Está en la página 1de 41

METRADO DE CARGAS PARA ALBAÑILERÍA

METRADO DE CARGAS MUERTAS


DESCRIPCIÓN N° VECES LARGO ANCHO ALTO
LOSA ARMADA 4 0.17
COBERTURA 0
ACABADO EN PISOS 0
MUROS PORTANTES 4 58.45 0.14 2.4
MUROS BAJOS 4 12.55 0.14 1
MUROS DE VENTANAS 0 0 0 0
VIDRIO DE VENTANAS ALTAS 4 2.22 0.14 1.8
VIDRIOS DE VENTANAS BAJAS 0 0 0 0

METRADO DE CARGAS VIVAS


DESCRIPCIÓN N° VECES LARGO ANCHO ALTO
CARGA VIVA 4 - - -

VIVIENDA DE CATEGORIA C 25%*


ALBAÑILERÍA
RTAS
ÁREA P.E. TOTAL
94.81 2.4 154.73 Tn. 98.36
94.81 0 0.00 Tn. 2.36
94.81 0 0.00 Tn. 1.19
- 1.8 141.40224 Tn. 94.81
- 1.8 12.65 Tn.
- 0 0.00 Tn.
- 1.8 4.03 Tn.
- 0 0.00 Tn.
TOTAL 312.81 Tn.

VAS
ÁREA P.E. TOTAL
94.81 0.2 75.85 Tn.
TOTAL 75.85
VIVIENDA DE CATEGORIA C 25%*C.V. 18.96

PESO TOTAL 348.74 Tn.


CORTANTE BAZAL
P= 348.74 TN. Peso de total de la edificación
Z= 0.25 Factor de zona
U= 1.00 Factor de uso
C= 2.50 Coeficiente de amplificación sismica
S= 1.20 Factor de suelo
R= 3.00 Factor de ductilidad
F'm 100.00 kg/cm2 ladrillo (E070)
V=(Z*U*C*S)*P/R
V 87.19

DISTRIBUCIÓN POR PISOS EN LA EDIFICACIÓN DE ALBAÑILERÍA

0.4*V 34.87
0.3*V 26.16
0.2*V 17.44
0.1*V 8.72

CORTANTE BAZAL DISTRIBUÍDA EN CADA UNO DE LOS NIVELES


F4 34.87 CUARTO NIVEL
F3 61.03 TERCER NIVEL
F2 78.47 SEGUNDO NIVEL
F1 87.19 PRIMER NIVEL
ERÍA
CÁLCULO DE RIGIDECES EN LOS MUROS
Ri= (Em*t)/((4*(h/L)^3)+3*(h/L))

MURO L(cm.) H(cm.) Em t(cm.) 4*(h/L)^3 3*(h/L)


1x 164 240 3.8 14 12.536 4.390
2x 120 240 3.8 14 32.000 6.000
3x 240 240 3.8 14 4.000 3.000
4x 127 240 3.8 14 26.995 5.669
5x 222 240 3.8 14 5.054 3.243
6x 265 240 3.8 14 2.971 2.717
7x 298 240 3.8 14 2.090 2.416
8x 167 240 3.8 14 11.873 4.311
9x 253 240 3.8 14 3.415 2.846
10x 273 240 3.8 14 2.718 2.637
11x 127 240 3.8 14 26.995 5.669
12x 231 240 3.8 14 4.486 3.117
13x 118 240 3.8 14 33.655 6.102
14x 125 240 3.8 14 28.312 5.760
15x 118 240 3.8 14 33.655 6.102
2848

MURO L(cm.) H(cm.) Em t(cm.) 4*(h/L)^3 3*(h/L)


1y 343 240 3.8 14 1.370 2.099
2y 132 240 3.8 14 24.042 5.455
3y 211 240 3.8 14 5.886 3.412
4y 242 240 3.8 14 3.902 2.975
5y 232 240 3.8 14 4.428 3.103
6y 350 240 3.8 14 1.290 2.057
7y 140 240 3.8 14 20.152 5.143
8y 300 240 3.8 14 2.048 2.400
9y 307 240 3.8 14 1.911 2.345
10y 300 240 3.8 14 2.048 2.400
11y 440 240 3.8 14 0.649 1.636
2997
Ri
3.143
1.400
7.600
1.629
6.412
9.352
11.807
3.287
8.498
9.934
1.629
6.997
1.338
1.561
1.338
75.927

Ri
15.334 3.43 343
1.804 3 300
5.721 1.75 175
7.736 1.75 175
7.064 2.36 236
15.896 2.18 218
2.103 2.68 268
11.960 3.61 361
12.499 1.43 143
11.960 2 200
23.277 1.43 143
115.354
CÁLCULO DE CENTRO DE RIGIDECES
MURO Rxi Yi Rxi*yi 9.66
1x 3.143 7.9 24.830 9.66
2x 1.400 7.9 11.060 9.66
3x 7.600 7.9 60.040 9.66
4x 1.629 7.9 12.867 9.66
5x 6.412 6.51 41.741 6.46
6x 9.352 4.4 41.151 5.8
7x 11.807 4.4 51.953 4.79
8x 3.287 4.4 14.464 4.74
9x 8.498 3 25.494 3.26
10x 9.934 3 29.803 1.2
11x 1.629 0 0.000 0
12x 6.997 0 0.000 0
13x 1.338 0 0.000 0
14x 1.561 0 0.000 0
15x 1.338 0 0.000
SUMA 75.927 ------- 313.402

YR 4.128

MURO RYi Xi Ryi*Yi


1y 15.334 0 0.000
2y 1.804 3.62 6.529
3y 5.721 3.62 20.711
4y 7.736 5.01 38.758
5y 7.064 8.06 56.932
6y 15.896 11.7 185.978
7y 2.103 0 0.000
8y 11.960 0 0.000
9y 12.499 3.5 43.746
10y 11.960 7.2 86.115
11y 23.277 11.7 272.343
SUMA 115.354 ------- 711.112

XR 6.165
CENTRO DE MASAS
MURO H(m) L(m.) t(m.) PESO ESP. Pi Xi
1x 2.40 1.64 0.14 1800.00 991.87 1.98
2x 2.40 1.20 0.14 1800.00 725.76 5.23
3x 2.40 2.40 0.14 1800.00 1451.52 8.13
4x 2.40 1.27 0.14 1800.00 768.10 11.10
5x 2.40 2.22 0.14 1800.00 1342.66 2.48
6x 2.40 2.65 0.14 1800.00 1602.72 1.36
7x 2.40 2.98 0.14 1800.00 1802.30 6.54
8x 2.40 1.67 0.14 1800.00 1010.02 10.83
9x 2.40 2.53 0.14 1800.00 1530.14 1.30
10x 2.40 2.73 0.14 1800.00 1651.10 5.80
11x 2.40 1.27 0.14 1800.00 768.10 0.60
12x 2.40 2.31 0.14 1800.00 1397.09 3.60
13x 2.40 1.18 0.14 1800.00 713.66 6.65
14x 2.40 1.25 0.14 1800.00 756.00 8.90
15x 2.40 1.18 0.14 1800.00 713.66 11.15
28.48 SUMA 17224.704

