DUCTO DE CONCRETO DE 2 VIAS m 14.40 51.98 748.51 208.99 241.15 249.18 49.19
01.03.04.03 LADRILLO CORRIENTE DE ARCILLA und 484.00 0.79 382.36 103.75 119.71 123.70 35.20
01.03.05 CABLE SUBTERRANEO Y ACCESORIOS 60,628.72
01.03.05.01 BANDEJA METALICA CERRADA LISA CON TAPA, COLGADO DE TECHO 250 x 100 mm m 56.80 155.02 8,805.14 2,299.88 2,653.71 2,742.17 1,109.38
01.03.05.02 BANDEJA METALICA TIPO ESCALERA DE 250 x 100 mm m 6.90 198.22 1,367.72 367.01 423.48 437.59 139.64
01.03.05.03 TUBERIA PVC SAP ( ELECTRICAS ) D = 100 mm m 203.20 44.95 9,133.84 2,398.80 2,757.29 2,849.20 1,128.55
01.03.05.04 CABLE ELECTRICO N2XSY 50 mm2 - UNIPOLAR m 539.10 76.65 41,322.02 10,754.37 12,408.89 12,822.51 5,336.25
01.03.06 SUB ESTACION PARTICULAR 207,610.80
01.03.06.01 CELDA DE SALIDA DE S.E. und 1.00 4,417.44 4,417.44 1,160.56 1,339.11 1,383.74 534.03
01.03.06.02 CELDA DE REMONTE DE CABLES und 1.00 3,686.84 3,686.84 970.60 1,119.93 1,157.26 439.05

01.03.06.03 CELDA DE SALIDA, MEDICION Y PROTECCION PRINCIPAL ( CABLE N2XSY 50 mm2 - 18 / 30 KV ) und 1.00 12,035.82 12,035.82 3,160.33 3,646.53 3,768.08 1,460.88

01.03.06.04 TRANSFORMADOR TRIFASICO SECO - 400 KVA, Yyn6, Dyn5, 22.9 - 10 / 0.23 kV und 1.00 187,470.70 187,470.70 48,773.39 56,276.99 58,152.89 24,267.43
01.03.07 PUESTA A TIERRA 5,391.96
01.03.07.01 POZO DE TIERRA ( PARA SUBESTACION ELECTRICA ) und 3.00 1,607.59 4,822.77 826.62 2,479.87 1,516.28
01.03.07.02 EXCAVACIONES SIMPLES m3 7.11 33.53 238.40 66.69 133.39 38.32
01.03.07.03 ELIMINACION DE MATERIAL, CARGADOR 125 HP / VOLQUETE 6 M3, D = 30 KM m3 8.53 38.78 330.79 103.36 206.71 20.72
01.03.08 VARIOS 8,935.57

01.03.08.01 DIVISIONES METALICAS CON MALLA OLIMPICA TEJIDA Y PERFILES Y ANGULOS DE FIERRO m2 12.24 115.31 1,411.39 250.61 751.82 408.96

01.03.08.02 BUZON DE CONCRETO PARA CONEXIONES ELECTRICAS und 3.00 2,508.06 7,524.18 1,979.94 3,801.01 1,743.23
01.03.09 SEGURIDAD Y SALUD 1,500.00
01.03.09.01 EQUIPOS DE PROTECCION Y MANIOBRA glb 1.00 1,500.00 1,500.00 390.00 450.00 465.00 195.00
01.03.10 PRUEBAS ELECTRICAS PARA MEDIA TENSION 2,250.00
01.03.10.01 DETERMINACION DE LA SECUENCIA DE FASES est 1.00 250.00 250.00 65.00 75.00 77.50 32.50

109 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO INSTALACIONES ELECTRICAS

02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015
01.03.10.02 PRUEBAS DE CONTINUIDAD Y RESISTENCIA ELECTRICA est 1.00 150.00 150.00 39.00 45.00 46.50 19.50
01.03.10.03 PRUEBAS DE AISLAMIENTO est 1.00 400.00 400.00 104.00 120.00 124.00 52.00
01.03.10.04 PRUEBAS DE PUESTA A TIERRA est 1.00 250.00 250.00 65.00 75.00 77.50 32.50
01.03.10.05 INSPECCION DE PRUEBAS est 1.00 450.00 450.00 117.00 135.00 139.50 58.50
01.03.10.06 PRUEBAS DE PROCTOR EN EXCAVACIONES est 1.00 750.00 750.00 195.00 225.00 232.50 97.50

