DESAGREGADO DE GASTOS GENERALES DE LA EJECUCION DE LA OBRA

DURACION DE LA OBRA 7 MESES


COSTO DIRECTO 1,840,103.70
ITEM DESCRIPCION INCIDENCIA UNIDAD CANTIDAD P.U PARCIAL TOTAL

1 GASTOS GENERALES FIJOS 9435.37


Impresiones, utiles de escritorio EST. 1.00 300.00 300.00
Gastos Notariales GLB 1.00 200.00 200.00
SENCICO, CONAFOVICER EST. 1.00 3000.00 3000.00
Pruebas de laboratorio GLB 1.00 3000.00 3000.00
Elementos de seguridad (obra y personal) GLB 1.00 2935.37 2935.37

2 GASTOS GENERALES VARIABLES

2.1 Remuneración de personal de obra


2.1.1 Personal técnico 132325.00
Gerente General 0.1 mes 7.00 6000.00 4200.00
Ing. Residente 1 mes 7.50 6000.00 45000.00
Ing. Asistente 1 mes 7.00 4000.00 28000.00
Ing. Redes Electricas y tableros 0.25 mes 7.00 4000.00 7000.00
Ing. Especialista en Medio Ambiente 0.25 7.00 4000.00 7000.00
Ing. Agrícola 0.25 7.00 4000.00 7000.00
Tecnico especialista en metal mecanica 0.25 7.00 2500.00 4375.00
Topografo 0.5 mes 7.00 2500.00 8750.00
Maestro de obra 1 mes 7.00 3000.00 21000.00
2.1.2 Personal Administrativo 12250.00
Guardianes 1 mes 7.00 1750.00 12250.00

2.2 Cargas financieras, fianzas, seguros 30000.00


Carta Fianza Fiel cumplimiento und 1.00 8800.00 8800.00
Carta Fianza Adelanto Directo und 1.00 8800.00 8800.00
Carta Fianza Adelanto de Materiales und 1.00 4000.00 4000.00
Seguro de accidente de personal de tecnico und 7.00 1200.00 8400.00

TOTAL GASTOS GENERALES VARIABLES 174575.00

RESUMEN DE GASTOS GENERALES

GASTOS GENERALES FIJOS 5.13 9435.37


GASTOS GENERALES VARIABLES 94.87 174575.00
TOTAL GASTOS GENERALES 184010.37
168000 158564.63

265,000.00

5 13,250.00 1104.16667 8833.33333


portes y otros gastos relacionados

4416.66667
184010.37 0
CALENDARIO VALORIZADO DE OBRA

PROYECTO: “CREACION DE UNA CANCHA DE FUTBOL EN LA UNIVERSIDAD NACIONAL DE PIURA, DISTRITO DE CASTILLA, PROVINCIA DE PIURA, DEPARTAMENTO DE PIURA”.