XG 5.272

MURO H(m) L(m.) t(m.) PESO ESP. Pi Yi


1y 2.40 3.43 0.14 1800.00 2074.46 6.15
2y 2.40 1.32 0.14 1800.00 798.34 7.21
3y 2.40 2.11 0.14 1800.00 1276.13 5.39
4y 2.40 2.42 0.14 1800.00 1463.62 5.58
5y 2.40 2.32 0.14 1800.00 1403.14 6.71
6y 2.40 3.50 0.14 1800.00 2116.80 6.15
7y 2.40 1.40 0.14 1800.00 846.72 3.70
8y 2.40 3.00 0.14 1800.00 1814.40 1.57
9y 2.40 3.07 0.14 1800.00 1856.74 1.57
10y 2.40 3.00 0.14 1800.00 1814.40 1.57
11y 2.40 4.40 0.14 1800.00 2661.12 2.20
29.97 SUMA 18125.856

YG 4.060

CÁLCULO DE EXCENTRICIDADES

ex -0.893 ex=XR-XG
eaac 0.592 Bx 11.84 eacc= 0.05*Bx

ey -0.068
eaac 0.402 By 8.04 ey=YR-YG
eacc= 0.05*By
Xi*Pi
1963.907
3795.725
11800.858
8525.866
3329.787
2179.699
11787.068
10938.473
1989.187
9576.403
460.858
5029.517
4745.866
6728.400
7957.354
90808.966

Xi*Pi
12757.954
5756.003
6878.330
8166.977
9415.043
13018.320
3132.864
2848.608
2915.076
2848.608
5854.464
73592.245

cc= 0.05*Bx
cc= 0.05*By
CÁLCULO DE MOMENTO TORSIONAL
Tambien se puede utilizar
MT1= Vn*(1.5*e+eacc) MT2= Vn*(e-eacc)
Donde:
Vn= Corte en cada nivel
e= excentricidad
eacc= excentricidad accidental

X Y
ex -0.893 ey -0.068
eaccx 0.592 eaccy 0.402

DESCRIPCIÓN Vn MT1= Vn*(1.5*e+eacc) MT2=Vn*(e-eacc)


X Y X Y
PRIMER NIV. 87.19 -65.115 26.206 -129.433 -40.943
SEGUNDO NIV. 78.47 -58.604 23.585 -116.489 -36.849
TERCER NIV. 61.03 -45.581 18.344 -90.603 -28.660
CUARTO NIV. 34.87 -26.046 10.482 -51.773 -16.377
Tn.
Tn.
Tn.
Tn.
Vi 87.19 Tn.
MURO L(cm) t(cm.) Y V (kg.) r=Ri
1x 164 14 7.90 3609.073 3.143
2x 120 14 7.90 1607.589 1.400
3x 240 14 7.90 8726.912 7.600
4x 127 14 7.90 1870.191 1.629
5x 222 14 6.51 7362.496 6.412
6x 265 14 4.40 10739.215 9.352
7x 298 14 4.40 13558.264 11.807
8x 167 14 4.40 3774.631 3.287
9x 253 14 3.00 9757.920 8.498
10x 273 14 3.00 11407.537 9.934
11x 127 14 0.00 1870.191 1.629
12x 231 14 0.00 8034.913 6.997
13x 118 14 0.00 1536.562 1.338
14x 125 14 0.00 1792.944 1.561
15x 118 14 0.00 1536.562 1.338
87185.000 75.927

MURO L(cm) t(cm.) X V r=Ri


1y 343 14 0.00 11589.480 15.334
2y 132 14 3.62 1363.162 1.804
3y 211 14 3.62 4324.129 5.721
4y 242 14 5.01 5846.961 7.736
5y 232 14 8.06 5338.611 7.064
6y 350 14 11.70 12013.903 15.896
7y 140 14 0.00 1589.624 2.103
8y 300 14 0.00 9039.721 11.960
9y 307 14 3.50 9446.738 12.499
10y 300 14 7.20 9039.721 11.960
11y 440 14 11.70 17592.949 23.277
87185.000 115.354

Vi 78.47 Tn.
MURO L(cm) t(cm.) Y V r=Ri
1x 164 14 7.90 3248.172 3.143
2x 120 14 7.90 1446.833 1.400
3x 240 14 7.90 7854.235 7.600
4x 127 14 7.90 1683.175 1.629
5x 222 14 6.51 6626.259 6.412
6x 265 14 4.40 9665.312 9.352
7x 298 14 4.40 12202.461 11.807
8x 167 14 4.40 3397.174 3.287
9x 253 14 3.00 8782.145 8.498
10x 273 14 3.00 10266.803 9.934
11x 127 14 0.00 1683.175 1.629
12x 231 14 0.00 7231.436 6.997
13x 118 14 0.00 1382.908 1.338
14x 125 14 0.00 1613.653 1.561
15x 118 14 0.00 1382.759 1.338
78466.500 75.927

MURO L(cm) t(cm.) X V r=Ri


1y 343 14 0.00 10430.532 15.334
2y 132 14 3.62 1226.846 1.804
3y 211 14 3.62 3891.716 5.721
4y 242 14 5.01 5262.265 7.736
5y 232 14 8.06 4804.750 7.064
6y 350 14 11.70 10812.513 15.896
7y 140 14 0.00 1430.661 2.103
8y 300 14 0.00 8135.749 11.960
9y 307 14 3.50 8502.065 12.499
10y 300 14 7.20 8135.749 11.960
11y 440 14 11.70 15833.654 23.277
78466.500 115.354

Vi 61.03 Tn.
MURO L(cm) t(cm.) Y V r=Ri
1x 164 14 7.90 2526.356 3.143
2x 120 14 7.90 1125.314 1.400
3x 240 14 7.90 6108.850 7.600
4x 127 14 7.90 1309.136 1.629
5x 222 14 6.51 5153.757 6.412
6x 265 14 4.40 7517.465 9.352
7x 298 14 4.40 9490.803 11.807
8x 167 14 4.40 2642.247 3.287
9x 253 14 3.00 6830.557 8.498
10x 273 14 3.00 7985.291 9.934
11x 127 14 0.00 1309.136 1.629
12x 231 14 0.00 5624.450 6.997
13x 118 14 0.00 1075.595 1.338
14x 125 14 0.00 1255.063 1.561
15x 118 14 0.00 1075.479 1.338
61029.500 75.927
MURO L(cm) t(cm.) X V r=Ri
1y 343 14 0.00 8112.636 15.334
2y 132 14 3.62 954.214 1.804
3y 211 14 3.62 3026.891 5.721
4y 242 14 5.01 4092.873 7.736
5y 232 14 8.06 3737.028 7.064
6y 350 14 11.70 8409.732 15.896
7y 140 14 0.00 1112.737 2.103
8y 300 14 0.00 6327.805 11.960
9y 307 14 3.50 6612.717 12.499
10y 300 14 7.20 6327.805 11.960
11y 440 14 11.70 12315.064 23.277
61029.500 115.354

