Está en la página 1de 57

PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "

CARRETERA COCHABAMBA - SANTA CRUZ


LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
"LE-3" TIPO DE HORMIGON "H-25" Kg/cm2

HORA FECHA EDAD REV AREA ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA
REGISTRO CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm2) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa)
C-LE-013 7:50 8-Aug 11-Aug 3 14.00 25.0 5.0 125.0 224.50 1.796 50.91 207.66 20.36
C-LE-013 7:50 8-Aug 11-Aug 3 14.00 25.0 5.0 125.0 222.40 1.779 45.40 185.18 18.16
C-LE-013 7:50 8-Aug 11-Aug 3 14.00 25.0 5.0 125.0 223.80 1.790 48.12 196.27 19.25
LECHADO EN SITIO TUNEL # 1
C-LE-013 7:50 8-Aug 15-Aug 7 14.00 25.0 5.0 125.0 221.70 1.774 59.71 243.55 23.88 TALUD DE SALIDA (1928-1924)
C-LE-013 7:50 8-Aug 15-Aug 7 14.00 25.0 5.0 125.0 225.50 1.804 54.44 222.05 21.78 PROG: 1+840 para pernos
C-LE-013 7:50 8-Aug 15-Aug 7 14.00 25.0 5.0 125.0 226.30 1.810 69.77 284.58 27.91
C-LE-013 7:50 8-Aug 5-Sep 28 14.00 25.0 5.0 125.0 228.50 1.828 87.92 358.61 35.17
C-LE-013 7:50 8-Aug 5-Sep 28 14.00 25.0 5.0 125.0 225.60 1.805 90.21 367.95 36.08
C-LE-013 7:50 8-Aug 5-Sep 28 14.00 25.0 5.0 125.0 228.40 1.827 82.35 335.89 32.94
C-LE-014 8:50 11-Aug 14-Aug 3 13.00 25.0 5.0 125.0 223.30 1.786 54.13 220.79 21.65
C-LE-014 8:50 11-Aug 14-Aug 3 13.00 25.0 5.0 125.0 227.40 1.819 45.60 186.00 18.24
C-LE-014 8:50 11-Aug 14-Aug 3 13.00 25.0 5.0 125.0 229.20 1.834 48.21 196.64 19.28
LECHADO EN SITIO TUNEL # 1
C-LE-014 8:50 11-Aug 18-Aug 7 13.00 25.0 5.0 125.0 228.50 1.828 63.28 258.11 25.31 TALUD DE SALIDA (193-194)
C-LE-014 8:50 11-Aug 18-Aug 7 13.00 25.0 5.0 125.0 224.60 1.797 63.27 258.07 25.31 PROG: 1+840 para pernos
C-LE-014 8:50 11-Aug 18-Aug 7 13.00 25.0 5.0 125.0 223.00 1.784 56.94 232.25 22.78
C-LE-014 8:50 11-Aug 8-Sep 28 13.00 25.0 5.0 125.0 225.50 1.804 90.53 369.26 36.21
C-LE-014 8:50 11-Aug 8-Sep 28 13.00 25.0 5.0 125.0 227.70 1.822 95.65 390.14 38.26
C-LE-014 8:50 11-Aug 8-Sep 28 13.00 25.0 5.0 125.0 224.50 1.796 100.21 408.74 40.08
C-LE-015 10:50 12-Aug 15-Aug 3 13.00 25.0 5.0 125.0 222.50 1.780 45.85 187.02 18.34
C-LE-015 10:50 12-Aug 15-Aug 3 13.00 25.0 5.0 125.0 221.90 1.775 45.10 183.96 18.04
C-LE-015 10:50 12-Aug 15-Aug 3 13.00 25.0 5.0 125.0 224.80 1.798 50.11 204.39 20.04
LECHADO EN SITIO TUNEL # 1
C-LE-015 10:50 12-Aug 19-Aug 7 13.00 25.0 5.0 125.0 230.50 1.844 67.12 273.77 26.85 TALUD DE SALIDA (1932-1924)
C-LE-015 10:50 12-Aug 19-Aug 7 13.00 25.0 5.0 125.0 229.60 1.837 66.33 270.55 26.53 PROG: 1+840 para pernos
C-LE-015 10:50 12-Aug 19-Aug 7 13.00 25.0 5.0 125.0 226.80 1.814 60.88 248.32 24.35
C-LE-015 10:50 12-Aug 9-Sep 28 13.00 25.0 5.0 125.0 224.80 1.798 96.87 395.12 38.75
C-LE-015 10:50 12-Aug 9-Sep 28 13.00 25.0 5.0 125.0 227.70 1.822 93.32 380.64 37.33
C-LE-015 10:50 12-Aug 9-Sep 28 13.00 25.0 5.0 125.0 232.00 1.856 86.47 352.70 34.59
C-LE-016 8:30 13-Aug 16-Aug 3 14.00 25.0 5.0 125.0 240.12 1.921 50.12 204.43 20.05
C-LE-016 8:30 13-Aug 16-Aug 3 14.00 25.0 5.0 125.0 237.67 1.901 48.68 198.56 19.47
C-LE-016 8:30 13-Aug 16-Aug 3 14.00 25.0 5.0 125.0 235.47 1.884 50.77 207.08 20.31
LECHADO EN SITIO TUNEL # 1
C-LE-016 8:30 13-Aug 20-Aug 7 14.00 25.0 5.0 125.0 249.12 1.993 71.25 290.62 28.50 PORTAL DE SALIDA (1928-1920) PROG:
C-LE-016 8:30 13-Aug 20-Aug 7 14.00 25.0 5.0 125.0 247.40 1.979 65.44 266.92 26.18 1+840 para pernos
C-LE-016 8:30 13-Aug 20-Aug 7 14.00 25.0 5.0 125.0 245.70 1.966 70.05 285.72 28.02
C-LE-016 8:30 13-Aug 10-Sep 28 14.00 25.0 5.0 125.0 228.50 1.828 87.65 357.51 35.06
C-LE-016 8:30 13-Aug 10-Sep 28 14.00 25.0 5.0 125.0 247.40 1.979 90.12 367.59 36.05
C-LE-016 8:30 13-Aug 10-Sep 28 14.00 25.0 5.0 125.0 245.70 1.966 83.44 340.34 33.38
C-LE-017 9:40 14-Aug 17-Aug 3 13.50 25.0 5.0 125.0 224.57 1.797 41.22 168.13 16.49
C-LE-017 9:40 14-Aug 17-Aug 3 13.50 25.0 5.0 125.0 225.87 1.807 54.84 223.68 21.94
LECHADO EN SITIO TUNEL # 2
PORTAL DE SALIDA
PROG: 2+165
tubo de lechada para techo
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
"LE-3" TIPO DE HORMIGON "H-25" Kg/cm2

HORA FECHA EDAD REV AREA ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA
REGISTRO CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm2) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa)
C-LE-017 9:40 14-Aug 17-Aug 3 13.50 25.0 5.0 125.0 230.14 1.841 49.65 202.52 19.86 LECHADO EN SITIO TUNEL # 2
C-LE-017 9:40 14-Aug 21-Aug 7 13.50 25.0 5.0 125.0 230.45 1.844 68.45 279.20 27.38 PORTAL DE SALIDA
PROG: 2+165
C-LE-017 9:40 14-Aug 21-Aug 7 13.50 25.0 5.0 125.0 231.25 1.850 65.12 265.62 26.05
tubo de lechada para techo
C-LE-017 9:40 14-Aug 21-Aug 7 13.50 25.0 5.0 125.0 234.11 1.873 70.11 285.97 28.04
C-LE-017 9:40 14-Aug 11-Sep 28 13.50 25.0 5.0 125.0 238.45 1.908 80.12 326.80 32.05
C-LE-017 9:40 14-Aug 11-Sep 28 13.50 25.0 5.0 125.0 240.11 1.921 79.68 325.00 31.87
C-LE-017 9:40 14-Aug 11-Sep 28 13.50 25.0 5.0 125.0 241.55 1.932 86.77 353.92 34.71
C-LE-018 8:10 24-Aug 27-Aug 3 14.00 25.0 5.0 125.0 237.70 1.902 50.87 207.49 20.35
C-LE-018 8:10 24-Aug 27-Aug 3 14.00 25.0 5.0 125.0 232.10 1.857 52.47 214.02 20.99
C-LE-018 8:10 24-Aug 27-Aug 3 14.00 25.0 5.0 125.0 234.10 1.873 51.99 212.06 20.80 LECHADO EN SITIO TUNEL # 2
C-LE-018 8:10 24-Aug 31-Aug 7 14.00 25.0 5.0 125.0 240.10 1.921 62.44 254.68 24.98 PORTAL DE SALIDA (1908-1905)
PROG: 2+165 para pernos
C-LE-018 8:10 24-Aug 31-Aug 7 14.00 25.0 5.0 125.0 237.44 1.900 60.77 247.87 24.31
C-LE-018 8:10 24-Aug 31-Aug 7 14.00 25.0 5.0 125.0 236.80 1.894 67.11 273.73 26.84
C-LE-018 8:10 24-Aug 21-Sep 28 14.00 25.0 5.0 125.0 234.80 1.878 69.28 282.58 27.71
C-LE-018 8:10 24-Aug 21-Sep 28 14.00 25.0 5.0 125.0 252.80 2.022 72.41 295.35 28.96
C-LE-018 8:10 24-Aug 21-Sep 28 14.00 25.0 5.0 125.0 249.10 1.993 72.53 295.84 29.01
C-LE-019 10:40 25-Aug 28-Aug 3 14.00 25.0 5.0 125.0 230.10 1.841 49.12 200.35 19.65
C-LE-019 10:40 25-Aug 28-Aug 3 14.00 25.0 5.0 125.0 229.80 1.838 50.80 207.21 20.32
C-LE-019 10:40 25-Aug 28-Aug 3 14.00 25.0 5.0 125.0 234.50 1.876 55.87 227.89 22.35 LECHADO EN SITIO TUNEL # 2
C-LE-019 10:40 25-Aug 1-Sep 7 14.00 25.0 5.0 125.0 232.50 1.860 64.04 261.21 25.62 PORTAL DE SALIDA (1908-1905)
PROG: 2+165 para pernos
C-LE-019 10:40 25-Aug 1-Sep 7 14.00 25.0 5.0 125.0 238.40 1.907 68.36 278.83 27.34
C-LE-019 10:40 25-Aug 1-Sep 7 14.00 25.0 5.0 125.0 240.50 1.924 61.04 248.97 24.42
C-LE-019 10:40 25-Aug 22-Sep 28 14.00 25.0 5.0 125.0 232.96 1.864 72.65 296.33 29.06
C-LE-019 10:40 25-Aug 22-Sep 28 14.00 25.0 5.0 125.0 234.12 1.873 68.84 280.79 27.54
C-LE-019 10:40 25-Aug 22-Sep 28 14.00 25.0 5.0 125.0 233.21 1.866 63.29 258.15 25.32
C-LE-020 7:50 27-Aug 30-Aug 3 13.00 25.0 5.0 125.0 231.60 1.853 44.29 180.65 17.72
C-LE-020 7:50 27-Aug 30-Aug 3 13.00 25.0 5.0 125.0 232.50 1.860 46.05 187.83 18.42
C-LE-020 7:50 27-Aug 30-Aug 3 13.00 25.0 5.0 125.0 245.90 1.967 37.45 152.75 14.98 LECHADO EN SITIO TUNEL # 2
C-LE-020 7:50 27-Aug 3-Sep 7 13.00 25.0 5.0 125.0 235.30 1.882 55.70 227.19 22.28 PORTAL DE SALIDA (1908-1905)
PROG: 2+165 para pernos
C-LE-020 7:50 27-Aug 3-Sep 7 13.00 25.0 5.0 125.0 245.10 1.961 56.23 229.35 22.49
C-LE-020 7:50 27-Aug 3-Sep 7 13.00 25.0 5.0 125.0 239.90 1.919 52.50 214.14 21.00
C-LE-020 7:50 27-Aug 24-Sep 28 13.00 25.0 5.0 125.0 242.30 1.938 75.70 308.77 30.28
C-LE-020 7:50 27-Aug 24-Sep 28 13.00 25.0 5.0 125.0 245.70 1.966 59.23 241.59 23.69
C-LE-020 7:50 27-Aug 24-Sep 28 13.00 25.0 5.0 125.0 240.90 1.927 80.50 328.35 32.20
C-LE-021 9:10 28-Aug 31-Aug 3 15.00 25.0 5.0 125.0 227.90 1.823 28.35 115.64 11.34
C-LE-021 9:10 28-Aug 31-Aug 3 15.00 25.0 5.0 125.0 230.50 1.844 23.50 95.85 9.40
C-LE-021 9:10 28-Aug 31-Aug 3 15.00 25.0 5.0 125.0 225.20 1.802 29.49 120.29 11.80
LECHADO EN SITIO TUNEL # 1
C-LE-021 9:10 28-Aug 4-Sep 7 15.00 25.0 5.0 125.0 229.30 1.834 48.32 197.09 19.33 PORTAL DE ENTRADA (1925-1920)
PROG: 1+840 para pernos
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
"LE-3" TIPO DE HORMIGON "H-25" Kg/cm2

HORA FECHA EDAD REV AREA ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA
REGISTRO CARACTERISTICAS
LECHADO DE LA ESTRUCTURA
EN SITIO TUNEL #1
MOLDEO VACIADO ROTURA Dias (cm) (cm2) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa) PORTAL DE ENTRADA (1925-1920)
C-LE-021 9:10 28-Aug 4-Sep 7 15.00 25.0 5.0 125.0 231.50 1.852 43.22 176.29 17.29 PROG: 1+840 para pernos
C-LE-021 9:10 28-Aug 4-Sep 7 15.00 25.0 5.0 125.0 225.90 1.807 59.78 243.83 23.91
C-LE-021 9:10 28-Aug 25-Sep 28 15.00 25.0 5.0 125.0 230.10 1.841 68.31 278.63 27.32
C-LE-021 9:10 28-Aug 25-Sep 28 15.00 25.0 5.0 125.0 233.80 1.870 73.25 298.78 29.30
C-LE-021 9:10 28-Aug 25-Sep 28 15.00 25.0 5.0 125.0 239.20 1.914 69.77 284.58 27.91
C-LE-022 7:50 29-Aug 1-Sep 3 13.00 25.0 5.0 125.0 233.40 1.867 35.70 145.62 14.28
C-LE-022 7:50 29-Aug 1-Sep 3 13.00 25.0 5.0 125.0 236.10 1.889 38.90 158.67 15.56
C-LE-022 7:50 29-Aug 1-Sep 3 13.00 25.0 5.0 125.0 235.90 1.887 41.50 169.27 16.60 LECHADO EN SITIO TUNEL # 2
C-LE-022 7:50 29-Aug 5-Sep 7 13.00 25.0 5.0 125.0 230.30 1.842 55.83 227.72 22.33 PORTAL DE ENTRADA (1924-1919)
PROG: 2+165 para pernos
C-LE-022 7:50 29-Aug 5-Sep 7 13.00 25.0 5.0 125.0 227.90 1.823 49.24 200.84 19.70
C-LE-022 7:50 29-Aug 5-Sep 7 13.00 25.0 5.0 125.0 232.50 1.860 47.35 193.13 18.94
C-LE-022 7:50 29-Aug 26-Sep 28 13.00 25.0 5.0 125.0 235.70 1.886 69.26 282.50 27.70
C-LE-022 7:50 29-Aug 26-Sep 28 13.00 25.0 5.0 125.0 229.40 1.835 59.52 242.77 23.81
C-LE-022 7:50 29-Aug 26-Sep 28 13.00 25.0 5.0 125.0 234.80 1.878 61.11 249.26 24.44
C-LE-023 10:45 30-Aug 2-Sep 3 14.00 25.0 5.0 125.0 2502.00 20.016 28.56 116.49 11.42
C-LE-023 10:45 30-Aug 2-Sep 3 14.00 25.0 5.0 125.0 251.60 2.013 24.74 100.91 9.90
C-LE-023 10:45 30-Aug 2-Sep 3 14.00 25.0 5.0 125.0 253.00 2.024 29.32 119.59 11.73 LECHADO EN SITIO TUNEL # 2
C-LE-023 10:45 30-Aug 6-Sep 7 14.00 25.0 5.0 125.0 249.60 1.997 38.56 157.28 15.42 PORTAL DE ENTRADA (1924-1919)
PROG: 2+165 para pernos
C-LE-023 10:45 30-Aug 6-Sep 7 14.00 25.0 5.0 125.0 250.80 2.006 34.84 142.11 13.94
C-LE-023 10:45 30-Aug 6-Sep 7 14.00 25.0 5.0 125.0 253.60 2.029 39.92 162.83 15.97
C-LE-023 10:45 30-Aug 27-Sep 28 14.00 25.0 5.0 125.0 252.60 2.021 70.56 287.80 28.22
C-LE-023 10:45 30-Aug 27-Sep 28 14.00 25.0 5.0 125.0 251.80 2.014 82.05 334.67 32.82
C-LE-023 10:45 30-Aug 27-Sep 28 14.00 25.0 5.0 125.0 254.60 2.037 65.92 268.88 26.37
C-LE-024 8:10 30-Aug 2-Sep 3 13.00 25.0 5.0 125.0 248.50 1.988 29.58 120.65 11.83
C-LE-024 8:10 30-Aug 2-Sep 3 13.00 25.0 5.0 125.0 252.50 2.020 24.71 100.79 9.88
C-LE-024 8:10 30-Aug 2-Sep 3 13.00 25.0 5.0 125.0 253.70 2.030 25.22 102.87 10.09
LECHADO EN SITIO TUNEL # 1
C-LE-024 8:10 30-Aug 6-Sep 7 13.00 25.0 5.0 125.0 250.20 2.002 39.56 161.36 15.82 PORTAL DE SALIDA (1925-1915) PROG:
C-LE-024 8:10 30-Aug 6-Sep 7 13.00 25.0 5.0 125.0 251.60 2.013 34.74 141.70 13.90 1+840 para pernos
C-LE-024 8:10 30-Aug 6-Sep 7 13.00 25.0 5.0 125.0 253.30 2.026 45.32 184.85 18.13
C-LE-024 8:10 30-Aug 27-Sep 28 13.00 25.0 5.0 125.0 256.80 2.054 59.97 244.61 23.99
C-LE-024 8:10 30-Aug 27-Sep 28 13.00 25.0 5.0 125.0 249.60 1.997 76.96 313.91 30.78
C-LE-024 8:10 30-Aug 27-Sep 28 13.00 25.0 5.0 125.0 248.90 1.991 70.83 288.91 28.33
C-LE-025 7:50 31-Aug 3-Sep 3 15.00 25.0 5.0 125.0 227.90 1.823 25.70 104.83 10.28
C-LE-025 7:50 31-Aug 3-Sep 3 15.00 25.0 5.0 125.0 231.40 1.851 29.23 119.23 11.69
C-LE-025 7:50 31-Aug 3-Sep 3 15.00 25.0 5.0 125.0 229.40 1.835 19.50 79.54 7.80
LECHADO EN SITIO TUNEL # 1
C-LE-025 7:50 31-Aug 7-Sep 7 15.00 25.0 5.0 125.0 225.30 1.802 35.70 145.62 14.28 PORTAL DE SALIDA (1915-1910) PROG:
C-LE-025 7:50 31-Aug 7-Sep 7 15.00 25.0 5.0 125.0 235.40 1.883 29.23 119.23 11.69 1+840 para pernos
C-LE-025 7:50 31-Aug 7-Sep 7 15.00 25.0 5.0 125.0 233.90 1.871 36.50 148.88 14.60
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
"LE-3" TIPO DE HORMIGON "H-25" Kg/cm2 LECHADO EN SITIO TUNEL # 1
PORTAL DE SALIDA (1915-1910) PROG:
HORA FECHA EDAD REV AREA ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA 1+840 para pernos
REGISTRO CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm2) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa)
C-LE-025 7:50 31-Aug 28-Sep 28 15.00 25.0 5.0 125.0 231.50 1.852 60.99 248.77 24.40
C-LE-025 7:50 31-Aug 28-Sep 28 15.00 25.0 5.0 125.0 232.80 1.862 66.91 272.92 26.76
C-LE-025 7:50 31-Aug 28-Sep 28 15.00 25.0 5.0 125.0 227.10 1.817 66.71 272.10 26.68
C-LE-026 10:30 31-Aug 3-Sep 3 14.00 25.0 5.0 125.0 23.40 0.187 25.70 104.83 10.28
C-LE-026 10:30 31-Aug 3-Sep 3 14.00 25.0 5.0 125.0 235.10 1.881 21.90 89.33 8.76
C-LE-026 10:30 31-Aug 3-Sep 3 14.00 25.0 5.0 125.0 232.90 1.863 28.50 116.25 11.40
LECHADO EN SITIO TUNEL # 1
C-LE-026 10:30 31-Aug 7-Sep 7 14.00 25.0 5.0 125.0 235.40 1.883 35.90 146.43 14.36 PORTAL DE SALIDA (1911-1910) PROG:
C-LE-026 10:30 31-Aug 7-Sep 7 14.00 25.0 5.0 125.0 233.10 1.865 40.90 166.83 16.36 1+840 para pernos
C-LE-026 10:30 31-Aug 7-Sep 7 14.00 25.0 5.0 125.0 230.90 1.847 36.21 147.70 14.48
C-LE-026 10:30 31-Aug 28-Sep 28 14.00 25.0 5.0 125.0 231.70 1.854 82.14 335.04 32.86
C-LE-026 10:30 31-Aug 28-Sep 28 14.00 25.0 5.0 125.0 242.80 1.942 54.65 222.91 21.86
C-LE-026 10:30 31-Aug 28-Sep 28 14.00 25.0 5.0 125.0 242.40 1.939 82.58 336.83 33.03

Constructora Control y Calidad


SINOHYDRO CONNAL S.R.L.
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
HORMIGÓN TIPO MF-05 (Fck=5 Mpa)

HORA FECHA EDAD REV DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA
REGISTRO CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa)
HFL-001 9:40 11-Aug 14-Aug 3 52.0 15.0 30 5301 12220 2.305 5.12 3.0 0.29
HFL-001 9:40 11-Aug 14-Aug 3 52.0 15.0 30 5301 12200 2.301 4.50 2.6 0.25
HFL-001 9:40 11-Aug 14-Aug 3 52.0 15.0 30 5301 12250 2.311 4.12 2.4 0.23
HFL-001 9:45 11-Aug 18-Aug 7 50.0 15.0 30 5301 12210 2.303 9.45 5.5 0.53
HFL-001 9:45 11-Aug 18-Aug 7 50.0 15.0 30 5301 12230 2.307 8.58 5.0 0.49
HFL-001 9:45 11-Aug 18-Aug 7 50.0 15.0 30 5301 12240 2.309 7.99 4.6 0.45 ALC. Nº437 PROG. 26+795
HFL-001 10:01 11-Aug 8-Sep 28 51.0 15.0 30 5301 10050 1.896 12.07 7.0 0.68 HORMIGÓN FLUIDO

HFL-001 10:01 11-Aug 8-Sep 28 51.0 15.0 30 5301 10820 2.041 11.81 6.8 0.67
HFL-001 10:01 11-Aug 8-Sep 28 51.0 15.0 30 5301 10070 1.899 11.08 6.4 0.63

HFL-001 10:15 11-Aug 8-Sep 28 50.0 15.0 30 5301 10870 2.050 10.33 6.0 0.58
HFL-001 10:15 11-Aug 8-Sep 28 50.0 15.0 30 5301 10320 1.947 11.18 6.5 0.63

HFL-001 10:15 11-Aug 8-Sep 28 50.0 15.0 30 5301 10370 1.956 10.68 6.2 0.60
HFL-002 19:20 16-Aug 19-Aug 3 45.0 15.0 30 5301 12190 2.299 6.45 3.7 0.36

HFL-002 19:20 16-Aug 19-Aug 3 45.0 15.0 30 5301 12210 2.303 6.78 3.9 0.38

HFL-002 19:20 16-Aug 19-Aug 3 45.0 15.0 30 5301 12220 2.305 5.54 3.2 0.31
HFL-002 19:41 16-Aug 23-Aug 7 45.0 15.0 30 5301 11200 2.113 8.14 4.7 0.46
HFL-002 19:41 16-Aug 23-Aug 7 45.0 15.0 30 5301 11180 2.109 7.25 4.2 0.41
HFL-002 19:41 16-Aug 23-Aug 7 45.0 15.0 30 5301 11290 2.130 7.88 4.5 0.45 ALC. Nº6 PROG. 1+060
HFL-002 20:20 16-Aug 13-Sep 28 49.0 15.0 30 5301 10290 1.941 9.95 5.7 0.56 HORMIGÓN FLUIDO

HFL-002 20:20 16-Aug 13-Sep 28 49.0 15.0 30 5301 10350 1.952 9.67 5.6 0.55
HFL-002 20:20 16-Aug 13-Sep 28 49.0 15.0 30 5301 10730 2.024 8.52 4.9 0.48

HFL-002 21:50 16-Aug 13-Sep 28 48.0 15.0 30 5301 10820 2.041 13.76 7.9 0.78
HFL-002 21:50 16-Aug 13-Sep 28 48.0 15.0 30 5301 10330 1.949 19.40 11.2 1.10

HFL-002 21:50 16-Aug 13-Sep 28 48.0 15.0 30 5301 10410 1.964 13.55 7.8 0.77
HFL-003 19:40 17-Aug 20-Aug 3 49.0 15.0 30 5301 12250 2.311 6.54 3.8 0.37
HFL-003 19:40 17-Aug 20-Aug 3 49.0 15.0 30 5301 12010 2.265 5.54 3.2 0.31

HFL-003 19:40 17-Aug 20-Aug 3 49.0 15.0 30 5301 12320 2.324 6.01 3.5 0.34
HFL-003 20:10 17-Aug 24-Aug 7 48.0 15.0 30 5301 11310 2.133 9.08 5.2 0.51
ALC. Nº16 PROG. 4+114
HFL-003 20:10 17-Aug 24-Aug 7 48.0 15.0 30 5301 11260 2.124 8.25 4.8 0.47
HORMIGÓN FLUIDO
HFL-003 20:10 17-Aug 24-Aug 7 48.0 15.0 30 5301 11260 2.124 8.57 4.9 0.48

HFL-003 20:36 17-Aug 14-Sep 28 48.0 15.0 30 5301 10950 2.065 12.38 7.1 0.70
HFL-003 20:36 17-Aug 14-Sep 28 48.0 15.0 30 5301 10770 2.032 11.78 6.8 0.67

HFL-003 20:36 17-Aug 14-Sep 28 48.0 15.0 30 5301 10890 2.054 11.08 6.4 0.63
HFL-004 9:05 19-Aug 22-Aug 3 48.0 15.0 30 5301 11310 2.133 4.45 2.6 0.25
HFL-004 9:05 19-Aug 22-Aug 3 48.0 15.0 30 5301 11440 2.158 5.31 3.1 0.30
HFL-004 9:05 19-Aug 22-Aug 3 48.0 15.0 30 5301 11490 2.167 5.03 2.9 0.28
HFL-004 9:20 19-Aug 26-Aug 7 47.0 15.0 30 5301 11370 2.145 7.39 4.3 0.42
HFL-004 9:20 19-Aug 26-Aug 7 47.0 15.0 30 5301 11430 2.156 7.73 4.5 0.44
ALC. Nº6 PROG. 1+060
HFL-004 9:20 19-Aug 26-Aug 7 47.0 15.0 30 5301 11410 2.152 7.79 4.5 0.44
HORMIGÓN FLUIDO
HFL-004 9:46 19-Aug 13-Sep 25 50.0 15.0 30 5301 11130 2.099 9.02 5.2 0.51

HFL-004 9:46 19-Aug 13-Sep 25 50.0 15.0 30 5301 11140 2.101 8.27 4.8 0.47
HFL-004 9:46 19-Aug 13-Sep 25 50.0 15.0 30 5301 11040 2.082 7.41 4.3 0.42

HFL-004 10:05 19-Aug 13-Sep 25 46.0 15.0 30 5301 11040 2.082 6.72 3.9 0.38
HFL-004 10:05 19-Aug 13-Sep 25 46.0 15.0 30 5301 11340 2.139 8.16 4.7 0.46

HFL-005 9:05 20-Aug 23-Aug 3 48.0 15.0 30 5301 11410 2.152 4.19 2.4 0.24

HFL-005 9:05 20-Aug 23-Aug 3 48.0 15.0 30 5301 11290 2.130 3.89 2.2 0.22
HFL-005 9:05 20-Aug 23-Aug 3 48.0 15.0 30 5301 11360 2.143 3.26 1.9 0.18

HFL-005 9:20 20-Aug 27-Aug 7 46.0 15.0 30 5301 11250 2.122 9.73 5.6 0.55
HFL-005 9:20 20-Aug 27-Aug 7 46.0 15.0 30 5301 11250 2.122 9.81 5.7 0.56
ALC. Nº16 PROG. 4+114
HFL-005 9:20 20-Aug 27-Aug 7 46.0 15.0 30 5301 11480 2.165 9.76 5.6 0.55
HORMIGÓN FLUIDO
HFL-005 9:46 20-Aug 17-Sep 28 49.0 15.0 30 5301 10790 2.035 10.95 6.3 0.62

HFL-005 9:46 20-Aug 17-Sep 28 49.0 15.0 30 5301 10870 2.050 12.91 7.4 0.73
HFL-005 9:46 20-Aug 17-Sep 28 49.0 15.0 30 5301 11150 2.103 15.70 9.1 0.89
HFL-005 10:05 20-Aug 17-Sep 28 47.0 15.0 30 5301 10950 2.065 15.25 8.8 0.86
ALC. Nº16 PROG. 4+114
HORMIGÓN FLUIDO

HFL-005 10:05 20-Aug 17-Sep 28 47.0 15.0 30 5301 10650 2.009 13.05 7.5 0.74

HFL-006 19:45 23-Aug 26-Aug 3 45.0 15.0 30 5301 11370 2.145 5.41 3.1 0.31

HFL-006 19:45 23-Aug 26-Aug 3 45.0 15.0 30 5301 11430 2.156 5.43 3.1 0.31
HFL-006 19:45 23-Aug 26-Aug 3 45.0 15.0 30 5301 11370 2.145 5.17 3.0 0.29

HFL-006 20:10 23-Aug 30-Aug 7 45.0 15.0 30 5301 11340 2.139 6.12 3.5 0.35
HFL-006 20:10 23-Aug 30-Aug 7 45.0 15.0 30 5301 11380 2.147 6.33 3.7 0.36

HFL-006 20:10 23-Aug 30-Aug 7 45.0 15.0 30 5301 11380 2.147 6.79 3.9 0.38 ALC. Nº6 PROG. 1+060
HFL-006 21:21 23-Aug 20-Sep 28 49.0 15.0 30 5301 10540 1.988 7.85 4.5 0.44 HORMIGÓN FLUIDO

HFL-006 21:21 23-Aug 20-Sep 28 49.0 15.0 30 5301 10210 1.926 8.74 5.0 0.49
HFL-006 21:21 23-Aug 20-Sep 28 49.0 15.0 30 5301 10530 1.986 9.14 5.3 0.52
HFL-006 21:56 23-Aug 20-Sep 28 48.0 15.0 30 5301 10760 2.030 8.85 5.1 0.50
HFL-006 21:56 23-Aug 20-Sep 28 48.0 15.0 30 5301 10730 2.024 7.37 4.3 0.42
HFL-006 21:56 23-Aug 20-Sep 28 48.0 15.0 30 5301 10310 1.945 8.60 5.0 0.49
HFL-007 8:30 24-Aug 31-Aug 7 48.0 15.0 30 5301 11100 2.094 5.17 3.0 0.29

HFL-007 8:30 24-Aug 31-Aug 7 48.0 15.0 30 5301 11120 2.098 5.34 3.1 0.30
HFL-007 8:30 24-Aug 31-Aug 7 48.0 15.0 30 5301 11320 2.135 6.23 3.6 0.35 ALC. Nº16 PROG. 4+114
HFL-007 8:51 24-Aug 21-Sep 28 49.0 15.0 30 5301 10780 2.033 9.66 5.6 0.55 HORMIGÓN FLUIDO

HFL-007 8:51 24-Aug 21-Sep 28 49.0 15.0 30 5301 10040 1.894 10.10 5.8 0.57

HFL-007 8:51 24-Aug 21-Sep 28 49.0 15.0 30 5301 10760 2.030 9.83 5.7 0.56
HFL-008 19:10 24-Aug 27-Aug 3 50.0 15.0 30 5301 11380 2.147 3.89 2.2 0.22

HFL-008 19:10 24-Aug 27-Aug 3 50.0 15.0 30 5301 11260 2.124 3.01 1.7 0.17

HFL-008 19:10 24-Aug 27-Aug 3 50.0 15.0 30 5301 11310 2.133 6.02 3.5 0.34
HFL-008 19:10 24-Aug 31-Aug 7 50.0 15.0 30 5301 11400 2.150 6.19 3.6 0.35

HFL-008 19:10 24-Aug 31-Aug 7 50.0 15.0 30 5301 11380 2.147 5.54 3.2 0.31
HFL-008 19:10 24-Aug 31-Aug 7 50.0 15.0 30 5301 11450 2.160 6.96 4.0 0.39 ALC. Nº6 PROG. 1+060
HFL-008 21:20 24-Aug 21-Sep 28 49.0 15.0 30 5301 11060 2.086 10.40 6.0 0.59 HORMIGÓN FLUIDO

HFL-008 21:20 24-Aug 21-Sep 28 49.0 15.0 30 5301 11260 2.124 11.19 6.5 0.63

HFL-008 21:20 24-Aug 21-Sep 28 49.0 15.0 30 5301 11090 2.092 10.59 6.1 0.60
HFL-008 21:20 24-Aug 21-Sep 28 49.0 15.0 30 5301 11110 2.096 9.85 5.7 0.56
HFL-008 21:20 24-Aug 21-Sep 28 49.0 15.0 30 5301 11190 2.111 9.90 5.7 0.56
HFL-008 21:20 24-Aug 21-Sep 28 49.0 15.0 30 5301 11020 2.079 10.12 5.8 0.57

Constructora Control y Calidad


SINOHYDRO CONNAL S.R.L.
RESISTENCIA
(kg/cm2) (Mpa)
2.31 2.64 0.26 3 MEDIA 11.79
2.31 2.64 0.26 0.26 -1.75

-10.04
2.31 5.00 0.49 7 0.49 8.95
2.31 5.00 0.49 -1.08

-7.88
1.96 6.46 0.63 28 MEDIA 3.58
1.95 6.72 0.66 0.66 1.34
-4.92

0.61 -3.73
1.98 6.19 0.61 4.19
-0.47
2.30 3.61 0.35 3 MEDIA 3.09
2.30 3.61 0.35 0.35 8.36
-11.45
2.12 4.48 0.44 7 0.44 4.94
2.12 4.48 0.44 -6.53

1.59
1.98 7.20 0.71 28 MEDIA 6.08
1.97 5.41 0.53 0.53 3.09
-9.17

0.88 -11.62
1.98 8.98 0.88 24.60
-12.97
2.30 3.48 0.34 3 MEDIA 8.46
2.30 3.48 0.34 0.34 -8.13

-0.33
2.13 4.98 0.49 7 0.49 5.17
2.13 4.98 0.49 -4.44
-0.73
2.05 6.78 0.66 28 MEDIA 5.39
2.05 6.78 0.66 0.66 0.28
-5.68
2.15 2.84 0.28 3 MEDIA -9.74
2.15 2.84 0.28 0.28 7.71
2.03
2.15 4.41 0.43 7 0.43 -3.23
2.15 4.41 0.43 1.22

2.01
2.10 4.52 0.44 28 MEDIA 9.55
2.09 4.75 0.47 0.47 0.45

-10.00
0.42 -9.68
2.11 4.29 0.42
9.68
2.14 2.18 0.21 3 MEDIA 10.85
2.14 2.18 0.21 0.21 2.91
-13.76
2.14 5.64 0.55 7 0.55 -0.38
2.14 5.64 0.55 0.44
-0.07
2.05 7.89 0.77 28 MEDIA -16.96
2.06 7.61 0.75 0.75 -2.10
19.06

0.80 7.77
2.04 8.17 0.80
2.04 8.17 0.80
-7.77
2.15 3.08 0.30 3 MEDIA 1.37
2.15 3.08 0.30 0.30 1.75
-3.12
2.14 3.70 0.36 7 0.36 -4.57
2.14 3.70 0.36 -1.30
5.87
1.98 4.86 0.48 28 MEDIA -8.47
1.97 4.95 0.49 0.49 1.90
6.57

0.47 6.97
2.00 4.77 0.47 -10.92

3.95
2.11 3.22 0.32 7 MEDIA -7.35
2.11 3.22 0.32 0.32 -4.30
11.65
1.99 5.69 0.56 28 0.56 -2.06
1.99 5.69 0.56 2.40
-0.34
2.13 2.49 0.24 3 MEDIA -9.67
2.13 2.49 0.24 0.24 -30.11

39.78
2.15 3.59 0.35 7 0.35 -0.64
2.15 3.59 0.35 -11.08
11.72
2.10 5.97 0.59 28 MEDIA -3.05
2.10 6.19 0.61 0.61 4.32
-1.27
0.56 -1.07
2.10 5.75 0.56 -0.57
1.64
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
"HB-4" - "HC-14" TIPO DE HORMIGON "H-21" Kg/cm2

HORA FECHA EDAD REV DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA
REGISTRO CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa)
C-GH-015 10:52 7-Aug 10-Aug 3 20.0 15.0 30 5301 12470 2.352 185.72 107.2 10.51
C-GH-015 10:52 7-Aug 10-Aug 3 20.0 15.0 30 5301 12570 2.371 200.47 115.7 11.34
C-GH-015 10:52 7-Aug 10-Aug 3 20.0 15.0 30 5301 12420 2.343 195.60 112.9 11.07
C-GH-015 10:52 7-Aug 14-Aug 7 20.0 15.0 30 5301 12390 2.337 327.77 189.1 18.55 ALC.N° 6. PROG.1+060 MUROS
LATERALES LOSA SUPERIOR DE
C-GH-015 10:52 7-Aug 14-Aug 7 20.0 15.0 30 5301 12460 2.350 335.95 193.9 19.01
ALCANTARILLA CAJON
C-GH-015 10:52 7-Aug 14-Aug 7 20.0 15.0 30 5301 12560 2.369 334.25 192.9 18.91 HORMIGON TIPO"HB-4"
C-GH-015 10:52 7-Aug 4-Sep 28 20.0 15.0 30 5301 12570 2.371 478.51 276.1 27.08
C-GH-015 10:52 7-Aug 4-Sep 28 20.0 15.0 30 5301 12340 2.328 421.55 243.3 23.85
C-GH-015 10:52 7-Aug 4-Sep 28 20.0 15.0 30 5301 12540 2.365 483.18 278.8 27.34
C-GH-016 10:15 11-Aug 14-Aug 3 17.5 15.0 30 5301 12580 2.373 192.32 111.0 10.88
C-GH-016 10:15 11-Aug 14-Aug 3 17.5 15.0 30 5301 12460 2.350 214.50 123.8 12.14
C-GH-016 10:15 11-Aug 14-Aug 3 17.5 15.0 30 5301 12390 2.337 200.12 115.5 11.32
C-GH-016 10:30 11-Aug 18-Aug 7 18.0 15.0 30 5301 12470 2.352 336.06 193.9 19.02 ALC.N° 16. PROG.4+114 LOSA
SUPERIOR DE CUERPO Y MUROS
C-GH-016 10:30 11-Aug 18-Aug 7 18.0 15.0 30 5301 12450 2.348 335.52 193.6 18.99
LATERALES DE ALCANTARILLA
C-GH-016 10:30 11-Aug 18-Aug 7 18.0 15.0 30 5301 12510 2.360 330.75 190.9 18.72 HORMIGON TIPO"HB-4"
C-GH-016 10:30 11-Aug 8-Sep 28 18.5 15.0 30 5301 12540 2.365 493.46 284.7 27.92
C-GH-016 10:30 11-Aug 8-Sep 28 18.5 15.0 30 5301 12530 2.364 503.15 290.3 28.47
C-GH-016 10:30 11-Aug 8-Sep 28 18.5 15.0 30 5301 12560 2.369 489.35 282.4 27.69
C-GH-017 10:20 12-Aug 9-Sep 28 18.0 15.0 30 5301 12600 2.377 498.74 287.8 28.22 ALC.N° 6. PROG.1+060
C-GH-017 10:20 12-Aug 9-Sep 28 18.0 15.0 30 5301 12540 2.365 521.03 300.7 29.48 CARPETA DE NIVELACION
C-GH-017 10:20 12-Aug 9-Sep 28 18.0 15.0 30 5301 12510 2.360 533.25 307.7 30.18 HORMIGON TIPO"HC-14"
C-GH-018 13:30 18-Aug 25-Aug 7 12.0 15.0 30 5301 12580 2.373 160.65 92.7 9.09
C-GH-018 13:30 18-Aug 25-Aug 7 12.0 15.0 30 5301 12680 2.392 159.19 91.9 9.01
C-GH-018 13:30 18-Aug 25-Aug 7 12.0 15.0 30 5301 12510 2.360 154.35 89.1 8.73 ALC.N° 15. PROG.3+936
CARPETA DE NIVELACION DE ALC CAJON
C-GH-018 13:30 18-Aug 15-Sep 28 12.0 15.0 30 5301 12630 2.382 274.34 158.3 15.52 HORMIGON TIPO"HC-14"
C-GH-018 13:30 18-Aug 15-Sep 28 12.0 15.0 30 5301 12510 2.360 302.04 174.3 17.09
C-GH-018 13:30 18-Aug 15-Sep 28 12.0 15.0 30 5301 12550 2.367 270.84 156.3 15.33
C-GH-019 7:50 28-Aug 4-Sep 7 17.5 15.0 30 5301 12320 2.324 387.89 223.8 21.95
C-GH-019 7:50 28-Aug 4-Sep 7 17.5 15.0 30 5301 12530 2.364 392.15 226.3 22.19
ALC.N° 15. PROG.3+936
C-GH-019 7:50 28-Aug 4-Sep 7 17.5 15.0 30 5301 12680 2.392 398.22 229.8 22.53 LOSAINFERIOR DE CUERPO DE
C-GH-019 8:15 28-Aug 25-Sep 28 16.5 15.0 30 5301 12520 2.362 575.80 332.3 32.58 ALCANTARILLA
HORMIGON TIPO"HB-4"
C-GH-019 8:15 28-Aug 25-Sep 28 16.5 15.0 30 5301 12580 2.373 584.27 337.1 33.06
C-GH-019 8:15 28-Aug 25-Sep 28 16.5 15.0 30 5301 12470 2.352 582.10 335.9 32.94
C-GH-020 17:17 30-Aug 6-Sep 7 20.0 15.0 30 5301 12530 2.364 487.89 281.5 27.61
C-GH-020 17:17 30-Aug 6-Sep 7 20.0 15.0 30 5301 12600 2.377 400.15 230.9 22.64
ALC.N° 15. PROG.3+936
C-GH-020 17:17 30-Aug 6-Sep 7 20.0 15.0 30 5301 12530 2.364 398.92 230.2 22.57 LOSAINFERIOR DE CUERPO DE
C-GH-020 17:30 30-Aug 27-Sep 28 18.0 15.0 30 5301 12630 2.382 565.23 326.2 31.99 ALCANTARILLA
HORMIGON TIPO"HB-4"
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
"HB-4" - "HC-14" TIPO DE HORMIGON "H-21" Kg/cm2
ALC.N° 15. PROG.3+936
HORA FECHA EDAD REV DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA LOSAINFERIORDEDELA
CUERPO DE
REGISTRO CARACTERISTICAS ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa) ALCANTARILLA
HORMIGON TIPO"HB-4"
C-GH-020 17:30 30-Aug 27-Sep 28 18.0 15.0 30 5301 12600 2.377 573.86 331.1 32.47
C-GH-020 17:30 30-Aug 27-Sep 28 18.0 15.0 30 5301 12610 2.379 554.44 319.9 31.37
C-GH-021 11:40 3-Sep 10-Sep 7 12.0 15.0 30 5301 12400 2.339 387.89 223.8 21.95
C-GH-021 11:40 3-Sep 10-Sep 7 12.0 15.0 30 5301 12440 2.347 309.15 178.4 17.49
ALC.N° 15. PROG.3+936
C-GH-021 11:40 3-Sep 10-Sep 7 12.0 15.0 30 5301 12290 2.318 358.92 207.1 20.31 LOSAINFERIOR DE CUERPO DE
C-GH-021 12:45 3-Sep 1-Oct 28 12.0 15.0 30 5301 12570 2.371 232.91 134.4 13.18 ALCANTARILLA
HORMIGON TIPO"HB-4"
C-GH-021 12:45 3-Sep 1-Oct 28 12.0 15.0 30 5301 12410 2.341 250.44 144.5 14.17
C-GH-021 12:45 3-Sep 1-Oct 28 12.0 15.0 30 5301 12670 2.390 224.96 129.8 12.73

