DESCRIPCION CANTIDAD VALOR UNITARIO TOTAL

Rollo de lino pesado 4.5 350 1575


Costura 1 400 400
Reparacion de fierros 1 400 400
materiales 1 550 550
transporte 1 300 300
estadia 2 300 600
comida 7 80 560
alquiler andamio 7 20 140
banners laterales 1 2000 2000
banners frontales 2 450 900
SERIGRAFIADO 60 28 1680
personal 3 560 1680
otros 1 300 300
Total precio real 11085
Comision 30% 3325.5
Total 14410.5
igv 18% 2593.89
total + igv 17004.39
BASE ALTURA AREA COSTO X M2 TOTAL
3 2 6 1060.3666666667 6362.2
125.6 1.5 188.4 22.349787685775 4210.7
39 2.8 109.2 25.464285714286 2780.7
19.5 252.3 176.15 44442.645
19.5 57796.245
109.2

30% 18%
toldos y logos 3655 4894 1468.2 6362.2 1145.196
banner latera 2000 3239 971.7 4210.7 757.926
banner fronta 900 2139 641.7 2780.7 500.526
mantenimien 400 813 243.9 1056.9 190.242
11085 3325.5 14410.5 2593.89
1350.91667 13353.6 5967
6235 1870.5 8105.5
950 285 1235
2440 732 3172
12512.5

2252.25 COSTOS FIJOS COSTOS VARIABLES


14764.75 7245 2380

4130
7507.396 30% 1239
4968.626 30% 1239
3281.226 30% 1239 13
1247.142 10% 413
17004.39 4130
994.5

TOTAL COSTOS
9625

50 1
18 0.36
ITEM

1.1

1.2

1.3

1.4

1.5

1.9
1.6

2
2.1
2.2
2.3

2.3
2.4
DESCRIPCION

TRANSPORTE, REMODELACIÓN E IMPLEMENTACIÓN DE TIENDA BITEL


Caunter de atención, material mdf, acabado poliuretano con retroiluminación led con acrílico, 1.10 de
ancho x 1.00 de alto x 0.70 de profundidad
Vitrina 0.90 x 0.90 material mdf, acabado poliuretano, curvo con tira led al contorno.
Letrero luminoso de estructura metálica con plancha galvanizada 4.00 ancho x 1.70 de alto x 0.25 de
profundidad
Separador de acrílico.
Acabado de paredes con pintura látex y remodelación de canaletas y desmontaje de muebles (no incluye
transporte de desmontaje)
TOTAL, NO INCLUYE IGV
IGV
TOTAL + IGV

SUB-TOTAL
SERVICIO
Instalación de nueva lona con diseño en fachada de mercado "APROMAC"
Pintado de puertas enrollables con logos en fachada de mercado "APROMAC"
Instalacion de toldos ubicados en fachada de mercado "APROMAC"
TOTAL NO INCLUYE IGV
Regulador de alimentacion.
Reforzamiento con varilla de fierro.
SUB-TOTAL
TOTAL NO INCLUYE IGV

4800
7940
3140
9240
8383
3583
9683
PRECIO
CANTIDAD PRECIO UNITARIO PRECIO CANTIDAD
UNITARIO
1

4 S/1,000.00 S/4,000.00

4 S/900.00 S/3,600.00

1 S/1,450.00 S/1,450.00

4 S/350.00 S/1,400.00
S/ 764.00
1 S/6,750.00 S/6,750.00

S/17,200.00
S/3,096.00
S/20,296.00

UB-TOTAL S/ 764.00
Base Altura M2 Precio x m2 COSTO TOTAL
14.8 3 44.4 S/52.00 S/2,308.80
15 3 45 S/54.00 S/2,430.00
13 1.2 15.6 S/125.00 S/1,950.00 S/ 600.00
S/6,688.80

UB-TOTAL #VALUE!
NO INCLUYE IGV #VALUE!

6100
10900
2,500.00
28% 700
28% 1,000.00 280

28% 500 140

10% 9800
0
28% $ 1,200.00 336

28% $ 1,000.00 280


28% $ 400.00 112
28% $ 700.00 196
10%
#REF!

19
11
209
1191
420
100
100
100
1000

2911
DESCRIPCIONCANTIDAD VALOR UNITATOTAL BASE
Rollo de lino 1 1395 1395 168.2
Costura 1 400 400 125.6
Reparacion de1 400 400 39
materiales 1 550 550 19.5
transporte 1 300 300 19.5
estadia 2 300 600
comida 7 80 560
alquiler anda7 20 140
banners later1 2000 2000
banners front2 450 900
SERIGRAFIAD1 1303 1303
personal 3 560 1680
otros 1 300 300
Total precio r10528
Comision 30 3158.4 toldos y logos 3098
Total 13686.4 banner latera 2000
igv 18% 2463.552 banner fronta 900
total + igv 16149.952 mantenimien 400
ALTURA AREA COSTO X M2 TOTAL
1.5 252.3 22.3468094 5638.1
1.5 188.4 22.3497877 4210.7
2.8 109.2 25.4642857 2780.7
252.3 4.18906064 1056.9
13686.4
109.2 5678 1703.4 7381.4
950 285 1235
2440 732 3172
252.3 5638.85143 11788.4
3098.75143
2121.912
13910.312

30% 18% 4130


4337 1301.1 5638.1 1014.858 6652.958 30% 1239
3239 971.7 4210.7 757.926 4968.626 30% 1239
2139 641.7 2780.7 500.526 3281.226 30% 1239
813 243.9 1056.9 190.242 1247.142 10% 413
10528 3158.4 13686.4 2463.552 16149.952 4130
29.2564407 12629.5 5967 23.6504162

COSTOS FIJOSCOSTOS VARITOTAL COSTOS


6688 2380 9068

50 1
18 0.36
13
FIERRO DE CONSTRUCCION EN TUBOS
materiales 3750 2658
mano de obr 2000 2000
SUB TOTAL 5750 4658
IGV 1035 838.44
TOTAL 6785 5496.44