CRONOGRAMA VALORIZADO DE ADICIONAL 01 DE OBRA - CAO

OBRA “AMPLIACION DEL SISTEMA DE AGUA POTABLE E INSTALACION DEL SISTEMA DE SANEAMIENTO EN LA LOCALIDAD DE POQUE, DISTRITO DE PUNOS - HUAMALIES - HUANUCO”

CRONOGRAMA VALORIZADO DE OBRA - CAO


ITEM COMPONENTE PARCIAL
Apr-19 May-19 Jun-19 Jul-19 Aug-19
01 "AMPLIACION DEL SISTEMA DE AGUA POTABLE E INSTALACION DEL SISTEMA DE 3,304,358.81 407637.51 12.34% 908561.45 27.50% 821972.75 24.88% 724335.71 21.92% 441851.42 13.37%
01.01 SISTEMA DE AGUA POTABLE 1,284,680.46 243964.4 18.99% 61501.33 4.79% 575483.36 44.80% 355962.52 27.71% 47768.86 3.72%
01.01.01 SECTOR I 958,345.25 243964.4 25.46% 61501.33 6.42% 575483.36 60.05% 355962.52 37.14% 47768.86 4.98%
01.01.01.01 CAPTACION "MANANTIAL POQUE 01" (01 UND) 1,933.98 1933.98 100.00%
01.01.01.02 LINEA DE CONDUCCION 180,730.42 158787.46 87.86% 20318.22 11.24% 1624.74 0.90%
01.01.01.03 CAMARA, VALVULAS Y OTROS 11,087.81 11087.81 100.00%
01.01.01.04 RESERVORIO 12.00 M3 (01UND) 716.37 716.37 100.00%
01.01.01.05 SISTEMA DE CLORACION POR GOTEO 2,201.96 2201.96 100.00%
01.01.01.06 CASETA DE VALVULAS (RESV. 10.00M3, 01 UND) 770.31 770.31 100.00%
01.01.01.07 REDES DE DISTRIBUCCION 570,104.87 14633.92 2.57% 39684.01 6.96% 438841.25 76.98% 48835.46 8.57% 28110.23 4.93%
01.01.01.08 CAMARA REGULADORA DE PRESION TIPO I (1 UND) 4,143.07 4143.07 100.00%
01.01.01.09 CAMARA REGULADORA DE PRESION TIPO II (1 UND) 3,097.91 3097.91 100.00%
01.01.01.10 CONEX. DOMICIL. HASTA CAJA DE PASO (DOMIC. 53 UND) 167,794.03 18269.81 10.89% 143536.08 85.54% 5988.15 3.57%
01.01.01.11 PASE AEREO - RED DE DISTRIBUCION 2,270.44 11257.35 495.82% 4507.17 198.52%
01.01.01.12 PASE AEREO TUB. F°G° D = 1" L= 21.50 m. 13,494.08 8986.91 66.60% 4507.17 33.40%
01.01.02 SECTOR II 88,293.72 62413.63 70.69% 1499.1 1.70% 24380.99 27.61%
01.01.02.01 LINEA DE CONDUCCION 12,043.67 12043.67 100.00%
01.01.02.02 CAMARA REGULADORA DE PRESION TIPO II (3 UND) 12,622.47 12622.47 100.00%
01.01.02.03 RESERVORIO 5.00 M3 (01UND) 629.42 629.42 100.00%
01.01.02.04 SISTEMA DE CLORACION POR GOTEO 2,201.96 2201.96 100.00%
01.01.02.05 CASETA DE VALVULAS (RESV. 5.00M3, 01 UND) 770.31 770.31 100.00%
01.01.02.06 REDES DE DISTRIBUCCION 35,644.90 34145.8 95.79% 1499.1 4.21%
01.01.02.07 CAMARA REGULADORA DE PRESION TIPO II (1 UND) 24,380.99 24380.99 100.00%
01.01.03 SECTOR III 238,041.49 4708.73 1.98% 60578.47 25.45% 159083.81 66.83% 13670.48 5.74%
01.01.03.01 LINEA DE CONDUCCION 2,904.44 2904.44 100.00%
01.01.03.02 RESERVORIO 5.00 M3 (01UND) 1,033.98 1033.98 100.00%
01.01.03.03 SISTEMA DE CLORACION POR GOTEO 2,201.96 2201.96 100.00%
01.01.03.04 CASETA DE VALVULAS (RESV. 5.00M3, 01 UND) 770.31 770.31 100.00%
01.01.03.05 REDES DE DISTRIBUCCION 194,085.45 21331.16 10.99% 159083.81 81.97% 13670.48 7.04%
01.01.03.06 CAMARA REGULADORA DE PRESION TIPO II (2 UND) 8,446.32 8446.32 100.00%
01.01.03.07 CONEX. DOMICIL. HASTA CAJA DE PASO (DOMIC. 4 UND)
01.02 SISTEMA DE ALCANTARILLADO Y UBS 1,141,842.52 92900.32 8.14% 762862.17 66.81% 207350.79 18.16% 58808.09 5.15% 19921.17 1.74%
01.02.01 SISTEMA DE ALCANTARILLADO 825,170.84 9378.29 1.14% 743715.83 90.13% 26971.68 3.27% 25183.88 3.05% 19921.17 2.41%
01.02.01.01 RED DE COLECTORES 825,170.84 9378.29 1.14% 743715.83 90.13% 26971.68 3.27% 25183.88 3.05% 19921.17 2.41%
01.02.02 BUZONES 295,006.76 83522.03 28.31% 19146.34 6.49% 180379.11 61.14% 11959.29 4.05%
01.02.03 CONDOMINIALES 21,664.92 21664.92 100.00%
01.02.03.01 COLECTORES CONDOMINIALES 19,391.02 19391.02 100.00%
01.02.03.02 BUZONES CONDIMINIALES 2,273.90 2273.9 100.00%
01.03 UNIDADES BASICAS DE SANEAMIENTO 450,924.87 50491.56 11.20% 32264.6 7.16% 18817.19 4.17% 126083.91 27.96% 223267.61 49.51%
01.03.70 CAJA DE TRAMPAS DE NATAS Y SOLIDOS 25,389.34 8469.65 33.36% 16919.69 66.64%
01.03.71 CAJA DE REGISTRO 11,454.78 6080.59 53.08% 5374.19 46.92%
01.03.72 LAVADERO DOMICILIARIO (40UND) 30,619.25 5305.16 17.33% 25314.09 82.67%
01.03.73 INSTALACION DE BIODIGESTORES 57,472.35 2842.35 4.95% 54630 95.05%
01.03.74 CAJA DE LODOS 20,686.35 6760.71 32.68% 13925.64 67.32%
01.03.75 CONSTRUCCION DE POZO PERCOLADOR (40UND) 70,066.38 2729.56 3.90% 67336.82 96.10%
01.04 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES 426,910.96 20281.23 4.75% 51933.35 12.16% 20321.41 4.76% 183481.19 42.98% 150893.78 35.35%
01.04.01 LOCALIDAD DE POQUE (TANQUE IMHOFF) 426,910.96 20281.23 4.75% 51933.35 12.16% 20321.41 4.76% 183481.19 42.98% 150893.78 35.35%
01.04.01.01 CAMARA DE REJAS (01UND) 1,969.17 3.23 0.16% 1965.94 99.84%
01.04.01.02 DESARENADOR (01UNID) 3,054.47 3054.47 100.00%
01.04.01.03 TANQUE IMHOFF (01 UND) 162,698.52 453.75 0.28% 51933.35 31.92% 20321.41 12.49% 83095.75 51.07% 6894.26 4.24%
01.04.01.04 FILTRO BIOLOGICO (01UNID) 86,532.26 56600.14 65.41% 29932.12 34.59%
01.04.01.05 LECHO DE SECADO (01 UND) 64,026.37 37194.91 58.09% 26831.46 41.91%
01.04.01.06 CAMARA DE CONTACTO DE CLORO (01 UND) 6,587.16 6587.16 100.00%
01.04.01.07 REDES EN LA PLANTA 27,223.33 27223.33 100.00%
01.04.01.08 CERCO DE SEGURIDAD 25,789.75 25789.75 100.00%
01.04.01.09 MEJORAMIENTO SUELO - PTAR 19,827.48 19827.48 100.00%
01.04.01.10 MURO SECO - PTAR 25,738.54 25738.54 100.00%
01.04.01.11 PASE AEREO L=4mtrs 3,463.91 3463.91 100.00%

COSTO DIRECTO 3,304,358.81 407,637.51 908,561.45 821,972.75 724,335.71 441,851.39


GASTOS GENERALES 8.00 % 264,348.70 32,611.00 72,684.92 65,757.82 57,946.86 35,348.11
UTILIDAD 7.00 % 231,305.12 28534.6257 63599.3015 57538.0925 50703.4997 30929.5973
SUB TOTAL 3,800,012.63 468,783.14 1,044,845.67 945,268.66 832,986.07 508,129.10
IGV 18.00 % 684,002.27 84,380.96 188,072.22 170,148.36 149,937.49 91,463.24
TOTAL PRESUPUESTO BASE 4,484,014.91 553,164.10 1,232,917.89 1,115,417.02 982,923.56 599,592.34

AVANCE MENSUAL (%) 12.34% 27.50% 24.88% 21.92% 13.37%


AVANCE ACUMULADO (%) 12.34% 39.83% 64.71% 86.63% 100.00%
CRONOGRAMA VALORIZADO DE ADICIONAL 01 DE OBRA - CAO
OBRA “AMPLIACION DEL SISTEMA DE AGUA POTABLE E INSTALACION DEL SISTEMA DE SANEAMIENTO EN LA LOCALIDAD DE POQUE, DISTRITO DE PUNOS - HUAMALIES - HUANUCO”

CRONOGRAMA VALORIZADO DE OBRA - CAO


ITEM COMPONENTE PARCIAL
Apr-19 May-19 Jun-19 Jul-19 Aug-19
01 "AMPLIACION DEL SISTEMA DE AGUA POTABLE E INSTALACION DEL SISTEMA DE 3,304,358.81 407637.51 12.34% 908561.45 27.50% 821972.75 24.88% 724335.71 21.92% 441851.42 13.37%
01.01 SISTEMA DE AGUA POTABLE 1,284,680.46 243964.4 18.99% 61501.33 4.79% 575483.36 44.80% 355962.52 27.71% 47768.86 3.72%
01.01.01 SECTOR I 958,345.25 243964.4 25.46% 61501.33 6.42% 575483.36 60.05% 355962.52 37.14% 47768.86 4.98%
01.01.01.01 CAPTACION "MANANTIAL POQUE 01" (01 UND) 1,933.98 1933.98 100.00%
01.01.01.01.01 OBRAS DE CONCRETO ARMADO 1,801.96 1801.96
01.01.01.01.02 CONCRETO F'C=210 KG/CM2 1,801.96 1801.96 100.00%
01.01.01.01.03 REVOQUES ENLUCIDOS Y MOLDURAS 132.02 132.02
01.01.01.01.04 TARRAJEO EN INTERIORES C/IMPERMEAB. E=1.5CM MEZCLA 1:2 33.66 33.66 100.00%
01.01.01.01.05 TARRAJEO EN EXTERIORES E=1.5 CM MEZCLA 1..5 98.36 98.36 100.00%
01.01.01.02 LINEA DE CONDUCCION 180,730.42 158787.46 87.86% 20318.22 11.24% 1624.74 0.90%
01.01.01.02.01 TRABAJOS PRELIMINARES 2,162.26 2162.26
01.01.01.02.02 LIMPIEZA DEL TERRENO MANUAL.. 1,730.30 1730.3 100.00%
01.01.01.02.03 TRAZO NIVELACION Y REPLANTEO 431.96 431.96 100.00%
01.01.01.02.04 MOVIMIENTO DE TIERRAS 157,949.77 136006.81
01.01.01.02.05 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 0.40 X 0.80M 34,406.35 27716.23 80.56% 6690.12 19.44%
01.01.01.02.06 CAMA DE TIERRA ZARANDEADA E=0.10M. ZANJA P/TUBO 36,322.99 35404.84 97.47% 918.15 2.53%
01.01.01.02.07 RELLENO Y COMPACTADO ZANJA CON MATERIAL PROPIO 80,339.16 72885.74 90.72% 7453.42 9.28%
01.01.01.02.08 ELIMINACION DE MATERIAL EXCEDENTE. 6,881.27 5256.53 76.39% 1624.74 23.61%
01.01.01.02.09 SUMINISTRO E INSTALACION DE TUBERIAS 18,746.85 18746.85
01.01.01.02.10 SUM. E INST. TUBERIA PVC SAP C-10 2" 13,586.85 13586.85 100.00%
01.01.01.02.11 SUM. E INST. TUBERIA PVC SAP C-10 1 1/2 " 5,160.00 5160 100.00%
01.01.01.02.12 PRUEBA HIDRAULICA Y DESINFECCION 1,871.54 1871.54
01.01.01.02.13 PRUEBA HIDRAULICA + DESINFECCION DE TUB. ZANJA TAPADA 1,871.54 1871.54 100.00%
01.01.01.03 CAMARA, VALVULAS Y OTROS 11,087.81 11087.81 100.00%
01.01.01.03.01 CAMARA REGULADORA DE PRESION TIPO I (2 UND) 11,087.81 11087.81 100.00%
01.01.01.03.01.0 OBRAS PRELIMINARES
01.01.01.03.01.0 TRAZO Y REPLANTEO 13.13 13.13 100.00%
01.01.01.03.01.0 MOVIMIENTO DE TIERRAS
01.01.01.03.01.0 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 167.66 167.66 100.00%
01.01.01.03.01.0 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50.00M) 201.28 201.28 100.00%
01.01.01.03.01.0 CONCRETO SIMPLE
01.01.01.03.01.0 CONCRETO F'c=140 KG/CM2 (SOLADOS Y/O DADOS) 232.62 232.62 100.00%
01.01.01.03.01.0 OBRAS DE CONCRETO ARMADO
01.01.01.03.01.0 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 743.73 743.73 100.00%
01.01.01.03.01.1 CONCRETO F'C=210 KG/CM2 P/ PISO 486.66 486.66 100.00%
01.01.01.03.01.1 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (MUROS) 489.67 489.67 100.00%
01.01.01.03.01.1 REVOQUES ENLUCIDOS Y MOLDURAS
01.01.01.03.01.1 TARRAJEO EN INTERIORES C/IMPERMEAB. E=1.5CM MEZCLA 1:2 336.64 336.64 100.00%
01.01.01.03.01.1 CARPINTERIA METALICA
01.01.01.03.01.1 TAPA METALICA 1.40X0.80 M SEGUN DISEÑO 668.98 668.98 100.00%
01.01.01.03.01.1 PINTURA
01.01.01.03.01.1 PINTURA DE TAPA C/ESMALTE ANTICORROSIVO 28.38 28.38 100.00%
01.01.01.03.01.1 SUMINISTRO E INSTALACION DE TUBERIAS
01.01.01.03.01.1 SUM. E INST. TUBERIA PVC SAP C-10 1" 48.72 48.72 100.00%
01.01.01.03.01.2 SUM. E INST. TUBERIA PVC SAP C-10 2" CRP 130.80 130.8 100.00%
01.01.01.03.01.2 SUMINISTRO E INSTALACION DE ACCESORIOS
01.01.01.03.01.2 SUMINISTRO E INSTALACION DE ACCESORIOS PARA CRP -2" 7,539.54 7539.54 100.00%
01.01.01.04 RESERVORIO 12.00 M3 (01UND) 716.37 716.37 100.00%
01.01.01.04.01 OBRAS DE CONCRETO ARMADO 180.46
01.01.01.04.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (PISO) 113.62 113.62 100.00%
01.01.01.04.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (TECHO) 66.84 66.84 100.00%
01.01.01.04.04 PINTURA 535.91
01.01.01.04.05 PINTURA DE MURO EXTERIOR C/ESMALTE 535.91 535.91 100.00%
01.01.01.05 SISTEMA DE CLORACION POR GOTEO 2,201.96 2201.96 100.00%
01.01.01.05.01 OBRAS PRELIMINARES
01.01.01.05.02 TRAZO Y REPLANTEO 8.91 8.91 100.00%
01.01.01.05.03 OBRAS DE CONCRETO ARMADO
01.01.01.05.04 .CONCRETO F'C=210 KG/CM2 P/ TECHO 84.80 84.8 100.00%