Vi 34.87 Tn.
MURO L(cm) t(cm.) Y V r=Ri
1x 164 14 7.90 1443.632 3.143
2x 120 14 7.90 643.037 1.400
3x 240 14 7.90 3490.771 7.600
4x 127 14 7.90 748.078 1.629
5x 222 14 6.51 2945.004 6.412
6x 265 14 4.40 4295.694 9.352
7x 298 14 4.40 5423.316 11.807
8x 167 14 4.40 1509.855 3.287
9x 253 14 3.00 3903.176 8.498
10x 273 14 3.00 4563.024 9.934
11x 127 14 0.00 748.078 1.629
12x 231 14 0.00 3213.971 6.997
13x 118 14 0.00 614.626 1.338
14x 125 14 0.00 717.179 1.561
15x 118 14 0.00 614.559 1.338
34874.000 75.927

MURO L(cm) t(cm.) X V r=Ri


1y 343 14 0.00 4635.792 15.334
2y 132 14 3.62 545.265 1.804
3y 211 14 3.62 1729.652 5.721
4y 242 14 5.01 2338.785 7.736
5y 232 14 8.06 2135.444 7.064
6y 350 14 11.70 4805.561 15.896
7y 140 14 0.00 635.850 2.103
8y 300 14 0.00 3615.888 11.960
9y 307 14 3.50 3778.695 12.499
10y 300 14 7.20 3615.888 11.960
11y 440 14 11.70 7037.180 23.277
34874.000 115.354
PRIMER NIVEL

r*y Y-YR r*(Y-YR) r*(Y-YR)^2 MT1 (kg.) MT2(kg.) dV1


24.830 3.77 11.857 44.726 -65,115.35 -129432.769 -259.054
11.060 3.77 5.281 19.923 -65,115.35 -129432.769 -115.391
60.040 3.77 28.670 108.151 -65,115.35 -129432.769 -626.406
12.867 3.77 6.144 23.177 -65,115.35 -129432.769 -134.240
41.741 2.38 15.275 36.390 -65,115.35 -129432.769 -333.743
41.151 0.27 2.547 0.694 -65,115.35 -129432.769 -55.646
51.953 0.27 3.215 0.876 -65,115.35 -129432.769 -70.253
14.464 0.27 0.895 0.244 -65,115.35 -129432.769 -19.558
25.494 -1.13 -9.583 10.807 -65,115.35 -129432.769 209.379
29.803 -1.13 -11.203 12.633 -65,115.35 -129432.769 244.775
0.000 -4.13 -6.723 27.749 -65,115.35 -129432.769 146.886
0.000 -4.13 -28.883 119.220 -65,115.35 -129432.769 631.067
0.000 -4.13 -5.523 22.799 -65,115.35 -129432.769 120.682
0.000 -4.13 -6.445 26.603 -65,115.35 -129432.769 140.819
0.000 -4.13 -5.523 22.799 -65,115.35 -129432.769 120.682
SUMA 476.789

r*x X-XR r*(X-XR) r*(X-XR)^2 MT1 MT2 dV1


0.000 -6.16 -94.528 582.727 26,205.811 -40,943.410 -831.207
6.529 -2.54 -4.589 11.678 26,205.811 -40,943.410 -40.356
20.711 -2.54 -14.558 37.045 26,205.811 -40,943.410 -128.014
38.758 -1.15 -8.932 10.313 26,205.811 -40,943.410 -78.542
56.932 1.90 13.388 25.376 26,205.811 -40,943.410 117.726
185.978 5.54 87.988 487.051 26,205.811 -40,943.410 773.702
0.000 -6.16 -12.966 79.927 26,205.811 -40,943.410 -114.009
0.000 -6.16 -73.731 454.523 26,205.811 -40,943.410 -648.336
43.746 -2.66 -33.305 88.743 26,205.811 -40,943.410 -292.856
86.115 1.04 12.384 12.822 26,205.811 -40,943.410 108.894
272.343 5.54 128.849 713.229 26,205.811 -40,943.410 1132.996
SUMA 2,503.436

SEGUNDO NIVEL

r*y Y-YR r*(Y-YR) r*(Y-YR)^2 MT1 MT2 dV1


24.830 3.77 11.857 44.726 -58603.819 -116489.493 -233.149
11.060 3.77 5.281 19.923 -58603.819 -116489.493 -103.852
60.040 3.77 28.670 108.151 -58603.819 -116489.493 -563.765
12.867 3.77 6.144 23.177 -58603.819 -116489.493 -120.816
41.741 2.38 15.275 36.390 -58603.819 -116489.493 -300.368
41.151 0.27 2.547 0.694 -58603.819 -116489.493 -50.081
51.953 0.27 3.215 0.876 -58603.819 -116489.493 -63.227
14.464 0.27 0.895 0.244 -58603.819 -116489.493 -17.603
25.494 -1.13 -9.583 10.807 -58603.819 -116489.493 188.441
29.803 -1.13 -11.203 12.633 -58603.819 -116489.493 220.298
0.000 -4.13 -6.723 27.749 -58603.819 -116489.493 132.197
0.000 -4.13 -28.883 119.220 -58603.819 -116489.493 567.960
0.000 -4.13 -5.523 22.799 -58603.819 -116489.493 108.614
0.000 -4.13 -6.445 26.603 -58603.819 -116489.493 126.737
0.000 -4.13 -5.523 22.797 -65,115.35 -129432.769 120.669
476.786

r*X X-XR r*(X-XR) r*(X-XR)^2 MT1 MT2 dV1


0.000 -6.16 -94.528 582.727 23585.230 -36849.069 -748.086
6.529 -2.54 -4.589 11.678 23585.230 -36849.069 -36.320
20.711 -2.54 -14.558 37.045 23585.230 -36849.069 -115.213
38.758 -1.15 -8.932 10.313 23585.230 -36849.069 -70.688
56.932 1.90 13.388 25.376 23585.230 -36849.069 105.953
185.978 5.54 87.988 487.051 23585.230 -36849.069 696.332
0.000 -6.16 -12.966 79.927 23585.230 -36849.069 -102.608
0.000 -6.16 -73.731 454.523 23585.230 -36849.069 -583.502
43.746 -2.66 -33.305 88.743 23585.230 -36849.069 -263.570
86.115 1.04 12.384 12.822 23585.230 -36849.069 98.005
272.343 5.54 128.849 713.229 23585.230 -36849.069 1019.697
SUMA 2503.436

