Item Descripción de la Partida Und. Metrado por 8 Precio Unit. Parcial/lote Parcial/8 lotes Valorizado Valorizado Valorizado Valorizado
N° Lotes Metrado C/U Metrado Metrado Metrado % Metrado %
lotes Tipo B (S/.) (S/.) (S/.) (S/.) (S/.) (S/.) (S/.)
01.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO m2 8 47.01 376.08 8.00 376.08 3,008.64 - 0.00 - - 0.00% 376.08 3,008.64 100.00%
01.03.04 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 8 3.53 28.24 100.00 353.00 2,824.00 0.00 - - 0.00% 28.24 2,824.00 100.00%
01.03.05 CONCRETO EN FALSO PISO 1:8 CEMENTO- HORMINGON E=4" m2 8 67.07 536.56 12.50 838.38 6,707.00 0.00 - - 0.00% 536.56 6,707.00 100.00%
01.03.06 CONCRETO F´C =175 KG/CM2 PARA VEREDA m2 8 5.47 43.76 5.00 27.35 218.80 0.00 - - 0.00% 43.76 218.80 100.00%
01.03.07 HUELLAS DE CONCRETO PARA COCHERA 0.50 X 0.50 M und 8 14.00 112.00 5.00 70.00 560.00 - 0.00 - - 0.00% 112.00 560.00 100.00%
01.04 CONCRETO ARMADO 3,973.11 31,784.89 - - - 0.00% - - 0.00%
01.04.01 ZAPATAS Y VIGAS DE CIMENTACIÓN 1,050.19 8,401.53 - - 0.00% - - 0.00%
01.04.01.01 CONCRETO PRE MEZCLADO PARA ZAPATAS F'C= 210 KG/CM2 m3 8 17.14 137.12 9.00 154.26 1,234.08 - 17.14 154.26 17.14 154.26 12.50% 119.98 1,079.82 87.50%
01.04.01.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 EN ZAPATAS kg 8 212.06 1,696.48 0.60 127.24 1,017.89 - 1,484.42 890.65 1,484.42 890.65 87.50% 212.06 127.24 12.50%
01.04.01.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS DE CIMENTACION m2 8 45.68 365.44 8.00 365.44 2,923.52
- 45.68 365.44 45.68 365.44 12.50% 319.76 2,558.08 87.50%
01.04.01.04 CONCRETO PRE MEZCLADO PARA VIGAS DE CIMENTACIÓN F'C= 210 m3 8 5.71 45.68 8.50 48.54 388.28
KG/CM2 - 5.71 48.54 5.71 48.54 12.50% 39.97 339.75 87.50%
01.04.01.05 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 EN VIGAS DE kg 8 591.20 4,729.60 0.60 354.72 2,837.76
CIMENTACIÓN 4,138.40 2,483.04 4,138.40 2,483.04 87.50% 591.20 354.72 12.50%
01.04.02.05.02 LADRILLO 15 x 30 x 30 CM PARA LOSA ALIGERADA und 8 476.00 3,808.00 0.70 333.20 2,665.60 - - - 0.00% 3,808.00 2,665.60 100.00%
01.04.02.05.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 EN LOSA ALIGERADA kg 8 410.64 3,285.12 0.80 328.51 2,628.10
- - - 0.00% 3,285.12 2,628.10 100.00%
01.04.02.05.04 CONCRETO PRE MEZCLADO PARA LOSA ALIGERADA F'C= 210 KG/CM2 m3 8 4.97 39.76 9.00 44.73 357.84
- - 0.00% 39.76 357.84 100.00%
02.01.02 MURO DE LADRILLO KK 18 HUECOS DE CANTO CON MORTERO 1:4, 1.5 cm m2 8 1.65 13.20 20.00 33.00 264.00
- - - 0.00% 13.20 264.00 100.00%
02.07.03 PUERTA CONTRAPLACADA P-4 INC. MARCO, CERRAJERÍA Y BISAGRAS und 8 4.00 32.00 10.00 40.00 320.00
- - - 0.00% 32.00 320.00 100.00%
02.07.04 ARMADURA DE MADERA PARA COBERTURA EN COCHERA glb 8 1.00 8.00 22.00 22.00 176.00 - - 0.00% 8.00 176.00 100.00%
02.07.05 CLOSET DE MELAMINE DE 15 MM und 8 2.00 16.00 10.00 20.00 160.00 - - - 0.00% 16.00 160.00 100.00%
02.07.06 MUEBLES ALTOS Y BAJOS DE MELAMINA 15 MM glb 8 1.00 8.00 10.00 10.00 80.00 - - - 0.00% 8.00 80.00 100.00%
02.08 VIDRIOS, CRISTALES Y SIMILARES 68.88 551.04 - - - 0.00% - - 0.00%
02.08.01 VIDRIO CRUDO DE 6 MM CRISTAL INCL. MARCO DE ALUMINIO m2 8 9.84 78.72 7.00 68.88 551.04 - - - 0.00% 78.72 551.04 100.00%
02.09 PINTURAS 2,180.97 17,447.76 - - - 0.00% - - 0.00%
02.09.01 PINTURA LATEX EN CIELO RASO m2 8 64.82 518.56 6.00 388.92 3,111.36 - - - 0.00% 518.56 3,111.36 100.00%
02.09.02 PINTURA LATEX INTERIOR Y EXTERIOR - 2 MANOS, INCL. MASILLADO Y m2 8 237.40 1,899.20 6.00 1,424.40 11,395.20
LIJADO - - - 0.00% 1,899.20 11,395.20 100.00%
02.09.03 IMPERMEABILIZACIÓN DE ÚLTIMA LOSA ALIGERADA m2 8 73.53 588.24 5.00 367.65 2,941.20 - - - 0.00% 588.24 2,941.20 100.00%
02.10 APARATOS Y ACCESORIOS SANITARIOS 193.00 1,544.00 - - 0.00% - - 0.00%
02.10.01 SUMINISTRO E INST.INODORO CERAMICO COLOR BLANCO INC. GRIFERIA und 8 2.00 16.00 12.00 24.00 192.00
Y ACCESORIOS - - - 0.00% 16.00 192.00 100.00%
02.10.02 SUMINISTRO E INST. LAVATORIO SIN PEDESTAL COLOR BLANCO INC. und 8 2.00 16.00 18.00 36.00 288.00
GRIFERIA Y ACCESORIOS - - - 0.00% 16.00 288.00 100.00%
02.10.03 SUMINISTRO E INST. LAVADERO DE ACERO INOXIDABLE CON und 8 1.00 8.00 5.00 5.00 40.00
ESCURRIDERO INC. GRIFERIA Y ACCESORIOS - - - 0.00% 8.00 40.00 100.00%
02.10.04 SUMINISTRO E INST. DE DUCHA INC. GRIFERIA Y ACCESORIOS und 8 1.00 8.00 16.00 16.00 128.00 - - 0.00% 8.00 128.00 100.00%
02.10.05 SUMINISTRO E INST. DE LAVADERO DE FIBRA DE VIDRIO und 8 1.00 8.00 12.00 12.00 96.00 - - 0.00% 8.00 96.00 100.00%
02.10.06 SUMINISTRO E INSTALACIÓN DE ACCESORIOS SANITARIOS jgo 8 2.00 16.00 50.00 100.00 800.00 - - - 0.00% 16.00 800.00 100.00%
03 INSTALACIONES SANITARIAS 823.94 6,591.53 - - - 0.00% - - 0.00%