01.01.01.05.05 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 63.91 63.91 100.00%
01.01.01.05.06 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (MUROS) 92.58 92.58 100.00%
01.01.01.05.07 MUROS Y TABIQUES DE ALBAÑILERIA
01.01.01.05.08 LADRILLO KING KONG 0.24 x 0.09 x 0.12 cm C/A 1:4 x 1.5cm 146.61 146.61 100.00%
01.01.01.05.09 REVOQUES ENLUCIDOS Y MOLDURAS
01.01.01.05.10 TARRAJEO EN EXTERIORES E=1.5 CM MEZCLA 1..5 94.51 94.51 100.00%
01.01.01.05.11 PINTURA
01.01.01.05.12 PINTURA DE MURO EXTERIOR C/ESMALTE 36.58 36.58 100.00%
01.01.01.05.13 COBERTURAS
01.01.01.05.14 COBERTURA CON CALAMINA GALVANIZADA 145.42 145.42 100.00%
01.01.01.05.15 SUMINISTRO E INSTALACION DE TUBERIAS
01.01.01.05.16 SUM. E INST. TUBERIA PVC C-10 1/2" 35.52 35.52 100.00%
01.01.01.05.17 SUMINISTRO E INSTALACION DE ACCESORIOS
01.01.01.05.18 SUMINISTRO E INSTALACION DE ACCESORIOS CLORACION 102.76 102.76 100.00%
01.01.01.05.19 VARIOS
01.01.01.05.20 SUM. E INST. DE TANQUE CONTENEDOR 40L 67.72 67.72 100.00%
01.01.01.05.21 SUM. E INST. DE TANQUE CONTENEDOR 250L 283.62 283.62 100.00%
01.01.01.05.22 CERCO DE SEGURIDAD 1,039.02 1039.02 100.00%
01.01.01.05.22.0 OBRAS PRELIMINARES
01.01.01.05.22.0 TRAZO Y REPLANTEO 8.91 8.91 100.00%
01.01.01.05.22.0 CARPINTERIA METALICA
01.01.01.05.22.0 POSTE DE FIERRO NEGRO ø3" 451.72 451.72 100.00%
01.01.01.05.22.0 CERCO DE TUBO DE FIERRO NEGRO Y MALLA OLIMPICA 249.41 249.41 100.00%
01.01.01.05.22.0 PUERTA C/MALLA CRIPADA Y MARCO FIERRO Ø 1 1/2" (1.00x2.10M) 129.43 129.43 100.00%
01.01.01.05.22.0 PINTURA
01.01.01.05.22.0 PINTURA C/ ESMALTE ANTICORROSIVA 199.55 199.55 100.00%
01.01.01.06 CASETA DE VALVULAS (RESV. 10.00M3, 01 UND) 770.31 770.31 100.00%
01.01.01.06.01 OBRAS PRELIMINARES 1.34
01.01.01.06.02 TRAZO Y REPLANTEO 1.34 1.34 100.00%
01.01.01.06.03 MOVIMIENTO DE TIERRAS 7.76
01.01.01.06.04 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 3.45 3.45 100.00%
01.01.01.06.05 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 4.31 4.31 100.00%
01.01.01.06.06 OBRAS DE CONCRETO SIMPLE 16.23
01.01.01.06.07 CONCRETO F'c=140 KG/CM2 (SOLADOS Y/O DADOS) 16.23 16.23 100.00%
01.01.01.06.08 OBRAS DE CONCRETO ARMADO 669.52
01.01.01.06.09 CONCRETO F'C=210 KG/CM2 P/ PISO 92.07 92.07 100.00%
01.01.01.06.10 ENCOFRADO Y DESENCOFRADO P/PISO 223.70 223.7 100.00%
01.01.01.06.11 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (PISO) 123.24 123.24 100.00%
01.01.01.06.12 CONCRETO F'C=210 KG/CM2 P/MUROS REFORZADO 72.34 72.34 100.00%
01.01.01.06.13 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 92.97 92.97 100.00%
01.01.01.06.14 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (MUROS) 65.20 65.2 100.00%
01.01.01.06.15 REVOQUES ENLUCIDOS Y MOLDURAS 36.05
01.01.01.06.16 TARRAJEO EN INTERIORES C/IMPERMEAB. E=1.5CM MEZCLA 1:2 8.00 8 100.00%
01.01.01.06.17 TARRAJEO EN EXTERIORES E=1.5 CM MEZCLA 1..5 28.05 28.05 100.00%
01.01.01.06.18 PINTURA 39.41
01.01.01.06.19 PINTURA DE MURO EXTERIOR C/ESMALTE 39.41 39.41 100.00%
01.01.01.07 REDES DE DISTRIBUCCION 570,104.87 14633.92 2.57% 39684.01 6.96% 438841.25 76.98% 48835.46 8.57% 28110.23 4.93%
01.01.01.07.01 TRABAJOS PRELIMINARES 3432.79
01.01.01.07.02 LIMPIEZA DEL TERRENO MANUAL. 2,317.60 2317.6 100.00%
01.01.01.07.03 TRAZO NIVELACION Y REPLANTEO 1,115.19 1115.19 100.00%
01.01.01.07.04 MOVIMIENTO DE TIERRAS 11201.13
01.01.01.07.05 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 0.40 X 0.80M 115,211.64 11201.13 9.72% 39684.01 34.44% 38403.88 33.33% 25922.62 22.50%
01.01.01.07.06 CAMA DE TIERRA ZARANDEADA E=0.10M. ZANJA P/TUBO 121,629.62 117606.7 96.69% 3990.74 3.28% 32.18 0.03%
01.01.01.07.07 RELLENO Y COMPACTADO ZANJA CON MATERIAL PROPIO 269,020.29 245062.47 91.09% 18922.1 7.03% 5035.72 1.87%
01.01.01.07.08 ELIMINACION DE MATERIAL EXCEDENTE. 23,042.33 23042.33 100.00%
01.01.01.07.09 SUMINISTRO E INSTALACION DE TUBERIAS
01.01.01.07.10 SUM. E INST. TUBERIA PVC SAP C-10 2". 6,384.68 6384.68 100.00%
01.01.01.07.11 SUM. E INST. TUBERIA PVC SAP C-10 1" 16,155.47 16155.47 100.00%
01.01.01.07.12 SUM. E INST. TUBERIA PVC SAP C-10 3/4" 10,781.51 10781.51 100.00%
01.01.01.07.13 SUMINISTRO E INSTALACION DE ACCESORIOS PARA RED DE ACCESORIOS
01.01.01.07.14 CODO PVC SAP DE 1" x 90° 14.89 14.89 100.00%
01.01.01.07.15 CODO PVC SAP DE 3/4" x 45° 13.34 13.34 100.00%
01.01.01.07.16 CODO PVC SAP DE 3/4" x 90° 13.34 13.34 100.00%
01.01.01.07.17 CODO PVC SAP DE 2"X45° 26.78 26.78 100.00%
01.01.01.07.18 TAPON MACHO PVC SAP 3/4]" 13.49 13.49 100.00%
01.01.01.07.19 REDUCCION PVC SAP DE 1" A 3/4" 14.68 14.68 100.00%
01.01.01.07.20 REDUCCION PVC SAP DE 2" A 3/4" 15.79 15.79 100.00%
01.01.01.07.21 REDUCCION PVC SAP DE 1 1/2" A 3/4" 19.20 19.2 100.00%
01.01.01.07.22 REDUCCION PVC SAP DE 1 1/2" A 1" 14.68 14.68 100.00%
01.01.01.07.23 REDUCCION PVC SAP DE 2" A 1" 17.29 17.29 100.00%
01.01.01.07.24 REDUCCION PVC SAP DE 2" A 1 1/2" 15.53 15.53 100.00%
01.01.01.07.25 TEE PVC SAP DE 2" 19.76 19.76 100.00%
01.01.01.07.26 CRUZ PVC SAP 1 24.00 24 100.00%
01.01.01.07.27 CRUZ PVC SAP 2" 34.26 34.26 100.00%
01.01.01.07.28 PRUEBA HIDRAULICA Y DESINFECCION
01.01.01.07.29 PRUEBA HIDRAULICA + DESINFECCION DE TUB. ZANJA TAPADA 4,189.51 4189.51 100.00%
01.01.01.08 CAMARA REGULADORA DE PRESION TIPO I (1 UND) 4,143.07 4143.07 100.00%
01.01.01.08.01 OBRAS PRELIMINARES
01.01.01.08.02 TRAZO Y REPLANTEO 6.57 6.57 100.00%
01.01.01.08.03 MOVIMIENTO DE TIERRAS
01.01.01.08.04 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 83.61 83.61 100.00%
01.01.01.08.05 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50.00M) 100.42 100.42 100.00%
01.01.01.08.06 CONCRETO SIMPLE
01.01.01.08.07 CONCRETO F'c=140 KG/CM2 (SOLADOS Y/O DADOS) 119.01 119.01 100.00%
01.01.01.08.08 OBRAS DE CONCRETO ARMADO
01.01.01.08.09 CONCRETO F'C=210 KG/CM2 P/ PISO 243.33 243.33 100.00%
01.01.01.08.10 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 371.87 371.87 100.00%
01.01.01.08.11 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (MUROS) 244.84 244.84 100.00%
01.01.01.08.12 REVOQUES ENLUCIDOS Y MOLDURAS
01.01.01.08.13 TARRAJEO EN INTERIORES C/IMPERMEAB. E=1.5CM MEZCLA 1:2 168.32 168.32 100.00%
01.01.01.08.14 CARPINTERIA METALICA
01.01.01.08.15 TAPA METALICA 1.40X0.80 M SEGUN DISEÑO 334.49 334.49 100.00%
01.01.01.08.16 PINTURA DE TAPA C/ESMALTE ANTICORROSIVO 14.19 14.19 100.00%
01.01.01.08.17 SUMINISTRO E INSTALACION DE TUBERIAS
01.01.01.08.18 SUM. E INST. TUBERIA PVC SAP C-10 2" 62.32 62.32 100.00%
01.01.01.08.19 SUM. E INST. TUBERIA PVC SAP C-10 1" 24.36 24.36 100.00%
01.01.01.08.20 SUMINISTRO E INSTALACION DE ACCESORIOS
01.01.01.08.21 SUMINISTRO E INSTALACION DE ACCESORIOS PARA CRP -2". 2,369.74 2369.74 100.00%
01.01.01.09 CAMARA REGULADORA DE PRESION TIPO II (1 UND) 3,097.91 3097.91 100.00%
01.01.01.09.01 OBRAS PRELIMINARES
01.01.01.09.02 TRAZO Y REPLANTEO 3.95 3.95 100.00%
01.01.01.09.03 MOVIMIENTO DE TIERRAS
01.01.01.09.04 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 50.43 50.43 100.00%
01.01.01.09.05 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50.00M) 60.34 60.34 100.00%
01.01.01.09.06 CONCRETO SIMPLE
01.01.01.09.07 CONCRETO F'c=140 KG/CM2 (SOLADOS Y/O DADOS) 70.33 70.33 100.00%
01.01.01.09.08 OBRAS DE CONCRETO ARMADO
01.01.01.09.09 CONCRETO F'C=210 KG/CM2 P/ PISO 144.68 144.68 100.00%
01.01.01.09.10 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 263.89 263.89 100.00%
01.01.01.09.11 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (MUROS) 179.64 179.64 100.00%
01.01.01.09.12 REVOQUES ENLUCIDOS Y MOLDURAS
01.01.01.09.13 TARRAJEO EN INTERIORES C/IMPERMEAB. E=1.5CM MEZCLA 1:2 115.30 115.3 100.00%
01.01.01.09.14 CARPINTERIA METALICA
01.01.01.09.15 .TAPA METALICA 0.90X0.60 M SEGUN DISEÑO 314.49 314.49 100.00%
01.01.01.09.16 PINTURA
01.01.01.09.17 PINTURA DE TAPA C/ESMALTE ANTICORROSIVO 6.84 6.84 100.00%
01.01.01.09.18 SUMINISTRO E INSTALACION DE TUBERIAS
01.01.01.09.19 SUM. E INST. TUBERIA PVC SAP C-10 1" 24.36 24.36 100.00%
01.01.01.09.20 SUM. E INST. TUBERIA PVC SAP C-10 1" CRP. 32.48 32.48 100.00%
01.01.01.09.21 SUMINISTRO E INSTALACION DE ACCESORIOS
01.01.01.09.22 SUMINISTRO E INSTALACION DE ACCESORIOS PARA CRP -1".. 1,831.18 1831.18 100.00%
01.01.01.10 CONEX. DOMICIL. HASTA CAJA DE PASO (DOMIC. 53 UND) 167,794.03 18269.81 10.89% 143536.08 85.54% 5988.15 3.57%
01.01.01.10.01 TRAZO NIVELACION Y REPLANTEO 2,054.10 2054.1 100.00%
01.01.01.10.02 EXCAVACION DE ZANJA PARA CONEX. DOMICILIARIAS DE 0.40x0.50M. 31,795.50 16215.71 51.00% 15579.8 49.00%
01.01.01.10.03 CAMA DE TIERRA ZARANDEADA E=0.10M. ZANJA P/TUBO 33,566.70 33566.7 100.00%
01.01.01.10.04 SUM. E INST. TUBERIA PVC C-10 1/2". 7,404.60 7404.6 100.00%
01.01.01.10.05 RELLENO Y COMPACTADO ZANJA CON MATERIAL PROPIO SELECCIONA 74,242.80 74242.8 100.00%
01.01.01.10.06 ELIMINACION DE MATERIAL EXCEDENTE. 6,359.10 370.95 5.83% 5988.15 94.17%
01.01.01.10.07 CONEXIONES DOMICILIARIAS DE R.D. Ø 2 ". 1,240.47 1240.47 100.00%
01.01.01.10.08 CONEXIONES DOMICILIARIAS DE R.D. Ø 1 ". 8,292.53 8292.53 100.00%
01.01.01.10.09 CONEXIONES DOMICILIARIAS DE R.D. Ø 3/4 ". 2,838.23 2838.23 100.00%
01.01.01.11 PASE AEREO - RED DE DISTRIBUCION 2,270.44 11257.35 495.82% 4507.17 198.52%
01.01.01.11.01 PASE AEREO L=8.00m 1,087.99 1087.99 100.00%
01.01.01.11.01.0 OBRAS PRELIMINARES
01.01.01.11.01.0 LIMPIEZA DEL TERRENO MANUAL 4.14 4.14 100.00%
01.01.01.11.01.0 TRAZO Y REPLANTEO 4.86 4.86 100.00%
01.01.01.11.01.0 MOVIMIENTO DE TIERRAS
01.01.01.11.01.0 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 55.17 55.17 100.00%
01.01.01.11.01.0 RELLENO CON MATERIAL PROPIO 124.34 124.34 100.00%
01.01.01.11.01.0 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50.00M) 8.62 8.62 100.00%
01.01.01.11.01.0 OBRAS DE CONCRETO ARMADO
01.01.01.11.01.0 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 263.06 263.06 100.00%
01.01.01.11.01.1 ENCOFRADO Y DESENCOFRADO P/VIGA 232.42 232.42 100.00%
01.01.01.11.01.1 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 P/VIGA 395.38 395.38 100.00%
01.01.01.11.02 PASE AEREO L=6.00m 636.00 636 100.00%
01.01.01.11.02.0 OBRAS PRELIMINARES
01.01.01.11.02.0 LIMPIEZA DEL TERRENO MANUAL 2.07 2.07 100.00%
01.01.01.11.02.0 TRAZO Y REPLANTEO 2.43 2.43 100.00%
01.01.01.11.02.0 MOVIMIENTO DE TIERRAS
01.01.01.11.02.0 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 27.58 27.58 100.00%
01.01.01.11.02.0 RELLENO CON MATERIAL PROPIO 62.17 62.17 100.00%