TERCER NIVEL

r*y Y-YR r*(Y-YR) r*(Y-YR)^2 MT1 MT2 dV1


24.830 3.77 11.857 44.726 -45580.748 -90602.939 -181.338
11.060 3.77 5.281 19.923 -45580.748 -90602.939 -80.773
60.040 3.77 28.670 108.151 -45580.748 -90602.939 -438.484
12.867 3.77 6.144 23.177 -45580.748 -90602.939 -93.968
41.741 2.38 15.275 36.390 -45580.748 -90602.939 -233.620
41.151 0.27 2.547 0.694 -45580.748 -90602.939 -38.952
51.953 0.27 3.215 0.876 -45580.748 -90602.939 -49.177
14.464 0.27 0.895 0.244 -45580.748 -90602.939 -13.691
25.494 -1.13 -9.583 10.807 -45580.748 -90602.939 146.565
29.803 -1.13 -11.203 12.633 -45580.748 -90602.939 171.343
0.000 -4.13 -6.723 27.749 -45580.748 -90602.939 102.820
0.000 -4.13 -28.883 119.220 -45580.748 -90602.939 441.747
0.000 -4.13 -5.523 22.799 -45580.748 -90602.939 84.478
0.000 -4.13 -6.445 26.603 -45580.748 -90602.939 98.573
0.000 -4.13 -5.523 22.797 -65,115.35 -129432.769 120.669
r*X X-XR r*(X-XR) r*(X-XR)^2 MT1 MT2 dV1
0.000 -6.16 -94.528 582.727 18344.067 -28660.387 -581.845
6.529 -2.54 -4.589 11.678 18344.067 -28660.387 -28.249
20.711 -2.54 -14.558 37.045 18344.067 -28660.387 -89.610
38.758 -1.15 -8.932 10.313 18344.067 -28660.387 -54.979
56.932 1.90 13.388 25.376 18344.067 -28660.387 82.408
185.978 5.54 87.988 487.051 18344.067 -28660.387 541.592
0.000 -6.16 -12.966 79.927 18344.067 -28660.387 -79.806
0.000 -6.16 -73.731 454.523 18344.067 -28660.387 -453.835
43.746 -2.66 -33.305 88.743 18344.067 -28660.387 -204.999
86.115 1.04 12.384 12.822 18344.067 -28660.387 76.226
272.343 5.54 128.849 713.229 18344.067 -28660.387 793.097
SUMA 2503.436

CUARTO NIVEL

r*y Y-YR r*(Y-YR) r*(Y-YR)^2 MT1 MT2 dV1


24.830 3.77 11.857 44.726 -26046.142 -51773.108 -103.622
11.060 3.77 5.281 19.923 -26046.142 -51773.108 -46.156
60.040 3.77 28.670 108.151 -26046.142 -51773.108 -250.562
12.867 3.77 6.144 23.177 -26046.142 -51773.108 -53.696
41.741 2.38 15.275 36.390 -26046.142 -51773.108 -133.497
41.151 0.27 2.547 0.694 -26046.142 -51773.108 -22.258
51.953 0.27 3.215 0.876 -26046.142 -51773.108 -28.101
14.464 0.27 0.895 0.244 -26046.142 -51773.108 -7.823
25.494 -1.13 -9.583 10.807 -26046.142 -51773.108 83.752
29.803 -1.13 -11.203 12.633 -26046.142 -51773.108 97.910
0.000 -4.13 -6.723 27.749 -26046.142 -51773.108 58.754
0.000 -4.13 -28.883 119.220 -26046.142 -51773.108 252.427
0.000 -4.13 -5.523 22.799 -26046.142 -51773.108 48.273
0.000 -4.13 -6.445 26.603 -26046.142 -51773.108 56.328
0.000 -4.13 -5.523 22.797 -65,115.35 -129432.769 120.669

r*X X-XR r*(X-XR) r*(X-XR)^2 MT1 MT2 dV1


0.000 -6.16 -94.528 582.727 10482.324 -16377.364 -332.483
6.529 -2.54 -4.589 11.678 10482.324 -16377.364 -16.142
20.711 -2.54 -14.558 37.045 10482.324 -16377.364 -51.206
38.758 -1.15 -8.932 10.313 10482.324 -16377.364 -31.417
56.932 1.90 13.388 25.376 10482.324 -16377.364 47.090
185.978 5.54 87.988 487.051 10482.324 -16377.364 309.481
0.000 -6.16 -12.966 79.927 10482.324 -16377.364 -45.604
0.000 -6.16 -73.731 454.523 10482.324 -16377.364 -259.334
43.746 -2.66 -33.305 88.743 10482.324 -16377.364 -117.142
86.115 1.04 12.384 12.822 10482.324 -16377.364 43.558
272.343 5.54 128.849 713.229 10482.324 -16377.364 453.198
SUMA 2503.436
dV2 V1 V2 V (kg.)
-514.934 3350.019 3094.139 3,350.02
-229.367 1492.198 1378.222 1,492.20
-1245.136 8100.506 7481.776 8,100.51
-266.835 1735.951 1603.357 1,735.95
-663.395 7028.753 6699.101 7,028.75
-110.609 10683.570 10628.606 10,683.57
-139.644 13488.012 13418.620 13,488.01
-38.877 3755.072 3735.754 3,755.07
416.192 9967.299 10174.112 10,174.11
486.551 11652.312 11894.088 11,894.09
291.972 2017.077 2162.163 2,162.16
1254.400 8665.980 9289.313 9,289.31
239.886 1657.244 1776.447 1,776.45
279.912 1933.763 2072.856 2,072.86
239.886 1657.244 1776.447 1,776.45
88,779.51

dV2 V1 V2 V (kg.)
1298.660 10758.273 12888.140 12,888.14
63.051 1322.806 1426.213 1,426.21
200.007 4196.115 4524.136 4,524.14
122.712 5768.420 5969.673 5,969.67
-183.932 5456.337 5154.679 5,456.34
-1208.816 12787.606 10805.087 12,787.61
178.125 1475.615 1767.749 1,767.75
1012.946 8391.385 10052.667 10,052.67
457.551 9153.883 9904.290 9,904.29
-170.134 9148.615 8869.586 9,148.62
-1770.170 18725.945 15822.779 18,725.95
92,651.37

dV2 V1 V2 V (kg.)
-463.441 3015.023 2784.731 3,015.02
-206.430 1342.981 1240.402 1,342.98
-1120.622 7290.470 6733.613 7,290.47
-240.151 1562.359 1443.024 1,562.36
-597.056 6325.891 6029.203 6,325.89
-99.548 9615.231 9565.764 9,615.23
-125.680 12139.234 12076.781 12,139.23
-34.989 3379.572 3362.185 3,379.57
374.573 8970.586 9156.718 9,156.72
437.896 10487.101 10704.699 10,704.70
262.775 1815.373 1945.950 1,945.95
1128.960 7799.395 8360.395 8,360.40
215.897 1491.522 1598.805 1,598.81
251.921 1740.390 1865.573 1,865.57
239.860 1503.428 1622.619 1,622.62
79,925.52

dV2 V1 V2 V (kg.)
1168.794 9682.446 11599.326 11,599.33
56.746 1190.526 1283.592 1,283.59
180.006 3776.504 4071.722 4,071.72
110.441 5191.578 5372.706 5,372.71
-165.539 4910.703 4639.211 4,910.70
-1087.935 11508.845 9724.578 11,508.85
160.313 1328.053 1590.974 1,590.97
911.652 7552.247 9047.400 9,047.40
411.796 8238.494 8913.861 8,913.86
-153.121 8233.754 7982.628 8,233.75
-1593.153 16853.351 14240.501 16,853.35
83,386.23

