VIADUCTOS 10+250 11+010 12+100 13+440 TOTAL

ÍTEM DESCRIPCIÓN UNIDAD P.U. (Bs) CANT. MONTO (Bs) CANT. MONTO (Bs) CANT. MONTO (Bs) CANT. MONTO (Bs) CANT. MONTO (Bs)
ESTRUCTURA

1.1 Infraestructura

1 HORMIGÓN TIPO A PARA INFRAESTRUCTURA FCK=210 KG/CM2 m3 508.72 768.48 525.72 509.60 2,312.52

2 ACERO ESTRUCTURAL (FY = 4.200 KG/CM2) kg 42,577.32 63,134.24 43,896.12 42,455.32 192,063.00

3 NEOPRENO COMPUESTO dm3 336.00 420.00 336.00 336.00 1,428.00

4 NEOPRENO SIMPLE dm3 27.72 27.72 27.72 27.72 110.88

5 PILOTES DE Ho Ao D=1,20 M ml 456.00 608.00 456.00 456.00 1,976.00

6 SONDEO ROTATIVO ml 96.00 96.00 96.00 96.00 384.00

1.2 Superestructura

7 HORMIGÓN TIPO P (FCK = 350 KG/CM2) m3 491.44 619.70 495.76 495.76 2,102.66

8 ACERO ESTRUCTURAL PARA VIGA (FY = 4.200 KG/CM2) kg 36,718.80 46,957.50 36,995.04 36,995.04 157,666.38

9 ACERO DE PRETENSADO kg 22,763.36 28,454.20 22,763.36 22,763.36 96,744.28

10 ANCLAJES PARA 12 T 1/2" pza 144.00 180.00 144.00 144.00 612.00

11 VAINAS DE D = 7 CM m 2,193.97 2,742.47 2,193.97 2,193.97 9,324.38

12 TESADO INYECCIÓN Y LECHADA DE CEMENTO m 2,193.97 2,742.47 2,193.97 2,193.97 9,324.38

13 HORMIGÓN SIMPLE TIPO "A1" SUPERESTRUCTURA (FCK = 280 KG/CM2) m3 362.56 574.52 371.56 371.56 1,680.20

14 ACERO ESTRUCTURAL PARA SUPERESTRUCTURA (FY = 4.200 KG/CM2) kg 35,136.38 65,626.02 35,892.26 35,892.26 172,546.92

15 JUNTA DE DILATACIÓN m 68.80 104.80 68.80 68.80 311.20

16 MURO TIPO NEW JERSEY UNIDIRECCIONAL m 1,420.44 1,409.46 1,426.02 1,425.92 5,681.84

17 DRENAJES PVC D=4" m 42.24 42.24 42.24 42.24 168.96

18 LANZAMIENTO Y/O OBRA FALSA PARA VIGAS DE 30,00 M pza 16.00 20.00 16.00 16.00 68.00

19 LANZAMIENTO Y/O OBRA FALSA PARA VIGAS DE 31,20 M pza 8.00 10.00 8.00 8.00 34.00