03.01 SISTEMA DE DESAGUE 413.32 3,306.57 - - 0.00% - - 0.00%
03.01.01 SALIDAS DE PVC SAL PARA DESAGUE DE 2" pto 8 8.00 64.00 16.00 128.00 1,024.00 - - - 0.00% 64.00 1,024.00 100.00%
03.01.02 TUBERIA DE PVC SAL 2" m 8 14.92 119.36 3.46 51.62 412.99 - - - 0.00% 119.36 412.99 100.00%
03.01.03 MONTANTE PLUVIAL PVC SAL 3" m 8 2.80 22.40 3.41 9.55 76.38 - - - 0.00% 22.40 76.38 99.99%
03.01.04 SALIDAS DE PVC SAL PARA DESAGUE DE 4" pto 8 2.00 16.00 16.00 32.00 256.00 - - - 0.00% 16.00 256.00 100.00%
03.01.05 TUBERIA DE PVC SAL 4" m 8 18.90 151.20 3.50 66.15 529.20 - - 0.00% 151.20 529.20 100.00%
03.01.06 SALIDAS DE PVC SAL PARA VENTILACIÓN DE 2" pto 8 2.00 16.00 16.00 32.00 256.00 - - - 0.00% 16.00 256.00 100.00%
03.01.07 REGISTRO DE BRONCE 2" und 8 3.00 24.00 6.00 18.00 144.00 - - - 0.00% 24.00 144.00 100.00%
03.01.08 SUMIDERO DE BRONCE 2" PROVISION Y COLOCACION und 8 2.00 16.00 6.00 12.00 96.00 - - - 0.00% 16.00 96.00 100.00%
03.01.09 CAJA DE REGISTRO DE DESAGUE 12" X 24" und 8 2.00 16.00 18.00 36.00 288.00 - - 0.00% 16.00 288.00 100.00%
03.01.10 CONEXIÓN A LA RED EXISTENTE glb 8 1.00 8.00 14.00 14.00 112.00 - - - 0.00% 8.00 112.00 100.00%
03.01.11 PRUEBA HIDRÁULICA PARA INSTALACIONES DE DESAGÜE glb 8 1.00 8.00 14.00 14.00 112.00 - - - 0.00% 8.00 112.00 100.00%
03.02 SISTEMA DE AGUA FRIA Y AGUA CALIENTE 0.00 410.62 3,284.96 - - - 0.00% - - 0.00%
03.02.01 SALIDA DE AGUA FRIA TUBERIA PVC C-10 O 1/2" pto 8 10.00 80.00 14.00 140.00 1,120.00 - - 0.00% 80.00 1,120.00 100.00%
03.02.02 RED DE DISTRIBUCION TUBERIA 1/2" PVC SAP m 8 21.82 174.56 2.00 43.64 349.12 - - - 0.00% 174.56 349.12 100.00%
03.02.03 RED DE DISTRIBUCION TUBERIA 3/4" PVC SAP m 8 24.43 195.44 2.00 48.86 390.88 - - - 0.00% 195.44 390.88 100.00%
03.02.04 VALVULAS DE COMPUERTA DE BRONCE DE 1/2" AGUA FRÍA und 8 5.00 40.00 16.00 80.00 640.00 - - 0.00% 40.00 640.00 100.00%
03.02.05 GRIFO DE RIEGO DE 1/2" und 8 1.00 8.00 2.00 2.00 16.00 - - - 0.00% 8.00 16.00 100.00%
03.02.06 SALIDA DE AGUA CALIENTE CPVC Ø 1/2" pto 8 3.00 24.00 13.00 39.00 312.00 - - 0.00% 24.00 312.00 100.00%
03.02.07 TUBERIA CPVC SAP C-10 Ø 1/2" AGUA CALIENTE m 8 10.56 84.48 2.00 21.12 168.96 - - - 0.00% 84.48 168.96 100.00%
03.02.08 CONEXIÓN A LA RED EXISTENTE glb 8 1.00 8.00 18.00 18.00 144.00 - - - 0.00% 8.00 144.00 100.00%
03.02.09 PRUEBA HIDRAULICA PARA AGUA FRIA Y AGUA CALIENTE glb 8 1.00 8.00 18.00 18.00 144.00 - - - 0.00% 8.00 144.00 100.00%
04 INSTALACIONES ELECTRICAS 1,516.50 12,132.00 - - - 0.00% - - 0.00%
04.01 SALIDA DE TECHO pto 8 15.00 120.00 28.00 420.00 3,360.00 - - - 0.00% 120.00 3,360.00 100.00%
04.02 SALIDA DE BRAQUETE pto 8 6.00 48.00 28.00 168.00 1,344.00 - - 0.00% 48.00 1,344.00 100.00%
04.03 SALIDA PARA INTERRUPTOR SIMPLE pto 8 9.00 72.00 15.00 135.00 1,080.00 - - - 0.00% 72.00 1,080.00 100.00%
04.04 SALIDA PARA INTERRUPTOR DOBLE pto 8 1.00 8.00 15.00 15.00 120.00 - - - 0.00% 8.00 120.00 100.00%
04.05 SALIDA PARA INTERRUPTOR TRIPLE pto 8 1.00 8.00 15.00 15.00 120.00 - - 0.00% 8.00 120.00 100.00%
04.06 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE pto 8 20.00 160.00 15.00 300.00 2,400.00 - - 0.00% 160.00 2,400.00 100.00%
04.07 SALIDA PARA CAMPANILLA DE TIMBRE pto 8 1.00 8.00 6.50 6.50 52.00 - - - 0.00% 8.00 52.00 100.00%
04.08 SALIDA PARA TELEFONO pto 8 4.00 32.00 12.00 48.00 384.00 - - - 0.00% 32.00 384.00 100.00%
04.09 SALIDA PARA ANTENA DE TELEVISION O CABLE pto 8 4.00 32.00 12.00 48.00 384.00 - - 0.00% 32.00 384.00 100.00%
04.10 SALIDA PARA INTERCOMUNICADOR pto 8 2.00 16.00 12.00 24.00 192.00 - - - 0.00% 16.00 192.00 100.00%
04.11 SUMINISTRO E INST.TABLEROS DE DISTRIBUCIÓN INC. LLAVES TÉRMICAS Y und 8 1.00 8.00 20.00 20.00 160.00
DIFERENCIALES - - - 0.00% 8.00 160.00 100.00%
04.12 POZO A TIERRA und 8 1.00 8.00 270.00 270.00 2,160.00 - - - 0.00% 8.00 2,160.00 100.00%
04.13 CAJA DE PASE CUADRA 150 MM X 150 MM X 50 MM und 8 6.00 48.00 3.00 18.00 144.00 - - - 0.00% 48.00 144.00 100.00%
04.14 SUMINISTRO E INSTALACIÓN DE MURETE Y CAJA PARA MEDIDOR und 8 1.00 8.00 11.00 11.00 88.00 - - 0.00% 8.00 88.00 100.00%
04.15 PRUEBAS ELECTRICAS glb 8 1.00 8.00 18.00 18.00 144.00 - - - 0.00% 8.00 144.00 100.00%
Página (1/7)
SUB CONTRATISTA LYC Contratistas Generales
VALORIZACIÓN DE AVANCE FÍSICO DE OBRA Nº 03 - MES SEPTIEMBRE-OCTUBRE 2020
OBRA: CONSTRUCCIÓN DE VIVIENDAS UNIFAMILIARES Y MULTIFAMILIARES EN LA PROVINCIA DE CHICLAYO- LAMBAYEQUE
Item Descripción de la Partida Und. Metrado Metrado por 8 Precio Unit. Parcial/lote Parcial/8 lotes Valorizado Valorizado Valorizado Valorizado
N° Lotes Metrado Metrado Metrado % Metrado %
C/U lotes Tipo B (S/.) (S/.) (S/.) (S/.) (S/.) (S/.) (S/.)
