Está en la página 1de 4

SUSTENTO DE METRADOS

PROYECTO : ADECUACION MEJORAMIENTO Y SUSTITUCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E.FRANCISCO IRAZOLA-SATIPO-SATIPO-JUNIN


I. E. : FRANCISCO IRAZOLA
UBICACIÓN : SATIPO-SATIPO-JUNIN
PROYECTISTA : LUIS ALBERTO TELL |
METRADO : ING. ASTERIA ALBAÑIL CAMPOS
INSTALACIONES ELECTRICAS : ALIMENTADORES
FECHA : DICIEMBRE 2012

M e t r a d o s
TABLEROS circuito
inicio longitud fin
REDES EXTERIORES.
TG.
a TD-3 C-1 3.95 8.90 15.45 2.60
a TD-2 C-1 26.50 5.60
a TD-1 C-2 3.95 8.90 15.45 26.50 15.00 2.60
a TD-14 C-2 17.00 18.00 5.10
a TD-26 C-2 -
a TD-15 C-2 7.70
a TD-4 C-3 3.95 8.90 18.90 2.65
a TD-5 C-3 16.00 3.50
a TD-6 C-3 14.80 3.50
a TD-11 C-3 11.00
a TD-7 C-4 3.95 8.90 18.90 16.00 14.80 16.50 9.60 18..5 18.50 26.20 3.50
a TD-8 C-4 7.50
a TD-28 C-4 16.20
a TD-9 C-5 3.95 8.90 18.90 16.00 14.80 16.50 9.60 18.50 18.50 26.20 18.70 10.50 23.00 3.50
a TD-10 C-5 4.60
a TD-13 C-5 13.20 4.50
a TD-27 C-5 11.50
a TD-12 C-6 3.95 8.90 18.90 16.00 14.80 16.50 9.60 18.50 18.50 26.20 18.70 10.50 23.00 15.00 3.50
a TD-20 C-7 3.95 8.90 18.90 16.00 14.80 16.50 9.60 18.50 18.50 26.20 18.70 10.50 23.00 15.00 32.00 8.10
a TD-22 C-8 3.95 8.90 18.90 16.00 14.80 16.50 9.60 18.50 18.50 26.20 18.70 10.50 23.00 15.00 32.00 17.80 26.00 25.70 20.20 25.00 25.20 9.90
a TD-16 C-9 3.95 8.90 15.45 26.50 15.00 17.00 18.00 13.80 3.50 13.80 3.50
a TD-17 C-9 4.40
a TD-18 C-10 3.95 8.90 15.45 26.50 15.00 17.00 18.00 13.80 3.50 13.80 27.60 8.30
a TD-19 C-10 14.00 10.00 3.50
a TD-23 C-11 3.95 8.90 15.45 26.50 15.00 17.00 18.00 13.80 3.50 13.80 27.60 14.00 17.80
a TD-24 C-11
a TD-21 C-12 3.95 8.90 15.45 26.50 15.00 17.00 18.00 13.80 3.50 13.80 27.60 14.00 17.80 14.40 10.30 15.70
a TD-25 C-12 34.40 4.50 3.10
Alumbrado externo
Pabellon A C-AL 3.95 4.00 1.40 6.70 10.50 37.20 39.70 70.00
Pabellon B C-AL 18.00 32.00 12.30 37.00
Pabellon C C-AL 18.30 40.00 11.00 36.00
Pabellon D C-AL 17.00 20.00 12.00 31.60
Pabellon E C-AL 37.80
Pabellon H C-AL 13.40 17.20 10.80 23.30
Pabellon G C-AL 14.70
Postes C-AL 3.95 53.00 29.00 35.00 30.00 11.00 55.00 9.50
Dentro de los postes (7 postes x 8.80 m.) 61.60

Página 1 de 4
SUSTENTO DE METRADOS
PROYECTO : ADECUACION MEJORAMIENTO Y SUSTITUCION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E.FRANCISCO IRAZOLA-SATIPO-SATIPO-JUNIN
I. E. : FRANCISCO IRAZOLA
UBICACIÓN : SATIPO-SATIPO-JUNIN
PROYECTISTA : LUIS ALBERTO TELL |
METRADO : ING. ASTERIA ALBAÑIL CAMPOS
INSTALACIONES ELECTRICAS : ALIMENTADORES
FECHA : DICIEMBRE 2012

M e t r a d o s
TABLEROS circuito
inicio longitud fin
RESUMEN GENERAL. DE TUBERIAS PVC-P

DE LOS ALIMENTADORES

Linea a Tierra
pararayos 1 18.00
pararayos 2 18.00
TGG 4.00
PT2-PR1 3.00
PT2-PR2 3.00
PT-2 - TGG 2.00

Página 2 de 4
PROYECTO : ADECUAC
I. E. : FRANCISC
UBICACIÓN : SATIPO-SA
PROYECTISTA : LUIS ALBE
METRADO : ING. ASTE
INSTALACIONES ELECTRICAS : AL
FECHA : DICIEMBR

