110-GPY-FR-008-V01
31/07/2018
3.01 CONCRETO 13,8 MPA (2000 PSI) SOLADO LIMPIEZA M3 1.72 $ 428,940.00 $ 737,776.80
CONCRETO ZAPATA 20.7 MPA (3000 PSI) NO INCLUYE
3.02 M3 1.75 $ 632,438.00 $ 1,106,766.50
HIERRO
COLUMNA 0.30 X 0.30 M CONCRETO 20.7 MPA (3000 PSI)
3.03 ML 13.20 $ 211,798.00 $ 2,795,733.60
INCLUYE REFUERZO 6125/8+F3/8C/0.15
VIGA CIMENTACION 0.30X0.30, CONCRETO 20.7 MPa (3000 PSI)
3.04 INCLUYE REFUERZO 6D=5/8+F3/8c/0.10 ML 27.45 $ 189,541.00 $ 5,202,900.45
4.01 ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2, G60) KG 826.00 $ 4,966.00 $ 4,101,916.00
6.01 TABLERO PARCIAL 4 CIRCUITOS. INCLUYE BREAKER UND 1.00 $ 334,839.00 $ 334,839.00
6.02 PUESTA A TIERRA TERMINAL DE BAJA TENSION UND 1.00 $ 381,947.00 $ 381,947.00
6.03 ACOMETIDA PARCIAL 2 No8+1No12 DUCTO PVC 1" ML 30.00 $ 28,891.00 $ 866,730.00
6.04 BAJANTE CON TUBO CONDUIT METALICO 1`` L=6M UND 1.00 $ 135,430.00 $ 135,430.00
CAJA DE INSPECCIÓN TIPO CS 274 - AP 274, INCLUYE TAPA
6.05 UND 1.00 $ 707,095.00 $ 707,095.00
EN MARCO METALICO
SALIDA PARA TOMA CORRIENTE DOBLE CON POLO A
6.06 PTO 2.00 $ 93,858.00 $ 187,716.00
TIERRA
6.07 SALIDA DE LAMPARA TIPO T8 DE 2*32 PTO 5.00 $ 163,312.00 $ 816,560.00
Pagina 1 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
7.01 PISO EN CERAMICA LISO 0.20X0.20 LINEA MEDITERRANEA M2 80.05 $ 51,114.00 $ 4,091,675.70
7.02 CONCRETO 3000 PSI - 20.7 MPA MEZCLA EN OBRA M3 8.01 $ 392,890.00 $ 3,147,048.90
NP ITEMS NO PREVISTOS
3.01 CONCRETO 13,8 MPA (2000 PSI) SOLADO LIMPIEZA M3 1.72 $ 428,940.00 $ 737,776.80
Pagina 2 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
4.01 ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2, G60) KG 826.00 $ 4,966.00 $ 4,101,916.00
6.01 TABLERO PARCIAL 4 CIRCUITOS. INCLUYE BREAKER UND 1.00 $ 334,839.00 $ 334,839.00
7.01 PISO EN CERAMICA LISO 0.20X0.20 LINEA MEDITERRANEA M2 80.05 $ 51,114.00 $ 4,091,675.70
7.02 CONCRETO 3000 PSI - 20.7 MPA MEZCLA EN OBRA M3 8.01 $ 392,890.00 $ 3,147,048.90
NP ITEMS NO PREVISTOS
Pagina 3 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
3.01 CONCRETO 13,8 MPA (2000 PSI) SOLADO LIMPIEZA M3 1.72 $ 428,940.00 $ 737,776.80
4.01 ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2, G60) KG 826.00 $ 4,966.00 $ 4,101,916.00
6.01 TABLERO PARCIAL 4 CIRCUITOS. INCLUYE BREAKER UND 1.00 $ 334,839.00 $ 334,839.00
6.02 PUESTA A TIERRA TERMINAL DE BAJA TENSION UND 1.00 $ 381,947.00 $ 381,947.00
6.03 ACOMETIDA PARCIAL 2 No8+1No12 DUCTO PVC 1" ML 30.00 $ 28,891.00 $ 866,730.00
6.04 BAJANTE CON TUBO CONDUIT METALICO 1`` L=6M UND 1.00 $ 135,430.00 $ 135,430.00
CAJA DE INSPECCIÓN TIPO CS 274 - AP 274, INCLUYE TAPA
6.05 UND 1.00 $ 707,095.00 $ 707,095.00
EN MARCO METALICO
SALIDA PARA TOMA CORRIENTE DOBLE CON POLO A
6.06 PTO 2.00 $ 93,858.00 $ 187,716.00
TIERRA
Pagina 4 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
7.01 PISO EN CERAMICA LISO 0.20X0.20 LINEA MEDITERRANEA M2 80.05 $ 51,114.00 $ 4,091,675.70
7.02 CONCRETO 3000 PSI - 20.7 MPA MEZCLA EN OBRA M3 8.01 $ 392,890.00 $ 3,147,048.90
3.01 CONCRETO 13,8 MPA (2000 PSI) SOLADO LIMPIEZA M3 1.72 $ 428,940.00 $ 737,776.80
Pagina 5 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