01.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO m2 8 47.01 376.08 8.00 376.08 3,008.64 - 188.04 188.04 1,504.32 50.00% 188.04 1,504.32 50.00%
01.03.04 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 8 3.53 28.24 100.00 353.00 2,824.00 14.12 14.12 1,412.00 50.00% 14.12 1,412.00 50.00%
01.03.05 CONCRETO EN FALSO PISO 1:8 CEMENTO- HORMINGON E=4" m2 8 67.07 536.56 12.50 838.38 6,707.00 0.00 - - 0.00% 536.56 6,707.00 100.00%
01.03.06 CONCRETO F´C =175 KG/CM2 PARA VEREDA m2 8 5.47 43.76 5.00 27.35 218.80 0.00 - - 0.00% 43.76 218.80 100.00%
01.03.07 HUELLAS DE CONCRETO PARA COCHERA 0.50 X 0.50 M und 8 14.00 112.00 5.00 70.00 560.00 - 0.00 - - 0.00% 112.00 560.00 100.00%
01.04 CONCRETO ARMADO 3,973.11 31,784.89 - - - 0.00% - - 0.00%
01.04.01 ZAPATAS Y VIGAS DE CIMENTACIÓN 1,050.19 8,401.53 - - 0.00% - - 0.00%
01.04.01.01 CONCRETO PRE MEZCLADO PARA ZAPATAS F'C= 210 KG/CM2 m3 8 17.14 137.12 9.00 154.26 1,234.08 - 119.98 1,079.82 119.98 1,079.82 87.50% 17.14 154.26 12.50%
01.04.01.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 EN ZAPATAS kg 8 212.06 1,696.48 0.60 127.24 1,017.89 - 1,696.48 1,017.89 1,696.48 1,017.89 100.00% - - 0.00%
01.04.01.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS DE CIMENTACION m2 8 45.68 365.44 8.00 365.44 2,923.52
- 319.76 2,558.08 319.76 2,558.08 87.50% 45.68 365.44 12.50%
01.04.01.04 CONCRETO PRE MEZCLADO PARA VIGAS DE CIMENTACIÓN F'C= 210 m3 8 5.71 45.68 8.50 48.54 388.28
KG/CM2 - 39.97 339.75 39.97 339.75 87.50% 5.71 48.54 12.50%
01.04.01.05 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 EN VIGAS DE kg 8 591.20 4,729.60 0.60 354.72 2,837.76
CIMENTACIÓN 4,138.40 2,483.04 4,138.40 2,483.04 87.50% 591.20 354.72 12.50%
01.04.02.05.02 LADRILLO 15 x 30 x 30 CM PARA LOSA ALIGERADA und 8 476.00 3,808.00 0.70 333.20 2,665.60 - - - 0.00% 3,808.00 2,665.60 100.00%
01.04.02.05.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 EN LOSA ALIGERADA kg 8 410.64 3,285.12 0.80 328.51 2,628.10
- - - 0.00% 3,285.12 2,628.10 100.00%
01.04.02.05.04 CONCRETO PRE MEZCLADO PARA LOSA ALIGERADA F'C= 210 KG/CM2 m3 8 4.97 39.76 9.00 44.73 357.84
- - 0.00% 39.76 357.84 100.00%
02.01.02 MURO DE LADRILLO KK 18 HUECOS DE CANTO CON MORTERO 1:4, 1.5 cm m2 8 1.65 13.20 20.00 33.00 264.00
- - - 0.00% 13.20 264.00 100.00%
02.07.03 PUERTA CONTRAPLACADA P-4 INC. MARCO, CERRAJERÍA Y BISAGRAS und 8 4.00 32.00 10.00 40.00 320.00
- - - 0.00% 32.00 320.00 100.00%
02.07.04 ARMADURA DE MADERA PARA COBERTURA EN COCHERA glb 8 1.00 8.00 22.00 22.00 176.00 - - 0.00% 8.00 176.00 100.00%
02.07.05 CLOSET DE MELAMINE DE 15 MM und 8 2.00 16.00 10.00 20.00 160.00 - - - 0.00% 16.00 160.00 100.00%
02.07.06 MUEBLES ALTOS Y BAJOS DE MELAMINA 15 MM glb 8 1.00 8.00 10.00 10.00 80.00 - - - 0.00% 8.00 80.00 100.00%
02.08 VIDRIOS, CRISTALES Y SIMILARES 68.88 551.04 - - - 0.00% - - 0.00%
02.08.01 VIDRIO CRUDO DE 6 MM CRISTAL INCL. MARCO DE ALUMINIO m2 8 9.84 78.72 7.00 68.88 551.04 - - - 0.00% 78.72 551.04 100.00%
02.09 PINTURAS 2,180.97 17,447.76 - - - 0.00% - - 0.00%
02.09.01 PINTURA LATEX EN CIELO RASO m2 8 64.82 518.56 6.00 388.92 3,111.36 - - - 0.00% 518.56 3,111.36 100.00%
02.09.02 PINTURA LATEX INTERIOR Y EXTERIOR - 2 MANOS, INCL. MASILLADO Y m2 8 237.40 1,899.20 6.00 1,424.40 11,395.20
LIJADO - - - 0.00% 1,899.20 11,395.20 100.00%
02.09.03 IMPERMEABILIZACIÓN DE ÚLTIMA LOSA ALIGERADA m2 8 73.53 588.24 5.00 367.65 2,941.20 - - - 0.00% 588.24 2,941.20 100.00%
02.10 APARATOS Y ACCESORIOS SANITARIOS 193.00 1,544.00 - - 0.00% - - 0.00%
02.10.01 SUMINISTRO E INST.INODORO CERAMICO COLOR BLANCO INC. GRIFERIA und 8 2.00 16.00 12.00 24.00 192.00
Y ACCESORIOS - - - 0.00% 16.00 192.00 100.00%
02.10.02 SUMINISTRO E INST. LAVATORIO SIN PEDESTAL COLOR BLANCO INC. und 8 2.00 16.00 18.00 36.00 288.00
GRIFERIA Y ACCESORIOS - - - 0.00% 16.00 288.00 100.00%
02.10.03 SUMINISTRO E INST. LAVADERO DE ACERO INOXIDABLE CON und 8 1.00 8.00 5.00 5.00 40.00
ESCURRIDERO INC. GRIFERIA Y ACCESORIOS - - - 0.00% 8.00 40.00 100.00%
02.10.04 SUMINISTRO E INST. DE DUCHA INC. GRIFERIA Y ACCESORIOS und 8 1.00 8.00 16.00 16.00 128.00 - - 0.00% 8.00 128.00 100.00%
02.10.05 SUMINISTRO E INST. DE LAVADERO DE FIBRA DE VIDRIO und 8 1.00 8.00 12.00 12.00 96.00 - - 0.00% 8.00 96.00 100.00%
02.10.06 SUMINISTRO E INSTALACIÓN DE ACCESORIOS SANITARIOS jgo 8 2.00 16.00 50.00 100.00 800.00 - - - 0.00% 16.00 800.00 100.00%
03 INSTALACIONES SANITARIAS 823.94 6,591.53 - - - 0.00% - - 0.00%
03.01 SISTEMA DE DESAGUE 413.32 3,306.57 - - 0.00% - - 0.00%
03.01.01 SALIDAS DE PVC SAL PARA DESAGUE DE 2" pto 8 8.00 64.00 16.00 128.00 1,024.00 - - - 0.00% 64.00 1,024.00 100.00%
03.01.02 TUBERIA DE PVC SAL 2" m 8 14.92 119.36 3.46 51.62 412.99 - - - 0.00% 119.36 412.99 100.00%
