PROYECTO: “MEJORAMIENTO Y AMPLIACION DEL SISTEMA BASICO INTEGRAL DEL C.P CHAMACA, DISTRITO D
CHUMBIVILCAS - CUSCO”

CALCULO DEL PESO DE LOS MATERIALES A TRANSPORTARSE

TRASNPORTE DE MATERIALES CUSCO-CHAMACA

ACERO Y OTROS SIMILARES


Descripción Unid. Cantidad Pu (kg)
ALAMBRE NEGRO RECOCIDO # 8 kg 934.36000 1.00
CLAVOS PARA MADERA C/C 3" kg 455.41000 1.00
CLAVOS PARA MADERA C/C 4" kg 186.59000 1.00
CLAVOS PARA MADERA C/C 5" kg 4.90000 1.00
CLAVOS Fo No C/C 3/4" kg 13.51680 1.00
ALAMBRE NEGRO N°16 kg 3,092.83000 1.00
BARRA REDONDA LISA DE 3/8" kg 12.50000 1.00
CLAVOS PARA CALAMINA kg 3.75000 1.00
TUBO DE HIERRO FUNDIDO DN 200 MM m 6.12000 23.10
ACERO CORRUGADO FY=4200 KG/CM2 kg 54,124.67000 1.00
TAPA METALICA Y ACC. 0.60X0.60X1/8 und 1.00000 15.00
CABLE TW # 14 AWG 2.5 MM2 m 182.39700 0.03
CABLE TW # 2 AWG - 35 MM2. m 18.45000 0.35
REJILLA DE ACERO CORRUGADO D=1/2" und 1.00000 5.00
TABLERO ELECTRICO METAL - 3 CIRCUITOS und 1.00000 1.50
TAPA METALICA 0.40X0.40 M und 43.00000 12.00
TAPA METALICA 0.70X0.70 M und 1.00000 16.00
TAPA METALICA 0.70X0.90 M und 1.00000 18.00
TAPA METALICA DE 25 X 30 cm und 410.00000 25.00
ANGULO 1" X 1" X 3/16" m 227.51000 1.25
ANGULO 2" X 2" X 1/4" m 3.05000 3.48
ANGULO 1"x1"x1/8" x6m pza 1.13100 14.28
ANGULO 3/4"x3/4"x1/8"x 6m. pza 0.70700 7.14
ANGULO DE ACERO LIVIANO 2"x2"x1/4" x 6 m pza 1.84140 14.28
CALAMINA GALVANIZADA 11 CANALES Nº 27 pln 160.38400 4.00
CANASTILLA BRONCE 3" und 1.00000 0.60
CANASTILLA DE BRONCE DN 250 MM und 1.00020 1.00
CLAVOS CC P/COSTRUCCION D. PROMEDIO kg 494.60290 1.00
CODO DE BRONCE DN 200 M und 1.00020 2.00
CODO F° GALVANIZADO 2" pza 3.00000 0.15
CODO F° GALVANIZADO 2" X 45° pza 1.00000 0.15
CODO F° GALVANIZADO 3" pza 1.00000 0.25
COMPUERTAS FIERRO CON VOLANTE 0.2*1.15M und 6.00000 3.00
MALLA DE ALAMBRE GALV. # 10 2" X 2" m2 529.24000 3.00
MARCO Y TAPA FO. GO. P/MEDIDOR 1/2"-3/4" und 3.69000 2.50
PLANCHA ACERO 1.6mm x 1.22m x 2.40m pln 0.75640 20.00
PLATINA DE ACERO LIVIANO DE 1/8"x11/2" x 6 m pza 0.19800 7.00
PLATINA DE FIERRO 1/2" X 4" m 0.15600 5.00
PLATINA FE 2"x3/16"x6M. pza 3.17600 8.00
PUERTA METALICA DE 0.80M X 1.70 und 1.00000 12.00
PUERTA METALICA DE 0.80M X 2.00 und 1.00000 2.20
TUBERIA DE VENTILACION F.G. 4" CON REJAS und 4.00000 15.00
TUBERIA F°G° 2" m 5.00000 4.11
TUBERIA F°G° 3" m 10.00000 6.76
TUBO Fo.GALV. DE 2" m 439.34000 4.11
TUBO FO.GALV.ST.ISO-I 3/4" m 22.62000 1.40
UNION UNIVERSAL DE Fo. GALV. DE 1 1/2" und 14.00000 0.15
UNION UNIVERSAL DE Fo. GALV. DE 1" und 26.00000 0.10
UNION UNIVERSAL DE Fo. GALV. DE 2" und 42.00000 0.20
UNION UNIVERSAL DE Fo. GALV. DE 3" und 12.00000 0.30
VALVULA COMPUERTA DE BRONCE DE 2" und 2.00000 0.30
VALVULA COMPUERTA DE BRONCE DE 3" und 2.00000 0.35