01.01.01.11.02.0 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50.00M) 4.31 4.31 100.00%
01.01.01.11.02.0 OBRAS DE CONCRETO ARMADO
01.01.01.11.02.0 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 197.30 197.3 100.00%
01.01.01.11.02.1 ENCOFRADO Y DESENCOFRADO P/VIGA 184.00 184 100.00%
01.01.01.11.02.1 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 P/VIGA 156.14 156.14 100.00%
01.01.01.11.03 PASE AEREO L=5.00m 546.45 546.45 100.00%
01.01.01.11.03.0 OBRAS PRELIMINARES
01.01.01.11.03.0 LIMPIEZA DEL TERRENO MANUAL 2.07 2.07 100.00%
01.01.01.11.03.0 TRAZO Y REPLANTEO 2.43 2.43 100.00%
01.01.01.11.03.0 MOVIMIENTO DE TIERRAS
01.01.01.11.03.0 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 27.58 27.58 100.00%
01.01.01.11.03.0 RELLENO CON MATERIAL PROPIO 62.17 62.17 100.00%
01.01.01.11.03.0 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50.00M) 4.31 4.31 100.00%
01.01.01.11.03.0 OBRAS DE CONCRETO ARMADO
01.01.01.11.03.0 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 164.41 164.41 100.00%
01.01.01.11.03.1 ENCOFRADO Y DESENCOFRADO P/VIGA 150.10 150.1 100.00%
01.01.01.11.03.1 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 P/VIGA 133.38 133.38 100.00%
01.01.01.12 PASE AEREO TUB. F°G° D = 1" L= 21.50 m. 13,494.08 8986.91 66.60% 4507.17 33.40%
01.01.01.12.01 OBRAS PRELIMINARES
01.01.01.12.02 LIMPIEZA DEL TERRENO MANUAL 10.36 10.36 100.00%
01.01.01.12.03 TRAZO Y REPLANTEO 12.16 12.16 100.00%
01.01.01.12.04 MOVIMIENTO DE TIERRAS
01.01.01.12.05 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 293.08 293.08 100.00%
01.01.01.12.06 RELLENO CON MATERIAL PROPIO 269.40 269.4 100.00%
01.01.01.12.07 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50.00M) 192.23 192.23 100.00%
01.01.01.12.08 CONCRETO SIMPLE
01.01.01.12.09 SOLADO E=4" MEZCLA 1:12 CEMENTO HORMIGON 193.04 193.04 100.00%
01.01.01.12.10 CONCRETO CICLOPIO C:H = 1:8+30% PM 985.28 985.28 100.00%
01.01.01.12.11 ENCOFRADO Y DESENCOFRADO EN CAMARA DE ANCLAJE 182.79 182.79 100.00%
01.01.01.12.12 OBRAS DE CONCRETO ARMADO 3,795.44 3795.44 100.00%
01.01.01.12.12.0 ZAPATAS
01.01.01.12.12.0 CONCRETO f'c=175 KG/CM2 PARA ZAPATAS 2,364.25 2364.25 100.00%
01.01.01.12.12.0 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (MUROS) 429.47 429.47 100.00%
01.01.01.12.12.0 COLUMNAS
01.01.01.12.12.0 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 341.98 341.98 100.00%
01.01.01.12.12.0 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (MUROS) 334.36 334.36 100.00%
01.01.01.12.12.0 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 325.38 325.38 100.00%
01.01.01.12.13 ESTRUCTURA DE ACERO
01.01.01.12.14 SUMINISTRO Y COLOCACION DEL CABLE PRINCIPAL DE ACERO GALVAN 959.84 959.84 100.00%
01.01.01.12.15 SUMINISTRO Y COLOCACION DE GRAPAS TIPO CROSBY PARA FIJACION 466.48 466.48 100.00%
01.01.01.12.16 SUMINISTRO Y COLOCACION DE PENDOLAS SEGÚN DETALLE 1,727.29 1626.81 94.18% 100.48 5.82%
01.01.01.12.17 DOBLADO Y SOLDADO DE EXTREMOS DE PENDOLAS SEGÚN DETALLE 417.30 417.3 100.00%
01.01.01.12.18 SUMINISTRO Y COLOCACION DE ABRAZADERA DE PLANCHA DE 6"x2"x 643.02 643.02 100.00%
01.01.01.12.19 SUMINISTRO Y COLOCACION DE GUARDACABOS PARA CABLE DIAM=1/ 478.54 478.54 100.00%
01.01.01.12.20 CARRITO DE DILATACION C/RODILLO MACIZO DE 2" 998.34 998.34 100.00%
01.01.01.12.21 MACIZO DE FIERRO LISO DE 3.0" PARA ANCLAJE Y SUJECION DE CABL 249.14 249.14 100.00%
01.01.01.12.22 SUMINISTRO E INSTALACION DE TUBERIA DE ACERO GALVANIZADO 1" 583.73 583.73 100.00%
01.01.01.12.23 SUMINISTRO Y COLOCACION DE ABRAZADERA F°F° 10"x1/2" PARTE I 685.23 685.23 100.00%
01.01.01.12.24 SUMINISTRO E INSTALACION DE UNION UNIVERSAL F° G° 1" 78.12 78.12 100.00%
01.01.01.12.25 PINTURA GENERAL
01.01.01.12.26 PINTURA EN ESTRUCTURA METALICA 273.27 273.27 100.00%
01.01.02 SECTOR II 88,293.72 62413.63 70.69% 1499.1 1.70% 24380.99 27.61%
01.01.02.01 LINEA DE CONDUCCION 12,043.67 12043.67 100.00%
01.01.02.01.01 TRABAJOS PRELIMINARES 1232.11
01.01.02.01.02 LIMPIEZA DEL TERRENO MANUAL.. 539.31 539.31 100.00%
01.01.02.01.03 TRAZO NIVELACION Y REPLANTEO 692.80 692.8 100.00%
01.01.02.01.04 MOVIMIENTO DE TIERRAS 1762.25
01.01.02.01.05 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 0.40 X 0.80M 383.87 383.87 100.00%
01.01.02.01.06 CAMA DE TIERRA ZARANDEADA E=0.10M. ZANJA P/TUBO 405.26 405.26 100.00%
01.01.02.01.07 RELLENO Y COMPACTADO ZANJA CON MATERIAL PROPIO 896.35 896.35 100.00%
01.01.02.01.08 ELIMINACION DE MATERIAL EXCEDENTE. 76.77 76.77 100.00%
01.01.02.01.09 SUMINISTRO E INSTALACION DE TUBERIAS 8659.35
01.01.02.01.10 SUM. E INST. TUBERIA PVC SAP C-10 1" 703.35 703.35 100.00%
01.01.02.01.11 TUBERIA HDPE Ø 1" 7,956.00 7956 100.00%
01.01.02.01.12 PRUEBA HIDRAULICA Y DESINFECCION 389.96
01.01.02.01.13 PRUEBA HIDRAULICA + DESINFECCION DE TUB. ZANJA TAPADA 389.96 389.96 100.00%
01.01.02.02 CAMARA REGULADORA DE PRESION TIPO II (3 UND) 12,622.47 12622.47 100.00%
01.01.02.02.01 OBRAS PRELIMINARES 11.86
01.01.02.02.02 TRAZO Y REPLANTEO 11.86 11.86 100.00%
01.01.02.02.03 MOVIMIENTO DE TIERRAS 332.73
01.01.02.02.04 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 151.28 151.28 100.00%
01.01.02.02.05 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50.00M) 181.45 181.45 100.00%
01.01.02.02.06 CONCRETO SIMPLE 210.98
01.01.02.02.07 CONCRETO F'c=140 KG/CM2 (SOLADOS Y/O DADOS) 210.98 210.98 100.00%
01.01.02.02.08 OBRAS DE CONCRETO ARMADO 1770.72
01.01.02.02.09 CONCRETO F'C=210 KG/CM2 P/ PISO 440.63 440.63 100.00%
01.01.02.02.10 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 791.18 791.18 100.00%
01.01.02.02.11 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (MUROS) 538.91 538.91 100.00%
01.01.02.02.12 REVOQUES ENLUCIDOS Y MOLDURAS 345.9
01.01.02.02.13 TARRAJEO EN INTERIORES C/IMPERMEAB. E=1.5CM MEZCLA 1:2 345.90 345.9 100.00%
01.01.02.02.14 CARPINTERIA METALICA 874
01.01.02.02.15 TAPA METALICA 0.90X0.60 M SEGUN DISEÑO... 853.47 853.47 100.00%
01.01.02.02.16 PINTURA DE TAPA C/ESMALTE ANTICORROSIVO 20.53 20.53 100.00%
01.01.02.02.17 SUMINISTRO E INSTALACION DE TUBERIAS 170.52
01.01.02.02.18 SUM. E INST. TUBERIA PVC SAP C-10 1" 73.08 73.08 100.00%
01.01.02.02.19 SUM. E INST. TUBERIA PVC SAP C-10 1" CRP. 97.44 97.44 100.00%
01.01.02.02.20 SUMINISTRO E INSTALACION DE ACCESORIOS 8905.76
01.01.02.02.21 SUMINISTRO E INSTALACION DE ACCESORIOS PARA CRP -1". 8,905.76 8905.76 100.00%
01.01.02.03 RESERVORIO 5.00 M3 (01UND) 629.42 629.42 100.00%
01.01.02.03.01 OBRAS DE CONCRETO ARMADO 248.78
01.01.02.03.02 CONCRETO F'C=210 KG/CM2 P/ PISO 223.60 223.6 100.00%
01.01.02.03.03 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 25.18 25.18 100.00%
01.01.02.03.04 REVOQUES ENLUCIDOS Y MOLDURAS 30.3
01.01.02.03.05 TARRAJEO EN INTERIORES C/IMPERMEAB. E=1.5CM MEZCLA 1:2 30.30 30.3 100.00%
01.01.02.03.06 PINTURA 350.34
01.01.02.03.07 PINTURA DE MURO EXTERIOR C/ESMALTE 350.34 350.34 100.00%
01.01.02.04 SISTEMA DE CLORACION POR GOTEO 2,201.96 2201.96 100.00%
01.01.02.04.01 OBRAS PRELIMINARES 8.91
01.01.02.04.02 TRAZO Y REPLANTEO 8.91 8.91 100.00%
01.01.02.04.03 OBRAS DE CONCRETO ARMADO 241.29
01.01.02.04.04 CONCRETO F'C=210 KG/CM2 P/ TECHO. 84.80 84.8 100.00%
01.01.02.04.05 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 63.91 63.91 100.00%
01.01.02.04.06 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (MUROS) 92.58 92.58 100.00%
01.01.02.04.07 MUROS Y TABIQUES DE ALBAÑILERIA 146.61
01.01.02.04.08 LADRILLO KING KONG 0.24 x 0.09 x 0.12 cm C/A 1:4 x 1.5cm 146.61 146.61 100.00%
01.01.02.04.09 REVOQUES ENLUCIDOS Y MOLDURAS 94.51
01.01.02.04.10 TARRAJEO EN EXTERIORES E=1.5 CM MEZCLA 1..5 94.51 94.51 100.00%
01.01.02.04.11 PINTURA 36.58
01.01.02.04.12 PINTURA DE MURO EXTERIOR C/ESMALTE 36.58 36.58 100.00%
01.01.02.04.13 COBERTURAS 145.42
01.01.02.04.14 COBERTURA CON CALAMINA GALVANIZADA 145.42 145.42 100.00%
01.01.02.04.15 SUMINISTRO E INSTALACION DE TUBERIAS 35.52
01.01.02.04.16 SUM. E INST. TUBERIA PVC C-10 1/2" 35.52 35.52 100.00%
01.01.02.04.17 SUMINISTRO E INSTALACION DE ACCESORIOS 102.76
01.01.02.04.18 SUMINISTRO E INSTALACION DE ACCESORIOS CLORACION 102.76 102.76 100.00%
01.01.02.04.19 VARIOS 351.34
01.01.02.04.20 SUM. E INST. DE TANQUE CONTENEDOR 250L 283.62 283.62 100.00%
01.01.02.04.21 SUM. E INST. DE TANQUE CONTENEDOR 40L 67.72 67.72 100.00%
01.01.02.04.22 CERCO DE SEGURIDAD 1,039.02 1039.02 100.00%
01.01.02.04.22.0 OBRAS PRELIMINARES 8.91
01.01.02.04.22.0 TRAZO Y REPLANTEO 8.91 8.91 100.00%
01.01.02.04.22.0 CARPINTERIA METALICA 830.56
01.01.02.04.22.0 POSTE DE FIERRO NEGRO ø3" 451.72 451.72 100.00%
01.01.02.04.22.0 CERCO DE TUBO DE FIERRO NEGRO Y MALLA OLIMPICA 249.41 249.41 100.00%
01.01.02.04.22.0 PUERTA C/MALLA CRIPADA Y MARCO FIERRO Ø 1 1/2" (1.00x2.10M) 129.43 129.43 100.00%
01.01.02.04.22.0 PINTURA 199.55
01.01.02.04.22.0 PINTURA C/ ESMALTE ANTICORROSIVA 199.55 199.55 100.00%
01.01.02.05 CASETA DE VALVULAS (RESV. 5.00M3, 01 UND) 770.31 770.31 100.00%
01.01.02.05.01 OBRAS PRELIMINARES 1.34
01.01.02.05.02 TRAZO Y REPLANTEO 1.34 1.34 100.00%
01.01.02.05.03 MOVIMIENTO DE TIERRAS 7.76
01.01.02.05.04 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 3.45 3.45 100.00%
01.01.02.05.05 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 4.31 4.31 100.00%
01.01.02.05.06 OBRAS DE CONCRETO SIMPLE 16.23
01.01.02.05.07 CONCRETO F'c=140 KG/CM2 (SOLADOS Y/O DADOS) 16.23 16.23 100.00%
01.01.02.05.08 OBRAS DE CONCRETO ARMADO 669.52
01.01.02.05.09 CONCRETO F'C=210 KG/CM2 P/ PISO 92.07 92.07 100.00%
01.01.02.05.10 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 223.70 223.7 100.00%
01.01.02.05.11 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (MUROS) 123.24 123.24 100.00%
01.01.02.05.12 CONCRETO F'C=210 KG/CM2 P/MUROS REFORZADO 72.34 72.34 100.00%
01.01.02.05.13 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 92.97 92.97 100.00%
01.01.02.05.14 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (MUROS) 65.20 65.2 100.00%
01.01.02.05.15 REVOQUES ENLUCIDOS Y MOLDURAS 36.05
01.01.02.05.16 TARRAJEO EN INTERIORES C/IMPERMEAB. E=1.5CM MEZCLA 1:2 8.00 8 100.00%
01.01.02.05.17 TARRAJEO EN EXTERIORES E=1.5 CM MEZCLA 1..5 28.05 28.05 100.00%
01.01.02.05.18 PINTURA 39.41
01.01.02.05.19 PINTURA DE MURO EXTERIOR C/ESMALTE 39.41 39.41 100.00%
01.01.02.06 REDES DE DISTRIBUCCION 35,644.90 34145.8 95.79% 1499.1 4.21%
01.01.02.06.01 TRABAJOS PRELIMINARES 593.12
01.01.02.06.02 LIMPIEZA DEL TERRENO MANUAL. 140.83 140.83 100.00%