TOTAL COSTO DIRECTO 2,714,694.76 0.00 0.00 533.29 58,601.11 28,958.59 33,653.76 584,677.62 750,689.61 866,322.79 391,257.99
GASTOS GENERALES 8.00% 8.00% 217,175.58 - - 42.66 4,688.09 2,316.69 2,692.30 46,774.21 60,055.17 69,305.82 31,300.64
UTILIDAD 8.00% 8.00% 217,175.58 - - 42.66 4,688.09 2,316.69 2,692.30 46,774.21 60,055.17 69,305.82 31,300.64
PARCIAL 3,149,045.92 - - 618.61 67,977.29 33,591.97 39,038.36 678,226.04 870,799.95 1,004,934.43 453,859.27
FACTOR DE RELACION (0.90000) 0.90000 2,834,141.33 - - 556.75 61,179.56 30,232.77 35,134.52 610,403.44 783,719.96 904,440.99 408,473.33
IGV 18.00% 510,145.43 - - 100.22 11,012.32 5,441.90 6,324.21 109,872.62 141,069.59 162,799.38 73,525.18
PRESUPUESTO TOTAL 3,344,286.76 - - 656.97 72,191.88 35,674.67 41,458.73 720,276.06 924,789.55 1,067,240.37 481,998.51
AVANCE PARCIAL - 0.00% 0.00% 0.02% 2.16% 1.07% 1.24% 21.54% 27.65% 31.91% 14.41%
AVANCE ACUMULADO 0.0% 0.00% 0.00% 0.02% 2.18% 3.25% 4.49% 26.02% 53.68% 85.59% 100.00%
0 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

110 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO INSTALACIONES DE COMUNICACIONES