03.01.03 MONTANTE PLUVIAL PVC SAL 3" m 8 2.80 22.40 3.41 9.55 76.38 - - - 0.00% 22.40 76.38 99.99%
03.01.04 SALIDAS DE PVC SAL PARA DESAGUE DE 4" pto 8 2.00 16.00 16.00 32.00 256.00 - - - 0.00% 16.00 256.00 100.00%
03.01.05 TUBERIA DE PVC SAL 4" m 8 18.90 151.20 3.50 66.15 529.20 4.73 4.73 16.54 3.13% 146.48 512.66 96.87%
03.01.06 SALIDAS DE PVC SAL PARA VENTILACIÓN DE 2" pto 8 2.00 16.00 16.00 32.00 256.00 - - - 0.00% 16.00 256.00 100.00%
03.01.07 REGISTRO DE BRONCE 2" und 8 3.00 24.00 6.00 18.00 144.00 - - - 0.00% 24.00 144.00 100.00%
03.01.08 SUMIDERO DE BRONCE 2" PROVISION Y COLOCACION und 8 2.00 16.00 6.00 12.00 96.00 - - - 0.00% 16.00 96.00 100.00%
03.01.09 CAJA DE REGISTRO DE DESAGUE 12" X 24" und 8 2.00 16.00 18.00 36.00 288.00 - - 0.00% 16.00 288.00 100.00%
03.01.10 CONEXIÓN A LA RED EXISTENTE glb 8 1.00 8.00 14.00 14.00 112.00 - - - 0.00% 8.00 112.00 100.00%
03.01.11 PRUEBA HIDRÁULICA PARA INSTALACIONES DE DESAGÜE glb 8 1.00 8.00 14.00 14.00 112.00 - - - 0.00% 8.00 112.00 100.00%
03.02 SISTEMA DE AGUA FRIA Y AGUA CALIENTE 0.00 410.62 3,284.96 - - - 0.00% - - 0.00%
03.02.01 SALIDA DE AGUA FRIA TUBERIA PVC C-10 O 1/2" pto 8 10.00 80.00 14.00 140.00 1,120.00 - - 0.00% 80.00 1,120.00 100.00%
03.02.02 RED DE DISTRIBUCION TUBERIA 1/2" PVC SAP m 8 21.82 174.56 2.00 43.64 349.12 - - - 0.00% 174.56 349.12 100.00%
03.02.03 RED DE DISTRIBUCION TUBERIA 3/4" PVC SAP m 8 24.43 195.44 2.00 48.86 390.88 - - - 0.00% 195.44 390.88 100.00%
03.02.04 VALVULAS DE COMPUERTA DE BRONCE DE 1/2" AGUA FRÍA und 8 5.00 40.00 16.00 80.00 640.00 - - 0.00% 40.00 640.00 100.00%
03.02.05 GRIFO DE RIEGO DE 1/2" und 8 1.00 8.00 2.00 2.00 16.00 - - - 0.00% 8.00 16.00 100.00%
03.02.06 SALIDA DE AGUA CALIENTE CPVC Ø 1/2" pto 8 3.00 24.00 13.00 39.00 312.00 - - 0.00% 24.00 312.00 100.00%
03.02.07 TUBERIA CPVC SAP C-10 Ø 1/2" AGUA CALIENTE m 8 10.56 84.48 2.00 21.12 168.96 - - - 0.00% 84.48 168.96 100.00%
03.02.08 CONEXIÓN A LA RED EXISTENTE glb 8 1.00 8.00 18.00 18.00 144.00 - - - 0.00% 8.00 144.00 100.00%
03.02.09 PRUEBA HIDRAULICA PARA AGUA FRIA Y AGUA CALIENTE glb 8 1.00 8.00 18.00 18.00 144.00 - - - 0.00% 8.00 144.00 100.00%
04 INSTALACIONES ELECTRICAS 1,516.50 12,132.00 - - - 0.00% - - 0.00%
04.01 SALIDA DE TECHO pto 8 15.00 120.00 28.00 420.00 3,360.00 - - - 0.00% 120.00 3,360.00 100.00%
04.02 SALIDA DE BRAQUETE pto 8 6.00 48.00 28.00 168.00 1,344.00 - - 0.00% 48.00 1,344.00 100.00%
04.03 SALIDA PARA INTERRUPTOR SIMPLE pto 8 9.00 72.00 15.00 135.00 1,080.00 - - - 0.00% 72.00 1,080.00 100.00%
04.04 SALIDA PARA INTERRUPTOR DOBLE pto 8 1.00 8.00 15.00 15.00 120.00 - - - 0.00% 8.00 120.00 100.00%
04.05 SALIDA PARA INTERRUPTOR TRIPLE pto 8 1.00 8.00 15.00 15.00 120.00 - - 0.00% 8.00 120.00 100.00%
04.06 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE pto 8 20.00 160.00 15.00 300.00 2,400.00 10.00 10.00 150.00 6.25% 150.00 2,250.00 93.75%
Página (2/7)
Presupuestado Anterior Actual Acumulado Saldo
Item Descripción de la Partida Und. Metrado Metrado por 8 Precio Unit. Parcial/lote Parcial/8 lotes Valorizado Valorizado Valorizado Valorizado
N° Lotes Metrado Metrado Metrado % Metrado %
C/U lotes Tipo B (S/.) (S/.) (S/.) (S/.) (S/.) (S/.) (S/.)
04.07 SALIDA PARA CAMPANILLA DE TIMBRE pto 8 1.00 8.00 6.50 6.50 52.00 - - - 0.00% 8.00 52.00 100.00%
04.08 SALIDA PARA TELEFONO pto 8 4.00 32.00 12.00 48.00 384.00 - - - 0.00% 32.00 384.00 100.00%
04.09 SALIDA PARA ANTENA DE TELEVISION O CABLE pto 8 4.00 32.00 12.00 48.00 384.00 - - 0.00% 32.00 384.00 100.00%
04.10 SALIDA PARA INTERCOMUNICADOR pto 8 2.00 16.00 12.00 24.00 192.00 - - - 0.00% 16.00 192.00 100.00%
04.11 SUMINISTRO E INST.TABLEROS DE DISTRIBUCIÓN INC. LLAVES TÉRMICAS Y und 8 1.00 8.00 20.00 20.00 160.00
DIFERENCIALES - - - 0.00% 8.00 160.00 100.00%
04.12 POZO A TIERRA und 8 1.00 8.00 270.00 270.00 2,160.00 - - - 0.00% 8.00 2,160.00 100.00%
04.13 CAJA DE PASE CUADRA 150 MM X 150 MM X 50 MM und 8 6.00 48.00 3.00 18.00 144.00 - - - 0.00% 48.00 144.00 100.00%
04.14 SUMINISTRO E INSTALACIÓN DE MURETE Y CAJA PARA MEDIDOR und 8 1.00 8.00 11.00 11.00 88.00 - - 0.00% 8.00 88.00 100.00%
04.15 PRUEBAS ELECTRICAS glb 8 1.00 8.00 18.00 18.00 144.00 - - - 0.00% 8.00 144.00 100.00%
Página (3/7)
SUB CONTRATISTA LYC Contratistas Generales
VALORIZACIÓN DE AVANCE FÍSICO DE OBRA Nº 03 - MES SEPTIEMBRE-OCTUBRE 2020
OBRA: CONSTRUCCIÓN DE VIVIENDAS UNIFAMILIARES Y MULTIFAMILIARES EN LA PROVINCIA DE CHICLAYO- LAMBAYEQUE
Item Descripción de la Partida Und. Metrado Metrado por 8 Precio Unit. Parcial/lote Parcial/8 lotes Valorizado Valorizado Valorizado Valorizado
N° Lotes Metrado Metrado Metrado % Metrado %
C/U lotes Tipo B (S/.) (S/.) (S/.) (S/.) (S/.) (S/.) (S/.)