Presupuesto MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7


ITEM DESCRIPCION
S/. S/. S/. S/.
1.00 CONFORMACION DE PLATAFORMA 295,108.64
01.01 TRABAJOS PROVISIONALES 11,097.89 11,097.89
01.02 TRABAJOS PRELIMINARES 41,429.08 29,000.36 12,428.72
01.03 MOVIMIENTO DE TIERRAS 242,581.67 121,290.84 121,290.84
2.00 02 VEREDAS CON BLOQUETAS 199,546.11
02.01 TRABAJOS PRELIMINARES 1,446.41 1,446.41
02.02 MOVIMIENTO DE TIERRAS 20,729.87 20,729.87
02.03 PISOS Y PAVIMENTOS 95,526.97 38,210.79 57,316.18
02.04 SARDINELES 81,842.86 40,921.43 40,921.43
3.00 03 GRAS NATURAL 210,480.26 31,572.04 52620.065 52620.065 52620.065 21048.026
4.00 04 GRADERIAS 288,106.40
04.01 MOVIMIENTO DE TIERRAS 18,106.93 12,674.85 5,432.08
04.02 CONCRETO SIMPLE 8,684.85 4,342.43 4,342.43
04.03 ZAPATAS Y VIGAS DE CONEXCION 67,535.84 47,275.09 20,260.75
04.04 VIGAS 36,791.90 7,358.38 18,395.95 11037.57
04.05 COLUMNAS 49,292.08 34504.456 14,787.62
04.06 GRADERIAS 54,176.18 27,088.09 27088.09
04.07 ALBAÑILERIA 13,332.89 6,666.45 6666.445
04.08 TARRAJEO Y ENLUCIDOS 40,185.73 16074.292 24111.438
5.00 05 COBERTURAS 106,291.80 21258.36 85033.44
6.00 06 CANALES 62,372.30 62,372.30
7.00 07 PUENTES 2,075.35 2,075.35
8.00 08 CONTRUCCION DEL CERCO DE LA CANCHA DE FUTBOL 333,423.80
08.01 TRABAJOS PRELIMINARES 5,066.96 5,066.96
08.02 MOVIMIENTO DE TIERRAS 8,405.12 2521.536 5883.584
08.03 CONCRETO SIMPLE 19,310.59 19,310.59
08.04 CONCRETO ARMADO 59,425.34 29712.67 29712.67
08.05 CARPINTERIA METALICA 171,529.16 51458.748 51458.748 68611.664
08.06 ALBAÑILERIA 25,431.84 25,431.84
08.07 TARRAJEO Y ENLUCIDOS 23,265.29 3489.7935 9306.116 10469.3805
08.08 PINTURA 20,989.50 4197.9 16791.6
9.00 09 VARIOS 27,368.13 27,368.13
11.00 11 MEDIDAS DE MITIGACION 23,362.58 2336.258 2336.258 2336.258 4672.516 4672.516 3504.387 3504.387
1,548,135.37
12.00 RIEGO POR ASPERSION 89,968.33
13.00 01.01 RED DE TUBERIAS 54,516.88 43613.504 10903.376
14.00 01.02 TANQUE CISTERNA 30,844.31 30,844.31
01.03 CASETA DE ELECTROBOMBA 4,607.14 4,607.14
15.00 INSTALACIONES ELECTRICAS 202000.00 48719.52 153280.48

TOTAL COSTO DIRECTO 1,840,103.70 212444.859 392720.145 346202.217 321172.1025 257063.058 173547.3355 136953.983
GASTOS GENERALES 10% 184010.37 21244.4859 39272.0145 34620.2217 32117.21025 25706.3058 17354.73355 13695.3983
UTILIDAD 10% 184010.37 21244.4859 39272.0145 34620.2217 32117.21025 25706.3058 17354.73355 13695.3983
SUB TOTAL 2,208,124.44 254,933.83 471,264.17 415,442.66 385,406.52 308,475.67 208,256.80 164,344.78
EQUIPAMIENTO 5,528.14 5,528.14
TOTAL 2,213,652.58 254,933.83 471,264.17 415,442.66 385,406.52 308,475.67 208,256.80 169,872.92
IGV 18% 398457.46 45888.09 84827.55 74779.68 69373.17 55525.62 37486.22 30577.13
TOTAL VALOR REFERENCIAL 2,612,110.04 300,821.92 556,091.73 490,222.34 454,779.70 364,001.29 245,743.03 200,450.05

AVANCE FISICO PROGRAMADO % 100 11.55 21.34 18.81 17.45 13.97 9.43 7.44

5 15 15 20 15 15 15
11,097.89 0.00
41,429.08 0.00
242,581.67 0.00
0.00 -199,546.11
1,446.41 0.00
20,729.87 0.00
95,526.97 0.00
81,842.86 0.00
210,480.26 0.00
0.00 -288,106.40
18,106.93 0.00
8,684.85 0.00
67,535.84 0.00
36,791.90 0.00
49,292.08 0.00
54,176.18 0.00
13,332.89 0.00
40,185.73 0.00
106,291.80 0.00
62,372.30 0.00
2,075.35 0.00
0.00 -333,423.80
5,066.96 0.00
8,405.12 0.00
19,310.59 0.00
59,425.34 0.00
171,529.16 0.00
25,431.84 0.00
23,265.29 0.00
20,989.50 0.00
27,368.13 0.00
23,362.58 0.00
0.00 ###
0.00 -89,968.33
54,516.88 0.00
30,844.31 0.00
4,607.14 0.00
202,000.00 0.00