Constructora Control y Calidad


SINOHYDRO CONNAL S.R.L.
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
HB-4 TIPO DE HORMIGON "H-21" Kg/cm2

HORA FECHA EDAD REV DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA
REGISTRO CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa)
C-PP-013 16:50 4-Aug 12-Aug 8 20.0 15.0 30 5301 12770 2.409 350.33 202.2 19.82
C-PP-013 16:50 4-Aug 12-Aug 8 20.0 15.0 30 5301 12770 2.409 344.55 198.8 19.50
C-PP-013 16:50 4-Aug 1-Sep 28 20.0 15.0 30 5301 12760 2.407 550.12 317.4 31.13 PUENTE ESPIRITU SANTO I
C-PP-013 16:50 4-Aug 1-Sep 28 20.0 15.0 30 5301 12750 2.405 544.30 314.1 30.80 24+960
PILOTE # 4
C-PP-013 16:50 4-Aug 1-Sep 28 20.0 15.0 30 5301 12710 2.397 542.17 312.9 30.68 PILA # 2
C-PP-013 16:50 4-Aug 1-Sep 28 20.0 15.0 30 5301 12800 2.414 533.26 307.7 30.18 HORMIGÓN TIPO "HB-4"
C-PP-013 16:50 4-Aug 1-Sep 28 20.0 15.0 30 5301 12690 2.394 531.72 306.8 30.09
C-PP-013 16:50 4-Aug 1-Sep 28 20.0 15.0 30 5301 12760 2.407 526.44 303.8 29.79
C-PP-014 15:50 7-Aug 14-Aug 7 19.0 15.0 30 5301 12720 2.399 345.09 199.1 19.53
C-PP-014 15:50 7-Aug 14-Aug 7 19.0 15.0 30 5301 12610 2.379 372.32 214.8 21.07
C-PP-014 15:50 7-Aug 4-Sep 28 19.0 15.0 30 5301 12560 2.369 386.08 222.8 21.85 PUENTE ESPIRITU SANTO II
C-PP-014 15:50 7-Aug 4-Sep 28 19.0 15.0 30 5301 12820 2.418 588.68 339.7 33.31 29+620 PILOTE #
6
C-PP-014 15:50 7-Aug 4-Sep 28 19.0 15.0 30 5301 12770 2.409 594.93 343.3 33.67 PILA # 1 HORMIGÓN
C-PP-014 15:50 7-Aug 4-Sep 28 19.0 15.0 30 5301 12800 2.414 580.93 335.2 32.87 TIPO "HB-4"
C-PP-014 15:50 7-Aug 4-Sep 28 19.0 15.0 30 5301 12880 2.430 583.10 336.5 33.00
C-PP-014 15:50 7-Aug 4-Sep 28 19.0 15.0 30 5301 12700 2.396 582.83 336.3 32.98
C-PP-015 17:00 7-Aug 14-Aug 7 19.0 15.0 30 5301 12660 2.388 339.68 196.0 19.22
C-PP-015 17:00 7-Aug 14-Aug 7 19.0 15.0 30 5301 12720 2.399 371.44 214.3 21.02
C-PP-015 17:00 7-Aug 4-Sep 28 19.0 15.0 30 5301 12510 2.360 356.52 205.7 20.17 PUENTE ESPIRITU SANTO I
C-PP-015 17:00 7-Aug 4-Sep 28 19.0 15.0 30 5301 12640 2.384 533.00 307.6 30.16 25+960 PILOTE #
9
C-PP-015 17:00 7-Aug 4-Sep 28 19.0 15.0 30 5301 12690 2.394 530.25 306.0 30.01 PILA # 2 HORMIGÓN
C-PP-015 17:00 7-Aug 4-Sep 28 19.0 15.0 30 5301 12730 2.401 537.24 310.0 30.40 TIPO "HB-4"
C-PP-015 17:00 7-Aug 4-Sep 28 19.0 15.0 30 5301 12710 2.397 513.94 296.6 29.08
C-PP-015 17:00 7-Aug 4-Sep 28 19.0 15.0 30 5301 12520 2.362 493.29 284.6 27.91
C-PP-016 17:40 11-Aug 18-Aug 7 19.0 15.0 30 5301 12700 2.396 351.71 203.0 19.90
C-PP-016 17:40 11-Aug 18-Aug 7 19.0 15.0 30 5301 12620 2.380 347.70 200.6 19.68
C-PP-016 17:55 11-Aug 8-Sep 28 20.0 15.0 30 5301 12700 2.396 583.70 336.8 33.03 PUENTE THIYUMAYU
C-PP-016 17:55 11-Aug 8-Sep 28 20.0 15.0 30 5301 12880 2.430 578.87 334.0 32.76 21+300 PILOTE #
10-E
C-PP-016 17:55 11-Aug 8-Sep 28 20.0 15.0 30 5301 12900 2.433 557.48 321.7 31.55 HORMIGÓN TIPO
C-PP-016 17:55 11-Aug 8-Sep 28 20.0 15.0 30 5301 12820 2.418 570.79 329.4 32.30 "HB-4"
C-PP-016 17:55 11-Aug 8-Sep 28 20.0 15.0 30 5301 12820 2.418 504.30 291.0 28.54
C-PP-016 17:55 11-Aug 8-Sep 28 20.0 15.0 30 5301 12850 2.424 520.12 300.1 29.43
C-PP-017 21:25 11-Aug 18-Aug 7 20.0 15.0 30 5301 12720 2.399 312.45 180.3 17.68
C-PP-017 21:25 11-Aug 18-Aug 7 20.0 15.0 30 5301 12890 2.431 336.55 194.2 19.04
PUENTE THIYUMAYU
C-PP-017 21:45 11-Aug 8-Sep 28 19.0 15.0 30 5301 12760 2.407 477.80 275.7 27.04
21+300 PILOTE #
C-PP-017 21:45 11-Aug 8-Sep 28 19.0 15.0 30 5301 12750 2.405 448.45 258.8 25.38 1- 1-B LADO
C-PP-017 21:45 11-Aug 8-Sep 28 19.0 15.0 30 5301 12510 2.360 537.78 310.3 30.43 COCHABAMBA
C-PP-017 21:50 11-Aug 8-Sep 28 18.5 15.0 30 5301 12510 2.360 503.77 290.7 28.51
HORMIGÓN TIPO "HB-4"
C-PP-017 21:50 11-Aug 8-Sep 28 18.5 15.0 30 5301 12670 2.390 516.86 298.2 29.25
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES PUENTE THIYUMAYU
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22 21+300 PILOTE #
1- 1-B LADO
HB-4 TIPO DE HORMIGON "H-21" Kg/cm2
COCHABAMBA
HORA FECHA EDAD REV DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA
REGISTRO HORMIGÓN DE
CARACTERISTICAS TIPO
LA "HB-4"
ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa)
C-PP-017 21:50 11-Aug 8-Sep 28 18.5 15.0 30 5301 12680 2.392 520.14 300.1 29.43
C-PP-018 14:00 12-Aug 19-Aug 7 20.0 15.0 30 5301 12670 2.390 346.95 200.2 19.63
C-PP-018 14:00 12-Aug 19-Aug 7 20.0 15.0 30 5301 12640 2.384 340.36 196.4 19.26
PUENTE THIYUMAYU
C-PP-018 14:15 12-Aug 9-Sep 28 19.0 15.0 30 5301 12610 2.379 340.88 196.7 19.29
21+300 PILOTE #
C-PP-018 14:15 12-Aug 9-Sep 28 19.0 15.0 30 5301 12590 2.375 556.88 321.3 31.51 1- 1-B LADO
C-PP-018 14:15 12-Aug 9-Sep 28 19.0 15.0 30 5301 12720 2.399 559.06 322.6 31.64 COCHABAMBA
C-PP-018 14:20 12-Aug 9-Sep 28 20.0 15.0 30 5301 12660 2.388 570.71 329.3 32.30
HORMIGÓN TIPO "HB-4"
C-PP-018 14:20 12-Aug 9-Sep 28 20.0 15.0 30 5301 12640 2.384 513.94 296.6 29.08
C-PP-018 14:20 12-Aug 9-Sep 28 20.0 15.0 30 5301 12760 2.407 493.29 284.6 27.91
C-PP-019 21:50 12-Aug 19-Aug 7 19.0 15.0 30 5301 12660 2.388 369.79 213.4 20.93
C-PP-019 21:50 12-Aug 19-Aug 7 19.0 15.0 30 5301 12770 2.409 362.87 209.4 20.53
PUENTE THIYUMAYU
C-PP-019 21:56 12-Aug 9-Sep 28 20.0 15.0 30 5301 12770 2.409 421.21 243.1 23.84
21+300 PILOTE #
C-PP-019 21:56 12-Aug 9-Sep 28 20.0 15.0 30 5301 12770 2.409 647.96 373.9 36.67 8- 8-C LADO
C-PP-019 21:56 12-Aug 9-Sep 28 20.0 15.0 30 5301 12790 2.413 596.57 344.2 33.76 SANTA CRUZ
HORMIGÓN
C-PP-019 22:04 12-Aug 9-Sep 28 19.5 15.0 30 5301 12740 2.403 690.48 398.4 39.07
TIPO "HB-4"
C-PP-019 22:04 12-Aug 9-Sep 28 19.5 15.0 30 5301 12640 2.384 653.71 377.2 36.99
C-PP-019 22:04 12-Aug 9-Sep 28 19.5 15.0 30 5301 12620 2.380 617.89 356.5 34.97
C-PP-020 22:30 12-Aug 19-Aug 7 20.0 15.0 30 5301 12540 2.365 403.05 232.6 22.81
C-PP-020 22:30 12-Aug 19-Aug 7 20.0 15.0 30 5301 12750 2.405 399.23 230.4 22.59
PUENTE THIYUMAYU
C-PP-020 22:47 12-Aug 9-Sep 28 19.0 15.0 30 5301 12810 2.416 397.33 229.3 22.48
21+300 PILOTE #
C-PP-020 22:47 12-Aug 9-Sep 28 19.0 15.0 30 5301 12590 2.375 585.59 337.9 33.14 7- 7-B LADO
C-PP-020 22:47 12-Aug 9-Sep 28 19.0 15.0 30 5301 12610 2.379 573.85 331.1 32.47 SANTA CRUZ
HORMIGÓN
C-PP-020 23:14 12-Aug 9-Sep 28 20.0 15.0 30 5301 12720 2.399 576.58 332.7 32.63
TIPO "HB-4"
C-PP-020 23:14 12-Aug 9-Sep 28 20.0 15.0 30 5301 12680 2.392 625.51 360.9 35.40
C-PP-020 23:14 12-Aug 9-Sep 28 20.0 15.0 30 5301 12740 2.403 620.79 358.2 35.13
C-PP-021 7:20 13-Aug 20-Aug 7 20.0 15.0 30 5301 12680 2.392 348.55 201.1 19.72
C-PP-021 7:20 13-Aug 20-Aug 7 20.0 15.0 30 5301 12710 2.397 325.88 188.0 18.44
PUENTE ESPIRITU SANTO II
C-PP-021 7:31 13-Aug 10-Sep 28 19.0 15.0 30 5301 12750 2.405 350.69 202.4 19.84
29+620 PILOTE #
C-PP-021 7:31 13-Aug 10-Sep 28 19.0 15.0 30 5301 12580 2.373 600.90 346.7 34.00 7
C-PP-021 7:31 13-Aug 10-Sep 28 19.0 15.0 30 5301 12660 2.388 506.55 292.3 28.66 PILA # 1
C-PP-021 7:40 13-Aug 10-Sep 28 20.0 15.0 30 5301 12640 2.384 574.72 331.6 32.52
HORMIGÓN TIPO "HB-4"
C-PP-021 7:40 13-Aug 10-Sep 28 20.0 15.0 30 5301 12700 2.396 581.86 335.8 32.93
C-PP-021 7:40 13-Aug 10-Sep 28 20.0 15.0 30 5301 12600 2.377 537.54 310.2 30.42
C-PP-022 23:10 13-Aug 20-Aug 7 20.0 15.0 30 5301 12740 2.403 330.58 190.8 18.71
C-PP-022 23:10 13-Aug 20-Aug 7 20.0 15.0 30 5301 12710 2.397 345.58 199.4 19.56
C-PP-022 23:16 13-Aug 10-Sep 28 20.0 15.0 30 5301 12730 2.401 350.69 202.4 19.84 PUENTE THIYUMAYU
C-PP-022 23:16 13-Aug 10-Sep 28 20.0 15.0 30 5301 12790 2.413 546.22 315.2 30.91 21+300 PILOTE #
9- 9-C ESTRIBO
C-PP-022 23:16 13-Aug 10-Sep 28 20.0 15.0 30 5301 1260 0.238 509.29 293.9 28.82
C-PP-022 23:35 13-Aug 10-Sep 28 20.0 15.0 30 5301 12720 2.399 562.42 324.5 31.83 HORMIGÓN TIPO "HB-4"
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
PUENTE THIYUMAYU
HB-4 TIPO DE HORMIGON "H-21" Kg/cm2 21+300 PILOTE #
9- 9-C ESTRIBO
HORA FECHA EDAD REV DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA
REGISTRO CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa) HORMIGÓN TIPO "HB-4"
C-PP-022 23:35 13-Aug 10-Sep 28 20.0 15.0 30 5301 12740 2.403 572.84 330.6 32.42
C-PP-022 23:35 13-Aug 10-Sep 28 20.0 15.0 30 5301 12740 2.403 471.39 272.0 26.68
C-PP-023 21:55 13-Aug 20-Aug 7 20.0 15.0 30 5301 12820 2.418 312.76 180.5 17.70
C-PP-023 21:55 13-Aug 20-Aug 7 20.0 15.0 30 5301 12780 2.411 337.59 194.8 19.10
PUENTE THIYUMAYU
C-PP-023 22:05 13-Aug 10-Sep 28 19.5 15.0 30 5301 12670 2.390 322.90 186.3 18.27
21+300 PILOTE #
C-PP-023 22:05 13-Aug 10-Sep 28 19.5 15.0 30 5301 12700 2.396 555.17 320.4 31.42 6- 6-A LADO
C-PP-023 22:05 13-Aug 10-Sep 28 19.5 15.0 30 5301 12780 2.411 547.84 316.1 31.00 COCHABAMBA
C-PP-023 22:19 13-Aug 10-Sep 28 20.0 15.0 30 5301 12850 2.424 487.70 281.4 27.60
HORMIGÓN TIPO "HB-4"
C-PP-023 22:19 13-Aug 10-Sep 28 20.0 15.0 30 5301 12810 2.416 506.74 292.4 28.68
C-PP-023 22:19 13-Aug 10-Sep 28 20.0 15.0 30 5301 12750 2.405 520.13 300.1 29.43
C-PP-024 2:40 14-Aug 21-Aug 7 20.0 15.0 30 5301 12640 2.384 401.35 231.6 22.71
C-PP-024 2:40 14-Aug 21-Aug 7 20.0 15.0 30 5301 12560 2.369 398.78 230.1 22.57
PUENTE ESPIRITU SANTO II
C-PP-024 2:46 14-Aug 11-Sep 28 20.5 15.0 30 5301 12570 2.371 408.47 235.7 23.11
29+550 PILOTE #
C-PP-024 2:46 14-Aug 11-Sep 28 20.5 15.0 30 5301 12630 2.382 679.66 392.2 38.46 18 PILA # 2 LADO
C-PP-024 2:46 14-Aug 11-Sep 28 20.5 15.0 30 5301 12700 2.396 494.50 285.3 27.98 SANTA CRUZ
HORMIGÓN
C-PP-024 2:58 14-Aug 11-Sep 28 20.0 15.0 30 5301 12780 2.411 555.76 320.7 31.45
TIPO "HB-4"
C-PP-024 2:58 14-Aug 11-Sep 28 20.0 15.0 30 5301 12790 2.413 598.86 345.6 33.89
C-PP-024 2:58 14-Aug 11-Sep 28 20.0 15.0 30 5301 12370 2.333 476.67 275.1 26.97
C-PP-025 16:30 14-Aug 21-Aug 7 20.0 15.0 30 5301 12290 2.318 431.83 249.2 24.44
C-PP-025 16:30 14-Aug 21-Aug 7 20.0 15.0 30 5301 12450 2.348 372.64 215.0 21.09
PUENTE ESPIRITU SANTO II
C-PP-025 16:45 14-Aug 11-Sep 28 19.0 15.0 30 5301 12690 2.394 433.86 250.4 24.55
29+620 PILOTE #
C-PP-025 16:45 14-Aug 11-Sep 28 19.0 15.0 30 5301 12660 2.388 611.77 353.0 34.62 14 PILA # 1 LADO
C-PP-025 16:45 14-Aug 11-Sep 28 19.0 15.0 30 5301 12670 2.390 621.64 358.7 35.18 COCHABAMBA
HORMIGÓN
C-PP-025 17:10 14-Aug 11-Sep 28 20.0 15.0 30 5301 12590 2.375 615.55 355.2 34.83
TIPO "HB-4"
C-PP-025 17:10 14-Aug 11-Sep 28 20.0 15.0 30 5301 12570 2.371 624.50 360.4 35.34
C-PP-025 17:10 14-Aug 11-Sep 28 20.0 15.0 30 5301 12690 2.394 672.94 388.3 38.08
C-PP-026 20:50 14-Aug 21-Aug 7 19.0 15.0 30 5301 12690 2.394 397.54 229.4 22.50
C-PP-026 20:50 14-Aug 21-Aug 7 19.0 15.0 30 5301 12610 2.379 387.59 223.7 21.93
PUENTE ESPIRITU SANTO II
C-PP-026 21:05 14-Aug 11-Sep 28 18.5 15.0 30 5301 12640 2.384 426.05 245.8 24.11
29+550 PILOTE #
C-PP-026 21:05 14-Aug 11-Sep 28 18.5 15.0 30 5301 12490 2.356 480.59 277.3 27.20 6 PILA # 2 LADO
C-PP-026 21:05 14-Aug 11-Sep 28 18.5 15.0 30 5301 12690 2.394 629.28 363.1 35.61 SANTA CRUZ
HORMIGÓN
C-PP-026 21:20 14-Aug 11-Sep 28 20.0 15.0 30 5301 12650 2.386 656.77 379.0 37.17
TIPO "HB-4"
C-PP-026 21:20 14-Aug 11-Sep 28 20.0 15.0 30 5301 12460 2.350 549.49 317.1 31.09
C-PP-026 21:20 14-Aug 11-Sep 28 20.0 15.0 30 5301 12620 2.380 613.44 354.0 34.71
C-PP-027 1:25 15-Aug 22-Aug 7 20.0 15.0 30 5301 12650 2.386 381.60 220.2 21.59
C-PP-027 1:25 15-Aug 22-Aug 7 20.0 15.0 30 5301 12640 2.384 385.28 222.3 21.80
PUENTE ESPIRITU SANTO I
C-PP-027 1:40 15-Aug 12-Sep 28 20.0 15.0 30 5301 12640 2.384 430.25 248.3 24.35
25+000 PILOTE #
C-PP-027 1:40 15-Aug 12-Sep 28 20.0 15.0 30 5301 12690 2.394 598.47 345.3 33.87 7 PILA # 2 LADO
C-PP-027 1:40 15-Aug 12-Sep 28 20.0 15.0 30 5301 12700 2.396 601.02 346.8 34.01 SANTA CRUZ

HORMIGÓN TIPO "HB-4"


PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
HB-4 TIPO DE HORMIGON "H-21" Kg/cm2 PUENTE ESPIRITU SANTO I
25+000 PILOTE #
HORA FECHA EDAD REV DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA 7 CARACTERISTICAS
PILA # 2 LADO
REGISTRO DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa) SANTA CRUZ
C-PP-027 2:10 15-Aug 12-Sep 28 19.5 15.0 30 5301 12680 2.392 516.21 297.9 29.21
HORMIGÓN TIPO "HB-4"
C-PP-027 2:10 15-Aug 12-Sep 28 19.5 15.0 30 5301 12650 2.386 585.41 337.8 33.13
C-PP-027 2:10 15-Aug 12-Sep 28 19.5 15.0 30 5301 12560 2.369 625.56 361.0 35.40
C-PP-028 14:15 16-Aug 23-Aug 7 20.0 15.0 30 5301 12480 2.354 405.65 234.1 22.96
C-PP-028 14:15 16-Aug 23-Aug 7 20.0 15.0 30 5301 12490 2.356 371.48 214.4 21.02
C-PP-028 14:38 16-Aug 13-Sep 28 20.0 15.0 30 5301 12530 2.364 399.15 230.3 22.59 PUENTE ESPIRITU SANTO II
C-PP-028 14:38 16-Aug 13-Sep 28 20.0 15.0 30 5301 12410 2.341 532.83 307.5 30.15 29+550 PILOTE #
13 PILA # 2
C-PP-028 14:38 16-Aug 13-Sep 28 20.0 15.0 30 5301 12450 2.348 541.05 312.2 30.62
C-PP-028 15:10 16-Aug 13-Sep 28 19.5 15.0 30 5301 12420 2.343 553.19 319.2 31.30 HORMIGÓN TIPO "HB-4"
C-PP-028 15:10 16-Aug 13-Sep 28 19.5 15.0 30 5301 12580 2.373 561.02 323.7 31.75
C-PP-028 15:10 16-Aug 13-Sep 28 19.5 15.0 30 5301 12570 2.371 551.93 318.5 31.23
C-PP-029 14:00 17-Aug 24-Aug 7 18.0 15.0 30 5301 12960 2.445 363.86 210.0 20.59
C-PP-029 14:00 17-Aug 24-Aug 7 18.0 15.0 30 5301 12740 2.403 388.72 224.3 22.00
C-PP-029 14:15 17-Aug 14-Sep 28 20.0 15.0 30 5301 12790 2.413 399.27 230.4 22.59 PUENTE THIYUMAYU
C-PP-029 14:15 17-Aug 14-Sep 28 20.0 15.0 30 5301 12770 2.409 556.14 320.9 31.47 21+300 PILOTE #
10- 10-D ESTRIBO
C-PP-029 14:15 17-Aug 14-Sep 28 20.0 15.0 30 5301 12900 2.433 564.23 325.6 31.93
C-PP-029 14:20 17-Aug 14-Sep 28 20.0 15.0 30 5301 12730 2.401 584.13 337.1 33.05 HORMIGÓN TIPO "HB-4"
C-PP-029 14:20 17-Aug 14-Sep 28 20.0 15.0 30 5301 12800 2.414 590.99 341.0 33.44
C-PP-029 14:20 17-Aug 14-Sep 28 20.0 15.0 30 5301 12860 2.426 595.09 343.4 33.68
C-PP-030 21:15 18-Aug 25-Aug 7 20.0 15.0 30 5301 12680 2.392 359.73 207.6 20.36
C-PP-030 21:15 18-Aug 25-Aug 7 20.0 15.0 30 5301 12800 2.414 360.39 208.0 20.39
C-PP-030 21:26 18-Aug 15-Sep 28 20.0 15.0 30 5301 12740 2.403 358.19 206.7 20.27 PUENTE THIYUMAYU
C-PP-030 21:26 18-Aug 15-Sep 28 20.0 15.0 30 5301 12720 2.399 492.08 284.0 27.85 21+300 PILOTE #
4- 4-B
C-PP-030 21:26 18-Aug 15-Sep 28 20.0 15.0 30 5301 12830 2.420 475.40 274.3 26.90
C-PP-030 21:26 18-Aug 15-Sep 28 20.0 15.0 30 5301 12680 2.392 522.98 301.8 29.59 HORMIGÓN TIPO "HB-4"
C-PP-030 21:26 18-Aug 15-Sep 28 20.0 15.0 30 5301 12800 2.414 522.63 301.6 29.57
C-PP-030 21:26 18-Aug 15-Sep 28 20.0 15.0 30 5301 12630 2.382 513.08 296.1 29.03
C-PP-031 15:00 19-Aug 26-Aug 7 20.0 15.0 30 5301 12770 2.409 315.85 182.3 17.87
C-PP-031 15:00 19-Aug 26-Aug 7 20.0 15.0 30 5301 12670 2.390 298.22 172.1 16.88
C-PP-031 15:30 19-Aug 16-Sep 28 20.0 15.0 30 5301 12770 2.409 354.09 204.3 20.04 PUENTE THIYUMAYU
C-PP-031 15:30 19-Aug 16-Sep 28 20.0 15.0 30 5301 12740 2.403 530.84 306.3 30.04 21+300 PILOTE #
6- 6-C
C-PP-031 15:30 19-Aug 16-Sep 28 20.0 15.0 30 5301 12630 2.382 531.29 306.6 30.06
C-PP-031 15:41 19-Aug 16-Sep 28 20.0 15.0 30 5301 12730 2.401 517.22 298.5 29.27 HORMIGÓN TIPO "HB-4"
C-PP-031 15:41 19-Aug 16-Sep 28 20.0 15.0 30 5301 12800 2.414 500.61 288.9 28.33
C-PP-031 15:41 19-Aug 16-Sep 28 20.0 15.0 30 5301 12700 2.396 520.42 300.3 29.45
C-PP-032 16:15 20-Aug 27-Aug 7 20.0 15.0 30 5301 12750 2.405 340.88 196.7 19.29
C-PP-032 16:15 20-Aug 27-Aug 7 20.0 15.0 30 5301 12760 2.407 350.95 202.5 19.86
C-PP-032 17:20 20-Aug 17-Sep 28 20.0 15.0 30 5301 12850 2.424 338.33 195.2 19.15 PUENTE THIYUMAYU
C-PP-032 17:20 20-Aug 17-Sep 28 20.0 15.0 30 5301 12660 2.388 508.73 293.6 28.79 21+300 PILOTE #
1- 1-A PILA # 1

HORMIGÓN TIPO "HB-4"


PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
HB-4 TIPO DE HORMIGON "H-21" Kg/cm2

HORA FECHA EDAD REV DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA PUENTE THIYUMAYU
REGISTRO CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa) 21+300 PILOTE #
1- 1-A PILA # 1
C-PP-032 17:20 20-Aug 17-Sep 28 20.0 15.0 30 5301 12600 2.377 562.84 324.8 31.85
C-PP-032 17:20 20-Aug 17-Sep 28 20.0 15.0 30 5301 12680 2.392 568.23 327.9 32.16 HORMIGÓN TIPO "HB-4"
C-PP-032 17:20 20-Aug 17-Sep 28 20.0 15.0 30 5301 12790 2.413 510.33 294.5 28.88
C-PP-032 17:20 20-Aug 17-Sep 28 20.0 15.0 30 5301 12700 2.396 492.67 284.3 27.88
C-PP-033 0:20 21-Aug 28-Aug 7 18.0 15.0 30 5301 12740 2.403 437.55 252.5 24.76
C-PP-033 0:20 21-Aug 28-Aug 7 18.0 15.0 30 5301 12710 2.397 396.95 229.1 22.46
PUENTE ESPIRITU SANTO I
C-PP-033 0:40 21-Aug 18-Sep 28 19.0 15.0 30 5301 12730 2.401 422.29 243.7 23.90
25+000 PILOTE #
C-PP-033 0:40 21-Aug 18-Sep 28 19.0 15.0 30 5301 12850 2.424 614.61 354.7 34.78 6 PILA # 2 LADO
C-PP-033 0:40 21-Aug 18-Sep 28 19.0 15.0 30 5301 12790 2.413 551.59 318.3 31.21 SANTA CRUZ
HORMIGÓN
C-PP-033 0:40 21-Aug 18-Sep 28 19.0 15.0 30 5301 12990 2.450 601.25 346.9 34.02
TIPO "HB-4"
C-PP-033 0:40 21-Aug 18-Sep 28 19.0 15.0 30 5301 12730 2.401 550.85 317.9 31.17
C-PP-033 0:40 21-Aug 18-Sep 28 19.0 15.0 30 5301 12760 2.407 547.19 315.8 30.96
C-PP-034 19:00 21-Aug 28-Aug 7 20.0 15.0 30 5301 12700 2.396 347.17 200.3 19.65
C-PP-034 19:00 21-Aug 28-Aug 7 20.0 15.0 30 5301 12680 2.392 388.21 224.0 21.97
C-PP-034 19:15 21-Aug 18-Sep 28 20.0 15.0 30 5301 12650 2.386 365.58 211.0 20.69 PUENTE THIYUMAYU
C-PP-034 19:15 21-Aug 18-Sep 28 20.0 15.0 30 5301 12770 2.409 497.61 287.1 28.16 21+300 PILOTE #
8-8-D PILA # 2
C-PP-034 19:15 21-Aug 18-Sep 28 20.0 15.0 30 5301 12740 2.403 558.77 322.4 31.62
C-PP-034 19:31 21-Aug 18-Sep 28 20.0 15.0 30 5301 12650 2.386 528.12 304.7 29.89 HORMIGÓN TIPO "HB-4"
C-PP-034 19:31 21-Aug 18-Sep 28 20.0 15.0 30 5301 12620 2.380 525.70 303.4 29.75
C-PP-034 19:31 21-Aug 18-Sep 28 20.0 15.0 30 5301 12580 2.373 541.42 312.4 30.64
C-PP-035 20:10 21-Aug 28-Aug 7 20.0 15.0 30 5301 12720 2.399 363.74 209.9 20.58
C-PP-035 20:10 21-Aug 28-Aug 7 20.0 15.0 30 5301 12750 2.405 388.56 224.2 21.99
PUENTE THIYUMAYU
C-PP-035 20:40 21-Aug 18-Sep 28 20.0 15.0 30 5301 12800 2.414 390.74 225.5 22.11
21+300 PILOTE #
C-PP-035 20:40 21-Aug 18-Sep 28 20.0 15.0 30 5301 12710 2.397 466.78 269.4 26.41 7- 7-C LADO
C-PP-035 20:40 21-Aug 18-Sep 28 20.0 15.0 30 5301 12730 2.401 489.88 282.7 27.72 COCHABAMBA
C-PP-035 21:10 21-Aug 18-Sep 28 20.0 15.0 30 5301 12740 2.403 528.77 305.1 29.92
HORMIGÓN TIPO "HB-4"
C-PP-035 21:10 21-Aug 18-Sep 28 20.0 15.0 30 5301 12760 2.407 538.68 310.8 30.48
C-PP-035 21:10 21-Aug 18-Sep 28 20.0 15.0 30 5301 12630 2.382 547.32 315.8 30.97
C-PP-036 0:50 22-Aug 29-Aug 7 20.0 15.0 30 5301 12740 2.403 392.62 226.6 22.22
C-PP-036 0:50 22-Aug 29-Aug 7 20.0 15.0 30 5301 12710 2.397 392.29 226.4 22.20
PUENTE THIYUMAYU
C-PP-036 1:10 22-Aug 19-Sep 28 21.0 15.0 30 5301 12700 2.396 343.17 198.0 19.42
21+300 PILOTE #
C-PP-036 1:10 22-Aug 19-Sep 28 21.0 15.0 30 5301 12800 2.414 559.67 323.0 31.67 3- 3-A LADO
C-PP-036 1:10 22-Aug 19-Sep 28 21.0 15.0 30 5301 12750 2.405 528.64 305.0 29.91 COCHABAMBA
C-PP-036 1:30 22-Aug 19-Sep 28 20.0 15.0 30 5301 12860 2.426 517.21 298.5 29.27
HORMIGÓN TIPO "HB-4"
C-PP-036 1:30 22-Aug 19-Sep 28 20.0 15.0 30 5301 12580 2.373 521.68 301.0 29.52
C-PP-036 1:30 22-Aug 19-Sep 28 20.0 15.0 30 5301 12640 2.384 546.44 315.3 30.92
C-PP-037 15:35 22-Aug 29-Aug 7 20.0 15.0 30 5301 12600 2.377 408.14 235.5 23.10
C-PP-037 15:35 22-Aug 29-Aug 7 20.0 15.0 30 5301 12680 2.392 405.48 234.0 22.95
C-PP-037 16:00 22-Aug 19-Sep 28 20.0 15.0 30 5301 12710 2.397 392.82 226.7 22.23 PUENTE ESPIRITU SANTO I
25+000 PILOTE #
12 PILA # 1

HORMIGÓN TIPO "HB-4"


PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
HB-4 TIPO DE HORMIGON "H-21" Kg/cm2

HORA FECHA EDAD REV DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA
REGISTRO CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa) PUENTE ESPIRITU SANTO I
C-PP-037 16:00 22-Aug 19-Sep 28 20.0 15.0 30 5301 12820 2.418 559.69 323.0 31.67 25+000 PILOTE #
12 PILA # 1
C-PP-037 16:00 22-Aug 19-Sep 28 20.0 15.0 30 5301 12830 2.420 565.00 326.0 31.97
C-PP-037 16:45 22-Aug 19-Sep 28 20.0 15.0 30 5301 12730 2.401 534.09 308.2 30.22 HORMIGÓN TIPO "HB-4"
C-PP-037 16:45 22-Aug 19-Sep 28 20.0 15.0 30 5301 12800 2.414 552.29 318.7 31.25
C-PP-037 16:45 22-Aug 19-Sep 28 20.0 15.0 30 5301 12780 2.411 560.85 323.6 31.74
C-PP-038 16:10 23-Aug 30-Aug 7 20.0 15.0 30 5301 12900 2.433 384.38 221.8 21.75
C-PP-038 16:10 23-Aug 30-Aug 7 20.0 15.0 30 5301 12910 2.435 377.20 217.7 21.35
PUENTE THIYUMAYU
C-PP-038 16:25 23-Aug 20-Sep 28 19.0 15.0 30 5301 12740 2.403 389.13 224.5 22.02
21+300 PILOTE #
C-PP-038 16:25 23-Aug 20-Sep 28 19.0 15.0 30 5301 12620 2.380 566.51 326.9 32.06 1- 1-B LADO
C-PP-038 16:25 23-Aug 20-Sep 28 19.0 15.0 30 5301 12810 2.416 562.01 324.3 31.80 SANTA CRUZ
HORMIGÓN
C-PP-038 16:46 23-Aug 20-Sep 28 20.0 15.0 30 5301 12840 2.422 557.11 321.5 31.53
TIPO "HB-4"
C-PP-038 16:46 23-Aug 20-Sep 28 20.0 15.0 30 5301 12640 2.384 563.41 325.1 31.88
C-PP-038 16:46 23-Aug 20-Sep 28 20.0 15.0 30 5301 12740 2.403 551.98 318.5 31.24
C-PP-039 15:00 24-Aug 31-Aug 7 20.0 15.0 30 5301 12610 2.379 383.11 221.1 21.68
C-PP-039 15:00 24-Aug 31-Aug 7 20.0 15.0 30 5301 12630 2.382 387.92 223.8 21.95
PUENTE THIYUMAYU
C-PP-039 15:10 24-Aug 21-Sep 28 19.0 15.0 30 5301 12760 2.407 400.40 231.0 22.66
21+300 PILOTE #
C-PP-039 15:10 24-Aug 21-Sep 28 19.0 15.0 30 5301 12710 2.397 446.27 257.5 25.25 6- 6-B LADO
C-PP-039 15:10 24-Aug 21-Sep 28 19.0 15.0 30 5301 12840 2.422 449.25 259.2 25.42 COCHABAMBA
C-PP-039 15:25 24-Aug 21-Sep 28 20.0 15.0 30 5301 12750 2.405 470.40 271.4 26.62
HORMIGÓN TIPO "HB-4"
C-PP-039 15:25 24-Aug 21-Sep 28 20.0 15.0 30 5301 12760 2.407 578.01 333.5 32.71
C-PP-039 15:25 24-Aug 21-Sep 28 20.0 15.0 30 5301 12640 2.384 568.50 328.0 32.17
C-PP-040 20:15 24-Aug 31-Aug 7 20.0 15.0 30 5301 12810 2.416 364.89 210.6 20.65
C-PP-040 20:15 24-Aug 31-Aug 7 20.0 15.0 30 5301 12670 2.390 377.06 217.6 21.34
C-PP-040 20:25 24-Aug 21-Sep 28 20.0 15.0 30 5301 12700 2.396 403.03 232.6 22.81 PUENTE ESPIRITU SANTO I
C-PP-040 20:25 24-Aug 21-Sep 28 20.0 15.0 30 5301 12790 2.413 445.43 257.0 25.21 25+000 PILOTE #
11 PILA # 2
C-PP-040 20:25 24-Aug 21-Sep 28 20.0 15.0 30 5301 12810 2.416 446.42 257.6 25.26
C-PP-040 20:40 24-Aug 21-Sep 28 20.0 15.0 30 5301 12850 2.424 474.99 274.1 26.88 HORMIGÓN TIPO "HB-4"
C-PP-040 20:40 24-Aug 21-Sep 28 20.0 15.0 30 5301 12750 2.405 540.22 311.7 30.57
C-PP-040 20:40 24-Aug 21-Sep 28 20.0 15.0 30 5301 12720 2.399 534.82 308.6 30.26
C-PP-041 17:00 26-Aug 2-Sep 7 20.0 15.0 30 5301 12610 2.379 368.13 212.4 20.83
C-PP-041 17:00 26-Aug 2-Sep 7 20.0 15.0 30 5301 12580 2.373 388.53 224.2 21.99
PUENTE ESPIRITU SANTO II
C-PP-041 17:20 26-Aug 23-Sep 28 20.0 15.0 30 5301 12710 2.397 397.01 229.1 22.47
29+551 PILOTE #
C-PP-041 17:20 26-Aug 23-Sep 28 20.0 15.0 30 5301 12720 2.399 533.76 308.0 30.20 2 PILA- 1 LADO
C-PP-041 17:20 26-Aug 23-Sep 28 20.0 15.0 30 5301 12670 2.390 548.85 316.7 31.06 COCHABAMBA
C-PP-041 17:35 26-Aug 23-Sep 28 20.0 15.0 30 5301 12740 2.403 509.60 294.1 28.84
HORMIGÓN TIPO "HB-4"
C-PP-041 17:35 26-Aug 23-Sep 28 20.0 15.0 30 5301 12620 2.380 513.20 296.1 29.04
C-PP-041 17:35 26-Aug 23-Sep 28 20.0 15.0 30 5301 12720 2.399 513.40 296.3 29.05
C-PP-042 19:20 26-Aug 2-Sep 7 20.0 15.0 30 5301 12600 2.377 405.55 234.0 22.95
C-PP-042 19:20 26-Aug 2-Sep 7 20.0 15.0 30 5301 12700 2.396 387.78 223.8 21.94
PUENTE ESPIRITU SANTO I
25+055 PILOTE #
5 ESTRIBO LADO
SANTA CRUZ
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
HB-4 TIPO DE HORMIGON "H-21" Kg/cm2