CONDUCTOS Ø PVC - P
TABLEROS circuito ml. TIPO DE CONDUCTORES Ø THW
20 mm 25 mm 35 mm 40 mm 50 mm 65 mm 80 mm 100 mm
REDES EXTERIORES.
TG.
a TD-3 C-1 30.90 30.90 N2XH[3-1x25 + 1x25(N) + 1x25(T)] mm².
a TD-2 C-1 32.10 32.10 N2XH[3-1x25 + 1x25(N) + 1x25(T)] mm².
a TD-1 C-2 72.40 72.40 N2XH[3-1x35 + 1x35(N) + 1x25(T)] mm².
a TD-14 C-2 40.10 40.10 N2XH[3-1x35 + 1x35(N) + 1x25(T)] mm².
a TD-26 C-2 - N2XH[3-1x35 + 1x35(N) + 1x25(T)] mm².
a TD-15 C-2 7.70 7.70 N2XH[3-1x35 + 1x35(N) + 1x25(T)] mm².
a TD-4 C-3 34.40 34.40 N2XH[3-1x25 + 1x25(N) + 1x25(T)] mm².
a TD-5 C-3 19.50 19.50 N2XH[3-1x25 + 1x25(N) + 1x25(T)] mm².
a TD-6 C-3 18.30 18.30 N2XH[3-1x25 + 1x25(N) + 1x25(T)] mm².
a TD-11 C-3 11.00 11.00 N2XH[3-1x25 + 1x25(N) + 1x25(T)] mm².
a TD-7 C-4 136.85 136.85 N2XH[3-1x50 + 1x50(N) + 1x10(T)] mm².
a TD-8 C-4 7.50 7.50 N2XH[3-1x50 + 1x50(N) + 1x10(T)] mm².
a TD-28 C-4 16.20 16.20 N2XH[3-1x50 + 1x50(N) + 1x10(T)] mm².
a TD-9 C-5 207.55 207.55 N2XH[3-1x70 + 1x70(N) + 1x16(T)] mm².
a TD-10 C-5 4.60 4.60 N2XH[3-1x70 + 1x70(N) + 1x16(T)] mm².
a TD-13 C-5 17.70 17.70 N2XH[3-1x70 + 1x70(N) + 1x16(T)] mm².
a TD-27 C-5 11.50 11.50 N2XH[3-1x70 + 1x70(N) + 1x16(T)] mm².
a TD-12 C-6 222.55 222.55 N2XH[3-1x70 + 1x70(N) + 1x16(T)] mm².
a TD-20 C-7 259.15 259.15 N2XH[3-1x16 + 1x16(N) + 1x10(T)] mm².
a TD-22 C-8 400.85 400.85 N2XH[3-1x240 + 1x240(N) + 1x25(T)] mm².
a TD-16 C-9 139.40 139.40 N2XH[3-1x35 + 1x35(N) + 1x10(T)] mm².
a TD-17 C-9 4.40 4.40 N2XH[3-1x35 + 1x35(N) + 1x10(T)] mm².
a TD-18 C-10 171.80 171.80 N2XH[3-1x16 + 1x16(N) + 1x10(T)] mm².
a TD-19 C-10 27.50 27.50 N2XH[3-1x16 + 1x16(N) + 1x10(T)] mm².
a TD-23 C-11 195.30 195.30 N2XH[3-1x50 + 1x50(N) + 1x10(T)] mm².
a TD-24 C-11 - - N2XH[3-1x50 + 1x50(N) + 1x10(T)] mm².
a TD-21 C-12 235.70 235.70 N2XH[3-1x35 + 1x35(N) + 1x10(T)] mm².
a TD-25 C-12 42.00 42.00 N2XH[3-1x35 + 1x35(N) + 1x10(T)] mm².
Alumbrado externo
Pabellon A C-AL 173.45 173.45 N2XH[3-1x6 + 1x6(N) + 1x6(T)] mm².
Pabellon B C-AL 99.30 99.30 N2XH[3-1x6 + 1x6(N) + 1x6(T)] mm².
Pabellon C C-AL 105.30 105.30 N2XH[3-1x6 + 1x6(N) + 1x6(T)] mm².
Pabellon D C-AL 80.60 80.60 N2XH[3-1x6 + 1x6(N) + 1x6(T)] mm².
Pabellon E C-AL 37.80 37.80 N2XH[3-1x6 + 1x6(N) + 1x6(T)] mm².
Pabellon H C-AL 64.70 64.70 N2XH[3-1x6 + 1x6(N) + 1x6(T)] mm².
Pabellon G C-AL 14.70 14.70 N2XH[3-1x6 + 1x6(N) + 1x6(T)] mm².
Postes C-AL 226.45 226.45 N2XH[3-1x6 + 1x6(N) + 1x6(T)] mm².
Dentro de lo 61.60 N2XH[3-1x6 + 1x6(N) + 1x6(T)] mm².

Página 3 de 4
PROYECTO : ADECUAC
I. E. : FRANCISC
UBICACIÓN : SATIPO-SA
PROYECTISTA : LUIS ALBE
METRADO : ING. ASTE
INSTALACIONES ELECTRICAS : AL
FECHA : DICIEMBR

CONDUCTOS Ø PVC - P
TABLEROS circuito ml. TIPO DE CONDUCTORES Ø THW
20 mm 25 mm 35 mm 40 mm 50 mm 65 mm 80 mm 100 mm
RESUMEN GENERAL. - - 802.30 - 1,146.35 - - 1,220.60
ml. Alimentador principal
863.90 N2XH[3-1x6 + 1x6(N) + 1x6(T)] mm².
199.30 N2XH[3-1x16 + 1x16(N) + 1x10(T)] mm².
146.20 N2XH[3-1x25 + 1x25(N) + 1x25(T)] mm².
534.00 N2XH[3-1x35 + 1x35(N) + 1x25(T)] mm².
355.85 N2XH[3-1x50 + 1x50(N) + 1x10(T)] mm².
463.90 N2XH[3-1x70 + 1x70(N) + 1x16(T)] mm².
400.85 N2XH[3-1x240 + 1x240(N) + 1x25(T)] mm².

Linea a Tierra
pararayos 1 18.00 18.00 1x50mm2 Cu desnudo
pararayos 2 18.00 18.00 1x50mm2 Cu desnudo
TGG
PT2-PR1
PT2-PR2
PT-2 - TGG 2.00 2.00 1x25mm2 Cu desnudo

Página 4 de 4

También podría gustarte