4.01 ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2, G60) KG 826.00 $ 4,966.00 $ 4,101,916.00
7.02 CONCRETO 3000 PSI - 20.7 MPA MEZCLA EN OBRA M3 8.01 $ 392,890.00 $ 3,147,048.90
Pagina 6 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
3.01 CONCRETO 13,8 MPA (2000 PSI) SOLADO LIMPIEZA M3 1.72 $ 428,940.00 $ 737,776.80
4.01 ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2, G60) KG 826.00 $ 4,966.00 $ 4,101,916.00
Pagina 7 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
7.01 PISO EN CERAMICA LISO 0.20X0.20 LINEA MEDITERRANEA M2 80.05 $ 51,114.00 $ 4,091,675.70
7.02 CONCRETO 3000 PSI - 20.7 MPA MEZCLA EN OBRA M3 8.01 $ 392,890.00 $ 3,147,048.90
Pagina 8 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
3.01 CONCRETO 13,8 MPA (2000 PSI) SOLADO LIMPIEZA M3 1.72 $ 428,940.00 $ 737,776.80
4.01 ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2, G60) KG 826.00 $ 4,966.00 $ 4,101,916.00
7.02 CONCRETO 3000 PSI - 20.7 MPA MEZCLA EN OBRA M3 8.01 $ 392,890.00 $ 3,147,048.90
Pagina 9 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
3.01 CONCRETO 13,8 MPA (2000 PSI) SOLADO LIMPIEZA M3 1.72 $ 453,220.00 $ 779,538.40
4.01 ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2, G60) KG 826.00 $ 5,247.00 $ 4,334,022.00
Pagina 10 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
7.02 CONCRETO 3000 PSI - 20.7 MPA MEZCLA EN OBRA M3 8.01 $ 415,129.00 $ 3,325,183.29
3.01 CONCRETO 13,8 MPA (2000 PSI) SOLADO LIMPIEZA M3 1.72 $ 404,660.00 $ 696,015.20
4.01 ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2, G60) KG 826.00 $ 4,685.00 $ 3,869,810.00
6.01 TABLERO PARCIAL 4 CIRCUITOS. INCLUYE BREAKER UND 1.00 $ 325,086.00 $ 325,086.00
6.02 PUESTA A TIERRA TERMINAL DE BAJA TENSION UND 1.00 $ 370,822.00 $ 370,822.00
6.03 ACOMETIDA PARCIAL 2 No8+1No12 DUCTO PVC 1" ML 30.00 $ 28,049.00 $ 841,470.00
6.04 BAJANTE CON TUBO CONDUIT METALICO 1`` L=6M UND 1.00 $ 131,485.00 $ 131,485.00
CAJA DE INSPECCIÓN TIPO CS 274 - AP 274, INCLUYE TAPA
6.05 UND $ 686,501.00 $ 686,501.00
EN MARCO METALICO 1.00
SALIDA PARA TOMA CORRIENTE DOBLE CON POLO A
6.06 PTO $ 91,124.00 $ 182,248.00
TIERRA 2.00
6.07 SALIDA DE LAMPARA TIPO T8 DE 2*32 PTO $ 158,555.00 $ 792,775.00
5.00
SUMINISTRO E INSTALACIÓN DE SISTEMA FOTOVOLTAICO
ON - GRID DE 5200WP (INCLUYE LA TOTALIDAD DE
6.08 UND 1.00 $ 14,799,852.00 $ 14,799,852.00
MATERIALES REQUERIDOS PARA SU CORRECTO
FUNCIONAMIENTO)
7.01 PISO EN CERAMICA LISO 0.20X0.20 LINEA MEDITERRANEA M2 80.05 $ 48,221.00 $ 3,860,091.05
7.02 CONCRETO 3000 PSI - 20.7 MPA MEZCLA EN OBRA M3 8.01 $ 370,651.00 $ 2,968,914.51
MURO EN BLOQUE FLEXA No. 5, 0.12X0.20X0.30 M
7.03 M2 27.75 $ 39,955.00 $ 1,108,751.25
(MORTERO TIPOS 1.3)
PAÑETE MUROS INTERIORES MORT 1:4 INCLUYE FILOS Y
7.04 M2 55.50 $ 21,222.00 $ 1,177,821.00
DILATAC
7.05 PINTURA VINILO T. CORAZA EXTERIOR 3 MANOS M2 55.50 $ 10,274.00 $ 570,207.00
8.00 CUBIERTA $ 9,239,804.07
SUMNISTRO E INSTALACIÓN CUBIERTA EN TEJA
8.01 TERMOACUSTICA PERFIL TRAPEZOIDAL COLOR. NO M2 78.75 $ 49,267.00 $ 3,879,776.25
INCLUYE ESTRUCTURA
Pagina 12 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
NP ITEMS NO PREVISTOS
3.01 CONCRETO 13,8 MPA (2000 PSI) SOLADO LIMPIEZA M3 1.72 $ 404,660.00 $ 696,015.20
CONCRETO ZAPATA 20.7 MPA (3000 PSI) NO INCLUYE