CALENDARIO DE ACTIVIDADES VALORIZADO DE COMUNICACIONES ACTUALIZADO A LA FECHA DE INICIO DE OBRA


LP Nº 003-2015-EF/43
: "AMPLIACIÓN Y MEJORAMIENTO DE LOS SERVICIOS COMPLEMENTARIOS DE LA SEDE CENTRAL DEL MINISTERIO DE ECONOMÍA Y FINANZAS, CERCADO DE
OBRA
LIMA - LIMA"
UBICACIÓN : LIMA - LIMA - LIMA
FECHA BASE :31/11/2014
PROPIETARIO : MINISTERIO DE ECONOMÍA Y FINANZAS 12/31/2015
CONTRATISTA : CONSORCIO T y M 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 21.88% 29.97% 30.97% 17.18%
FECHA DE INICIO : 02/12/2015 1.94% 1.94% 1.94% 1.94% 1.94% 1.95% 1.95% 1.95% 1.95% 1.93%
- - - - - - 478,077.22 654,938.59 676,708.33 375,433.74
02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015
01 INSTALACIONES DE COMUNICACIONES 2,185,157.88 - - - - - - 478,077.22 654,938.59 676,708.33 375,433.74
01.01 CABLEADO ESTRUCTURADO EN INTERIORES DE EDIFICIOS 331,459.20
01.01.01 SALIDAS PARA SISTEMA DE CONTROL DE ACCESO Y SEGURIDAD 15,185.91
01.01.01.01 SALIDA PARA CONTROL DE ACCESO RDFI CON TUBERIA PVC SAP 25 mm, EN PARED pto 7.00 1,090.81 7,635.67 2,026.69 2,291.65 2,368.04 949.29
01.01.01.02 SALIDA PARA MARCADOR BIOMETRICO CON TUBERIA PVC SAP 25 mm, EN PARED pto 4.00 1,887.56 7,550.24 1,981.00 2,267.94 2,343.53 957.77
01.01.02 SALIDAS PARA SISTEMA DE VIDEO SEGURIDAD 81,441.44
SALIDA PARA UNA CAMARA IP, TIPO FIJA, PARA INTERIOR CON TUBERIA PVC SAP 25 mm, EN
01.01.02.01 pto 22.00 1,877.66 41,308.52 10,820.34 12,386.93 12,799.82 5,301.43
PARED
SALIDA PARA DOS CAMARAS IP, TIPO FIJAS, PARA INTERIOR CON TUBERIA PVC SAP 25 mm,
01.01.02.02 pto 6.00 3,678.88 22,073.28 5,770.30 6,631.29 6,852.33 2,819.36
EN PARED
SALIDA PARA UNA CAMARA IP, INTEGRADA, PARA EXTERIOR CON TUBERIA PVC SAP 25 mm,
01.01.02.03 pto 2.00 9,029.82 18,059.64 4,706.59 5,421.77 5,602.49 2,328.79
EN PARED
01.01.03 SALIDAS PARA SISTEMA DE DATA Y VOZ 126,328.26
01.01.03.01 SALIDA SIMPLE PARA VOZ Y DATA PVC SAP 25 mm EN PARED pto 7.00 114.72 803.04 291.17 220.82 228.18 62.87
01.01.03.02 SALIDA DOBLE PARA VOZ Y DATA PVC SAP 25 mm EN PARED pto 33.00 138.16 4,559.28 1,587.10 1,225.84 1,266.71 479.63
01.01.03.03 SALIDA SIMPLE PARA VOZ Y DATA PVC SAP 25 mm EN MUEBLE pto 40.00 122.60 4,904.00 1,711.64 1,317.01 1,360.91 514.44
01.01.03.04 SALIDA DOBLE PARA VOZ Y DATA PVC SAP 25 mm EN MUEBLE pto 53.00 138.21 7,325.13 2,631.26 1,924.90 1,989.06 779.91
01.01.03.05 SALIDA PARA EQUIPO WIRELESS PVC SAP 25 mm EN TECHO pto 6.00 1,111.51 6,669.06 1,817.39 1,986.91 2,053.14 811.62
01.01.03.06 SALIDA PARA TELEFONO PUBLICO PVC SAP 25 mm EN PARED pto 2.00 138.16 276.32 100.25 78.98 81.61 15.48
01.01.03.07 SALIDA PARA CAJERO AUTOMATICO PVC SAP 25 mm EN PARED pto 2.00 138.16 276.32 100.25 78.98 81.61 15.48
01.01.03.08 CAJA DE PASE 100 x 100 x 55 mm pza 18.00 16.98 305.64 97.27 112.54 75.98 19.85
01.01.03.09 CAJA DE PASE 150 x 150 x 75 mm pza 41.00 18.74 768.34 462.07 145.24 150.08 10.95
01.01.03.10 CAJA DE PASE 200 x 200 x 100 mm pza 13.00 20.61 267.93 82.17 95.62 80.81 9.33
01.01.03.11 TUBERIA PVC SAP ( ELECTRICAS ) D = 25 mm m 392.33 6.90 2,707.08 1,353.48 574.68 593.84 185.08
01.01.03.12 TUBERIA PVC SAP ( ELECTRICAS ) D = 35 mm m 41.71 7.88 328.67 99.22 112.31 116.06 1.08
01.01.03.13 TUBERIA METALICA ( ELECTRICAS ) D = 20 mm m 136.44 21.91 2,989.40 801.74 925.08 955.92 306.66
01.01.03.14 TUBERIA METALICA ( ELECTRICAS ) D = 25 mm m 861.73 23.73 20,448.85 5,343.22 6,165.25 6,370.76 2,569.62
01.01.03.15 TUBERIA METALICA ( ELECTRICAS ) D = 35 mm m 11.00 32.49 357.39 107.25 123.80 124.72 1.62
01.01.03.16 CABLE UTP CATEGORIA 6a m 9,857.77 7.44 73,341.81 19,083.09 22,018.95 22,752.91 9,486.86
01.01.04 GABINETES DE COMUNICACION 71,055.04
01.01.04.01 GABINETE DE COMUNICACIONES - GDS0 und 1.00 7,635.38 7,635.38 1,999.43 2,307.03 2,383.93 944.99
01.01.04.02 GABINETE DE COMUNICACIONES - GA und 1.00 7,335.38 7,335.38 1,921.43 2,217.03 2,290.93 905.99
01.01.04.03 GABINETE DE COMUNICACIONES - GDS1 und 1.00 8,835.38 8,835.38 2,311.43 2,667.03 2,755.93 1,100.99
01.01.04.04 GABINETE DE COMUNICACIONES - GDP und 1.00 9,859.38 9,859.38 2,577.67 2,974.23 3,073.37 1,234.11
01.01.04.05 GABINETE DE COMUNICACIONES - GS1 und 1.00 9,859.38 9,859.38 2,577.67 2,974.23 3,073.37 1,234.11
01.01.04.06 GABINETE DE COMUNICACIONES - GS2 und 1.00 9,859.38 9,859.38 2,577.67 2,974.23 3,073.37 1,234.11
01.01.04.07 GABINETE DE COMUNICACIONES - GDS2 und 1.00 8,835.38 8,835.38 2,311.43 2,667.03 2,755.93 1,100.99
01.01.04.08 GABINETE DE COMUNICACIONES - GDS3 und 1.00 8,835.38 8,835.38 2,311.43 2,667.03 2,755.93 1,100.99
01.01.05 SALIDAS PARA SISTEMA DE PERIFONEO Y MUSICA 3,670.25
01.01.05.01 SALIDA PARA CONTROL DE VOLUMEN pto 1.00 137.80 137.80 44.63 41.57 42.96 8.64
01.01.05.02 SALIDA DE ALTAVOZ PARA EMPOTRAR pto 16.00 175.94 2,815.04 847.11 818.57 845.86 303.50
01.01.05.03 CABLE AMPLIFICADOR 2 x 18 m 367.90 1.95 717.41 195.26 225.30 232.81 64.04
01.01.06 SALIDAS PARA SISTEMA DE COLAS Y GESTION AL USUARIO 211.43
SALIDA PARA DISPENSADOR DE ATENCION AL USUARIO CON TUBERIA PVC SAP 25 mm, EN
01.01.06.01 pto 1.00 96.71 96.71 28.44 31.48 32.53 4.26
PARED

111 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO INSTALACIONES DE COMUNICACIONES