HORA FECHA EDAD REV DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA
REGISTRO CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa)
PUENTE ESPIRITU SANTO I
C-PP-042 19:40 26-Aug 23-Sep 28 20.0 15.0 30 5301 12590 2.375 379.26 218.8 21.46
25+055 PILOTE #
C-PP-042 19:40 26-Aug 23-Sep 28 20.0 15.0 30 5301 12450 2.348 520.90 300.6 29.48 5 ESTRIBO LADO
C-PP-042 19:40 26-Aug 23-Sep 28 20.0 15.0 30 5301 12650 2.386 546.35 315.3 30.92 SANTA CRUZ
HORMIGÓN
C-PP-042 19:55 26-Aug 23-Sep 28 20.0 15.0 30 5301 12680 2.392 522.67 301.6 29.58
TIPO "HB-4"
C-PP-042 19:55 26-Aug 23-Sep 28 20.0 15.0 30 5301 12710 2.397 534.18 308.2 30.23
C-PP-042 19:55 26-Aug 23-Sep 28 20.0 15.0 30 5301 12610 2.379 583.28 336.6 33.01
C-PP-043 22:30 26-Aug 2-Sep 7 20.0 15.0 30 5301 12590 2.375 345.78 199.5 19.57
C-PP-043 22:30 26-Aug 2-Sep 7 20.0 15.0 30 5301 12660 2.388 343.50 198.2 19.44
C-PP-043 23:20 26-Aug 23-Sep 28 20.0 15.0 30 5301 12550 2.367 340.55 196.5 19.27 PUENTE THIYUMAYU
C-PP-043 23:20 26-Aug 23-Sep 28 20.0 15.0 30 5301 12480 2.354 543.96 313.9 30.78 21+300 PILOTE #
1- 1-C
C-PP-043 23:20 26-Aug 23-Sep 28 20.0 15.0 30 5301 12750 2.405 415.24 239.6 23.50
C-PP-043 23:56 26-Aug 23-Sep 28 20.0 15.0 30 5301 12750 2.405 544.06 313.9 30.79 HORMIGÓN TIPO "HB-4"
C-PP-043 23:56 26-Aug 23-Sep 28 20.0 15.0 30 5301 12750 2.405 540.35 311.8 30.58
C-PP-043 23:56 26-Aug 23-Sep 28 20.0 15.0 30 5301 12580 2.373 438.28 252.9 24.80
C-PP-044 17:30 27-Aug 3-Sep 7 20.0 15.0 30 5301 12660 2.388 421.51 243.2 23.85
C-PP-044 17:30 27-Aug 3-Sep 7 20.0 15.0 30 5301 12560 2.369 450.74 260.1 25.51
PUENTE ESPIRITU SANTO I
C-PP-044 17:45 27-Aug 24-Sep 28 20.0 15.0 30 5301 12730 2.401 386.93 223.3 21.90
25+055 PILOTE #
C-PP-044 17:45 27-Aug 24-Sep 28 20.0 15.0 30 5301 12670 2.390 582.97 336.4 32.99 3 PILA # 2 LADO
C-PP-044 17:45 27-Aug 24-Sep 28 20.0 15.0 30 5301 12590 2.375 601.94 347.3 34.06 SANTA CRUZ
HORMIGÓN
C-PP-044 18:05 27-Aug 24-Sep 28 20.0 15.0 30 5301 12600 2.377 594.61 343.1 33.65
TIPO "HB-4"
C-PP-044 18:05 27-Aug 24-Sep 28 20.0 15.0 30 5301 12720 2.399 572.41 330.3 32.39
C-PP-044 18:05 27-Aug 24-Sep 28 20.0 15.0 30 5301 12590 2.375 563.15 325.0 31.87
C-PP-045 21:10 27-Aug 3-Sep 7 20.0 15.0 30 5301 12770 2.409 400.12 230.9 22.64
C-PP-045 21:10 27-Aug 3-Sep 7 20.0 15.0 30 5301 12670 2.390 390.18 225.1 22.08
PUENTE ESPIRITU SANTO II
C-PP-045 21:40 27-Aug 24-Sep 28 20.0 15.0 30 5301 12760 2.407 399.15 230.3 22.59
29+680 PILOTE #
C-PP-045 21:40 27-Aug 24-Sep 28 20.0 15.0 30 5301 12650 2.386 588.88 339.8 33.32 17 PILA # 2 LADO
C-PP-045 21:40 27-Aug 24-Sep 28 20.0 15.0 30 5301 12780 2.411 583.96 337.0 33.05 SANTA CRUZ
HORMIGÓN
C-PP-045 21:56 27-Aug 24-Sep 28 20.0 15.0 30 5301 12580 2.373 566.72 327.0 32.07
TIPO "HB-4"
C-PP-045 21:56 27-Aug 24-Sep 28 20.0 15.0 30 5301 12600 2.377 566.42 326.8 32.05
C-PP-045 21:56 27-Aug 24-Sep 28 20.0 15.0 30 5301 12590 2.375 589.90 340.4 33.38
C-PP-046 0:30 28-Aug 4-Sep 7 20.0 15.0 30 5301 12600 2.377 463.10 267.2 26.21
C-PP-046 0:30 28-Aug 4-Sep 7 20.0 15.0 30 5301 12670 2.390 391.15 225.7 22.13
PUENTE THIYUMAYU
C-PP-046 0:55 28-Aug 25-Sep 28 20.0 15.0 30 5301 12660 2.388 389.35 224.7 22.03
21+300 PILOTE #
C-PP-046 0:55 28-Aug 25-Sep 28 20.0 15.0 30 5301 12630 2.382 565.54 326.3 32.00 4- 4-A LADO
C-PP-046 0:55 28-Aug 25-Sep 28 20.0 15.0 30 5301 12630 2.382 553.24 319.2 31.31 COCHABAMBA
C-PP-046 0:55 28-Aug 25-Sep 28 20.0 15.0 30 5301 12620 2.380 496.71 286.6 28.11
HORMIGÓN TIPO "HB-4"
C-PP-046 0:55 28-Aug 25-Sep 28 20.0 15.0 30 5301 12590 2.375 547.10 315.7 30.96
C-PP-046 0:55 28-Aug 25-Sep 28 20.0 15.0 30 5301 12600 2.377 548.23 316.4 31.02
C-PP-047 14:00 28-Aug 4-Sep 7 20.0 15.0 30 5301 12580 2.373 387.20 223.4 21.91

PUENTE THIYUMAYU
21+300 PILOTE #
3- 3-B ESTRIBO
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
HB-4 TIPO DE HORMIGON "H-21" Kg/cm2

HORA FECHA EDAD REV DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA
REGISTRO CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa)
C-PP-047 14:00 28-Aug 4-Sep 7 20.0 15.0 30 5301 12820 2.418 372.15 214.7 21.06
PUENTE THIYUMAYU
C-PP-047 14:10 28-Aug 25-Sep 28 20.0 15.0 30 5301 12730 2.401 351.22 202.7 19.87
21+300 PILOTE #
C-PP-047 14:10 28-Aug 25-Sep 28 20.0 15.0 30 5301 12580 2.373 556.64 321.2 31.50 3- 3-B ESTRIBO
C-PP-047 14:10 28-Aug 25-Sep 28 20.0 15.0 30 5301 12630 2.382 532.83 307.5 30.15 LADO COCHABAMBA
C-PP-047 14:30 28-Aug 25-Sep 28 20.0 15.0 30 5301 12570 2.371 562.44 324.6 31.83
HORMIGÓN TIPO "HB-4"
C-PP-047 14:30 28-Aug 25-Sep 28 20.0 15.0 30 5301 12620 2.380 550.34 317.6 31.14
C-PP-047 14:30 28-Aug 25-Sep 28 20.0 15.0 30 5301 12790 2.413 574.43 331.5 32.51
C-PP-048 17:25 28-Aug 4-Sep 7 20.0 15.0 30 5301 12670 2.390 399.83 230.7 22.63
C-PP-048 17:25 28-Aug 4-Sep 7 20.0 15.0 30 5301 12590 2.375 374.98 216.4 21.22
C-PP-048 17:45 28-Aug 25-Sep 28 20.0 15.0 30 5301 12600 2.377 494.71 285.5 27.99 PUENTE THIYUMAYU
C-PP-048 17:45 28-Aug 25-Sep 28 20.0 15.0 30 5301 12570 2.371 587.76 339.2 33.26 21+300 PILOTE #
9- 9-A PILA # 2
C-PP-048 17:45 28-Aug 25-Sep 28 20.0 15.0 30 5301 12580 2.373 574.80 331.7 32.53
C-PP-048 18:05 28-Aug 25-Sep 28 20.0 15.0 30 5301 12590 2.375 552.31 318.7 31.25 HORMIGÓN TIPO "HB-4"
C-PP-048 18:05 28-Aug 25-Sep 28 20.0 15.0 30 5301 12590 2.375 567.47 327.5 32.11
C-PP-048 18:05 28-Aug 25-Sep 28 20.0 15.0 30 5301 12620 2.380 560.87 323.6 31.74
C-PP-049 14:15 29-Aug 5-Sep 7 20.0 15.0 30 5301 12700 2.396 495.83 286.1 28.06
C-PP-049 14:15 29-Aug 5-Sep 7 20.0 15.0 30 5301 12700 2.396 354.53 204.6 20.06
PUENTE ESPIRITU SANTO II
C-PP-049 14:35 29-Aug 26-Sep 28 20.0 15.0 30 5301 12810 2.416 388.03 223.9 21.96
29+500 PILOTE #
C-PP-049 14:35 29-Aug 26-Sep 28 20.0 15.0 30 5301 12720 2.399 592.33 341.8 33.52 15 PILA # 1 LADO
C-PP-049 14:35 29-Aug 26-Sep 28 20.0 15.0 30 5301 12660 2.388 594.92 343.3 33.67 COCHABAMBA
C-PP-049 14:45 29-Aug 26-Sep 28 20.0 15.0 30 5301 12590 2.375 598.89 345.6 33.89
HORMIGÓN TIPO "HB-4"
C-PP-049 14:45 29-Aug 26-Sep 28 20.0 15.0 30 5301 12870 2.428 582.28 336.0 32.95
C-PP-049 14:45 29-Aug 26-Sep 28 20.0 15.0 30 5301 12800 2.414 597.32 344.7 33.80
C-PP-050 14:00 29-Aug 5-Sep 7 20.0 15.0 30 5301 12710 2.397 406.12 234.3 22.98
C-PP-050 14:00 29-Aug 5-Sep 7 20.0 15.0 30 5301 12610 2.379 402.73 232.4 22.79
PUENTE ESPIRITU SANTO II
C-PP-050 14:15 29-Aug 26-Sep 28 20.0 15.0 30 5301 12610 2.379 388.03 223.9 21.96
29+678 PILOTE #
C-PP-050 14:15 29-Aug 26-Sep 28 20.0 15.0 30 5301 12590 2.375 605.21 349.2 34.25 7 PILA # 2 LADO
C-PP-050 14:15 29-Aug 26-Sep 28 20.0 15.0 30 5301 12840 2.422 603.92 348.5 34.17 SANTA CRUZ
HORMIGÓN
C-PP-050 14:20 29-Aug 26-Sep 28 20.0 15.0 30 5301 12850 2.424 603.87 348.5 34.17
TIPO "HB-4"
C-PP-050 14:20 29-Aug 26-Sep 28 20.0 15.0 30 5301 12710 2.397 586.10 338.2 33.17
C-PP-050 14:20 29-Aug 26-Sep 28 20.0 15.0 30 5301 12660 2.388 592.91 342.1 33.55
C-PP-051 20:30 29-Aug 5-Sep 7 20.0 15.0 30 5301 12690 2.394 366.55 211.5 20.74
C-PP-051 20:30 29-Aug 5-Sep 7 20.0 15.0 30 5301 12740 2.403 402.38 232.2 22.77
PUENTE THIYUMAYU
C-PP-051 20:45 29-Aug 26-Sep 28 20.0 15.0 30 5301 12660 2.388 385.70 222.6 21.83
21+300 PILOTE #
C-PP-051 20:45 29-Aug 26-Sep 28 20.0 15.0 30 5301 12610 2.379 550.88 317.9 31.17 7- 7-A PILA # 2
C-PP-051 20:45 29-Aug 26-Sep 28 20.0 15.0 30 5301 12750 2.405 559.99 323.1 31.69 LADO SANTA CRUZ
C-PP-051 20:55 29-Aug 26-Sep 28 20.0 15.0 30 5301 12940 2.441 598.71 345.5 33.88
HORMIGÓN TIPO "HB-4"
C-PP-051 20:55 29-Aug 26-Sep 28 20.0 15.0 30 5301 12670 2.390 582.28 336.0 32.95
C-PP-051 20:55 29-Aug 26-Sep 28 20.0 15.0 30 5301 12710 2.397 534.07 308.2 30.22
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
HB-4 TIPO DE HORMIGON "H-21" Kg/cm2

HORA FECHA EDAD REV DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA
REGISTRO CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa)
C-PP-052 14:05 30-Aug 6-Sep 7 20.0 15.0 30 5301 12750 2.405 469.22 270.8 26.55
C-PP-052 14:05 30-Aug 6-Sep 7 20.0 15.0 30 5301 12750 2.405 311.07 179.5 17.60
PUENTE THIYUMAYU
C-PP-052 14:20 30-Aug 27-Sep 28 19.0 15.0 30 5301 12810 2.416 337.76 194.9 19.11
21+300 PILOTE #
C-PP-052 14:20 30-Aug 27-Sep 28 19.0 15.0 30 5301 12820 2.418 549.06 316.8 31.07 10- 10-B LADO
C-PP-052 14:20 30-Aug 27-Sep 28 19.0 15.0 30 5301 12720 2.399 525.28 303.1 29.72 SANTA CRUZ
HORMIGÓN
C-PP-052 14:35 30-Aug 27-Sep 28 20.0 15.0 30 5301 12650 2.386 505.88 291.9 28.63
TIPO "HB-4"
C-PP-052 14:35 30-Aug 27-Sep 28 20.0 15.0 30 5301 12730 2.401 560.60 323.5 31.72
C-PP-052 14:35 30-Aug 27-Sep 28 20.0 15.0 30 5301 12690 2.394 510.39 294.5 28.88
C-PP-053 17:25 30-Aug 6-Sep 7 20.0 15.0 30 5301 12570 2.371 378.11 218.2 21.40
C-PP-053 17:25 30-Aug 6-Sep 7 20.0 15.0 30 5301 12730 2.401 418.41 241.4 23.68
PUENTE THIYUMAYU
C-PP-053 17:35 30-Aug 27-Sep 28 20.0 15.0 30 5301 12610 2.379 419.51 242.1 23.74
21+300 PILOTE #
C-PP-053 17:35 30-Aug 27-Sep 28 20.0 15.0 30 5301 12560 2.369 549.91 317.3 31.12 5- 5-C PILA # 2
C-PP-053 17:35 30-Aug 27-Sep 28 20.0 15.0 30 5301 12750 2.405 564.40 325.7 31.94 LADO COCHABAMBA
C-PP-053 17:50 30-Aug 27-Sep 28 20.0 15.0 30 5301 12520 2.362 548.52 316.5 31.04
HORMIGÓN TIPO "HB-4"
C-PP-053 17:50 30-Aug 27-Sep 28 20.0 15.0 30 5301 12700 2.396 577.58 333.3 32.68
C-PP-053 17:50 30-Aug 27-Sep 28 20.0 15.0 30 5301 12570 2.371 554.77 320.1 31.39
C-PP-054 19:01 1-Sep 8-Sep 7 19.0 15.0 30 5301 12640 2.384 440.02 253.9 24.90
C-PP-054 19:01 1-Sep 8-Sep 7 19.0 15.0 30 5301 12580 2.373 326.57 188.4 18.48
PUENTE ESPIRITU SANTO II
C-PP-054 19:18 1-Sep 29-Sep 28 20.0 15.0 30 5301 12540 2.365 428.20 247.1 24.23
29+685 PILOTE #
C-PP-054 19:18 1-Sep 29-Sep 28 20.0 15.0 30 5301 12700 2.396 571.65 329.9 32.35 12 PILA # 2 LADO
C-PP-054 19:18 1-Sep 29-Sep 28 20.0 15.0 30 5301 12810 2.416 552.98 319.1 31.29 SANTA CRUZ
HORMIGÓN
C-PP-054 19:18 1-Sep 29-Sep 28 20.0 15.0 30 5301 12750 2.405 558.65 322.4 31.61
TIPO "HB-4"
C-PP-054 19:18 1-Sep 29-Sep 28 20.0 15.0 30 5301 12630 2.382 528.26 304.8 29.89
C-PP-054 19:18 1-Sep 29-Sep 28 20.0 15.0 30 5301 12690 2.394 573.53 331.0 32.46
C-PP-055 11:35 2-Sep 9-Sep 7 20.0 15.0 30 5301 12600 2.377 441.89 255.0 25.01
C-PP-055 11:35 2-Sep 9-Sep 7 20.0 15.0 30 5301 12550 2.367 445.02 256.8 25.18
PUENTE THIYUMAYU
C-PP-055 11:46 2-Sep 30-Sep 28 20.0 15.0 30 5301 12700 2.396 465.52 268.6 26.34
21+300 PILOTE #
C-PP-055 11:46 2-Sep 30-Sep 28 20.0 15.0 30 5301 12670 2.390 554.28 319.8 31.37 2- 2-A PILA # 1
C-PP-055 11:46 2-Sep 30-Sep 28 20.0 15.0 30 5301 12640 2.384 573.65 331.0 32.46 LADO COCHABAMBA
C-PP-055 11:55 2-Sep 30-Sep 28 19.5 15.0 30 5301 12660 2.388 580.33 334.9 32.84
HORMIGÓN TIPO "HB-4"
C-PP-055 11:55 2-Sep 30-Sep 28 19.5 15.0 30 5301 12760 2.407 552.59 318.9 31.27
C-PP-055 11:55 2-Sep 30-Sep 28 19.5 15.0 30 5301 12650 2.386 535.80 309.2 30.32
C-PP-056 21:07 3-Sep 10-Sep 7 20.0 15.0 30 5301 12530 2.364 396.83 229.0 22.46
C-PP-056 21:07 3-Sep 10-Sep 7 20.0 15.0 30 5301 12480 2.354 394.91 227.9 22.35
PUENTE THIYUMAYU
C-PP-056 21:45 3-Sep 1-Oct 28 20.0 15.0 30 5301 12410 2.341 494.00 285.1 27.95
21+300 PILOTE #
C-PP-056 21:45 3-Sep 1-Oct 28 20.0 15.0 30 5301 12680 2.392 404.99 233.7 22.92 5- 5-D LADO
C-PP-056 21:45 3-Sep 1-Oct 28 20.0 15.0 30 5301 12680 2.392 454.28 262.1 25.71 COCHABAMBA
C-PP-056 22:00 3-Sep 1-Oct 28 20.0 15.0 30 5301 12670 2.390 391.74 226.1 22.17
HORMIGÓN TIPO "HB-4"
C-PP-056 22:00 3-Sep 1-Oct 28 20.0 15.0 30 5301 12560 2.369 432.78 249.7 24.49
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES PUENTE THIYUMAYU
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22 21+300 PILOTE #
5- 5-D LADO
HB-4 TIPO DE HORMIGON "H-21" Kg/cm2
COCHABAMBA
HORA FECHA EDAD REV DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA
REGISTRO HORMIGÓN DE
CARACTERISTICAS TIPO
LA "HB-4"
ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa)
C-PP-056 22:00 3-Sep 1-Oct 28 20.0 15.0 30 5301 12690 2.394 431.17 248.8 24.40

Constructora Control y Calidad


SINOHYDRO CONNAL S.R.L.
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
HC-14 - "HB-4" TIPO DE HORMIGON "H-21" Kg/cm2

HORA FECHA EDAD REV DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA
REGISTRO CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa)
C-ML - 066 19:50 9-Aug 12-Aug 3 19.0 15.0 30 5301 12840 2.422 294.75 170.1 16.68
C-ML - 066 19:50 9-Aug 12-Aug 3 19.0 15.0 30 5301 12850 2.424 263.59 152.1 14.92
C-ML - 066 19:50 9-Aug 12-Aug 3 19.0 15.0 30 5301 12820 2.418 288.23 166.3 16.31
C-ML - 066 20:20 9-Aug 16-Aug 7 18.5 15.0 30 5301 12890 2.431 429.10 247.6 24.28
C-ML - 066 20:20 9-Aug 16-Aug 7 18.5 15.0 30 5301 12870 2.428 410.65 237.0 23.24 MURO.N° 11 ; TRAMO.21+380-21+550
ZAPATA DE FUNDACION
C-ML - 066 20:20 9-Aug 16-Aug 7 18.5 15.0 30 5301 12880 2.430 400.65 231.2 22.67
C-ML - 066 20:48 9-Aug 6-Sep 28 19.5 15.0 30 5301 12800 2.414 616.75 355.9 34.90 MURO DEFENSIVO
HORMIGON TIPO ¨HB-4¨
C-ML - 066 20:48 9-Aug 6-Sep 28 19.5 15.0 30 5301 12720 2.399 482.96 278.7 27.33
C-ML - 066 20:48 9-Aug 6-Sep 28 19.5 15.0 30 5301 12830 2.420 494.48 285.3 27.98
C-ML - 066 21:10 9-Aug 6-Sep 28 17.0 15.0 30 5301 12880 2.430 606.70 350.1 34.33
C-ML - 066 21:10 9-Aug 6-Sep 28 17.0 15.0 30 5301 12780 2.411 629.18 363.1 35.60
C-ML - 066 21:10 9-Aug 6-Sep 28 17.0 15.0 30 5301 12890 2.431 596.57 344.2 33.76
C-ML - 067 23:10 9-Aug 12-Aug 3 16.0 15.0 30 5301 12840 2.422 278.61 160.8 15.77
C-ML - 067 23:10 9-Aug 12-Aug 3 16.0 15.0 30 5301 12780 2.411 300.60 173.5 17.01
C-ML - 067 23:10 9-Aug 12-Aug 3 16.0 15.0 30 5301 12780 2.411 272.76 157.4 15.44
C-ML - 067 23:16 9-Aug 16-Aug 7 18.5 15.0 30 5301 12840 2.422 411.81 237.6 23.30
C-ML - 067 23:16 9-Aug 16-Aug 7 18.5 15.0 30 5301 12880 2.430 439.87 253.8 24.89
C-ML - 067 23:16 9-Aug 16-Aug 7 18.5 15.0 30 5301 12770 2.409 453.66 261.8 25.67 MURO.N° 11 ; TRAMO.21+380-21+550
(0+000-0+010)
C-ML - 067 23:30 9-Aug 6-Sep 28 19.0 15.0 30 5301 13010 2.454 606.41 349.9 34.32 ZAPATA DE FUNDACION
C-ML - 067 23:30 9-Aug 6-Sep 28 19.0 15.0 30 5301 12970 2.447 638.02 368.2 36.10
C-ML - 067 23:30 9-Aug 6-Sep 28 19.0 15.0 30 5301 12860 2.426 595.08 343.4 33.67 MURO DEFENSIVO
HORMIGON TIPO ¨HB-4¨
C-ML - 067 23:44 9-Aug 6-Sep 28 18.0 15.0 30 5301 12860 2.426 603.04 348.0 34.13
C-ML - 067 23:44 9-Aug 6-Sep 28 18.0 15.0 30 5301 12810 2.416 581.51 335.6 32.91
C-ML - 067 23:44 9-Aug 6-Sep 28 18.0 15.0 30 5301 12760 2.407 631.15 364.2 35.72
C-ML - 067 23:58 9-Aug 6-Sep 28 17.5 15.0 30 5301 12860 2.426 587.63 339.1 33.25
C-ML - 067 23:58 9-Aug 6-Sep 28 17.5 15.0 30 5301 12860 2.426 647.38 373.6 36.63
C-ML - 067 23:58 9-Aug 6-Sep 28 17.5 15.0 30 5301 12740 2.403 621.43 358.6 35.17
C-ML - 068 0:12 10-Aug 12-Aug 2 17.0 15.0 30 5301 12630 2.382 297.24 171.5 16.82
C-ML - 068 0:12 10-Aug 12-Aug 2 17.0 15.0 30 5301 12720 2.399 268.47 154.9 15.19
C-ML - 068 0:12 10-Aug 12-Aug 2 17.0 15.0 30 5301 12770 2.409 283.79 163.8 16.06
C-ML - 068 0:23 10-Aug 17-Aug 7 18.5 15.0 30 5301 12920 2.437 429.75 248.0 24.32
C-ML - 068 0:23 10-Aug 17-Aug 7 18.5 15.0 30 5301 12930 2.439 441.08 254.5 24.96
C-ML - 068 0:23 10-Aug 17-Aug 7 18.5 15.0 30 5301 12790 2.413 428.57 247.3 24.25 MURO.N° 11 ; TRAMO.21+380-21+550
(0+010-0+020)
C-ML - 068 0:36 10-Aug 7-Sep 28 19.0 15.0 30 5301 12940 2.441 623.99 360.1 35.31 ZAPATA DE FUNDACION
C-ML - 068 0:36 10-Aug 7-Sep 28 19.0 15.0 30 5301 12780 2.411 572.32 330.3 32.39
C-ML - 068 0:36 10-Aug 7-Sep 28 19.0 15.0 30 5301 12700 2.396 613.47 354.0 34.72 MURO DEFENSIVO
HORMIGON TIPO ¨HB-4¨
C-ML - 068 0:48 10-Aug 7-Sep 28 17.5 15.0 30 5301 12810 2.416 596.01 343.9 33.73
C-ML - 068 0:48 10-Aug 7-Sep 28 17.5 15.0 30 5301 12800 2.414 587.86 339.2 33.27
C-ML - 068 0:48 10-Aug 7-Sep 28 17.5 15.0 30 5301 12730 2.401 603.31 348.1 34.14
C-ML - 068 0:59 10-Aug 7-Sep 28 18.0 15.0 30 5301 12840 2.422 583.05 336.4 32.99
C-ML - 068 0:59 10-Aug 7-Sep 28 18.0 15.0 30 5301 12840 2.422 597.52 344.8 33.81
C-ML - 068 0:59 10-Aug 7-Sep 28 18.0 15.0 30 5301 13020 2.456 590.64 340.8 33.42
C-ML - 069 1:10 10-Aug 13-Aug 3 17.0 15.0 30 5301 12770 2.409 252.49 145.7 14.29
C-ML - 069 1:10 10-Aug 13-Aug 3 17.0 15.0 30 5301 12800 2.414 303.60 175.2 17.18
C-ML - 069 1:10 10-Aug 13-Aug 3 17.0 15.0 30 5301 12880 2.430 280.79 162.0 15.89
C-ML - 069 1:21 10-Aug 18-Aug 8 18.5 15.0 30 5301 12640 2.384 414.01 238.9 23.43
C-ML - 069 1:21 10-Aug 18-Aug 8 18.5 15.0 30 5301 12770 2.409 455.14 262.6 25.76
C-ML - 069 1:21 10-Aug 18-Aug 8 18.5 15.0 30 5301 12730 2.401 433.45 250.1 24.53 MURO.N° 11 ; TRAMO.21+380-21+550
ZAPATA DE
C-ML - 069 1:30 10-Aug 7-Sep 28 19.0 15.0 30 5301 12780 2.411 566.17 326.7 32.04 FUNDACION
C-ML - 069 1:30 10-Aug 7-Sep 28 19.0 15.0 30 5301 12690 2.394 592.61 342.0 33.53
C-ML - 069 1:30 10-Aug 7-Sep 28 19.0 15.0 30 5301 12800 2.414 588.64 339.7 33.31 MURO DEFENSIVO
HORMIGON TIPO ¨HB-4¨
C-ML - 069 1:48 10-Aug 7-Sep 28 17.5 15.0 30 5301 12850 2.424 606.18 349.8 34.30
C-ML - 069 1:48 10-Aug 7-Sep 28 17.5 15.0 30 5301 12780 2.411 587.06 338.8 33.22
C-ML - 069 1:48 10-Aug 7-Sep 28 17.5 15.0 30 5301 12660 2.388 624.29 360.2 35.33
C-ML - 069 2:05 10-Aug 7-Sep 28 18.0 15.0 30 5301 12730 2.401 539.86 311.5 30.55
C-ML - 069 2:05 10-Aug 7-Sep 28 18.0 15.0 30 5301 12680 2.392 584.83 337.5 33.09
C-ML - 069 2:05 10-Aug 7-Sep 28 18.0 15.0 30 5301 12780 2.411 576.54 332.7 32.63
C-ML - 70 6:01 10-Aug 13-Aug 3 18.0 15.0 30 5301 12820 2.418 262.86 151.7 14.87
C-ML - 70 6:01 10-Aug 13-Aug 3 18.0 15.0 30 5301 12730 2.401 287.47 165.9 16.27
C-ML - 70 6:01 10-Aug 13-Aug 3 18.0 15.0 30 5301 12740 2.403 259.40 149.7 14.68
C-ML - 70 7:10 10-Aug 17-Aug 7 17.5 15.0 30 5301 12750 2.405 400.12 230.9 22.64
C-ML - 70 7:10 10-Aug 17-Aug 7 17.5 15.0 30 5301 12780 2.411 391.81 226.1 22.17
C-ML - 70 7:10 10-Aug 17-Aug 7 17.5 15.0 30 5301 12850 2.424 421.22 243.1 23.84 MURO.N° 11 ; TRAMO.21+380-21+550
ZAPATA DE
C-ML - 70 8:30 10-Aug 7-Sep 28 19.0 15.0 30 5301 12770 2.409 603.51 348.3 34.15 FUNDACION
C-ML - 70 8:30 10-Aug 7-Sep 28 19.0 15.0 30 5301 12760 2.407 565.37 326.2 31.99
C-ML - 70 8:30 10-Aug 7-Sep 28 19.0 15.0 30 5301 12680 2.392 582.24 336.0 32.95 MURO DEFENSIVO
HORMIGON TIPO ¨HB-4¨
C-ML - 70 8:50 10-Aug 7-Sep 28 18.5 15.0 30 5301 12810 2.416 559.99 323.1 31.69
C-ML - 70 8:50 10-Aug 7-Sep 28 18.5 15.0 30 5301 12750 2.405 571.19 329.6 32.32
C-ML - 70 8:50 10-Aug 7-Sep 28 18.5 15.0 30 5301 12690 2.394 571.19 329.6 32.32
C-ML - 70 9:11 10-Aug 7-Sep 28 19.5 15.0 30 5301 12760 2.407 611.38 352.8 34.60
C-ML - 70 9:11 10-Aug 7-Sep 28 19.5 15.0 30 5301 12670 2.390 594.45 343.0 33.64
C-ML - 70 9:11 10-Aug 7-Sep 28 19.5 15.0 30 5301 12780 2.411 558.95 322.5 31.63
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
HC-14 - "HB-4" TIPO DE HORMIGON "H-21" Kg/cm2

HORA FECHA EDAD REV DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA
REGISTRO CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa)
C-ML - 71 15:40 10-Aug 13-Aug 3 18.0 15.0 30 5301 12770 2.409 259.56 149.8 14.69
C-ML - 71 15:40 10-Aug 13-Aug 3 18.0 15.0 30 5301 12800 2.414 246.83 142.4 13.97
C-ML - 71 15:40 10-Aug 13-Aug 3 18.0 15.0 30 5301 12880 2.430 242.04 139.7 13.70
C-ML - 71 15:47 10-Aug 17-Aug 7 19.0 15.0 30 5301 12750 2.405 420.58 242.7 23.80
C-ML - 71 15:47 10-Aug 17-Aug 7 19.0 15.0 30 5301 12790 2.413 410.68 237.0 23.24
C-ML - 71 15:47 10-Aug 17-Aug 7 19.0 15.0 30 5301 12720 2.399 399.73 230.7 22.62 MURO.N° 11 ; TRAMO.21+380-21+550
ZAPATA DE
C-ML - 71 15:58 10-Aug 7-Sep 28 19.5 15.0 30 5301 12840 2.422 472.25 272.5 26.72 FUNDACION
C-ML - 71 15:58 10-Aug 7-Sep 28 19.5 15.0 30 5301 12950 2.443 517.80 298.8 29.30
C-ML - 71 15:58 10-Aug 7-Sep 28 19.5 15.0 30 5301 12800 2.414 498.67 287.8 28.22 MURO DEFENSIVO
HORMIGON TIPO ¨HB-4¨
C-ML - 71 16:10 10-Aug 7-Sep 28 18.5 15.0 30 5301 12820 2.418 587.78 339.2 33.26
C-ML - 71 16:10 10-Aug 7-Sep 28 18.5 15.0 30 5301 12780 2.411 498.43 287.6 28.21
C-ML - 71 16:10 10-Aug 7-Sep 28 18.5 15.0 30 5301 12920 2.437 534.01 308.1 30.22
C-ML - 71 16:20 10-Aug 7-Sep 28 19.0 15.0 30 5301 12810 2.416 506.71 292.4 28.67
C-ML - 71 16:20 10-Aug 7-Sep 28 19.0 15.0 30 5301 12730 2.401 491.43 283.6 27.81
C-ML - 71 16:20 10-Aug 7-Sep 28 19.0 15.0 30 5301 12860 2.426 516.83 298.2 29.25
C-ML - 72 19:40 10-Aug 13-Aug 3 17.5 15.0 30 5301 12640 2.384 257.17 148.4 14.55
C-ML - 72 19:40 10-Aug 13-Aug 3 17.5 15.0 30 5301 12820 2.418 243.03 140.2 13.75
C-ML - 72 19:40 10-Aug 13-Aug 3 17.5 15.0 30 5301 12830 2.420 251.08 144.9 14.21
C-ML - 72 20:00 10-Aug 17-Aug 7 18.0 15.0 30 5301 12720 2.399 393.14 226.9 22.25
C-ML - 72 20:00 10-Aug 17-Aug 7 18.0 15.0 30 5301 12840 2.422 376.17 217.1 21.29
C-ML - 72 20:00 10-Aug 17-Aug 7 18.0 15.0 30 5301 12800 2.414 400.21 230.9 22.65 MURO.N° 11 ; TRAMO.21+380-21+550
ZAPATA DE
C-ML - 72 20:10 10-Aug 7-Sep 28 16.5 15.0 30 5301 12670 2.390 523.23 301.9 29.61 FUNDACION
C-ML - 72 20:10 10-Aug 7-Sep 28 16.5 15.0 30 5301 12840 2.422 542.98 313.3 30.73
C-ML - 72 20:10 10-Aug 7-Sep 28 16.5 15.0 30 5301 12850 2.424 485.35 280.1 27.47 MURO DEFENSIVO
HORMIGON TIPO ¨HB-4¨
C-ML - 72 20:35 10-Aug 7-Sep 28 19.0 15.0 30 5301 12750 2.405 536.81 309.8 30.38
C-ML - 72 20:35 10-Aug 7-Sep 28 19.0 15.0 30 5301 12820 2.418 506.45 292.2 28.66
C-ML - 72 20:35 10-Aug 7-Sep 28 19.0 15.0 30 5301 12730 2.401 532.35 307.2 30.12
C-ML - 72 20:41 10-Aug 7-Sep 28 18.5 15.0 30 5301 12870 2.428 559.00 322.6 31.63
C-ML - 72 20:41 10-Aug 7-Sep 28 18.5 15.0 30 5301 12870 2.428 563.47 325.1 31.89
C-ML - 72 20:41 10-Aug 7-Sep 28 18.5 15.0 30 5301 12830 2.420 546.42 315.3 30.92
C-ML - 73 0:35 11-Aug 14-Aug 3 18.0 15.0 30 5301 12700 2.396 277.00 159.8 15.67
C-ML - 73 0:35 11-Aug 14-Aug 3 18.0 15.0 30 5301 12700 2.396 270.12 155.9 15.29
C-ML - 73 0:35 11-Aug 14-Aug 3 18.0 15.0 30 5301 12700 2.396 269.50 155.5 15.25
C-ML - 73 1:55 11-Aug 18-Aug 7 17.5 15.0 30 5301 12710 2.397 405.13 233.8 22.93
MURO.N° 11 ; TRAMO.21+380-21+550
C-ML - 73 1:55 11-Aug 18-Aug 7 17.5 15.0 30 5301 12760 2.407 409.70 236.4 23.18
ZAPATA DE FUNDACION
C-ML - 73 1:55 11-Aug 18-Aug 7 17.5 15.0 30 5301 12840 2.422 406.39 234.5 23.00
C-ML - 73 2:30 11-Aug 8-Sep 28 18.5 15.0 30 5301 12770 2.409 489.56 282.5 27.70 MURO DEFENSIVO
HORMIGON TIPO ¨HB-4¨
C-ML - 73 2:30 11-Aug 8-Sep 28 18.5 15.0 30 5301 12680 2.392 545.81 315.0 30.89
C-ML - 73 2:30 11-Aug 8-Sep 28 18.5 15.0 30 5301 12780 2.411 438.42 253.0 24.81
C-ML - 73 2:38 11-Aug 8-Sep 28 19.0 15.0 30 5301 12750 2.405 535.60 309.1 30.31
C-ML - 73 2:38 11-Aug 8-Sep 28 19.0 15.0 30 5301 12680 2.392 532.35 307.2 30.12
C-ML - 73 2:38 11-Aug 8-Sep 28 19.0 15.0 30 5301 12720 2.399 490.96 283.3 27.78
C-ML - 74 16:30 11-Aug 14-Aug 3 18.0 15.0 30 5301 12770 2.409 231.34 133.5 13.09
C-ML - 74 16:30 11-Aug 14-Aug 3 18.0 15.0 30 5301 12820 2.418 233.16 134.5 13.19
C-ML - 74 16:30 11-Aug 14-Aug 3 18.0 15.0 30 5301 12780 2.411 230.78 133.2 13.06
C-ML - 74 16:36 11-Aug 18-Aug 7 18.0 15.0 30 5301 12760 2.407 393.95 227.3 22.29
C-ML - 74 16:36 11-Aug 18-Aug 7 18.0 15.0 30 5301 12840 2.422 372.84 215.1 21.10
C-ML - 74 16:36 11-Aug 18-Aug 7 18.0 15.0 30 5301 12940 2.441 364.81 210.5 20.64 MURO.N° 11 ; TRAMO.21+380-21+550
ZAPATA DE
C-ML - 74 16:40 11-Aug 8-Sep 28 19.0 15.0 30 5301 12850 2.424 588.86 339.8 33.32 FUNDACION
C-ML - 74 16:40 11-Aug 8-Sep 28 19.0 15.0 30 5301 12680 2.392 548.88 316.7 31.06
C-ML - 74 16:40 11-Aug 8-Sep 28 19.0 15.0 30 5301 12850 2.424 524.53 302.7 29.68 MURO DEFENSIVO
HORMIGON TIPO ¨HB-4¨
C-ML - 74 16:47 11-Aug 8-Sep 28 19.5 15.0 30 5301 12800 2.414 592.82 342.1 33.55
C-ML - 74 16:47 11-Aug 8-Sep 28 19.5 15.0 30 5301 12830 2.420 519.34 299.7 29.39
C-ML - 74 16:47 11-Aug 8-Sep 28 19.5 15.0 30 5301 12850 2.424 579.84 334.6 32.81
C-ML - 74 16:53 11-Aug 8-Sep 28 17.5 15.0 30 5301 12710 2.397 588.47 339.6 33.30
C-ML - 74 16:53 11-Aug 8-Sep 28 17.5 15.0 30 5301 12850 2.424 596.99 344.5 33.78
C-ML - 74 16:53 11-Aug 8-Sep 28 17.5 15.0 30 5301 12840 2.422 596.36 344.1 33.75
C-ML - 75 20:00 11-Aug 14-Aug 3 17.0 15.0 30 5301 12790 2.413 231.14 133.4 13.08
C-ML - 75 20:00 11-Aug 14-Aug 3 17.0 15.0 30 5301 12780 2.411 226.96 131.0 12.84
C-ML - 75 20:00 11-Aug 14-Aug 3 17.0 15.0 30 5301 12700 2.396 220.35 127.2 12.47
C-ML - 75 20:15 11-Aug 18-Aug 7 19.5 15.0 30 5301 12800 2.414 378.25 218.3 21.40
C-ML - 75 20:15 11-Aug 18-Aug 7 19.5 15.0 30 5301 12880 2.430 379.26 218.8 21.46
C-ML - 75 20:15 11-Aug 18-Aug 7 19.5 15.0 30 5301 12710 2.397 367.20 211.9 20.78 MURO.N° 11 ; TRAMO.21+380-21+550
ZAPATA DE
C-ML - 75 20:21 11-Aug 8-Sep 28 18.5 15.0 30 5301 12710 2.397 524.66 302.8 29.69 FUNDACION
C-ML - 75 20:21 11-Aug 8-Sep 28 18.5 15.0 30 5301 12800 2.414 542.25 312.9 30.69
C-ML - 75 20:21 11-Aug 8-Sep 28 18.5 15.0 30 5301 12790 2.413 570.62 329.3 32.29 MURO DEFENSIVO
HORMIGON TIPO ¨HB-4¨
C-ML - 75 20:35 11-Aug 8-Sep 28 18.0 15.0 30 5301 12750 2.405 544.97 314.5 30.84
C-ML - 75 20:35 11-Aug 8-Sep 28 18.0 15.0 30 5301 12650 2.386 572.55 330.4 32.40
C-ML - 75 20:35 11-Aug 8-Sep 28 18.0 15.0 30 5301 12650 2.386 544.33 314.1 30.80
C-ML - 75 20:59 11-Aug 8-Sep 28 19.0 15.0 30 5301 12590 2.375 549.69 317.2 31.11
C-ML - 75 20:59 11-Aug 8-Sep 28 19.0 15.0 30 5301 12750 2.405 577.30 333.1 32.67
C-ML - 75 20:59 11-Aug 8-Sep 28 19.0 15.0 30 5301 12760 2.407 527.72 304.5 29.86
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
HC-14 - "HB-4" TIPO DE HORMIGON "H-21" Kg/cm2