3.02 M3 1.75 $ 596,640.00 $ 1,044,120.00
HIERRO
COLUMNA 0.30 X 0.30 M CONCRETO 20.7 MPA (3000 PSI)
3.03 ML 13.20 $ 199,810.00 $ 2,637,492.00
INCLUYE REFUERZO 6125/8+F3/8C/0.15
VIGA CIMENTACION 0.30X0.30, CONCRETO 20.7 MPa (3000 PSI)
3.04 INCLUYE REFUERZO 6D=5/8+F3/8c/0.10 ML 27.45 $ 178,812.00 $ 4,908,389.40
4.01 ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2, G60) KG 826.00 $ 4,685.00 $ 3,869,810.00
ACERO ESTRUCTURAL ASTM A-500 G C (INCLUYE
4.02 KG 2,250.00 $ 14,121.00 $ 31,772,250.00
SUMINISTRO MONTAJE Y PINTURA)
ACERO ESTRUCTURAL T ASTM A-36 (INCLUYE SUMINISTRO
4.03 KG 60.54 $ 13,490.00 $ 816,684.60
MONTAJE Y PINTURA)
6.01 TABLERO PARCIAL 4 CIRCUITOS. INCLUYE BREAKER UND 1.00 $ 325,086.00 $ 325,086.00
6.02 PUESTA A TIERRA TERMINAL DE BAJA TENSION UND 1.00 $ 370,822.00 $ 370,822.00
6.03 ACOMETIDA PARCIAL 2 No8+1No12 DUCTO PVC 1" ML 30.00 $ 28,049.00 $ 841,470.00
6.04 BAJANTE CON TUBO CONDUIT METALICO 1`` L=6M UND 1.00 $ 131,485.00 $ 131,485.00
Pagina 13 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
7.01 PISO EN CERAMICA LISO 0.20X0.20 LINEA MEDITERRANEA M2 80.05 $ 48,221.00 $ 3,860,091.05
7.02 CONCRETO 3000 PSI - 20.7 MPA MEZCLA EN OBRA M3 8.01 $ 370,651.00 $ 2,968,914.51
MURO EN BLOQUE FLEXA No. 5, 0.12X0.20X0.30 M
7.03 M2 27.75 $ 39,955.00 $ 1,108,751.25
(MORTERO TIPOS 1.3)
PAÑETE MUROS INTERIORES MORT 1:4 INCLUYE FILOS Y
7.04 M2 55.50 $ 21,222.00 $ 1,177,821.00
DILATAC
7.05 PINTURA VINILO T. CORAZA EXTERIOR 3 MANOS M2 55.50 $ 10,274.00 $ 570,207.00
8.00 CUBIERTA $ 9,239,804.07
SUMNISTRO E INSTALACIÓN CUBIERTA EN TEJA
8.01 TERMOACUSTICA PERFIL TRAPEZOIDAL COLOR. NO M2 78.75 $ 49,267.00 $ 3,879,776.25
INCLUYE ESTRUCTURA
NP ITEMS NO PREVISTOS
3.01 CONCRETO 13,8 MPA (2000 PSI) SOLADO LIMPIEZA M3 1.72 $ 453,220.00 $ 779,538.40
CONCRETO ZAPATA 20.7 MPA (3000 PSI) NO INCLUYE
3.02 M3 1.75 $ 668,237.00 $ 1,169,414.75
HIERRO
Pagina 14 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
4.01 ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2, G60) KG 826.00 $ 5,247.00 $ 4,334,022.00
ACERO ESTRUCTURAL ASTM A-500 G C (INCLUYE
4.02 KG 2,250.00 $ 15,816.00 $ 35,586,000.00
SUMINISTRO MONTAJE Y PINTURA)
6.01 TABLERO PARCIAL 4 CIRCUITOS. INCLUYE BREAKER UND 1.00 $ 344,591.00 $ 344,591.00
6.02 PUESTA A TIERRA TERMINAL DE BAJA TENSION UND 1.00 $ 393,072.00 $ 393,072.00
6.03 ACOMETIDA PARCIAL 2 No8+1No12 DUCTO PVC 1" ML 30.00 $ 29,732.00 $ 891,960.00
6.04 BAJANTE CON TUBO CONDUIT METALICO 1`` L=6M UND 1.00 $ 139,374.00 $ 139,374.00
CAJA DE INSPECCIÓN TIPO CS 274 - AP 274, INCLUYE TAPA
6.05 UND $ 727,690.00 $ 727,690.00
EN MARCO METALICO 1.00
SALIDA PARA TOMA CORRIENTE DOBLE CON POLO A
6.06 PTO $ 96,592.00 $ 193,184.00
TIERRA 2.00
6.07 SALIDA DE LAMPARA TIPO T8 DE 2*32 PTO $ 168,068.00 $ 840,340.00
5.00
SUMINISTRO E INSTALACIÓN DE SISTEMA FOTOVOLTAICO
ON - GRID DE 5200WP (INCLUYE LA TOTALIDAD DE
6.08 UND 1.00 $ 15,687,843.00 $ 15,687,843.00
MATERIALES REQUERIDOS PARA SU CORRECTO
FUNCIONAMIENTO)
7.01 PISO EN CERAMICA LISO 0.20X0.20 LINEA MEDITERRANEA M2 80.05 $ 54,008.00 $ 4,323,340.40
7.02 CONCRETO 3000 PSI - 20.7 MPA MEZCLA EN OBRA M3 8.01 $ 415,129.00 $ 3,325,183.29
Pagina 15 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