01.01.02.06.03 TRAZO NIVELACION Y REPLANTEO 452.29 452.29 100.00%
01.01.02.06.04 MOVIMIENTO DE TIERRAS 30640.3
01.01.02.06.05 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 0.40 X 0.80M 7,000.96 7000.96 100.00%
01.01.02.06.06 CAMA DE TIERRA ZARANDEADA E=0.10M. ZANJA P/TUBO 7,390.95 7390.95 100.00%
01.01.02.06.07 RELLENO Y COMPACTADO ZANJA CON MATERIAL PROPIO 16,347.30 16248.39 99.39% 98.91 0.61%
01.01.02.06.08 ELIMINACION DE MATERIAL EXCEDENTE. 1,400.19 0.00% 1400.19 100.00%
01.01.02.06.09 SUMINISTRO E INSTALACION DE TUBERIAS 1743.18
01.01.02.06.10 SUM. E INST. TUBERIA PVC SAP C-10 1" 701.57 701.57 100.00%
01.01.02.06.11 SUM. E INST. TUBERIA PVC SAP C-10 3/4" 1,041.61 1041.61 100.00%
01.01.02.06.12 PRUEBA HIDRAULICA Y DESINFECCION 1169.2
01.01.02.06.13 PRUEBA HIDRAULICA + DESINFECCION DE TUB. ZANJA TAPADA 1,169.20 1169.2 100.00%
01.01.02.07 CAMARA REGULADORA DE PRESION TIPO II (1 UND) 24,380.99 24380.99 100.00%
01.01.02.07.01 OBRAS PRELIMINARES
01.01.02.07.02 TRAZO Y REPLANTEO 3.95 3.95 100.00%
01.01.02.07.03 MOVIMIENTO DE TIERRAS
01.01.02.07.04 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 50.43 50.43 100.00%
01.01.02.07.05 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50.00M) 60.34 60.34 100.00%
01.01.02.07.06 CONCRETO SIMPLE
01.01.02.07.07 CONCRETO F'c=140 KG/CM2 (SOLADOS Y/O DADOS) 70.33 70.33 100.00%
01.01.02.07.08 OBRAS DE CONCRETO ARMADO
01.01.02.07.09 CONCRETO F'C=210 KG/CM2 P/ PISO 144.68 144.68 100.00%
01.01.02.07.10 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 263.89 263.89 100.00%
01.01.02.07.11 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (MUROS) 179.64 179.64 100.00%
01.01.02.07.12 REVOQUES ENLUCIDOS Y MOLDURAS
01.01.02.07.13 TARRAJEO EN INTERIORES C/IMPERMEAB. E=1.5CM MEZCLA 1:2 115.30 115.3 100.00%
01.01.02.07.14 CARPINTERIA METALICA
01.01.02.07.15 TAPA METALICA 0.90X0.60 M SEGUN DISEÑO... 284.49 284.49 100.00%
01.01.02.07.16 PINTURA DE TAPA C/ESMALTE ANTICORROSIVO 6.84 6.84 100.00%
01.01.02.07.17 SUMINISTRO E INSTALACION DE TUBERIAS
01.01.02.07.18 SUM. E INST. TUBERIA PVC SAP C-10 1" 24.36 24.36 100.00%
01.01.02.07.19 SUM. E INST. TUBERIA PVC SAP C-10 1" CRP. 32.48 32.48 100.00%
01.01.02.07.20 SUMINISTRO E INSTALACION DE ACCESORIOS
01.01.02.07.21 SUMINISTRO E INSTALACION DE ACCESORIOS PARA CRP -1".. 1,831.18 1831.18 100.00%
01.01.02.07.22 CONEX. DOMICIL. HASTA CAJA DE PASO (DOMIC. 53 UND)
01.01.02.07.23 TRAZO NIVELACION Y REPLANTEO 250.50 250.5 100.00%
01.01.02.07.24 EXCAVACION DE ZANJA PARA CONEX. DOMICILIARIAS DE 0.40x0.50M. 3,877.50 3877.5 100.00%
01.01.02.07.25 CAMA DE TIERRA ZARANDEADA E=0.10M. ZANJA P/TUBO 4,093.50 4093.5 100.00%
01.01.02.07.26 SUM. E INST. TUBERIA PVC C-10 1/2". 903.00 903 100.00%
01.01.02.07.27 RELLENO Y COMPACTADO ZANJA CON MATERIAL PROPIO SELECCIONA 9,054.00 9054 100.00%
01.01.02.07.28 ELIMINACION DE MATERIAL EXCEDENTE. 775.50 775.5 100.00%
01.01.02.07.29 CONEXIONES DOMICILIARIAS DE R.D. Ø 1 ". 499.55 499.55 100.00%
01.01.02.07.30 CONEXIONES DOMICILIARIAS DE R.D. Ø 3/4 ". 1,859.53 1859.53 100.00%
01.01.03 SECTOR III 238,041.49 4708.73 1.98% 60578.47 25.45% 159083.81 66.83% 13670.48 5.74%
01.01.03.01 LINEA DE CONDUCCION 2,904.44 2904.44 100.00%
01.01.03.01.01 SUMINISTRO E INSTALACION DE TUBERIAS 2576.38
01.01.03.01.02 SUM. E INST. TUBERIA PVC SAP C-10 1 1/2".. 2,576.38 2576.38 100.00%
01.01.03.01.03 PRUEBA HIDRAULICA Y DESINFECCION 328.06
01.01.03.01.04 PRUEBA HIDRAULICA + DESINFECCION DE TUB. ZANJA TAPADA 328.06 328.06 100.00%
01.01.03.02 RESERVORIO 5.00 M3 (01UND) 1,033.98 1033.98 100.00%
01.01.03.02.01 OBRAS DE CONCRETO ARMADO 653.34
01.01.03.02.02 CONCRETO F'C=210 KG/CM2 P/ PISO 223.60 223.6 100.00%
01.01.03.02.03 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 25.18 25.18 100.00%
01.01.03.02.04 CONCRETO F'C=210 KG/CM2 P/MUROS REFORZADO 210.45 210.45 100.00%
01.01.03.02.05 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 154.94 154.94 100.00%
01.01.03.02.06 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (MUROS) 39.17 39.17 100.00%
01.01.03.02.07 REVOQUES ENLUCIDOS Y MOLDURAS 30.3
01.01.03.02.08 TARRAJEO EN INTERIORES C/IMPERMEAB. E=1.5CM MEZCLA 1:2 30.30 30.3 100.00%
01.01.03.02.09 PINTURA 350.34
01.01.03.02.10 PINTURA DE MURO EXTERIOR C/ESMALTE 350.34 350.34 100.00%
01.01.03.03 SISTEMA DE CLORACION POR GOTEO 2,201.96 2201.96 100.00%
01.01.03.03.01 OBRAS PRELIMINARES
01.01.03.03.02 TRAZO Y REPLANTEO 8.91 8.91 100.00%
01.01.03.03.03 OBRAS DE CONCRETO ARMADO
01.01.03.03.04 CONCRETO F'C=210 KG/CM2 P/ TECHO. 84.80 84.8 100.00%
01.01.03.03.05 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 63.91 63.91 100.00%
01.01.03.03.06 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (MUROS) 92.58 92.58 100.00%
01.01.03.03.07 MUROS Y TABIQUES DE ALBAÑILERIA
01.01.03.03.08 LADRILLO KING KONG 0.24 x 0.09 x 0.12 cm C/A 1:4 x 1.5cm 146.61 146.61 100.00%
01.01.03.03.09 REVOQUES ENLUCIDOS Y MOLDURAS
01.01.03.03.10 TARRAJEO EN EXTERIORES E=1.5 CM MEZCLA 1..5 94.51 94.51 100.00%
01.01.03.03.11 PINTURA
01.01.03.03.12 PINTURA DE MURO EXTERIOR C/ESMALTE 36.58 36.58 100.00%
01.01.03.03.13 COBERTURAS
01.01.03.03.14 COBERTURA CON CALAMINA GALVANIZADA 145.42 145.42 100.00%
01.01.03.03.15 SUMINISTRO E INSTALACION DE TUBERIAS
01.01.03.03.16 SUM. E INST. TUBERIA PVC C-10 1/2" 35.52 35.52 100.00%
01.01.03.03.17 SUMINISTRO E INSTALACION DE ACCESORIOS
01.01.03.03.18 SUMINISTRO E INSTALACION DE ACCESORIOS CLORACION 102.76 102.76 100.00%
01.01.03.03.19 VARIOS
01.01.03.03.20 SUM. E INST. DE TANQUE CONTENEDOR 40L 67.72 67.72 100.00%
01.01.03.03.21 SUM. E INST. DE TANQUE CONTENEDOR 250L 283.62 283.62 100.00%
01.01.03.03.22 CERCO DE SEGURIDAD 1,039.02 1039.02 100.00%
01.01.03.03.22.0 OBRAS PRELIMINARES
01.01.03.03.22.0 TRAZO Y REPLANTEO 8.91 8.91 100.00%
01.01.03.03.22.0 CARPINTERIA METALICA
01.01.03.03.22.0 POSTE DE FIERRO NEGRO ø3" 451.72 451.72 100.00%
01.01.03.03.22.0 CERCO DE TUBO DE FIERRO NEGRO Y MALLA OLIMPICA 249.41 249.41 100.00%
01.01.03.03.22.0 PUERTA C/MALLA CRIPADA Y MARCO FIERRO Ø 1 1/2" (1.00x2.10M) 129.43 129.43 100.00%
01.01.03.03.22.0 PINTURA
01.01.03.03.22.0 PINTURA C/ ESMALTE ANTICORROSIVA 199.55 199.55 100.00%
01.01.03.04 CASETA DE VALVULAS (RESV. 5.00M3, 01 UND) 770.31 770.31 100.00%
01.01.03.04.01 OBRAS PRELIMINARES 1.34
01.01.03.04.02 TRAZO Y REPLANTEO 1.34 1.34 100.00%
01.01.03.04.03 MOVIMIENTO DE TIERRAS 7.76
01.01.03.04.04 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 3.45 3.45 100.00%
01.01.03.04.05 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 4.31 4.31 100.00%
01.01.03.04.06 OBRAS DE CONCRETO SIMPLE 16.23
01.01.03.04.07 CONCRETO F'c=140 KG/CM2 (SOLADOS Y/O DADOS) 16.23 16.23 100.00%
01.01.03.04.08 OBRAS DE CONCRETO ARMADO 669.52
01.01.03.04.09 CONCRETO F'C=210 KG/CM2 P/ PISO 92.07 92.07 100.00%
01.01.03.04.10 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 223.70 223.7 100.00%
01.01.03.04.11 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (MUROS) 123.24 123.24 100.00%
01.01.03.04.12 CONCRETO F'C=210 KG/CM2 P/MUROS REFORZADO 72.34 72.34 100.00%
01.01.03.04.13 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 92.97 92.97 100.00%
01.01.03.04.14 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (MUROS) 65.20 65.2 100.00%
01.01.03.04.15 REVOQUES ENLUCIDOS Y MOLDURAS 36.05
01.01.03.04.16 TARRAJEO EN INTERIORES C/IMPERMEAB. E=1.5CM MEZCLA 1:2 8.00 8 100.00%
01.01.03.04.17 TARRAJEO EN EXTERIORES E=1.5 CM MEZCLA 1..5 28.05 28.05 100.00%
01.01.03.04.18 PINTURA 39.41
01.01.03.04.19 PINTURA DE MURO EXTERIOR C/ESMALTE 39.41 39.41 100.00%
01.01.03.05 REDES DE DISTRIBUCCION 194,085.45 21331.16 10.99% 159083.81 81.97% 13670.48 7.04%
01.01.03.05.01 TRABAJOS PRELIMINARES
01.01.03.05.02 LIMPIEZA DEL TERRENO MANUAL. 775.29 775.29 100.00%
01.01.03.05.03 TRAZO NIVELACION Y REPLANTEO 2,489.87 2489.87 100.00%
01.01.03.05.04 MOVIMIENTO DE TIERRAS
01.01.03.05.05 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 0.40 X 0.80M 38,540.80 18066 46.88% 20474.8 53.13%
01.01.03.05.06 CAMA DE TIERRA ZARANDEADA E=0.10M. ZANJA P/TUBO 40,687.75 40687.75 100.00%
01.01.03.05.07 RELLENO Y COMPACTADO ZANJA CON MATERIAL PROPIO 89,993.14 84030.82 93.37% 5962.32 6.63%
01.01.03.05.08 ELIMINACION DE MATERIAL EXCEDENTE. 7,708.16 7708.16 100.00%
01.01.03.05.09 SUMINISTRO E INSTALACION DE TUBERIAS
01.01.03.05.10 SUM. E INST. TUBERIA PVC SAP C-10 1" 7,238.49 7238.49 100.00%
01.01.03.05.11 SUM. E INST. TUBERIA PVC SAP C-10 3/4" 5,062.47 5062.47 100.00%
01.01.03.05.12 PRUEBA HIDRAULICA Y DESINFECCION
01.01.03.05.13 PRUEBA HIDRAULICA + DESINFECCION DE TUB. ZANJA TAPADA 1,589.48 1589.48 100.00%
01.01.03.06 CAMARA REGULADORA DE PRESION TIPO II (2 UND) 8,446.32 8446.32 100.00%
01.01.03.06.01 OBRAS PRELIMINARES
01.01.03.06.02 TRAZO Y REPLANTEO 7.90 7.9 100.00%
01.01.03.06.03 MOVIMIENTO DE TIERRAS
01.01.03.06.04 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 100.85 100.85 100.00%
01.01.03.06.05 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50.00M) 121.11 121.11 100.00%
01.01.03.06.06 CONCRETO SIMPLE
01.01.03.06.07 CONCRETO F'c=140 KG/CM2 (SOLADOS Y/O DADOS) 140.65 140.65 100.00%
01.01.03.06.08 OBRAS DE CONCRETO ARMADO
01.01.03.06.09 CONCRETO F'C=210 KG/CM2 P/ PISO... 295.90 295.9 100.00%
01.01.03.06.10 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 527.78 527.78 100.00%
01.01.03.06.11 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (MUROS) 359.27 359.27 100.00%
01.01.03.06.12 REVOQUES ENLUCIDOS Y MOLDURAS
01.01.03.06.13 TARRAJEO EN INTERIORES C/IMPERMEAB. E=1.5CM MEZCLA 1:2 230.60 230.6 100.00%
01.01.03.06.14 CARPINTERIA METALICA
01.01.03.06.15 TAPA METALICA 0.90X0.60 M SEGUN DISEÑO... 568.98 568.98 100.00%
01.01.03.06.16 PINTURA DE TAPA C/ESMALTE ANTICORROSIVO 13.68 13.68 100.00%
01.01.03.06.17 SUMINISTRO E INSTALACION DE TUBERIAS
01.01.03.06.18 SUM. E INST. TUBERIA PVC SAP C-10 1" CRP. 48.72 48.72 100.00%
01.01.03.06.19 SUM. E INST. TUBERIA PVC SAP C-10 1" 64.96 64.96 100.00%
01.01.03.06.20 SUMINISTRO E INSTALACION DE ACCESORIOS
01.01.03.06.21 SUMINISTRO E INSTALACION DE ACCESORIOS PARA CRP -1" 5,965.92 5965.92 100.00%
01.01.03.07 CONEX. DOMICIL. HASTA CAJA DE PASO (DOMIC. 4 UND)
01.01.03.08 TRAZO NIVELACION Y REPLANTEO 350.70 350.7 100.00%
01.01.03.09 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 0.40 X 0.50M 5,428.50 5428.5 100.00%
01.01.03.10 CAMA DE TIERRA ZARANDEADA E=0.10M. ZANJA P/TUBO 5,730.90 5730.9 100.00%
