METRADO V ORDENADA - Solo Falta Mov. Tierras
METRADO V ORDENADA - Solo Falta Mov. Tierras
: CONSTRUCCION DEL PUENTE PEATONAL BELLA SELVA - II ETAPA, SOBRE EL RÍO YANAYACU,
PROYECTO
DISTRITO DE MOYOBAMBA, PROVINCIA DE MOYOBAMBA – SAN MARTÍN
ELABORACIÓN : INSTITUTO VIAL PROVINCIAL DE MOYOBAMBA
UBICACIÓN : BELLA SELVA, DISTRITO MOYOBAMBA, PROV. MOYOBAMBA, DPTO SAN MARTÍN
FECHA : Diciembre - 2018
COLUMNA
MARGEN IZQUIERDA 2.00 1.00 0.50 3.86 3.86
(2do. Nivel) 2.00 2.00 0.60 3.85 9.24
bixti = 0.70x0.50 2.00 1.00 0.50 3.85 3.85
bjxtj = 0.50x0.50
COLUMNA
MARGEN DERECHA 2.00 1.00 0.50 3.86 3.86
(2do. Nivel) 2.00 2.00 0.60 3.85 9.24
bixti = 0.70x0.50 2.00 1.00 0.50 3.85 3.85
bjxtj = 0.50x0.50
M2 33.89
PARTIDA 01.01.02 COLUMNAS - CONCRETO F'C= 210 KG/CM2 CON MEZCLADORA INC CURADO UNIDAD M3
SECCION
ELEMENTO CANTIDAD VECES ALTURA PARCIAL TOTAL
PROMEDIO
COLUMNA
MARGEN IZQUIERDA 2.00 1.00 0.30 3.85 2.31
(2do. Nivel)
bixti = 0.70x0.50
bjxtj = 0.50x0.50
COLUMNA
MARGEN DERECHA 2.00 1.00 0.30 3.85 2.31
(2do. Nivel)
bixti = 0.70x0.50
bjxtj = 0.50x0.50
M3 4.62
01.02 VIGAS
VIGA
MARGEN IZQUIERDA 1.00 1.00 0.50 2.54 1.27
(2do. Nivel) 1.00 2.00 0.70 2.54 3.56
bixti = 0.50x0.70
VIGA
MARGEN DERECHA 1.00 1.00 0.50 2.54 1.27
(2do. Nivel) 1.00 2.00 0.70 2.54 3.56
bixti = 0.50x0.70
M2 9.65
PARTIDA 01.02.02 VIGAS DE CONCRETO F´C=210KG/CM2 CON MEZCLADORA INC CURADO UNIDAD M3
SECCION
ELEMENTO CANTIDAD VECES LONGITUD PARCIAL TOTAL
PROMEDIO
VIGA
MARGEN IZQUIERDA 1.00 1.00 0.35 2.54 0.89
(2do. Nivel)
bixti = 0.50x0.70
VIGA
MARGEN DERECHA 1.00 1.00 0.35 2.54 0.89
(2do. Nivel)
bixti = 0.50x0.70
M3 1.78
MARGEN IZQUIERDA
sección 1.00 1.00 4.20 2.50 10.50
AxB = 4.20 x 2.50
MARGEN IZQUIERDA
sección 1.00 1.00 4.20 2.50 10.50
AxB = 4.20 x 2.50
M2 21.00
PESO PARCIAL
DIAMETRO
ELEMENTO CANTIDAD Nº Elementos LONGITUD 1/2" 3/8" TOTAL
1/2" 3/8" 0.99 0.56
MARGEN IZQUIERDA
Asp Ø, HORIZONTAL 2.00 9.00 4.00 72.00 0.00 40.25 40.25
Asp Ø, VERTICAL 2.00 12.00 3.50 84.00 83.50 0.00 83.50
Asp Ø, MALLA 1.00 6.00 2.80 16.80 16.70 0.00 16.70
1.00 12.00 2.80 33.60 33.40 0.00 33.40
MARGEN DERECHA
Asp Ø, HORIZONTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Asp Ø, VERTICAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Asp Ø, MALLA 0.00 0.00 0.00
KG 173.84
M2 57.72
SECCION
ELEMENTO CANTIDAD VECES ALTURA PARCIAL TOTAL
TRANSVERSAL
PESO PARCIAL
DIAMETRO
ELEMENTO CANTIDAD Nº Elementos LONGITUD 1/2" 3/8" TOTAL
1/2" 3/8" 0.99 0.56
MARGEN IZQUIERDA
Asp Ø, vertical 2.00 28.00 4.50 252.00 250.49 0.00 250.49
Asp Ø, horizontal 2.00 13.00 2.35 61.10 60.73 0.00 60.73
MARGEN DERECHA
Asp Ø, vertical 2.00 28.00 4.50 252.00 250.49 0.00 250.49
Asp Ø, horizontal 2.00 13.00 2.35 61.10 60.73 0.00 60.73
KG 622.44
M2 12.40
MARGEN IZQUIERDA
sección 1.00 1.00 8.40 0.50 4.20
AxB = 4.20 x 2.00
MARGEN IZQUIERDA
sección 1.00 1.00 8.40 0.50 4.20
AxB = 4.20 x 2.00
M3 8.40
MARGEN IZQUIERDA
sección 1.00 1.00 8.40 0.50 4.20
AxB = 4.20 x 2.00
MARGEN IZQUIERDA
sección 1.00 1.00 8.40 0.50 4.20
AxB = 4.20 x 2.00
M3 8.40
CANTIDADES DE MATERIAL
: CONSTRUCCION DE TORRES PARA PUENTE PEATONAL BELLA SELVA, SOBRE EL RÍO YANAYACU,
PROYECTO
DISTRITO DE MOYOBAMBA, PROVINCIA DE MOYOBAMBA – SAN MARTÍN
ELABORACIÓN : INSTITUTO VIAL PROVINCIAL DE MOYOBAMBA
UBICACIÓN : BELLA SELVA, DISTRITO MOYOBAMBA, PROV. MOYOBAMBA, DPTO SAN MARTÍN
FECHA : 2018
PARTIDA
1.01 COLUMNAS
01.01.01 CONCRETO F'C=210 KG/CM2 P/ COLUMNAS
Volumen
COLUMNAS 4.62 m3
Volumen
MENSULA #NAME?
1.02 VIGAS
01.02.01 CONCRETO F'C=210 KG/CM2 P/VIGAS
Volumen
VIGAS 1.78 m3
2 TRAMO Err:509
5 UBICACIÓN GEOGRÁFICA
REGIÓN : SAN MARTÍN PROVINCIA : MOYOBAMBA
DEPARTAMENTO :SAN MARTÍN DISTRITO : MOYOBAMBA
Nota: El costo horario de maquinaria pesada, no ha sido contemplado dado a que esta será provista sin costo
por la entidad. Solamente se ha considerado el consumo de combustible por cada máquina.
El Combustible Total a utilizar en el presente Proyecto es: 5,656 Galones de Petróleo Biodiesel B5