NP ITEMS NO PREVISTOS
3.01 CONCRETO 13,8 MPA (2000 PSI) SOLADO LIMPIEZA M3 1.72 $ 453,220.00 $ 779,538.40
CONCRETO ZAPATA 20.7 MPA (3000 PSI) NO INCLUYE
3.02 M3 1.75 $ 668,237.00 $ 1,169,414.75
HIERRO
COLUMNA 0.30 X 0.30 M CONCRETO 20.7 MPA (3000 PSI)
3.03 ML 13.20 $ 223,786.00 $ 2,953,975.20
INCLUYE REFUERZO 6125/8+F3/8C/0.15
VIGA CIMENTACION 0.30X0.30, CONCRETO 20.7 MPa (3000 PSI)
3.04 INCLUYE REFUERZO 6D=5/8+F3/8c/0.10 ML 27.45 $ 200,269.00 $ 5,497,384.05
4.01 ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2, G60) KG 826.00 $ 5,247.00 $ 4,334,022.00
ACERO ESTRUCTURAL ASTM A-500 G C (INCLUYE
4.02 KG 2,250.00 $ 15,816.00 $ 35,586,000.00
SUMINISTRO MONTAJE Y PINTURA)
ACERO ESTRUCTURAL T ASTM A-36 (INCLUYE SUMINISTRO
4.03 KG 60.54 $ 15,109.00 $ 914,698.86
MONTAJE Y PINTURA)
6.01 TABLERO PARCIAL 4 CIRCUITOS. INCLUYE BREAKER UND 1.00 $ 344,591.00 $ 344,591.00
6.02 PUESTA A TIERRA TERMINAL DE BAJA TENSION UND 1.00 $ 393,072.00 $ 393,072.00
6.03 ACOMETIDA PARCIAL 2 No8+1No12 DUCTO PVC 1" ML 30.00 $ 29,732.00 $ 891,960.00
6.04 BAJANTE CON TUBO CONDUIT METALICO 1`` L=6M UND 1.00 $ 139,374.00 $ 139,374.00
CAJA DE INSPECCIÓN TIPO CS 274 - AP 274, INCLUYE TAPA
6.05 UND $ 727,690.00 $ 727,690.00
EN MARCO METALICO 1.00
Pagina 16 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
7.01 PISO EN CERAMICA LISO 0.20X0.20 LINEA MEDITERRANEA M2 80.05 $ 54,008.00 $ 4,323,340.40
7.02 CONCRETO 3000 PSI - 20.7 MPA MEZCLA EN OBRA M3 8.01 $ 415,129.00 $ 3,325,183.29
MURO EN BLOQUE FLEXA No. 5, 0.12X0.20X0.30 M
7.03 M2 27.75 $ 44,750.00 $ 1,241,812.50
(MORTERO TIPOS 1.3)
PAÑETE MUROS INTERIORES MORT 1:4 INCLUYE FILOS Y
7.04 M2 55.50 $ 23,769.00 $ 1,319,179.50
DILATAC
7.05 PINTURA VINILO T. CORAZA EXTERIOR 3 MANOS M2 55.50 $ 11,507.00 $ 638,638.50
8.00 CUBIERTA $ 10,348,599.16
SUMNISTRO E INSTALACIÓN CUBIERTA EN TEJA
8.01 TERMOACUSTICA PERFIL TRAPEZOIDAL COLOR. NO M2 78.75 $ 55,179.00 $ 4,345,346.25
INCLUYE ESTRUCTURA
NP ITEMS NO PREVISTOS
3.01 CONCRETO 13,8 MPA (2000 PSI) SOLADO LIMPIEZA M3 1.72 $ 453,220.00 $ 779,538.40
CONCRETO ZAPATA 20.7 MPA (3000 PSI) NO INCLUYE
3.02 M3 1.75 $ 668,237.00 $ 1,169,414.75
HIERRO
COLUMNA 0.30 X 0.30 M CONCRETO 20.7 MPA (3000 PSI)
3.03 ML 13.20 $ 223,786.00 $ 2,953,975.20
INCLUYE REFUERZO 6125/8+F3/8C/0.15
Pagina 17 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
4.01 ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2, G60) KG 826.00 $ 5,247.00 $ 4,334,022.00
6.01 TABLERO PARCIAL 4 CIRCUITOS. INCLUYE BREAKER UND 1.00 $ 344,591.00 $ 344,591.00
6.02 PUESTA A TIERRA TERMINAL DE BAJA TENSION UND 1.00 $ 393,072.00 $ 393,072.00
6.03 ACOMETIDA PARCIAL 2 No8+1No12 DUCTO PVC 1" ML 30.00 $ 29,732.00 $ 891,960.00
6.04 BAJANTE CON TUBO CONDUIT METALICO 1`` L=6M UND 1.00 $ 139,374.00 $ 139,374.00
CAJA DE INSPECCIÓN TIPO CS 274 - AP 274, INCLUYE TAPA
6.05 UND $ 727,690.00 $ 727,690.00
EN MARCO METALICO 1.00
SALIDA PARA TOMA CORRIENTE DOBLE CON POLO A
6.06 PTO $ 96,592.00 $ 193,184.00
TIERRA 2.00
6.07 SALIDA DE LAMPARA TIPO T8 DE 2*32 PTO $ 168,068.00 $ 840,340.00
5.00
SUMINISTRO E INSTALACIÓN DE SISTEMA FOTOVOLTAICO
ON - GRID DE 5200WP (INCLUYE LA TOTALIDAD DE
6.08 UND 1.00 $ 15,687,843.00 $ 15,687,843.00