HORA FECHA EDAD REV DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA
REGISTRO CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa)
C-ML - 76 0:10 12-Aug 15-Aug 3 18.0 15.0 30 5301 12880 2.430 252.15 145.5 14.27
C-ML - 76 0:10 12-Aug 15-Aug 3 18.0 15.0 30 5301 12700 2.396 288.13 166.3 16.30
C-ML - 76 0:10 12-Aug 15-Aug 3 18.0 15.0 30 5301 12810 2.416 309.83 178.8 17.53
C-ML - 76 0:16 12-Aug 19-Aug 7 17.0 15.0 30 5301 12770 2.409 325.88 188.0 18.44
C-ML - 76 0:16 12-Aug 19-Aug 7 17.0 15.0 30 5301 12840 2.422 350.26 202.1 19.82
C-ML - 76 0:16 12-Aug 19-Aug 7 17.0 15.0 30 5301 12880 2.430 336.61 194.2 19.05 MURO.N° 11 ; TRAMO.21+380-21+550
ZAPATA DE
C-ML - 76 0:24 12-Aug 9-Sep 28 19.0 15.0 30 5301 12830 2.420 457.17 263.8 25.87 FUNDACION
C-ML - 76 0:24 12-Aug 9-Sep 28 19.0 15.0 30 5301 12790 2.413 564.54 325.8 31.95
C-ML - 76 0:24 12-Aug 9-Sep 28 19.0 15.0 30 5301 12900 2.433 425.52 245.5 24.08 MURO DEFENSIVO
HORMIGON TIPO ¨HB-4¨
C-ML - 76 0:46 12-Aug 9-Sep 28 18.5 15.0 30 5301 12740 2.403 617.45 356.3 34.94
C-ML - 76 0:46 12-Aug 9-Sep 28 18.5 15.0 30 5301 12730 2.401 546.29 315.2 30.91
C-ML - 76 0:46 12-Aug 9-Sep 28 18.5 15.0 30 5301 12820 2.418 597.59 344.8 33.82
C-ML - 76 0:58 12-Aug 9-Sep 28 17.5 15.0 30 5301 12820 2.418 462.62 267.0 26.18
C-ML - 76 0:58 12-Aug 9-Sep 28 17.5 15.0 30 5301 12950 2.443 611.39 352.8 34.60
C-ML - 76 0:58 12-Aug 9-Sep 28 17.5 15.0 30 5301 12820 2.418 620.20 357.9 35.10
C-ML - 77 14:15 13-Aug 16-Aug 3 16.0 15.0 30 5301 12760 2.407 200.36 115.6 11.34
C-ML - 77 14:15 13-Aug 16-Aug 3 16.0 15.0 30 5301 12800 2.414 250.36 144.5 14.17
C-ML - 77 14:15 13-Aug 16-Aug 3 16.0 15.0 30 5301 12890 2.431 281.72 162.6 15.94
C-ML - 77 14:21 13-Aug 20-Aug 7 18.0 15.0 30 5301 12800 2.414 396.78 229.0 22.45
C-ML - 77 14:21 13-Aug 20-Aug 7 18.0 15.0 30 5301 12780 2.411 367.33 212.0 20.79
C-ML - 77 14:21 13-Aug 20-Aug 7 18.0 15.0 30 5301 12620 2.380 356.28 205.6 20.16 MURO.N° 11 ; TRAMO.21+380-21+550
ZAPATA DE
C-ML - 77 14:46 13-Aug 10-Sep 28 17.5 15.0 30 5301 12780 2.411 561.85 324.2 31.79 FUNDACION
C-ML - 77 14:46 13-Aug 10-Sep 28 17.5 15.0 30 5301 12740 2.403 493.35 284.7 27.92
C-ML - 77 14:46 13-Aug 10-Sep 28 17.5 15.0 30 5301 12950 2.443 521.11 300.7 29.49 MURO DEFENSIVO
HORMIGON TIPO ¨HB-4¨
C-ML - 77 14:58 13-Aug 10-Sep 28 16.5 15.0 30 5301 12800 2.414 556.96 321.4 31.52
C-ML - 77 14:58 13-Aug 10-Sep 28 16.5 15.0 30 5301 12810 2.416 574.46 331.5 32.51
C-ML - 77 14:58 13-Aug 10-Sep 28 16.5 15.0 30 5301 12810 2.416 495.70 286.0 28.05
C-ML - 77 15:16 13-Aug 10-Sep 28 17.0 15.0 30 5301 12710 2.397 529.61 305.6 29.97
C-ML - 77 15:16 13-Aug 10-Sep 28 17.0 15.0 30 5301 12800 2.414 559.98 323.1 31.69
C-ML - 77 15:16 13-Aug 10-Sep 28 17.0 15.0 30 5301 12690 2.394 593.93 342.7 33.61
C-ML - 78 21:05 13-Aug 16-Aug 3 17.0 15.0 30 5301 12620 2.380 233.99 135.0 13.24
C-ML - 78 21:05 13-Aug 16-Aug 3 17.0 15.0 30 5301 12670 2.390 248.20 143.2 14.05
C-ML - 78 21:05 13-Aug 16-Aug 3 17.0 15.0 30 5301 12620 2.380 271.97 156.9 15.39
C-ML - 78 21:15 13-Aug 20-Aug 7 17.5 15.0 30 5301 12630 2.382 426.78 246.3 24.15
C-ML - 78 21:15 13-Aug 20-Aug 7 17.5 15.0 30 5301 12650 2.386 423.08 244.1 23.94
C-ML - 78 21:15 13-Aug 20-Aug 7 17.5 15.0 30 5301 12730 2.401 409.33 236.2 23.16 MURO.N° 11 ; TRAMO.21+380-21+550
ZAPATA DE
C-ML - 78 21:21 13-Aug 10-Sep 28 18.0 15.0 30 5301 12510 2.360 617.99 356.6 34.97 FUNDACION
C-ML - 78 21:21 13-Aug 10-Sep 28 18.0 15.0 30 5301 12700 2.396 608.30 351.0 34.42
C-ML - 78 21:21 13-Aug 10-Sep 28 18.0 15.0 30 5301 12630 2.382 598.26 345.2 33.85 MURO DEFENSIVO
HORMIGON TIPO ¨HB-4¨
C-ML - 78 21:31 13-Aug 10-Sep 28 18.5 15.0 30 5301 12780 2.411 593.90 342.7 33.61
C-ML - 78 21:31 13-Aug 10-Sep 28 18.5 15.0 30 5301 12870 2.428 620.31 357.9 35.10
C-ML - 78 21:31 13-Aug 10-Sep 28 18.5 15.0 30 5301 12740 2.403 646.84 373.3 36.60
C-ML - 78 21:48 13-Aug 10-Sep 28 17.5 15.0 30 5301 12650 2.386 607.48 350.5 34.38
C-ML - 78 21:48 13-Aug 10-Sep 28 17.5 15.0 30 5301 12750 2.405 606.95 350.2 34.35
C-ML - 78 21:48 13-Aug 10-Sep 28 17.5 15.0 30 5301 12620 2.380 642.69 370.9 36.37
C-ML - 79 20:30 13-Aug 16-Aug 3 19.0 15.0 30 5301 12890 2.431 239.13 138.0 13.53
C-ML - 79 20:30 13-Aug 16-Aug 3 19.0 15.0 30 5301 12700 2.396 213.68 123.3 12.09
C-ML - 79 20:30 13-Aug 16-Aug 3 19.0 15.0 30 5301 12810 2.416 250.36 144.5 14.17
C-ML - 79 22:45 13-Aug 20-Aug 7 18.0 15.0 30 5301 12640 2.384 390.88 225.6 22.12
C-ML - 79 22:45 13-Aug 20-Aug 7 18.0 15.0 30 5301 12700 2.396 422.93 244.0 23.93
C-ML - 79 22:45 13-Aug 20-Aug 7 18.0 15.0 30 5301 12740 2.403 408.37 235.6 23.11 MURO.N° 11 ; TRAMO.21+380-21+550
ZAPATA DE
C-ML - 79 22:58 13-Aug 10-Sep 28 19.5 15.0 30 5301 12770 2.409 609.59 351.8 34.50 FUNDACION
C-ML - 79 22:58 13-Aug 10-Sep 28 19.5 15.0 30 5301 12680 2.392 667.54 385.2 37.78
C-ML - 79 22:58 13-Aug 10-Sep 28 19.5 15.0 30 5301 12540 2.365 643.34 371.2 36.41 MURO DEFENSIVO
HORMIGON TIPO ¨HB-4¨
C-ML - 79 23:16 13-Aug 10-Sep 28 18.5 15.0 30 5301 12810 2.416 657.95 379.7 37.23
C-ML - 79 23:16 13-Aug 10-Sep 28 18.5 15.0 30 5301 12740 2.403 607.64 350.6 34.39
C-ML - 79 23:16 13-Aug 10-Sep 28 18.5 15.0 30 5301 12980 2.448 586.22 338.3 33.17
C-ML - 79 23:37 13-Aug 10-Sep 28 19.0 15.0 30 5301 12860 2.426 631.34 364.3 35.73
C-ML - 79 23:37 13-Aug 10-Sep 28 19.0 15.0 30 5301 12850 2.424 616.18 355.6 34.87
C-ML - 79 23:37 13-Aug 10-Sep 28 19.0 15.0 30 5301 12670 2.390 626.41 361.5 35.45
C-ML - 80 5:15 14-Aug 17-Aug 3 16.0 15.0 30 5301 12830 2.420 273.93 158.1 15.50
C-ML - 80 5:15 14-Aug 17-Aug 3 16.0 15.0 30 5301 12810 2.416 259.94 150.0 14.71
C-ML - 80 5:15 14-Aug 17-Aug 3 16.0 15.0 30 5301 12740 2.403 296.11 170.9 16.76
C-ML - 80 5:36 14-Aug 21-Aug 7 18.0 15.0 30 5301 12600 2.377 429.61 247.9 24.31
C-ML - 80 5:36 14-Aug 21-Aug 7 18.0 15.0 30 5301 12780 2.411 420.85 242.8 23.82
C-ML - 80 5:36 14-Aug 21-Aug 7 18.0 15.0 30 5301 12860 2.426 487.55 281.3 27.59 MURO.N° 11 ; TRAMO.21+380-21+550
ZAPATA DE
C-ML - 80 5:49 14-Aug 11-Sep 28 17.5 15.0 30 5301 12590 2.375 538.78 310.9 30.49 FUNDACION
C-ML - 80 5:49 14-Aug 11-Sep 28 17.5 15.0 30 5301 12530 2.364 525.30 303.1 29.73
C-ML - 80 5:49 14-Aug 11-Sep 28 17.5 15.0 30 5301 12800 2.414 672.38 388.0 38.05 MURO DEFENSIVO
HORMIGON TIPO ¨HB-4¨
C-ML - 80 6:01 14-Aug 11-Sep 28 16.5 15.0 30 5301 12940 2.441 628.28 362.5 35.55
C-ML - 80 6:01 14-Aug 11-Sep 28 16.5 15.0 30 5301 12690 2.394 612.93 353.7 34.68
C-ML - 80 6:01 14-Aug 11-Sep 28 16.5 15.0 30 5301 12720 2.399 573.50 330.9 32.45
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR " MURO.N° 11 ; TRAMO.21+380-21+550
CARRETERA COCHABAMBA - SANTA CRUZ ZAPATA DE
LABORATORIO DE SUELOS Y MATERIALES FUNDACION

RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22 MURO DEFENSIVO


HC-14 - "HB-4" TIPO DE HORMIGON "H-21" Kg/cm2 HORMIGON TIPO ¨HB-4¨

HORA FECHA EDAD REV DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA
REGISTRO CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa)
C-ML - 80 6:30 14-Aug 11-Sep 28 17.0 15.0 30 5301 12750 2.405 561.56 324.0 31.78
C-ML - 80 6:30 14-Aug 11-Sep 28 17.0 15.0 30 5301 12890 2.431 611.44 352.8 34.60
C-ML - 80 6:30 14-Aug 11-Sep 28 17.0 15.0 30 5301 12500 2.358 613.28 353.9 34.70
C-ML - 081 11:20 16-Aug 23-Aug 7 18.5 15.0 30 5301 12560 2.369 359.82 207.6 20.36 MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 081 11:20 16-Aug 23-Aug 7 18.5 15.0 30 5301 12680 2.392 370.45 213.8 20.96 (0+000-0+010)
C-ML - 081 11:20 16-Aug 23-Aug 7 18.5 15.0 30 5301 12630 2.382 390.57 225.4 22.10 1 FASE PANTALLA DE
C-ML - 081 11:40 16-Aug 13-Sep 28 20.0 15.0 30 5301 12710 2.397 547.78 316.1 31.00 MURO DEFENSIVO
C-ML - 081 11:40 16-Aug 13-Sep 28 20.0 15.0 30 5301 12730 2.401 539.83 311.5 30.55 HORMIGON TIPO ¨HB-4¨
C-ML - 081 11:40 16-Aug 13-Sep 28 20.0 15.0 30 5301 12540 2.365 537.64 310.2 30.42
C-ML - 082 12:20 16-Aug 23-Aug 7 20.0 15.0 30 5301 12770 2.409 454.06 262.0 25.69 MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 082 12:20 16-Aug 23-Aug 7 20.0 15.0 30 5301 12710 2.397 354.02 204.3 20.03 (0+020-0+030)
C-ML - 082 12:20 16-Aug 23-Aug 7 20.0 15.0 30 5301 12690 2.394 420.35 242.6 23.79 1 FASE PANTALLA DE
C-ML - 082 12:50 16-Aug 13-Sep 28 19.0 15.0 30 5301 12690 2.394 568.92 328.3 32.19 MURO DEFENSIVO
C-ML - 082 12:50 16-Aug 13-Sep 28 19.0 15.0 30 5301 12740 2.403 497.61 287.1 28.16 HORMIGON TIPO ¨HB-4¨
C-ML - 082 12:50 16-Aug 13-Sep 28 19.0 15.0 30 5301 12720 2.399 584.64 337.4 33.08
C-ML - 083 14:55 16-Aug 23-Aug 7 19.0 15.0 30 5301 12630 2.382 380.78 219.7 21.55 MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 083 14:55 16-Aug 23-Aug 7 19.0 15.0 30 5301 12650 2.386 393.67 227.2 22.28 (0+042-0+050)
C-ML - 083 14:55 16-Aug 23-Aug 7 19.0 15.0 30 5301 12780 2.411 363.51 209.8 20.57 1 FASE PANTALLA DE
C-ML - 083 15:30 16-Aug 13-Sep 28 18.0 15.0 30 5301 12790 2.413 543.02 313.3 30.73 MURO DEFENSIVO
C-ML - 083 15:30 16-Aug 13-Sep 28 18.0 15.0 30 5301 12630 2.382 532.30 307.2 30.12 HORMIGON TIPO ¨HB-4¨
C-ML - 083 15:30 16-Aug 13-Sep 28 18.0 15.0 30 5301 12830 2.420 588.59 339.6 33.31
C-ML - 084 18:30 16-Aug 23-Aug 7 20.0 15.0 30 5301 12840 2.422 482.69 278.5 27.31 MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 084 18:30 16-Aug 23-Aug 7 20.0 15.0 30 5301 12750 2.405 388.55 224.2 21.99 (0+060-0+070)
C-ML - 084 18:30 16-Aug 23-Aug 7 20.0 15.0 30 5301 12830 2.420 390.58 225.4 22.10 1 FASE PANTALLA DE
C-ML - 084 18:49 16-Aug 13-Sep 28 19.5 15.0 30 5301 12690 2.394 616.08 355.5 34.86 MURO DEFENSIVO
C-ML - 084 18:49 16-Aug 13-Sep 28 19.5 15.0 30 5301 12710 2.397 563.99 325.4 31.92 HORMIGON TIPO ¨HB-4¨
C-ML - 084 18:49 16-Aug 13-Sep 28 19.5 15.0 30 5301 12570 2.371 530.86 306.3 30.04
C-ML - 085 8:10 18-Aug 21-Aug 3 16.5 15.0 30 5301 12710 2.397 312.88 180.5 17.71
C-ML - 085 8:10 18-Aug 21-Aug 3 16.5 15.0 30 5301 12760 2.407 313.29 180.8 17.73
C-ML - 085 8:10 18-Aug 21-Aug 3 16.5 15.0 30 5301 12700 2.396 322.19 185.9 18.23
C-ML - 085 8:20 18-Aug 25-Aug 7 17.0 15.0 30 5301 12750 2.405 452.80 261.3 25.62 MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 085 8:20 18-Aug 25-Aug 7 17.0 15.0 30 5301 12870 2.428 420.44 242.6 23.79 (0+000-0+010)
C-ML - 085 8:20 18-Aug 25-Aug 7 17.0 15.0 30 5301 12780 2.411 449.73 259.5 25.45 2 FASE PANTALLA DE
C-ML - 085 8:30 18-Aug 15-Sep 28 18.0 15.0 30 5301 12810 2.416 592.05 341.6 33.50 MURO DEFENSIVO
C-ML - 085 8:30 18-Aug 15-Sep 28 18.0 15.0 30 5301 12920 2.437 572.89 330.6 32.42 HORMIGON TIPO ¨HB-4¨
C-ML - 085 8:30 18-Aug 15-Sep 28 18.0 15.0 30 5301 12940 2.441 595.47 343.6 33.70
C-ML - 085 8:45 18-Aug 15-Sep 28 19.0 15.0 30 5301 12820 2.418 572.96 330.6 32.42
C-ML - 085 8:45 18-Aug 15-Sep 28 19.0 15.0 30 5301 12770 2.409 592.15 341.7 33.51
C-ML - 085 8:45 18-Aug 15-Sep 28 19.0 15.0 30 5301 12780 2.411 575.35 332.0 32.56
C-ML - 086 10:30 18-Aug 21-Aug 3 16.5 15.0 30 5301 12770 2.409 297.69 171.8 16.85
C-ML - 086 10:30 18-Aug 21-Aug 3 16.5 15.0 30 5301 12840 2.422 313.50 180.9 17.74
C-ML - 086 10:30 18-Aug 21-Aug 3 16.5 15.0 30 5301 12710 2.397 282.30 162.9 15.97
C-ML - 086 11:06 18-Aug 25-Aug 7 17.0 15.0 30 5301 12900 2.433 437.75 252.6 24.77 MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 086 11:06 18-Aug 25-Aug 7 17.0 15.0 30 5301 12800 2.414 420.89 242.9 23.82 (0+020-0+030)
C-ML - 086 11:06 18-Aug 25-Aug 7 17.0 15.0 30 5301 12840 2.422 408.85 235.9 23.14 2 FASE PANTALLA DE
C-ML - 086 11:30 18-Aug 15-Sep 28 18.0 15.0 30 5301 12840 2.422 569.61 328.7 32.23 MURO DEFENSIVO
C-ML - 086 11:30 18-Aug 15-Sep 28 18.0 15.0 30 5301 12760 2.407 589.61 340.2 33.37 HORMIGON TIPO ¨HB-4¨
C-ML - 086 11:30 18-Aug 15-Sep 28 18.0 15.0 30 5301 12720 2.399 490.03 282.8 27.73
C-ML - 086 11:50 18-Aug 15-Sep 28 19.0 15.0 30 5301 12720 2.399 559.04 322.6 31.64
C-ML - 086 11:50 18-Aug 15-Sep 28 19.0 15.0 30 5301 12900 2.433 578.39 333.8 32.73
C-ML - 086 11:50 18-Aug 15-Sep 28 19.0 15.0 30 5301 12940 2.441 559.20 322.7 31.64
C-ML - 087 14:45 18-Aug 21-Aug 3 19.0 15.0 30 5301 12810 2.416 321.07 185.3 18.17
C-ML - 087 14:45 18-Aug 21-Aug 3 19.0 15.0 30 5301 12880 2.430 325.26 187.7 18.41
C-ML - 087 14:45 18-Aug 21-Aug 3 19.0 15.0 30 5301 12880 2.430 267.76 154.5 15.15 MURO.N° 11 ; TRAMO.21+386-21+550
(0+042-0+050)
C-ML - 087 15:01 18-Aug 25-Aug 7 18.5 15.0 30 5301 12750 2.405 400.12 230.9 22.64 2 FASE PANTALLA DE
C-ML - 087 15:01 18-Aug 25-Aug 7 18.5 15.0 30 5301 12880 2.430 393.80 227.2 22.28
C-ML - 087 15:01 18-Aug 25-Aug 7 18.5 15.0 30 5301 12730 2.401 409.74 236.4 23.19 MURO DEFENSIVO
HORMIGON TIPO ¨HB-4¨
C-ML - 087 15:20 18-Aug 15-Sep 28 17.0 15.0 30 5301 12930 2.439 552.92 319.1 31.29
C-ML - 087 15:20 18-Aug 15-Sep 28 17.0 15.0 30 5301 12740 2.403 526.31 303.7 29.78
C-ML - 087 15:20 18-Aug 15-Sep 28 17.0 15.0 30 5301 12910 2.435 554.27 319.8 31.37
C-ML - 088 15:20 18-Aug 21-Aug 3 16.5 15.0 30 5301 12680 2.392 278.89 160.9 15.78
C-ML - 088 15:20 18-Aug 21-Aug 3 16.5 15.0 30 5301 12760 2.407 286.90 165.6 16.24
C-ML - 088 15:20 18-Aug 21-Aug 3 16.5 15.0 30 5301 12690 2.394 246.04 142.0 13.92
C-ML - 088 15:50 18-Aug 25-Aug 7 17.0 15.0 30 5301 12800 2.414 429.92 248.1 24.33 MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 088 15:50 18-Aug 25-Aug 7 17.0 15.0 30 5301 12750 2.405 408.12 235.5 23.09 (0+060-0+070)
C-ML - 088 15:50 18-Aug 25-Aug 7 17.0 15.0 30 5301 12770 2.409 426.94 246.4 24.16 2 FASE PANTALLA DE
C-ML - 088 16:10 18-Aug 15-Sep 28 18.0 15.0 30 5301 12740 2.403 561.01 323.7 31.75 MURO DEFENSIVO
C-ML - 088 16:10 18-Aug 15-Sep 28 18.0 15.0 30 5301 12820 2.418 440.48 254.2 24.93 HORMIGON TIPO ¨HB-4¨
C-ML - 088 16:10 18-Aug 15-Sep 28 18.0 15.0 30 5301 12750 2.405 568.21 327.9 32.15
C-ML - 088 16:30 18-Aug 15-Sep 28 17.5 15.0 30 5301 12810 2.416 564.85 325.9 31.96
C-ML - 088 16:30 18-Aug 15-Sep 28 17.5 15.0 30 5301 12850 2.424 562.18 324.4 31.81
C-ML - 088 16:30 18-Aug 15-Sep 28 17.5 15.0 30 5301 12720 2.399 572.52 330.4 32.40
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
HC-14 - "HB-4" TIPO DE HORMIGON "H-21" Kg/cm2

HORA FECHA EDAD REV DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA
REGISTRO CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa)
C-ML - 089 20:21 18-Aug 21-Aug 3 19.0 15.0 30 5301 12700 2.396 228.49 131.8 12.93
C-ML - 089 20:21 18-Aug 21-Aug 3 19.0 15.0 30 5301 12460 2.350 231.27 133.5 13.09
C-ML - 089 20:21 18-Aug 21-Aug 3 19.0 15.0 30 5301 12510 2.360 227.85 131.5 12.89
C-ML - 089 20:45 18-Aug 25-Aug 7 18.0 15.0 30 5301 12690 2.394 358.46 206.8 20.28 MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 089 20:45 18-Aug 25-Aug 7 18.0 15.0 30 5301 12790 2.413 351.52 202.8 19.89 (0+090-0+100)
C-ML - 089 20:45 18-Aug 25-Aug 7 18.0 15.0 30 5301 12810 2.416 356.14 205.5 20.15 1 FASE PANTALLA DE
C-ML - 089 21:01 18-Aug 15-Sep 28 18.0 15.0 30 5301 12730 2.401 477.06 275.3 27.00 MURO DEFENSIVO
C-ML - 089 21:01 18-Aug 15-Sep 28 18.0 15.0 30 5301 12580 2.373 414.62 239.3 23.46 HORMIGON TIPO ¨HB-4¨
C-ML - 089 21:01 18-Aug 15-Sep 28 18.0 15.0 30 5301 12540 2.365 437.47 252.4 24.76
C-ML - 089 21:25 18-Aug 15-Sep 28 19.0 15.0 30 5301 12810 2.416 436.30 251.8 24.69
C-ML - 089 21:25 18-Aug 15-Sep 28 19.0 15.0 30 5301 12750 2.405 464.58 268.1 26.29
C-ML - 089 21:25 18-Aug 15-Sep 28 19.0 15.0 30 5301 12540 2.365 434.38 250.7 24.58
C-ML - 090 14:23 21-Aug 28-Aug 7 16.5 15.0 30 5301 12720 2.399 328.45 189.5 18.59 MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 090 14:23 21-Aug 28-Aug 7 16.5 15.0 30 5301 12700 2.396 350.14 202.0 19.81 (0+010-0+020)
C-ML - 090 14:23 21-Aug 28-Aug 7 16.5 15.0 30 5301 12690 2.394 376.25 217.1 21.29 PANTALLA DE
C-ML - 090 14:40 21-Aug 18-Sep 28 16.0 15.0 30 5301 12760 2.407 522.15 301.3 29.55 MURO DEFENSIVO
C-ML - 090 14:40 21-Aug 18-Sep 28 16.0 15.0 30 5301 12780 2.411 425.02 245.3 24.05 HORMIGON TIPO ¨HB-4¨
C-ML - 090 14:40 21-Aug 18-Sep 28 16.0 15.0 30 5301 12870 2.428 545.22 314.6 30.85
C-ML - 091 15:20 21-Aug 28-Aug 7 17.0 15.0 30 5301 12680 2.392 381.24 220.0 21.57 MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 091 15:20 21-Aug 28-Aug 7 17.0 15.0 30 5301 12650 2.386 321.88 185.7 18.21 (0+030-0+042)
C-ML - 091 15:20 21-Aug 28-Aug 7 17.0 15.0 30 5301 12710 2.397 336.88 194.4 19.06 PANTALLA DE
C-ML - 091 16:03 21-Aug 18-Sep 28 16.0 15.0 30 5301 12790 2.413 489.99 282.7 27.73 MURO DEFENSIVO
C-ML - 091 16:03 21-Aug 18-Sep 28 16.0 15.0 30 5301 12740 2.403 420.32 242.5 23.79 HORMIGON TIPO ¨HB-4¨
C-ML - 091 16:03 21-Aug 18-Sep 28 16.0 15.0 30 5301 12800 2.414 470.43 271.5 26.62
C-ML - 092 16:40 21-Aug 28-Aug 7 20.0 15.0 30 5301 12660 2.388 310.18 179.0 17.55 MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 092 16:40 21-Aug 28-Aug 7 20.0 15.0 30 5301 12680 2.392 337.93 195.0 19.12 (0+050-0+060)
C-ML - 092 16:40 21-Aug 28-Aug 7 20.0 15.0 30 5301 12700 2.396 317.32 183.1 17.96 PANTALLA DE
C-ML - 092 17:20 21-Aug 18-Sep 28 19.0 15.0 30 5301 12800 2.414 545.65 314.9 30.88 MURO DEFENSIVO
C-ML - 092 17:20 21-Aug 18-Sep 28 19.0 15.0 30 5301 12670 2.390 478.22 276.0 27.06 HORMIGON TIPO ¨HB-4¨
C-ML - 092 17:20 21-Aug 18-Sep 28 19.0 15.0 30 5301 12860 2.426 485.06 279.9 27.45
C-ML - 093 20:40 21-Aug 28-Aug 7 17.0 15.0 30 5301 12740 2.403 322.89 186.3 18.27 MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 093 20:40 21-Aug 28-Aug 7 17.0 15.0 30 5301 12710 2.397 356.98 206.0 20.20 (0+100-0+110)
C-ML - 093 20:40 21-Aug 28-Aug 7 17.0 15.0 30 5301 12730 2.401 312.52 180.3 17.69 PANTALLA DE
C-ML - 093 20:57 21-Aug 18-Sep 28 18.5 15.0 30 5301 12590 2.375 548.32 316.4 31.03 MURO DEFENSIVO
C-ML - 093 20:57 21-Aug 18-Sep 28 18.5 15.0 30 5301 12830 2.420 462.56 266.9 26.18 HORMIGON TIPO ¨HB-4¨
C-ML - 093 20:57 21-Aug 18-Sep 28 18.5 15.0 30 5301 12690 2.394 477.76 275.7 27.04
C-ML - 094 0:10 22-Aug 29-Aug 7 18.0 15.0 30 5301 12630 2.382 335.60 193.7 18.99 MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 094 0:10 22-Aug 29-Aug 7 18.0 15.0 30 5301 12650 2.386 321.88 185.7 18.21
C-ML - 094 0:10 22-Aug 29-Aug 7 18.0 15.0 30 5301 12580 2.373 371.61 214.4 21.03 PANTALLA DE
C-ML - 094 0:45 22-Aug 19-Sep 28 17.5 15.0 30 5301 12580 2.373 448.30 258.7 25.37 MURO DEFENSIVO
C-ML - 094 0:45 22-Aug 19-Sep 28 17.5 15.0 30 5301 12770 2.409 485.70 280.3 27.48 HORMIGON TIPO ¨HB-4¨
C-ML - 094 0:45 22-Aug 19-Sep 28 17.5 15.0 30 5301 12700 2.396 379.43 218.9 21.47
C-ML - 095 11:05 23-Aug 30-Aug 7 17.0 15.0 30 5301 12680 2.392 506.62 292.3 28.67 MURO.N° 11 ; TRAMO.21+386-21+550
(0+010-
C-ML - 095 11:05 23-Aug 30-Aug 7 17.0 15.0 30 5301 12710 2.397 445.70 257.2 25.22
0+020) PANTALLA
C-ML - 095 11:05 23-Aug 30-Aug 7 17.0 15.0 30 5301 12620 2.380 394.60 227.7 22.33 DE
C-ML - 095 11:16 23-Aug 20-Sep 28 18.5 15.0 30 5301 12840 2.422 523.49 302.1 29.62
MURO DEFENSIVO
C-ML - 095 11:16 23-Aug 20-Sep 28 18.5 15.0 30 5301 12680 2.392 534.96 308.7 30.27
HORMIGON TIPO ¨HB-4¨
C-ML - 095 11:16 23-Aug 20-Sep 28 18.5 15.0 30 5301 12670 2.390 543.14 313.4 30.74
C-ML - 096 12:18 23-Aug 30-Aug 7 16.5 15.0 30 5301 12600 2.377 377.36 217.8 21.35 MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 096 12:18 23-Aug 30-Aug 7 16.5 15.0 30 5301 12510 2.360 393.86 227.3 22.29
C-ML - 096 12:18 23-Aug 30-Aug 7 16.5 15.0 30 5301 12550 2.367 383.44 221.3 21.70 PANTALLA DE
C-ML - 096 14:25 23-Aug 20-Sep 28 18.0 15.0 30 5301 12790 2.413 533.08 307.6 30.17 MURO
C-ML - 096 14:25 23-Aug 20-Sep 28 18.0 15.0 30 5301 12640 2.384 553.80 319.6 31.34 DEFENSIVO HORMIGON
C-ML - 096 14:25 23-Aug 20-Sep 28 18.0 15.0 30 5301 12790 2.413 542.62 313.1 30.71 TIPO ¨HB-4¨
C-ML - 097 16:00 23-Aug 30-Aug 7 17.0 15.0 30 5301 12650 2.386 410.88 237.1 23.25 MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 097 16:00 23-Aug 30-Aug 7 17.0 15.0 30 5301 12750 2.405 417.24 240.8 23.61
C-ML - 097 16:00 23-Aug 30-Aug 7 17.0 15.0 30 5301 12550 2.367 352.62 203.5 19.95 PANTALLA DE
C-ML - 097 16:30 23-Aug 20-Sep 28 17.5 15.0 30 5301 12750 2.405 508.96 293.7 28.80 MURO
C-ML - 097 16:30 23-Aug 20-Sep 28 17.5 15.0 30 5301 12660 2.388 519.69 299.9 29.41 DEFENSIVO HORMIGON
C-ML - 097 16:30 23-Aug 20-Sep 28 17.5 15.0 30 5301 12690 2.394 509.44 294.0 28.83 TIPO ¨HB-4¨
C-ML - 098 20:35 23-Aug 30-Aug 7 17.5 15.0 30 5301 12660 2.388 373.75 215.7 21.15 MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 098 20:35 23-Aug 30-Aug 7 17.5 15.0 30 5301 12620 2.380 382.10 220.5 21.62
C-ML - 098 20:35 23-Aug 30-Aug 7 17.5 15.0 30 5301 12640 2.384 386.91 223.3 21.89 PANTALLA DE
C-ML - 098 20:50 23-Aug 20-Sep 28 18.0 15.0 30 5301 12810 2.416 478.88 276.3 27.10 MURO
C-ML - 098 20:50 23-Aug 20-Sep 28 18.0 15.0 30 5301 12610 2.379 483.41 278.9 27.36 DEFENSIVO HORMIGON
C-ML - 098 20:50 23-Aug 20-Sep 28 18.0 15.0 30 5301 12560 2.369 476.83 275.2 26.98 TIPO ¨HB-4¨
C-ML - 099 22:50 23-Aug 30-Aug 7 19.0 15.0 30 5301 12700 2.396 386.18 222.8 21.85 MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 099 22:50 23-Aug 30-Aug 7 19.0 15.0 30 5301 12650 2.386 385.90 222.7 21.84
C-ML - 099 22:50 23-Aug 30-Aug 7 19.0 15.0 30 5301 12490 2.356 411.93 237.7 23.31 PANTALLA DE
C-ML - 099 23:30 23-Aug 20-Sep 28 18.0 15.0 30 5301 12610 2.379 496.29 286.4 28.08 MURO
C-ML - 099 23:30 23-Aug 20-Sep 28 18.0 15.0 30 5301 12850 2.424 493.17 284.6 27.91 DEFENSIVO HORMIGON
C-ML - 099 23:30 23-Aug 20-Sep 28 18.0 15.0 30 5301 12630 2.382 501.48 289.4 28.38 TIPO ¨HB-4¨
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
HC-14 - "HB-4" TIPO DE HORMIGON "H-21" Kg/cm2

HORA FECHA EDAD REV DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA
REGISTRO CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa)
C-ML - 100 8:35 27-Aug 3-Sep 7 18.0 15.0 30 5301 12750 2.405 319.93 184.6 18.10 MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 100 8:35 27-Aug 3-Sep 7 18.0 15.0 30 5301 12900 2.433 325.14 187.6 18.40
(0+070-0+080)
C-ML - 100 8:35 27-Aug 3-Sep 7 18.0 15.0 30 5301 12760 2.407 347.16 200.3 19.65 PANTALLA DE
C-ML - 100 9:01 27-Aug 24-Sep 28 19.5 15.0 30 5301 12650 2.386 491.56 283.7 27.82
MURO DEFENSIVO
C-ML - 100 9:01 27-Aug 24-Sep 28 19.5 15.0 30 5301 12710 2.397 462.61 266.9 26.18
HORMIGON TIPO ¨HB-4¨
C-ML - 100 9:01 27-Aug 24-Sep 28 19.5 15.0 30 5301 12720 2.399 499.59 288.3 28.27
C-ML - 101 10:20 27-Aug 3-Sep 7 20.0 15.0 30 5301 12790 2.413 380.12 219.3 21.51 MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 101 10:20 27-Aug 3-Sep 7 20.0 15.0 30 5301 12820 2.418 360.58 208.1 20.40
(0+090-0+100)
C-ML - 101 10:20 27-Aug 3-Sep 7 20.0 15.0 30 5301 12750 2.405 441.12 254.5 24.96 PANTALLA DE
C-ML - 101 10:59 27-Aug 24-Sep 28 17.5 15.0 30 5301 12760 2.407 510.28 294.5 28.88
MURO DEFENSIVO
C-ML - 101 10:59 27-Aug 24-Sep 28 17.5 15.0 30 5301 12720 2.399 569.18 328.4 32.21
HORMIGON TIPO ¨HB-4¨
C-ML - 101 10:59 27-Aug 24-Sep 28 17.5 15.0 30 5301 12730 2.401 592.76 342.0 33.54
C-ML - 102 14:30 27-Aug 3-Sep 7 20.0 15.0 30 5301 12770 2.409 320.45 184.9 18.13 MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 102 14:30 27-Aug 3-Sep 7 20.0 15.0 30 5301 12690 2.394 390.11 225.1 22.08
(0+120-0+130)
C-ML - 102 14:30 27-Aug 3-Sep 7 20.0 15.0 30 5301 12610 2.379 397.74 229.5 22.51 PANTALLA DE
C-ML - 102 15:10 27-Aug 24-Sep 28 17.0 15.0 30 5301 12760 2.407 448.73 258.9 25.39
MURO DEFENSIVO
C-ML - 102 15:10 27-Aug 24-Sep 28 17.0 15.0 30 5301 12730 2.401 507.54 292.9 28.72
HORMIGON TIPO ¨HB-4¨
C-ML - 102 15:10 27-Aug 24-Sep 28 17.0 15.0 30 5301 12780 2.411 429.02 247.6 24.28
C-ML - 103 15:40 27-Aug 3-Sep 7 18.0 15.0 30 5301 12790 2.413 412.57 238.1 23.35 MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 103 15:40 27-Aug 3-Sep 7 18.0 15.0 30 5301 12780 2.411 411.25 237.3 23.27
C-ML - 103 15:40 27-Aug 3-Sep 7 18.0 15.0 30 5301 12850 2.424 407.15 234.9 23.04 PANTALLA DE
C-ML - 103 16:30 27-Aug 24-Sep 28 19.5 15.0 30 5301 12820 2.418 555.31 320.4 31.42
MURO DEFENSIVO
C-ML - 103 16:30 27-Aug 24-Sep 28 19.5 15.0 30 5301 12860 2.426 555.08 320.3 31.41
HORMIGON TIPO ¨HB-4¨
C-ML - 103 16:30 27-Aug 24-Sep 28 19.5 15.0 30 5301 12710 2.397 516.86 298.2 29.25
MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 104 16:10 28-Aug 4-Sep 7 17.5 15.0 30 5301 12800 2.414 532.87 307.5 30.15
C-ML - 104 16:10 28-Aug 4-Sep 7 17.5 15.0 30 5301 12710 2.397 510.04 294.3 28.86
C-ML - 104 16:10 28-Aug 4-Sep 7 17.5 15.0 30 5301 12670 2.390 508.74 293.6 28.79 (0+120-0+130)
PANTALLA DE
C-ML - 104 16:51 28-Aug 25-Sep 28 18.0 15.0 30 5301 12700 2.396 508.76 293.6 28.79
C-ML - 104 16:51 28-Aug 25-Sep 28 18.0 15.0 30 5301 12690 2.394 479.80 276.9 27.15 MURO DEFENSIVO
C-ML - 104 16:51 28-Aug 25-Sep 28 18.0 15.0 30 5301 12750 2.405 528.61 305.0 29.91 HORMIGON TIPO ¨HB-4¨
MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 105 19:50 28-Aug 25-Sep 28 20.0 15.0 30 5301 12610 2.379 528.99 305.2 29.93
C-ML - 105 19:50 28-Aug 25-Sep 28 20.0 15.0 30 5301 12690 2.394 494.91 285.6 28.01
C-ML - 105 19:50 28-Aug 25-Sep 28 20.0 15.0 30 5301 12630 2.382 456.24 263.3 25.82 (0+140-0+154)
PANTALLA DE
C-ML - 105 20:15 28-Aug 25-Sep 28 18.0 15.0 30 5301 12600 2.377 503.46 290.5 28.49
C-ML - 105 20:15 28-Aug 25-Sep 28 18.0 15.0 30 5301 12590 2.375 499.78 288.4 28.28 MURO DEFENSIVO
C-ML - 105 20:15 28-Aug 25-Sep 28 18.0 15.0 30 5301 12550 2.367 508.17 293.2 28.76 HORMIGON TIPO ¨HB-4¨
C-ML - 106 13:00 29-Aug 31-Aug 2 12.0 15.0 30 5301 12600 2.377 193.81 111.8 10.97
C-ML - 106 13:00 29-Aug 1-Sep 3 12.0 15.0 30 5301 12530 2.364 199.42 115.1 11.28
C-ML - 106 13:00 29-Aug 1-Sep 3 12.0 15.0 30 5301 12580 2.373 229.66 132.5 13.00 MURO.N° 8 ; TRAMO.17+770-18+070
CARPETA
C-ML - 106 13:20 29-Aug 5-Sep 7 12.0 15.0 30 5301 12630 2.382 239.77 138.4 13.57 DE NIVELACION DE
C-ML - 106 13:20 29-Aug 5-Sep 7 12.0 15.0 30 5301 12580 2.373 238.99 137.9 13.52
C-ML - 106 13:20 29-Aug 5-Sep 7 12.0 15.0 30 5301 12610 2.379 226.52 130.7 12.82 MURO DEFENSIVO
HORMIGON TIPO ¨HC-14¨
C-ML - 106 14:01 29-Aug 26-Sep 28 11.0 15.0 30 5301 12630 2.382 247.50 142.8 14.01
C-ML - 106 14:01 29-Aug 26-Sep 28 11.0 15.0 30 5301 12650 2.386 280.22 161.7 15.86
C-ML - 106 14:01 29-Aug 26-Sep 28 11.0 15.0 30 5301 12610 2.379 251.22 145.0 14.22
MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 107 17:30 29-Aug 5-Sep 7 16.0 15.0 30 5301 12580 2.373 394.35 227.6 22.32
C-ML - 107 17:30 29-Aug 5-Sep 7 16.0 15.0 30 5301 12740 2.403 414.77 239.3 23.47
C-ML - 107 17:30 29-Aug 5-Sep 7 16.0 15.0 30 5301 12850 2.424 424.63 245.0 24.03 (0+080-0+090)
PANTALLA DE
C-ML - 107 18:05 29-Aug 26-Sep 28 16.0 15.0 30 5301 12770 2.409 520.85 300.6 29.47
C-ML - 107 18:05 29-Aug 26-Sep 28 16.0 15.0 30 5301 12690 2.394 520.50 300.4 29.45 MURO DEFENSIVO
C-ML - 107 18:05 29-Aug 26-Sep 28 16.0 15.0 30 5301 12660 2.388 520.56 300.4 29.46 HORMIGON TIPO ¨HB-4¨
MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 108 20:50 29-Aug 5-Sep 7 20.0 15.0 30 5301 12740 2.403 497.98 287.4 28.18
C-ML - 108 20:50 29-Aug 5-Sep 7 20.0 15.0 30 5301 12770 2.409 389.24 224.6 22.03
C-ML - 108 20:50 29-Aug 5-Sep 7 20.0 15.0 30 5301 12700 2.396 401.00 231.4 22.69 (0+110-0+120)
PANTALLA DE
C-ML - 108 21:30 29-Aug 26-Sep 28 19.0 15.0 30 5301 12670 2.390 524.88 302.9 29.70
C-ML - 108 21:30 29-Aug 26-Sep 28 19.0 15.0 30 5301 12610 2.379 525.34 303.1 29.73 MURO DEFENSIVO
C-ML - 108 21:30 29-Aug 26-Sep 28 19.0 15.0 30 5301 12630 2.382 539.74 311.5 30.54 HORMIGON TIPO ¨HB-4¨
MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 109 3:00 30-Aug 6-Sep 7 18.0 15.0 30 5301 12520 2.362 414.91 239.4 23.48
C-ML - 109 3:00 30-Aug 6-Sep 7 18.0 15.0 30 5301 12650 2.386 408.69 235.8 23.13
C-ML - 109 3:00 30-Aug 6-Sep 7 18.0 15.0 30 5301 12610 2.379 432.35 249.5 24.47 (0+130-0+140)
PANTALLA DE
C-ML - 109 3:20 30-Aug 27-Sep 28 19.0 15.0 30 5301 12670 2.390 447.86 258.4 25.34
C-ML - 109 3:20 30-Aug 27-Sep 28 19.0 15.0 30 5301 12660 2.388 410.24 236.7 23.21 MURO DEFENSIVO
C-ML - 109 3:20 30-Aug 27-Sep 28 19.0 15.0 30 5301 12650 2.386 419.50 242.1 23.74 HORMIGON TIPO ¨HB-4¨
C-ML - 110 20:40 30-Aug 6-Sep 7 19.0 15.0 30 5301 12670 2.390 445.99 257.4 25.24 MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 110 20:40 30-Aug 6-Sep 7 19.0 15.0 30 5301 12640 2.384 451.38 260.5 25.54
C-ML - 110 20:40 30-Aug 6-Sep 7 19.0 15.0 30 5301 12640 2.384 461.97 266.6 26.14 PANTALLA DE
C-ML - 110 20:58 30-Aug 27-Sep 28 18.5 15.0 30 5301 12680 2.392 516.55 298.1 29.23
MURO
C-ML - 110 20:58 30-Aug 27-Sep 28 18.5 15.0 30 5301 12660 2.388 411.07 237.2 23.26
DEFENSIVO HORMIGON
C-ML - 110 20:58 30-Aug 27-Sep 28 18.5 15.0 30 5301 12660 2.388 509.56 294.0 28.84 TIPO ¨HB-4¨
C-ML - 111 22:00 30-Aug 6-Sep 7 19.0 15.0 30 5301 12760 2.407 479.36 276.6 27.13 MURO.N° 11 ; TRAMO.21+386-21+550
C-ML - 111 22:00 30-Aug 6-Sep 7 19.0 15.0 30 5301 12820 2.418 451.74 260.7 25.56
C-ML - 111 22:00 30-Aug 6-Sep 7 19.0 15.0 30 5301 12750 2.405 466.36 269.1 26.39 PANTALLA DE
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
HC-14 - "HB-4" TIPO DE HORMIGON "H-21" Kg/cm2