dV2 V1 V2 V (kg.)
-360.454 2345.018 2165.902 2,345.02
-160.557 1044.541 964.757 1,044.54
-871.595 5670.366 5237.255 5,670.37
-186.784 1215.168 1122.352 1,215.17
-464.377 4920.137 4689.380 4,920.14
-77.427 7478.513 7440.039 7,478.51
-97.751 9441.626 9393.052 9,441.63
-27.214 2628.556 2615.033 2,628.56
291.334 6977.122 7121.891 7,121.89
340.585 8156.634 8325.877 8,325.88
204.380 1411.956 1513.517 1,513.52
878.080 6066.196 6502.530 6,502.53
167.920 1160.073 1243.515 1,243.52
195.938 1353.636 1451.002 1,451.00
239.860 1196.148 1315.339 1,315.34
62,217.60
dV2 V1 V2 V (kg.)
909.062 7530.791 9021.698 9,021.70
44.136 925.964 998.349 998.35
140.005 2937.281 3166.895 3,166.90
85.898 4037.894 4178.771 4,178.77
-128.752 3819.436 3608.275 3,819.44
-846.172 8951.324 7563.561 8,951.32
124.688 1032.930 1237.424 1,237.42
709.062 5873.970 7036.867 7,036.87
320.286 6407.718 6933.003 6,933.00
-119.094 6404.031 6208.711 6,404.03
-1239.119 13108.162 11075.946 13,108.16
64,855.96

dV2 V1 V2 V (kg.)
-205.974 1340.010 1237.658 1,340.01
-91.747 596.881 551.290 596.88
-498.054 3240.209 2992.717 3,240.21
-106.734 694.382 641.344 694.38
-265.358 2811.507 2679.646 2,811.51
-44.244 4273.436 4251.451 4,273.44
-55.858 5395.215 5367.458 5,395.21
-15.551 1502.032 1494.304 1,502.03
166.477 3986.927 4069.652 4,069.65
194.620 4660.934 4757.644 4,757.64
116.789 806.832 864.867 864.87
501.760 3466.398 3715.731 3,715.73
95.954 662.899 710.580 710.58
111.965 773.506 829.144 829.14
239.860 735.229 854.420 854.42
35,655.71

dV2 V1 V2 V (kg.)
519.464 4303.309 5155.256 5,155.26
25.220 529.123 570.485 570.49
80.003 1678.446 1809.654 1,809.65
49.085 2307.368 2387.869 2,387.87
-73.573 2182.535 2061.872 2,182.53
-483.527 5115.042 4322.035 5,115.04
71.250 590.246 707.100 707.10
405.179 3356.554 4021.067 4,021.07
183.021 3661.553 3961.716 3,961.72
-68.054 3659.446 3547.835 3,659.45
-708.068 7490.378 6329.112 7,490.38
37,060.55
FUERZA CORTANTE EN CADA MURO POR PISO
LONG. MUROS LM 58.8
PESO MUERTO PD 221.57 TN. WD 3.77 TN/m.
PESO VIVO PL 22.67 TN. WL 0.39 TN/m.

VERIFICACIÓN POR CORTANTE DEL PRIMER NIVEL X

MURO LONG. (cm.) PD V (kg.) t(cm.) Vact (kg/cm2) f'd


1x 164 6179.84 3350.019 14 1.46 2.69
2x 120 4521.84 1492.198 14 0.89 2.69
3x 240 9043.67 8100.506 14 2.41 2.69
4x 127 4785.61 1735.951 14 0.98 2.69
5x 222 8365.40 7028.753 14 2.26 2.69
6x 265 9985.72 10683.570 14 2.88 2.69
7x 298 11229.23 13488.012 14 3.23 2.69
8x 167 6292.89 3755.072 14 1.61 2.69
9x 253 9533.54 10174.112 14 2.87 2.69
10x 273 10287.18 11894.088 14 3.11 2.69
11x 127 4785.61 2162.163 14 1.22 2.69
12x 231 8704.54 9289.313 14 2.87 2.69
13x 118 4446.47 1776.447 14 1.08 2.69
14x 125 4710.25 2072.856 14 1.18 2.69
15x 118 4446.47 1776.447 14 1.08 2.69

VERIFICACIÓN POR CORTANTE DEL PRIMER NIVEL Y


MURO LONG. (cm.) PD V t(cm.) Vact f'd
1y 343 12924.92 12888.14 14 2.68 2.69
2y 132 4974.02 1426.21 14 0.77 2.69
3y 211 7950.90 4524.14 14 1.53 2.69
4y 242 9119.04 5969.67 14 1.76 2.69
5y 232 8742.22 5456.34 14 1.68 2.69
6y 350 13188.69 12787.61 14 2.61 2.69
7y 140 5275.48 1767.75 14 0.90 2.69
8y 300 11304.59 10052.67 14 2.39 2.69
9y 307 11568.37 9904.29 14 2.30 2.69
10y 300 11304.59 9148.62 14 2.18 2.69
11y 440 16580.07 18725.95 14 3.04 2.69

VERIFICACIÓN POR CORTANTE DEL SEGUNDO X

MURO LONG. (cm.) PD V (kg.) t(cm.) Vact (kg/cm2) f'd


1x 164 4943.87 3015.023 14 1.31 2.15
2x 120 3617.47 1342.981 14 0.80 2.15
3x 240 7234.94 7290.470 14 2.17 2.15
4x 213 6421.01 1562.359 14 0.52 2.15
5x 213 6421.01 6325.891 14 2.12 2.15
6x 265 7988.58 9615.231 14 2.59 2.15
7x 298 8983.38 12139.234 14 2.91 2.15
8x 167 5034.31 3379.572 14 1.45 2.15
9x 253 7626.83 9156.718 14 2.59 2.15
10x 273 8229.74 10704.699 14 2.80 2.15
11x 127 3828.49 1945.950 14 1.09 2.15
12x 231 6963.63 8360.395 14 2.59 2.15
13x 118 3557.18 1598.805 14 0.97 2.15
14x 125 3768.20 1865.573 14 1.07 2.15
15x 118 4446.47 1865.573 14 1.13 2.15

VERIFICACIÓN POR CORTANTE DEL SEGUNDO NIVEL Y


MURO LONG. (cm.) PD V t(cm.) Vact f'd
1y 343 10339.93 11599.33 14 2.42 2.15
2y 132 3979.22 1283.59 14 0.69 2.15
3y 211 6360.72 4071.72 14 1.38 2.15
4y 242 7295.23 5372.71 14 1.59 2.15
5y 232 6993.77 4910.70 14 1.51 2.15
6y 350 10550.95 11508.85 14 2.35 2.15
7y 140 4220.38 1590.97 14 0.81 2.15
8y 300 9043.67 9047.40 14 2.15 2.15
9y 307 9254.69 8913.86 14 2.07 2.15
10y 300 9043.67 8233.75 14 1.96 2.15
11y 440 13264.05 16853.35 14 2.74 2.15

VERIFICACIÓN POR CORTANTE DEL TERCER NIVEL X

MURO LONG. (cm.) PD V (kg.) t(cm.) Vact (kg/cm2) f'd


1x 164 3707.91 2345.018 14 1.02 1.61
2x 120 2713.10 1044.541 14 0.62 1.61
3x 240 5426.20 5670.366 14 1.69 1.61
4x 127 2871.37 1215.168 14 0.68 1.61
5x 222 5019.24 4920.137 14 1.58 1.61
6x 265 5991.43 7478.513 14 2.02 1.61
7x 298 6737.54 9441.626 14 2.26 1.61
8x 167 3775.73 2628.556 14 1.12 1.61
9x 253 5720.12 7121.891 14 2.01 1.61
10x 273 6172.31 8325.877 14 2.18 1.61
11x 127 2871.37 1513.517 14 0.85 1.61
12x 231 5222.72 6502.530 14 2.01 1.61
13x 118 2667.88 1243.515 14 0.75 1.61
14x 125 2826.15 1451.002 14 0.83 1.61
15x 118 4446.47 1243.515 14 0.75 1.61