01.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO m2 8 47.01 376.08 8.00 376.08 3,008.64 188.04 2,256.48 94.02 752.16 282.06 2,256.48 75.00% 94.02 752.16 25.00%
01.03.04 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 8 3.53 28.24 100.00 353.00 2,824.00 10.59 2,118.00 7.06 706.00 17.65 1,765.00 62.50% 10.59 1,059.00 37.50%
01.03.05 CONCRETO EN FALSO PISO 1:8 CEMENTO- HORMINGON E=4" m2 8 67.07 536.56 12.50 838.38 6,707.00 6,707.00 67.07 838.38 67.07 838.38 12.50% 469.49 5,868.63 87.50%
01.03.06 CONCRETO F´C =175 KG/CM2 PARA VEREDA m2 8 5.47 43.76 5.00 27.35 218.80 0.00 - - - 0.00% 43.76 218.80 100.00%
01.03.07 HUELLAS DE CONCRETO PARA COCHERA 0.50 X 0.50 M und 8 14.00 112.00 5.00 70.00 560.00 0.00 - - - 0.00% 112.00 560.00 100.00%
01.04 CONCRETO ARMADO 3,973.11 31,784.89 - - 0.00% - - 0.00%
01.04.01 ZAPATAS Y VIGAS DE CIMENTACIÓN 1,050.19 8,401.53 - - 0.00% - - 0.00%
01.04.01.01 CONCRETO PRE MEZCLADO PARA ZAPATAS F'C= 210 KG/CM2 m3 8 17.14 137.12 9.00 154.26 1,234.08 102.84 925.56 34.28 308.52 137.12 1,234.08 100.00% - - 0.00%
01.04.01.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 EN ZAPATAS kg 8 212.06 1,696.48 0.60 127.24 1,017.89 1696.48 1,017.89 0.00 - 1,696.48 1,017.89 100.00% - - 0.00%
01.04.01.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS DE CIMENTACION m2 8 45.68 365.44 8.00 365.44 2,923.52
228.40 1,827.20 137.04 1,096.32 365.44 2,923.52 100.00% - - 0.00%
01.04.01.04 CONCRETO PRE MEZCLADO PARA VIGAS DE CIMENTACIÓN F'C= 210 m3 8 5.71 45.68 8.50 48.54 388.28
KG/CM2 28.55 242.68 17.13 145.61 45.68 388.28 100.00% - - 0.00%
01.04.01.05 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 EN VIGAS DE kg 8 591.20 4,729.60 0.60 354.72 2,837.76
CIMENTACIÓN 3,547.20 2,837.76 1,182.40 709.44 4,729.60 2,837.76 100.00% - - 0.00%
01.04.02.05.02 LADRILLO 15 x 30 x 30 CM PARA LOSA ALIGERADA und 8 476.00 3,808.00 0.70 333.20 2,665.60 - - - - 0.00% 3,808.00 2,665.60 100.00%
01.04.02.05.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 EN LOSA ALIGERADA kg 8 410.64 3,285.12 0.80 328.51 2,628.10
- - - - 0.00% 3,285.12 2,628.10 100.00%
01.04.02.05.04 CONCRETO PRE MEZCLADO PARA LOSA ALIGERADA F'C= 210 KG/CM2 m3 8 4.97 39.76 9.00 44.73 357.84
- - - 0.00% 39.76 357.84 100.00%
02.01.02 MURO DE LADRILLO KK 18 HUECOS DE CANTO CON MORTERO 1:4, 1.5 cm m2 8 1.65 13.20 20.00 33.00 264.00
- 0.00 - - - 0.00% 13.20 264.00 100.00%
02.07.03 PUERTA CONTRAPLACADA P-4 INC. MARCO, CERRAJERÍA Y BISAGRAS und 8 4.00 32.00 10.00 40.00 320.00
- 0.00 - - 0.00% 32.00 320.00 100.00%
02.07.04 ARMADURA DE MADERA PARA COBERTURA EN COCHERA glb 8 1.00 8.00 22.00 22.00 176.00 0.00 - - 0.00% 8.00 176.00 100.00%
02.07.05 CLOSET DE MELAMINE DE 15 MM und 8 2.00 16.00 10.00 20.00 160.00 - 0.00 - - 0.00% 16.00 160.00 100.00%
02.07.06 MUEBLES ALTOS Y BAJOS DE MELAMINA 15 MM glb 8 1.00 8.00 10.00 10.00 80.00 - 0.00 - - 0.00% 8.00 80.00 100.00%
02.08 VIDRIOS, CRISTALES Y SIMILARES 68.88 551.04 - - - 0.00% - - 0.00%
02.08.01 VIDRIO CRUDO DE 6 MM CRISTAL INCL. MARCO DE ALUMINIO m2 8 9.84 78.72 7.00 68.88 551.04 - 0.00 - - 0.00% 78.72 551.04 100.00%
02.09 PINTURAS 2,180.97 17,447.76 - - - 0.00% - - 0.00%
02.09.01 PINTURA LATEX EN CIELO RASO m2 8 64.82 518.56 6.00 388.92 3,111.36 - 0.00 - - 0.00% 518.56 3,111.36 100.00%
02.09.02 PINTURA LATEX INTERIOR Y EXTERIOR - 2 MANOS, INCL. MASILLADO Y m2 8 237.40 1,899.20 6.00 1,424.40 11,395.20
LIJADO - 0.00 - - 0.00% 1,899.20 11,395.20 100.00%
02.09.03 IMPERMEABILIZACIÓN DE ÚLTIMA LOSA ALIGERADA m2 8 73.53 588.24 5.00 367.65 2,941.20 - 0.00 - - 0.00% 588.24 2,941.20 100.00%
02.10 APARATOS Y ACCESORIOS SANITARIOS 193.00 1,544.00 - - 0.00% - - 0.00%
02.10.01 SUMINISTRO E INST.INODORO CERAMICO COLOR BLANCO INC. GRIFERIA und 8 2.00 16.00 12.00 24.00 192.00
Y ACCESORIOS - 0.00 - - 0.00% 16.00 192.00 100.00%
02.10.02 SUMINISTRO E INST. LAVATORIO SIN PEDESTAL COLOR BLANCO INC. und 8 2.00 16.00 18.00 36.00 288.00
GRIFERIA Y ACCESORIOS - 0.00 - - 0.00% 16.00 288.00 100.00%
02.10.03 SUMINISTRO E INST. LAVADERO DE ACERO INOXIDABLE CON und 8 1.00 8.00 5.00 5.00 40.00
ESCURRIDERO INC. GRIFERIA Y ACCESORIOS - 0.00 - - 0.00% 8.00 40.00 100.00%
02.10.04 SUMINISTRO E INST. DE DUCHA INC. GRIFERIA Y ACCESORIOS und 8 1.00 8.00 16.00 16.00 128.00 0.00 - - 0.00% 8.00 128.00 100.00%
02.10.05 SUMINISTRO E INST. DE LAVADERO DE FIBRA DE VIDRIO und 8 1.00 8.00 12.00 12.00 96.00 0.00 - - 0.00% 8.00 96.00 100.00%
02.10.06 SUMINISTRO E INSTALACIÓN DE ACCESORIOS SANITARIOS jgo 8 2.00 16.00 50.00 100.00 800.00 - 0.00 - - 0.00% 16.00 800.00 100.00%
03 INSTALACIONES SANITARIAS 823.94 6,591.53 - - - 0.00% - - 0.00%
03.01 SISTEMA DE DESAGUE 413.32 3,306.57 - - 0.00% - - 0.00%
03.01.01 SALIDAS DE PVC SAL PARA DESAGUE DE 2" pto 8 8.00 64.00 16.00 128.00 1,024.00 - 16.00 16.00 256.00 25.00% 48.00 768.00 75.00%
03.01.02 TUBERIA DE PVC SAL 2" m 8 14.92 119.36 3.46 51.62 412.99 - 29.84 29.84 103.25 25.00% 89.52 309.74 75.00%