MATERIALES REQUERIDOS PARA SU CORRECTO
FUNCIONAMIENTO)
7.01 PISO EN CERAMICA LISO 0.20X0.20 LINEA MEDITERRANEA M2 80.05 $ 54,008.00 $ 4,323,340.40
7.02 CONCRETO 3000 PSI - 20.7 MPA MEZCLA EN OBRA M3 8.01 $ 415,129.00 $ 3,325,183.29
MURO EN BLOQUE FLEXA No. 5, 0.12X0.20X0.30 M
7.03 M2 27.75 $ 44,750.00 $ 1,241,812.50
(MORTERO TIPOS 1.3)
PAÑETE MUROS INTERIORES MORT 1:4 INCLUYE FILOS Y
7.04 M2 55.50 $ 23,769.00 $ 1,319,179.50
DILATAC
7.05 PINTURA VINILO T. CORAZA EXTERIOR 3 MANOS M2 55.50 $ 11,507.00 $ 638,638.50
8.00 CUBIERTA $ 10,348,599.16
SUMNISTRO E INSTALACIÓN CUBIERTA EN TEJA
8.01 TERMOACUSTICA PERFIL TRAPEZOIDAL COLOR. NO M2 78.75 $ 55,179.00 $ 4,345,346.25
INCLUYE ESTRUCTURA
Pagina 18 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
NP ITEMS NO PREVISTOS
3.01 CONCRETO 13,8 MPA (2000 PSI) SOLADO LIMPIEZA M3 1.72 $ 428,940.00 $ 737,776.80
CONCRETO ZAPATA 20.7 MPA (3000 PSI) NO INCLUYE
3.02 M3 1.75 $ 632,438.00 $ 1,106,766.50
HIERRO
COLUMNA 0.30 X 0.30 M CONCRETO 20.7 MPA (3000 PSI)
3.03 ML 13.20 $ 211,798.00 $ 2,795,733.60
INCLUYE REFUERZO 6125/8+F3/8C/0.15
VIGA CIMENTACION 0.30X0.30, CONCRETO 20.7 MPa (3000 PSI)
3.04 INCLUYE REFUERZO 6D=5/8+F3/8c/0.10 ML 27.45 $ 189,541.00 $ 5,202,900.45
4.01 ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2, G60) KG 826.00 $ 4,966.00 $ 4,101,916.00
ACERO ESTRUCTURAL ASTM A-500 G C (INCLUYE
4.02 KG 2,250.00 $ 14,968.00 $ 33,678,000.00
SUMINISTRO MONTAJE Y PINTURA)
ACERO ESTRUCTURAL T ASTM A-36 (INCLUYE SUMINISTRO
4.03 KG 60.54 $ 14,299.00 $ 865,661.46
MONTAJE Y PINTURA)
6.01 TABLERO PARCIAL 4 CIRCUITOS. INCLUYE BREAKER UND 1.00 $ 334,839.00 $ 334,839.00
6.02 PUESTA A TIERRA TERMINAL DE BAJA TENSION UND 1.00 $ 381,947.00 $ 381,947.00
6.03 ACOMETIDA PARCIAL 2 No8+1No12 DUCTO PVC 1" ML 30.00 $ 28,891.00 $ 866,730.00
6.04 BAJANTE CON TUBO CONDUIT METALICO 1`` L=6M UND 1.00 $ 135,430.00 $ 135,430.00
CAJA DE INSPECCIÓN TIPO CS 274 - AP 274, INCLUYE TAPA
6.05 UND $ 707,095.00 $ 707,095.00
EN MARCO METALICO 1.00
SALIDA PARA TOMA CORRIENTE DOBLE CON POLO A
6.06 PTO $ 93,858.00 $ 187,716.00
TIERRA 2.00
6.07 SALIDA DE LAMPARA TIPO T8 DE 2*32 PTO $ 163,312.00 $ 816,560.00
5.00
SUMINISTRO E INSTALACIÓN DE SISTEMA FOTOVOLTAICO
ON - GRID DE 5200WP (INCLUYE LA TOTALIDAD DE
6.08 UND 1.00 $ 15,243,847.00 $ 15,243,847.00
MATERIALES REQUERIDOS PARA SU CORRECTO
FUNCIONAMIENTO)
Pagina 19 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
7.01 PISO EN CERAMICA LISO 0.20X0.20 LINEA MEDITERRANEA M2 80.05 $ 51,114.00 $ 4,091,675.70
7.02 CONCRETO 3000 PSI - 20.7 MPA MEZCLA EN OBRA M3 8.01 $ 392,890.00 $ 3,147,048.90
MURO EN BLOQUE FLEXA No. 5, 0.12X0.20X0.30 M
7.03 M2 27.75 $ 42,352.00 $ 1,175,268.00
(MORTERO TIPOS 1.3)
PAÑETE MUROS INTERIORES MORT 1:4 INCLUYE FILOS Y
7.04 M2 55.50 $ 22,495.00 $ 1,248,472.50
DILATAC
7.05 PINTURA VINILO T. CORAZA EXTERIOR 3 MANOS M2 55.50 $ 10,891.00 $ 604,450.50
8.00 CUBIERTA $ 9,794,170.42
SUMNISTRO E INSTALACIÓN CUBIERTA EN TEJA
8.01 TERMOACUSTICA PERFIL TRAPEZOIDAL COLOR. NO M2 78.75 $ 52,223.00 $ 4,112,561.25
INCLUYE ESTRUCTURA
NP ITEMS NO PREVISTOS
3.01 CONCRETO 13,8 MPA (2000 PSI) SOLADO LIMPIEZA M3 1.72 $ 453,220.00 $ 779,538.40
CONCRETO ZAPATA 20.7 MPA (3000 PSI) NO INCLUYE
