CALENDARIO VALORIZADO DE OBRA
PROYECTO: “CREACION DE UNA CANCHA DE FUTBOL EN LA UNIVERSIDAD NACIONAL DE PIURA, DISTRITO DE CASTILLA, PROVINCIA DE PIURA, DEPARTAMENTO DE PIURA”.
TOTAL COSTO DIRECTO 1,840,103.70 212444.859 392720.145 346202.217 321172.1025 257063.058 173547.3355 136953.983
GASTOS GENERALES 10% 184010.37 21244.4859 39272.0145 34620.2217 32117.21025 25706.3058 17354.73355 13695.3983
UTILIDAD 10% 184010.37 21244.4859 39272.0145 34620.2217 32117.21025 25706.3058 17354.73355 13695.3983
SUB TOTAL 2,208,124.44 254,933.83 471,264.17 415,442.66 385,406.52 308,475.67 208,256.80 164,344.78
EQUIPAMIENTO 5,528.14 5,528.14
TOTAL 2,213,652.58 254,933.83 471,264.17 415,442.66 385,406.52 308,475.67 208,256.80 169,872.92
IGV 18% 398457.46 45888.09 84827.55 74779.68 69373.17 55525.62 37486.22 30577.13
TOTAL VALOR REFERENCIAL 2,612,110.04 300,821.92 556,091.73 490,222.34 454,779.70 364,001.29 245,743.03 200,450.05
AVANCE FISICO PROGRAMADO % 100 11.55 21.34 18.81 17.45 13.97 9.43 7.44
5 15 15 20 15 15 15
11,097.89 0.00
41,429.08 0.00
242,581.67 0.00
0.00 -199,546.11
1,446.41 0.00
20,729.87 0.00
95,526.97 0.00
81,842.86 0.00
210,480.26 0.00
0.00 -288,106.40
18,106.93 0.00
8,684.85 0.00
67,535.84 0.00
36,791.90 0.00
49,292.08 0.00
54,176.18 0.00
13,332.89 0.00
40,185.73 0.00
106,291.80 0.00
62,372.30 0.00
2,075.35 0.00
0.00 -333,423.80
5,066.96 0.00
8,405.12 0.00
19,310.59 0.00
59,425.34 0.00
171,529.16 0.00
25,431.84 0.00
23,265.29 0.00
20,989.50 0.00
27,368.13 0.00
23,362.58 0.00
0.00 ###
0.00 -89,968.33
54,516.88 0.00
30,844.31 0.00
4,607.14 0.00
202,000.00 0.00
1,840,103.70
2,612,110.04
100.00
dd
CRONOGRAMA DE DESEMBOLSOS
2612110.04
RESUMEN DE VALOR REFERENCIAL
SON DOS MILLONES SEISCIENTOS DOCE MIL CIENTO DIEZ CON 04/100 NUEVOS SOLES
###
GASTOS GENERALES (10%) 167,122.92
UTILIDADES (10%) 167,122.92
================
SUB TOTAL 2,005,474.99
IGV (18%) 360,985.50
================
VALOR REFERNCIAL 2,366,460.49
0.01 2612110.05
0.00474576
91,486.34
GASTOS GENERALES (10%) 9,148.63
UTILIDADES (10%) 9,148.63
=================
SUB TOTAL 109,783.60
IGV (18%) 19,761.05
=================
VALOR REFERENCIAL 129,544.65
7 14 21 28 35 42 49 56
DESCRIPCION S1 S2 S3 S4 S5 S6 S7 S8
CONFORMACION DE PLATAFORMA
TRABAJOS PROVISIONALES X X
TRABAJOS PRELIMINARES X X X X X
MOVIMIENTO DE TIERRAS X X X
VEREDAS CON BLOQUETAS
TRABAJOS PRELIMINARES 1,433.50 X
MOVIMIENTO DE TIERRAS X X
PISOS Y PAVIMENTOS X
SARDINELES X
GRAS NATURAL
GRADERIAS
MOVIMIENTO DE TIERRAS
CONCRETO SIMPLE
ZAPATAS Y VIGAS DE CONEXCION
VIGAS
COLUMNAS
GRADERIAS
ALBAÑILERIA
TARRAJEO Y ENLUCIDOS
COBERTURAS
CANALES
PUENTES X X
CONTRUCCION DEL CERCO DE LA CANCHA DE FUTBOL
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
CONCRETO SIMPLE
CONCRETO ARMADO
CARPINTERIA METALICA
ALBAÑILERIA
TARRAJEO Y ENLUCIDOS
PINTURA
VARIOS
DRENAJE PLUVIAL
MEDIDAS DE MITIGACION X X X X X X X X
RIEGO POR ASPERSION
TANQUE CISTERNA
CASETA DE ELECTROBOMBA
INSTALACION ELECTRICA X X X X X X X X
63 70 77 84 91 98 105 112 119 126 133 140 147 154 161 168
S9 S10 S11 S12 S13 S14 S15 S16 S17 S18 S19 S20 S21 S22 S23 S24
X X X X
X X
X X X X X X X X X X X X
X X X X X X
X X X X X
X X X X X
X X X X X
X X X X X
X X X X X X
X x X X
X X
X X X x
X X
X X X X X
X X X
X X X X X X X
X X X X X X X X X X X X
X X X
X X X X X X X X
X
X X X X X X X X X X X X X X X X
X X X X X X X
X X X X
X X X
175 182 189 196 203 210
S25 S26 S27 S28 S29 S30
X X X X X X
X X
X X X X X X
X X
X X X X
X X X X X X