03.01.03 MONTANTE PLUVIAL PVC SAL 3" m 8 2.80 22.40 3.41 9.55 76.38 - 5.60 5.60 19.10 25.01% 16.80 57.29 75.00%
03.01.04 SALIDAS DE PVC SAL PARA DESAGUE DE 4" pto 8 2.00 16.00 16.00 32.00 256.00 - 4.00 4.00 64.00 25.00% 12.00 192.00 75.00%
03.01.05 TUBERIA DE PVC SAL 4" m 8 18.90 151.20 3.50 66.15 529.20 37.80 37.80 132.30 25.00% 113.40 396.90 75.00%
03.01.06 SALIDAS DE PVC SAL PARA VENTILACIÓN DE 2" pto 8 2.00 16.00 16.00 32.00 256.00 - 4.00 4.00 64.00 25.00% 12.00 192.00 75.00%
03.01.07 REGISTRO DE BRONCE 2" und 8 3.00 24.00 6.00 18.00 144.00 - 6.00 6.00 36.00 25.00% 18.00 108.00 75.00%
03.01.08 SUMIDERO DE BRONCE 2" PROVISION Y COLOCACION und 8 2.00 16.00 6.00 12.00 96.00 - 4.00 4.00 24.00 25.00% 12.00 72.00 75.00%
03.01.09 CAJA DE REGISTRO DE DESAGUE 12" X 24" und 8 2.00 16.00 18.00 36.00 288.00 4.00 4.00 72.00 25.00% 12.00 216.00 75.00%
03.01.10 CONEXIÓN A LA RED EXISTENTE glb 8 1.00 8.00 14.00 14.00 112.00 - 2.00 2.00 28.00 25.00% 6.00 84.00 75.00%
03.01.11 PRUEBA HIDRÁULICA PARA INSTALACIONES DE DESAGÜE glb 8 1.00 8.00 14.00 14.00 112.00 - 2.00 2.00 28.00 25.00% 6.00 84.00 75.00%
03.02 SISTEMA DE AGUA FRIA Y AGUA CALIENTE 0.00 410.62 3,284.96 - - - 0.00% - - 0.00%
03.02.01 SALIDA DE AGUA FRIA TUBERIA PVC C-10 O 1/2" pto 8 10.00 80.00 14.00 140.00 1,120.00 20.00 20.00 280.00 25.00% 60.00 840.00 75.00%
03.02.02 RED DE DISTRIBUCION TUBERIA 1/2" PVC SAP m 8 21.82 174.56 2.00 43.64 349.12 - 43.64 43.64 87.28 25.00% 130.92 261.84 75.00%
03.02.03 RED DE DISTRIBUCION TUBERIA 3/4" PVC SAP m 8 24.43 195.44 2.00 48.86 390.88 - 48.86 48.86 97.72 25.00% 146.58 293.16 75.00%
03.02.04 VALVULAS DE COMPUERTA DE BRONCE DE 1/2" AGUA FRÍA und 8 5.00 40.00 16.00 80.00 640.00 0.00 - - 0.00% 40.00 640.00 100.00%
03.02.05 GRIFO DE RIEGO DE 1/2" und 8 1.00 8.00 2.00 2.00 16.00 - 0.00 - - 0.00% 8.00 16.00 100.00%
03.02.06 SALIDA DE AGUA CALIENTE CPVC Ø 1/2" pto 8 3.00 24.00 13.00 39.00 312.00 0.00 - - 0.00% 24.00 312.00 100.00%
03.02.07 TUBERIA CPVC SAP C-10 Ø 1/2" AGUA CALIENTE m 8 10.56 84.48 2.00 21.12 168.96 - 0.00 - - 0.00% 84.48 168.96 100.00%
03.02.08 CONEXIÓN A LA RED EXISTENTE glb 8 1.00 8.00 18.00 18.00 144.00 - 0.00 - - 0.00% 8.00 144.00 100.00%
03.02.09 PRUEBA HIDRAULICA PARA AGUA FRIA Y AGUA CALIENTE glb 8 1.00 8.00 18.00 18.00 144.00 - 0.00 - - 0.00% 8.00 144.00 100.00%
04 INSTALACIONES ELECTRICAS 1,516.50 12,132.00 - - - 0.00% - - 0.00%
04.01 SALIDA DE TECHO pto 8 15.00 120.00 28.00 420.00 3,360.00 - 0.00 - - 0.00% 120.00 3,360.00 100.00%
04.02 SALIDA DE BRAQUETE pto 8 6.00 48.00 28.00 168.00 1,344.00 0.00 - - 0.00% 48.00 1,344.00 100.00%
04.03 SALIDA PARA INTERRUPTOR SIMPLE pto 8 9.00 72.00 15.00 135.00 1,080.00 - 0.00 - - 0.00% 72.00 1,080.00 100.00%
04.04 SALIDA PARA INTERRUPTOR DOBLE pto 8 1.00 8.00 15.00 15.00 120.00 - 0.00 - - 0.00% 8.00 120.00 100.00%
04.05 SALIDA PARA INTERRUPTOR TRIPLE pto 8 1.00 8.00 15.00 15.00 120.00 0.00 - - 0.00% 8.00 120.00 100.00%
04.06 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE pto 8 20.00 160.00 15.00 300.00 2,400.00 40.00 40.00 600.00 25.00% 120.00 1,800.00 75.00%
Página (4/7)
Presupuestado Anterior Actual Acumulado Saldo
Item Descripción de la Partida Und. Metrado Metrado por 8 Precio Unit. Parcial/lote Parcial/8 lotes Valorizado Valorizado Valorizado Valorizado
N° Lotes Metrado Metrado Metrado % Metrado %
C/U lotes Tipo B (S/.) (S/.) (S/.) (S/.) (S/.) (S/.) (S/.)
04.07 SALIDA PARA CAMPANILLA DE TIMBRE pto 8 1.00 8.00 6.50 6.50 52.00 - 0.00 - - 0.00% 8.00 52.00 100.00%
04.08 SALIDA PARA TELEFONO pto 8 4.00 32.00 12.00 48.00 384.00 - 0.00 - - 0.00% 32.00 384.00 100.00%
04.09 SALIDA PARA ANTENA DE TELEVISION O CABLE pto 8 4.00 32.00 12.00 48.00 384.00 0.00 - - 0.00% 32.00 384.00 100.00%
04.10 SALIDA PARA INTERCOMUNICADOR pto 8 2.00 16.00 12.00 24.00 192.00 - 0.00 - - 0.00% 16.00 192.00 100.00%
04.11 SUMINISTRO E INST.TABLEROS DE DISTRIBUCIÓN INC. LLAVES TÉRMICAS Y und 8 1.00 8.00 20.00 20.00 160.00
DIFERENCIALES - 0.00 - - 0.00% 8.00 160.00 100.00%
04.12 POZO A TIERRA und 8 1.00 8.00 270.00 270.00 2,160.00 - 0.00 - - 0.00% 8.00 2,160.00 100.00%
04.13 CAJA DE PASE CUADRA 150 MM X 150 MM X 50 MM und 8 6.00 48.00 3.00 18.00 144.00 - 0.00 - - 0.00% 48.00 144.00 100.00%
04.14 SUMINISTRO E INSTALACIÓN DE MURETE Y CAJA PARA MEDIDOR und 8 1.00 8.00 11.00 11.00 88.00 0.00 - - 0.00% 8.00 88.00 100.00%
04.15 PRUEBAS ELECTRICAS glb 8 1.00 8.00 18.00 18.00 144.00 - 0.00 - - 0.00% 8.00 144.00 100.00%
Página (5/7)
SUB CONTRATISTA LYC Contratistas Generales
VALORIZACIÓN DE AVANCE FÍSICO DE OBRA Nº 04 - MES OCTUBRE 2020
OBRA: CONSTRUCCIÓN DE VIVIENDAS UNIFAMILIARES Y MULTIFAMILIARES EN LA PROVINCIA DE CHICLAYO- LAMBAYEQUE
Item Descripción de la Partida Und. Metrado Metrado por 8 Precio Unit. Parcial/lote Parcial/8 lotes Valorizado Valorizado Valorizado Valorizado
N° Lotes Metrado Metrado Metrado % Metrado %
C/U lotes Tipo B (S/.) (S/.) (S/.) (S/.) (S/.) (S/.) (S/.)