01.01.03.11 SUM. E INST. TUBERIA PVC SAP C-10 1/2" 1,264.20 1264.2 100.00%
01.01.03.12 RELLENO Y COMPACTADO ZANJA CON MATERIAL PROPIO 12,675.60 12675.6 100.00%
01.01.03.13 ELIMINACION DE MATERIAL EXCEDENTE. 1,085.70 1085.7 100.00%
01.01.03.14 CONEXIONES DOMICILIARIAS DE R.D. Ø 3/4" 1,663.79 1663.79 100.00%
01.01.03.15 CONEXIONES DOMICILIARIAS DE R.D. Ø 1 ". 399.64 399.64 100.00%
01.02 SISTEMA DE ALCANTARILLADO Y UBS 1,141,842.52 92900.32 8.14% 762862.17 66.81% 207350.79 18.16% 58808.09 5.15% 19921.17 1.74%
01.02.01 SISTEMA DE ALCANTARILLADO 825,170.84 9378.29 1.14% 743715.83 90.13% 26971.68 3.27% 25183.88 3.05% 19921.17 2.41%
01.02.01.01 RED DE COLECTORES 825,170.84 9378.29 1.14% 743715.83 90.13% 26971.68 3.27% 25183.88 3.05% 19921.17 2.41%
01.02.01.01.01 TRABAJOS PRELIMINARES 825,170.84 5651.88 0.68%
01.02.01.01.01.0 LIMPIEZA DEL TERRENO MANUAL.. 4,658.85 4658.85 100.00%
01.02.01.01.01.0 TRAZO NIVELACION Y REPLANTEO 993.03 993.03 100.00%
01.02.01.01.01.0 MOVIMIENTO DE TIERRAS 700,550.79 3726.41 0.53% 625972.71 89.35% 25746.63 3.68% 25183.88 3.59% 19921.17 2.84%
01.02.01.01.01.0 EXCAVACIÓN DE ZANJA PARA TUBERÍAS Ø160MM S20 ANCHO= 7,665.75 3726.41 48.61% 3939.34 51.39%
01.02.01.01.01.0 EXCAVACIÓN DE ZANJA PARA TUBERÍAS Ø160MM S20 ANCHO=0 1,620.43 1620.43 100.00%
01.02.01.01.01.0 EXCAVACIÓN DE ZANJA PARA TUBERÍAS Ø160MM S20 ANCHO=0 502.17 502.17 100.00%
01.02.01.01.01.0 EXCAVACIÓN DE ZANJA PARA TUBERÍAS Ø200MM S20 ANCHO=0 9,109.22 7763.54 85.23% 1345.68 14.77%
01.02.01.01.01.0 REFINE, NIVELACION Y FONDOS TUBERIA HASTA 8" 117,725.64 117725.64 100.00%
01.02.01.01.01.0 CAMA DE APOYO PARA TUBERIA, DE D=160MM - 200MM 134,632.68 134603.23 99.98% 29.45 0.02%
01.02.01.01.01.0 RELLENO COMPACTADO DE ZANJA CON MATERIAL PROPIO 414,451.13 359818.36 86.82% 24371.5 5.88% 25183.88 6.08% 5077.4 1.23%
01.02.01.01.01.0 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50.00M). 14,843.77 14843.77 100.00%
01.02.01.01.01.0 SUMINISTRO E INSTALACION DE TUBERIAS 117,247.98 117247.98 100.00%
01.02.01.01.01.0 SUMINISTRO E INSTALACION DE TUBERIA PVC UF ISO 4435 160MM 57,779.89 57779.89 100.00%
01.02.01.01.01.0 SUMINISTRO E INSTALACION DE TUBERIA PVC UF ISO 4435 200MM 59,468.09 59468.09 100.00%
01.02.01.01.01.0 PRUEBA HIDRAULICA 1,720.19 495.14 28.78% 1225.05 71.22%
01.02.01.01.01.0 DOBLE PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE 1,720.19 495.14 28.78% 1225.05 71.22%
01.02.02 BUZONES 295,006.76 83522.03 28.31% 19146.34 6.49% 180379.11 61.14% 11959.29 4.05%
01.02.02.01 TRABAJOS PRELIMINARES 230.46 230.46 100.00%
01.02.02.01.01 TRAZO Y REPLANTEO 230.46 230.46 100.00%
01.02.02.02 MOVIMIENTO DE TIERRAS 8,094.03 6869.51 84.87% 1224.53 15.13%
01.02.02.02.01 EXCAVACION DE BUZONES EN T.S.R, Hmáx <= 1.50M 2,575.80 2575.8 100.00%
01.02.02.02.02 EXCAVACION DE BUZONES EN T.S.R, Hmáx <= 2.00 M 1,970.46 1970.46 100.00%
01.02.02.02.03 EXCAVACION DE BUZONES EN T.S.R, Hmáx <= 3.00 M 1,506.27 1506.27 100.00%
01.02.02.02.04 NIVELACION INTERIOR Y APISONADO MANUAL 82.26 82.26 100.00%
01.02.02.02.05 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50.00M). 1,959.24 734.72 37.50% 1224.53 62.50%
01.02.02.03 CONCRETO EN BUZONES 94,343.87 76422.06 81.00% 17921.81 19.00%
01.02.02.03.01 BUZON DE CONCRETO D=1.20 M, PROF. HASTA 1.51 - 2.00 M E=0.15 44,160.00 33817.66 76.58% 10342.34 23.42%
01.02.02.03.02 BUZON DE CONCRETO D=1.20 M, PROF. HASTA 2.01 - 3.00 M E=0.20 9,160.55 9160.55 100.00%
01.02.02.03.03 DADO DE CONCRETO PARA EMPALME DE BUZON (0.55X0.55X0.55) F' 41,023.32 33443.85 81.52% 7579.47 18.48%
01.02.02.04 CONEXIONES DOMICILIARIAS 192,338.40 180379.11 93.78% 11959.29 6.22%
01.02.02.04.01 MOVIMIENTO DE TIERRAS
01.02.02.04.02 EXCAVACION DE ZANJA MANUAL EN T.S.R. HASTA 1.00M P/TUBERIA 31,020.00 31020 100.00%
01.02.02.04.03 REFINE Y NIVELACION DE ZANJA EN T.S.R. P/TUBERIA 1,560.00 1560 100.00%
01.02.02.04.04 CAMA DE APOYO PARA TUBERÍA CON MATERIAL PROPIO, INCLUYE ZA 39,252.00 39252 100.00%
01.02.02.04.05 RELLENO DE ZANJA CON MATERIAL PROPIO EN T.S.R. HASTA 1.00M 73,488.00 73488 100.00%
01.02.02.04.06 ELIMINACIÓN DE MATERIAL EXCEDENTE, DIST. PROM. 3 KM, CARGUIO 8,301.60 5707.35 68.75% 2594.25 31.25%
01.02.02.04.07 SUMINISTRO E INSTALACION DE TUBERIAS
01.02.02.04.08 CONEXION A LA RED DE DESAGUE Ø 160 mm, ACOMETIDA Ø 4" Lpro 38,716.80 29351.76 75.81% 9365.04 24.19%
01.02.03 CONDOMINIALES 21,664.92 21664.92 100.00%
01.02.03.01 COLECTORES CONDOMINIALES 19,391.02 19391.02 100.00%
01.02.03.01.01 OBRAS PRELIMINARES
01.02.03.01.02 LIMPIEZA DEL TERRENO MANUAL.. 276.56 276.56 100.00%
01.02.03.01.03 TRAZO NIVELACION Y REPLANTEO 355.28 355.28 100.00%
01.02.03.01.04 MOVIMIENTO DE TIERRAS
01.02.03.01.05 EXCAVACIÓN DE ZANJA PARA TUBERÍAS Ø160MM S20 ANCHO=0.60 314.53 314.53 100.00%
01.02.03.01.06 REFINE, NIVELACION Y FONDOS TUBERIA HASTA 8" 4,659.23 4659.23 100.00%
01.02.03.01.07 CAMA DE APOYO PARA TUBERIA, DE D=160MM - 200MM 6,794.40 6794.4 100.00%
01.02.03.01.08 RELLENO COMPACTADO DE ZANJA CON MATERIAL PROPIO 4,810.11 4810.11 100.00%
01.02.03.01.09 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50.00M). 466.22 466.22 100.00%
01.02.03.01.10 SUMINISTRO E INSTALACION DE TUBERIAS
01.02.03.01.11 SUMINISTRO E INSTALACION DE TUBERIA PVC SAL 4" 1,612.57 1612.57 100.00%
01.02.03.01.12 PRUEBA HIDRAULICA
01.02.03.01.13 DOBLE PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE 102.12 102.12 100.00%
01.02.03.02 BUZONES CONDIMINIALES 2,273.90 2273.9 100.00%
01.02.03.02.01 OBRAS PRELIMINARES
01.02.03.02.02 TRAZO Y REPLANTEO 12.22 12.22 100.00%
01.02.03.02.03 MOVIMIENTO DE TIERRAS
01.02.03.02.04 EXCAVACION DE BUZONES EN T.S.R, Hmáx <= 1.40M 163.26 163.26 100.00%
01.02.03.02.05 NIVELACION INTERIOR Y APISONADO MANUAL 4.34 4.34 100.00%
01.02.03.02.06 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50.00M). 64.48 64.48 100.00%
01.02.03.02.07 CONCRETO EN BUZONES
01.02.03.02.08 BUZONES CONDIMINIALES 2,029.60 2029.6 100.00%
01.03 UNIDADES BASICAS DE SANEAMIENTO 450,924.87 50491.56 11.20% 32264.6 7.16% 18817.19 4.17% 126083.91 27.96% 223267.61 49.51%
01.03.01 OBRAS PRELIMINARES 1621.44
01.03.02 LIMPIEZA DEL TERRENO MANUAL 745.92 745.92 100.00%
01.03.03 TRAZO Y REPLANTEO 875.52 875.52 100.00%
01.03.04 MOVIMIENTO DE TIERRAS 6739.68
01.03.05 EXCAVACION MANUAL PARA CIMIENTO . 2,334.15 2334.15 100.00%
01.03.06 RELLENO CON MATERIAL PROPIO 128.57 128.57 100.00%
01.03.07 RELLENO CON MATERIAL DE PRESTAMO. 563.90 563.9 100.00%
01.03.08 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50.00M) 3,775.99 3713.06 98.33% 62.93 1.67%
01.03.09 OBRAS DE CONCRETO SIMPLE 42130.44
01.03.10 CIMIENTO C:H, 1:8 + 30% P.G. 24,846.10 24846.1 100.00%
01.03.11 SOBRECIMIENTO - CONCRETO 1:8 + 30% P.M 4,679.09 4411.89 94.29% 267.2 5.71%
01.03.12 ENCOFRADO Y DESENCOFRADO NORMAL 12,872.45 12872.45 100.00%
01.03.13 CONCRETO f'c=140 kg/cm2, PARA SEPARADOR DE DUCHAS 152.52 152.52 100.00%
01.03.14 OBRAS DE CONCRETO ARMADO
01.03.14.01 VIGAS
01.03.14.02 CONCRETO F'C=175 KG/CM2 995.62 995.62 100.00%
01.03.14.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60. 880.28 880.28 100.00%
01.03.14.04 ENCOFRADO Y DESENCODRAFO NORMAL 1,045.87 1045.87 100.00%
01.03.15 ESTRUCTURAS DE MADERA Y COBERTURA
01.03.16 VIGA DE MADERA TORNILLO Y/O SIMILAR DE 2"X4" 4,804.25 4804.25 100.00%
01.03.17 CORREA DE MADERA TORNILLO Y/O SIMILAR DE 2"X3" 663.60 663.6 100.00%
01.03.18 COBERTURA CON CALAMINA GALVANIZADDA N°32 8,589.60 8589.6 100.00%
01.03.19 MUROS Y TABIQUES DE ALBAÑILERIA
01.03.20 MURO DE LADRILLO KING KONG 9x13x24 cm. SOGA C/A 1:4 x 1.5cm 37,709.98 31781.95 84.28% 5928.03 15.72%
01.03.21 REVOQUES ENLUCIDOS Y MOLDURAS
01.03.22 TARRAJEO EN INTERIORES CON CEMENTO-ARENA 8,365.50 3754.26 44.88% 4611.24 55.12%
01.03.23 TARRAJEO EN EXTERIORES E=1.5 CM MEZCLA 1..5 23,689.77 17665.21 74.57% 6024.56 25.43%
01.03.24 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS 1,396.08 1396.08 100.00%
01.03.25 BRUÑAS
01.03.26 BRUÑAS e=1.00 CM 5,347.58 1154.59 21.59% 4192.99 78.41%
01.03.27 ZOCALOS Y CONTRAZOCALOS
01.03.28 ZOCALO PULIDO E=8.25 cm 9,332.96 5058.54 54.20% 4274.42 45.80%
01.03.29 PISOS Y PAVIMENTOS
01.03.30 PISO DE CEMENTO PULIDO E=10 CM 3,696.30 3696.3 100.00%
01.03.31 VEREDA DE CONCRETO DE E=4" 6,100.52 6100.52 100.00%
01.03.32 CARPINTERIA METALICA
01.03.33 PUERTA MET. LAC 1/27" DE 0.80MX2.00M (SUM. E INST.) 8,400.00 8400 100.00%
01.03.34 CARPINTERIA DE MADERA
01.03.35 VENTANA DE MADERA TORNILLO O SIMILAR INC. MALLA MOSQUITERO 4,011.20 4011.2 100.00%
01.03.36 CERRAJERIA
01.03.37 CANDADO DE 45mm 476.00 476 100.00%
01.03.38 CERROJO DE 4" 360.00 360 100.00%
01.03.39 PINTURA
01.03.40 PINTURA EN EXTERIORES AL LATEX 12,202.51 7370.42 60.40% 4832.09 39.60%
01.03.41 PINTURA EN INTERIORES 1,930.35 1930.35 100.00%
01.03.42 SISTEMA DE AGUA FRIA
01.03.43 SUM. E INST. TUBERIA PVC C-10 1/2" . 2,656.02 2656.02 100.00%
01.03.44 ACCESORIOS PARA SISTEMA DE AGUA FRIA
01.03.45 TEE PVC-SAP 1/2" PARA AGUA FRIA 1,516.80 1516.8 100.00%
01.03.46 CODO DE PVC SAP DE 1/2" AGUA FRIA 4,856.00 4122.85 84.90% 733.15 15.10%
01.03.47 CODO DE F°G° DE 1/2" AGUA FRIA 1,507.20 1507.2 100.00%
01.03.48 VALVULA DE PASO DE PVC SAP DE 1/2" 1,270.80 1270.8 100.00%
01.03.49 SUMINISTRO E INSTALACION DE DUCHAS INCLIYE ACCESORIOS 1,418.40 1418.4 100.00%
01.03.50 SISTEMA DE DESAGÜE
01.03.51 RED DE DISTRIBUCION DE DESAGUE TUB PVC SAP DE 2" 3,318.90 3318.9 100.00%
01.03.52 RED DE DISTRIBUCION DE DESAGUE TUB PVC SAP DE 4" 582.12 451.39 77.54% 130.73 22.46%
01.03.53 ACCESORIOS PARA SISTEMA DE DESAGÜE
01.03.54 CODO PVC SAL P/DESAGUE 2"X90" 4,284.80 964.08 22.50% 3320.72 77.50%
01.03.55 CODO PVC SAL P/DESAGUE 2"X45" 3,213.60 1618.36 50.36% 1595.24 49.64%
01.03.56 CODO REVENTILADO PVC SANITARIA DE 4" X 2" 1,335.20 868.12 65.02% 467.08 34.98%
01.03.57 YEE PVC SAL P/DESAGUE 2"X90" 838.00 277.65 33.13% 560.35 66.87%
01.03.58 TEE PVC SAL SANITARIA 2" 790.40 466.95 59.08% 323.45 40.92%
01.03.59 TEE PVC SAL SANITARIA 4" 974.00 506.92 52.05% 467.08 47.95%
01.03.60 ADITAMIENTOS VARIOS
01.03.61 SUMIDERO CROMADO DE 2" EN PISO 2,716.00 2073.05 76.33% 642.95 23.67%
01.03.62 REGISTRO DE BRONCE 4" 1,470.00 1470 100.00%
01.03.63 APARATOS SANITARIOS
01.03.64 INODORO TANQUE BAJO C/ACCESORIOS 5,898.40 5898.4 100.00%
01.03.65 LAVATORIO DE PARED BLANCO 1 LLAVE 2,888.00 2888 100.00%
01.03.66 INSTALACION DE APARATOS SANITARIOS 1,549.60 193.7 12.50% 1355.9 87.50%
01.03.67 DUCHA CROMADA 1 LLAVE INCL. ACCESORIOS 720.00 720 100.00%
01.03.68 ACCESORIOS