02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015
01.01.06.02 SALIDA PARA KIOSKO MULTIMEDIA CON TUBERIA PVC SAP 25 mm, EN PARED pto 1.00 114.72 114.72 42.81 32.95 34.05 4.91
01.01.07 SALIDAS PARA SISTEMA DE TV Y VIDEO 8,773.68
01.01.07.01 SALIDA PARA TERMINAL TV-IP CON TUBERIA PVC SAP 25 mm, EN PARED pto 8.00 1,096.71 8,773.68 2,297.74 2,640.59 2,728.61 1,106.74
01.01.08 SISTEMA DE BANDEJAS Y BUZONES 24,793.19
01.01.08.01 BANDEJA METALICA CERRADA LISA CON TAPA, COLGADO DE TECHO 400 x 100 mm m 149.06 135.53 20,202.10 5,269.04 6,079.66 6,282.32 2,571.08
01.01.08.02 BANDEJA METALICA TIPO ESCALERA DE 200 x 100 mm m 15.00 114.48 1,717.20 463.45 534.75 552.57 166.43
01.01.08.03 CODO PARA BANDEJA METALICA DE FIERRO GALVANIZADO, 400 x 100 mm pza 7.00 97.39 681.73 190.00 219.23 226.53 45.97
01.01.08.04 TEE PARA BANDEJA METALICA DE FIERRO GALVANIZADO, 400 x 100 mm pza 3.00 97.39 292.17 81.43 93.95 97.09 19.70
01.01.08.05 BUZON DE CONCRETO PARA ACOMETIDA DE TELECOMUNICACIONES und 1.00 1,899.99 1,899.99 730.06 568.17 587.11 14.65
01.02 SISTEMA DE SEGURIDAD CONTRA INCENDIOS 239,148.66
01.02.01 SALIDAS PARA ALARMAS CONTRA INCENDIO 239,148.66
01.02.01.01 SALIDA PARA DETECTOR DE HUMO FOTOELECTRICO ( INC. APARATO ) pto 78.00 296.14 23,098.92 6,230.03 6,882.50 7,111.92 2,874.47
01.02.01.02 SALIDA PARA DETECTOR DE ELEVACION DE TEMPERATURA ( INC. APARATO ) pto 14.00 296.14 4,145.96 1,138.36 1,258.57 1,300.53 448.50
01.02.01.03 SALIDA PARA DETECTOR PHOTOBEAM CONVENCIONAL ( INC. APARATO ) pto 5.00 1,700.89 8,504.45 2,242.12 2,567.45 2,653.03 1,041.85
01.02.01.04 SALIDA PARA MODULO DE CONTROL, NACS, OFF/ON pto 2.00 4,153.13 8,306.26 2,173.45 2,499.98 2,583.31 1,049.52
01.02.01.05 SALIDA PARA MODULO AISLADOR DE FALLAS pto 6.00 4,153.13 24,918.78 6,507.16 7,484.72 7,734.21 3,192.69
SALIDA PARA SISTEMA DE CONTROL DE ZONA DE ROCIADORES MONITOREO VALVULA Y
01.02.01.06 pto 24.00 4,252.63 102,063.12 26,617.88 30,618.79 31,639.41 13,187.04
FLUJO
01.02.01.07 PANEL DE ALARMA CONTRAINCENDIOS und 1.00 5,284.47 5,284.47 1,407.43 1,593.96 1,647.08 636.00
01.02.01.08 SALIDA PARA PARLANTE CON LUZ ESTROBOSCOPICA pto 16.00 339.74 5,435.84 1,469.92 1,633.29 1,687.73 644.90
01.02.01.09 SALIDA PARA ESTACION MANUAL DIRECCIONABLE pto 16.00 600.34 9,605.44 2,556.86 2,887.46 2,983.70 1,177.42
01.02.01.10 SALIDA PARA TELEFONO DE BOMBEROS pto 8.00 143.05 1,144.40 325.84 350.96 362.66 104.94
01.02.01.11 SALIDA PARA DETECTOR DE MONOXIDO DE CARBONO pto 20.00 221.36 4,427.20 1,347.71 1,269.01 1,311.31 499.17
01.02.01.12 SALIDA PARA SENSOR DE ANIEGO pto 16.00 221.36 3,541.76 1,083.44 1,021.30 1,055.34 381.68
01.02.01.13 SALIDA PARA PANEL DE CONTROL DE EXTINCION - PX pto 1.00 158.36 158.36 52.32 46.07 47.61 12.36
01.02.01.14 SALIDA PARA SISTEMA DE AGENTE LIMPIO pto 1.00 8,203.72 8,203.72 2,144.12 2,459.68 2,541.67 1,058.25
01.02.01.15 SALIDA PARA CARTEL DE EXTINCION DISPARADA - ED pto 1.00 227.41 227.41 64.08 70.02 72.35 20.96
01.02.01.16 RESISTENCIA FINAL DE LAZO und 3.00 35.88 107.64 30.20 34.84 36.00 6.60
01.02.01.17 TUBERIA METALICA ( ELECTRICAS ) D = 20 mm m 1,098.56 21.91 24,069.45 6,284.98 7,251.90 7,493.63 3,038.94
01.02.01.18 CABLE CONDUCTOR #18 AWG CON RECUBRIMIENTO LSZH m 1,531.46 3.46 5,298.85 1,391.32 1,605.37 1,658.88 643.28
01.02.01.19 CABLE PARA TELEFONO DE BOMBEROS m 277.00 2.19 606.63 170.88 197.16 203.74 34.85
01.03 EQUIPAMIENTO 1,614,550.02
01.03.01 SWITCH CORE und 1.00 500,000.00 500,000.00 105,000.00 150,000.00 155,000.00 90,000.00
01.03.02 SWITCH DE DISTRIBUCION DE 24 PUNTOS und 4.00 38,250.00 153,000.00 32,130.00 45,900.00 47,430.00 27,540.00
01.03.03 SWITCH DE BORDE DE 48 PUNTOS und 7.00 23,042.86 161,300.02 33,873.00 48,390.01 50,003.01 29,034.00
01.03.04 SERVIDORES APLICATIVOS DE 1 RU und 4.00 116,400.00 465,600.00 97,776.00 139,680.00 144,336.00 83,808.00
01.03.05 CAJAS DE ALMACENAMIENTO und 1.00 116,400.00 116,400.00 24,444.00 34,920.00 36,084.00 20,952.00
01.03.06 SERVIDOR DE RESPALDO und 1.00 43,650.00 43,650.00 9,166.50 13,095.00 13,531.50 7,857.00
01.03.07 INSTALACION Y CONFIGURACION und 1.00 174,600.00 174,600.00 22,698.00 52,380.00 54,126.00 45,396.00