1,840,103.70

2,612,110.04

100.00
dd
CRONOGRAMA DE DESEMBOLSOS

MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7


S/. S/. S/. S/. S/. S/. S/.
COSTO DIRECTO 212444.86 392720.15 346202.22 321172.10 257063.06 173547.34 136953.98
GASTOS GENERALES (10%) 21244.49 39272.01 34620.22 32117.21 25706.31 17354.73 13695.40
UTILIDAD (10%) 21244.49 39272.01 34620.22 32117.21 25706.31 17354.73 13695.40
SUB TOTAL 254933.83 471264.17 415442.66 385406.52 308475.67 208256.80 164344.78
EQUIPAMIENTO 5528.14
TOTAL 254933.83 471264.17 415442.66 385406.52 308475.67 208256.80 169872.92
IGV (18%) 45888.09 84827.55 74779.68 69373.17 55525.62 37486.22 30577.13
TOTAL DESEMBOLSO 300821.92 556091.73 490222.34 454779.70 364001.29 245743.03 200450.05
1840103.70

2612110.04
RESUMEN DE VALOR REFERENCIAL

ITEM DESCRIPCION CANTIDAD


1 OBRAS CIVILES 1,548,135.37
2 SISTEMA DE RIEGO 89,968.33
3 OBRAS ELECTRICAS 202000.00
4 TOTAL COSTO DIRECTO 1,840,103.70
5 GASTOS GENERALES 10% 184010.37
6 UTILIDAD 10% 184010.37
7 SUB TOTAL 2,208,124.44
EQUIPAMIENTO 5528.14
8 TOTAL SIN IGV 2,213,652.58
9 IGV 398457.46
10 TOTAL VALOR REFERENCIAL 2,612,110.04

SON DOS MILLONES SEISCIENTOS DOCE MIL CIENTO DIEZ CON 04/100 NUEVOS SOLES
###
GASTOS GENERALES (10%) 167,122.92
UTILIDADES (10%) 167,122.92
================
SUB TOTAL 2,005,474.99
IGV (18%) 360,985.50
================
VALOR REFERNCIAL 2,366,460.49
0.01 2612110.05
0.00474576

91,486.34
GASTOS GENERALES (10%) 9,148.63
UTILIDADES (10%) 9,148.63
=================
SUB TOTAL 109,783.60
IGV (18%) 19,761.05
=================
VALOR REFERENCIAL 129,544.65
7 14 21 28 35 42 49 56
DESCRIPCION S1 S2 S3 S4 S5 S6 S7 S8

CONFORMACION DE PLATAFORMA
TRABAJOS PROVISIONALES X X
TRABAJOS PRELIMINARES X X X X X
MOVIMIENTO DE TIERRAS X X X
VEREDAS CON BLOQUETAS
TRABAJOS PRELIMINARES 1,433.50 X
MOVIMIENTO DE TIERRAS X X
PISOS Y PAVIMENTOS X
SARDINELES X
GRAS NATURAL
GRADERIAS
MOVIMIENTO DE TIERRAS
CONCRETO SIMPLE
ZAPATAS Y VIGAS DE CONEXCION
VIGAS
COLUMNAS
GRADERIAS
ALBAÑILERIA
TARRAJEO Y ENLUCIDOS
COBERTURAS
CANALES
PUENTES X X
CONTRUCCION DEL CERCO DE LA CANCHA DE FUTBOL
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
CONCRETO SIMPLE
CONCRETO ARMADO
CARPINTERIA METALICA
ALBAÑILERIA
TARRAJEO Y ENLUCIDOS
PINTURA
VARIOS
DRENAJE PLUVIAL
MEDIDAS DE MITIGACION X X X X X X X X
RIEGO POR ASPERSION
TANQUE CISTERNA
CASETA DE ELECTROBOMBA
INSTALACION ELECTRICA X X X X X X X X
63 70 77 84 91 98 105 112 119 126 133 140 147 154 161 168
S9 S10 S11 S12 S13 S14 S15 S16 S17 S18 S19 S20 S21 S22 S23 S24

X X X X
X X
X X X X X X X X X X X X

X X X X X X
X X X X X
X X X X X
X X X X X
X X X X X
X X X X X X
X x X X
X X

X X X x

X X
X X X X X
X X X
X X X X X X X
X X X X X X X X X X X X
X X X
X X X X X X X X
X

X X X X X X X X X X X X X X X X
X X X X X X X
X X X X
X X X
175 182 189 196 203 210
S25 S26 S27 S28 S29 S30

X X X X X X

X X
X X X X X X

X X
X X X X

X X X X X X