3.02 M3 1.75 $ 668,237.00 $ 1,169,414.75
HIERRO
COLUMNA 0.30 X 0.30 M CONCRETO 20.7 MPA (3000 PSI)
3.03 ML 13.20 $ 223,786.00 $ 2,953,975.20
INCLUYE REFUERZO 6125/8+F3/8C/0.15
VIGA CIMENTACION 0.30X0.30, CONCRETO 20.7 MPa (3000 PSI)
3.04 INCLUYE REFUERZO 6D=5/8+F3/8c/0.10 ML 27.45 $ 200,269.00 $ 5,497,384.05
Pagina 20 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
4.01 ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2, G60) KG 826.00 $ 5,247.00 $ 4,334,022.00
6.01 TABLERO PARCIAL 4 CIRCUITOS. INCLUYE BREAKER UND 1.00 $ 344,591.00 $ 344,591.00
6.02 PUESTA A TIERRA TERMINAL DE BAJA TENSION UND 1.00 $ 393,072.00 $ 393,072.00
6.03 ACOMETIDA PARCIAL 2 No8+1No12 DUCTO PVC 1" ML 30.00 $ 29,732.00 $ 891,960.00
6.04 BAJANTE CON TUBO CONDUIT METALICO 1`` L=6M UND 1.00 $ 139,374.00 $ 139,374.00
CAJA DE INSPECCIÓN TIPO CS 274 - AP 274, INCLUYE TAPA
6.05 UND $ 727,690.00 $ 727,690.00
EN MARCO METALICO 1.00
SALIDA PARA TOMA CORRIENTE DOBLE CON POLO A
6.06 PTO $ 96,592.00 $ 193,184.00
TIERRA 2.00
6.07 SALIDA DE LAMPARA TIPO T8 DE 2*32 PTO $ 168,068.00 $ 840,340.00
5.00
SUMINISTRO E INSTALACIÓN DE SISTEMA FOTOVOLTAICO
ON - GRID DE 5200WP (INCLUYE LA TOTALIDAD DE
6.08 UND 1.00 $ 15,687,843.00 $ 15,687,843.00
MATERIALES REQUERIDOS PARA SU CORRECTO
FUNCIONAMIENTO)
7.01 PISO EN CERAMICA LISO 0.20X0.20 LINEA MEDITERRANEA M2 80.05 $ 54,008.00 $ 4,323,340.40
7.02 CONCRETO 3000 PSI - 20.7 MPA MEZCLA EN OBRA M3 8.01 $ 415,129.00 $ 3,325,183.29
MURO EN BLOQUE FLEXA No. 5, 0.12X0.20X0.30 M
7.03 M2 27.75 $ 44,750.00 $ 1,241,812.50
(MORTERO TIPOS 1.3)
PAÑETE MUROS INTERIORES MORT 1:4 INCLUYE FILOS Y
7.04 M2 55.50 $ 23,769.00 $ 1,319,179.50
DILATAC
7.05 PINTURA VINILO T. CORAZA EXTERIOR 3 MANOS M2 55.50 $ 11,507.00 $ 638,638.50
8.00 CUBIERTA $ 10,348,599.16
SUMNISTRO E INSTALACIÓN CUBIERTA EN TEJA
8.01 TERMOACUSTICA PERFIL TRAPEZOIDAL COLOR. NO M2 78.75 $ 55,179.00 $ 4,345,346.25
INCLUYE ESTRUCTURA
NP ITEMS NO PREVISTOS
Pagina 21 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
3.01 CONCRETO 13,8 MPA (2000 PSI) SOLADO LIMPIEZA M3 1.72 $ 461,313.00 $ 793,458.36
4.01 ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2, G60) KG 826.00 $ 5,341.00 $ 4,411,666.00
ACERO ESTRUCTURAL ASTM A-500 G C (INCLUYE
4.02 KG 2,250.00 $ 16,098.00 $ 36,220,500.00
SUMINISTRO MONTAJE Y PINTURA)
ACERO ESTRUCTURAL T ASTM A-36 (INCLUYE SUMINISTRO
4.03 KG 60.54 $ 15,379.00 $ 931,044.66
MONTAJE Y PINTURA)
6.01 TABLERO PARCIAL 4 CIRCUITOS. INCLUYE BREAKER UND 1.00 $ 344,591.00 $ 344,591.00
6.02 PUESTA A TIERRA TERMINAL DE BAJA TENSION UND 1.00 $ 393,072.00 $ 393,072.00
6.03 ACOMETIDA PARCIAL 2 No8+1No12 DUCTO PVC 1" ML 30.00 $ 29,732.00 $ 891,960.00
6.04 BAJANTE CON TUBO CONDUIT METALICO 1`` L=6M UND 1.00 $ 139,374.00 $ 139,374.00
CAJA DE INSPECCIÓN TIPO CS 274 - AP 274, INCLUYE TAPA
6.05 UND $ 727,690.00 $ 727,690.00
EN MARCO METALICO 1.00
SALIDA PARA TOMA CORRIENTE DOBLE CON POLO A
6.06 PTO $ 96,592.00 $ 193,184.00
TIERRA 2.00
6.07 SALIDA DE LAMPARA TIPO T8 DE 2*32 PTO $ 168,068.00 $ 840,340.00
5.00
SUMINISTRO E INSTALACIÓN DE SISTEMA FOTOVOLTAICO
ON - GRID DE 5200WP (INCLUYE LA TOTALIDAD DE
6.08 UND 1.00 $ 15,687,843.00 $ 15,687,843.00
MATERIALES REQUERIDOS PARA SU CORRECTO