1 de 9
CALCULO FLETE
F

PROYECTO: “MEJORAMIENTO Y AMPLIACION DEL SISTEMA BASICO INTEGRAL DEL C.P CHAMACA, DISTRITO D
CHUMBIVILCAS - CUSCO”

CALCULO DEL PESO DE LOS MATERIALES A TRANSPORTARSE

TRASNPORTE DE MATERIALES CUSCO-CHAMACA


VALVULA COMPUERTA DE BRONCE DN 200 MM und 16.00000 14.40
VALVULA ESFERICA DE 1 1/2" und 7.00000 0.30
VALVULA ESFERICA DE 1" und 13.00000 0.20
VALVULA ESFERICA DE 2" und 19.00000 0.35
VALVULA ESFERICA DE 3" und 4.00000 0.50
YEE DE BRONCE DN 200 M und 1.00000 3.00
BRIDA ROMPE AGUA FFD DN 160MMx0.25M pza 7.00000 4.50
BRIDA ROMPE AGUA FFD DN 200MMx0.25M pza 5.00000 6.00
BRIDA ROMPE AGUA FºGº 2" pza 8.00 3.00
ABRAZADERA DE F°F° PARA TUBO DE 2" pza 205.00 2.20
ABRAZADERA METALICA P/TUB. DN 160MM pza 820.00 2.00
Total
CEMENTO PORTLAND TIPO IP (42.5KG)
Descripción Unid. Cantidad PU/(kg)
CEMENTO PORTLAND TIPO I (42.5KG) BOL 8597.30 42.50
Total
MADERA
Descripción Unid. Cantidad PU/(kg)
MADERA EUCALIPTO p2 419.23500 0.20
MADERA EUCALIPTO 6"X2" p2 723.52000 7.50
MADERA EUCALIPTO ROLLIZO p2 48.00000 14.00
MADERA EUCALIPTO ROLLIZO D= 3" m 1,756.24200 2.33
MADERA EUCALIPTO ROLLIZO D= 3" x 2.3 mts und 5.00000 7.00
MADERA EUCALIPTO ROLLIZO D= 4" x 4mts und 10.00000 7.30
MADERA NACIONAL PARA ENCOFRADO p2 17,772.49000 0.20
MADERA INC.CORTE P/ENCOFRADO p2 42.08520 0.25
MADERA CORRIENTE p2 6,421.65000 0.25
MADERA CORRIENTE INCLUYE CORTE PARA NCOFRADO p2 137.79060 0.20
ESTACA DE MADERA p2 256.19480 0.20

Total

OTROS
Descripción Unid. Cantidad PU/(kg)
ADITIVO IMPERMEABILIZANTE kg 871.18810 1.00
CARTEL DE OBRA INC.TRANSP und 1.00000 15.00
EXTINTORES EQUIPO COMPLETO und 1.00000 20.00
PETROLEO gln 114.59300 0.85
PINTURA ANTICORROSIVA gln 11.66550 3.84
PINTURA ANTICORROSIVA EPOX-USO NAVAL gln 0.31200 3.84
PINTURA ESMALTE SINTETICO gln 12.45750 3.84
THINER gln 10.07750 3.84
YESO EN BOLSAS DE 28 KG. bls 451.63000 28.00