01.03.69 SUMINISTRO E INSTALACION DE SOMBRERO DE VENTILACION PVC 2" Y AC 460.00 460 100.00%
01.03.70 CAJA DE TRAMPAS DE NATAS Y SOLIDOS 25,389.34 8469.65 33.36% 16919.69 66.64%
01.03.70.01 OBRAS PRELIMINARES
01.03.70.02 LIMPIEZA DEL TERRENO MANUAL 62.16 62.16 100.00%
01.03.70.03 TRAZO Y REPLANTEO 72.96 72.96 100.00%
01.03.70.04 MOVIMIENTO DE TIERRAS
01.03.70.05 EXCAVACION MANUAL PARA CIMIENTO . 1,078.20 1078.2 100.00%
01.03.70.06 RELLENO CON MATERIAL PROPIO 890.31 890.31 100.00%
01.03.70.07 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50.00M) 1,002.94 438.79 43.75% 564.15 56.25%
01.03.70.08 OBRAS DE CONCRETO ARMADO
01.03.70.09 CONCRETO F'C=175 KG/CM2 5,715.59 5715.59 100.00%
01.03.70.10 ENCOFRADO Y DESENCOFRADO NORMAL 8,580.02 8580.02 100.00%
01.03.70.11 REVOQUES ENLUCIDOS Y MOLDURAS
01.03.70.12 TARRAJEO PULIDO EN LAVATORIOS 1,604.42 1604.42 100.00%
01.03.70.13 SISTEMA DE DESAGÜE
01.03.70.14 RED DE DISTRIBUCION DE DESAGUE TUB PVC SAP DE 2" 4,801.94 4734.57 98.60% 67.37 1.40%
01.03.70.15 ACCESORIOS
01.03.70.16 TEE PVC SAL SANITARIA 2" 1,580.80 1192.66 75.45% 388.14 24.55%
01.03.71 CAJA DE REGISTRO 11,454.78 6080.59 53.08% 5374.19 46.92%
01.03.71.01 OBRAS PRELIMINARES
01.03.71.02 LIMPIEZA DEL TERRENO MANUAL 41.44 41.44 100.00%
01.03.71.03 TRAZO Y REPLANTEO 48.64 48.64 100.00%
01.03.71.04 MOVIMIENTO DE TIERRAS
01.03.71.05 EXCAVACION MANUAL PARA CIMIENTO . 510.66 510.66 100.00%
01.03.71.06 RELLENO CON MATERIAL PROPIO 383.89 383.89 100.00%
01.03.71.07 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50.00M) 508.58 508.58 100.00%
01.03.71.08 OBRAS DE CONCRETO ARMADO
01.03.71.09 CONCRETO F'C=175 KG/CM2 3,318.73 3318.73 100.00%
01.03.71.10 ENCOFRADO Y DESENCOFRADO NORMAL 4,900.10 3336.9 68.10% 1563.2 31.90%
01.03.71.11 REVOQUES ENLUCIDOS Y MOLDURAS
01.03.71.12 TARRAJEO PULIDO EN LAVATORIOS 492.26 492.26 100.00%
01.03.71.13 SISTEMA DE DESAGÜE
01.03.71.14 RED DE DISTRIBUCION DE DESAGUE TUB PVC SAP DE 4" 1,250.48 1250.48 100.00%
01.03.72 LAVADERO DOMICILIARIO (40UND) 30,619.25 5305.16 17.33% 25314.09 82.67%
01.03.72.01 OBRAS PRELIMINARES
01.03.72.02 LIMPIEZA DEL TERRENO MANUAL 54.13 54.13 100.00%
01.03.72.03 TRAZO Y REPLANTEO 63.54 63.54 100.00%
01.03.72.04 MOVIMIENTO DE TIERRAS
01.03.72.05 EXCAVACION MANUAL PARA CIMIENTO . 135.42 135.42 100.00%
01.03.72.06 RELLENO CON MATERIAL PROPIO 171.42 171.42 100.00%
01.03.72.07 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 72.84 72.84 100.00%
01.03.72.08 OBRAS DE CONCRETO SIMPLE
01.03.72.09 CONCRETO F'C=175 KG/CM2 1,825.30 1750.06 95.88% 75.24 4.12%
01.03.72.10 ENCOFRADO Y DESENCOFRADO NORMAL 3,057.75 3057.75 100.00%
01.03.72.11 OBRAS DE CONCRETO ARMADO
01.03.72.12 CONCRETO F'C=175 KG/CM2 3,232.69 3232.69 100.00%
01.03.72.13 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 2,061.94 2061.94 100.00%
01.03.72.14 ENCOFRADO Y DESENCOFRADO NORMAL 5,107.34 5107.34 100.00%
01.03.72.15 MUROS Y TABIQUES DE ALBAÑILERIA
01.03.72.16 MURO DE LADRILLO KING KONG 9x13x24 cm. SOGA C/A 1:4 x 1.5cm 1,508.40 1508.4 100.00%
01.03.72.17 REVOQUES ENLUCIDOS Y MOLDURAS
01.03.72.18 TARRAJEO PULIDO EN LAVATORIOS 1,412.98 1412.98 100.00%
01.03.72.19 ACCESORIOS Y VALVULAS
01.03.72.20 ACCESORIOS PARA LAVADERO DOMICILIARIOS 636.00 636 100.00%
01.03.72.21 SISTEMA DE AGUA FRIA
01.03.72.22 SUM. E INST. TUBERIA PVC 1/2" 349.16 349.16 100.00%
01.03.72.23 TEE PVC-SAP 1/2" PARA AGUA FRIA 505.60 505.6 100.00%
01.03.72.24 CODO DE PVC SAP DE 1/2" AGUA FRIA 971.20 971.2 100.00%
01.03.72.25 VALVULA DE PASO DE PVC SAP DE 1/2" 1,270.80 1270.8 100.00%
01.03.72.26 SISTEMA DE DESAGÜE
01.03.72.27 RED DE DISTRIBUCION DE DESAGUE TUB PVC SAP DE 2" 1,213.94 1213.94 100.00%
01.03.72.28 ACCESORIOS
01.03.72.29 CODO PVC SAL P/DESAGUE 2"X90" 2,678.00 2678 100.00%
01.03.72.30 CODO PVC SAP DE 2"X45° 2,142.40 2142.4 100.00%
01.03.72.31 TEE PVC SAL SANITARIA 2" 790.40 790.4 100.00%
01.03.72.32 ADITAMIENTOS VARIOS
01.03.72.33 SUMIDERO CROMADO DE 2" PARA LAVADERO DOMICILIARIO 1,358.00 1358 100.00%
01.03.73 INSTALACION DE BIODIGESTORES 57,472.35 2842.35 4.95% 54630 95.05%
01.03.73.01 OBRAS PRELIMINARES
01.03.73.02 TRAZO Y REPLANTEO 229.82 229.82 100.00%
01.03.73.03 LIMPIEZA DEL TERRENO MANUAL 195.80 195.8 100.00%
01.03.73.04 MOVIMIENTO DE TIERRAS
01.03.73.05 EXCAVACION MANUAL PARA CIMIENTO . 5,155.69 2416.73 46.88% 2738.96 53.12%
01.03.73.06 RELLENO CON MATERIAL PROPIO 3,761.64 3761.64 100.00%
01.03.73.07 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50.00M) 5,236.65 5236.65 100.00%
01.03.73.08 OBRAS DE CONCRETO SIMPLE
01.03.73.09 CONCRETO F'c=140 KG/CM2 (SOLADOS Y/O DADOS) 865.55 865.55 100.00%
01.03.73.10 BIODIGESTORES
01.03.73.11 BIODEGESTOR DE 600 ltrs (SUMINISTRO E INSTALACION) 42,027.20 42027.2 100.00%
01.03.74 CAJA DE LODOS 20,686.35 6760.71 32.68% 13925.64 67.32%
01.03.74.01 OBRAS PRELIMINARES
01.03.74.02 LIMPIEZA DEL TERRENO MANUAL 66.30 66.3 100.00%
01.03.74.03 TRAZO Y REPLANTEO 77.82 77.82 100.00%
01.03.74.04 MOVIMIENTO DE TIERRAS
01.03.74.05 EXCAVACION MANUAL PARA CIMIENTO . 661.91 661.91 100.00%
01.03.74.06 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50.00M) 1,103.36 606.85 55.00% 496.51 45.00%
01.03.74.07 OBRAS DE CONCRETO ARMADO
01.03.74.08 CONCRETO F'C=175 KG/CM2 3,355.61 3355.61 100.00%
01.03.74.09 ENCOFRADO Y DESENCOFRADO NORMAL 9,964.84 5347.83 53.67% 4617.01 46.33%
01.03.74.10 REVOQUES ENLUCIDOS Y MOLDURAS
01.03.74.11 TARRAJEO EN INTERIORES CON CEMENTO-ARENA 4,056.51 4056.51 100.00%
01.03.74.12 TUBERIAS Y ACCESORIOS VARIOS
01.03.74.13 ACCESORIOS PARA CAJA DE LODOS 1,400.00 1400 100.00%
01.03.75 CONSTRUCCION DE POZO PERCOLADOR (40UND) 70,066.38 2729.56 3.90% 67336.82 96.10%
01.03.75.01 OBRAS PRELIMINARES
01.03.75.02 LIMPIEZA DEL TERRENO MANUAL 192.70 192.7 100.00%
01.03.75.03 TRAZO Y REPLANTEO 226.18 226.18 100.00%
01.03.75.04 MOVIMIENTO DE TIERRAS
01.03.75.05 EXCAVACION MANUAL PARA CIMIENTO . 4,929.45 2310.68 46.88% 2618.77 53.12%
01.03.75.06 RELLENO COMPACTADO CON MATERIAL PROPIO 1,122.70 1122.7 100.00%
01.03.75.07 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50.00M) 7,214.94 7214.94 100.00%
01.03.75.08 SUMINISTRO E INSTALACION DE PIEDRA SELECIONADA 55,003.54 55003.54 100.00%
01.03.75.09 TUBERIAS Y ACCESORIOS VARIOS
01.03.75.10 PLASTICO DOBLE DE PROTECCION EN POZO DE PERCOLACION 976.87 976.87 100.00%
01.03.75.11 ACCESORIOS PARA POZO DE PERCOLACION 400.00 400 100.00%
01.04 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES 426,910.96 20281.23 4.75% 51933.35 12.16% 20321.41 4.76% 183481.19 42.98% 150893.78 35.35%
01.04.01 LOCALIDAD DE POQUE (TANQUE IMHOFF) 426,910.96 20281.23 4.75% 51933.35 12.16% 20321.41 4.76% 183481.19 42.98% 150893.78 35.35%
01.04.01.01 CAMARA DE REJAS (01UND) 1,969.17 3.23 0.16% 1965.94 99.84%
01.04.01.01.01 TRABAJOS PRELIMINARES
01.04.01.01.02 TRAZO Y REPLANTEO 4.16 3.23 77.64% 0.93 22.36%
01.04.01.01.03 MOVIMIENTO DE TIERRAS
01.04.01.01.04 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 25.43 25.43 100.00%
01.04.01.01.05 ELIMINACION MATERIAL EXCEDENTE MANUAL. 28.88 28.88 100.00%
01.04.01.01.06 CONCRETO SIMPLE
01.04.01.01.07 SOLADOS CONCRETO f'c=100 kg/cm2 h=4" 146.38 146.38 100.00%
01.04.01.01.08 CONCRETO ARMADO
01.04.01.01.09 CONCRETO F'C=210 KG/CM2 P/MUROS REFORZADO 690.53 690.53 100.00%
01.04.01.01.10 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 186.03 186.03 100.00%
01.04.01.01.11 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 209.66 209.66 100.00%
01.04.01.01.12 REVOQUES ENLUCIDOS Y MOLDURAS
01.04.01.01.13 TARRAJEO EN INTERIORES C/IMPERMEAB. E=1.5CM MEZCLA 1:2 329.49 329.49 100.00%
01.04.01.01.14 TARRAJEO EN EXTERIORES E=1.5 CM MEZCLA 1..5 201.71 201.71 100.00%
01.04.01.01.15 VESTIDURA EN DERRAMES 41.83 41.83 100.00%
01.04.01.01.16 PINTURA
01.04.01.01.17 PINTURA EN EXTERIORES LATEX. 95.76 95.76 100.00%
01.04.01.01.18 CARPINTERIA METALICA
01.04.01.01.19 REJILLA SUMIDERO PLATINA 1 1/4"X1/4" @ 1/2" Y MARCO "L" 1 1/4" 9.31 9.31 100.00%
01.04.01.02 DESARENADOR (01UNID) 3,054.47 3054.47 100.00%
01.04.01.02.01 TRABAJOS PRELIMINARES
01.04.01.02.02 TRAZO Y REPLANTEO 4.47 4.47 100.00%
01.04.01.02.04 CONCRETO SIMPLE
01.04.01.02.05 SOLADOS CONCRETO f'c=100 kg/cm2 h=4" 193.04 193.04 100.00%
01.04.01.02.06 CONCRETO ARMADO
01.04.01.02.07 CONCRETO F'C=210 KG/CM2 P/MUROS REFORZADO 907.56 907.56 100.00%
01.04.01.02.08 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 156.11 156.11 100.00%
01.04.01.02.09 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 359.28 359.28 100.00%
01.04.01.02.10 REVOQUES ENLUCIDOS Y MOLDURAS
01.04.01.02.11 TARRAJEO EN INTERIORES C/IMPERMEAB. E=1.5CM MEZCLA 1:2 354.31 354.31 100.00%
01.04.01.02.12 TARRAJEO EN EXTERIORES E=1.5 CM MEZCLA 1..5 218.61 218.61 100.00%
01.04.01.02.13 VESTIDURA EN DERRAMES 48.31 48.31 100.00%
01.04.01.02.14 PINTURA
01.04.01.02.15 PINTURA EN EXTERIORES LATEX. 104.09 104.09 100.00%
01.04.01.02.16 CARPINTERIA METALICA
01.04.01.02.17 COMPUERTA METALICA DE 0.55x0.15 m 364.66 364.66 100.00%
01.04.01.02.18 VERTEDERO TIPO SUTRO 344.03 344.03 100.00%
01.04.01.03 TANQUE IMHOFF (01 UND) 162,698.52 453.75 0.28% 51933.35 31.92% 20321.41 12.49% 83095.75 51.07% 6894.26 4.24%
01.04.01.03.01 TRABAJOS PRELIMINARES 117.04
01.04.01.03.02 TRAZO Y REPLANTEO 117.04 117.04 100.00%
01.04.01.03.03 MOVIMIENTO DE TIERRAS 336.71
01.04.01.03.04 EXCAVACION C/EQUIPO P/ESTRUCTURAS EN T. CONGLOMERADO 878.38 336.71 38.33% 541.67 61.67%
01.04.01.03.05 RELLENO COMPACTADO MANUAL MATERIAL PROPIO 16,020.34 16020.34 100.00%
01.04.01.03.06 ELIMINACION MATERIAL EXCEDENTE MANUAL. 6,462.41 1781.31 27.56% 4681.1 72.44%
01.04.01.03.07 CONCRETO SIMPLE
01.04.01.03.08 SOLADOS CONCRETO f'c=100 kg/cm2 h=4" 2,925.62 2925.62 100.00%
01.04.01.03.09 CONCRETO ARMADO
01.04.01.03.10 CONCRETO F'C=210 KG/CM2 P/MUROS REFORZADO 41,267.54 41267.54 100.00%
01.04.01.03.11 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 52,697.25 48466.06 91.97% 4231.19 8.03%
01.04.01.03.12 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 16,803.19 16090.22 95.76% 712.97 4.24%
01.04.01.03.13 REVOQUES ENLUCIDOS Y MOLDURAS
01.04.01.03.14 TARRAJEO EN INTERIORES C/IMPERMEAB. E=1.5CM MEZCLA 1:2 7,777.65 7777.65 100.00%
01.04.01.03.15 TARRAJEO EN EXTERIORES E=1.5 CM MEZCLA 1..5 5,631.99 5631.99 100.00%
01.04.01.03.16 VESTIDURA EN DERRAMES 251.52 218.15 86.73% 33.37 13.27%
01.04.01.03.17 PINTURA
01.04.01.03.18 PINTURA EN EXTERIORES LATEX. 2,179.79 2179.79 100.00%
01.04.01.03.19 CARPINTERIA METALICA