FUNCIONAMIENTO)
7.01 PISO EN CERAMICA LISO 0.20X0.20 LINEA MEDITERRANEA M2 80.05 $ 54,972.00 $ 4,400,508.60
Pagina 22 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
NP ITEMS NO PREVISTOS
3.01 CONCRETO 13,8 MPA (2000 PSI) SOLADO LIMPIEZA M3 1.72 $ 453,220.00 $ 779,538.40
4.01 ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2, G60) KG 826.00 $ 5,247.00 $ 4,334,022.00
Pagina 23 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
7.01 PISO EN CERAMICA LISO 0.20X0.20 LINEA MEDITERRANEA M2 80.05 $ 54,008.00 $ 4,323,340.40
7.02 CONCRETO 3000 PSI - 20.7 MPA MEZCLA EN OBRA M3 8.01 $ 415,129.00 $ 3,325,183.29
Pagina 24 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
3.01 CONCRETO 13,8 MPA (2000 PSI) SOLADO LIMPIEZA M3 1.72 $ 453,220.00 $ 779,538.40
4.01 ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2, G60) KG 826.00 $ 5,247.00 $ 4,334,022.00
6.01 TABLERO PARCIAL 4 CIRCUITOS. INCLUYE BREAKER UND 1.00 $ 344,591.00 $ 344,591.00
7.01 PISO EN CERAMICA LISO 0.20X0.20 LINEA MEDITERRANEA M2 80.05 $ 54,008.00 $ 4,323,340.40
7.02 CONCRETO 3000 PSI - 20.7 MPA MEZCLA EN OBRA M3 8.01 $ 415,129.00 $ 3,325,183.29
Pagina 25 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
NP ITEMS NO PREVISTOS
4.01 ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2, G60) KG 826.00 $ 5,247.00 $ 4,334,022.00
Pagina 26 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
7.01 PISO EN CERAMICA LISO 0.20X0.20 LINEA MEDITERRANEA M2 80.05 $ 54,008.00 $ 4,323,340.40
7.02 CONCRETO 3000 PSI - 20.7 MPA MEZCLA EN OBRA M3 8.01 $ 415,129.00 $ 3,325,183.29
MURO EN BLOQUE FLEXA No. 5, 0.12X0.20X0.30 M
7.03 M2 27.75 $ 44,750.00 $ 1,241,812.50
(MORTERO TIPOS 1.3)
PAÑETE MUROS INTERIORES MORT 1:4 INCLUYE FILOS Y
7.04 M2 55.50 $ 23,769.00 $ 1,319,179.50
DILATAC
7.05 PINTURA VINILO T. CORAZA EXTERIOR 3 MANOS M2 55.50 $ 11,507.00 $ 638,638.50
8.00 CUBIERTA $ 10,348,599.16
SUMNISTRO E INSTALACIÓN CUBIERTA EN TEJA
8.01 TERMOACUSTICA PERFIL TRAPEZOIDAL COLOR. NO M2 78.75 $ 55,179.00 $ 4,345,346.25
INCLUYE ESTRUCTURA
NP ITEMS NO PREVISTOS
Pagina 27 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
4.01 ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2, G60) KG 826.00 $ 5,247.00 $ 4,334,022.00
7.01 PISO EN CERAMICA LISO 0.20X0.20 LINEA MEDITERRANEA M2 80.05 $ 54,008.00 $ 4,323,340.40
7.02 CONCRETO 3000 PSI - 20.7 MPA MEZCLA EN OBRA M3 8.01 $ 415,129.00 $ 3,325,183.29
MURO EN BLOQUE FLEXA No. 5, 0.12X0.20X0.30 M
7.03 M2 27.75 $ 44,750.00 $ 1,241,812.50
(MORTERO TIPOS 1.3)
PAÑETE MUROS INTERIORES MORT 1:4 INCLUYE FILOS Y
7.04 M2 55.50 $ 23,769.00 $ 1,319,179.50
DILATAC
7.05 PINTURA VINILO T. CORAZA EXTERIOR 3 MANOS M2 55.50 $ 11,507.00 $ 638,638.50
8.00 CUBIERTA $ 10,348,599.16
SUMNISTRO E INSTALACIÓN CUBIERTA EN TEJA
8.01 TERMOACUSTICA PERFIL TRAPEZOIDAL COLOR. NO M2 78.75 $ 55,179.00 $ 4,345,346.25
INCLUYE ESTRUCTURA
Pagina 28 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
NP ITEMS NO PREVISTOS
4.01 ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2, G60) KG 826.00 $ 5,247.00 $ 4,334,022.00
Pagina 29 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
7.01 PISO EN CERAMICA LISO 0.20X0.20 LINEA MEDITERRANEA M2 80.05 $ 54,008.00 $ 4,323,340.40