Total

2 de 9
CALCULO FLETE
F

PROYECTO: “MEJORAMIENTO Y AMPLIACION DEL SISTEMA BASICO INTEGRAL DEL C.P CHAMACA, DISTRITO D
CHUMBIVILCAS - CUSCO”

CALCULO DEL PESO DE LOS MATERIALES A TRANSPORTARSE

TRASNPORTE DE MATERIALES CUSCO-CHAMACA

TUBERIAS
Descripción Unid. Cantidad CAP/VIAJE
TUBERIA PVC SAP CLASE 10, 1/2" m 6,334.50 3,400.00
TUBERIA PVC SAP CLASE 10, 1" m 2,595.53 3,360.00
TUBERIA PVC SAP CLASE 10, 1 1/2" m 1,386.06 1,690.00
TUBERIA PVC SAP CLASE 7.5, 1 1/2" m 1,615.09 1,690.00
TUBERIA PVC SAP CLASE 10, 2" m 292.99 994.00
TUBERIA PVC SAP CLASE 7.5, 2" m 2,517.11 994.00
TUBERIA PVC SAP CLASE 7.5, 3" m 2,488.74 470.00
TUBERIA PVC SAP D=4" C-7.5 PARA VERTEDERO DE PVC m 52.00 259.00
TUBERIA P.V.C. ALCANT. U.F. ISO 4435 S-25 TN DE 110 MM (4") m 6,273.00 259.00
TUBERIA P.V.C. ALCANT. U.F. ISO 4435 S-25 TN DE 160 MM (6") m 1,707.48 110.00
TUBERIA P.V.C. ALCANT. U.F. ISO 4435 S-25 TN DE 200 MM (8") m 8,189.89 65.00
TUBERIA P.V.C. ALCANT. U.F. ISO 4435 S-25 TN DE 250 MM (10") m 394.74 50.00
NUMERO TOTAL DE VIAJES
REDONDEO
TUBERIA EN VOLUMEN

A-POR PESO

Descripción UND TOTAL


ACERO Y OTROS SIMILARES kg 77,384.10
CEMENTO PORTLAND TIPO IP (42.5KG) kg 365,385.25
MADERA kg 15,637.37
OTROS kg 13,781.76
TOTAL kg 472,188.49

UNIDAD DE TRANSPORTE
UNIDAD QUE DA COMPROBANTE UNIDAD QUE NO DA COMPROBANTE
CAPACIDAD DEL CAMION ( M3 ) 6.00 CAPACIDAD DEL CAMION ( M3 )
COSTO POR VIAJE S/. 1,700.00 COSTO POR VIAJE S/.
CAPACIDAD DEL CAMION (KG) 10,000.00 CAPACIDAD DEL CAMION (KG)
INCIDENCIA DE PERSONAL EN TRANSPORTE 0.02 COSTO X KG DE UNA CAUDRILLA DE
FLETE POR KG 0.190

DESCRIPCION SIN IGV


FLETE POR PESO 98,713.56 FLETE POR PESO =Peso Total * Flete
FLETE POR VOLUMEN 5,100.00 FLETE POR VOLUMEN=No viajes*costo
COSTO TOTAL FLETE TERR. AGUA S/. 103,813.56

3 de 9
CALCULO FLETE
F

PROYECTO: “MEJORAMIENTO Y AMPLIACION DEL SISTEMA BASICO INTEGRAL DEL C.P CHAMACA, DISTRITO D
CHUMBIVILCAS - CUSCO”

CALCULO DEL PESO DE LOS MATERIALES A TRANSPORTARSE

TRASNPORTE DE MATERIALES CUSCO-CHAMACA

FLETE ALAMACEN PUNTO DE OBRA (FLETE RURAL)