01.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO m2 8 47.01 376.08 8.00 376.08 3,008.64 188.04 1,504.32 0.00 - 188.04 1,504.32 50.00% 188.04 1,504.32 50.00%
01.03.04 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 8 3.53 28.24 100.00 353.00 2,824.00 14.12 1,412.00 3.53 353.00 17.65 1,765.00 62.50% 10.59 1,059.00 37.50%
01.03.05 CONCRETO EN FALSO PISO 1:8 CEMENTO- HORMINGON E=4" m2 8 67.07 536.56 12.50 838.38 6,707.00 67.07 838.38 134.14 1,676.75 201.21 2,515.13 37.50% 335.35 4,191.88 62.50%
01.03.06 CONCRETO F´C =175 KG/CM2 PARA VEREDA m2 8 5.47 43.76 5.00 27.35 218.80 - - 0.00 - - - 0.00% 43.76 218.80 100.00%
01.03.07 HUELLAS DE CONCRETO PARA COCHERA 0.50 X 0.50 M und 8 14.00 112.00 5.00 70.00 560.00 0 - 0.00 - - - 0.00% 112.00 560.00 100.00%
01.04 CONCRETO ARMADO 3,973.11 31,784.89 - -
01.04.01 ZAPATAS Y VIGAS DE CIMENTACIÓN 1,050.19 8,401.53 - - - - 0.00% - - 0.00%
01.04.01.01 CONCRETO PRE MEZCLADO PARA ZAPATAS F'C= 210 KG/CM2 m3 8 17.14 137.12 9.00 154.26 1,234.08 137.12 1,234.08 0.00 - 137.12 1,234.08 100.00% - - 0.00%
01.04.01.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 EN ZAPATAS kg 8 212.06 1,696.48 0.60 127.24 1,017.89 1696.48 1,017.89 0.00 - 1,696.48 1,017.89 100.00% - - 0.00%
01.04.01.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS DE CIMENTACION m2 8 45.68 365.44 8.00 365.44 2,923.52
365.44 2,923.52 0.00 - 365.44 2,923.52 100.00% - - 0.00%
01.04.01.04 CONCRETO PRE MEZCLADO PARA VIGAS DE CIMENTACIÓN F'C= 210 m3 8 5.71 45.68 8.50 48.54 388.28
KG/CM2 45.68 388.28 0.00 - 45.68 388.28 100.00% - - 0.00%
01.04.01.05 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 EN VIGAS DE kg 8 591.20 4,729.60 0.60 354.72 2,837.76
CIMENTACIÓN 4,729.60 3,547.20 0.00 - 4,729.60 2,837.76 100.00% - - 0.00%
01.04.02.05.02 LADRILLO 15 x 30 x 30 CM PARA LOSA ALIGERADA und 8 476.00 3,808.00 0.70 333.20 2,665.60 0 - 476.00 333.20 476.00 333.20 12.50% 3,332.00 2,332.40 87.50%
01.04.02.05.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 EN LOSA ALIGERADA kg 8 410.64 3,285.12 0.80 328.51 2,628.10
- - 410.00 328.00 410.00 328.00 12.48% 2,875.12 2,300.10 87.52%
01.04.02.05.04 CONCRETO PRE MEZCLADO PARA LOSA ALIGERADA F'C= 210 KG/CM2 m3 8 4.97 39.76 9.00 44.73 357.84
0 - 4.97 44.73 4.97 44.73 12.50% 34.79 313.11 87.50%
02.01.02 MURO DE LADRILLO KK 18 HUECOS DE CANTO CON MORTERO 1:4, 1.5 cm m2 8 1.65 13.20 20.00 33.00 264.00
- - 1.65 33.00 1.65 33.00 12.50% 11.55 231.00 87.50%
02.07.03 PUERTA CONTRAPLACADA P-4 INC. MARCO, CERRAJERÍA Y BISAGRAS und 8 4.00 32.00 10.00 40.00 320.00
- - 0.00 - - - 0.00% 32.00 320.00 100.00%
02.07.04 ARMADURA DE MADERA PARA COBERTURA EN COCHERA glb 8 1.00 8.00 22.00 22.00 176.00 - - 0.00 - - - 0.00% 8.00 176.00 100.00%
02.07.05 CLOSET DE MELAMINE DE 15 MM und 8 2.00 16.00 10.00 20.00 160.00 - - 0.00 - - - 0.00% 16.00 160.00 100.00%
02.07.06 MUEBLES ALTOS Y BAJOS DE MELAMINA 15 MM glb 8 1.00 8.00 10.00 10.00 80.00 0 - 0.00 - - - 0.00% 8.00 80.00 100.00%
02.08 VIDRIOS, CRISTALES Y SIMILARES 68.88 551.04 - - -
02.08.01 VIDRIO CRUDO DE 6 MM CRISTAL INCL. MARCO DE ALUMINIO m2 8 9.84 78.72 7.00 68.88 551.04 - - 0.00 - - - 0.00% 78.72 551.04 100.00%
02.09 PINTURAS 2,180.97 17,447.76 - - -
02.09.01 PINTURA LATEX EN CIELO RASO m2 8 64.82 518.56 6.00 388.92 3,111.36 - - 0.00 - - - 0.00% 518.56 3,111.36 100.00%
02.09.02 PINTURA LATEX INTERIOR Y EXTERIOR - 2 MANOS, INCL. MASILLADO Y m2 8 237.40 1,899.20 6.00 1,424.40 11,395.20
LIJADO - - 0.00 - - - 0.00% 1,899.20 11,395.20 100.00%
02.09.03 IMPERMEABILIZACIÓN DE ÚLTIMA LOSA ALIGERADA m2 8 73.53 588.24 5.00 367.65 2,941.20 0 - 0.00 - - - 0.00% 588.24 2,941.20 100.00%
02.10 APARATOS Y ACCESORIOS SANITARIOS 193.00 1,544.00 - - -
02.10.01 SUMINISTRO E INST.INODORO CERAMICO COLOR BLANCO INC. GRIFERIA und 8 2.00 16.00 12.00 24.00 192.00
Y ACCESORIOS - - 0.00 - - - 0.00% 16.00 192.00 100.00%
02.10.02 SUMINISTRO E INST. LAVATORIO SIN PEDESTAL COLOR BLANCO INC. und 8 2.00 16.00 18.00 36.00 288.00
GRIFERIA Y ACCESORIOS - - 0.00 - - - 0.00% 16.00 288.00 100.00%
02.10.03 SUMINISTRO E INST. LAVADERO DE ACERO INOXIDABLE CON und 8 1.00 8.00 5.00 5.00 40.00
ESCURRIDERO INC. GRIFERIA Y ACCESORIOS - - 0.00 - - - 0.00% 8.00 40.00 100.00%
02.10.04 SUMINISTRO E INST. DE DUCHA INC. GRIFERIA Y ACCESORIOS und 8 1.00 8.00 16.00 16.00 128.00 - - 0.00 - - - 0.00% 8.00 128.00 100.00%
02.10.05 SUMINISTRO E INST. DE LAVADERO DE FIBRA DE VIDRIO und 8 1.00 8.00 12.00 12.00 96.00 - - 0.00 - - - 0.00% 8.00 96.00 100.00%
02.10.06 SUMINISTRO E INSTALACIÓN DE ACCESORIOS SANITARIOS jgo 8 2.00 16.00 50.00 100.00 800.00 - - 0.00 - - - 0.00% 16.00 800.00 100.00%
03 INSTALACIONES SANITARIAS 823.94 6,591.53 0 - - - - 0.00% - - 0.00%
03.01 SISTEMA DE DESAGUE 413.32 3,306.57 - - - - - 0.00% - - 0.00%
03.01.01 SALIDAS DE PVC SAL PARA DESAGUE DE 2" pto 8 8.00 64.00 16.00 128.00 1,024.00 16 256.00 40.00 640.00 56.00 896.00 87.50% 8.00 128.00 12.50%