TOTAL COSTO DIRECTO 2,185,157.88 0.00 0.00 0.00 0.00 0.00 0.00 478,077.22 654,938.59 676,708.33 375,433.74
GASTOS GENERALES 8.00% 8.00% 174,812.63 - - - - - - 38,246.18 52,395.09 54,136.67 30,034.70
UTILIDAD 8.00% 8.00% 174,812.63 - - - - - - 38,246.18 52,395.09 54,136.67 30,034.70
PARCIAL 2,534,783.14 - - - - - - 554,569.58 759,728.77 784,981.67 435,503.14
FACTOR DE RELACION (0.90000) 0.90000 2,281,304.83 - - - - - - 499,112.62 683,755.89 706,483.50 391,952.82
IGV 18.00% 410,634.86 - - - - - - 89,840.27 123,076.06 127,167.03 70,551.49
PRESUPUESTO TOTAL 2,691,939.69 - - - - - - 588,952.89 806,831.95 833,650.53 462,504.31
AVANCE PARCIAL - 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 21.88% 29.97% 30.97% 17.18%
AVANCE ACUMULADO 0.0% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 21.88% 51.85% 82.82% 100.00%
0 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

112 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO IMPACTO AMBIENTAL

CALENDARIO DE ACTIVIDADES VALORIZADO DE IMPACTO AMBIENTAL ACTUALIZADO A LA FECHA DE INICIO DE OBRA


LP Nº 003-2015-EF/43
: "AMPLIACIÓN Y MEJORAMIENTO DE LOS SERVICIOS COMPLEMENTARIOS DE LA SEDE CENTRAL DEL MINISTERIO DE ECONOMÍA Y FINANZAS, CERCADO DE
OBRA
LIMA - LIMA"
UBICACIÓN : LIMA - LIMA - LIMA
FECHA BASE :31/11/2014
PROPIETARIO : MINISTERIO DE ECONOMÍA Y FINANZAS 12/31/2015
CONTRATISTA : CONSORCIO T y M 5.39% 11.15% 11.15% 10.59% 11.15% 10.87% 11.15% 10.87% 11.15% 6.54%
FECHA DE INICIO : 02/12/2015 38.62% 38.65% 38.68% 38.71% 38.73% 38.76% 38.79% 38.82% 38.85% 38.54%
5,917.94 12,228.93 12,228.93 11,612.44 12,228.93 11,920.69 12,228.93 11,920.67 12,228.93 7,179.05
02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015
01 IMPACTO AMBIENTAL 109,695.44 5,917.94 12,228.93 12,228.93 11,612.44 12,228.93 11,920.69 12,228.93 11,920.67 12,228.93 7,179.05
01.01 ETAPA DE CONSTRUCCION 100,842.01
01.01.01 MEDIDAS DE CONTROL DE IMPACTOS AMBIENTALES POR CONTAMINACION DE AIRE 22,606.81
01.01.01.01 RIEGO DE TERRENO A MEDIDA QUE SE REMUEVA LAS CAPAS DE TIERRA mes 7.00 305.86 2,141.02 214.10 161.84 161.84 151.40 161.84 156.62 161.84 156.62 161.84 46.73
01.01.01.02 PROTECCION DE MATERIAL DESCARGADO EN RUMAS mes 7.00 281.97 1,973.79 59.43 230.29 230.29 215.43 230.29 222.86 230.29 222.86 230.29 101.76

01.01.01.03 ESTABLECIMIENTO DE PLANES DE RUTAS Y TIEMPOS PARA MINIMIZAR EL USO DE EQUIPOS mes 10.00 144.23 1,442.30 169.62 169.62 158.67 169.62 164.15 169.62 164.15 169.62 63.46

