Documentos de Académico
Documentos de Profesional
Documentos de Cultura
DATOS:
H = 3.60 m
Concr. armado = 2400.00 kg/m3
h
f´c = 210.00 kg/cm2
fy = 4200.00 kg/cm2
rec = 4.00 cm b
Del predimensionamiento
ɸ (pulg) As (cm2)
3/8´´ 0.71
AS min="ρmin.b.h"
1/2´´ 1.27
As min = 6.25 cm2 5/8´´ 1.98
3/4´´ 2.85
2.1.1) ACERO POR FLEXION 1´´ 5.07
As = 6.25 cm2
Asmin = 6.25 cm2 Uso: As = 6.25 cm2
Zona de conf.
Lo
(s1)
Zona central
(s2)
Zona de conf.
Lo
(s1)
H/6 = 60.00 cm
Lo b o h (mayor) = 25.00 cm Lo = 60.00 cm
50.00 cm
16Øblm = 25.40 cm
48Øe = 45.72 cm s2 = 25.00 cm
s2
b o h (mayor) = 25.00 m
30.00 cm