INTEGRANTES:
Datos:
b= 0.25m t= 0.50m
Ab= 2.75cm2
Gt= 2.3 Kg/cm2
Df= 1.50m
Fc= 230 Kg/cm2
Fy= 4200 Kg/cm2
Pd= 110,000 Kg
Pl= 55,000 K
CONCRETO ARMADO I
Paso 01:
METRADO DE CARGAS
Carga de servicio:
Pd = 110,000 Kg
PL = 55,000 Kg
Por lo tanto:
Área de la Zapata:
𝑊
Az=
𝐺𝑡
177,927.585 Kg
Az=
2.3 𝐾𝑔/𝑐𝑚2
Az= 77,359.82 cm2
Calculo de m:
CONCRETO ARMADO I
Calculo de A:
A = t + 2n
A = 50 + 2(120.46)
A = 290.92cm
Calculo de B:
B= b + 2m
B= 25 + 2(120.46)
B= 265.92cm
Carga ultima:
Pu = 1.4(Pd) + 1.7(PL)
Pu = 1.4(110,000 Kg) + 1.7(55,000 Kg)
Pu = 247,500.00 Kg
𝑃𝑢
Wn =
𝐴∗𝐵
247,500
Wn =
290.92∗265.92
Wn = 3.2 Kg/cm2
CONCRETO ARMADO I
Paso 02:
𝐴𝑏∗𝐹𝑦
Ld = 0.06
√𝐹´𝑐
2.75∗4200
Ld = 0.06
√230
Ld = 45.69 cm
Ahora:
H = Ld + re (3¨)
H = 45.69 cm + 7.5 cm
H = 53.19 cm
Sabemos que:
En (*)
d = 38.42 cm
H = 38.42cm + 7.5cm
CONCRETO ARMADO I
H = 45.92 cm
Entonces:
Paso 03:
Sabemos que:
bo = 2(b + d) + 2(t + d)
bo = 2(25 + 50.5) + 2(50 + 50.5)
bo = 352 cm
ØVc1 = 0.85*1.1*√230*352*50.5
CONCRETO ARMADO I
ØVc1 = 252,063.2726 Kg
1.1𝑏
ØVc2 = Ø* [0.53 + ]*√𝐹´𝑐 * bo*d
𝑡
1.1(25)
ØVc2 = 0.85*[0.53 + ]* √230 *352*50.5
50
ØVc2 = 247,480.304 Kg
Debe cumplir:
Vu ≤ ØVc1
223,275.8285 kg ≤ 252,063.2726 Kg (correcto)
Vu ≤ ØVc2
223,275.8285 kg ≤ 247,480.304 Kg (correcto)
Paso 04:
0.852 ∗𝐹´𝑐∗(6090)
Wb =
𝐹𝑦(6090+𝐹𝑦)
0.852 ∗230∗(6090)
Wb =
4200∗(6090+4200)
Wb = 0.02341
𝐹𝑦
Wmáx = Wmecmáx*
𝐹´𝑐
4200
Wmáx = 0.02341*
230
CONCRETO ARMADO I
Wmáx = 0.43
Ahora:
Paso 05
MOMENTO DE CARGA
𝑚2
M1-1 = Wn*A*
2
(120.46𝑐𝑚)2
M1-1 = 3.2kg/cm *290.92cm*
2
2
M1-1 = 67,542.83 Kg-m ≤ 492,842.9833 Kg-m (OK)
𝑚2
M2-2 = Wn*B*
2
(120.46𝑐𝑚)2
M2-2 = 3.2kg/cm2*265.92cm*
2
CONCRETO ARMADO I
Paso 06
DETERMINAMOS AREA DE ACERO
1.7(𝑀1−1)
Wc1 = 0.85 - √0.7225 −
∅∗𝐹´𝑐∗𝐴∗𝑑 2
1.7(67,542.83)∗100
Wc1 = 0.85 - √0.7225 −
0.90∗230∗290.92∗50.52
Wc1 = 0.045
𝐹´𝑐
As1 = Wc1 * * A*d
𝐹𝑦
230
As1 = 0.045 * * 290.92*50.5
4200
As1 = 36.20 cm2
1.7(𝑀2−2)
Wc2 = 0.85 - √0.7225 −
∅∗𝐹´𝑐∗𝐵∗𝑑 2
1.7(67,738.589)∗100
Wc2 = 0.85 - √0.7225 −
0.90∗230∗265.92∗50.52
Wc2 = 0.049
𝐹´𝑐
As2 = Wc1 * 𝐹𝑦 * B*d
230
As2 = 0.045 * * 265.92*50.5
4200
As2 = 33.09 cm2
Asmín = 0.0018*b*H
Asmín = 0.0018*290.62*58
CONCRETO ARMADO I
Paso 07
ESPACIAMIENTO
Sp = (b – 15) / (N - 1)
Con As1 = 36.20 cm2
36.20 cm2
Ø 5/8´´ => = 18.28 = 19 varillas
1.98 𝑐𝑚2
Sp = (265.92 – 15) / (19 -1)
Sp = 13.94 cm
Entonces:
Ø 5/8´´ ===> 19 Ø 5/8´´ @ 13.94 cm
Con As2 = 33.09 cm2
33.09 cm2
Ø 5/8´´ => = 16.71 = 17 varillas
1.98 𝑐𝑚2
Sp = (290.92 – 15) / (17 -1)
Sp = 17.24 cm
Entonces:
Ø 5/8´´ ===> 17 Ø 5/8´´ @ 17.24 cm