COLOCACION DE MALLAS VERTICALES PARA EVITAR DISPERSION DE POLVO A LAS


01.01.01.04 mes 10.00 1,091.16 10,911.60 325.98 1,263.16 1,263.16 1,181.66 1,263.16 1,222.41 1,263.16 1,222.41 1,263.16 643.34
VIVIENDAS O VECINOS
PROGRAMA DE MANTENIMIENTO PREVENTIVO DE LOS EQUIPOS Y MAQUINARIAS Y
01.01.01.05 mes 10.00 613.81 6,138.10 708.72 708.72 663.00 708.72 685.86 708.72 685.86 708.72 376.88
MONITOREO AMBIENTAL
01.01.02 MEDIDAS DE CONTROL DE IMPACTO AMBIENTAL POR CONTAMINACION DEL AGUA 12,313.70
01.01.02.01 CONTROL DE LA CONTAMINACION DEL AGUA Y MONITOREO AMBIENTAL mes 10.00 1,231.37 12,313.70 1,434.23 1,434.23 1,341.70 1,434.23 1,387.96 1,434.23 1,387.96 1,434.23 654.81

01.01.03 MEDIDAS DE CONTROL DE IMPACTOS AMBIENTALES POR CONTAMINACION DE SUELOS 5,602.00

01.01.03.01 PREVENCION DE DERRAME DE COMBUSTIBLE Y REMEDIACION mes 10.00 560.20 5,602.00 650.73 650.73 608.75 650.73 629.74 650.73 629.74 650.71 312.21
01.01.04 MEDIDAS DE CONTROL DE IMPACTOS AMBIENTALES POR RESIDUOS SOLIDOS 21,737.60
RECIPIENTES PARA LA RECOLECCION DE LOS RESIDUOS EN ZONA TEMPORAL DE
01.01.04.01 mes 10.00 1,413.16 14,131.60 1,626.18 1,626.18 1,521.27 1,626.18 1,573.73 1,626.18 1,573.73 1,626.18 912.31
ALMACENAMIENTO PARA LOS RRSS DE CONSTRUCCION
DISPOSICION DE RESIDUOS PELIGROSOS Y NO PELIGROSOS SEGUN EL PMR EN LA ETAPA
01.01.04.02 mes 10.00 638.09 6,380.90 744.27 744.27 696.26 744.27 720.26 744.27 720.26 744.29 330.68
DE CONSTRUCCION
REUTILIZACION DE RESIDUOS DE CONSTRUCCION ( CHATARRA, BOLSAS DE CEMENTO,
01.01.04.03 mes 10.00 122.51 1,225.10 38.06 147.49 147.49 137.97 147.49 142.73 147.49 142.71 147.49 26.18
PLASTICO, ETC )
01.01.05 MEDIDAS DE CONTROL POR IMPACTOS A LA SALUD Y SEGURIDAD 38,581.90
01.01.05.01 CONTROL DE LA CONTAMINACION DEL AIRE mes 10.00 763.31 7,633.10 227.68 882.25 882.25 825.33 882.25 853.79 882.25 853.79 882.25 461.26
INSPECCION DIARIA PARA VERIFICACION DEL CUMPLIMIENTO DEL USO DE EPPS Y LOS
01.01.05.02 mes 10.00 421.60 4,216.00 128.04 496.16 496.16 464.15 496.16 480.16 496.16 480.16 496.16 182.69
ACUERDOS DE PREVENCION DE RIESGOS
01.01.05.03 RESPUESTA ANTE MEDIDAS DE SEGURIDAD Y EN CASO DE EMERGENCIAS mes 10.00 2,673.28 26,732.80 2,673.28 2,673.28 2,673.28 2,673.28 2,673.28 2,673.28 2,673.28 2,673.28 2,673.28
01.02 ETAPA DE CIERRE 8,853.43
01.02.01 MEDIDAS DE CONTROL DE IMPACTOS AMBIENTALES POR DETERIORO DEL PAISAJE 8,853.43
01.02.01.01 MANTENIMIENTO Y LIMPIEZA DE EXTERIORES DE OBRA glb 1.00 8,853.43 8,853.43 268.57 1,040.71 1,040.71 973.57 1,040.71 1,007.14 1,040.71 1,007.14 1,040.71 393.46

TOTAL COSTO DIRECTO 109,695.44 5,917.94 12,228.93 12,228.93 11,612.44 12,228.93 11,920.69 12,228.93 11,920.67 12,228.93 7,179.05
GASTOS GENERALES 8.00% 8.00% 8,775.64 473.44 978.31 978.31 929.00 978.31 953.66 978.31 953.65 978.31 574.32
UTILIDAD 8.00% 8.00% 8,775.64 473.44 978.31 978.31 929.00 978.31 953.66 978.31 953.65 978.31 574.32
PARCIAL 127,246.72 6,864.82 14,185.55 14,185.55 13,470.44 14,185.55 13,828.01 14,185.55 13,827.97 14,185.55 8,327.69
FACTOR DE RELACION (0.90000) 0.90000 114,522.05 6,178.34 12,767.00 12,767.00 12,123.40 12,767.00 12,445.21 12,767.00 12,445.17 12,767.00 7,494.91
IGV 18.00% 20,613.96 1,112.10 2,298.06 2,298.06 2,182.21 2,298.06 2,240.14 2,298.06 2,240.13 2,298.06 1,349.06
PRESUPUESTO TOTAL 135,136.01 7,290.44 15,065.06 15,065.06 14,305.61 15,065.06 14,685.35 15,065.06 14,685.30 15,065.06 8,843.97
AVANCE PARCIAL - 5.40% 11.15% 11.15% 10.59% 11.15% 10.87% 11.15% 10.87% 11.15% 6.54%
AVANCE ACUMULADO 0.0% 5.40% 16.54% 27.69% 38.28% 49.43% 60.29% 71.44% 82.31% 93.46% 100.00%
0 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