HORA FECHA EDAD REV DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA
REGISTRO CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa)
C-ML - 111 22:50 30-Aug 27-Sep 28 18.0 15.0 30 5301 12720 2.399 540.86 312.1 30.61
MURO
C-ML - 111 22:50 30-Aug 27-Sep 28 18.0 15.0 30 5301 12640 2.384 494.51 285.4 27.98
DEFENSIVO HORMIGON
C-ML - 111 22:50 30-Aug 27-Sep 28 18.0 15.0 30 5301 12700 2.396 513.60 296.4 29.06 TIPO ¨HB-4¨
C-ML - 112 9:10 31-Aug 3-Sep 3 16.5 15.0 30 5301 12690 2.394 369.83 213.4 20.93
C-ML - 112 9:10 31-Aug 3-Sep 3 16.5 15.0 30 5301 12640 2.384 334.08 192.8 18.91
C-ML - 112 9:10 31-Aug 3-Sep 3 16.5 15.0 30 5301 12690 2.394 344.71 198.9 19.51
C-ML - 112 9:30 31-Aug 7-Sep 7 17.0 15.0 30 5301 12740 2.403 379.83 219.2 21.49 MURO.N° 8 ; TRAMO.17+770-18+070
C-ML - 112 9:30 31-Aug 7-Sep 7 17.0 15.0 30 5301 12750 2.405 399.08 230.3 22.58 (0+050-0+110)
C-ML - 112 9:30 31-Aug 7-Sep 7 17.0 15.0 30 5301 12750 2.405 444.71 256.6 25.17 ZAPATA DE
C-ML - 112 10:40 31-Aug 28-Sep 28 18.0 15.0 30 5301 12850 2.424 507.82 293.0 28.74 MURO DEFENSIVO
C-ML - 112 10:40 31-Aug 28-Sep 28 18.0 15.0 30 5301 12790 2.413 523.24 301.9 29.61 HORMIGON TIPO ¨HB-4¨
C-ML - 112 10:40 31-Aug 28-Sep 28 18.0 15.0 30 5301 12700 2.396 490.56 283.1 27.76
C-ML - 112 11:10 31-Aug 28-Sep 28 17.5 15.0 30 5301 12730 2.401 513.75 296.5 29.07
C-ML - 112 11:10 31-Aug 28-Sep 28 17.5 15.0 30 5301 12750 2.405 530.25 306.0 30.01
C-ML - 112 11:10 31-Aug 28-Sep 28 17.5 15.0 30 5301 12780 2.411 524.24 302.5 29.67
C-ML - 113 11:50 1-Sep 4-Sep 3 18.0 15.0 30 5301 12750 2.405 337.03 194.5 19.07
C-ML - 113 11:50 1-Sep 4-Sep 3 18.0 15.0 30 5301 12970 2.447 359.08 207.2 20.32
C-ML - 113 11:50 1-Sep 4-Sep 3 18.0 15.0 30 5301 12790 2.413 344.71 198.9 19.51
C-ML - 113 12:10 1-Sep 8-Sep 7 19.0 15.0 30 5301 12850 2.424 437.01 252.2 24.73 MURO.N° 8 ; TRAMO.17+770-18+070
C-ML - 113 12:10 1-Sep 8-Sep 7 19.0 15.0 30 5301 12820 2.418 399.18 230.3 22.59
C-ML - 113 12:10 1-Sep 8-Sep 7 19.0 15.0 30 5301 12820 2.418 444.71 256.6 25.17 DENTELLON DE ZAPATA
C-ML - 113 12:48 1-Sep 29-Sep 28 19.0 15.0 30 5301 12690 2.394 553.73 319.5 31.33 MURO DEFENSIVO
C-ML - 113 12:48 1-Sep 29-Sep 28 19.0 15.0 30 5301 12790 2.413 504.66 291.2 28.56 HORMIGON TIPO ¨HB-4¨
C-ML - 113 12:48 1-Sep 29-Sep 28 19.0 15.0 30 5301 12770 2.409 551.97 318.5 31.24
C-ML - 113 13:30 1-Sep 29-Sep 28 20.0 15.0 30 5301 12650 2.386 554.03 319.7 31.35
C-ML - 113 13:30 1-Sep 29-Sep 28 20.0 15.0 30 5301 12680 2.392 533.16 307.7 30.17
C-ML - 113 13:30 1-Sep 29-Sep 28 20.0 15.0 30 5301 12730 2.401 542.30 312.9 30.69
C-ML - 114 8:30 3-Sep 6-Sep 3 21.0 15.0 30 5301 12550 2.367 317.04 182.9 17.94
C-ML - 114 8:30 3-Sep 6-Sep 3 21.0 15.0 30 5301 12510 2.360 365.36 210.8 20.68
C-ML - 114 8:30 3-Sep 6-Sep 3 21.0 15.0 30 5301 12600 2.377 280.74 162.0 15.89
MURO.N° 8 ; TRAMO.17+770-18+070
C-ML - 114 8:48 3-Sep 10-Sep 7 18.0 15.0 30 5301 12560 2.369 428.30 247.1 24.24 (0+110-0+120)
C-ML - 114 8:48 3-Sep 10-Sep 7 18.0 15.0 30 5301 12510 2.360 388.38 224.1 21.98 (0+120-0+130) (0+130-0+140)
C-ML - 114 8:48 3-Sep 10-Sep 7 18.0 15.0 30 5301 12870 2.428 339.00 195.6 19.18 (0+140-0+150)
DENTELLON DE ZAPATA
C-ML - 114 9:05 3-Sep 1-Oct 28 16.5 15.0 30 5301 12680 2.392 460.58 265.8 26.06
C-ML - 114 9:05 3-Sep 1-Oct 28 16.5 15.0 30 5301 12750 2.405 441.40 254.7 24.98 MURO DEFENSIVO
C-ML - 114 9:05 3-Sep 1-Oct 28 16.5 15.0 30 5301 12850 2.424 411.27 237.3 23.27 HORMIGON TIPO ¨HB-4¨
C-ML - 114 9:20 3-Sep 1-Oct 28 17.0 15.0 30 5301 12640 2.384 434.62 250.8 24.59
C-ML - 114 9:20 3-Sep 1-Oct 28 17.0 15.0 30 5301 12640 2.384 449.69 259.5 25.45
C-ML - 114 9:20 3-Sep 1-Oct 28 17.0 15.0 30 5301 12630 2.382 441.50 254.8 24.98
C-ML - 115 15:40 3-Sep 6-Sep 3 20.0 15.0 30 5301 12460 2.350 346.95 200.2 19.63
C-ML - 115 15:40 3-Sep 6-Sep 3 20.0 15.0 30 5301 12740 2.403 383.12 221.1 21.68
C-ML - 115 15:40 3-Sep 6-Sep 3 20.0 15.0 30 5301 12650 2.386 342.12 197.4 19.36
MURO.N° 8 ; TRAMO.17+770-18+070
C-ML - 115 16:20 3-Sep 10-Sep 7 19.0 15.0 30 5301 12380 2.335 393.84 227.3 22.29 (0+170-0+180)
C-ML - 115 16:20 3-Sep 10-Sep 7 19.0 15.0 30 5301 12700 2.396 427.51 246.7 24.19 (0+180-0+190) (0+190-0+200)
C-ML - 115 16:20 3-Sep 10-Sep 7 19.0 15.0 30 5301 12660 2.388 338.89 195.6 19.18 (0+200-0+210)
DENTELLON DE ZAPATA
C-ML - 115 19:30 3-Sep 1-Oct 28 18.0 15.0 30 5301 12620 2.380 482.05 278.2 27.28
C-ML - 115 19:30 3-Sep 1-Oct 28 18.0 15.0 30 5301 12580 2.373 460.29 265.6 26.05 MURO DEFENSIVO
C-ML - 115 19:30 3-Sep 1-Oct 28 18.0 15.0 30 5301 12610 2.379 453.77 261.8 25.68 HORMIGON TIPO ¨HB-4¨
C-ML - 115 20:00 3-Sep 1-Oct 28 18.5 15.0 30 5301 12690 2.394 388.84 224.4 22.00
C-ML - 115 20:00 3-Sep 1-Oct 28 18.5 15.0 30 5301 12710 2.397 451.35 260.4 25.54
C-ML - 115 20:00 3-Sep 1-Oct 28 18.5 15.0 30 5301 12630 2.382 438.10 252.8 24.79
C-ML - 116 21:50 3-Sep 6-Sep 3 12.0 15.0 30 5301 12540 2.365 320.93 185.2 18.16
C-ML - 116 21:50 3-Sep 6-Sep 3 12.0 15.0 30 5301 12450 2.348 345.50 199.4 19.55
C-ML - 116 21:50 3-Sep 6-Sep 3 12.0 15.0 30 5301 12730 2.401 357.48 206.3 20.23 MURO.N° 8 ; TRAMO.17+770-18+070
CARPETA
C-ML - 116 22:40 3-Sep 10-Sep 7 12.0 15.0 30 5301 12570 2.371 324.76 187.4 18.38 DE NIVELACION DE
C-ML - 116 22:40 3-Sep 10-Sep 7 12.0 15.0 30 5301 12610 2.379 367.50 212.1 20.80
C-ML - 116 22:40 3-Sep 10-Sep 7 12.0 15.0 30 5301 12580 2.373 374.05 215.8 21.17 MURO DEFENSIVO
HORMIGON TIPO ¨HC-14¨
C-ML - 116 23:00 3-Sep 1-Oct 28 11.0 15.0 30 5301 12630 2.382 385.73 222.6 21.83
C-ML - 116 23:00 3-Sep 1-Oct 28 11.0 15.0 30 5301 12740 2.403 420.00 242.4 23.77
C-ML - 116 23:00 3-Sep 1-Oct 28 11.0 15.0 30 5301 12660 2.388 427.94 246.9 24.22

Constructora Control y Calidad


SINOHYDRO CONNAL S.R.L.
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
"HB-8" - "HC-11" TIPO DE HORMIGON "H-21" Kg/cm2

HORA FECHA EDAD REV DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA
REGISTRO CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa)
C-PS-102 10:00 3-Aug 31-Aug 28 18.0 15.0 30 5301 12960 2.445 581.77 335.7 32.92 TRAMO: 28+630-28+000
CARPETA DE HORMIGON SIMPLE DE
C-PS-102 10:00 3-Aug 31-Aug 28 18.0 15.0 30 5301 12810 2.416 556.31 321.0 31.48
BANQUINA NIVEL # 5
C-PS-102 10:00 3-Aug 31-Aug 28 18.0 15.0 30 5301 12900 2.433 583.97 337.0 33.05 HORMIGON TIPO"HB-08"
C-PS-103 10:28 3-Aug 31-Aug 28 7.0 15.0 30 5301 12470 2.352 406.44 234.5 23.00
C-PS-103 10:28 3-Aug 31-Aug 28 7.0 15.0 30 5301 12570 2.371 415.57 239.8 23.52
C-PS-103 10:28 3-Aug 31-Aug 28 7.0 15.0 30 5301 12480 2.354 388.15 224.0 21.96 TRAMO: 3+980-4+010 CUNETA
DE BANQUINA NIVEL # 4
C-PS-103 10:28 3-Aug 31-Aug 28 7.0 15.0 30 5301 12490 2.356 531.42 306.7 30.07 HORMIGON TIPO"HC-11"
C-PS-103 10:28 3-Aug 31-Aug 28 7.0 15.0 30 5301 12500 2.358 544.16 314.0 30.79
C-PS-103 10:28 3-Aug 31-Aug 28 7.0 15.0 30 5301 12510 2.360 578.42 333.8 32.73
C-PS-104 8:14 4-Aug 1-Sep 28 20.0 15.0 30 5301 12680 2.392 533.39 307.8 30.18 TRAMO: 28+637-28+731
C-PS-104 8:14 4-Aug 1-Sep 28 20.0 15.0 30 5301 12570 2.371 533.25 307.7 30.18 CUNETA DE BANQUINA NIVEL # 5
C-PS-104 8:14 4-Aug 1-Sep 28 20.0 15.0 30 5301 12790 2.413 542.35 313.0 30.69 HORMIGON TIPO"HB-08"
C-PS-105 12:58 7-Aug 4-Sep 28 19.0 15.0 30 5301 12500 2.358 443.40 255.9 25.09 TRAMO: 3+710-3+760 CUNETA
C-PS-105 12:58 7-Aug 4-Sep 28 19.0 15.0 30 5301 12540 2.365 432.95 249.8 24.50 DE BANQUINA NIVEL # 4
C-PS-105 12:58 7-Aug 4-Sep 28 19.0 15.0 30 5301 12620 2.380 437.30 252.3 24.75 HORMIGON TIPO"HB-08"
C-PS-106 8:57 8-Aug 5-Sep 28 19.0 15.0 30 5301 12480 2.354 509.28 293.9 28.82 TRAMO: 23+260-23+390
C-PS-106 8:57 8-Aug 5-Sep 28 19.0 15.0 30 5301 12420 2.343 517.85 298.8 29.30 CUNETA DE BANQUINA NIVEL # 1
C-PS-106 8:57 8-Aug 5-Sep 28 19.0 15.0 30 5301 12410 2.341 506.43 292.2 28.66 HORMIGON TIPO"HB-08"
C-PS-107 10:10 9-Aug 6-Sep 28 20.0 15.0 30 5301 12510 2.360 459.66 265.2 26.01 TRAMO: 3+980-4+150 CUNETA
C-PS-107 10:10 9-Aug 6-Sep 28 20.0 15.0 30 5301 12610 2.379 424.22 244.8 24.01 DE BANQUINA NIVEL # 2
C-PS-107 10:10 9-Aug 6-Sep 28 20.0 15.0 30 5301 12590 2.375 396.59 228.8 22.44 HORMIGON TIPO"HB-08"
C-PS-108 11:20 9-Aug 6-Sep 28 18.0 15.0 30 5301 12660 2.388 515.49 297.5 29.17 TRAMO: 3+980-4+150 CUNETA
C-PS-108 11:20 9-Aug 6-Sep 28 18.0 15.0 30 5301 12700 2.396 543.11 313.4 30.73 DE BANQUINA NIVEL # 3
C-PS-108 11:20 9-Aug 6-Sep 28 18.0 15.0 30 5301 12530 2.364 535.76 309.2 30.32 HORMIGON TIPO"HB-08"
C-PS-109 8:40 10-Aug 7-Sep 28 20.0 15.0 30 5301 12410 2.341 527.73 304.5 29.86 TRAMO: 23+300 CUNETA DE
C-PS-109 8:40 10-Aug 7-Sep 28 20.0 15.0 30 5301 12500 2.358 535.45 309.0 30.30 BANQUINA NIVEL # 3
C-PS-109 8:40 10-Aug 7-Sep 28 20.0 15.0 30 5301 12470 2.352 545.86 315.0 30.89 HORMIGON TIPO"HB-08"
C-PS-110 10:40 10-Aug 7-Sep 28 12.0 15.0 30 5301 12490 2.356 522.58 301.6 29.57 TRAMO: 23+980- 4+050
C-PS-110 10:40 10-Aug 7-Sep 28 12.0 15.0 30 5301 12550 2.367 520.38 300.3 29.45 CUNETA DE BANQUINA NIVEL # 2
C-PS-110 10:40 10-Aug 7-Sep 28 12.0 15.0 30 5301 12620 2.380 517.20 298.4 29.27 HORMIGON TIPO"HC-11"
C-PS-111 11:00 10-Aug 7-Sep 28 11.0 15.0 30 5301 12520 2.362 497.21 286.9 28.14 TRAMO: 3+990-4+040
C-PS-111 11:00 10-Aug 7-Sep 28 11.0 15.0 30 5301 12550 2.367 499.76 288.4 28.28 CUNETA DE BANQUINA NIVEL # 3
C-PS-111 11:00 10-Aug 7-Sep 28 11.0 15.0 30 5301 12480 2.354 493.93 285.0 27.95 HORMIGON TIPO"HC-11"
C-PS-112 15:00 11-Aug 8-Sep 28 8.5 15.0 30 5301 12320 2.324 475.33 274.3 26.90 TRAMO: 3+971-4+080
C-PS-112 15:00 11-Aug 8-Sep 28 8.5 15.0 30 5301 12280 2.316 458.82 264.8 25.96 CUNETA DE BANQUINA NIVEL # 2
C-PS-112 15:00 11-Aug 8-Sep 28 8.5 15.0 30 5301 12360 2.331 450.15 259.8 25.47 HORMIGON TIPO"HC-11"
C-PS-113 15:30 11-Aug 8-Sep 28 9.2 15.0 30 5301 12290 2.318 455.89 263.1 25.80 TRAMO: 3+974-4+061
CUNETA DE BANQUINA NIVEL # 3
HORMIGON TIPO"HC-11"
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
"HB-8" - "HC-11" TIPO DE HORMIGON "H-21" Kg/cm2

HORA FECHA EDAD REV DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA
REGISTRO CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa) TRAMO: 3+974-4+061
C-PS-113 15:30 11-Aug 8-Sep 28 9.2 15.0 30 5301 12370 2.333 438.10 252.8 24.79 CUNETA DE BANQUINA NIVEL # 3
C-PS-113 15:30 11-Aug 8-Sep 28 9.2 15.0 30 5301 12280 2.316 457.86 264.2 25.91 HORMIGON TIPO"HC-11"
C-PS-114 8:00 11-Aug 8-Sep 28 20.0 15.0 30 5301 12600 2.377 560.37 323.4 31.71 TRAMO: 21+600-21+700
C-PS-114 8:00 11-Aug 8-Sep 28 20.0 15.0 30 5301 12640 2.384 551.18 318.1 31.19 ZANJA DE CORONAMIENTO
C-PS-114 8:00 11-Aug 8-Sep 28 20.0 15.0 30 5301 12600 2.377 560.39 323.4 31.71 HORMIGON TIPO"HB-08"
C-PS-115 10:31 11-Aug 8-Sep 28 8.0 15.0 30 5301 12410 2.341 507.50 292.8 28.72 TRAMO:23+300 CUNETA DE
C-PS-115 10:31 11-Aug 8-Sep 28 8.0 15.0 30 5301 12340 2.328 544.34 314.1 30.80 BANQUINA HORMIGON TIPO"HC-
C-PS-115 10:31 11-Aug 8-Sep 28 8.0 15.0 30 5301 12500 2.358 516.42 298.0 29.22 11"
C-PS-116 9:15 11-Aug 8-Sep 28 16.0 15.0 30 5301 12470 2.352 505.23 291.5 28.59 TRAMO:28+637-28+731
CARPETA DE HORMIGON SIMPLE
C-PS-116 9:15 11-Aug 8-Sep 28 16.0 15.0 30 5301 12480 2.354 526.48 303.8 29.79
BANQUINA NIVEL # 5 HORMIGON
C-PS-116 9:15 11-Aug 8-Sep 28 16.0 15.0 30 5301 12400 2.339 501.82 289.6 28.40 TIPO"HB-08"
C-PS-117 10:20 12-Aug 9-Sep 28 18.0 15.0 30 5301 12510 2.360 589.87 340.4 33.38 TRAMO: 21 KM
C-PS-117 10:20 12-Aug 9-Sep 28 18.0 15.0 30 5301 12610 2.379 509.70 294.1 28.84 CARPETA DE BANQUINA NIVEL # 1
C-PS-117 10:20 12-Aug 9-Sep 28 18.0 15.0 30 5301 12530 2.364 557.58 321.7 31.55 HORMIGON TIPO"HB-08"
C-PS-118 8:11 12-Aug 9-Sep 28 12.0 15.0 30 5301 12730 2.401 493.85 285.0 27.95 TRAMO: 28+637-28+731
CARPETA DE H° SIMPLE BANQUINA
C-PS-118 8:11 12-Aug 9-Sep 28 12.0 15.0 30 5301 12880 2.430 407.82 235.3 23.08
NIVEL # 5
C-PS-118 8:11 12-Aug 9-Sep 28 12.0 15.0 30 5301 12710 2.397 472.99 272.9 26.77 HORMIGON TIPO"HC-11"
C-PS-119 7:50 13-Aug 10-Sep 28 20.0 15.0 30 5301 12640 2.384 598.29 345.2 33.86 TRAMO: 23+267-23+340
C-PS-119 7:50 13-Aug 10-Sep 28 20.0 15.0 30 5301 12640 2.384 620.82 358.2 35.13 CUNETA DE BANQUINA NIVEL # 1
C-PS-119 7:50 13-Aug 10-Sep 28 20.0 15.0 30 5301 12640 2.384 591.26 341.2 33.46 HORMIGON TIPO"HB-08"
C-PS-120 8:10 13-Aug 10-Sep 28 19.0 15.0 30 5301 12620 2.380 564.97 326.0 31.97 TRAMO: 28+615-28+677
C-PS-120 8:10 13-Aug 10-Sep 28 19.0 15.0 30 5301 12540 2.365 534.23 308.3 30.23 CUNETA DE BANQUINA NIVEL # 4
C-PS-120 8:10 13-Aug 10-Sep 28 19.0 15.0 30 5301 12610 2.379 555.18 320.4 31.42 HORMIGON TIPO"HB-08"
C-PS-121 9:30 13-Aug 10-Sep 28 19.0 15.0 30 5301 12660 2.388 558.44 322.2 31.60 TRAMO: 4+000-4+080
C-PS-121 9:30 13-Aug 10-Sep 28 19.0 15.0 30 5301 12520 2.362 554.29 319.8 31.37 CUNETA DE BANQUINA NIVEL # 1
C-PS-121 9:30 13-Aug 10-Sep 28 19.0 15.0 30 5301 12450 2.348 578.79 334.0 32.75 HORMIGON TIPO"HB-08"
C-PS-122 10:30 13-Aug 10-Sep 28 10.0 15.0 30 5301 12460 2.350 371.45 214.3 21.02
C-PS-122 10:30 13-Aug 10-Sep 28 10.0 15.0 30 5301 12670 2.390 401.05 231.4 22.69
C-PS-122 10:30 13-Aug 10-Sep 28 10.0 15.0 30 5301 12680 2.392 398.97 230.2 22.58 TRAMO: 4+000-4+080 CUNETA
DE BANQUINA NIVEL # 2
C-PS-122 10:41 13-Aug 10-Sep 28 11.0 15.0 30 5301 12650 2.386 561.36 323.9 31.77 HORMIGON TIPO"HC-11"
C-PS-122 10:41 13-Aug 10-Sep 28 11.0 15.0 30 5301 12460 2.350 511.52 295.2 28.95
C-PS-122 10:41 13-Aug 10-Sep 28 11.0 15.0 30 5301 12640 2.384 547.28 315.8 30.97
C-PS-123 8:20 14-Aug 11-Sep 28 9.0 15.0 30 5301 12620 2.380 466.99 269.5 26.43
C-PS-123 8:20 14-Aug 11-Sep 28 9.0 15.0 30 5301 12620 2.380 484.45 279.5 27.41
C-PS-123 8:20 14-Aug 11-Sep 28 9.0 15.0 30 5301 12620 2.380 484.38 279.5 27.41 TRAMO: 28+615-28+677
CUNETA DE BANQUINA NIVEL # 4
C-PS-123 8:20 14-Aug 11-Sep 28 9.0 15.0 30 5301 12720 2.399 630.85 364.0 35.70 HORMIGON TIPO"HC-11"
C-PS-123 8:20 14-Aug 11-Sep 28 9.0 15.0 30 5301 12660 2.388 623.81 360.0 35.30
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
"HB-8" - "HC-11" TIPO DE HORMIGON "H-21" Kg/cm2 TRAMO: 28+615-28+677
CUNETA DE BANQUINA NIVEL # 4
HORA FECHA EDAD REV DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA
REGISTRO HORMIGON
CARACTERISTICAS TIPO"HC-11"
DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa)
C-PS-123 8:20 14-Aug 11-Sep 28 9.0 15.0 30 5301 12650 2.386 620.29 357.9 35.10
C-PS-124 11:30 14-Aug 11-Sep 28 10.0 15.0 30 5301 12630 2.382 482.41 278.4 27.30
C-PS-124 11:30 14-Aug 11-Sep 28 10.0 15.0 30 5301 12650 2.386 428.58 247.3 24.25
C-PS-124 11:30 14-Aug 11-Sep 28 10.0 15.0 30 5301 12660 2.388 453.23 261.5 25.65 TRAMO: 3+966-4+078 CUNETA
DE BANQUINA NIVEL # 1
C-PS-124 11:30 14-Aug 11-Sep 28 10.0 15.0 30 5301 12450 2.348 591.09 341.1 33.45 HORMIGON TIPO"HC-11"
C-PS-124 11:30 14-Aug 11-Sep 28 10.0 15.0 30 5301 12440 2.347 605.97 349.7 34.29
C-PS-124 11:30 14-Aug 11-Sep 28 10.0 15.0 30 5301 12520 2.362 686.38 396.1 38.84
C-PS-125 10:40 15-Aug 12-Sep 28 7.0 15.0 30 5301 12590 2.375 541.67 312.6 30.65 TRAMO: 21+640-21+690
C-PS-125 10:40 15-Aug 12-Sep 28 7.0 15.0 30 5301 12600 2.377 567.95 327.7 32.14 CUNETA DE BANQUINA NIVEL # 3
C-PS-125 10:40 15-Aug 12-Sep 28 7.0 15.0 30 5301 12540 2.365 535.43 309.0 30.30 HORMIGON TIPO"HC-11"
C-PS-126 8:00 16-Aug 13-Sep 28 18.0 15.0 30 5301 12740 2.403 661.32 381.6 37.42 TRAMO: 3+980-4+020
C-PS-126 8:00 16-Aug 13-Sep 28 18.0 15.0 30 5301 12730 2.401 653.61 377.2 36.99 CARPETA DE BANQUINA NIVEL # 3
C-PS-126 8:00 16-Aug 13-Sep 28 18.0 15.0 30 5301 12720 2.399 664.87 383.7 37.62 HORMIGON TIPO"HB-08"
C-PS-127 10:11 16-Aug 13-Sep 28 17.5 15.0 30 5301 12780 2.411 622.75 359.4 35.24 TRAMO: 6+160-6+220
C-PS-127 10:11 16-Aug 13-Sep 28 17.5 15.0 30 5301 12620 2.380 656.21 378.7 37.13 ZANJA DE CORONAMIENTO
C-PS-127 10:11 16-Aug 13-Sep 28 17.5 15.0 30 5301 12630 2.382 547.48 315.9 30.98 HORMIGON TIPO"HB-08"
C-PS-128 10:20 16-Aug 13-Sep 28 11.0 15.0 30 5301 12700 2.396 566.39 326.8 32.05 TRAMO: 21+640-21+690
C-PS-128 10:20 16-Aug 13-Sep 28 11.0 15.0 30 5301 12670 2.390 549.74 317.2 31.11 CUNETA DE BANQUINA NIVEL # 1
C-PS-128 10:20 16-Aug 13-Sep 28 11.0 15.0 30 5301 12890 2.431 658.99 380.3 37.29 HORMIGON TIPO"HB-08"
C-PS-129 11:16 16-Aug 13-Sep 28 18.5 15.0 30 5301 12370 2.333 534.42 308.4 30.24 TRAMO: 23+360-23+400
C-PS-129 11:16 16-Aug 13-Sep 28 18.5 15.0 30 5301 12540 2.365 561.78 324.2 31.79 ZANJA DE CORONAMIENTO
C-PS-129 11:16 16-Aug 13-Sep 28 18.5 15.0 30 5301 12500 2.358 528.37 304.9 29.90 HORMIGON TIPO"HB-08"
C-PS-130 8:17 17-Aug 14-Sep 28 20.0 15.0 30 5301 12430 2.345 545.60 314.8 30.87 TRAMO: 3+975-4+075
C-PS-130 8:17 17-Aug 14-Sep 28 20.0 15.0 30 5301 12490 2.356 565.89 326.5 32.02 CARPETA DE BANQUINA NIVEL# 1
C-PS-130 8:17 17-Aug 14-Sep 28 20.0 15.0 30 5301 12420 2.343 598.73 345.5 33.88 HORMIGON TIPO"HB-08"
C-PS-131 8:20 17-Aug 14-Sep 28 19.0 15.0 30 5301 12490 2.356 465.75 268.8 26.36 TRAMO: 3+970-4+040
C-PS-131 8:20 17-Aug 14-Sep 28 19.0 15.0 30 5301 12410 2.341 432.05 249.3 24.45 CARPETA DE BANQUINA NIVEL# 2
C-PS-131 8:20 17-Aug 14-Sep 28 19.0 15.0 30 5301 12470 2.352 494.18 285.2 27.96 HORMIGON TIPO"HB-08"
C-PS-132 9:10 17-Aug 14-Sep 28 20.0 15.0 30 5301 12520 2.362 482.05 278.2 27.28 TRAMO: 23+355-23+390
C-PS-132 9:10 17-Aug 14-Sep 28 20.0 15.0 30 5301 12450 2.348 487.79 281.5 27.60 CUNETA DE BANQUINA NIVEL # 2
C-PS-132 9:10 17-Aug 14-Sep 28 20.0 15.0 30 5301 12450 2.348 462.25 266.7 26.16 HORMIGON TIPO"HB-08"
C-PS-133 9:30 17-Aug 14-Sep 28 20.0 15.0 30 5301 12450 2.348 430.82 248.6 24.38 TRAMO: 23+350-23+400
C-PS-133 9:30 17-Aug 14-Sep 28 20.0 15.0 30 5301 12390 2.337 447.25 258.1 25.31 CUNETA DE BANQUINA NIVEL #3
C-PS-133 9:30 17-Aug 14-Sep 28 20.0 15.0 30 5301 12490 2.356 500.47 288.8 28.32 HORMIGON TIPO"HB-08"
C-PS-134 8:50 18-Aug 15-Sep 28 12.0 15.0 30 5301 12590 2.375 547.50 315.9 30.98 TRAMO: 21+630-21+690
CARPETA DE HORMIGON SIMPLE
C-PS-134 8:50 18-Aug 15-Sep 28 12.0 15.0 30 5301 12390 2.337 491.51 283.6 27.81
BANQUINA NIVEL # 2
C-PS-134 8:50 18-Aug 15-Sep 28 12.0 15.0 30 5301 12470 2.352 498.64 287.7 28.22 HORMIGON TIPO"HC-11"
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
"HB-8" - "HC-11" TIPO DE HORMIGON "H-21" Kg/cm2

HORA FECHA EDAD REV DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA
REGISTRO CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa)
C-PS-135 9:05 18-Aug 15-Sep 28 18.0 15.0 30 5301 12840 2.422 527.97 304.7 29.88 TRAMO: 23+355-23+390
C-PS-135 9:05 18-Aug 15-Sep 28 18.0 15.0 30 5301 12440 2.347 484.32 279.5 27.41 CUNETA DE BANQUINA NIVEL # 2
C-PS-135 9:05 18-Aug 15-Sep 28 18.0 15.0 30 5301 12590 2.375 510.82 294.8 28.91 HORMIGON TIPO"HC-11"
C-PS-136 9:16 18-Aug 15-Sep 28 18.0 15.0 30 5301 12480 2.354 466.51 269.2 26.40 TRAMO: 23+380-23+390
C-PS-136 9:16 18-Aug 15-Sep 28 18.0 15.0 30 5301 12480 2.354 462.47 266.9 26.17 ZANJA DE CORONAMIENTO
C-PS-136 9:16 18-Aug 15-Sep 28 18.0 15.0 30 5301 12460 2.350 475.41 274.3 26.90 HORMIGON TIPO"HB-08"
C-PS-137 8:30 19-Aug 16-Sep 28 20.0 15.0 30 5301 12720 2.399 536.39 309.5 30.35 TRAMO: 21+630-21+690
CARPETA DE H° SIMPLE BANQUINA
C-PS-137 8:30 19-Aug 16-Sep 28 20.0 15.0 30 5301 12680 2.392 550.46 317.6 31.15
NIVEL # 1 HORMIGON
C-PS-137 8:30 19-Aug 16-Sep 28 20.0 15.0 30 5301 12550 2.367 525.08 303.0 29.71 TIPO"HB-08"
C-PS-138 8:50 19-Aug 16-Sep 28 18.0 15.0 30 5301 12500 2.358 431.42 248.9 24.41 TRAMO: 23+390-23+340
C-PS-138 8:50 19-Aug 16-Sep 28 18.0 15.0 30 5301 12540 2.365 454.17 262.1 25.70 CUNETA DE BANQUINA NIVEL # 2
C-PS-138 8:50 19-Aug 16-Sep 28 18.0 15.0 30 5301 12520 2.362 431.60 249.1 24.42 HORMIGON TIPO"HB-08"
C-PS-139 8:30 20-Aug 17-Sep 28 20.0 15.0 30 5301 12410 2.341 396.18 228.6 22.42 TRAMO: 5+520-5+600
C-PS-139 8:30 20-Aug 17-Sep 28 20.0 15.0 30 5301 12340 2.328 387.47 223.6 21.93 ZANJA DE CORONAMIENTO
C-PS-139 8:30 20-Aug 17-Sep 28 20.0 15.0 30 5301 12430 2.345 407.42 235.1 23.06 HORMIGON TIPO"HB-08"
C-PS-140 10:00 21-Aug 18-Sep 28 17.0 15.0 30 5301 12500 2.358 493.01 284.5 27.90 TRAMO: 5+520-5+600
C-PS-140 10:00 21-Aug 18-Sep 28 17.0 15.0 30 5301 12430 2.345 486.92 281.0 27.55 ZANJA DE CORONAMIENTO
C-PS-140 10:00 21-Aug 18-Sep 28 17.0 15.0 30 5301 12480 2.354 470.93 271.7 26.65 HORMIGON TIPO"HB-08"
C-PS-141 14:15 21-Aug 18-Sep 28 12.0 15.0 30 5301 12550 2.367 471.37 272.0 26.67 TRAMO: 5+530-5+580
C-PS-141 14:15 21-Aug 18-Sep 28 12.0 15.0 30 5301 12510 2.360 488.07 281.6 27.62 CUNETA DE BANQUINA NIVEL # 2
C-PS-141 14:15 21-Aug 18-Sep 28 12.0 15.0 30 5301 12510 2.360 485.07 279.9 27.45 HORMIGON TIPO"HC-11"
C-PS-142 8:20 22-Aug 19-Sep 28 17.0 15.0 30 5301 12530 2.364 453.64 261.8 25.67 TRAMO: 5+520-5+600
C-PS-142 8:20 22-Aug 19-Sep 28 17.0 15.0 30 5301 12450 2.348 461.04 266.0 26.09 ZANJA DE CORONAMIENTO
C-PS-142 8:20 22-Aug 19-Sep 28 17.0 15.0 30 5301 12460 2.350 457.14 263.8 25.87 HORMIGON TIPO"HB-08"
C-PS-143 8:40 22-Aug 19-Sep 28 19.0 15.0 30 5301 12480 2.354 537.53 310.2 30.42 TRAMO: 22+060-22+140
C-PS-143 8:40 22-Aug 19-Sep 28 19.0 15.0 30 5301 12440 2.347 415.60 239.8 23.52 CUNETA DE BANQUINA NIVEL # 3
C-PS-143 8:40 22-Aug 19-Sep 28 19.0 15.0 30 5301 12530 2.364 467.38 269.7 26.45 HORMIGON TIPO"HB-08"
C-PS-144 8:58 22-Aug 19-Sep 28 18.0 15.0 30 5301 12520 2.362 540.19 311.7 30.57 TRAMO: 23+340-23+420
C-PS-144 8:58 22-Aug 19-Sep 28 18.0 15.0 30 5301 12620 2.380 462.72 267.0 26.18 CUNETA DE BANQUINA NIVEL # 1
C-PS-144 8:58 22-Aug 19-Sep 28 18.0 15.0 30 5301 12500 2.358 472.21 272.5 26.72 HORMIGON TIPO"HB-08"
C-PS-145 8:05 23-Aug 20-Sep 28 19.0 15.0 30 5301 12570 2.371 461.19 266.1 26.10 TRAMO: 5+530-5+580
C-PS-145 8:05 23-Aug 20-Sep 28 19.0 15.0 30 5301 12490 2.356 488.24 281.7 27.63 CUNETA DE BANQUINA NIVEL # 2
C-PS-145 8:05 23-Aug 20-Sep 28 19.0 15.0 30 5301 12440 2.347 478.23 276.0 27.06 HORMIGON TIPO"HB-08"
C-PS-146 8:30 23-Aug 20-Sep 28 18.0 15.0 30 5301 12420 2.343 495.67 286.0 28.05 TRAMO: 22+080-22+130
C-PS-146 8:30 23-Aug 20-Sep 28 18.0 15.0 30 5301 12490 2.356 465.52 268.6 26.34 CUNETA DE BANQUINA NIVEL # 3
C-PS-146 8:30 23-Aug 20-Sep 28 18.0 15.0 30 5301 12610 2.379 491.80 283.8 27.83 HORMIGON TIPO"HB-08"
C-PS-147 8:47 23-Aug 20-Sep 28 19.0 15.0 30 5301 12440 2.347 524.43 302.6 29.68 TRAMO: 23+340-23+420
CUNETA DE BANQUINA NIVEL # 1
HORMIGON TIPO"HB-08"
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
"HB-8" - "HC-11" TIPO DE HORMIGON "H-21" Kg/cm2

