PROYECTO: “MEJORAMIENTO Y AMPLIACION DEL SISTEMA BASICO INTEGRAL DEL C.P CHAMACA, DISTRITO D
CHUMBIVILCAS - CUSCO”
1 de 9
CALCULO FLETE
F
PROYECTO: “MEJORAMIENTO Y AMPLIACION DEL SISTEMA BASICO INTEGRAL DEL C.P CHAMACA, DISTRITO D
CHUMBIVILCAS - CUSCO”
Total
OTROS
Descripción Unid. Cantidad PU/(kg)
ADITIVO IMPERMEABILIZANTE kg 871.18810 1.00
CARTEL DE OBRA INC.TRANSP und 1.00000 15.00
EXTINTORES EQUIPO COMPLETO und 1.00000 20.00
PETROLEO gln 114.59300 0.85
PINTURA ANTICORROSIVA gln 11.66550 3.84
PINTURA ANTICORROSIVA EPOX-USO NAVAL gln 0.31200 3.84
PINTURA ESMALTE SINTETICO gln 12.45750 3.84
THINER gln 10.07750 3.84
YESO EN BOLSAS DE 28 KG. bls 451.63000 28.00
Total
2 de 9
CALCULO FLETE
F
PROYECTO: “MEJORAMIENTO Y AMPLIACION DEL SISTEMA BASICO INTEGRAL DEL C.P CHAMACA, DISTRITO D
CHUMBIVILCAS - CUSCO”
TUBERIAS
Descripción Unid. Cantidad CAP/VIAJE
TUBERIA PVC SAP CLASE 10, 1/2" m 6,334.50 3,400.00
TUBERIA PVC SAP CLASE 10, 1" m 2,595.53 3,360.00
TUBERIA PVC SAP CLASE 10, 1 1/2" m 1,386.06 1,690.00
TUBERIA PVC SAP CLASE 7.5, 1 1/2" m 1,615.09 1,690.00
TUBERIA PVC SAP CLASE 10, 2" m 292.99 994.00
TUBERIA PVC SAP CLASE 7.5, 2" m 2,517.11 994.00
TUBERIA PVC SAP CLASE 7.5, 3" m 2,488.74 470.00
TUBERIA PVC SAP D=4" C-7.5 PARA VERTEDERO DE PVC m 52.00 259.00
TUBERIA P.V.C. ALCANT. U.F. ISO 4435 S-25 TN DE 110 MM (4") m 6,273.00 259.00
TUBERIA P.V.C. ALCANT. U.F. ISO 4435 S-25 TN DE 160 MM (6") m 1,707.48 110.00
TUBERIA P.V.C. ALCANT. U.F. ISO 4435 S-25 TN DE 200 MM (8") m 8,189.89 65.00
TUBERIA P.V.C. ALCANT. U.F. ISO 4435 S-25 TN DE 250 MM (10") m 394.74 50.00
NUMERO TOTAL DE VIAJES
REDONDEO
TUBERIA EN VOLUMEN
A-POR PESO
UNIDAD DE TRANSPORTE
UNIDAD QUE DA COMPROBANTE UNIDAD QUE NO DA COMPROBANTE
CAPACIDAD DEL CAMION ( M3 ) 6.00 CAPACIDAD DEL CAMION ( M3 )
COSTO POR VIAJE S/. 1,700.00 COSTO POR VIAJE S/.
CAPACIDAD DEL CAMION (KG) 10,000.00 CAPACIDAD DEL CAMION (KG)
INCIDENCIA DE PERSONAL EN TRANSPORTE 0.02 COSTO X KG DE UNA CAUDRILLA DE
FLETE POR KG 0.190
3 de 9
CALCULO FLETE
F
PROYECTO: “MEJORAMIENTO Y AMPLIACION DEL SISTEMA BASICO INTEGRAL DEL C.P CHAMACA, DISTRITO D
CHUMBIVILCAS - CUSCO”
4 de 9
CALCULO FLETE
F
IACION DEL SISTEMA BASICO INTEGRAL DEL C.P CHAMACA, DISTRITO DE CHAMACA,
CHUMBIVILCAS - CUSCO”
TE DE MATERIALES CUSCO-CHAMACA
Pe*Cant.
934.36
455.41
186.59
4.90
13.52
3,092.83
12.50
3.75
141.37
54,124.67
15.00
4.56
6.46
5.00
1.50
516.00
16.00
18.00
10,250.00
284.39
10.61
16.15
5.05
26.30
641.54
0.60
1.00
494.60
2.00
0.45
0.15
0.25
18.00
1,587.72
9.23
15.13
1.39
0.78
25.41
12.00
2.20
60.00
20.55
67.60
1,805.69
31.67
2.10
2.60
8.40
3.60
0.60
0.70
5 de 9
CALCULO FLETE
F
IACION DEL SISTEMA BASICO INTEGRAL DEL C.P CHAMACA, DISTRITO DE CHAMACA,
CHUMBIVILCAS - CUSCO”
TE DE MATERIALES CUSCO-CHAMACA
230.40
2.10
2.60
6.65
2.00
3.00
31.50
30.00
24.00
451.00
1,640.00
77,384.10 kg.
Pe*Cant.
365,385.25
365,385.25 kg
Pe*Cant.
83.85
5,426.40
672.00
4,097.90
35.00
73.00
3,554.50
10.52
1,605.41
27.56
51.24
15,637.37 kg
Pe*Cant.
871.19
15.00
20.00
97.40
44.80
1.20
47.84
38.70
12,645.64
13,781.76 kg
6 de 9
CALCULO FLETE
F
IACION DEL SISTEMA BASICO INTEGRAL DEL C.P CHAMACA, DISTRITO DE CHAMACA,
CHUMBIVILCAS - CUSCO”
TE DE MATERIALES CUSCO-CHAMACA
Nº DE TUBOS Nº VIAJES
1,266.90 0.20
519.11 0.20
277.21 0.20
323.02 0.20
58.60 0.20
503.42 0.20
497.75 0.20
10.40 0.20
1,045.50 0.17
284.58 0.17
1,364.98 0.17
65.79 0.17
2.27
3.00
494.50
UNIDAD DE TRANSPORTE
UNIDAD QUE NO DA COMPROBANTE
CAPACIDAD DEL CAMION ( M3 )
COSTO POR VIAJE S/.
CAPACIDAD DEL CAMION (KG)
COSTO X KG DE UNA CAUDRILLA DE PERSONAL
7 de 9
CALCULO FLETE
F
IACION DEL SISTEMA BASICO INTEGRAL DEL C.P CHAMACA, DISTRITO DE CHAMACA,
CHUMBIVILCAS - CUSCO”
TE DE MATERIALES CUSCO-CHAMACA
UNIDAD DE TRANSPORTE
UNIDAD QUE NO DA COMPROBANTE
CAPACIDAD DEL CAMION ( M3 )
COSTO POR VIAJE S/.
CAPACIDAD DEL CAMION (KG)
COSTO X KG DE UNA CAUDRILLA DE PERSONAL
8 de 9
CALCULO FLETE
RESUMEN MATERIALES CLASIFICADO
CONSTRUCCION
Descripción UND TOTAL
DE CARRETERA