VERIFICACIÓN POR CORTANTE DEL TERCER NIVEL Y


MURO LONG. (cm.) PD V t(cm.) Vact f'd
1y 343 7754.95 9021.70 14 1.88 1.61
2y 132 2984.41 998.35 14 0.54 1.61
3y 211 4770.54 3166.90 14 1.07 1.61
4y 242 5471.42 4178.77 14 1.23 1.61
5y 232 5245.33 3819.44 14 1.18 1.61
6y 350 7913.21 8951.32 14 1.83 1.61
7y 140 3165.29 1237.42 14 0.63 1.61
8y 300 6782.76 7036.87 14 1.68 1.61
9y 307 6941.02 6933.00 14 1.61 1.61
10y 300 6782.76 6404.03 14 1.52 1.61
11y 440 9948.04 13108.16 14 2.13 1.61

VERIFICACIÓN POR CORTANTE DEL CUARTO NIVEL X


PESO POR MURO CORTANTE ACTUANTE
MURO LONG. (cm.) PD V (kg.) t(cm.) Vact (kg/cm2) f'd
1x 164 2471.94 1340.010 14 0.58 1.08
2x 120 1808.73 596.881 14 0.36 1.08
3x 240 3617.47 3240.209 14 0.96 1.08
4x 127 1914.24 694.382 14 0.39 1.08
5x 222 3346.16 2811.507 14 0.90 1.08
6x 265 3994.29 4273.436 14 1.15 1.08
7x 298 4491.69 5395.215 14 1.29 1.08
8x 167 2517.16 1502.032 14 0.64 1.08
9x 253 3813.42 4069.652 14 1.15 1.08
10x 273 4114.87 4757.644 14 1.24 1.08
11x 127 1914.24 864.867 14 0.49 1.08
12x 231 3481.81 3715.731 14 1.15 1.08
13x 118 1778.59 710.580 14 0.43 1.08
14x 125 1884.10 829.144 14 0.47 1.08
15x 118 4446.47 864.867 14 0.52 1.08

VERIFICACIÓN POR CORTANTE DEL CUARTO NIVEL Y


MURO LONG. (cm.) PD V t(cm.) Vact f'd
1y 343 5169.97 5155.26 14 1.07 1.08
2y 132 1989.61 570.49 14 0.31 1.08
3y 211 3180.36 1809.65 14 0.61 1.08
4y 242 3647.61 2387.87 14 0.70 1.08
5y 232 3496.89 2182.53 14 0.67 1.08
6y 350 5275.48 5115.04 14 1.04 1.08
7y 140 2110.19 707.10 14 0.36 1.08
8y 300 4521.84 4021.07 14 0.96 1.08
9y 307 4627.35 3961.72 14 0.92 1.08
10y 300 4521.84 3659.45 14 0.87 1.08
11y 440 6632.03 7490.38 14 1.22 1.08
PISO
WD=PD/LONG. MUROS
WL=PD/LONG. MUROS

VEL X

Vadm. ESTADO
2.28 OK
2.28 OK
2.28 ERROR
2.28 OK
2.28 OK
2.28 ERROR
2.28 ERROR
2.28 OK
2.28 ERROR
2.28 ERROR
2.28 OK
2.28 ERROR
2.28 OK
2.28 OK
2.28 OK

VEL Y
Vadm. ESTADO
2.28 ERROR
2.28 OK
2.28 OK
2.28 OK
2.28 OK
2.28 ERROR
2.28 OK
2.28 ERROR
2.28 ERROR
2.28 OK
2.28 ERROR

OX

Vadm. ESTADO
2.19 OK
2.19 OK
2.19 OK
2.19 OK
2.19 OK
2.19 ERROR
2.19 ERROR
2.19 OK
2.19 ERROR
2.19 ERROR
2.19 OK
2.19 ERROR
2.19 OK
2.19 OK
2.19 OK

NIVEL Y
Vadm. ESTADO
2.19 ERROR
2.19 OK
2.19 OK
2.19 OK
2.19 OK
2.19 ERROR
2.19 OK
2.19 OK
2.19 OK
2.19 OK
2.19 ERROR

VEL X

Vadm. ESTADO
2.09 OK
2.09 OK
2.09 OK
2.09 OK
2.09 OK
2.09 OK
2.09 ERROR
2.09 OK
2.09 OK
2.09 ERROR
2.09 OK
2.09 OK
2.09 OK
2.09 OK
2.09 OK

VEL Y
Vadm. ESTADO
2.09 OK
2.09 OK
2.09 OK
2.09 OK
2.09 OK
2.09 OK
2.09 OK
2.09 OK
2.09 OK
2.09 OK
2.09 ERROR

IVEL X

Vadm. ESTADO
1.99 OK
1.99 OK
1.99 OK
1.99 OK
1.99 OK
1.99 OK
1.99 OK
1.99 OK
1.99 OK
1.99 OK
1.99 OK
1.99 OK
1.99 OK
1.99 OK
1.99 OK

IVEL Y
Vadm. ESTADO
1.99 OK
1.99 OK
1.99 OK
1.99 OK
1.99 OK
1.99 OK
1.99 OK
1.99 OK
1.99 OK
1.99 OK
1.99 OK
PRIMER NIVEL EJE "MURO X"

MURO Ln PD/Lm PL/Lm PD1 PL1 peso total


1x 1.64 3.770 0.39 6.183 0.640 6.822
2x 1.2 3.770 0.39 4.524 0.468 4.992
3x 2.4 3.770 0.39 9.048 0.936 9.984
4x 1.27 3.770 0.39 4.788 0.495 5.283
5x 2.22 3.770 0.39 8.369 0.866 9.235
6x 2.65 3.770 0.39 9.991 1.034 11.024
7x 2.98 3.770 0.39 11.235 1.162 12.397
8x 1.67 3.770 0.39 6.296 0.651 6.947
9x 2.53 3.770 0.39 9.538 0.987 10.525
10x 2.73 3.770 0.39 10.292 1.065 11.357
11x 1.27 3.770 0.39 4.788 0.495 5.283
12x 2.31 3.770 0.39 8.709 0.901 9.610
13x 1.18 3.770 0.39 4.449 0.460 4.909
14x 1.25 3.770 0.39 4.713 0.488 5.200
15x 1.18 3.770 0.39 4.449 0.460 4.909

PRIMER NIVEL EJE "MURO Y"

MURO Ln PD/Lm PL/Lm PD1 PL1 peso total


1Y 3.43 3.770 0.39 12.931 1.338 14.269
2Y 1.32 3.770 0.39 4.976 0.515 5.491
3Y 2.11 3.770 0.39 7.955 0.823 8.778
4Y 2.42 3.770 0.39 9.123 0.944 10.067
5y 2.32 3.770 0.39 8.746 0.905 9.651
6y 3.5 3.770 0.39 13.195 1.365 14.560
7y 1.4 3.770 0.39 5.278 0.546 5.824
8y 3 3.770 0.39 11.310 1.170 12.480
9Y 3.07 3.770 0.39 11.574 1.197 12.771
10Y 3 3.770 0.39 11.310 1.170 12.480
11Y 4.4 3.770 0.39 16.588 1.716 18.304