01.04.01.03.20 ESCALERA DE GATO F°G° 3/4" 201.27 201.27 100.00%
01.04.01.03.21 BARANDA DE TUBO FIERRO NEGRO DE 2" 1,220.17 1220.17 100.00%
01.04.01.03.22 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
01.04.01.03.23 SUM. E INST. TUBERIA PVC SAP C-7.5 8" 290.55 290.55 100.00%
01.04.01.03.24 SUMINISTRO E INSTALACION DE ACCESORIOS TANQUE IMHOFF 578.15 578.15 100.00%
01.04.01.03.25 VARIOS
01.04.01.03.26 ABRAZADERA PARA TUBERIA 416.46 416.46 100.00%
01.04.01.03.27 WATER STOP DE PVC DE 6" PROVISION Y COLOCADO DE JUNTA 1,742.98 1742.98 100.00%
01.04.01.03.28 CAJA DE INGRESO - TANQUE IMHOF 587.85 587.85 100.00%
01.04.01.03.28.0 TRABAJOS PRELIMINARES
01.04.01.03.28.0 TRAZO Y REPLANTEO 1.85 1.85 100.00%
01.04.01.03.28.0 CONCRETO ARMADO
01.04.01.03.28.0 CONCRETO F'C=210 KG/CM2 P/MUROS REFORZADO 124.95 124.95 100.00%
01.04.01.03.28.0 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 200.67 200.67 100.00%
01.04.01.03.28.0 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 109.91 109.91 100.00%
01.04.01.03.28.0 REVOQUES ENLUCIDOS Y MOLDURAS
01.04.01.03.28.0 TARRAJEO EN INTERIORES C/IMPERMEAB. E=1.5CM MEZCLA 1:2 48.81 48.81 100.00%
01.04.01.03.28.0 TARRAJEO EN EXTERIORES E=1.5 CM MEZCLA 1..5 65.70 65.7 100.00%
01.04.01.03.28.1 VESTIDURA EN DERRAMES 10.53 10.53 100.00%
01.04.01.03.28.1 PINTURA
01.04.01.03.28.1 PINTURA EN EXTERIORES LATEX. 25.43 25.43 100.00%
01.04.01.03.29 CAJA DE SALIDA - TANQUE IMHOF 1,252.39 1252.39 100.00%
01.04.01.03.29.0 TRABAJOS PRELIMINARES
01.04.01.03.29.0 TRAZO Y REPLANTEO 1.85 1.85 100.00%
01.04.01.03.29.0 CONCRETO ARMADO
01.04.01.03.29.0 CONCRETO F'C=210 KG/CM2 P/MUROS REFORZADO 282.79 282.79 100.00%
01.04.01.03.29.0 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 368.39 368.39 100.00%
01.04.01.03.29.0 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 263.40 263.4 100.00%
01.04.01.03.29.0 REVOQUES ENLUCIDOS Y MOLDURAS
01.04.01.03.29.0 TARRAJEO EN INTERIORES C/IMPERMEAB. E=1.5CM MEZCLA 1:2 134.66 134.66 100.00%
01.04.01.03.29.0 TARRAJEO EN EXTERIORES E=1.5 CM MEZCLA 1..5 137.54 137.54 100.00%
01.04.01.03.29.1 VESTIDURA EN DERRAMES 10.53 10.53 100.00%
01.04.01.03.29.1 PINTURA
01.04.01.03.29.1 PINTURA EN EXTERIORES LATEX. 53.23 53.23 100.00%
01.04.01.03.30 CAJA DE VALVULAS - TANQUE IMHOF 3,395.98 3395.98 100.00%
01.04.01.03.30.0 TRABAJOS PRELIMINARES
01.04.01.03.30.0 TRAZO Y REPLANTEO 5.11 5.11 100.00%
01.04.01.03.30.0 CONCRETO ARMADO
01.04.01.03.30.0 CONCRETO F'C=210 KG/CM2 P/MUROS REFORZADO 802.33 802.33 100.00%
01.04.01.03.30.0 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 493.18 493.18 100.00%
01.04.01.03.30.0 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 531.65 531.65 100.00%
01.04.01.03.30.0 REVOQUES ENLUCIDOS Y MOLDURAS
01.04.01.03.30.0 TARRAJEO EN INTERIORES C/IMPERMEAB. E=1.5CM MEZCLA 1:2 206.19 206.19 100.00%
01.04.01.03.30.0 TARRAJEO EN EXTERIORES E=1.5 CM MEZCLA 1..5 283.54 283.54 100.00%
01.04.01.03.30.1 VESTIDURA EN DERRAMES 18.84 18.84 100.00%
01.04.01.03.30.1 PINTURA
01.04.01.03.30.1 PINTURA EN EXTERIORES LATEX. 109.74 109.74 100.00%
01.04.01.03.30.1 CARPINTERIA METALICA
01.04.01.03.30.1 TAPA METALICA 1.2X1.2 M SEGUN DISEÑO 153.12 153.12 100.00%
01.04.01.03.30.1 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
01.04.01.03.30.1 SUMINISTRO E INSTALACION DE TUBERIA PVC UF ISO 4435 200MM S 82.24 82.24 100.00%
01.04.01.03.30.1 SUMINISTRO E INSTALACION DE ACCESORIOS DE CAJA DE VALVULA 710.04 710.04 100.00%
01.04.01.04 FILTRO BIOLOGICO (01UNID) 86,532.26 56600.14 65.41% 29932.12 34.59%
01.04.01.04.01 TRABAJOS PRELIMINARES
01.04.01.04.02 TRAZO Y REPLANTEO 105.28 105.28 100.00%
01.04.01.04.03 MOVIMIENTO DE TIERRAS
01.04.01.04.04 EXCAVACION C/EQUIPO P/ESTRUCTURAS EN T. CONGLOMERADO 171.67 171.67 100.00%
01.04.01.04.05 RELLENO COMPACTADO MANUAL MATERIAL PROPIO 274.01 274.01 100.00%
01.04.01.04.06 ELIMINACION MATERIAL EXCEDENTE MANUAL. 2,599.79 2599.79 100.00%
01.04.01.04.07 CONCRETO SIMPLE
01.04.01.04.08 SOLADOS CONCRETO f'c=100 kg/cm2 h=4" 2,098.49 2098.49 100.00%
01.04.01.04.09 CONCRETO ARMADO
01.04.01.04.10 CONCRETO F'C=210 KG/CM2 P/MUROS REFORZADO 25,141.96 21691.94 86.28% 3450.02 13.72%
01.04.01.04.11 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 19,570.89 19570.89 100.00%
01.04.01.04.12 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 9,528.09 9528.09 100.00%
01.04.01.04.13 REVOQUES ENLUCIDOS Y MOLDURAS
01.04.01.04.14 TARRAJEO EN INTERIORES C/IMPERMEAB. E=1.5CM MEZCLA 1:2 3,793.93 3793.93 100.00%
01.04.01.04.15 TARRAJEO EN EXTERIORES E=1.5 CM MEZCLA 1..5 3,815.49 3815.49 100.00%
01.04.01.04.16 VESTIDURA EN DERRAMES 191.68 191.68 100.00%
01.04.01.04.17 PINTURA
01.04.01.04.18 PINTURA EN EXTERIORES LATEX. 1,597.63 1597.63 100.00%
01.04.01.04.19 FILTROS
01.04.01.04.20 FILTRO DE PIEDRA 1" 3,612.28 3612.28 100.00%
01.04.01.04.21 FILTRO DE PIEDRA 2" 3,612.28 3612.28 100.00%
01.04.01.04.22 FILTRO DE PIEDRA 3" 4,913.44 4913.44 100.00%
01.04.01.04.23 CARPINTERIA METALICA
01.04.01.04.24 ESCALERA DE GATO 201.27 201.27 100.00%
01.04.01.04.25 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
01.04.01.04.26 SUMINISTRO E INSTALACION DE TUB. F°G°DE 4" CORTADA DE DISTRIB 1,344.55 1344.55 100.00%
01.04.01.04.27 SUM. E INST. TUBERIA PVC SAP C-7.5 6" 13.30 13.3 100.00%
01.04.01.04.28 VARIOS
01.04.01.04.29 WATER STOP DE PVC DE 6" PROVISION Y COLOCADO DE JUNTA 592.38 559.98 94.53% 32.4 5.47%
01.04.01.04.30 CAJA DE PASE - FILTRO BIOLOGICO 3,353.85 3353.85 100.00%
01.04.01.04.30.0 TRABAJOS PRELIMINARES
01.04.01.04.30.0 TRAZO Y REPLANTEO 5.44 5.44 100.00%
01.04.01.04.30.0 MOVIMIENTO DE TIERRAS
01.04.01.04.30.0 EXCAVACION C/EQUIPO P/ESTRUCTURAS EN T. CONGLOMERADO 23.02 23.02 100.00%
01.04.01.04.30.0 RELLENO COMPACTADO MANUAL MATERIAL PROPIO 36.84 36.84 100.00%
01.04.01.04.30.0 ELIMINACION MATERIAL EXCEDENTE MANUAL. 348.68 348.68 100.00%
01.04.01.04.30.0 CONCRETO SIMPLE
01.04.01.04.30.0 SOLADOS CONCRETO f'c=100 kg/cm2 h=4" 114.42 114.42 100.00%
01.04.01.04.30.0 CONCRETO ARMADO
01.04.01.04.30.1 CONCRETO F'C=210 KG/CM2 P/MUROS REFORZADO 1,630.97 1630.97 100.00%
01.04.01.04.30.1 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 315.81 315.81 100.00%
01.04.01.04.30.1 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 409.63 409.63 100.00%
01.04.01.04.30.1 REVOQUES ENLUCIDOS Y MOLDURAS
01.04.01.04.30.1 TARRAJEO EN INTERIORES C/IMPERMEAB. E=1.5CM MEZCLA 1:2 265.95 265.95 100.00%
01.04.01.04.30.1 TARRAJEO EN EXTERIORES E=1.5 CM MEZCLA 1..5 189.79 189.79 100.00%
01.04.01.04.30.1 TUBERIAS
01.04.01.04.30.1 SUM. E INST. TUBERIA PVC SAP C-7.5 6" 13.30 13.3 100.00%
01.04.01.05 LECHO DE SECADO (01 UND) 64,026.37 37194.91 58.09% 26831.46 41.91%
01.04.01.05.01 TRABAJOS PRELIMINARES
01.04.01.05.02 LIMPIEZA DEL TERRENO MANUAL 140.51 140.51 100.00%
01.04.01.05.03 TRAZO Y REPLANTEO 164.92 164.92 100.00%
01.04.01.05.04 MOVIMIENTO DE TIERRAS
01.04.01.05.05 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 6,326.65 6326.65 100.00%
01.04.01.05.06 RELLENO CON MATERIAL PROPIO 294.73 294.73 100.00%
01.04.01.05.07 ELIMINACION MATERIAL EXCEDENTE MANUAL. 7,770.07 2141.75 27.56% 5628.32 72.44%
01.04.01.05.08 CONCRETO SIMPLE
01.04.01.05.09 SOLADOS CONCRETO f'c=100 kg/cm2 h=4" 3,467.66 3467.66 100.00%
01.04.01.05.10 MUROS 22,927.49 22927.49 100.00%
01.04.01.05.10.0 CONCRETO ARMADO
01.04.01.05.10.0 CONCRETO F'C=210 KG/CM2 P/MUROS REFORZADO 10,502.67 10502.67 100.00%
01.04.01.05.10.0 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 7,362.02 7362.02 100.00%
01.04.01.05.10.0 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 5,062.80 5062.8 100.00%
01.04.01.05.11 COLUMNETAS 2,435.28 1731.2 71.09% 704.08 28.91%
01.04.01.05.11.0 CONCRETO ARMADO
01.04.01.05.11.0 CONCRETO F'C=210 KG/CM2 P/MUROS REFORZADO 644.50 644.5 100.00%
01.04.01.05.11.0 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 919.22 919.22 100.00%
01.04.01.05.11.0 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 871.56 811.98 93.16% 59.58 6.84%
01.04.01.05.12 VIGAS 1,711.25 1711.25 100.00%
01.04.01.05.12.0 CONCRETO ARMADO
01.04.01.05.12.0 CONCRETO F'C=210 KG/CM2 P/MUROS REFORZADO 368.28 368.28 100.00%
01.04.01.05.12.0 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 1,016.13 1016.13 100.00%
01.04.01.05.12.0 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 326.84 326.84 100.00%
01.04.01.05.13 REVOQUES ENLUCIDOS Y MOLDURAS
01.04.01.05.14 TARRAJEO EN INTERIORES C/IMPERMEAB. E=1.5CM MEZCLA 1:2 1,897.81 1897.81 100.00%
01.04.01.05.15 TARRAJEO EN EXTERIORES E=1.5 CM MEZCLA 1..5 1,743.50 1743.5 100.00%
01.04.01.05.16 VESTIDURA EN DERRAMES 202.76 202.76 100.00%
01.04.01.05.17 PINTURA
01.04.01.05.18 PINTURA EN EXTERIORES LATEX. 756.44 756.44 100.00%
01.04.01.05.19 TUBERIAS
01.04.01.05.20 SUMINISTRO E INSTALACION DE TUBERIA PVC UF ISO 4435 160MM S-2 261.39 261.39 100.00%
01.04.01.05.21 SUMINISTRO E INSTALACION DE TUBERIA PVC UF ISO 4435 200MM S-2 240.83 240.83 100.00%
01.04.01.05.22 ACCESORIOS
01.04.01.05.23 SUMINISTRO E INSTALACION DE ACCESORIOS LECHO DE SECADO 615.52 615.52 100.00%
01.04.01.05.24 COBERTURAS
01.04.01.05.25 VIGA DE MADERA TORNILLO Y/O SIMILAR DE 2"X4" 39.86 39.86 100.00%
01.04.01.05.26 CORREA DE MADERA TORNILLO Y/O SIMILAR DE 2"X3" 228.55 228.55 100.00%
01.04.01.05.27 COBERTURA CON CALAMINA GALVANIZADDA N°32 4,012.06 4012.06 100.00%
01.04.01.05.28 CUMBRERA GALVANIZADA 332.51 332.51 100.00%
01.04.01.05.29 FILTROS
01.04.01.05.30 FILTRO DE GRAVA SELECCIONADA 1 " - 2" 1,867.68 1867.68 100.00%
01.04.01.05.31 FILTRO DE GRAVA FINA (1/2") 814.32 814.32 100.00%
01.04.01.05.32 FILTRO DE ARENA GRUESA 2,850.12 2850.12 100.00%
01.04.01.05.33 VARIOS
01.04.01.05.34 ABRAZADERA PARA TUBERIA 832.92 832.92 100.00%
01.04.01.05.35 CAJA DE PASE - LECHO DE SECADO 2,091.54 2091.54 100.00%
01.04.01.05.35.0 TRABAJOS PRELIMINARES
01.04.01.05.35.0 TRAZO Y REPLANTEO 2.46 2.46 100.00%
01.04.01.05.35.0 MOVIMIENTO DE TIERRAS
01.04.01.05.35.0 EXCAVACION C/EQUIPO P/ESTRUCTURAS EN T. CONGLOMERADO 28.88 28.88 100.00%
01.04.01.05.35.0 RELLENO COMPACTADO MANUAL MATERIAL PROPIO 17.27 17.27 100.00%
01.04.01.05.35.0 ELIMINACION MATERIAL EXCEDENTE MANUAL. 451.26 451.26 100.00%
01.04.01.05.35.0 CONCRETO SIMPLE
01.04.01.05.35.0 SOLADOS CONCRETO f'c=100 kg/cm2 h=4" 54.33 54.33 100.00%
01.04.01.05.35.0 CONCRETO ARMADO
01.04.01.05.35.1 CONCRETO F'C=210 KG/CM2 P/MUROS REFORZADO 263.06 263.06 100.00%
01.04.01.05.35.1 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 222.09 222.09 100.00%