HORA FECHA EDAD REV DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA
REGISTRO CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa) TRAMO: 23+340-23+420
C-PS-147 8:47 23-Aug 20-Sep 28 19.0 15.0 30 5301 12470 2.352 526.42 303.8 29.79 CUNETA DE BANQUINA NIVEL # 1
C-PS-147 8:47 23-Aug 20-Sep 28 19.0 15.0 30 5301 12390 2.337 523.42 302.0 29.62 HORMIGON TIPO"HB-08"
C-PS-148 11:45 23-Aug 20-Sep 28 20.0 15.0 30 5301 12380 2.335 515.06 297.2 29.15 TRAMO: 2+560-2+590
C-PS-148 11:45 23-Aug 20-Sep 28 20.0 15.0 30 5301 12530 2.364 521.13 300.7 29.49 CUNETA DE BANQUINA NIVEL # 3
C-PS-148 11:45 23-Aug 20-Sep 28 20.0 15.0 30 5301 12430 2.345 541.96 312.7 30.67 HORMIGON TIPO"HB-08"
C-PS-149 7:40 24-Aug 21-Sep 28 17.0 15.0 30 5301 12310 2.322 446.70 257.8 25.28 TRAMO: 2+530-2+610
C-PS-149 7:40 24-Aug 21-Sep 28 17.0 15.0 30 5301 12420 2.343 425.56 245.6 24.08 CUNETA DE BANQUINA NIVEL # 2
C-PS-149 7:40 24-Aug 21-Sep 28 17.0 15.0 30 5301 12400 2.339 441.17 254.6 24.97 HORMIGON TIPO"HB-08"
C-PS-150 8:10 24-Aug 21-Sep 28 19.0 15.0 30 5301 12350 2.330 448.54 258.8 25.38 TRAMO: 2+550-2+590
C-PS-150 8:10 24-Aug 21-Sep 28 19.0 15.0 30 5301 12390 2.337 447.49 258.2 25.32 CUNETA DE BANQUINA NIVEL # 3
C-PS-150 8:10 24-Aug 21-Sep 28 19.0 15.0 30 5301 12450 2.348 445.81 257.3 25.23 HORMIGON TIPO"HB-08"
C-PS-151 8:40 25-Aug 22-Sep 28 20.0 15.0 30 5301 12440 2.347 555.09 320.3 31.41 TRAMO: 2+570-2+590
C-PS-151 8:40 25-Aug 22-Sep 28 20.0 15.0 30 5301 12500 2.358 501.98 289.7 28.41 CARPETA DE BANQUINA NIVEL # 3
C-PS-151 8:40 25-Aug 22-Sep 28 20.0 15.0 30 5301 12660 2.388 489.31 282.4 27.69 HORMIGON TIPO"HB-08"
C-PS-152 9:25 25-Aug 22-Sep 28 20.0 15.0 30 5301 12640 2.384 503.76 290.7 28.51 TRAMO: 23+340-24+000
CARPETA DE H° SIMPLE
C-PS-152 9:25 25-Aug 22-Sep 28 20.0 15.0 30 5301 12470 2.352 508.12 293.2 28.75
BANQUINA NIVEL # 3
C-PS-152 9:25 25-Aug 22-Sep 28 20.0 15.0 30 5301 12440 2.347 537.21 310.0 30.40 HORMIGON TIPO"HB-08"
C-PS-153 10:30 25-Aug 22-Sep 28 19.5 15.0 30 5301 12480 2.354 511.32 295.1 28.93 TRAMO: 22+070-22+140
C-PS-153 10:30 25-Aug 22-Sep 28 19.5 15.0 30 5301 12610 2.379 517.17 298.4 29.27 CUNETA DE BANQUINA NIVEL # 2
C-PS-153 10:30 25-Aug 22-Sep 28 19.5 15.0 30 5301 12550 2.367 518.66 299.3 29.35 HORMIGON TIPO"HB-08"
C-PS-154 11:40 25-Aug 22-Sep 28 21.0 15.0 30 5301 12530 2.364 525.13 303.0 29.72 TRAMO: 2+570-2+610
C-PS-154 11:40 25-Aug 22-Sep 28 21.0 15.0 30 5301 12430 2.345 526.69 303.9 29.80 CARPETA DE BANQUINA NIVEL # 2
C-PS-154 11:40 25-Aug 22-Sep 28 21.0 15.0 30 5301 12570 2.371 523.93 302.3 29.65 HORMIGON TIPO"HB-08"
C-PS-155 8:10 27-Aug 24-Sep 28 18.5 15.0 30 5301 12320 2.324 558.54 322.3 31.61 TRAMO: 2+500 CUNETA DE
C-PS-155 8:10 27-Aug 24-Sep 28 18.5 15.0 30 5301 12420 2.343 555.94 320.8 31.46 BANQUINA
C-PS-155 8:10 27-Aug 24-Sep 28 18.5 15.0 30 5301 12350 2.330 524.16 302.5 29.66 HORMIGON TIPO"HB-08"
C-PS-156 8:30 27-Aug 24-Sep 28 19.0 15.0 30 5301 12430 2.345 555.97 320.8 31.46 TRAMO: 22+070-22+150
C-PS-156 8:30 27-Aug 24-Sep 28 19.0 15.0 30 5301 12430 2.345 554.45 319.9 31.38 CUNETA DE BANQUINA NIVEL # 1
C-PS-156 8:30 27-Aug 24-Sep 28 19.0 15.0 30 5301 12410 2.341 556.84 321.3 31.51 HORMIGON TIPO"HB-08"
C-PS-157 10:40 27-Aug 24-Sep 28 19.0 15.0 30 5301 12430 2.345 555.97 320.8 31.46 TRAMO: 23+340-23+420
CARPETA DE H° SIMPLE DE BANQUINA
C-PS-157 10:40 27-Aug 24-Sep 28 19.0 15.0 30 5301 12420 2.343 558.47 322.3 31.60
NIVEL # 2 HORMIGON
C-PS-157 10:40 27-Aug 24-Sep 28 19.0 15.0 30 5301 12400 2.339 556.68 321.2 31.50 TIPO"HB-08"
C-PS-158 8:20 28-Aug 25-Sep 28 20.0 15.0 30 5301 12460 2.350 577.37 333.2 32.67 TRAMO: 23+340-23+420
CARPETA DE H° SIMPLE DE BANQUINA
C-PS-158 8:20 28-Aug 25-Sep 28 20.0 15.0 30 5301 12630 2.382 577.03 333.0 32.65
NIVEL # 2 HORMIGON
C-PS-158 8:20 28-Aug 25-Sep 28 20.0 15.0 30 5301 12450 2.348 577.24 333.1 32.67 TIPO"HB-08"
C-PS-159 8:50 29-Aug 26-Sep 28 19.0 15.0 30 5301 12480 2.354 540.14 311.7 30.57 TRAMO: 22+070-22+150
C-PS-159 8:50 29-Aug 26-Sep 28 19.0 15.0 30 5301 12350 2.330 507.50 292.8 28.72 CUNETA DE BANQUINA NIVEL # 1
HORMIGON TIPO"HB-08"
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
"HB-8" - "HC-11" TIPO DE HORMIGON "H-21" Kg/cm2

HORA FECHA EDAD REV DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA
REGISTRO TRAMO: 22+070-22+150
CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa) CUNETA DE BANQUINA NIVEL # 1
C-PS-159 8:50 29-Aug 26-Sep 28 19.0 15.0 30 5301 12520 2.362 512.63 295.8 29.01 HORMIGON TIPO"HB-08"
C-PS-160 9:45 30-Aug 27-Sep 28 20.0 15.0 30 5301 12660 2.388 540.84 312.1 30.61 TRAMO: 2+600-2+670
C-PS-160 9:45 30-Aug 27-Sep 28 20.0 15.0 30 5301 12480 2.354 507.71 293.0 28.73 CUNETA DE BANQUINA NIVEL # 1
C-PS-160 9:45 30-Aug 27-Sep 28 20.0 15.0 30 5301 12460 2.350 524.96 302.9 29.71 HORMIGON TIPO"HB-08"
C-PS-161 9:58 30-Aug 27-Sep 28 19.0 15.0 30 5301 12530 2.364 547.37 315.9 30.97 TRAMO: 2+800-2+850
C-PS-161 9:58 30-Aug 27-Sep 28 19.0 15.0 30 5301 12540 2.365 513.05 296.1 29.03 ZANJA DE CORONAMIENTO
C-PS-161 9:58 30-Aug 27-Sep 28 19.0 15.0 30 5301 12640 2.384 558.41 322.2 31.60 HORMIGON TIPO"HB-08"
C-PS-162 7:40 31-Aug 28-Sep 28 20.0 15.0 30 5301 12580 2.373 515.14 297.3 29.15 TRAMO: 2+800-2+850
C-PS-162 7:40 31-Aug 28-Sep 28 20.0 15.0 30 5301 12490 2.356 527.48 304.4 29.85 CUNETA DE BANQUINA NIVEL # 7
C-PS-162 7:40 31-Aug 28-Sep 28 20.0 15.0 30 5301 12550 2.367 504.11 290.9 28.53 HORMIGON TIPO"HB-08"
C-PS-163 8:20 31-Aug 28-Sep 28 17.0 15.0 30 5301 12510 2.360 542.97 313.3 30.73 TRAMO: 21+630-21+640
C-PS-163 8:20 31-Aug 28-Sep 28 17.0 15.0 30 5301 12590 2.375 563.77 325.3 31.90 CUNETA DE BANQUINA NIVEL # 2
C-PS-163 8:20 31-Aug 28-Sep 28 17.0 15.0 30 5301 12540 2.365 569.99 328.9 32.25 HORMIGON TIPO"HB-08"
C-PS-164 14:20 31-Aug 28-Sep 28 20.0 15.0 30 5301 12510 2.360 561.05 323.7 31.75 TRAMO: 2+800-2+850
C-PS-164 14:20 31-Aug 28-Sep 28 20.0 15.0 30 5301 12590 2.375 558.14 322.1 31.58 ZANJA DE CORONAMIENTO
C-PS-164 14:20 31-Aug 28-Sep 28 20.0 15.0 30 5301 12540 2.365 573.31 330.8 32.44 HORMIGON TIPO"HB-08"
C-PS-165 8:10 1-Sep 29-Sep 28 20.0 15.0 30 5301 12640 2.384 591.47 341.3 33.47 TRAMO: 2+800-2+850
C-PS-165 8:10 1-Sep 29-Sep 28 20.0 15.0 30 5301 12540 2.365 524.67 302.8 29.69 CARPETA DE BANQUINA NIVEL # 7
C-PS-165 8:10 1-Sep 29-Sep 28 20.0 15.0 30 5301 12540 2.365 561.82 324.2 31.79 HORMIGON TIPO"HB-08"
C-PS-166 8:50 1-Sep 29-Sep 28 19.0 15.0 30 5301 12510 2.360 512.40 295.7 29.00 TRAMO: 21+630-21+640
BAJANTE Y CUNETA DE BANQUINA
C-PS-166 8:50 1-Sep 29-Sep 28 19.0 15.0 30 5301 12570 2.371 512.82 295.9 29.02
NIVEL # 1 HORMIGON
C-PS-166 8:50 1-Sep 29-Sep 28 19.0 15.0 30 5301 12500 2.358 500.65 288.9 28.33 TIPO"HB-08"
C-PS-167 9:05 1-Sep 29-Sep 28 19.0 15.0 30 5301 12630 2.382 553.69 319.5 31.33 TRAMO: 22+070-22+150
C-PS-167 9:05 1-Sep 29-Sep 28 19.0 15.0 30 5301 12620 2.380 553.68 319.5 31.33 CARPETA DE BANQUINA NIVEL # 1
C-PS-167 9:05 1-Sep 29-Sep 28 19.0 15.0 30 5301 12780 2.411 557.38 321.6 31.54 HORMIGON TIPO"HB-08"
C-PS-168 9:05 2-Sep 30-Sep 28 18.0 15.0 30 5301 12520 2.362 554.28 319.8 31.37 TRAMO: 22+640-22+700
C-PS-168 9:05 2-Sep 30-Sep 28 18.0 15.0 30 5301 12450 2.348 573.65 331.0 32.46 CUNETA DE BANQUINA NIVEL # 4
C-PS-168 9:05 2-Sep 30-Sep 28 18.0 15.0 30 5301 12580 2.373 580.33 334.9 32.84 HORMIGON TIPO"HB-08"
C-PS-169 9:10 3-Sep 1-Oct 28 19.0 15.0 30 5301 12500 2.358 449.66 259.5 25.45 TRAMO: 22+640-22+700
C-PS-169 9:10 3-Sep 1-Oct 28 19.0 15.0 30 5301 12630 2.382 429.37 247.8 24.30 CUNETA DE BANQUINA NIVEL # 4
C-PS-169 9:10 3-Sep 1-Oct 28 19.0 15.0 30 5301 12530 2.364 414.99 239.5 23.48 HORMIGON TIPO"HB-08"
C-PS-170 10:10 3-Sep 1-Oct 28 20.0 15.0 30 5301 12550 2.367 409.38 236.2 23.17 TRAMO: 22+070-22+150
C-PS-170 10:10 3-Sep 1-Oct 28 20.0 15.0 30 5301 12590 2.375 417.71 241.0 23.64 CARPETA DE BANQUINA NIVEL # 1
C-PS-170 10:10 3-Sep 1-Oct 28 20.0 15.0 30 5301 12540 2.365 388.22 224.0 21.97 HORMIGON TIPO"HB-08"
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
"HB-8" - "HC-11" TIPO DE HORMIGON "H-21" Kg/cm2

HORA FECHA EDAD REV DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA
REGISTRO CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa)
Constructora Control y Calidad
SINOHYDRO CONNAL S.R.L.
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
VH TIPO DE HORMIGON "H-25" Kg/cm2

HORA FECHA EDAD H./D. DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA RESIST. CORREGIDA
REGISTRO FC CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa) (kg/cm2) (Mpa)
C-VH - 051 10:13 4-Aug 7-Aug 3 1.65 0.977 10.0 16.45 1286.82 3050 2.370 210.85 274.9 26.95 268.53 26.33
C-VH - 051 10:13 4-Aug 7-Aug 3 1.59 0.968 10.0 15.88 1247.21 2987 2.395 240.65 312.4 30.64 302.45 29.66

C-VH - 051 10:13 4-Aug 7-Aug 3 1.71 0.973 10.0 17.12 1344.60 3185 2.369 220.58 286.4 28.09 278.66 27.33
C-VH - 051 10:13 4-Aug 11-Aug 7 1.57 0.960 10.0 15.69 1232.29 2930 2.378 292.95 380.3 37.30 365.14 35.81 TUNEL N° 1 ; TRAMO ; 1+165 - 1+840
PORTAL DE SALIDA PROG. 1+840
C-VH - 051 10:13 4-Aug 11-Aug 7 1.48 0.979 10.0 14.78 1160.82 2740 2.360 265.43 344.6 33.80 337.38 33.09 COTAS: 1928 - 1924
HORMIGON DE LANZADO TIPO
C-VH - 051 10:13 4-Aug 11-Aug 7 1.59 0.963 10.0 15.89 1248.00 3010 2.412 280.85 364.6 35.76 351.15 34.44 ¨VH¨
C-VH - 051 10:13 4-Aug 1-Sep 28 1.57 0.978 10.0 15.66 1229.93 2900 2.358 320.45 416.1 40.80 406.90 39.90
C-VH - 051 10:13 4-Aug 1-Sep 28 1.77 0.977 10.0 17.65 1386.23 3290 2.373 350.47 455.0 44.62 444.56 43.60
C-VH - 051 10:13 4-Aug 1-Sep 28 1.64 0.976 10.0 16.36 1284.91 3050 2.374 380.15 493.6 48.40 481.72 47.24

C-VH - 052 14:40 7-Aug 10-Aug 3 1.71 0.977 10.0 17.12 1339.23 3219 2.404 230.90 301.0 29.52 294.07 28.84
C-VH - 052 14:40 7-Aug 10-Aug 3 1.60 0.968 10.0 16.01 1257.42 3000 2.386 229.11 297.5 29.17 287.94 28.24
C-VH - 052 14:40 7-Aug 10-Aug 3 1.66 0.973 10.0 16.58 1302.19 3085 2.369 228.55 296.7 29.10 288.72 28.31

C-VH - 052 14:40 7-Aug 14-Aug 7 1.50 0.960 10.0 15.01 1178.88 2886 2.448 302.42 392.6 38.51 376.94 36.97 TUNEL N° 1 ; TRAMO ; 1+165 - 1+840
PORTAL DE SALIDA PROG. 1+840
C-VH - 052 14:40 7-Aug 14-Aug 7 1.74 0.979 10.0 17.38 1365.02 3335 2.443 301.09 390.9 38.34 382.71 37.53 COTAS: 1928 - 1924
HORMIGON DE LANZADO TIPO
C-VH - 052 14:40 7-Aug 14-Aug 7 1.54 0.963 10.0 15.35 1205.59 2872 2.382 316.06 410.4 40.24 395.17 38.75 ¨VH¨
C-VH - 052 14:40 7-Aug 4-Sep 28 1.73 0.978 10.0 17.31 1359.52 2895 2.129 375.83 488.0 47.85 477.22 46.80
C-VH - 052 14:40 7-Aug 4-Sep 28 1.71 0.977 10.0 17.13 1345.39 3175 2.360 362.22 470.3 46.12 459.47 45.06
C-VH - 052 14:40 7-Aug 4-Sep 28 1.70 0.976 10.0 16.97 1332.82 3120 2.341 366.22 475.5 46.63 464.07 45.51
C-VH - 053 16:10 7-Aug 10-Aug 3 1.71 0.977 10.0 17.12 1339.23 3201 2.390 235.64 307.2 30.12 300.10 29.43
C-VH - 053 16:10 7-Aug 10-Aug 3 1.61 0.969 10.0 16.13 1266.85 3035 2.396 228.60 296.8 29.11 287.60 28.20
C-VH - 053 16:10 7-Aug 10-Aug 3 1.64 0.971 10.0 16.44 1291.19 3116 2.413 233.88 303.7 29.78 294.85 28.91

C-VH - 053 16:10 7-Aug 14-Aug 7 1.70 0.976 10.0 16.96 1332.04 3191 2.396 300.68 390.4 38.28 381.02 37.36 TUNEL N° 1 ; TRAMO ; 1+165 - 1+840
PORTAL DE SALIDA PROG. 1+840
C-VH - 053 16:10 7-Aug 14-Aug 7 1.69 0.975 10.0 16.94 1330.46 3165 2.379 322.65 418.9 41.08 408.44 40.05 COTAS: 1929 - 1925
HORMIGON DE LANZADO TIPO
C-VH - 053 16:10 7-Aug 14-Aug 7 1.75 0.980 10.0 17.45 1370.52 3267 2.384 308.72 400.8 39.31 392.81 38.52 ¨VH¨
C-VH - 053 16:10 7-Aug 4-Sep 28 1.69 0.975 10.0 16.90 1327.32 3201 2.412 382.01 496.0 48.64 483.58 47.42

C-VH - 053 16:10 7-Aug 4-Sep 28 1.69 0.975 10.0 16.85 1323.40 3193 2.413 369.18 479.3 47.01 467.34 45.83
C-VH - 053 16:10 7-Aug 4-Sep 28 1.66 0.973 10.0 16.63 1306.12 3120 2.389 366.94 476.4 46.72 463.55 45.46
C-VH - 054 11:32 8-Aug 11-Aug 3 1.51 0.961 10.0 15.05 1177.30 2789 2.369 240.50 313.5 30.74 301.28 29.55

C-VH - 054 11:32 8-Aug 11-Aug 3 1.40 0.948 10.0 14.01 1100.34 2644 2.403 238.60 309.8 30.38 293.68 28.80
C-VH - 054 11:32 8-Aug 11-Aug 3 1.76 0.981 10.0 17.62 1383.87 3310 2.392 235.44 305.7 29.98 299.87 29.41
C-VH - 054 11:32 8-Aug 15-Aug 7 1.60 0.968 10.0 16.04 1259.78 3000 2.381 293.48 381.0 37.37 368.84 36.17 TUNEL N° 1 ; TRAMO ; 1+165 - 1+840
PORTAL DE SALIDA PROG. 1+840
C-VH - 054 11:32 8-Aug 15-Aug 7 1.70 0.976 10.0 16.99 1334.39 3190 2.391 312.61 405.9 39.80 396.13 38.85 COTAS: 1840
HORMIGON DE LANZADO TIPO ¨VH¨
C-VH - 054 11:32 8-Aug 15-Aug 7 1.64 0.971 10.0 16.38 1286.48 3080 2.394 298.65 387.8 38.03 376.51 36.92
C-VH - 054 11:32 8-Aug 5-Sep 28 1.66 0.973 10.0 16.65 1307.69 3060 2.340 312.58 405.8 39.80 394.88 38.72

C-VH - 054 11:32 8-Aug 5-Sep 28 1.68 0.974 10.0 16.75 1315.54 3080 2.341 350.12 454.6 44.58 442.76 43.42
C-VH - 054 11:32 8-Aug 5-Sep 28 1.68 0.974 10.0 16.77 1317.11 3090 2.346 340.11 441.6 43.30 430.10 42.18
C-VH - 055 11:00 10-Aug 13-Aug 3 1.66 0.973 10.0 16.58 1296.99 3010 2.321 174.90 228.0 22.36 221.84 21.75

C-VH - 055 11:00 10-Aug 13-Aug 3 1.72 0.978 10.0 17.22 1352.46 3080 2.277 168.96 219.4 21.51 214.54 21.04
C-VH - 055 11:00 10-Aug 13-Aug 3 1.64 0.971 10.0 16.35 1284.13 2950 2.297 183.91 238.8 23.42 231.85 22.74
C-VH - 055 11:00 10-Aug 17-Aug 7 1.69 0.975 10.0 16.85 1323.40 3070 2.320 240.12 311.8 30.57 303.96 29.81 TUNEL N° 1 ; TRAMO ; 1+165 - 1+840
PORTAL DE SALIDA PROG. 1+840
C-VH - 055 11:00 10-Aug 17-Aug 7 1.59 0.967 10.0 15.88 1247.21 2900 2.325 245.18 318.3 31.22 307.82 30.19 COTAS: 1924 - 1920
HORMIGON DE LANZADO TIPO
C-VH - 055 11:00 10-Aug 17-Aug 7 1.65 0.972 10.0 16.47 1293.55 3010 2.327 225.88 293.3 28.76 285.06 27.95 ¨VH¨
C-VH - 055 11:00 10-Aug 7-Sep 28 1.81 0.985 10.0 18.10 1421.57 3280 2.307 295.70 383.9 37.65 378.16 37.08
C-VH - 055 11:00 10-Aug 7-Sep 28 1.75 0.980 10.0 17.50 1374.45 3210 2.335 385.75 500.8 49.12 490.82 48.13

C-VH - 055 11:00 10-Aug 7-Sep 28 1.78 0.982 10.0 17.81 1398.79 3250 2.323 289.99 376.5 36.92 369.73 36.26
C-VH - 056 9:15 11-Aug 14-Aug 3 1.71 0.977 10.0 17.11 1338.45 3050 2.279 190.11 247.8 24.30 242.12 23.74
C-VH - 056 9:15 11-Aug 14-Aug 3 1.81 0.985 10.0 18.05 1417.64 3210 2.264 180.54 234.4 22.99 230.89 22.64

C-VH - 056 9:15 11-Aug 14-Aug 3 1.73 0.978 10.0 17.32 1360.31 3120 2.294 200.45 260.3 25.52 254.53 24.96
C-VH - 056 9:15 11-Aug 18-Aug 7 1.65 0.972 10.0 16.54 1299.05 2990 2.302 245.11 318.2 31.21 309.33 30.33 TUNEL N° 1 ; TRAMO ; 1+165 - 1+840
PORTAL DE SALIDA PROG. 1+840
C-VH - 056 9:15 11-Aug 18-Aug 7 1.65 0.972 10.0 16.47 1293.55 2980 2.304 258.41 335.5 32.90 326.11 31.98 COTAS: 1924 - 1920
HORMIGON DE LANZADO TIPO
C-VH - 056 9:15 11-Aug 18-Aug 7 1.60 0.968 10.0 15.98 1255.07 2870 2.287 230.65 299.5 29.37 289.88 28.43 ¨VH¨
C-VH - 056 9:15 11-Aug 8-Sep 28 1.76 0.981 10.0 17.55 1378.37 3210 2.329 303.92 394.6 38.70 387.10 37.96
C-VH - 056 9:15 11-Aug 8-Sep 28 1.74 0.979 10.0 17.44 1369.73 3180 2.322 375.84 488.0 47.85 477.72 46.85

C-VH - 056 9:15 11-Aug 8-Sep 28 1.65 0.972 10.0 16.51 1296.69 3000 2.314 350.87 455.5 44.67 442.79 43.42
C-VH - 057 10:00 12-Aug 15-Aug 3 1.64 0.971 10.0 15.60 1220.33 2960 2.426 273.50 356.5 34.96 346.18 33.95
C-VH - 057 10:00 12-Aug 15-Aug 3 1.57 0.966 10.0 16.02 1258.21 2840 2.257 243.60 316.3 31.02 305.52 29.96

C-VH - 057 10:00 12-Aug 15-Aug 3 1.73 0.978 10.0 16.11 1265.28 3110 2.458 246.80 320.4 31.42 313.38 30.73
C-VH - 057 10:00 12-Aug 19-Aug 7 1.73 0.978 10.0 14.69 1153.75 3160 2.739 340.60 442.2 43.37 432.49 42.41 TUNEL N° 1 ; TRAMO ; 1+165 - 1+840
PORTAL DE SALIDA PROG. 1+840
C-VH - 057 10:00 12-Aug 19-Aug 7 1.65 0.972 10.0 15.12 1187.52 2970 2.501 305.90 397.2 38.95 386.04 37.86 COTAS: 1924 - 1920
HORMIGON DE LANZADO TIPO
C-VH - 057 10:00 12-Aug 19-Aug 7 1.83 0.986 10.0 15.14 1189.09 3310 2.784 324.10 420.8 41.27 414.90 40.69 ¨VH¨
C-VH - 057 10:00 12-Aug 9-Sep 28 1.71 0.977 10.0 19.17 1505.61 3090 2.052 474.20 615.7 60.38 601.51 58.99
C-VH - 057 10:00 12-Aug 9-Sep 28 1.75 0.980 10.0 17.12 1344.60 3180 2.365 456.30 592.4 58.10 580.59 56.94
C-VH - 057 10:00 12-Aug 9-Sep 28 1.71 0.977 10.0 16.99 1334.39 3120 2.338 454.70 590.4 57.89 576.78 56.56

C-VH - 058 7:50 13-Aug 16-Aug 3 1.62 0.970 10.0 16.15 1263.35 2910 2.303 180.32 235.1 23.05 228.00 22.36
C-VH - 058 7:50 13-Aug 16-Aug 3 1.57 0.966 10.0 15.74 1236.22 2810 2.273 186.45 242.1 23.74 233.85 22.93
C-VH - 058 7:50 13-Aug 16-Aug 3 1.72 0.978 10.0 17.23 1353.24 3080 2.276 175.12 227.4 22.30 222.36 21.81
TUNEL N° 1 ; TRAMO ; 1+165 - 1+840
C-VH - 058 7:50 13-Aug 20-Aug 7 1.71 0.977 10.0 17.12 1344.60 3080 2.291 230.64 299.4 29.37 292.56 28.69 PORTAL DE SALIDA PROG. 1+840
COTAS: 1924 - 1920 COTAS: 1925 - 1921
C-VH - 058 7:50 13-Aug 20-Aug 7 1.76 0.973 10.0 16.58 1302.19 2990 2.296 241.77 313.9 30.78 305.43 29.95
HORMIGON DE
C-VH - 058 7:50 13-Aug 20-Aug 7 1.82 0.986 10.0 18.20 1429.42 3280 2.295 260.32 338.0 33.14 333.25 32.68 LANZADO TIPO ¨VH¨

C-VH - 058 7:50 13-Aug 10-Sep 28 1.64 0.971 10.0 16.39 1287.27 2990 2.323 370.01 480.4 47.11 466.47 45.74
C-VH - 058 7:50 13-Aug 10-Sep 28 1.61 0.969 10.0 16.10 1264.49 2910 2.301 330.19 428.7 42.04 415.41 40.74
C-VH - 058 7:50 13-Aug 10-Sep 28 1.68 0.974 10.0 16.80 1319.47 3050 2.312 269.64 350.1 34.33 340.98 33.44

C-VH - 059 8:47 14-Aug 17-Aug 3 1.63 0.970 10.0 16.32 1276.65 3210 2.514 175.65 229.0 22.45 222.10 21.78

TUNEL N° 2 ; TRAMO. 1+140-2+165


PORTAL DE SALIDA PROG. 1+140
HORMIGON DE
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
VH TIPO DE HORMIGON "H-25" Kg/cm2

HORA FECHA EDAD H./D. DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA RESIST. CORREGIDA
REGISTRO FC CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa) (kg/cm2) (Mpa)
C-VH - 059 8:47 14-Aug 17-Aug 3 1.59 0.967 10.0 15.87 1246.43 2870 2.303 180.55 234.4 22.99 226.68 22.23
C-VH - 059 8:47 14-Aug 17-Aug 3 1.71 0.977 10.0 17.11 1343.82 3020 2.247 175.54 227.9 22.35 222.67 21.84

C-VH - 059 8:47 14-Aug 21-Aug 7 1.78 0.982 10.0 17.81 1398.79 3210 2.295 240.14 311.8 30.58 306.17 30.03 TUNEL N° 2 ; TRAMO. 1+140-2+165
PORTAL DE SALIDA PROG. 1+140
C-VH - 059 8:47 14-Aug 21-Aug 7 1.55 0.964 10.0 15.48 1215.80 2770 2.278 137.11 178.0 17.46 171.61 16.83 HORMIGON DE
LANZADO TIPO ¨VH¨
C-VH - 059 8:47 14-Aug 21-Aug 7 1.63 0.970 10.0 16.32 1281.77 2920 2.278 226.37 293.9 28.82 285.09 27.96
C-VH - 059 8:47 14-Aug 11-Sep 28 1.67 0.974 10.0 16.69 1310.83 3040 2.319 289.14 375.4 36.81 365.64 35.86

C-VH - 059 8:47 14-Aug 11-Sep 28 1.65 0.972 10.0 16.50 1295.91 3010 2.323 302.80 393.1 38.55 382.13 37.47
C-VH - 059 8:47 14-Aug 11-Sep 28 1.71 0.977 10.0 17.08 1341.46 3130 2.333 322.46 418.7 41.06 409.03 40.11
C-VH - 060 15:00 14-Aug 17-Aug 3 1.73 0.978 10.0 17.32 1354.87 3110 2.295 170.12 221.8 21.75 216.88 21.27

C-VH - 060 15:00 14-Aug 17-Aug 3 1.67 0.974 10.0 16.71 1312.40 2970 2.263 180.65 234.5 23.00 228.45 22.40
C-VH - 060 15:00 14-Aug 17-Aug 3 1.60 0.968 10.0 15.98 1255.07 2880 2.295 167.65 217.7 21.35 210.70 20.66
C-VH - 060 15:00 14-Aug 21-Aug 7 1.67 0.974 10.0 16.65 1307.69 3010 2.302 236.98 307.7 30.17 299.68 29.39 TUNEL N° 1 ; TRAMO ; 1+165 - 1+840
PORTAL DE SALIDA PROG. 1+840
C-VH - 060 15:00 14-Aug 21-Aug 7 1.67 0.974 10.0 16.71 1312.40 3000 2.286 242.58 315.0 30.89 306.76 30.08 COTAS: 1923 - 1921
HORMIGON DE LANZADO TIPO ¨VH¨
C-VH - 060 15:00 14-Aug 21-Aug 7 1.82 0.980 10.0 18.17 1427.07 3270 2.291 220.47 286.2 28.07 280.52 27.51
C-VH - 060 15:00 14-Aug 11-Sep 28 1.78 0.982 10.0 17.75 1394.08 3220 2.310 296.37 384.8 37.74 377.86 37.06

C-VH - 060 15:00 14-Aug 11-Sep 28 1.61 0.969 10.0 16.12 1266.06 2940 2.322 320.58 416.2 40.82 403.32 39.55
C-VH - 060 15:00 14-Aug 11-Sep 28 1.67 0.974 10.0 16.72 1313.19 3040 2.315 341.78 443.7 43.52 432.21 42.39
C-VH - 061 9:20 15-Aug 18-Aug 3 1.55 0.964 10.0 15.48 1210.94 2790 2.304 167.30 218.1 21.39 210.23 20.62
C-VH - 061 9:20 15-Aug 18-Aug 3 1.70 0.976 10.0 16.97 1332.82 3040 2.281 193.44 251.2 24.63 245.12 24.04
C-VH - 061 9:20 15-Aug 18-Aug 3 1.62 0.970 10.0 16.24 1275.49 2900 2.274 171.24 222.3 21.80 215.66 21.15
C-VH - 061 9:20 15-Aug 22-Aug 7 1.65 0.972 10.0 16.45 1291.98 2960 2.291 255.33 331.5 32.51 322.22 31.60 TUNEL N° 1 ; TRAMO ; 1+165 - 1+840
PORTAL DE SALIDA PROG. 1+840
C-VH - 061 9:20 15-Aug 22-Aug 7 1.78 0.982 10.0 17.81 1398.79 3220 2.302 236.54 307.1 30.12 301.58 29.58 COTAS: 1921 - 1917
HORMIGON DE LANZADO TIPO ¨VH¨
C-VH - 061 9:20 15-Aug 22-Aug 7 1.58 0.966 10.0 15.78 1239.36 2820 2.275 240.64 312.4 30.64 301.81 29.60
C-VH - 061 9:20 15-Aug 12-Sep 28 1.78 0.982 10.0 17.75 1394.08 3220 2.310 326.58 424.0 41.58 416.38 40.83
C-VH - 061 9:20 15-Aug 12-Sep 28 1.61 0.969 10.0 16.12 1266.06 2940 2.322 324.32 421.1 41.29 408.03 40.01

C-VH - 061 9:20 15-Aug 12-Sep 28 1.67 0.974 10.0 16.72 1313.19 3050 2.323 319.83 415.2 40.72 404.45 39.66
C-VH - 062 11:50 16-Aug 19-Aug 3 1.57 0.966 10.0 15.66 1225.02 2810 2.294 175.65 229.0 22.45 221.18 21.69
C-VH - 062 11:50 16-Aug 19-Aug 3 1.77 0.982 10.0 17.65 1386.23 3150 2.272 180.65 234.5 23.00 230.32 22.59

C-VH - 062 11:50 16-Aug 19-Aug 3 1.64 0.971 10.0 16.36 1284.91 2910 2.265 190.65 247.5 24.27 240.35 23.57
TUNEL N° 1 ; TRAMO ; 1+165 - 1+840
C-VH - 062 11:50 16-Aug 23-Aug 7 1.65 0.972 10.0 16.53 1298.26 2970 2.288 235.83 306.2 30.03 297.61 29.19 PORTAL DE SALIDA PROG. 1+840
COTAS: 1925 - 1921 COTAS: 1920-1915
C-VH - 062 11:50 16-Aug 23-Aug 7 1.70 0.976 10.0 17.02 1336.75 3070 2.297 218.65 283.9 27.84 277.07 27.17
HORMIGON DE
C-VH - 062 11:50 16-Aug 23-Aug 7 1.73 0.978 10.0 17.34 1361.88 3100 2.276 220.47 286.2 28.07 279.95 27.45 LANZADO TIPO ¨VH¨

C-VH - 062 11:50 16-Aug 13-Sep 28 1.60 0.968 10.0 16.01 1257.42 2920 2.322 320.14 415.7 40.76 402.35 39.46
C-VH - 062 11:50 16-Aug 13-Sep 28 1.56 0.965 10.0 15.59 1224.44 2850 2.328 330.11 428.6 42.03 413.60 40.56

C-VH - 062 11:50 16-Aug 13-Sep 28 1.61 0.969 10.0 16.12 1266.06 2970 2.346 300.65 390.3 38.28 378.25 37.09
C-VH - 063 7:25 17-Aug 20-Aug 3 1.62 0.970 10.0 16.23 1269.61 3050 2.402 180.12 234.8 23.03 227.75 22.33
C-VH - 063 7:25 17-Aug 20-Aug 3 1.59 0.967 10.0 15.87 1246.43 3000 2.407 170.15 220.9 21.66 213.62 20.95

C-VH - 063 7:25 17-Aug 20-Aug 3 1.66 0.973 10.0 16.57 1301.40 3120 2.397 185.12 240.3 23.57 233.86 22.93
C-VH - 063 7:25 17-Aug 24-Aug 7 1.62 0.970 10.0 16.16 1269.20 2950 2.324 222.25 288.6 28.30 279.90 27.45 TUNEL N° 1 ; TRAMO ; 1+165 - 1+840
PORTAL DE SALIDA PROG. 1+840
C-VH - 063 7:25 17-Aug 24-Aug 7 1.80 0.984 10.0 18.01 1414.50 3250 2.298 245.23 318.4 31.22 313.30 30.72 COTAS: 1920 - 1925
HORMIGON DE LANZADO TIPO ¨VH¨
C-VH - 063 7:25 17-Aug 24-Aug 7 1.98 0.998 10.0 19.77 1552.73 3580 2.306 238.99 310.3 30.43 309.67 30.37
C-VH - 063 7:25 17-Aug 14-Sep 28 1.52 0.962 10.0 15.18 1192.23 2820 2.365 299.16 388.4 38.09 373.65 36.64
C-VH - 063 7:25 17-Aug 14-Sep 28 1.72 0.983 10.0 17.92 1407.43 3260 2.316 299.51 388.9 38.13 382.26 37.49
C-VH - 063 7:25 17-Aug 14-Sep 28 1.72 0.978 10.0 17.19 1350.10 3120 2.311 304.18 394.9 38.73 386.24 37.88

C-VH - 064 14:50 18-Aug 21-Aug 3 1.72 0.978 10.0 17.18 1343.92 3150 2.344 180.12 234.8 23.03 229.63 22.52
C-VH - 064 14:50 18-Aug 21-Aug 3 1.59 0.967 10.0 15.87 1246.43 2880 2.311 195.22 253.5 24.86 245.10 24.04
C-VH - 064 14:50 18-Aug 21-Aug 3 1.63 0.970 10.0 16.33 1282.56 2950 2.300 178.12 231.3 22.68 224.32 22.00

C-VH - 064 14:50 18-Aug 25-Aug 7 1.91 0.993 10.0 19.11 1500.90 3480 2.319 251.12 326.0 31.97 323.76 31.75 TUNEL N° 1 ; TRAMO ; 1+165 - 1+840
PORTAL DE SALIDA PROG. 1+840
C-VH - 064 14:50 18-Aug 25-Aug 7 1.81 0.985 10.0 18.12 1423.14 3300 2.319 262.37 340.6 33.41 335.54 32.90 COTAS: 1920 - 1915
HORMIGON DE LANZADO TIPO ¨VH¨
C-VH - 064 14:50 18-Aug 25-Aug 7 1.76 0.981 10.0 17.55 1378.37 3180 2.307 269.88 350.4 34.36 343.74 33.71

C-VH - 064 14:50 18-Aug 15-Sep 28 1.74 0.979 10.0 17.42 1368.16 3210 2.346 434.90 564.6 55.37 552.79 54.21
C-VH - 064 14:50 18-Aug 15-Sep 28 1.60 0.968 10.0 16.02 1258.21 3040 2.416 316.38 410.8 40.28 397.63 38.99
C-VH - 064 14:50 18-Aug 15-Sep 28 1.78 0.982 10.0 17.80 1398.01 3320 2.375 351.35 456.2 44.74 447.96 43.93

C-VH - 065 9:10 19-Aug 22-Aug 3 1.82 0.986 10.0 18.15 1419.80 3290 2.317 195.05 254.3 24.93 250.70 24.59
C-VH - 065 9:10 19-Aug 22-Aug 3 1.63 0.970 10.0 16.32 1281.77 2940 2.294 185.47 240.8 23.61 233.58 22.91
C-VH - 065 9:10 19-Aug 22-Aug 3 1.72 0.978 10.0 17.22 1352.46 3110 2.300 180.66 234.6 23.00 229.40 22.50

C-VH - 065 9:10 19-Aug 26-Aug 7 1.62 0.970 10.0 16.15 1268.42 2910 2.294 260.54 338.3 33.17 328.12 32.18 TUNEL N° 1 ; TRAMO ; 1+165 - 1+840
PORTAL DE SALIDA PROG. 1+840
C-VH - 065 9:10 19-Aug 26-Aug 7 1.51 0.961 10.0 15.12 1187.52 2750 2.316 270.11 350.7 34.39 337.02 33.05 COTAS: 1920 - 1915
HORMIGON DE LANZADO TIPO ¨VH¨
C-VH - 065 9:10 19-Aug 26-Aug 7 1.53 0.962 10.0 15.33 1204.02 2780 2.309 265.33 344.5 33.78 331.40 32.50

C-VH - 065 9:10 19-Aug 16-Sep 28 1.76 0.981 10.0 17.64 1385.44 3270 2.360 350.25 454.7 44.60 446.10 43.75
C-VH - 065 9:10 19-Aug 16-Sep 28 1.58 0.966 10.0 15.80 1240.93 2880 2.321 334.76 434.6 42.62 419.86 41.17
C-VH - 065 9:10 19-Aug 16-Sep 28 1.72 0.978 10.0 17.23 1353.24 3130 2.313 332.61 431.8 42.35 422.34 41.42
C-VH - 066 8:05 20-Aug 23-Aug 3 1.52 0.962 10.0 15.22 1190.60 2750 2.310 179.66 234.2 22.97 225.30 22.09

C-VH - 066 8:05 20-Aug 23-Aug 3 1.59 0.967 10.0 15.87 1246.43 2880 2.311 189.67 246.3 24.15 238.13 23.35
C-VH - 066 8:05 20-Aug 23-Aug 3 1.61 0.969 10.0 16.05 1260.56 2900 2.301 170.25 221.0 21.68 214.19 21.00
C-VH - 066 8:05 20-Aug 27-Aug 7 1.58 0.966 10.0 15.75 1237.00 2850 2.304 260.35 338.0 33.15 326.53 32.02 TUNEL N° 2 ; TRAMO. 1+140-2+165
PORTAL DE SALIDA PROG. 1+140
C-VH - 066 8:05 20-Aug 27-Aug 7 1.57 0.966 10.0 15.68 1231.50 2840 2.306 255.11 331.2 32.48 319.96 31.38 COTAS: 1925 - 1915
HORMIGON DE LANZADO TIPO ¨VH¨
C-VH - 066 8:05 20-Aug 27-Aug 7 1.64 0.971 10.0 16.35 1284.13 2970 2.313 259.66 337.1 33.06 327.35 32.10
C-VH - 066 8:05 20-Aug 17-Sep 28 1.66 0.973 10.0 16.56 1300.62 3090 2.376 299.80 389.2 38.17 378.73 37.14