SEGUNDO NIVEL EJE "MURO X"

MURO Ln PD/Lm PL/Lm PD1 PL1 peso total


1x 1.64 1.330 0.33 2.181 0.541 2.722
2x 1.2 1.330 0.33 1.596 0.396 1.992
3x 2.4 1.330 0.33 3.192 0.792 3.984
4x 1.27 1.330 0.33 1.689 0.419 2.108
5x 2.22 1.330 0.33 2.953 0.733 3.685
6x 2.65 1.330 0.33 3.525 0.875 4.399
7x 2.98 1.330 0.33 3.963 0.983 4.947
8x 1.67 1.330 0.33 2.221 0.551 2.772
9x 2.53 1.330 0.33 3.365 0.835 4.200
10x 2.73 1.330 0.33 3.631 0.901 4.532
11x 1.27 1.330 0.33 1.689 0.419 2.108
12x 2.31 1.330 0.33 3.072 0.762 3.835
13x 1.18 1.330 0.33 1.569 0.389 1.959
14x 1.25 1.330 0.33 1.663 0.413 2.075
15x 1.18 1.330 0.33 1.569 0.389 1.959

SEEGUNDO NIVEL EJE "MURO Y"

MURO Ln PD/Lm PL/Lm PD1 PL1 peso total


1Y 3.43 1.330 0.33 4.562 1.132 5.694
2Y 1.32 1.330 0.33 1.756 0.436 2.191
3Y 2.11 1.330 0.33 2.806 0.696 3.503
4Y 2.42 1.330 0.33 3.219 0.799 4.017
0 2.32 1.330 0.33 3.086 0.766 3.851
0 3.5 1.330 0.33 4.655 1.155 5.810
0 1.4 1.330 0.33 1.862 0.462 2.324
0 3 1.330 0.33 3.990 0.990 4.980
9Y 3.07 1.330 0.33 4.083 1.013 5.096
10Y 3 1.330 0.33 3.990 0.990 4.980
11Y 4.4 3.770 0.39 16.588 1.716 18.304

TERCER NIVEL EJE "MURO X"

MURO Ln PD/Lm PL/Lm PD1 PL1 peso total


1x 1.64 1.040 0.26 1.706 0.426 2.132
2x 1.2 1.040 0.26 1.248 0.312 1.560
3x 2.4 1.040 0.26 2.496 0.624 3.120
4x 1.27 1.040 0.26 1.321 0.330 1.651
5x 2.22 1.040 0.26 2.309 0.577 2.886
6x 2.65 1.040 0.26 2.756 0.689 3.445
7x 2.98 1.040 0.26 3.099 0.775 3.874
8x 1.67 1.040 0.26 1.737 0.434 2.171
9x 2.53 1.040 0.26 2.631 0.658 3.289
10x 2.73 1.040 0.26 2.839 0.710 3.549
11x 1.27 1.040 0.26 1.321 0.330 1.651
12x 2.31 1.040 0.26 2.402 0.601 3.003
13x 1.18 1.040 0.26 1.227 0.307 1.534
14x 1.25 1.040 0.26 1.300 0.325 1.625
15x 1.18 1.040 0.26 1.227 0.307 1.534

TERCER NIVEL EJE "MURO Y"

MURO Ln PD/Lm PL/Lm PD1 PL1 peso total


1Y 3.43 1.040 0.26 3.567 0.892 4.459
2Y 1.32 1.040 0.26 1.373 0.343 1.716
3Y 2.11 1.040 0.26 2.194 0.549 2.743
4Y 2.42 1.040 0.26 2.517 0.629 3.146
0 2.32 1.040 0.26 2.413 0.603 3.016
0 3.5 1.040 0.26 3.640 0.910 4.550
0 1.4 1.040 0.26 1.456 0.364 1.820
0 3 1.040 0.26 3.120 0.780 3.900
9Y 3.07 1.040 0.26 3.193 0.798 3.991
10Y 3 1.040 0.26 3.120 0.780 3.900
11Y 4.4 1.040 0.26 4.576 1.144 5.720

CUARTO NIVEL EJE "MURO X"

MURO Ln PD/Lm PL/Lm PD1 PL1 peso total


1x 1.64 0.590 0.15 0.968 0.246 1.214
2x 1.2 0.590 0.15 0.708 0.180 0.888
3x 2.4 0.590 0.15 1.416 0.360 1.776
4x 1.27 0.590 0.15 0.749 0.191 0.940
5x 2.22 0.590 0.15 1.310 0.333 1.643
6x 2.65 0.590 0.15 1.564 0.398 1.961
7x 2.98 0.590 0.15 1.758 0.447 2.205
8x 1.67 0.590 0.15 0.985 0.251 1.236
9x 2.53 0.590 0.15 1.493 0.380 1.872
10x 2.73 0.590 0.15 1.611 0.410 2.020
11x 1.27 0.590 0.15 0.749 0.191 0.940
12x 2.31 0.590 0.15 1.363 0.347 1.709
13x 1.18 0.590 0.15 0.696 0.177 0.873
14x 1.25 0.590 0.15 0.738 0.188 0.925
15x 1.18 0.590 0.15 0.696 0.177 0.873

CUARTO NIVEL EJE "MURO Y"

MURO Ln PD/Lm PL/Lm PD1 PL1 peso total


1Y 3.43 0.590 0.15 2.024 0.515 2.538
2Y 1.32 0.590 0.15 0.779 0.198 0.977
3Y 2.11 0.590 0.15 1.245 0.317 1.561
4Y 2.42 0.590 0.15 1.428 0.363 1.791
0 2.32 0.590 0.15 1.369 0.348 1.717
0 3.5 0.590 0.15 2.065 0.525 2.590
0 1.4 0.590 0.15 0.826 0.210 1.036
0 3 0.590 0.15 1.770 0.450 2.220
9Y 3.07 0.590 0.15 1.811 0.461 2.272
10Y 3 0.590 0.15 1.770 0.450 2.220
11Y 4.4 0.590 0.15 2.596 0.660 3.256
PRIMER NIVEL EJE "MURO X"

MURO Ln (m) t (m) PD1 (tn) PL1 (tn) Pu (tn) Fm (tn/m2)


1x 1.64 0.14 6.183 2.411 12.891 56.146
2x 1.2 0.14 4.524 1.764 9.433 56.146
3x 2.4 0.14 9.048 3.529 18.865 56.146
4x 1.27 0.14 4.788 1.867 9.983 56.146
5x 2.22 0.14 8.369 3.264 17.450 56.146
6x 2.65 0.14 9.991 3.896 20.830 56.146
7x 2.98 0.14 11.235 4.381 23.424 56.146
8x 1.67 0.14 6.296 2.455 13.127 56.146
9x 2.53 0.14 9.538 3.720 19.887 56.146
10x 2.73 0.14 10.292 4.014 21.459 56.146
11x 1.27 0.14 4.788 1.867 9.983 56.146
12x 2.31 0.14 8.709 3.396 18.158 56.146
13x 1.18 0.14 4.449 1.735 9.275 56.146
14x 1.25 0.14 4.713 1.838 9.826 56.146
15x 1.18 0.14 4.449 1.735 9.275 56.146