03.01.02 TUBERIA DE PVC SAL 2" m 8 14.92 119.36 3.46 51.62 412.99 29.84 103.25 74.60 258.12 104.44 361.36 87.50% 14.92 51.62 12.50%
03.01.03 MONTANTE PLUVIAL PVC SAL 3" m 8 2.80 22.40 3.41 9.55 76.38 5.60 19.10 14.00 47.74 19.60 66.84 87.51% 2.80 9.55 12.50%
03.01.04 SALIDAS DE PVC SAL PARA DESAGUE DE 4" pto 8 2.00 16.00 16.00 32.00 256.00 4.00 64.00 10.00 160.00 14.00 224.00 87.50% 2.00 32.00 12.50%
03.01.05 TUBERIA DE PVC SAL 4" m 8 18.90 151.20 3.50 66.15 529.20 42.53 148.84 94.50 330.75 137.03 479.59 90.63% 14.18 49.61 9.37%
03.01.06 SALIDAS DE PVC SAL PARA VENTILACIÓN DE 2" pto 8 2.00 16.00 16.00 32.00 256.00 4.00 64.00 10.00 160.00 14.00 224.00 87.50% 2.00 32.00 12.50%
03.01.07 REGISTRO DE BRONCE 2" und 8 3.00 24.00 6.00 18.00 144.00 6.00 36.00 15.00 90.00 21.00 126.00 87.50% 3.00 18.00 12.50%
03.01.08 SUMIDERO DE BRONCE 2" PROVISION Y COLOCACION und 8 2.00 16.00 6.00 12.00 96.00 4 24.00 10.00 60.00 14.00 84.00 87.50% 2.00 12.00 12.50%
03.01.09 CAJA DE REGISTRO DE DESAGUE 12" X 24" und 8 2.00 16.00 18.00 36.00 288.00 4 72.00 10.00 180.00 14.00 252.00 87.50% 2.00 36.00 12.50%
03.01.10 CONEXIÓN A LA RED EXISTENTE glb 8 1.00 8.00 14.00 14.00 112.00 2.00 28.00 5.00 70.00 7.00 98.00 87.50% 1.00 14.00 12.50%
03.01.11 PRUEBA HIDRÁULICA PARA INSTALACIONES DE DESAGÜE glb 8 1.00 8.00 14.00 14.00 112.00 2.00 28.00 5.00 70.00 7.00 98.00 87.50% 1.00 14.00 12.50%
03.02 SISTEMA DE AGUA FRIA Y AGUA CALIENTE 0.00 410.62 3,284.96 0 - -
03.02.01 SALIDA DE AGUA FRIA TUBERIA PVC C-10 O 1/2" pto 8 10.00 80.00 14.00 140.00 1,120.00 20.00 280.00 50.00 700.00 70.00 980.00 87.50% 10.00 140.00 12.50%
03.02.02 RED DE DISTRIBUCION TUBERIA 1/2" PVC SAP m 8 21.82 174.56 2.00 43.64 349.12 43.64 87.28 109.10 218.20 152.74 305.48 87.50% 21.82 43.64 12.50%
03.02.03 RED DE DISTRIBUCION TUBERIA 3/4" PVC SAP m 8 24.43 195.44 2.00 48.86 390.88 48.86 97.72 122.15 244.30 171.01 342.02 87.50% 24.43 48.86 12.50%
03.02.04 VALVULAS DE COMPUERTA DE BRONCE DE 1/2" AGUA FRÍA und 8 5.00 40.00 16.00 80.00 640.00 - - 0.00 - - - 0.00% 40.00 640.00 100.00%
03.02.05 GRIFO DE RIEGO DE 1/2" und 8 1.00 8.00 2.00 2.00 16.00 0 - 0.00 - - - 0.00% 8.00 16.00 100.00%
03.02.06 SALIDA DE AGUA CALIENTE CPVC Ø 1/2" pto 8 3.00 24.00 13.00 39.00 312.00 - - 0.00 - - - 0.00% 24.00 312.00 100.00%
03.02.07 TUBERIA CPVC SAP C-10 Ø 1/2" AGUA CALIENTE m 8 10.56 84.48 2.00 21.12 168.96 - - 21.12 42.24 21.12 42.24 25.00% 63.36 126.72 75.00%
03.02.08 CONEXIÓN A LA RED EXISTENTE glb 8 1.00 8.00 18.00 18.00 144.00 - - 0.00 - - - 0.00% 8.00 144.00 100.00%
03.02.09 PRUEBA HIDRAULICA PARA AGUA FRIA Y AGUA CALIENTE glb 8 1.00 8.00 18.00 18.00 144.00 0 - 3.00 54.00 3.00 54.00 37.50% 5.00 90.00 62.50%
04 INSTALACIONES ELECTRICAS 1,516.50 12,132.00 - - - - - 0.00% - - 0.00%
04.01 SALIDA DE TECHO pto 8 15.00 120.00 28.00 420.00 3,360.00 0 - 15.00 420.00 15.00 420.00 12.50% 105.00 2,940.00 87.50%
04.02 SALIDA DE BRAQUETE pto 8 6.00 48.00 28.00 168.00 1,344.00 0 - 6.00 168.00 6.00 168.00 12.50% 42.00 1,176.00 87.50%
04.03 SALIDA PARA INTERRUPTOR SIMPLE pto 8 9.00 72.00 15.00 135.00 1,080.00 0 - 9.00 135.00 9.00 135.00 12.50% 63.00 945.00 87.50%
04.04 SALIDA PARA INTERRUPTOR DOBLE pto 8 1.00 8.00 15.00 15.00 120.00 - - 1.00 15.00 1.00 15.00 12.50% 7.00 105.00 87.50%
04.05 SALIDA PARA INTERRUPTOR TRIPLE pto 8 1.00 8.00 15.00 15.00 120.00 - - 1.00 15.00 1.00 15.00 12.50% 7.00 105.00 87.50%
04.06 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE pto 8 20.00 160.00 15.00 300.00 2,400.00 45 675.00 20.00 300.00 65.00 975.00 40.63% 95.00 1,425.00 59.38%
Página (6/7)
Presupuestado Anterior Actual Acumulado Saldo
Item Descripción de la Partida Und. Metrado Metrado por 8 Precio Unit. Parcial/lote Parcial/8 lotes Valorizado Valorizado Valorizado Valorizado
N° Lotes Metrado Metrado Metrado % Metrado %
C/U lotes Tipo B (S/.) (S/.) (S/.) (S/.) (S/.) (S/.) (S/.)
04.07 SALIDA PARA CAMPANILLA DE TIMBRE pto 8 1.00 8.00 6.50 6.50 52.00 - - 1.00 6.50 1.00 6.50 12.50% 7.00 45.50 87.50%
04.08 SALIDA PARA TELEFONO pto 8 4.00 32.00 12.00 48.00 384.00 - - 4.00 48.00 4.00 48.00 12.50% 28.00 336.00 87.50%
04.09 SALIDA PARA ANTENA DE TELEVISION O CABLE pto 8 4.00 32.00 12.00 48.00 384.00 - - 4.00 48.00 4.00 48.00 12.50% 28.00 336.00 87.50%
04.10 SALIDA PARA INTERCOMUNICADOR pto 8 2.00 16.00 12.00 24.00 192.00 - - 2.00 24.00 2.00 24.00 12.50% 14.00 168.00 87.50%
04.11 SUMINISTRO E INST.TABLEROS DE DISTRIBUCIÓN INC. LLAVES TÉRMICAS Y und 8 1.00 8.00 20.00 20.00 160.00
DIFERENCIALES 0 - 0.00 - - - 0.00% 8.00 160.00 100.00%
04.12 POZO A TIERRA und 8 1.00 8.00 270.00 270.00 2,160.00 - - 0.00 - - - 0.00% 8.00 2,160.00 100.00%
04.13 CAJA DE PASE CUADRA 150 MM X 150 MM X 50 MM und 8 6.00 48.00 3.00 18.00 144.00 - - 0.00 - - - 0.00% 48.00 144.00 100.00%
04.14 SUMINISTRO E INSTALACIÓN DE MURETE Y CAJA PARA MEDIDOR und 8 1.00 8.00 11.00 11.00 88.00 - - 0.00 - - - 0.00% 8.00 88.00 100.00%
04.15 PRUEBAS ELECTRICAS glb 8 1.00 8.00 18.00 18.00 144.00 0 - 0.00 - - - 0.00% 8.00 144.00 100.00%
Página (7/7)