C-VH - 066 8:05 20-Aug 17-Sep 28 1.58 0.966 10.0 15.79 1240.14 2930 2.363 294.41 382.2 37.49 369.25 36.21
C-VH - 066 8:05 20-Aug 17-Sep 28 1.60 0.968 10.0 16.04 1259.78 2970 2.358 284.57 369.5 36.23 357.65 35.07
C-VH - 067 11:10 21-Aug 24-Aug 3 1.68 0.974 10.0 16.84 1317.33 3050 2.315 182.44 237.8 23.32 231.64 22.72

C-VH - 067 11:10 21-Aug 24-Aug 3 1.70 0.976 10.0 16.97 1332.82 3070 2.303 180.69 234.6 23.01 228.97 22.45

TUNEL N° 2 ; TRAMO. 1+140-2+165


PORTAL DE SALIDA PROG. 2+165
COTAS: 1925 - 1920
HORMIGON DE LANZADO TIPO ¨VH¨
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
VH TIPO DE HORMIGON "H-25" Kg/cm2

HORA FECHA EDAD H./D. DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA RESIST. CORREGIDA
REGISTRO FC CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa) (kg/cm2) (Mpa)
C-VH - 067 11:10 21-Aug 24-Aug 3 1.80 0.984 10.0 18.02 1415.29 3260 2.303 192.65 250.1 24.53 246.12 24.14
C-VH - 067 11:10 21-Aug 28-Aug 7 1.57 0.966 10.0 15.65 1229.15 2820 2.294 260.32 338.0 33.14 326.49 32.02 TUNEL N° 2 ; TRAMO. 1+140-2+165
PORTAL DE SALIDA PROG. 2+165
C-VH - 067 11:10 21-Aug 28-Aug 7 1.52 0.962 10.0 15.22 1195.38 2750 2.301 258.47 335.6 32.91 322.83 31.66 COTAS: 1925 - 1920
HORMIGON DE LANZADO TIPO ¨VH¨
C-VH - 067 11:10 21-Aug 28-Aug 7 1.69 0.975 10.0 16.87 1324.97 3050 2.302 265.33 344.5 33.78 335.88 32.94
C-VH - 067 11:10 21-Aug 18-Sep 28 1.62 0.970 10.0 16.19 1271.56 3000 2.359 263.54 342.2 33.55 331.90 32.55
C-VH - 067 11:10 21-Aug 18-Sep 28 1.66 0.973 10.0 16.63 1306.12 3080 2.358 274.16 356.0 34.91 346.34 33.96

C-VH - 067 11:10 21-Aug 18-Sep 28 1.68 0.974 10.0 16.76 1316.33 3090 2.347 276.82 359.4 35.25 350.06 34.33
C-VH - 068 16:30 22-Aug 25-Aug 3 1.61 0.969 10.0 16.12 1261.00 2920 2.316 200.12 260.9 25.58 252.78 24.79
C-VH - 068 16:30 22-Aug 25-Aug 3 1.72 0.978 10.0 17.22 1352.46 3110 2.300 204.33 265.3 26.02 259.45 25.44

C-VH - 068 16:30 22-Aug 25-Aug 3 1.62 0.970 10.0 16.24 1275.49 2930 2.297 192.65 250.1 24.53 242.62 23.79
C-VH - 068 16:30 22-Aug 29-Aug 7 1.57 0.966 10.0 15.68 1231.50 2860 2.322 270.32 351.0 34.42 339.04 33.25 TUNEL N° 1 ; TRAMO ; 1+165 - 1+840
PORTAL DE SALIDA PROG. 1+840
C-VH - 068 16:30 22-Aug 29-Aug 7 1.61 0.961 10.0 16.12 1266.06 2910 2.298 259.32 336.7 33.02 323.56 31.73 COTAS: 1916 - 1911
HORMIGON DE LANZADO TIPO ¨VH¨
C-VH - 068 16:30 22-Aug 29-Aug 7 1.59 0.967 10.0 15.87 1246.43 2880 2.311 268.88 349.1 34.23 337.58 33.11
C-VH - 068 16:30 22-Aug 19-Sep 28 1.68 0.974 10.0 16.80 1319.47 3020 2.289 259.01 336.3 32.98 327.54 32.12
C-VH - 068 16:30 22-Aug 19-Sep 28 1.51 0.961 10.0 15.05 1182.02 2840 2.403 296.84 385.4 37.79 370.37 36.32

C-VH - 068 16:30 22-Aug 19-Sep 28 1.76 0.981 10.0 17.56 1379.16 3230 2.342 305.74 397.0 38.93 389.41 38.19
C-VH - 069 8:55 23-Aug 26-Aug 3 1.63 0.970 10.0 16.25 1271.17 2930 2.305 190.87 248.8 24.40 241.34 23.67
C-VH - 069 8:55 23-Aug 26-Aug 3 1.65 0.972 10.0 16.53 1298.26 3000 2.311 178.99 232.4 22.79 225.88 22.15
C-VH - 069 8:55 23-Aug 26-Aug 3 1.57 0.966 10.0 15.66 1229.93 2820 2.293 180.24 234.0 22.95 226.06 22.17
C-VH - 069 8:55 23-Aug 30-Aug 7 1.56 0.965 10.0 15.57 1222.86 2830 2.314 257.89 334.8 32.84 323.11 31.69 TUNEL N° 2 ; TRAMO. 1+140-2+165
PORTAL DE SALIDA PROG. 2+165
C-VH - 069 8:55 23-Aug 30-Aug 7 1.60 0.968 10.0 16.01 1257.42 2880 2.290 268.57 348.7 34.20 337.54 33.10 COTAS: 1908 - 1905
HORMIGON DE LANZADO TIPO ¨VH¨
C-VH - 069 8:55 23-Aug 30-Aug 7 1.59 0.967 10.0 15.88 1247.21 2870 2.301 247.01 320.7 31.45 310.12 30.41
C-VH - 069 8:55 23-Aug 20-Sep 28 1.72 0.978 10.0 17.24 1354.03 3190 2.356 291.87 378.9 37.16 370.61 36.34
C-VH - 069 8:55 23-Aug 20-Sep 28 1.67 0.974 10.0 16.69 1310.83 2980 2.273 239.99 311.6 30.56 303.49 29.76
C-VH - 069 8:55 23-Aug 20-Sep 28 1.67 0.974 10.0 16.71 1312.40 3000 2.286 280.88 364.7 35.76 355.20 34.83

C-VH - 070 13:15 24-Aug 27-Aug 3 1.61 0.969 10.0 16.12 1261.00 2900 2.300 180.74 235.6 23.10 228.30 22.39
C-VH - 070 13:15 24-Aug 27-Aug 3 1.61 0.969 10.0 16.10 1264.49 2880 2.278 191.24 248.3 24.35 240.60 23.59
C-VH - 070 13:15 24-Aug 27-Aug 3 1.74 0.979 10.0 17.35 1362.67 3140 2.304 185.11 240.3 23.57 235.29 23.07

C-VH - 070 13:15 24-Aug 31-Aug 7 1.70 0.976 10.0 17.02 1336.75 3070 2.297 270.11 350.7 34.39 342.28 33.57 TUNEL N° 1 ; TRAMO ; 1+165 - 1+840
PORTAL DE ENTRADA PROG. 1+165
C-VH - 070 13:15 24-Aug 31-Aug 7 1.76 0.981 10.0 17.55 1378.37 3150 2.285 268.12 348.1 34.14 341.50 33.49 COTAS: 1925 - 1920
HORMIGON DE LANZADO TIPO ¨VH¨
C-VH - 070 13:15 24-Aug 31-Aug 7 1.69 0.975 10.0 16.88 1325.75 3050 2.301 255.98 332.3 32.59 324.04 31.78

C-VH - 070 13:15 24-Aug 21-Sep 28 1.79 0.983 10.0 17.90 1405.86 3340 2.376 304.56 395.4 38.78 388.70 38.12
C-VH - 070 13:15 24-Aug 21-Sep 28 1.54 0.963 10.0 15.36 1206.37 2910 2.412 375.88 488.0 47.86 469.96 46.09
C-VH - 070 13:15 24-Aug 21-Sep 28 1.59 0.967 10.0 15.94 1251.92 2960 2.364 332.71 432.0 42.36 417.72 40.96

C-VH - 071 9:10 25-Aug 28-Aug 3 1.59 0.967 10.0 15.87 1241.45 2880 2.320 160.58 209.3 20.53 202.42 19.85
C-VH - 071 9:10 25-Aug 28-Aug 3 1.65 0.972 10.0 16.48 1294.34 2960 2.287 172.58 224.1 21.97 217.79 21.36
C-VH - 071 9:10 25-Aug 28-Aug 3 1.68 0.974 10.0 16.77 1317.11 3030 2.300 166.22 215.8 21.16 210.20 20.61

C-VH - 071 9:10 25-Aug 1-Sep 7 1.78 0.982 10.0 17.80 1398.01 3260 2.332 282.39 366.6 35.96 360.04 35.31 TUNEL N° 2 ; TRAMO. 1+140-2+165
PORTAL DE SALIDA PROG. 2+165
C-VH - 071 9:10 25-Aug 1-Sep 7 1.73 0.978 10.0 17.32 1360.31 3210 2.360 288.57 374.7 36.74 366.42 35.93 COTAS: 1916 - 1911
HORMIGON DE LANZADO TIPO ¨VH¨
C-VH - 071 9:10 25-Aug 1-Sep 7 1.62 0.970 10.0 16.17 1269.99 2970 2.339 271.21 352.1 34.53 341.56 33.50

C-VH - 071 9:10 25-Aug 22-Sep 28 1.71 0.977 10.0 17.12 1344.60 3230 2.402 374.10 485.7 47.63 474.54 46.54
C-VH - 071 9:10 25-Aug 22-Sep 28 1.60 0.968 10.0 16.00 1256.64 2970 2.363 327.96 425.8 41.76 412.18 40.42
C-VH - 071 9:10 25-Aug 22-Sep 28 1.59 0.967 10.0 15.92 1250.35 2920 2.335 341.63 443.6 43.50 428.92 42.06
C-VH - 072 7:30 26-Aug 29-Aug 3 1.62 0.970 10.0 16.15 1263.35 2900 2.295 210.15 273.9 26.86 265.72 26.06

C-VH - 072 7:30 26-Aug 29-Aug 3 1.59 0.967 10.0 15.87 1246.43 2870 2.303 202.35 262.7 25.76 254.05 24.91
C-VH - 072 7:30 26-Aug 29-Aug 3 1.63 0.970 10.0 16.32 1281.77 2950 2.302 197.68 256.7 25.17 248.96 24.41
C-VH - 072 7:30 26-Aug 2-Sep 7 1.73 0.978 10.0 17.25 1354.81 3180 2.347 247.82 321.8 31.55 314.68 30.86 TUNEL N° 2 ; TRAMO. 1+140-2+165
PORTAL DE ENTRADA PROG. 1+140
C-VH - 072 7:30 26-Aug 2-Sep 7 1.66 0.973 10.0 16.56 1300.62 2990 2.299 269.61 350.0 34.33 340.60 33.40 COTAS: 1926 - 1921
HORMIGON DE LANZADO TIPO ¨VH¨
C-VH - 072 7:30 26-Aug 2-Sep 7 1.61 0.969 10.0 16.06 1261.35 3080 2.442 272.80 354.2 34.73 343.21 33.66
C-VH - 072 7:30 26-Aug 23-Sep 28 1.61 0.969 10.0 16.09 1263.71 2940 2.326 282.55 366.8 35.98 355.47 34.86

C-VH - 072 7:30 26-Aug 23-Sep 28 1.43 0.952 10.0 14.33 1125.48 2690 2.390 269.65 350.1 34.33 333.29 32.68
C-VH - 072 7:30 26-Aug 23-Sep 28 1.70 0.976 10.0 16.99 1334.39 3150 2.361 304.72 395.6 38.80 386.14 37.87
C-VH - 073 10:30 27-Aug 30-Aug 3 1.66 0.973 10.0 16.60 1298.55 2990 2.303 205.78 268.2 26.31 261.00 25.60

C-VH - 073 10:30 27-Aug 30-Aug 3 1.60 0.968 10.0 15.99 1255.85 2900 2.309 220.14 285.8 28.03 276.67 27.13
C-VH - 073 10:30 27-Aug 30-Aug 3 1.63 0.970 10.0 16.30 1280.20 2970 2.320 208.69 271.0 26.57 262.82 25.77
C-VH - 073 10:30 27-Aug 3-Sep 7 1.48 0.958 10.0 14.80 1162.39 2700 2.323 270.60 351.3 34.45 336.58 33.01 TUNEL N° 2 ; TRAMO. 1+140-2+165
PORTAL DE ENTRADA PROG. 1+140
C-VH - 073 10:30 27-Aug 3-Sep 7 1.46 0.955 10.0 14.55 1142.75 2760 2.415 272.92 354.3 34.75 338.40 33.19 COTAS: 1924 - 1919
HORMIGON DE LANZADO TIPO ¨VH¨
C-VH - 073 10:30 27-Aug 3-Sep 7 1.53 0.962 10.0 15.31 1202.44 2870 2.387 270.14 350.7 34.40 337.41 33.09
C-VH - 073 10:30 27-Aug 24-Sep 28 1.53 0.962 10.0 15.34 1204.80 2910 2.415 323.67 420.2 41.21 404.27 39.64

C-VH - 073 10:30 27-Aug 24-Sep 28 1.55 0.964 10.0 15.52 1218.94 2920 2.396 304.58 395.4 38.78 381.21 37.38
C-VH - 073 10:30 27-Aug 24-Sep 28 1.42 0.950 10.0 14.17 1112.91 2600 2.336 347.87 451.7 44.29 429.07 42.08
C-VH - 074 8:00 28-Aug 31-Aug 3 1.63 0.970 10.0 16.25 1271.17 2990 2.352 215.47 280.9 27.54 272.45 26.72
C-VH - 074 8:00 28-Aug 31-Aug 3 1.69 0.975 10.0 16.88 1325.75 3090 2.331 197.65 256.6 25.17 250.20 24.54

C-VH - 074 8:00 28-Aug 31-Aug 3 1.60 0.968 10.0 15.96 1253.50 2910 2.322 200.14 259.9 25.48 251.54 24.67
C-VH - 074 8:00 28-Aug 4-Sep 7 1.49 0.959 10.0 14.88 1168.67 2760 2.362 264.73 343.7 33.71 329.62 32.32 TUNEL N° 1 ; TRAMO ; 1+165 - 1+840
PORTAL DE ENTRADA PROG. 1+165
C-VH - 074 8:00 28-Aug 4-Sep 7 1.65 0.972 10.0 16.53 1298.26 3020 2.326 272.77 354.1 34.73 344.23 33.76 COTAS: 1924 - 1919
HORMIGON DE LANZADO TIPO ¨VH¨
C-VH - 074 8:00 28-Aug 4-Sep 7 1.47 0.956 10.0 14.73 1156.89 2710 2.342 273.46 355.0 34.82 339.42 33.29
C-VH - 074 8:00 28-Aug 25-Sep 28 1.58 0.966 10.0 15.76 1237.79 2910 2.351 306.85 398.4 39.07 384.85 37.74
C-VH - 074 8:00 28-Aug 25-Sep 28 1.44 0.953 10.0 14.44 1134.11 2730 2.407 313.29 406.8 39.89 387.64 38.01

C-VH - 074 8:00 28-Aug 25-Sep 28 1.52 0.962 10.0 15.22 1195.38 2800 2.342 325.94 423.2 41.50 407.10 39.92
C-VH - 075 9:20 29-Aug 1-Sep 3 1.66 0.973 10.0 16.58 1296.99 3010 2.321 264.73 345.1 33.84 335.77 32.93
C-VH - 075 9:20 29-Aug 1-Sep 3 1.64 0.971 10.0 16.43 1290.41 3280 2.542 222.77 289.2 28.36 280.84 27.54

C-VH - 075 9:20 29-Aug 1-Sep 3 1.47 0.956 10.0 14.73 1156.89 2890 2.498 213.46 277.1 27.18 264.95 25.98
TUNEL N° 1 ; TRAMO ; 1+165 - 1+840
PORTAL DE SALIDA PROG. 1+840
COTAS: 1911 - 1906
HORMIGON DE LANZADO TIPO ¨VH¨
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
VH TIPO DE HORMIGON "H-25" Kg/cm2

HORA FECHA EDAD H./D. DIAM ALTURA VOLUMEN PESO DENSIDAD CARGA RESISTENCIA RESIST. CORREGIDA
REGISTRO FC CARACTERISTICAS DE LA ESTRUCTURA
MOLDEO VACIADO ROTURA Dias (cm) (cm) (cm) (cm3) (g) (g/cm3) (kN) (kg/cm2) (Mpa) (kg/cm2) (Mpa)
C-VH - 075 9:20 29-Aug 5-Sep 7 1.60 0.968 10.0 16.00 1256.64 2990 2.379 274.33 356.2 34.93 344.78 33.81 TUNEL N° 1 ; TRAMO ; 1+165 - 1+840
PORTAL DE SALIDA PROG. 1+840
C-VH - 075 9:20 29-Aug 5-Sep 7 1.50 0.960 10.0 15.00 1178.10 2760 2.343 262.28 340.5 33.39 326.91 32.06 COTAS: 1911 - 1906
HORMIGON DE LANZADO TIPO ¨VH¨
C-VH - 075 9:20 29-Aug 5-Sep 7 1.55 0.964 10.0 15.45 1213.44 2870 2.365 275.48 357.7 35.08 344.79 33.81

C-VH - 075 9:20 29-Aug 26-Sep 28 1.64 0.971 10.0 16.43 1290.41 3050 2.364 282.64 367.0 35.99 356.32 34.94
C-VH - 075 9:20 29-Aug 26-Sep 28 1.45 0.954 10.0 14.49 1138.04 2730 2.399 245.76 319.1 31.29 304.40 29.85
C-VH - 075 9:20 29-Aug 26-Sep 28 1.66 0.973 10.0 16.57 1301.40 3120 2.397 323.21 419.6 41.15 408.31 40.04
C-VH - 076 10:25 30-Aug 2-Sep 3 1.69 0.975 10.0 16.85 1318.11 3170 2.405 192.22 250.6 24.57 244.30 23.96
C-VH - 076 10:25 30-Aug 2-Sep 3 1.72 0.978 10.0 17.21 1351.67 3090 2.286 204.45 265.4 26.03 259.61 25.46
C-VH - 076 10:25 30-Aug 2-Sep 3 1.64 0.971 10.0 16.43 1290.41 3120 2.418 218.05 283.1 27.76 274.89 26.96

C-VH - 076 10:25 30-Aug 6-Sep 7 1.76 0.981 10.0 17.59 1381.52 3240 2.345 228.50 296.7 29.09 291.03 28.54 TUNEL N° 1 ; TRAMO ; 1+165 - 1+840
PORTAL DE ENTRADA PROG. 1+165
C-VH - 076 10:25 30-Aug 6-Sep 7 1.40 0.948 10.0 14.00 1099.56 2690 2.446 259.72 337.2 33.07 319.67 31.35 COTAS: 1920 - 1915
HORMIGON DE LANZADO TIPO ¨VH¨
C-VH - 076 10:25 30-Aug 6-Sep 7 1.42 0.950 10.0 14.17 1112.91 2580 2.318 214.74 278.8 27.34 264.87 25.97
C-VH - 076 10:25 30-Aug 27-Sep 28 1.60 0.968 10.0 15.98 1255.07 2910 2.319 352.62 457.8 44.90 443.17 43.46

C-VH - 076 10:25 30-Aug 27-Sep 28 1.47 0.956 10.0 14.72 1156.11 2740 2.370 306.99 398.6 39.09 381.04 37.37
C-VH - 076 10:25 30-Aug 27-Sep 28 1.41 0.949 10.0 14.05 1103.48 2620 2.374 352.63 457.8 44.90 434.49 42.61
C-VH - 077 16:20 1-Sep 4-Sep 3 1.51 0.961 10.0 15.12 1182.78 2920 2.469 189.99 247.7 24.29 238.00 23.34

C-VH - 077 16:20 1-Sep 4-Sep 3 1.62 0.970 10.0 16.15 1268.42 3090 2.436 209.05 271.4 26.62 263.28 25.82
C-VH - 077 16:20 1-Sep 4-Sep 3 1.53 0.962 10.0 15.33 1204.02 3190 2.649 214.74 278.8 27.34 268.21 26.30
C-VH - 077 16:20 1-Sep 8-Sep 7 1.73 0.978 10.0 17.33 1361.10 3120 2.292 239.53 311.0 30.50 304.15 29.83 TUNEL N° 2 ; TRAMO. 1+140-2+165
PORTAL DE ENTRADA PROG. 1+140
C-VH - 077 16:20 1-Sep 8-Sep 7 1.54 0.963 10.0 15.41 1210.30 2860 2.363 222.91 289.4 28.38 278.71 27.33 COTAS: 1928 - 1923
HORMIGON DE LANZADO TIPO ¨VH¨
C-VH - 077 16:20 1-Sep 8-Sep 7 1.43 0.952 10.0 14.34 1126.26 2690 2.388 228.91 297.2 29.15 282.94 27.75
C-VH - 077 16:20 1-Sep 29-Sep 28 1.42 0.950 10.0 14.15 1111.34 2610 2.349 347.97 451.8 44.30 429.20 42.09

C-VH - 077 16:20 1-Sep 29-Sep 28 1.69 0.975 10.0 16.94 1330.46 3140 2.360 309.95 402.4 39.46 392.36 38.48
C-VH - 077 16:20 1-Sep 29-Sep 28 1.67 0.974 10.0 16.66 1308.47 3100 2.369 294.42 382.3 37.49 372.32 36.51
C-VH - 078 15:25 2-Sep 5-Sep 3 1.75 0.980 10.0 17.51 1369.74 3290 2.402 192.80 251.3 24.65 246.30 24.15
C-VH - 078 15:25 2-Sep 5-Sep 3 1.73 0.978 10.0 17.34 1361.88 3050 2.240 184.91 240.1 23.54 234.79 23.03
C-VH - 078 15:25 2-Sep 5-Sep 3 1.80 0.984 10.0 18.01 1414.50 3190 2.255 196.48 255.1 25.02 251.02 24.62
C-VH - 078 15:25 2-Sep 9-Sep 7 1.84 0.987 10.0 18.39 1444.35 3370 2.333 202.80 263.3 25.82 259.88 25.49 TUNEL N° 1 ; TRAMO ; 1+165 - 1+840
PORTAL DE ENTRADA PROG. 1+165
C-VH - 078 15:25 2-Sep 9-Sep 7 1.73 0.978 10.0 17.31 1359.52 3210 2.361 214.01 277.9 27.25 271.75 26.65 COTAS: 1915 - 1911
HORMIGON DE LANZADO TIPO ¨VH¨
C-VH - 078 15:25 2-Sep 9-Sep 7 1.88 0.990 10.0 18.78 1474.98 3450 2.339 265.98 345.3 33.87 341.88 33.53
C-VH - 078 15:25 2-Sep 30-Sep 28 1.44 0.953 10.0 14.36 1127.83 2670 2.367 323.75 420.3 41.22 400.58 39.28
C-VH - 078 15:25 2-Sep 30-Sep 28 1.67 0.974 10.0 16.71 1312.40 3130 2.385 255.19 331.3 32.49 322.71 31.65

C-VH - 078 15:25 2-Sep 30-Sep 28 1.80 0.984 10.0 18.00 1413.72 3320 2.348 343.42 445.9 43.73 438.74 43.03

Constructora Control y Calidad


SINOHYDRO CONNAL S.R.L.
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
VH TIPO DE HORMIGON "H-25" Kg/cm2
03 DIAS 7 DIAS 28 DIAS
TRAMO TIPO
FECHA DENSIDAD RESISTENCIA DENSIDAD RESISTENCIA DENSIDAD RESISTENCIA
REGISTRO ELEMENTO ESTRUCTURAL OBS
VACIADO
INICIO FINAL (g/cm3) (kg/cm2) (Mpa) (g/cm3) (kg/cm2) (Mpa) (g/cm3) (kg/cm2) (Mpa) H°

C-VH-051 4-Aug 1+165 1+840 2.380 283.2 27.8 2.380 351.2 34.4 2.370 444.4 43.6 VH HORMIGON DE LANZADO EN PORTAL DE SALIDA TUNEL # 1 CUMPLE

C-VH-052 7-Aug 1+165 1+840 2.386 290.2 28.5 2.425 384.9 37.7 2.277 466.9 45.8 VH HORMIGON DE LANZADO EN PORTAL DE SALIDA TUNEL # 1 CUMPLE

C-VH-053 7-Aug 1+165 1+840 2.400 294.2 28.8 2.386 394.1 38.6 2.404 471.5 46.2 VH HORMIGON DE LANZADO EN PORTAL DE SALIDA TUNEL # 1 CUMPLE

C-VH-054 8-Aug 1+165 1+840 2.388 298.3 29.3 2.389 380.5 37.3 2.342 422.6 41.4 VH HORMIGON DE LANZADO EN PORTAL DE SALIDA TUNEL # 1 CUMPLE

C-VH-055 10-Aug 1+165 1+840 2.298 222.7 21.8 2.324 298.9 29.3 2.322 412.9 40.5 VH HORMIGON DE LANZADO EN PORTAL DE SALIDA TUNEL # 1 CUMPLE

C-VH-056 11-Aug 1+165 1+840 2.279 242.5 23.8 2.297 308.4 30.2 2.321 435.9 42.7 VH HORMIGON DE LANZADO EN PORTAL DE SALIDA TUNEL # 1 CUMPLE

C-VH-057 12-Aug 1+165 1+840 2.380 321.7 31.5 2.675 411.1 40.3 2.252 586.3 57.5 VH HORMIGON DE LANZADO EN PORTAL DE SALIDA TUNEL # 1 CUMPLE

C-VH-058 13-Aug 1+165 1+840 2.284 228.1 22.4 2.294 310.4 30.4 2.312 407.6 40.0 VH HORMIGON DE LANZADO EN PORTAL DE SALIDA TUNEL # 1 CUMPLE

C-VH-059 14-Aug 1+140 2+165 2.355 223.8 21.9 2.284 254.3 24.9 2.325 385.6 37.8 VH HORMIGON DE LANZADO EN PORTAL DE SALIDA TUNEL # 2 CUMPLE

C-VH-060 14-Aug 1+165 1+840 2.284 218.7 21.4 2.293 295.7 29.0 2.316 404.5 39.7 VH HORMIGON DE LANZADO EN PORTAL DE SALIDA TUNEL # 1 CUMPLE

C-VH-061 15-Aug 1+165 1+840 2.286 223.7 21.9 2.289 308.5 30.3 2.318 409.6 40.2 VH HORMIGON DE LANZADO EN PORTAL DE SALIDA TUNEL # 1 CUMPLE

C-VH-062 16-Aug 1+165 1+840 2.277 230.6 22.6 2.287 284.9 27.9 2.332 398.1 39.0 VH HORMIGON DE LANZADO EN PORTAL DE SALIDA TUNEL # 1 CUMPLE

C-VH-063 17-Aug 1+165 1+840 2.402 225.1 22.1 2.309 301.0 29.5 2.331 380.7 37.3 VH HORMIGON DE LANZADO EN PORTAL DE SALIDA TUNEL # 1 CUMPLE

C-VH-064 18-Aug 1+165 1+840 2.318 233.0 22.9 2.315 334.3 32.8 2.379 466.1 45.7 VH HORMIGON DE LANZADO EN PORTAL DE SALIDA TUNEL # 1 CUMPLE

C-VH-065 19-Aug 1+165 1+840 2.303 237.9 23.3 2.306 332.2 32.6 2.331 429.4 42.1 VH HORMIGON DE LANZADO EN PORTAL DE SALIDA TUNEL # 1 CUMPLE

C-VH-066 20-Aug 1+140 2+165 2.307 225.9 22.2 2.308 324.6 31.8 2.365 368.5 36.1 VH HORMIGON DE LANZADO EN PORTAL DE SALIDA TUNEL # 2 CUMPLE

C-VH-067 21-Aug 1+140 2+165 2.307 235.6 23.1 2.299 328.4 32.2 2.355 342.8 33.6 VH HORMIGON DE LANZADO EN PORTAL DE SALIDA TUNEL # 2 CUMPLE

C-VH-068 22-Aug 1+165 1+840 2.304 251.6 24.7 2.310 333.4 32.7 2.344 362.4 35.5 VH HORMIGON DE LANZADO EN PORTAL DE SALIDA TUNEL # 1 CUMPLE

C-VH-069 23-Aug 1+140 2+165 2.303 231.1 22.7 2.302 323.6 31.7 2.305 343.1 33.6 VH HORMIGON DE LANZADO EN PORTAL DE SALIDA TUNEL # 2 CUMPLE

C-VH-070 24-Aug 1+140 1+840 2.294 234.7 23.0 2.294 335.9 32.9 2.384 425.5 41.7 VH HORMIGON DE LANZADO EN PORTAL DE ENTRADA TUNEL # 1 CUMPLE

C-VH-071 25-Aug 1+140 2+165 2.302 210.1 20.6 2.343 356.0 34.9 2.367 438.5 43.0 VH HORMIGON DE LANZADO EN PORTAL DE SALIDA TUNEL # 2 CUMPLE

C-VH-072 26-Aug 1+140 2+165 2.300 256.2 25.1 2.363 332.8 32.6 2.359 358.3 35.1 VH HORMIGON DE LANZADO EN PORTAL DE ENTRADA TUNEL # 2 CUMPLE

C-VH-073 27-Aug 1+140 2+165 2.311 266.8 26.2 2.375 337.5 33.1 2.382 404.9 39.7 VH HORMIGON DE LANZADO EN PORTAL DE ENTRADA TUNEL # 2 CUMPLE

C-VH-074 28-Aug 1+165 1+840 2.335 258.1 25.3 2.343 337.8 38.6 2.367 393.2 38.6 VH HORMIGON DE LANZADO EN PORTAL DE ENTRADA TUNEL # 1 CUMPLE

C-VH-075 29-Aug 1+165 1+840 2.454 293.9 28.8 2.362 338.8 33.2 2.387 356.3 34.9 VH HORMIGON DE LANZADO EN PORTAL DE SALIDA TUNEL # 1 CUMPLE

C-VH-076 30-Aug 1+165 1+840 2.370 259.6 25.5 2.370 291.9 28.6 2.354 419.6 41.1 VH HORMIGON DE LANZADO EN PORTAL DE ENTRADA TUNEL # 1 CUMPLE

C-VH-077 1-Sep 1+140 2+165 2.518 256.5 25.2 2.348 288.6 28.3 2.359 398.0 39.0 VH HORMIGON DE LANZADO EN PORTAL DE ENTRADA TUNEL # 2 CUMPLE

C-VH-078 2-Sep 1+165 1+840 2.299 244.0 23.9 2.344 291.2 28.6 2.367 387.3 38.0 VH HORMIGON DE LANZADO EN PORTAL DE ENTRADA TUNEL # 1 CUMPLE

Número de ensayos 5

Valor promedio(kg/cm2) 391

Valor mínimo(kg/cm2) 356

Desviación estándar 23

Coef. de variación (%) 6%

Resistencia Característica(kg/cm2) 353


PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
VH TIPO DE HORMIGON "H-25" Kg/cm2
03 DIAS 7 DIAS 28 DIAS
TRAMO TIPO
FECHA DENSIDAD RESISTENCIA DENSIDAD RESISTENCIA DENSIDAD RESISTENCIA
REGISTRO ELEMENTO ESTRUCTURAL OBS
VACIADO
INICIO FINAL (g/cm3) (kg/cm2) (Mpa) (g/cm3) (kg/cm2) (Mpa) (g/cm3) (kg/cm2) (Mpa) H°

Constructora Control y Calidad


SINOHYDRO CONNAL S.R.L.
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
"LE-3" TIPO DE HORMIGON "H-25" Kg/cm2

03 DIAS 7 DIAS 28 DIAS


TIPO
FECHA DENSIDAD RESISTENCIA DENSIDAD RESISTENCIA DENSIDAD RESISTENCIA
REGISTRO PROG. ELEMENTO ESTRUCTURAL OBS
VACIADO
(g/cm3) (kg/cm2) (Mpa) (g/cm3) (kg/cm2) (Mpa) (g/cm3) (kg/cm2) (Mpa) H°

C-LE-013 8-Aug 1+840 1.789 196.4 19.3 1.796 250.1 24.5 1.820 354.2 34.7 LE-3 LECHADO EN SITIO TUNEL # 1 TALUD DE SALIDA CUMPLE

C-LE-014 11-Aug 1+840 1.813 201.1 19.7 1.803 249.5 24.5 1.807 389.4 38.2 LE-3 LECHADO EN SITIO TUNEL # 1 TALUD DE SALIDA CUMPLE

C-LE-015 12-Aug 1+840 1.785 191.8 18.8 1.832 264.2 25.9 1.825 376.2 36.9 LE-3 LECHADO EN SITIO TUNEL # 1 TALUD DE SALIDA CUMPLE

C-LE-016 13-Aug 1+840 1.902 203.4 19.9 1.979 281.1 27.6 1.924 355.1 34.8 LE-3 LECHADO EN SITIO TUNEL # 1 TALUD DE SALIDA CUMPLE

LECHADO EN SITIO TUNEL # 2 PORTAL DE SALIDA


C-LE-017 14-Aug 2+165 1.815 198.1 19.4 1.855 276.9 27.2 1.920 335.2 32.9 LE-3 TUBO LECHADA PARA TECHO
CUMPLE
LECHADO EN SITIO TUNEL # 2 PORTAL DE SALIDA
C-LE-018 24-Aug 2+165 1.877 211.2 20.7 1.905 258.8 25.4 1.965 291.3 28.6 LE-3 CUMPLE
LECHADO EN SITIO TUNEL # 2 PORTAL DE SALIDA
C-LE-019 25-Aug 2+165 1.852 211.8 20.8 1.897 263.0 25.8 1.867 278.4 27.3 LE-3 CUMPLE
LECHADO EN SITIO TUNEL # 2 PORTAL DE SALIDA
C-LE-020 27-Aug 2+165 1.893 173.7 17.0 1.921 223.6 21.9 1.944 292.9 28.7 LE-3 CUMPLE
LECHADO EN SITIO TUNEL # 1 PORTAL DE ENTRADA
C-LE-021 28-Aug 1+840 1.823 110.6 10.8 1.831 205.7 20.2 1.875 287.3 28.2 LE-3 CUMPLE
LECHADO EN SITIO TUNEL # 2 PORTAL DE ENTRADA
C-LE-022 29-Aug 2+165 1.881 157.9 15.5 1.842 207.2 20.3 1.866 258.2 25.3 LE-3 CUMPLE
LECHADO EN SITIO TUNEL # 2 PORTAL DE ENTRADA
C-LE-023 30-Aug 2+165 8.018 112.3 11.0 2.011 154.1 15.1 2.024 297.1 29.1 LE-3 CUMPLE
LECHADO EN SITIO TUNEL # 1 PORTAL DE SALIDA
C-LE-024 30-Aug 1+840 2.013 108.1 10.6 2.014 162.6 15.9 2.014 282.5 27.7 LE-3 CUMPLE
LECHADO EN SITIO TUNEL # 1 PORTAL DE SALIDA
C-LE-025 31-Aug 1+840 1.837 101.2 9.9 1.852 137.9 13.5 1.844 264.6 25.9 LE-3 CUMPLE
LECHADO EN SITIO TUNEL # 1 PORTAL DE SALIDA

R E S IS T E N C IA k g / cm 2
C-LE-026 31-Aug 1+840 1.310 103.5 10.1 1.865 153.7 15.1 1.912 298.3 29.2 LE-3 CUMPLE

Número de ensayos 14
Valor promedio(kg/cm2) 311
RESISTENCIA A COMPRESION
Valor mínimo(kg/cm2) 258 450.0
400.0
350.0
Desviación estándar 42 300.0
250.0
Coef. de variación (%) 14% 200.0
150.0
Resistencia Característica(kg/cm2) 242 100.0
50.0
0.0
C-LE-012 C-LE-014 C-LE-016 C-LE-018 C-LE-020 C-LE-022 C-LE-024 C-LE-026 C-LE-028

Constructora Control y Calidad


SINOHYDRO CONNAL S.R.L.
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
HC-14 - "HB-4" TIPO DE HORMIGON "H-21" Kg/cm2

03 DIAS 07 DIAS 28 DIAS


FECHA N° TRAMO TIPO
REGISTRO DENSIDAD RESISTENCIA DENSIDAD RESISTENCIA DENSIDAD RESISTENCIA ELEMENTO ESTRUCTURAL OBS
VACIADO
MURO INICIO FINAL (g/cm3) (kg/cm2) (Mpa) (g/cm3) (kg/cm2) (Mpa) (g/cm3) (kg/cm2) (Mpa) H°
ZAPATA DE FUNDACION MURO
C-ML-066 9-Aug 11 21+380 21+550 2.42 162.8 16.0 2.430 238.6 23.4 2.418 329.6 32.3 HB-4 DEFENSIVO CUMPLE

ZAPATA DE FUNDACION MURO


C-ML-067 9-Aug 11 21+380 21+550 2.41 163.9 16.1 2.420 251.1 24.6 2.426 353.4 34.7 HB-4 DEFENSIVO CUMPLE

ZAPATA DE FUNDACION MURO


C-ML-068 10-Aug 11 21+380 21+550 2.40 163.4 16.0 2.430 249.9 24.5 2.420 344.2 33.8 HB-4 DEFENSIVO CUMPLE

ZAPATA DE FUNDACION MURO


C-ML-069 10-Aug 11 21+380 21+550 2.42 161.0 15.8 2.398 250.6 24.6 2.405 337.6 33.1 HB-4 DEFENSIVO CUMPLE

ZAPATA DE FUNDACION MURO


C-ML-070 10-Aug 11 21+380 21+550 2.41 155.7 15.3 2.413 233.3 22.9 2.403 334.6 32.8 HB-4 DEFENSIVO CUMPLE

ZAPATA DE FUNDACION MURO


C-ML-071 10-Aug 11 21+380 21+550 2.42 144.0 14.1 2.406 236.8 23.2 2.421 296.5 29.1 HB-4 DEFENSIVO CUMPLE

ZAPATA DE FUNDACION MURO


C-ML-072 10-Aug 11 21+380 21+550 2.41 144.5 14.2 2.412 225.0 22.1 2.415 307.5 30.2 HB-4 DEFENSIVO CUMPLE

ZAPATA DE FUNDACION MURO


C-ML-073 11-Aug 11 21+380 21+550 2.40 157.1 15.4 2.409 234.9 23.0 2.401 291.7 28.6 HB-4 DEFENSIVO CUMPLE

ZAPATA DE FUNDACION MURO


C-ML-074 11-Aug 11 21+380 21+550 2.41 133.7 13.1 2.423 217.7 21.3 2.416 329.3 32.3 HB-4 DEFENSIVO CUMPLE

ZAPATA DE FUNDACION MURO


C-ML-075 11-Aug 11 21+380 21+550 2.41 130.5 12.8 2.414 216.3 21.2 2.399 317.6 31.1 HB-4 DEFENSIVO CUMPLE

ZAPATA DE FUNDACION MURO


C-ML-076 12-Aug 11 21+380 21+550 2.41 163.5 16.0 2.420 194.8 19.1 2.419 314.3 30.8 HB-4 DEFENSIVO CUMPLE

ZAPATA DE FUNDACION MURO


C-ML-077 13-Aug 11 21+380 21+550 2.42 140.9 13.8 2.402 215.5 21.1 2.412 313.3 30.7 HB-4 DEFENSIVO CUMPLE

ZAPATA DE FUNDACION MURO


C-ML-078 13-Aug 11 21+380 21+550 2.38 145.1 14.2 2.390 242.2 23.8 2.395 355.4 34.9 HB-4 DEFENSIVO CUMPLE

ZAPATA DE FUNDACION MURO


C-ML-079 13-Aug 11 21+380 21+550 2.41 135.3 13.3 2.394 235.1 23.1 2.408 362.0 35.5 HB-4 DEFENSIVO CUMPLE

ZAPATA DE FUNDACION MURO


C-ML-080 14-Aug 11 21+380 21+550 2.41 159.6 15.7 2.404 257.4 25.2 2.398 342.2 33.6 HB-4 DEFENSIVO CUMPLE

C-ML-081 16-Aug 11 21+386 21+550 - - - 2.381 215.6 21.1 2.388 312.6 30.7 HB-4 1° FASE PANTALLA DE MURO DEFENSIVO CUMPLE
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
HC-14 - "HB-4" TIPO DE HORMIGON "H-21" Kg/cm2

03 DIAS 07 DIAS 28 DIAS


FECHA N° TRAMO TIPO
REGISTRO DENSIDAD RESISTENCIA DENSIDAD RESISTENCIA DENSIDAD RESISTENCIA ELEMENTO ESTRUCTURAL OBS
VACIADO
MURO INICIO FINAL (g/cm3) (kg/cm2) (Mpa) (g/cm3) (kg/cm2) (Mpa) (g/cm3) (kg/cm2) (Mpa) H°