PRIMER NIVEL EJE "MURO Y"

MURO Ln (m) t (m) PD1 (tn) PL1 (tn) Pu (tn) Fm (tn/m2)


1Y 3.43 0.14 12.931 1.338 21.403 44.571
2Y 1.32 0.14 4.976 0.515 8.237 44.571
3Y 2.11 0.14 7.955 0.823 13.166 44.571
4Y 2.42 0.14 9.123 0.944 15.101 44.571
3y 2.32 0.14 8.746 0.905 14.477 44.571
4y 3.5 0.14 13.195 1.365 21.840 44.571
5y 1.4 0.14 5.278 0.546 8.736 44.571
6y 3 0.14 11.310 1.170 18.720 44.571
9Y 3.07 0.14 11.574 1.197 19.157 44.571
10Y 3 0.14 11.310 1.170 18.720 44.571
11Y 4.4 0.14 16.588 1.716 27.456 44.571

SEGUNDO NIVEL EJE "MURO X"

MURO Ln PD/Lm PL/Lm PD1 PL1 peso total


1x 1.64 1.330 0.33 2.181 0.541 2.722
2x 1.2 1.330 0.33 1.596 0.396 1.992
3x 2.4 1.330 0.33 3.192 0.792 3.984
4x 1.27 1.330 0.33 1.689 0.419 2.108
5x 2.22 1.330 0.33 2.953 0.733 3.685
6x 2.65 1.330 0.33 3.525 0.875 4.399
7x 2.98 1.330 0.33 3.963 0.983 4.947
8x 1.67 1.330 0.33 2.221 0.551 2.772
9x 2.53 1.330 0.33 3.365 0.835 4.200
10x 2.73 1.330 0.33 3.631 0.901 4.532
11x 1.27 1.330 0.33 1.689 0.419 2.108
12x 2.31 1.330 0.33 3.072 0.762 3.835
13x 1.18 1.330 0.33 1.569 0.389 1.959
14x 1.25 1.330 0.33 1.663 0.413 2.075
15x 1.18 1.330 0.33 1.569 0.389 1.959

SEEGUNDO NIVEL EJE "MURO Y"

MURO Ln PD/Lm PL/Lm PD1 PL1 peso total


1Y 3.43 1.330 0.33 4.562 1.132 5.694
2Y 1.32 1.330 0.33 1.756 0.436 2.191
3Y 2.11 1.330 0.33 2.806 0.696 3.503
4Y 2.42 1.330 0.33 3.219 0.799 4.017
0 2.32 1.330 0.33 3.086 0.766 3.851
0 3.5 1.330 0.33 4.655 1.155 5.810
0 1.4 1.330 0.33 1.862 0.462 2.324
0 3 1.330 0.33 3.990 0.990 4.980
9Y 3.07 1.330 0.33 4.083 1.013 5.096
10Y 3 1.330 0.33 3.990 0.990 4.980
11Y 4.4 3.770 0.39 16.588 1.716 18.304

TERCER NIVEL EJE "MURO X"

MURO Ln PD/Lm PL/Lm PD1 PL1 peso total


1x 1.64 1.040 0.26 1.706 0.426 2.132
2x 1.2 1.040 0.26 1.248 0.312 1.560
3x 2.4 1.040 0.26 2.496 0.624 3.120
4x 1.27 1.040 0.26 1.321 0.330 1.651
5x 2.22 1.040 0.26 2.309 0.577 2.886
6x 2.65 1.040 0.26 2.756 0.689 3.445
7x 2.98 1.040 0.26 3.099 0.775 3.874
8x 1.67 1.040 0.26 1.737 0.434 2.171
9x 2.53 1.040 0.26 2.631 0.658 3.289
10x 2.73 1.040 0.26 2.839 0.710 3.549
11x 1.27 1.040 0.26 1.321 0.330 1.651
12x 2.31 1.040 0.26 2.402 0.601 3.003
13x 1.18 1.040 0.26 1.227 0.307 1.534
14x 1.25 1.040 0.26 1.300 0.325 1.625
15x 1.18 1.040 0.26 1.227 0.307 1.534
TERCER NIVEL EJE "MURO Y"

MURO Ln PD/Lm PL/Lm PD1 PL1 peso total


1Y 3.43 1.040 0.26 3.567 0.892 4.459
2Y 1.32 1.040 0.26 1.373 0.343 1.716
3Y 2.11 1.040 0.26 2.194 0.549 2.743
4Y 2.42 1.040 0.26 2.517 0.629 3.146
0 2.32 1.040 0.26 2.413 0.603 3.016
0 3.5 1.040 0.26 3.640 0.910 4.550
0 1.4 1.040 0.26 1.456 0.364 1.820
0 3 1.040 0.26 3.120 0.780 3.900
9Y 3.07 1.040 0.26 3.193 0.798 3.991
10Y 3 1.040 0.26 3.120 0.780 3.900
11Y 4.4 1.040 0.26 4.576 1.144 5.720

CUARTO NIVEL EJE "MURO X"

MURO Ln PD/Lm PL/Lm PD1 PL1 peso total


1x 1.64 0.590 0.15 0.968 0.246 1.214
2x 1.2 0.590 0.15 0.708 0.180 0.888
3x 2.4 0.590 0.15 1.416 0.360 1.776
4x 1.27 0.590 0.15 0.749 0.191 0.940
5x 2.22 0.590 0.15 1.310 0.333 1.643
6x 2.65 0.590 0.15 1.564 0.398 1.961
7x 2.98 0.590 0.15 1.758 0.447 2.205
8x 1.67 0.590 0.15 0.985 0.251 1.236
9x 2.53 0.590 0.15 1.493 0.380 1.872
10x 2.73 0.590 0.15 1.611 0.410 2.020
11x 1.27 0.590 0.15 0.749 0.191 0.940
12x 2.31 0.590 0.15 1.363 0.347 1.709
13x 1.18 0.590 0.15 0.696 0.177 0.873
14x 1.25 0.590 0.15 0.738 0.188 0.925
15x 1.18 0.590 0.15 0.696 0.177 0.873

CUARTO NIVEL EJE "MURO Y"

MURO Ln PD/Lm PL/Lm PD1 PL1 peso total


1Y 3.43 0.590 0.15 2.024 0.515 2.538
2Y 1.32 0.590 0.15 0.779 0.198 0.977
3Y 2.11 0.590 0.15 1.245 0.317 1.561
4Y 2.42 0.590 0.15 1.428 0.363 1.791
0 2.32 0.590 0.15 1.369 0.348 1.717
0 3.5 0.590 0.15 2.065 0.525 2.590
0 1.4 0.590 0.15 0.826 0.210 1.036
0 3 0.590 0.15 1.770 0.450 2.220
9Y 3.07 0.590 0.15 1.811 0.461 2.272
10Y 3 0.590 0.15 1.770 0.450 2.220
11Y 4.4 0.590 0.15 2.596 0.660 3.256