01.04.01.05.35.1 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 203.36 203.36 100.00%
01.04.01.05.35.1 REVOQUES ENLUCIDOS Y MOLDURAS
01.04.01.05.35.1 TARRAJEO EN INTERIORES C/IMPERMEAB. E=1.5CM MEZCLA 1:2 60.60 60.6 100.00%
01.04.01.05.35.1 TARRAJEO EN EXTERIORES E=1.5 CM MEZCLA 1..5 726.14 726.14 100.00%
01.04.01.05.35.1 VESTIDURA EN DERRAMES 16.62 16.62 100.00%
01.04.01.05.35.1 PINTURA
01.04.01.05.35.1 PINTURA EN EXTERIORES LATEX. 30.78 30.78 100.00%
01.04.01.05.35.1 SUMINISTRO E INSTALACION DE ACCESORIOS PARA BUZONETA
01.04.01.05.35.2 SUMINISTRO E INSTALACION DE TUBERIA PVC UF ISO 4435 160MM S 14.69 14.69 100.00%
01.04.01.06 CAMARA DE CONTACTO DE CLORO (01 UND) 6,587.16 6587.16 100.00%
01.04.01.06.01 TRABAJOS PRELIMINARES
01.04.01.06.02 TRAZO Y REPLANTEO 10.21 10.21 100.00%
01.04.01.06.03 MOVIMIENTO DE TIERRAS
01.04.01.06.04 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 57.32 57.32 100.00%
01.04.01.06.05 ELIMINACION MATERIAL EXCEDENTE MANUAL. 71.98 71.98 100.00%
01.04.01.06.06 CONCRETO SIMPLE
01.04.01.06.07 SOLADOS CONCRETO f'c=100 kg/cm2 h=4" 214.77 214.77 100.00%
01.04.01.06.08 CONCRETO ARMADO
01.04.01.06.09 CONCRETO F'C=210 KG/CM2 P/MUROS REFORZADO 1,282.42 1282.42 100.00%
01.04.01.06.10 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 406.87 406.87 100.00%
01.04.01.06.11 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 996.48 996.48 100.00%
01.04.01.06.12 REVOQUES ENLUCIDOS Y MOLDURAS
01.04.01.06.13 TARRAJEO EN INTERIORES C/IMPERMEAB. E=1.5CM MEZCLA 1:2 613.11 613.11 100.00%
01.04.01.06.14 TARRAJEO EN EXTERIORES E=1.5 CM MEZCLA 1..5 341.17 341.17 100.00%
01.04.01.06.15 VESTIDURA EN DERRAMES 37.67 37.67 100.00%
01.04.01.06.16 PINTURA
01.04.01.06.17 PINTURA EN EXTERIORES LATEX. 147.21 147.21 100.00%
01.04.01.06.18 SUMINISTRO E INSTALACION DE TUBERIA
01.04.01.06.19 SUMINISTRO E INSTALACION DE TUBERIA PVC UF ISO 4435 160MM S-2 14.69 14.69 100.00%
01.04.01.06.20 BUZONETA DE CLORAZION Y TANQUE CONTENEDOR (01UND) 2,393.26 2393.26 100.00%
01.04.01.06.20.0 TRABAJOS PRELIMINARES
01.04.01.06.20.0 TRAZO Y REPLANTEO 4.38 4.38 100.00%
01.04.01.06.20.0 MOVIMIENTO DE TIERRAS
01.04.01.06.20.0 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 12.50 12.5 100.00%
01.04.01.06.20.0 ELIMINACION MATERIAL EXCEDENTE MANUAL. 15.52 15.52 100.00%
01.04.01.06.20.0 CONCRETO SIMPLE
01.04.01.06.20.0 SOLADOS CONCRETO f'c=100 kg/cm2 h=4" 92.04 92.04 100.00%
01.04.01.06.20.0 CONCRETO ARMADO
01.04.01.06.20.0 CONCRETO F'C=210 KG/CM2 P/MUROS REFORZADO 138.11 138.11 100.00%
01.04.01.06.20.1 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 124.56 124.56 100.00%
01.04.01.06.20.1 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 182.54 182.54 100.00%
01.04.01.06.20.1 REVOQUES ENLUCIDOS Y MOLDURAS
01.04.01.06.20.1 TARRAJEO EN INTERIORES C/IMPERMEAB. E=1.5CM MEZCLA 1:2 76.16 76.16 100.00%
01.04.01.06.20.1 TARRAJEO EN EXTERIORES E=1.5 CM MEZCLA 1..5 89.13 89.13 100.00%
01.04.01.06.20.1 PINTURA
01.04.01.06.20.1 PINTURA EN EXTERIORES LATEX. 29.15 29.15 100.00%
01.04.01.06.20.1 SUMINISTRO E INSTALACION DE TUBERIAS
01.04.01.06.20.1 SUMINISTRO E INSTALACION DE TUBERIA PVC UF ISO 4435 200MM S 14.69 14.69 100.00%
01.04.01.06.20.1 SUM. E INST. TUBERIA PVC SAP C-10 1" 24.36 24.36 100.00%
01.04.01.06.20.2 SUM. E INST. TUBERIA PVC SAP C-10 1/2" 30.10 30.1 100.00%
01.04.01.06.20.2 SUMINISTRO E INSTALACION DE ACCESORIOS PARA BUZONETA
01.04.01.06.20.2 SUMINISTRO E INSTALACION DE VALVULA DE CONTROL DE PVC 1/2" 17.07 17.07 100.00%
01.04.01.06.20.2 SUMINISTRO E INSTALACION DE VALVULA DE CONTROL PVC DE 1" 41.20 41.2 100.00%
01.04.01.06.20.2 VARIOS
01.04.01.06.20.2 TANQUE CONTENEDOR 1100 LTRS 1,501.75 1501.75 100.00%
01.04.01.07 REDES EN LA PLANTA 27,223.33 27223.33 100.00%
01.04.01.07.01 TRABAJOS PRELIMINARES
01.04.01.07.02 TRAZO NIVELACION Y REPLANTEO 62.32 62.32 100.00%
01.04.01.07.03 MOVIMIENTO DE TIERRAS
01.04.01.07.04 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 743.91 743.91 100.00%
01.04.01.07.05 NIVELACION INTERIOR Y APISONADO FINAL DEL TERRENO PREVIO AL P 84.98 84.98 100.00%
01.04.01.07.06 CAMA DE APOYO PARA TUBERIA 45.21 45.21 100.00%
01.04.01.07.07 RELLENO Y COMPACTADO ZANJA CON MATERIAL SELECCIONADO EN C 17.57 17.57 100.00%
01.04.01.07.08 RELLENO COMPACTADO MANUAL MATERIAL PROPIO 155.43 155.43 100.00%
01.04.01.07.09 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50.00M). 321.26 321.26 100.00%
01.04.01.07.10 CONCRETO SIMPLE
01.04.01.07.11 SOLADOS CONCRETO f'c=100 kg/cm2 h=4" 767.04 767.04 100.00%
01.04.01.07.12 CONCRETO ARMADO 14,784.52 14784.52 100.00%
01.04.01.07.12.0 ZAPATAS
01.04.01.07.12.0 CONCRETO F'C=210 KG/CM2 P/ PISO 7,102.62 7102.62 100.00%
01.04.01.07.12.0 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 1,401.73 1401.73 100.00%
01.04.01.07.12.0 COLUMNAS
01.04.01.07.12.0 CONCRETO F'C=210 KG/CM2 P/MUROS REFORZADO 1,637.55 1637.55 100.00%
01.04.01.07.12.0 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 2,711.15 2711.15 100.00%
01.04.01.07.12.0 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 1,931.47 1931.47 100.00%
01.04.01.07.13 CAJA DE INGRESO
01.04.01.07.14 CONCRETO F'C=210 KG/CM2 P/MUROS REFORZADO 263.06 263.06 100.00%
01.04.01.07.15 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 222.09 222.09 100.00%
01.04.01.07.16 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 203.36 203.36 100.00%
01.04.01.07.17 CAJA DE PASE LLEGADA C.C.C
01.04.01.07.18 CONCRETO F'C=210 KG/CM2 P/MUROS REFORZADO 263.06 263.06 100.00%
01.04.01.07.19 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 222.09 222.09 100.00%
01.04.01.07.20 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 203.36 203.36 100.00%
01.04.01.07.21 REVOQUES ENLUCIDOS Y MOLDURAS
01.04.01.07.22 TARRAJEO EN INTERIORES C/IMPERMEAB. E=1.5CM MEZCLA 1:2 121.19 121.19 100.00%
01.04.01.07.23 TARRAJEO EN EXTERIORES E=1.5 CM MEZCLA 1..5 1,452.28 1452.28 100.00%
01.04.01.07.24 VESTIDURA EN DERRAMES 33.24 33.24 100.00%
01.04.01.07.25 PINTURA
01.04.01.07.26 PINTURA EN EXTERIORES LATEX. 1,155.25 1155.25 100.00%
01.04.01.07.27 SUMINISTRO E INSTALACION DE ACCESORIOS Y TUBERIAS
01.04.01.07.28 TUBERIAS
01.04.01.07.29 SUMINISTRO E INSTALACION DE TUBERIA PVC UF ISO 4435 160MM S-2 769.49 769.49 100.00%
01.04.01.07.30 SUM. E INST. TUBERIA HD 160MM 4,106.95 4106.95 100.00%
01.04.01.07.31 SUM. E INST. TUBERIA PVC SAP C-7.5 8" 38.74 38.74 100.00%
01.04.01.07.32 ACCESORIOS
01.04.01.07.33 SUMINISTRO E INSTALACION DE ACCESORIOS REDES EN PLANTA 215.19 215.19 100.00%
01.04.01.07.34 VARIOS
01.04.01.07.35 ABRAZADERA PARA TUBERIA 971.74 971.74 100.00%
01.04.01.08 CERCO DE SEGURIDAD 25,789.75 25789.75 100.00%
01.04.01.08.01 TRAZO Y REPLANTEO 228.00 228 100.00%
01.04.01.08.02 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 322.39 322.39 100.00%
01.04.01.08.03 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50.00M) 402.99 402.99 100.00%
01.04.01.08.04 CONCRETO CICLOPIO C:H = 1:8+30% PM 7,338.60 7338.6 100.00%
01.04.01.08.05 POSTE DE TUBO DE FIERRO NEGRO Ø 3" 9,034.40 9034.4 100.00%
01.04.01.08.06 CERCO DE TUBO DE FIERRO NEGRO Y MALLA OLIMPICA 4,453.75 4453.75 100.00%
01.04.01.08.07 PUERTA C/MALLA CRIPADA Y MARCO FIERRO Ø 1 1/2" (1.00x2.10M) 129.43 129.43 100.00%
01.04.01.08.08 PINTURA C/ ESMALTE ANTICORROSIVA 3,880.19 3880.19 100.00%
01.04.01.09 MEJORAMIENTO SUELO - PTAR 19,827.48 19827.48 100.00%
01.04.01.09.01 TRABAJOS PRELIMINARES 387.87
01.04.01.09.02 TRAZO Y REPLANTEO 387.87 387.87 100.00%
01.04.01.09.03 MOVIMIENTO DE TIERRAS 7560.98
01.04.01.09.04 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 5,499.13 5499.13 100.00%
01.04.01.09.05 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50.00M). 2,061.85 2061.85 100.00%
01.04.01.09.06 VARIOS 11878.63
01.04.01.09.07 SUMINISTRO E INSTALACION DE PIEDR OVER DE 8" A 10" 11,878.63 11878.63 100.00%
01.04.01.10 MURO SECO - PTAR 25,738.54 25738.54 100.00%
01.04.01.10.01 TRABAJOS PRELIMINARES
01.04.01.10.02 LIMPIEZA DEL TERRENO MANUAL 46.67 46.67 100.00%
01.04.01.10.03 TRAZO Y REPLANTEO 105.46 105.46 100.00%
01.04.01.10.04 MOVIMIENTO DE TIERRAS
01.04.01.10.05 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 771.06 771.06 100.00%
01.04.01.10.06 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50.00M) 962.85 962.85 100.00%
01.04.01.10.07 MANPOSTERIA
01.04.01.10.08 MURO CON MAMPOSTERIA DE PIEDRA 20,610.78 20610.78 100.00%
01.04.01.10.09 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 3,241.72 3241.72 100.00%
01.04.01.11 PASE AEREO L=4mtrs 3,463.91 3463.91 100.00%
01.04.01.11.01 OBRAS PRELIMINARES
01.04.01.11.02 TRAZO Y REPLANTEO 8.76 8.76 100.00%
01.04.01.11.03 MOVIMIENTO DE TIERRAS
01.04.01.11.04 EXCAVACION MANUAL EN TERRENO CONGLOMERADO 138.78 138.78 100.00%
01.04.01.11.05 RELLENO CON MATERIAL PROPIO 118.58 118.58 100.00%
01.04.01.11.06 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50.00M) 118.09 118.09 100.00%
01.04.01.11.07 CONCRETO SIMPLE
01.04.01.11.08 SOLADOS CONCRETO f'c=100 kg/cm2 h=4" 184.09 184.09 100.00%
01.04.01.11.09 OBRAS DE CONCRETO ARMADO 2,895.61 2895.61 100.00%
01.04.01.11.09.0 ZAPATAS
01.04.01.11.09.0 CONCRETO f'c=175 KG/CM2 PARA ZAPATAS 929.58 929.58 100.00%
01.04.01.11.09.0 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (MUROS) 97.50 97.5 100.00%
01.04.01.11.09.0 COLUMNAS
01.04.01.11.09.0 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 190.72 190.72 100.00%
01.04.01.11.09.0 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 (MUROS) 159.27 159.27 100.00%
01.04.01.11.09.0 ENCOFRADO Y DESENCOFRADO P/MURO REFORZADO 223.70 223.7 100.00%
01.04.01.11.09.0 TUBERIAS
01.04.01.11.09.0 SUM. E INST. TUBERIA HD 160MM 1,017.20 1017.2 100.00%
01.04.01.11.09.1 VARIOS
01.04.01.11.09.1 ABRAZADERA PARA TUBERIA 277.64 277.64 100.00%

COSTO DIRECTO 3,304,358.81 407,637.51 908,561.45 821,972.75 724,335.71 441,851.39


GASTOS GENERALES 8.00 % 264,348.70 32,611.00 72,684.92 65,757.82 57,946.86 35,348.11
UTILIDAD 7.00 % 231,305.12 28534.6257 63599.3015 57538.0925 50703.4997 30929.5973
SUB TOTAL 3,800,012.63 468,783.14 1,044,845.67 945,268.66 832,986.07 508,129.10
IGV 18.00 % 684,002.27 84,380.96 188,072.22 170,148.36 149,937.49 91,463.24
TOTAL PRESUPUESTO BASE 4,484,014.91 553,164.10 1,232,917.89 1,115,417.02 982,923.56 599,592.34

AVANCE MENSUAL (%) 12.34% 27.50% 24.88% 21.92% 13.37%


AVANCE ACUMULADO (%) 12.34% 39.83% 64.71% 86.63% 100.00%