Está en la página 1de 1

PLANTA GENERAL

PLACA CTO 3000PSI, RFZO MALLA XX-131 SECC VIGA DE PISO Y COL 20X20

A B C REFUERZO TRANS 38"

PLACA CONCRETO ESTRUCTURAL f’c=210 kg/cm2 (3000PSI), e=0.10m


6.00 MALLA XX-131 DIAM: 5MM, ESPACIAMNIENTO 15CM

0.20 2.70 0.20 2.70 0.20


MATERIAL SELECCIONADO COMPACTADO AL 95% DEL PROCTOR
REFUERZO LONG 21"
0.20

1 1
2.00
PLACA EN CONCRETO REFORZADO e:0.10m
A B C Titulo del Proyecto
6.00
0.20 0.20 2.70 0.20 2.70 0.20

ALZADO COL 20X20 DESPIECE DE ACEROS VIGA TRANSVERSAL,


2 2 ADECUACION
0.20

1 1
EJES 1, 5 Y 9
2.00

0.20
AULA IE SANTA
2 2
2.00

2.00
ANA - SEDE
3
0.20

3
Long: 4.70m
0.70
CASCAJEROS
0.20
0.02 Long: 2.50m

3 3 2.00

0.20

4 4
2.00

2.00
0.20

5 17.80
5 0.70 Ubicación

GUAPI, CAUCA
2.00
0.20
1.12 Long: 4.70m

4 4 6
0.20

6
Long: 2.50m

2.00

11e ø3/8" @0.14m 3e ø3/8" @0.14m 3e ø3/8" @0.14m 11e ø3/8" @0.14m
0.20

10e ø3/8" @0.05m 10e ø3/8" @0.05m


2.00
7 7
2.00
2.90 2.90

0.20
Elaboró:
0.20 8 8

5 17.80
5 2.00 0.10 A B C
KELLY YOHANA
0.20

9 9

2.00 A B C MACHADO GALVÁN

0.20

6 6 DESPIECE DE ACEROS VIGA LONGITUDINAL, EJES A Y C TEAM SHELTER &


SETTLEMENTS -
WASH WA
0.70
2.00
Long: 6.00m
Long: 6.00m
0.70
Long: 5.30m

Long: 3.00m
0.20 Contiene:
7 7
2.00
0.70 0.70

0.70

0.20
Long: 6.00m Long: 3.00m Long: 6.00m
ACEROS, PLANTA DE
8 8
Long: 5.30 m

8e ø3/8" @0.05m 7e ø3/8" @0.15m 3e ø3/8" @0.15m 8e ø3/8" @0.05m 7e ø3/8" @0.15m 3e ø3/8" @0.15m 8e ø3/8" @0.05m 7e ø3/8" @0.15m 3e ø3/8" @0.15m 8e ø3/8" @0.05m 8e ø3/8" @0.05m 8e ø3/8" @0.05m
CIMENTACIÓN
8e ø3/8" @0.05m 8e ø3/8" @0.05m 8e ø3/8" @0.05m 8e ø3/8" @0.05m
7e ø3/8" @0.15m 13e ø3/8" @0.05m 7e ø3/8" @0.15m 13e ø3/8" @0.05m 7e ø3/8" @0.15m 13e ø3/8" @0.05m 7e ø3/8" @0.15m 7e ø3/8" @0.15m

2.20 2.20 2.20 2.20 2.20 2.20 2.20 2.20


2.00

0.20
4 3 2 1 1 3 2 1 1
9 9

A B
A-01
C

También podría gustarte