113 de 114
CALENDARIO DE ACTIVIDADES VALORIZADO IMPACTO VIAL

CALENDARIO DE ACTIVIDADES VALORIZADO DE IMPACTO AMBIENTAL ACTUALIZADO A LA FECHA DE INICIO DE OBRA


LP Nº 003-2015-EF/43
: "AMPLIACIÓN Y MEJORAMIENTO DE LOS SERVICIOS COMPLEMENTARIOS DE LA SEDE CENTRAL DEL MINISTERIO DE ECONOMÍA Y FINANZAS, CERCADO DE
OBRA
LIMA - LIMA"
UBICACIÓN : LIMA - LIMA - LIMA
FECHA BASE :31/11/2014
PROPIETARIO : MINISTERIO DE ECONOMÍA Y FINANZAS 12/31/2015
CONTRATISTA : CONSORCIO T y M 5.01% 11.26% 11.26% 10.71% 11.26% 10.98% 11.26% 10.98% 11.26% 6.04%
FECHA DE INICIO : 02/12/2015 95.83% 95.90% 95.97% 96.04% 96.10% 96.17% 96.24% 96.31% 96.38% 95.61%
2,214.68 4,977.03 4,977.04 4,733.48 4,977.05 4,855.29 4,977.05 4,855.29 4,977.05 2,668.55
02/12/2015 al
ITEM Descripción Und. Metrado Precio S/. Parcial S/. 31-Jan-16 29-Feb-16 31-Mar-16 30-Apr-16 31-May-16 30-Jun-16 31-Jul-16 31-Aug-16 26-Sep-15
31/12/2015
01 IMPACTO VIAL 44,212.51 2,214.68 4,977.03 4,977.04 4,733.48 4,977.05 4,855.29 4,977.05 4,855.29 4,977.05 2,668.55
01.01 TRABAJOS PRELIMINARES 6,369.77
01.01.01 CORTE DE PAVIMENTO DE ASFALTO EXIST. C/ DISCO DE CORTE m 12.04 6.40 77.06 7.70 7.70 7.70 7.70 7.71 7.71 7.71 7.71 7.71 7.71
01.01.02 DEMOLICION DE PAVIMENTO EXISTENTE m2 180.60 19.72 3,561.43 112.12 434.46 434.46 406.43 434.46 420.45 434.46 420.45 434.46 29.68
01.01.03 ELIMINACION DE MATERIAL, CARGADOR 125 HP / VOLQUETE 6 M3, D = 30 KM m3 70.43 38.78 2,731.28 273.12 273.12 273.13 273.13 273.13 273.13 273.13 273.13 273.13 273.13
01.02 MITIGACION PARA EL AREA DE IMPACTO INMEDIATA 832.53
01.02.01 TRAZOS, NIVELES Y REPLANTEO PRELIMINAR CON EQUIPO m2 9.70 1.71 16.59 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.65
01.02.02 BASE GRANULAR PARA VEREDA, E = 0.10 M m2 9.70 13.64 132.31 13.23 13.23 13.23 13.23 13.23 13.23 13.23 13.23 13.23 13.24
01.02.03 VEREDA DE ADOQUIN DE CONCRETO 21 x 10.5 x 4 cm ( INC. CONFINAMIENTO ) m2 9.70 61.10 592.67 59.27 59.27 59.27 59.27 59.27 59.27 59.27 59.27 59.27 59.24
01.02.04 ESPEJO CIRCULAR PARA ESTACIONAMIENTO, TIPO CONVEXOS und 1.00 90.96 90.96 9.10 9.10 9.10 9.10 9.10 9.10 9.10 9.10 9.10 9.06
01.03 MITIGACION PARA EL AREA DE IMPACTO DIRECTA E INDIRECTA 37,010.21
01.03.01 SEÑAL DE NO DETENERSE pza 1.00 376.35 376.35 30.10 41.89 41.89 39.19 41.89 40.54 41.89 40.54 41.89 16.53
01.03.02 SEÑAL DE RESALTO pza 1.00 376.35 376.35 30.10 41.89 41.89 39.19 41.89 40.54 41.89 40.54 41.89 16.53
01.03.03 MARCAS EN EL PAVIMENTO - PINTADO DE LINEAS, ANCHO = 0.10 m m 184.99 10.00 1,849.90 56.86 220.32 220.32 206.11 220.32 213.22 220.32 213.22 220.32 58.89
01.03.04 MARCAS EN BORDE DE VEREDA - PINTADO DE LINEAS, ANCHO = 0.10 m m 708.00 16.21 11,476.68 342.85 1,328.54 1,328.54 1,242.82 1,328.54 1,285.68 1,328.54 1,285.68 1,328.54 676.95
01.03.05 PINTURA DE SEÑALIZACION EN PAVIMENTO EN CRUCES, C/ TRAFICO - 2 MANOS m2 183.32 30.99 5,681.09 171.17 663.27 663.27 620.48 663.27 641.88 663.27 641.88 663.27 289.33
01.03.06 PINTURA DE SEÑAL DE DIRECCION DE 1 VIA C/ TRAFICO - 2 MANOS und 16.00 25.93 414.88 12.99 50.32 50.32 47.07 50.32 48.70 50.32 48.70 50.32 5.82
01.03.07 PINTURA DE SEÑAL DE DIRECCION DE 2 VIA C/ TRAFICO - 2 MANOS und 7.00 27.94 195.58 19.56 19.56 19.56 19.56 19.56 19.56 19.56 19.56 19.56 19.54
01.03.08 CADENA DE HIERRO ESLABON 30 mm, PARA BOLARDOS m 18.03 48.12 867.60 86.76 86.76 86.76 86.76 86.76 86.76 86.76 86.76 86.76 86.76
01.03.09 TRAZOS, NIVELES Y REPLANTEO PRELIMINAR CON EQUIPO m2 180.60 1.71 308.83 30.88 30.88 30.88 30.88 30.88 30.88 30.88 30.88 30.88 30.91
01.03.10 SELLO DE ASFALTO C/ MEZCLA EN CALIENTE, E = 1"; H = 0.20 M m 12.04 5.15 62.01 6.20 6.20 6.20 6.20 6.20 6.20 6.20 6.20 6.20 6.21
01.03.11 SARDINEL DE CONCRETO F'C = 210 Kg/cm2, H = 0.15 M; ANCHO = 0.15 M m 63.47 30.91 1,961.86 196.17 196.17 196.17 196.17 196.17 196.17 196.17 196.17 196.17 196.33
01.03.12 CONCRETO F'C = 210 Kg/cm2 RAMPAS m3 3.97 306.10 1,215.22 121.52 121.52 121.52 121.52 121.52 121.52 121.52 121.52 121.52 121.54
01.03.13 ENCOFRADO Y DESENCOFRADO NORMAL RAMPAS m2 7.83 45.28 354.54 35.45 35.45 35.45 35.45 35.45 35.45 35.45 35.45 35.45 35.49
01.03.14 ACERO CORRUGADO FY = 4200 Kg/cm2 kg 112.74 3.94 444.20 44.42 44.42 44.42 44.42 44.42 44.42 44.42 44.42 44.42 44.42
01.03.15 CURADO DE CONCRETO EN PAVIMENTO m2 24.08 4.11 98.97 9.90 9.90 9.90 9.90 9.90 9.90 9.90 9.90 9.90 9.87
01.03.16 RESALTO DE ADOQUIN DE CONCRETO 20 x 10 x 6 cm m2 156.52 34.12 5,340.46 162.88 631.15 631.15 590.43 631.15 610.79 631.15 610.79 631.15 209.82
01.03.17 BASE GRANULAR PARA RESALTO DE ADOQUIN, E = 0.20 M m2 156.52 18.33 2,869.01 286.90 286.90 286.90 286.90 286.90 286.90 286.90 286.90 286.90 286.91
01.03.18 SEÑALIZACIONES TEMPORALES DE DESVIOS DE VIAS est 1.00 3,116.68 3,116.68 93.77 363.35 363.35 339.91 363.35 351.63 363.35 351.63 363.35 162.99