7.02 CONCRETO 3000 PSI - 20.7 MPA MEZCLA EN OBRA M3 8.01 $ 415,129.00 $ 3,325,183.29
MURO EN BLOQUE FLEXA No. 5, 0.12X0.20X0.30 M
7.03 M2 27.75 $ 44,750.00 $ 1,241,812.50
(MORTERO TIPOS 1.3)
PAÑETE MUROS INTERIORES MORT 1:4 INCLUYE FILOS Y
7.04 M2 55.50 $ 23,769.00 $ 1,319,179.50
DILATAC
7.05 PINTURA VINILO T. CORAZA EXTERIOR 3 MANOS M2 55.50 $ 11,507.00 $ 638,638.50
8.00 CUBIERTA $ 10,348,599.16
SUMNISTRO E INSTALACIÓN CUBIERTA EN TEJA
8.01 TERMOACUSTICA PERFIL TRAPEZOIDAL COLOR. NO M2 78.75 $ 55,179.00 $ 4,345,346.25
INCLUYE ESTRUCTURA
NP ITEMS NO PREVISTOS
Pagina 30 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
4.01 ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2, G60) KG 826.00 $ 5,997.00 $ 4,953,522.00
7.01 PISO EN CERAMICA LISO 0.20X0.20 LINEA MEDITERRANEA M2 80.05 $ 61,723.00 $ 4,940,926.15
7.02 CONCRETO 3000 PSI - 20.7 MPA MEZCLA EN OBRA M3 8.01 $ 474,433.00 $ 3,800,208.33
MURO EN BLOQUE FLEXA No. 5, 0.12X0.20X0.30 M
7.03 M2 27.75 $ 51,143.00 $ 1,419,218.25
(MORTERO TIPOS 1.3)
PAÑETE MUROS INTERIORES MORT 1:4 INCLUYE FILOS Y
7.04 M2 55.50 $ 27,164.00 $ 1,507,602.00
DILATAC
7.05 PINTURA VINILO T. CORAZA EXTERIOR 3 MANOS M2 55.50 $ 13,151.00 $ 729,880.50
8.00 CUBIERTA $ 11,826,970.69
SUMNISTRO E INSTALACIÓN CUBIERTA EN TEJA
8.01 TERMOACUSTICA PERFIL TRAPEZOIDAL COLOR. NO M2 78.75 $ 63,062.00 $ 4,966,132.50
INCLUYE ESTRUCTURA
NP ITEMS NO PREVISTOS
Pagina 31 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
4.01 ACERO REFUERZO FIGURADO 412 MPa (4200 KG/CM2, G60) KG 826.00 $ 5,997.00 $ 4,953,522.00
7.01 PISO EN CERAMICA LISO 0.20X0.20 LINEA MEDITERRANEA M2 80.05 $ 61,723.00 $ 4,940,926.15
7.02 CONCRETO 3000 PSI - 20.7 MPA MEZCLA EN OBRA M3 8.01 $ 474,433.00 $ 3,800,208.33
Pagina 32 de 33
Carrera 31 No. 38-41 Centro
www.idm-meta.gov.co
gerencia@idm-meta.gov.co
PRESUPUESTO OFICIAL DE OBRA
110-GPY-FR-008-V01
31/07/2018
NP ITEMS NO PREVISTOS
DOS MIL OCHOCIENTOS SETENTA MILLONES CUATROCIENTOS OCHENTA Y TRES MIL NOVECIENTOS CINCUENTA Y TRES PESOS CON SESENTA Y TRES CENTAVOS
SON:
M/CTE
NOTA: Los precios unitarios del presente presupuesto corresponden a la resolución de precios de referencia 057 del 24 de Febrero de 2017 de la Agencia para
la Infraestructura del Meta.
NOTA: Los precios unitarios para el proyecto localizado en el municipio de Villavicencio no tienen incluido el Factor Transporte de acuerdo a su localización. Lo
anterior teniendo en cuenta la tabla de incrementos sugeridos por transportes, acarreos y condiciones especiales a municipios de la resolución de precios
oficiales de referencia 057 de 24 de febrero de 2017 de la Agencia para la Infraestructura del Meta.
NOTA: El presente presupuesto fue elaborado con base en el resultado de los estudios y diseños contratados por la AIM mediante contrato 455 DE 2019, 362
DE 2019, 460 DE 2019, en cumplimiento del objeto contractual de cada uno.
Firma Firma
Nombre: ROLFE LEONARDO MARTINEZ DIAZ Nombre: ARQ. BORIS RAUL LONDOÑO
Profesion: ARQUITECTO Profesion: ARQUITECTO
Cargo: DISEÑADOR CARGO: DIRECTOR TECNICO DE ESTRUCTURACION DE PROYECTOS (E)
N° Matrícula Profesional: A16342018 - 1118121899 N° Matrícula Profesional: A25111999-
79691749
Pagina 33 de 33