C-ML-082 16-Aug 11 21+380 21+550 - - - 2.400 236.3 23.2 2.399 317.6 31.1 HB-4 1° FASE PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-083 16-Aug 11 21+380 21+550 - - - 2.393 218.9 21.5 2.405 320.0 31.4 HB-4 1° FASE PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-084 16-Aug 11 21+380 21+550 - - - 2.416 242.7 23.8 2.387 329.1 32.3 HB-4 1° FASE PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-085 18-Aug 11 21+380 21+550 2.40 182.4 17.9 2.414 254.5 25.0 2.422 336.7 33.0 HB-4 2° FASE PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-086 18-Aug 11 21+380 21+550 2.41 171.9 16.9 2.423 243.8 23.9 2.417 321.8 31.6 HB-4 2° FASE PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-087 18-Aug 11 21+380 21+550 2.43 175.8 17.2 2.412 231.5 22.7 2.426 314.2 30.8 HB-4 2° FASE PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-088 18-Aug 11 21+380 21+550 2.40 156.2 15.3 2.409 243.3 23.9 2.411 314.4 30.8 HB-4 2° FASE PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-089 18-Aug 11 21+380 21+550 2.37 132.3 13.0 2.408 205.1 20.1 2.388 256.2 25.1 HB-4 1° FASE PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-090 21-Aug 11 21+380 21+550 - - - 2.396 202.9 19.9 2.415 287.1 28.2 HB-4 PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-091 21-Aug 11 21+380 21+550 - - - 2.392 200.0 19.6 2.410 265.6 26.0 HB-4 PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-092 21-Aug 11 21+380 21+550 - - - 2.392 185.7 18.2 2.410 290.2 28.5 HB-4 PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-093 21-Aug 11 21+380 21+550 - - - 2.401 190.9 18.7 2.396 286.3 28.1 HB-4 PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-094 22-Aug 11 21+380 21+550 - - - 2.380 197.9 19.4 2.392 252.6 24.8 HB-4 PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-095 23-Aug 11 21+380 21+550 - - - 2.390 259.1 25.4 2.401 308.1 30.2 HB-4 PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-096 23-Aug 11 21+380 21+550 2.368 222.1 21.8 2.403 313.4 30.7 HB-4 PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-097 23-Aug 11 21+380 21+550 2.386 227.1 22.3 2.396 295.8 29.0 HB-4 PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-098 23-Aug 11 21+380 21+550 2.384 219.8 21.6 2.388 276.8 27.1 HB-4 PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-099 23-Aug 11 21+380 21+550 2.379 227.7 22.3 2.395 286.8 28.1 HB-4 PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-100 27-Aug 11 21+380 21+550 2.415 190.9 18.7 2.394 279.6 27.4 HB-4 PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-101 27-Aug 11 21+380 21+550 2.412 227.3 22.3 2.402 321.6 31.5 HB-4 PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-102 27-Aug 11 21+380 21+550 2.394 213.2 20.9 2.406 266.5 26.1 HB-4 PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-103 27-Aug 11 21+380 21+550 2.416 236.8 23.2 2.414 313.0 30.7 HB-4 PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-104 28-Aug 11 21+380 21+550 2.401 298.5 29.3 2.398 291.8 28.6 HB-4 PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-105 28-Aug 11 21+380 21+550 2.379 287.7 28.2 HB-4 PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-106 29-Aug 8 17+770 18+070 2.37 119.8 11.7 2.378 135.7 13.3 2.382 149.8 14.7 HC-14 CARPETA DE NIVELACION DE MURO DEFENSIVO CUMPLE

C-ML-107 29-Aug 11 21+380 21+550 2.400 237.3 23.3 2.397 300.4 29.5 HB-4 PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-108 29-Aug 11 21+380 21+550 2.402 247.8 24.3 2.384 305.8 30.0 HB-4 PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-109 30-Aug 11 21+380 21+550 2.375 241.6 23.7 2.388 245.7 24.1 HB-8 PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-110 30-Aug 11 21+380 21+550 2.386 261.5 25.6 2.389 276.4 27.1 HB-4 PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-111 30-Aug 11 21+380 21+550 2.410 268.8 26.4 2.393 297.9 29.2 HB-4 PANTALLA DE MURO DEFENSIVO CUMPLE

C-ML-112 31-Aug 8 17+770 18+070 2.39 201.7 19.8 2.404 235.4 23.1 2.408 297.2 29.1 HB-4 ZAPATA MURO DEFENSIVO CUMPLE

C-ML-113 1-Sep 8 17+770 18+070 2.42 200.2 19.6 2.420 246.4 24.2 2.399 311.6 30.6 HB-4 DENTELLONES DE ZAPATA MURO DEFENSIVO CUMPLE

C-ML-114 3-Sep 8 17+770 18+070 2.37 185.3 18.2 2.386 222.3 21.8 2.395 253.8 24.9 HB-4 DENTELLONES DE ZAPATA MURO DEFENSIVO CUMPLE

C-ML-115 3-Sep 8 17+770 18+070 2.38 206.2 20.2 2.373 223.2 21.9 2.384 257.2 25.2 HB-4 DENTELLONES DE ZAPATA MURO DEFENSIVO CUMPLE

C-ML-116 3-Sep 8 17+770 18+070 2.37 196.9 19.3 2.374 205.1 20.1 2.391 237.3 23.3 HC-14 CARPETA DE NIVELACION DE MURO DEFENSIVO CUMPLE

Número de ensayos 51
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
HC-14 - "HB-4" TIPO DE HORMIGON "H-21" Kg/cm2

03 DIAS 07 DIAS 28 DIAS


FECHA N° TRAMO TIPO
REGISTRO DENSIDAD RESISTENCIA DENSIDAD RESISTENCIA DENSIDAD RESISTENCIA ELEMENTO ESTRUCTURAL OBS
VACIADO
MURO INICIO FINAL (g/cm3) (kg/cm2) (Mpa) (g/cm3) (kg/cm2) (Mpa) (g/cm3) (kg/cm2) (Mpa) H°
Valor promedio(kg/cm2) 300

Valor mínimo(kg/cm2) 150

Desviación estándar 36

Coef. de variación (%) 12%

Resistencia Característica(kg/cm2) 240

Constructora Control y Calidad


SINOHYDRO CONNAL S.R.L.
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
"HB-4" - "HC-14" TIPO DE HORMIGON "H-21" Kg/cm

03 DIAS 7 DIAS 28 DIAS


FECHA N° PROG TIPO
REGISTRO DENSIDAD RESISTENCIA DENSIDAD RESISTENCIA DENSIDAD RESISTENCIA ELEMENTO ESTRUCTURAL OBS
VACIADO
ALC ALC (g/cm3) (kg/cm2) (Mpa) (g/cm3) (kg/cm2) (Mpa) (g/cm3) (kg/cm2) (Mpa) H°

C-GH-015 7-Aug 6 1+063 2.355 111.9 11.0 2.352 192.0 18.8 2.355 266.1 26.1 HB-4 LOSA SUPERIOR DE CUERPO Y MUROS LATERALES CUMPLE

C-GH-016 11-Aug 16 4+114 2.353 116.7 11.4 2.353 192.8 18.9 2.366 285.8 28.0 HB-4 LOSA SUPERIOR DE CUERPO Y MUROS LATERALES CUMPLE

C-GH-017 12-Aug 6 1+063 - - - 2.367 298.7 29.3 HB-4 MUROS LATERALES,CAJON DE ENTRADA CUMPLE

C-GH-018 18-Aug 15 3+936 - - - 2.375 91.2 8.9 2.370 163.0 16.0 HC-14 CARPETA DE NIVELACION DE CUERPO Y CABEZAL CUMPLE

C-GH-019 28-Aug 15 3+936 - - - 2.360 226.6 22.2 2.362 335.1 32.9 HB-4 LOSA INFERIOR DE CUERPO CUMPLE

C-GH-020 30-Aug 16 4+114 - - - 2.368 247.5 24.3 2.379 325.7 31.9 HB-4 ALEROS CUMPLE

C-GH-021 3-Sep 2 0+524 - - - 2.335 203.1 19.9 2.367 136.2 13.4 HC-14 CARPETA DE NIVELACION DE CUERPO Y CABEZAL CUMPLE

Número de ensayos 7

Valor promedio(kg/cm2) 259

Valor mínimo(kg/cm2) 136

Desviación estándar 78

Coef. de variación (%) 30%

Resistencia Característica(kg/cm2) 129

Constructora Control y Calidad


SINOHYDRO CONNAL S.R.L.
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
HB-4 TIPO DE HORMIGON "H-21" Kg/cm2

3 DIAS 7 DIAS 28 DIAS


TIPO
FECHA
REGISTRO PUENTE DENSIDAD RESISTENCIA DENSIDAD RESISTENCIA DENSIDAD RESISTENCIA ELEMENTO ESTRUCTURAL OBS
VACIADO
(g/cm3) (kg/cm2) (Mpa) (g/cm3) (kg/cm2) (Mpa) (g/cm3) (kg/cm2) (Mpa) H°

C-PP-013 4-Aug E. SANTO I - - - 2.409 200.5 19.7 2.404 310.4 30.4 HB-4 PILOTE # 4 PILA #2 CUMPLE

C-PP-014 7-Aug E. SANTO II - - - 2.382 212.3 20.8 2.413 337.9 33.1 HB-4 PILOTE # 6 PILA # 1 CUMPLE

C-PP-015 7-Aug E. SANTO I - - - 2.382 205.4 20.1 2.386 299.2 29.3 HB-4 PILOTE # 9 PILA # 2 CUMPLE

C-PP-016 11-Aug P.THIYUMAYU - - - 2.388 201.8 19.8 2.420 318.8 31.3 HB-4 PILOTE # 10 E CUMPLE

C-PP-017 11-Aug P.THIYUMAYU - - - 2.415 187.2 18.4 2.386 289.0 28.3 HB-4 PILOTE # 1 B CUMPLE

C-PP-018 12-Aug E. SANTO I - - - 2.384 197.8 19.4 2.391 307.5 30.2 HB-4 PILOTE # 4 PILA # 3 CUMPLE

C-PP-019 12-Aug P.THIYUMAYU - - - 2.402 221.9 21.8 2.395 369.5 36.2 HB-4 PILOTE # 8 -8 C L/SANTA CRUZ CUMPLE

C-PP-020 12-Aug P.THIYUMAYU - - - 2.396 230.7 22.6 2.391 346.8 34.0 HB-4 PILOTE # 7 -7 B L/SANTA CRUZ CUMPLE

C-PP-021 13-Aug E. SANTO II - - - 2.398 197.2 19.3 2.384 323.3 31.7 HB-4 PILOTE # 7 PILA # 1 CUMPLE

C-PP-022 13-Aug P.THIYUMAYU - - - 2.401 197.5 19.4 2.043 306.2 30.0 HB-4 PILOTE # 9 -C ESTRIBO CUMPLE

C-PP-023 13-Aug P.THIYUMAYU 2.406 187.2 18.4 2.410 301.1 29.5 HB-4 PILOTE # 6 A L/CBBA CUMPLE

C-PP-024 14-Aug E. SANTO II 2.375 232.5 22.8 2.385 321.5 31.5 HB-4 PILOTE # 18 PILA # 2 L/SANTA CRUZ CUMPLE

C-PP-025 14-Aug E. SANTO II 2.353 238.2 23.4 2.383 365.0 35.8 HB-4 PILOTE # 14 PILA # 1 L/CBBA CUMPLE

C-PP-026 14-Aug E. SANTO II 2.386 233.0 22.8 2.372 337.7 33.1 HB-4 PILOTE # 6 PILA # 2 L/SANTA CRUZ CUMPLE

C-PP-027 15-Aug E. SANTO I 2.385 230.3 22.6 2.386 339.7 33.3 HB-4 PILOTE # 7 PILA # 2 CUMPLE

C-PP-028 16-Aug E. SANTO II 2.358 226.3 22.2 2.358 317.0 31.1 HB-4 PILOTE # 13 PILA # 2 CUMPLE

C-PP-029 17-Aug P.THIYUMAYU 2.420 221.6 21.7 2.417 335.0 32.9 HB-4 PILOTE # 10 -10 D CUMPLE

C-PP-030 18-Aug P.THIYUMAYU 2.403 207.4 20.3 2.401 292.8 28.7 HB-4 PILOTE # 4 -4-B CUMPLE

C-PP-031 19-Aug P.THIYUMAYU 2.402 186.2 18.3 2.400 299.2 29.3 HB-4 PILOTE # 6 -6 C L/CBBA CUMPLE

C-PP-032 20-Aug P.THIYUMAYU 2.412 198.1 19.4 2.395 302.4 29.7 HB-4 PILOTE # 1-1 A L/CBBA CUMPLE

C-PP-033 21-Aug E. SANTO I - - - 2.401 241.7 23.7 2.416 328.4 32.2 HB-4 PILOTE # 6 PILA # 2 L/SANTA CRUZ CUMPLE

C-PP-034 21-Aug P.THIYUMAYU - - - 2.391 211.8 20.8 2.388 306.3 30.0 HB-4 PILOTE # 8-8 D PILA # 2 L/CBBA CUMPLE

C-PP-035 21-Aug P.THIYUMAYU - - - 2.406 219.9 21.6 2.398 299.5 29.4 HB-4 PILOTE # 7-7 C PILA # 2 L/CBBA CUMPLE

C-PP-036 22-Aug P.THIYUMAYU - - - 2.399 217.0 21.3 2.397 308.5 30.3 HB-4 PILOTE # 3-3 A ESTRIBO L/CBBA CUMPLE

C-PP-037 22-Aug E. SANTO II - - - 2.389 232.1 22.8 2.413 320.1 31.4 HB-4 PILOTE # 12 PILA # 1 CUMPLE
PILOTE # 10-10 C ESTRIBO L/SANTA
C-PP-038 23-Aug P.THIYUMAYU - - - 2.424 221.3 21.7 2.400 323.0 31.7 HB-4 CRUZ CUMPLE

C-PP-039 24-Aug P.THIYUMAYU - - - 2.389 225.3 22.1 2.402 296.8 29.1 HB-4 PILOTE # 6-6 B L/CBBA CUMPLE

C-PP-040 24-Aug E. SANTO I - - - 2.401 220.2 21.6 2.410 286.5 28.1 HB-4 PILOTE # 11 PILA #2 CUMPLE

C-PP-041 26-Aug E. SANTO II - - - 2.383 221.9 21.8 2.394 301.2 29.5 HB-4 PILOTE # 2 PILA # 1 L/CBBA CUMPLE

C-PP-042 26-Aug E. SANTO I - - - 2.382 225.5 22.1 2.380 275.4 27.0 HB-4 PILOTE # 5 ESTRIBO L/SANTA CRUZ CUMPLE

C-PP-043 26-Aug P.THIYUMAYU - - - 2.377 198.1 19.4 2.389 285.8 28.0 HB-4 PILOTE # 1-1 C CUMPLE

C-PP-044 27-Aug E. SANTO I - - - 2.386 242.2 23.8 2.384 335.0 32.8 HB-4 PILOTE # 3 PILA # 2 L/SANTA CRUZ CUMPLE
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
HB-4 TIPO DE HORMIGON "H-21" Kg/cm2
C-PP-045 27-Aug E. SANTO II - - - 2.402 228.8 22.4 2.383 334.1 32.8 HB-4 PILOTE # 17 PILA # 2 L/SANTA CRUZ CUMPLE

C-PP-046 28-Aug P.THIYUMAYU - - - 2.385 239.2 23.5 2.379 313.4 30.7 HB-4 PILOTE # 4-4 A L/CBBA CUMPLE

C-PP-047 28-Aug P.THIYUMAYU - - - 2.397 213.6 20.9 2.386 321.1 31.5 HB-4 PILOTE # 3- 3 B ESTRIBO L/ CBBA CUMPLE

C-PP-048 28-Aug P.THIYUMAYU - - - 2.380 244.2 23.9 2.375 327.7 32.1 HB-4 PILOTE # 9 PILA # 2 CUMPLE

C-PP-049 29-Aug E. SANTO II - - - 2.402 238.2 23.4 2.404 341.9 33.5 HB-4 PILOTE # 15 PILA # 1 L/CBBA CUMPLE

C-PP-050 29-Aug E. SANTO II - - - 2.385 230.2 22.6 2.400 344.4 33.8 HB-4 PILOTE # 7 PILA # 2 L/SANTA CRUZ CUMPLE

C-PP-051 29-Aug P.THIYUMAYU - - - 2.395 222.1 21.8 2.401 325.5 31.9 HB-4 PILOTE # 7- 7 A PILA # 2 L/SANTA CRUZ CUMPLE

C-PP-052 30-Aug P.THIYUMAYU - - - 2.409 215.1 21.1 2.399 306.5 30.1 HB-4 PILOTE # 10 -10 B L/SANTA CRUZ CUMPLE

C-PP-053 30-Aug P.THIYUMAYU - - - 2.384 233.9 22.9 2.381 323.3 31.7 HB-4 PILOTE # 5-5 C PILA # 2 L/CBBA CUMPLE

C-PP-054 1-Sep E. SANTO II - - - 2.374 229.8 22.5 2.397 320.8 31.5 HB-4 PILOTE # 12 PILA # 2 L/SANTA CRUZ CUMPLE

C-PP-055 2-Sep P.THIYUMAYU - - - 2.380 260.1 25.5 2.392 321.3 31.5 HB-4 PILOTE # 2 PILA # 1 L/CBBA CUMPLE

C-PP-056 3-Sep P.THIYUMAYU - - - 2.353 247.3 24.3 2.386 244.9 24.0 HB-4 PILOTE # 5-5 D L/CBBA CUMPLE

Número de ensayos 44

Valor promedio(kg/cm2) 316

Valor mínimo(kg/cm2) 245

Desviación estándar 23

Coef. de variación (%) 7%

Resistencia Característica(kg/cm2) 278

Constructora Control y Calidad


SINOHYDRO CONNAL S.R.L.
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
HB-8 - "HC-11" TIPO DE HORMIGON "H-21" Kg/cm2

03 DIAS 7 DIAS 28 DIAS


TRAMO TIPO
FECHA DENSIDAD RESISTENCIA DENSIDAD RESISTENCIA DENSIDAD RESISTENCIA
REGISTRO ELEMENTO ESTRUCTURAL OBS
VACIADO
INICIO FINAL (g/cm3) (kg/cm2) (Mpa) (g/cm3) (kg/cm2) (Mpa) (g/cm3) (kg/cm2) (Mpa) H°

C-PS-102 3-Aug 28+630 28+000 2.431 331.2 32.5 HB-08 CARPETA SIMPLE DE BANQUINA NIVEL # 5 CUMPLE

C-PS-103 3-Aug 3+980 4+010 2.359 232.8 22.8 2.358 318.1 31.2 HC-11 CUNETA DE BANQUINA NIVEL # 4 CUMPLE

C-PS-104 4-Aug 28+637 28+731 2.392 309.5 30.4 HB-08 CUNETA DE BANQUINA NIVEL # 5 CUMPLE

C-PS-105 7-Aug 3+710 3+760 - - - - - - 2.368 252.7 24.8 HB-08 CUNETA DE BANQUINA NIVEL # 4 CUMPLE

C-PS-106 8-Aug 23+260 23+390 - - - - - - 2.346 295.0 28.9 HB-8 CUNETA DE BANQUINA NIVEL # 1 CUMPLE

C-PS-107 9-Aug 3+980 4+150 - - - - - - 2.371 246.3 24.2 HB-8 CUNETA DE BANQUINA NIVEL # 2 CUMPLE

C-PS-108 9-Aug 3+980 4+150 - - - - - - 2.382 306.7 30.1 HB-8 CUNETA DE BANQUINA NIVEL # 3 CUMPLE

C-PS-109 10-Aug 23+260 23+390 - - - - - - 2.350 309.5 30.4 HB-8 CUNETA DE BANQUINA NIVEL # 3 CUMPLE

C-PS-110 10-Aug 3+980 4+050 - - - - - - 2.368 300.1 29.4 HC-11 CUNETA DE BANQUINA NIVEL # 2 CUMPLE

C-PS-111 10-Aug 3+990 4+040 - - - - - - 2.361 286.8 28.1 HC-11 CUNETA DE BANQUINA NIVEL # 3 CUMPLE

C-PS-112 11-Aug 3+971 4+080 - - - - - - 2.324 266.3 26.1 HC-11 CUNETA DE BANQUINA NIVEL # 2 CUMPLE

C-PS-113 11-Aug 3+974 4+061 - - - - - - 2.323 260.0 25.5 HC-11 CUNETA DE BANQUINA NIVEL # 3 CUMPLE

C-PS-114 11-Aug 21+600 21+700 - - - - - - 2.379 321.6 31.5 HB-8 ZANJA DE CORONAMIENTO CUMPLE

C-PS-115 11-Aug 23+260 23+390 - - - - - - 2.342 301.7 29.6 HC-11 CUNETA DE BANQUINA NIVEL # 3 CUMPLE

C-PS-116 11-Aug 28+637 28+731 - - - - - - 2.348 295.0 28.9 HB-8 CARPETA SIMPLE DE BANQUINA NIVEL # 5 CUMPLE

C-PS-117 12-Aug 21+600 21+700 - - - - - - 2.367 318.7 31.3 HB-8 CARPETA SIMPLE DE BANQUINA NIVEL # 1 CUMPLE

C-PS-118 12-Aug 28+637 28+731 - - - - - - 2.409 264.4 25.9 HC-11 CARPETA SIMPLE DE BANQUINA NIVEL # 5 CUMPLE

C-PS-119 13-Aug 23+267 23+340 - - - - - - 2.384 348.2 34.1 HB-8 CUNETA DE BANQUINA NIVEL # 1 CUMPLE

C-PS-120 13-Aug 28+615 28+677 - - - - - - 2.375 318.2 31.2 HB-8 CUNETA DE BANQUINA NIVEL # 4 CUMPLE

C-PS-121 13-Aug 4+000 4+080 - - - - - - 2.366 325.4 31.9 HB-8 CUNETA DE BANQUINA NIVEL # 1 CUMPLE

C-PS-122 13-Aug 4+000 4+080 - - - 2.377 225.329 22.097 2.374 311.6 30.6 HC-11 CUNETA DE BANQUINA NIVEL # 2 CUMPLE

C-PS-123 14-Aug 28+615 28+677 - - - 2.380 276.176 27.084 2.391 360.6 35.4 HC-11 CUNETA DE BANQUINA NIVEL # 4 CUMPLE

C-PS-124 14-Aug 3+966 4+078 - - - 2.386 262.404 25.733 2.352 362.3 35.5 HC-11 CUNETA DE BANQUINA NIVEL # 1 CUMPLE

C-PS-125 15-Aug 21+640 21+690 - - - - - - 2.372 316.4 31.0 HC-11 CUNETA DE BANQUINA NIVEL # 3 CUMPLE

C-PS-126 16-Aug 3+980 4+020 - - - - - - 2.401 380.8 37.3 HB-8 CARPETA SIMPLE DE BANQUINA NIVEL # 3 CUMPLE

C-PS-127 16-Aug 6+160 6+220 - - - - - - 2.391 351.3 34.5 HB-8 ZANJA DE CORONAMIENTO CUMPLE

C-PS-128 16-Aug 21+640 21+690 - - - - - - 2.406 341.4 33.5 HC-11 CUNETA DE BANQUINA NIVEL # 1 CUMPLE

C-PS-129 16-Aug 23+360 23+400 - - - - - - 2.352 312.5 30.6 HB-8 ZANJA DE CORONAMIENTO CUMPLE
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
HB-8 - "HC-11" TIPO DE HORMIGON "H-21" Kg/cm2

03 DIAS 7 DIAS 28 DIAS


TRAMO TIPO
FECHA DENSIDAD RESISTENCIA DENSIDAD RESISTENCIA DENSIDAD RESISTENCIA
REGISTRO ELEMENTO ESTRUCTURAL OBS
VACIADO
INICIO FINAL (g/cm3) (kg/cm2) (Mpa) (g/cm3) (kg/cm2) (Mpa) (g/cm3) (kg/cm2) (Mpa) H°

C-PS-130 17-Aug 3+975 4+075 - - - - - - 2.348 329.0 32.3 HB-08 CARPETA SIMPLE DE BANQUINA NIVEL # 1 CUMPLE

C-PS-131 17-Aug 3+970 4+040 - - - - - - 2.350 267.7 26.3 HB-08 CARPETA SIMPLE DE BANQUINA NIVEL # 2 CUMPLE

C-PS-132 17-Aug 23+355 23+390 - - - - - - 2.353 275.5 27.0 HB-8 CUNETA DE BANQUINA NIVEL # 2 CUMPLE

C-PS-133 17-Aug 23+350 23+400 - - - - - - 2.347 265.2 26.0 HB-08 CUNETA DE BANQUINA NIVEL # 3 CUMPLE

C-PS-134 18-Aug 21+630 21+690 - - - - - - 2.355 295.8 29.0 HC-11 CARPETA SIMPLE DE BANQUINA NIVEL # 2 CUMPLE

C-PS-135 18-Aug 23+355 23+390 - - - - - - 2.381 293.0 28.7 HB-08 CUNETA DE BANQUINA NIVEL # 2 CUMPLE

C-PS-136 18-Aug 23+380 23+390 - - - - - - 2.353 270.1 26.5 HB-08 ZANJA DE CORONAMIENTO CUMPLE

C-PS-137 19-Aug 21+630 21+690 - - - - - - 2.386 310.1 30.4 HB-08 CARPETA SIMPLE DE BANQUINA NIVEL # 1 CUMPLE

C-PS-138 19-Aug 23+390 23+340 - - - - - - 2.362 253.4 24.8 HB-08 CUNETA DE BANQUINA NIVEL # 2 CUMPLE

C-PS-139 20-Aug 5+520 5+600 - - - - - - 2.338 229.1 22.5 HB-08 ZANJA DE CORONAMIENTO CUMPLE

C-PS-140 21-Aug 5+520 5+600 - - - - - - 2.352 279.1 27.4 HB-08 ZANJA DE CORONAMIENTO CUMPLE

C-PS-141 21-Aug 5+530 5+580 - - - - - - 2.362 277.8 27.2 HC-11 CUNETA DE BANQUINA NIVEL # 2 CUMPLE

C-PS-142 22-Aug 5+520 5+600 - - - - - - 2.354 263.9 25.9 HB-08 ZANJA DE CORONAMIENTO CUMPLE

C-PS-143 22-Aug 22+060 22+140 - - - - - - 2.355 273.2 26.8 HB-8 CUNETA DE BANQUINA NIVEL # 3 CUMPLE

C-PS-144 22-Aug 23+340 23+420 - - - - - - 2.367 283.7 27.8 HB-08 CUNETA DE BANQUINA NIVEL # 1 CUMPLE

C-PS-145 23-Aug 5+530 5+580 - - - - - - 2.358 274.6 26.9 HB-08 CUNETA DE BANQUINA NIVEL # 2 CUMPLE

C-PS-146 23-Aug 22+080 22+130 - - - - - - 2.359 279.5 27.4 HB-08 CUNETA DE BANQUINA NIVEL # 3 CUMPLE

C-PS-147 23-Aug 23+340 23+420 - - - - - - 2.345 302.8 29.7 HB-08 CUNETA DE BANQUINA NIVEL # 1 CUMPLE

C-PS-148 23-Aug 2+560 2+590 - - - - - - 2.348 303.6 29.8 HB-08 CUNETA DE BANQUINA NIVEL # 3 CUMPLE

C-PS-149 24-Aug 2+530 2+610 - - - - - - 2.335 252.6 24.8 HB-08 CUNETA DE BANQUINA NIVEL # 2 CUMPLE

C-PS-150 24-Aug 2+550 2+590 - - - - - - 2.338 258.1 25.3 HB-08 CUNETA DE BANQUINA NIVEL # 3 CUMPLE

C-PS-151 25-Aug 2+570 2+590 - - - - - - 2.364 297.4 29.2 HB-08 CARPETA SIMPLE DE BANQUINA NIVEL # 3 CUMPLE

C-PS-152 25-Aug 23+340 24+000 - - - - - - 2.361 298.0 29.2 HB-08 CARPETA SIMPLE DE BANQUINA NIVEL # 3 CUMPLE

C-PS-153 25-Aug 22+070 22+140 - - - - - - 2.367 297.6 29.2 HB-08 CUNETA DE BANQUINA NIVEL # 2 CUMPLE

C-PS-154 25-Aug 2+570 2+610 - - - - - - 2.360 303.1 29.7 HB-08 CARPETA SIMPLE DE BANQUINA NIVEL # 2 CUMPLE

C-PS-155 27-Aug 2+500 - - - - - - 2.332 315.2 30.9 HB-08 CUNETA DE BANQUINA CUMPLE

C-PS-156 27-Aug 22+070 22+150 - - - - - - 2.343 320.7 31.4 HB-08 CUNETA DE BANQUINA NIVEL # 1 CUMPLE

C-PS-157 27-Aug 23+340 23+420 - - - - - - 2.342 321.4 31.5 HB-08 CARPETA SIMPLE DE BANQUINA NIVEL # 2 CUMPLE

C-PS-158 28-Aug 23+340 23+420 - - - - - - 2.360 333.1 32.7 HB-08 CARPETA SIMPLE DE BANQUINA NIVEL # 2 CUMPLE

C-PS-159 29-Aug 22+070 22+150 - - - - - - 2.348 300.1 29.4 HB-08 CUNETA DE BANQUINA NIVEL # 1 CUMPLE

C-PS-160 30-Aug 2+600 2+670 - - - - - - 2.364 302.7 29.7 HB-08 CUNETA DE BANQUINA NIVEL # 1 CUMPLE

C-PS-161 30-Aug 2+800 2+850 - - - - - - 2.371 311.4 30.5 HB-08 ZANJA DE CORONAMIENTO CUMPLE

C-PS-162 31-Aug 2+800 2+850 - - - - - - 2.365 297.5 29.2 HB-08 CUNETA DE BANQUINA NIVEL # 7 CUMPLE

C-PS-163 31-Aug 21+630 21+640 - - - - - - 2.367 322.5 31.6 HB-08 CUNETA DE BANQUINA NIVEL # 2 CUMPLE

C-PS-164 31-Aug 2+800 2+850 - - - - - - 2.367 325.5 31.9 HB-08 ZANJA DE CORONAMIENTO CUMPLE

C-PS-165 1-Sep 2+800 2+850 - - - - - - 2.372 322.8 31.7 HB-08 CARPETA SIMPLE DE BANQUINA NIVEL # 7 CUMPLE
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
HB-8 - "HC-11" TIPO DE HORMIGON "H-21" Kg/cm2

03 DIAS 7 DIAS 28 DIAS


TRAMO TIPO
FECHA DENSIDAD RESISTENCIA DENSIDAD RESISTENCIA DENSIDAD RESISTENCIA
REGISTRO ELEMENTO ESTRUCTURAL OBS
VACIADO
INICIO FINAL (g/cm3) (kg/cm2) (Mpa) (g/cm3) (kg/cm2) (Mpa) (g/cm3) (kg/cm2) (Mpa) H°

C-PS-166 1-Sep 21+630 21+640 - - - - - - 2.363 293.5 28.8 HB-08 BAJANTE Y CUNETA DE BANQUINA NIVEL # 1 CUMPLE

C-PS-167 1-Sep 22+070 22+150 - - - - - - 2.391 320.2 31.4 HB-08 CARPETA SIMPLE DE BANQUINA NIVEL # 1 CUMPLE

C-PS-168 2-Sep 22+640 22+700 - - - - - - 2.361 328.6 32.2 HB-08 CUNETA DE BANQUINA NIVEL # 4 CUMPLE

C-PS-169 3-Sep 22+640 22+700 - - - - - - 2.368 248.9 24.4 HB-08 CUNETA DE BANQUINA NIVEL # 4 CUMPLE

C-PS-170 3-Sep 22+070 22+150 - - - - - - 2.369 233.8 22.9 HB-08 CARPETA SIMPLE DE BANQUINA NIVEL # 1 CUMPLE

Número de ensayos 69

Valor promedio(kg/cm2) 299

Valor mínimo(kg/cm2) 229

Desviación estándar 31

Coef. de variación (%) 10%

Resistencia Característica(kg/cm2) 248

Constructora Control y Calidad


SINOHYDRO CONNAL S.R.L.
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLAR "
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T -22
HORMIGÓN TIPO MF-05

03 DIAS 07 DIAS 28 DIAS


FECHA N° PROG ELEMENTO
REGISTRO DENSIDAD RESISTENCIA DENSIDAD RESISTENCIA DENSIDAD RESISTENCIA OBS
VACIADO ESTRUCTURAL
ALC ALC (g/cm3) (kg/cm2) (Mpa) (g/cm3) (kg/cm2) (Mpa) (g/cm3) (kg/cm2) (Mpa)
RC-HFL-001 11-Aug 26+795 2.3 2.6 0.3 2.3 5.0 0.5 1.965 6.5 0.6 HORMIGÓN FLUIDO CUMPLE
RC-HFL-002 16-Aug 6 1+063 2.3 3.6 0.4 2.1 4.5 0.4 1.978 7.2 0.7 HORMIGÓN FLUIDO CUMPLE
RC-HFL-003 17-Aug 16 4+114 2.3 3.5 0.3 2.1 5.0 0.5 2.050 6.8 0.7 HORMIGÓN FLUIDO CUMPLE
RC-HFL-004 19-Aug 6 1+063 2.2 2.8 0.3 2.2 4.4 0.4 2.103 4.5 0.4 HORMIGÓN FLUIDO CUMPLE
RC-HFL-005 20-Aug 16 4+114 2.1 2.2 0.2 2.1 5.6 0.6 2.050 7.9 0.8 HORMIGÓN FLUIDO CUMPLE
RC-HFL-006 23-Aug 6 1+063 2.1 3.1 0.3 2.1 3.7 0.4 1.983 4.9 0.5 HORMIGÓN FLUIDO CUMPLE
RC-HFL-007 24-Aug 16 4+114 - - - 2.1 3.2 0.3 1.986 5.7 0.6 HORMIGÓN FLUIDO CUMPLE
RC-HFL-008 24-Aug 6 1+063 2.1 2.5 0.2 2.2 3.6 0.4 2.098 6.0 0.6 HORMIGÓN FLUIDO CUMPLE

Número de ensayos 8

Valor promedio(kg/cm2) 6

Valor mínimo(kg/cm2) 5

Desviación estándar 1

Coef. de variación (%) 19%

Resistencia Característica(kg/cm2) 4

Constructora Control y Calidad


SINOHYDRO CONNAL S.R.L.
PROYECTO : CONSTRUCCION DEL TRAMO CENTRAL DOBLE VIA "EL SILLA
CARRETERA COCHABAMBA - SANTA CRUZ
LABORATORIO DE SUELOS Y MATERIALES
RESISTENCIA CILINDRICA A LA COMPRESION DE HORMIGONES AASHTO T

28 DIAS
TIPO
FECHA
REGISTRO PUENTE RESISTENCIA ELEMENTO ESTRUCTURAL
VACIADO
(kg/cm2) (Mpa) H°

C-PP-013 4-Aug E. SANTO I 310.4 30.4 HB-4 PILOTE # 4 PILA #2

C-PP-014 7-Aug E. SANTO II 337.9 33.1 HB-4 PILOTE # 6 PILA # 1

C-PP-015 7-Aug E. SANTO I 299.2 29.3 HB-4 PILOTE # 9 PILA # 2

C-PP-016 11-Aug P.THIYUMAYU 318.8 31.3 HB-4 PILOTE # 10 E

C-PP-017 11-Aug P.THIYUMAYU 289.0 28.3 HB-4 PILOTE # 1 B

C-PP-018 12-Aug E. SANTO I 307.5 30.2 HB-4 PILOTE # 4 PILA # 3

C-PP-019 12-Aug P.THIYUMAYU 369.5 36.2 HB-4 PILOTE # 8 -8 C L/SANTA CRUZ

C-PP-020 12-Aug P.THIYUMAYU 346.8 34.0 HB-4 PILOTE # 7 -7 B L/SANTA CRUZ

C-PP-021 13-Aug E. SANTO II 323.3 31.7 HB-4 PILOTE # 7 PILA # 1

C-PP-022 13-Aug P.THIYUMAYU 306.2 30.0 HB-4 PILOTE # 9 -C ESTRIBO

C-PP-023 13-Aug P.THIYUMAYU 301.1 29.5 HB-4 PILOTE # 6 A L/CBBA

C-PP-024 14-Aug E. SANTO II 321.5 31.5 HB-4 PILOTE # 18 PILA # 2 L/SANTA CRU

C-PP-025 14-Aug E. SANTO II 365.0 35.8 HB-4 PILOTE # 14 PILA # 1 L/CBBA

C-PP-026 14-Aug E. SANTO II 337.7 33.1 HB-4 PILOTE # 6 PILA # 2 L/SANTA CRUZ

C-PP-027 15-Aug E. SANTO I 339.7 33.3 HB-4 PILOTE # 7 PILA # 2

C-PP-028 16-Aug E. SANTO II 317.0 31.1 HB-4 PILOTE # 13 PILA # 2

C-PP-029 17-Aug P.THIYUMAYU 335.0 32.9 HB-4 PILOTE # 10 -10 D

C-PP-030 18-Aug P.THIYUMAYU 292.8 28.7 HB-4 PILOTE # 4 -4-B

C-PP-031 19-Aug P.THIYUMAYU 299.2 29.3 HB-4 PILOTE # 6 -6 C L/CBBA

C-PP-032 20-Aug P.THIYUMAYU 302.4 29.7 HB-4 PILOTE # 1-1 A L/CBBA

C-PP-033 21-Aug E. SANTO I 328.4 32.2 HB-4 PILOTE # 6 PILA # 2 L/SANTA CRUZ

C-PP-034 21-Aug P.THIYUMAYU 306.3 30.0 HB-4 PILOTE # 8-8 D PILA # 2 L/CBBA

C-PP-035 21-Aug P.THIYUMAYU 299.5 29.4 HB-4 PILOTE # 7-7 C PILA # 2 L/CBBA
C-PP-036 22-Aug P.THIYUMAYU 308.5 30.3 HB-4 PILOTE # 3-3 A ESTRIBO L/CBBA

C-PP-037 22-Aug E. SANTO II 320.1 31.4 HB-4 PILOTE # 12 PILA # 1


PILOTE # 10-10 C ESTRIBO L/SANTA
C-PP-038 23-Aug P.THIYUMAYU 323.0 31.7 HB-4 CRUZ
C-PP-039 24-Aug P.THIYUMAYU 296.8 29.1 HB-4 PILOTE # 6-6 B L/CBBA

C-PP-040 24-Aug E. SANTO I 286.5 28.1 HB-4 PILOTE # 11 PILA #2

C-PP-041 26-Aug E. SANTO II 301.2 29.5 HB-4 PILOTE # 2 PILA # 1 L/CBBA

C-PP-042 26-Aug E. SANTO I 275.4 27.0 HB-4 PILOTE # 5 ESTRIBO L/SANTA CRUZ

C-PP-043 26-Aug P.THIYUMAYU 285.8 28.0 HB-4 PILOTE # 1-1 C

C-PP-044 27-Aug E. SANTO I 335.0 32.8 HB-4 PILOTE # 3 PILA # 2 L/SANTA CRUZ

C-PP-045 27-Aug E. SANTO II 334.1 32.8 HB-4 PILOTE # 17 PILA # 2 L/SANTA CRUZ

C-PP-046 28-Aug P.THIYUMAYU 313.4 30.7 HB-4 PILOTE # 4-4 A L/CBBA

C-PP-047 28-Aug P.THIYUMAYU 321.1 31.5 HB-4 PILOTE # 3- 3 B ESTRIBO L/ CBBA

C-PP-048 28-Aug P.THIYUMAYU 327.7 32.1 HB-4 PILOTE # 9 PILA # 2

C-PP-049 29-Aug E. SANTO II 341.9 33.5 HB-4 PILOTE # 15 PILA # 1 L/CBBA

C-PP-050 29-Aug E. SANTO II 344.4 33.8 HB-4 PILOTE # 7 PILA # 2 L/SANTA CRUZ

C-PP-051 29-Aug P.THIYUMAYU 325.5 31.9 HB-4 PILOTE # 7- 7 A PILA # 2 L/SANTA CR

C-PP-052 30-Aug P.THIYUMAYU 306.5 30.1 HB-4 PILOTE # 10 -10 B L/SANTA CRUZ

C-PP-053 30-Aug P.THIYUMAYU 323.3 31.7 HB-4 PILOTE # 5-5 C PILA # 2 L/CBBA

C-PP-054 1-Sep E. SANTO II 320.8 31.5 HB-4 PILOTE # 12 PILA # 2 L/SANTA CRUZ

C-PP-055 2-Sep P.THIYUMAYU 321.3 31.5 HB-4 PILOTE # 2 PILA # 1 L/CBBA

C-PP-056 3-Sep P.THIYUMAYU 244.9 24.0 HB-4 PILOTE # 5-5 D L/CBBA

44

316

245

23

7%

278

Constructora
SINOHYDRO
OBLE VIA "EL SILLAR "
CRUZ
ALES
MIGONES AASHTO T -22

NTO ESTRUCTURAL OBS

LA #2 CUMPLE

ILA # 1 CUMPLE

LA # 2 CUMPLE

E CUMPLE

CUMPLE

LA # 3 CUMPLE

C L/SANTA CRUZ CUMPLE

B L/SANTA CRUZ CUMPLE

LA # 1 CUMPLE

ESTRIBO CUMPLE

L/CBBA CUMPLE

ILA # 2 L/SANTA CRUZ CUMPLE

ILA # 1 L/CBBA CUMPLE

LA # 2 L/SANTA CRUZ CUMPLE

LA # 2 CUMPLE

ILA # 2 CUMPLE

10 D CUMPLE

-B CUMPLE

C L/CBBA CUMPLE

A L/CBBA CUMPLE

LA # 2 L/SANTA CRUZ CUMPLE

D PILA # 2 L/CBBA CUMPLE

C PILA # 2 L/CBBA CUMPLE


A ESTRIBO L/CBBA CUMPLE

ILA # 1 CUMPLE
10 C ESTRIBO L/SANTA
CUMPLE

B L/CBBA CUMPLE

ILA #2 CUMPLE

LA # 1 L/CBBA CUMPLE

STRIBO L/SANTA CRUZ CUMPLE

C CUMPLE

LA # 2 L/SANTA CRUZ CUMPLE

ILA # 2 L/SANTA CRUZ CUMPLE

A L/CBBA CUMPLE

B ESTRIBO L/ CBBA CUMPLE

LA # 2 CUMPLE

ILA # 1 L/CBBA CUMPLE

LA # 2 L/SANTA CRUZ CUMPLE

A PILA # 2 L/SANTA CRUZ CUMPLE

10 B L/SANTA CRUZ CUMPLE

C PILA # 2 L/CBBA CUMPLE

ILA # 2 L/SANTA CRUZ CUMPLE

LA # 1 L/CBBA CUMPLE

D L/CBBA CUMPLE

Control y Calidad
CONNAL S.R.L.