TOTAL COSTO DIRECTO 44,212.51 2,214.68 4,977.03 4,977.04 4,733.48 4,977.05 4,855.29 4,977.05 4,855.29 4,977.05 2,668.55
GASTOS GENERALES 8.00% 8.00% 3,537.00 177.17 398.16 398.16 378.68 398.16 388.42 398.16 388.42 398.16 213.48
UTILIDAD 8.00% 8.00% 3,537.00 177.17 398.16 398.16 378.68 398.16 388.42 398.16 388.42 398.16 213.48
PARCIAL 51,286.51 2,569.02 5,773.35 5,773.36 5,490.84 5,773.37 5,632.13 5,773.37 5,632.13 5,773.37 3,095.51
FACTOR DE RELACION (0.90000) 0.90000 46,157.86 2,312.12 5,196.02 5,196.02 4,941.76 5,196.03 5,068.92 5,196.03 5,068.92 5,196.03 2,785.95
IGV 18.00% 8,308.40 416.18 935.28 935.28 889.52 935.29 912.41 935.29 912.41 935.29 501.45
PRESUPUESTO TOTAL 54,466.26 2,728.30 6,131.30 6,131.30 5,831.28 6,131.32 5,981.33 6,131.32 5,981.33 6,131.32 3,287.40
AVANCE PARCIAL - 5.01% 11.26% 11.26% 10.71% 11.26% 10.98% 11.26% 10.98% 11.26% 6.04%
AVANCE ACUMULADO 0.0% 5.01% 16.27% 27.52% 38.23% 49.49% 60.47% 71.73% 82.71% 93.96% 100.00%
0 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

114 de 114