Documentos de Académico
Documentos de Profesional
Documentos de Cultura
1.interpretación de Planos Oficial
1.interpretación de Planos Oficial
COTAS
A 50.25
50.45
50.84
51.29
51.73
52.2
52.66
53.12
B 50.79
51.08
51.28
51.47
51.85
52.35
52.72
53.06
C 51.18
51.44
51.66
51.87
52.2
52.47
52.74
53.05
D 51.39
51.63
51.87
52.14
52.44
52.72
52.97
53.23
E1 52.69
E2 53.09
E3 52.7
E4 53.07
E5 52.72
E6 53.06
E7 52.73
E8 53.05
E9 52.85
E10 53.14
BASE ALTURA Apedestal Acero #3 /m Acero #5/m Acero #5/m Vmaterial selecto
0.4 0.4 0.16 17.3 8 12.86 0.121
0.45 0.45 0.2025 18.7 8 12.86 0.225
0.45 0.45 0.2025 2.7 8 12.86 0.15625
Acero en Pedestal Acero en zapata
ALTURA DE LOSA 53
0.58
Losa 53
Desplante minimo 2
COTAS Losa-cota TN-1
A 50.25 2.75 rellenar 49.25
50.45 2.55 rellenar 49.45
50.84 2.16 rellenar 49.84
51.29 1.71 rellenar 50.29
51.73 1.27 rellenar 50.73
52.2 0.8 rellenar 51.2
52.66 0.34 rellenar 51.66
53.12 -0.12 remover tierra 52.12
B 50.79 2.21 rellenar 49.79
51.08 1.92 rellenar 50.08
51.28 1.72 rellenar 50.28
51.47 1.53 rellenar 50.47
51.85 1.15 rellenar 50.85
52.35 0.65 rellenar 51.35
52.72 0.28 rellenar 51.72
53.06 -0.06 remover tierra 52.06
C 51.18 1.82 rellenar 50.18
51.44 1.56 rellenar 50.44
51.66 1.34 rellenar 50.66
51.87 1.13 rellenar 50.87
52.2 0.8 rellenar 51.2
52.47 0.53 rellenar 51.47
52.74 0.26 rellenar 51.74
53.05 -0.05 remover tierra 52.05
D 51.39 1.61 rellenar 50.39
51.63 1.37 rellenar 50.63
51.87 1.13 rellenar 50.87
52.14 0.86 rellenar 51.14
52.44 0.56 rellenar 51.44
52.72 0.28 rellenar 51.72
52.97 0.03 rellenar 51.97
53.23 -0.23 remover tierra 52.23
E1 52.69 0.31 rellenar 51.69
E2 53.09 -0.09 remover tierra 52.09
E3 52.7 0.3 rellenar 51.7
E4 53.07 -0.07 remover tierra 52.07
E5 52.72 0.28 rellenar 51.72
E6 53.06 -0.06 remover tierra 52.06
E7 52.73 0.27 rellenar 51.73
E8 53.05 -0.05 remover tierra 52.05
E9 52.85 0.15 rellenar 51.85
E10 53.14 -0.14 remover tierra 52.14
HUECO COTA HUECO (M) a exca. Desplante error Corr de HUECO
49.25 49.25 1 3.75 0
49.45 49.45 1 3.55 0
49.84 49.84 1 3.16 0
50.29 50.29 1 2.71 0
50.73 50.73 1 2.27 0
51.2 51.2 1.2 1.8 0.2
51 51 1.66 2 0
51 51 2.12 2 0
49.79 49.79 1 3.21 0
50.08 50.08 1 2.92 0
50.28 50.28 1 2.72 0
50.47 50.47 1 2.53 0
50.85 50.85 1 2.15 0
51.35 51.35 1.35 1.65 0.35
51 51 1.72 2 0
51 51 2.06 2 0
50.18 50.18 1 2.82 0
50.44 50.44 1 2.56 0
50.66 50.66 1 2.34 0
50.87 50.87 1 2.13 0
51.2 51.2 1.2 1.8 0.2
51 51 1.47 2 0
51 51 1.74 2 0
51 51 2.05 2 0
50.39 50.39 1 2.61 0
50.63 50.63 1 2.37 0
50.87 50.87 1 2.13 0
51.14 51.14 1.14 1.86 0.14
51 51 1.44 2 0
51 51 1.72 2 0
51 51 1.97 2 0
51 51 2.23 2 0
51 51 1.69 2 0
51 51 2.09 2 0
51 51 1.7 2 0
51 51 2.07 2 0
51 51 1.72 2 0
51 51 2.06 2 0
51 51 1.73 2 0
51 51 2.05 2 0
51 51 1.85 2 0
51 51 2.14 2 0
C h zapata x Base y Base
10x33 0.25 1.1 1.1
12x35 0.3 1.5 1.5
Mezanie 0.3 1.25 1.25
Vol. Concreto (m3) Acero #3 (m) Acero #5 (m) Remoción de tierra (m3)
0.8625 60.6666666666667 28 1.331
0.83 57.20 26.40 1.331
0.77 50.44 23.28 1.331
0.70 42.64 19.68 1.331
0.63 35.01 16.16 1.331
0.58 30.33 14.00 1.81500000000001
0.58 30.33 14.00 2.1296
0.58 30.33 14.00 2.6862
1.26 54.32 23.28 2.475
1.21 48.91 20.96 2.475
1.17 45.17 19.36 2.475
1.13 41.63 17.84 2.475
1.05 34.53 14.80 2.475
1.02 31.73 13.60 4.05000000000001
1.02 31.73 13.60 4.095
