CUADRO DE DATOS
COLUMNA Medidas X - X Y - Y
b t Pcm Pcv Mcm Mcv Mcs Ps Mcm Mcv Mcs Ps
m. m. ton ton ton.m ton.m ton.m ton ton.m ton.m ton.m ton
C-5 0.3 0.6 56.43 26.33 34.79 0.21 0.16 3.5 45.62 0.55 2.58 2.37
C-6 0.3 0.6 89.27 42.65 34.79 0.08 0.16 3.9 45.62 5.4 0.81 20.58
t1 t2
b1 b2
Asumo para
Sección Viga de Conexión:
b h
0.3 0.8
t 1.5 Kg/cm2
P1 P2
fc = 210 Kg/cm2
fy 4200 Kg/cm2
R1 R2
e L1= 7.3 m.
L = 7.8 m.
Predimensionamiento inicial:
Ppzap Az Asumo A e
P1= Pcm + Pcv 5%P1 P1 + 5%P1 1.05%P1/Gt L1 B1 L1*B1 (L1-t1)/2
Estatico 82.76 ton. 4.14 86.90 ton. 5.793 ton. 1.8 3.6 6.48 0.5
Sísmico 82.76 ton. 4.14 86.90 ton. 5.793 ton. 1.8 3.6 6.48 0.5
Segundo tanteo:
Página 1
Pu1 Pu2 Mu1 Mu2 Mu1' Ru1
HIP. I U=1.5*CM+1.8*CV 132.04 210.68 52.56 52.33 52.56 Pu1*L/(L-e) 143.04
HIP. II U= 1.25*(CM+CV+CS) 106.41 190.63 60.94 64.79 (Pu1*L+Mu1+Mu2)/(L-e) 132.74
HIP. III U= 0.9*CM + 1.25*CS 53.75 106.07 413.81 42.07 (Pu1*L+Mu1+Mu2)/(L-e) 121.54
-27.99 ton.
4.76 m.
52.33 ton.
e L1= 7.3 m.
L = 7.8 m.
11.00 ton.
132.04 ton.
e L1= 7.3 m.
L = 7.8 m.
Se realiza transversalmente:
A S U M I R
Asumimos: h = 0.5 m.
Página 2
B1 b+d d = 0.4 m.
t+d/2
L1
Comparar
0 Vu/0 Vu/0 < Vc
0.9 124.46 BIEN
L1
As(temp.)
0.0018*b*t
14.4 cm2
Página 3
El diseño se hace igual a una zapata aislada:
t m b = 0.3 m.
B2 b t = 0.6 m. YY
L2
XX
Ppzap Pt Az' B2 L2 Az
P2= Pcm + Pcv 10%P2 P2 + 10%P2 Pt/Gt m 2*m+b 2*m+t L2*B2
Estatico 131.92 ton. 13.192 145.11 ton. 9.6741 m2 1.35 3 3.3 9.9 m2
Sísmico 131.92 ton. 13.192 145.11 ton. 7.4416 m2
b) Cálculo de Gu:
e L2/6
Pu Mu Mu/Pu B2/6 Gu1 Gu2
Hip. I X-X 210.68 52.33 0.248 0.55 30.89 11.67 Si: e<=L/6
Y-Y 210.68 78.15 0.371 0.50 37.07 5.49 Calcular:
Hip. II X-X (+CS) 169.78 43.79 0.258 0.55 25.19 9.11 Gu=Pu/(L*B)*(1+-6*e/L)
Y-Y (+CS) 190.63 64.79 0.340 0.50 32.34 6.17
X-X (-CS) 160.03 43.39 0.271 0.55 24.13 8.20 Si: e> L/6
Y-Y (-CS) 139.18 62.76 0.451 0.50 26.74 1.38 Calcular:
Hip. III X-X (+CS) 85.218 313.31 3.677 0.55 -9.34 -9.34 Gu=Pu/(L*B)*(4*L/(3*L-6*e))
Y-Y (+CS) 106.07 411.59 3.880 0.50 -9.00 -9.00
X-X (-CS) 75.468 312.91 4.146 0.55 -6.72 -6.72
Y-Y (-CS) 54.62 409.57 7.499 0.50 -1.84 -1.84
b) Dimensionamiento en elevación:
d/2
t d/2
B2 b Yo Asumo para h = 0.80 m.
Página 4
Xo
L2
d Xo Yo Ao bo
Az Gu2 b t h h-10 (L2+t+d)/2 b+d Xo*Yo Xo + Yo 0
9.9 37.07 0.3 0.6 0.8 0.7 2.3 1 2.3 3.3 0.85
Mu B2 Ku Usar As
Gu * m^2/2*B2 b d Mu/(b*d^2) p pmin p cm2
101.34 ton.m 3 0.7 68.935 0.0018 39.16
B L
m. m. Acero Principal Acero Transv. 0 Area cm.
Z-1 4 2 43.22 cm2 14.4 cm2 Usar fierros de 3/4' 2.84 Usar 16 cada 25
Z-2 3 3.3 39.16 cm2 39.16 cm2 Usar fierros de 5/8' 2 Usar 20 cada 15
En metros.
Usar 6 3/4' cada 33 cm. Usar 20 5/8' cada 15 cm.
Z-1 YY
Z-2
Página 5
L 3.3
L1= 2
Usar 4 3/4'
Usar 5 1"
Estribos
Colocar 3 a .05, 2 a 0.10 , 1 a 0.15
resto a 35 cm. en cada ext.
Página 6