1.02 31.73 13.60 4.86000000000001
1.19 47.04 20.16 2.475
1.13 42.19 18.08 2.475
1.09 38.08 16.32 2.475
1.05 34.16 14.64 2.475
1.02 31.73 13.60 3.37500000000001
1.02 31.73 13.60 3.5325
1.02 31.73 13.60 4.14000000000001
1.02 31.73 13.60 4.83749999999999
0.68 40.91 18.88 1.331
0.64 36.75 16.96 1.331
0.60 32.59 15.04 1.331
0.58 30.33 14.00 1.6698
0.58 30.33 14.00 1.8634
0.58 30.33 14.00 2.2022
0.58 30.33 14.00 2.5047
0.58 30.33 14.00 2.8193
0.81 4.53 13.60 2.796875
0.81 4.53 13.60 3.42187500000001
0.81 4.53 13.60 2.8125
0.81 4.53 13.60 3.390625
0.81 4.53 13.60 2.84375
0.81 4.53 13.60 3.375
0.81 4.53 13.60 2.859375
0.81 4.53 13.60 3.359375
0.81 4.53 13.60 3.046875
0.81 4.53 13.60 3.5
Vol. Concreto (m3) Acero #3 (m) Acero #5 (m) Remoción de tierra (m3)
35.67259748 1252.36 673.04 110.90945
Vol 0.08891756 0.13393496
7.0985
Volumen de material selecto
0.121
0.225
0.15625
Cota de Losa (Piso) 53
Volumen de Tierra
1.30
Tabla nominal de barras de acero
Masa (kg/m) Area (m^2)
0.25 3.2E-05
0.56 7.1E-05
0.994 0.000129
1.552 0.000199
2.235 0.000284
3.042 0.000387
3.973 0.00051
5.06 0.000645
6.404 0.000819
7.907 0.001006
11.38 0.001452
20.24 0.002581
Bloque a utilizar
Ancho
Alto
Largo
CONCRETO
Volumen (m^3) Volumen de concreto
V Zapata Aisladas 35.67
0.01 V Zapata Corridas 9.95
0.02 Total 45.62
0.01
0.01
0.04
0.01
0.01
0.02 Relleno del Bloque
0.01 Tipo Volumen
6" 0.009
0.01
0.03
0.01
0.17
Volumen del Mortero
Pegamuro 1.1064
m3
Bloque Cantidad
6" 922.00
RETO DE LA ZAPATA
Distancia Select Concrete 2.52
42
0.06
0.4 Volumen Total 10.68
0.15
2.52
Distancia
42
0.06
0.4
0.15
2.52
Distancia
52
0.06
0.4
0.15
3.12
Distancia
42
0.06
0.4
0.15
2.52
UE
Precio Total
0.9 829.8
B H A As#3 As#4
Caso1 0.25 0.3 0.075 3.75 6
Caso2 0.3 0.3 0.09 3.75 6
Rev. 7.5 1
fcr 210 4
Mfar 2.6 2
TMg 9.5 1
Vol. Grava 0.48
Agua 228
Aire 3
A/C 0.68 0.62
Cemento 368
Grava 768
Arena 825
Grava 783
Arena 874
Agua 173
Cemento= 373
1yd 0.914 m 2082.4 Agua= 7881.8
1m 1.094 yd Arena= 16.0
3
1m 1000 L Grava= 13.7
1gal 3.785 L
1Bolsa de Cemento 45 kg
gravedad especifica Volumen de Concreto 45.62 m3
Cemento 3.15
Grava 2.6 59.75 yd3
Arena 2.5
L
m3
m3
relacion agua/cemento
resistencia a la compresion
concreto sin aire concreto con aire
a los 28 dias (kg/cm2)
420 0.41
350 0.48 0.40
280 0.57 0.48
210 0.68 0.59
140 0.82 0.74
/cemento
concreto con aire
0.40
0.48
0.59
0.74
a de la arena
3
0.44
0.53
0.6
0.65
0.69
0.72
0.76
0.81
Material Precio Cantidad
Piedra $ 15.79 la yd^3
Arena $ 39.99 la yd^3
Cemento $ 8.84 la bolsa
Acero #4 $ 7.85 la barra de 30'
Acero #5 $ 10.86 la barra de 30'
Acero #6 $ 6.95 la barra de 30'
Acero #3 $ 3.90 la barra de 30'
Bloques de 4" $ 0.78 la unidad
Bloques de 6" $ 0.90 la unidad
Material Precio
Piedra $ 15.79 la yd^3
Arena $ 39.99 la yd^3
Cemento $ 8.84 la bolsa
Acero #4 $ 7.85 la barra de 30'
Acero #5 $ 10.86 la barra de 30'
Acero #6 $ 6.95 la barra de 30'
Acero #3 $ 3.90 la barra de 30'
Bloques de 4" $ 0.78 la unidad
Bloques de 6" $ 0.90 la unidad
Barra lisa 1/4 $ 1.51 la barra de 20'
Tubo cuadrado de 1/4 $ 101.66 5.8mts
Soldadura $ 1.49 1/8 libra
Angulo de 1/4 $ 25.34
Tipo de Columna
16 x 31 12 22.15 265.8
Tubo 6 x 6 x 3/16 4 8.13 32.52
16 7.62 121.92
4 6.69 26.76
4 6.7 26.8
208
* Tubo 4 x 4 x 1/4 4 18 72
4 18.62 74.48
146.5
B H L
V-A 0.1 0.3
V-T 0.1 0.3
C-A 0.1 0.3