SISTEMA DE ALCANTARILLADO Y PLANTA DE TRATAMIENTO
UNIDAD DE TRANSPORTE
UNIDAD QUE DA COMPROBANTE UNIDAD QUE NO DA COMPROBANTE
CAPACIDAD DEL CAMION ( M3 ) 4.00 CAPACIDAD DEL CAMION ( M3 )
COSTO POR VIAJE S/. 1,700.00 COSTO POR VIAJE S/.
CAPACIDAD DEL CAMION (KG) 8,000.00 CAPACIDAD DEL CAMION (KG)
INCIDENCIA DE PERSONAL EN TRANSPORTE 0.02 COSTO X KG DE UNA CAUDRILLA DE
FLETE POR KG 0.233

DESCRIPCION SIN IGV


FLETE POR PESO 43,913.53 FLETE POR PESO =Peso Total * Flete
FLETE POR VOLUMEN 2,040.00 FLETE POR VOLUMEN=No viajes*costo

SISTEMA DE ALCANTARILLADO 71,779.03


PLANTA DE TRATAMIENTO 43,067.42

4 de 9
CALCULO FLETE
F

IACION DEL SISTEMA BASICO INTEGRAL DEL C.P CHAMACA, DISTRITO DE CHAMACA,
CHUMBIVILCAS - CUSCO”

O DE LOS MATERIALES A TRANSPORTARSE

TE DE MATERIALES CUSCO-CHAMACA

Pe*Cant.
934.36
455.41
186.59
4.90
13.52
3,092.83
12.50
3.75
141.37
54,124.67
15.00
4.56
6.46
5.00
1.50
516.00
16.00
18.00
10,250.00
284.39
10.61
16.15
5.05
26.30
641.54
0.60
1.00
494.60
2.00
0.45
0.15
0.25
18.00
1,587.72
9.23
15.13
1.39
0.78
25.41
12.00
2.20
60.00
20.55
67.60
1,805.69
31.67
2.10
2.60
8.40
3.60
0.60
0.70

5 de 9
CALCULO FLETE
F

IACION DEL SISTEMA BASICO INTEGRAL DEL C.P CHAMACA, DISTRITO DE CHAMACA,
CHUMBIVILCAS - CUSCO”

O DE LOS MATERIALES A TRANSPORTARSE

TE DE MATERIALES CUSCO-CHAMACA
230.40
2.10
2.60
6.65
2.00
3.00
31.50
30.00
24.00
451.00
1,640.00
77,384.10 kg.

Pe*Cant.
365,385.25
365,385.25 kg

Pe*Cant.
83.85
5,426.40
672.00
4,097.90
35.00
73.00
3,554.50
10.52
1,605.41
27.56
51.24

15,637.37 kg

Pe*Cant.
871.19
15.00
20.00
97.40
44.80
1.20
47.84
38.70
12,645.64

13,781.76 kg

6 de 9
CALCULO FLETE
F

IACION DEL SISTEMA BASICO INTEGRAL DEL C.P CHAMACA, DISTRITO DE CHAMACA,
CHUMBIVILCAS - CUSCO”

O DE LOS MATERIALES A TRANSPORTARSE

TE DE MATERIALES CUSCO-CHAMACA

Nº DE TUBOS Nº VIAJES
1,266.90 0.20
519.11 0.20
277.21 0.20
323.02 0.20
58.60 0.20
503.42 0.20
497.75 0.20
10.40 0.20
1,045.50 0.17
284.58 0.17
1,364.98 0.17
65.79 0.17
2.27
3.00
494.50

UNIDAD DE TRANSPORTE
UNIDAD QUE NO DA COMPROBANTE
CAPACIDAD DEL CAMION ( M3 )
COSTO POR VIAJE S/.
CAPACIDAD DEL CAMION (KG)
COSTO X KG DE UNA CAUDRILLA DE PERSONAL

FLETE POR PESO =Peso Total * Flete por peso


FLETE POR VOLUMEN=No viajes*costo por viaje

7 de 9
CALCULO FLETE
F

IACION DEL SISTEMA BASICO INTEGRAL DEL C.P CHAMACA, DISTRITO DE CHAMACA,
CHUMBIVILCAS - CUSCO”

O DE LOS MATERIALES A TRANSPORTARSE

TE DE MATERIALES CUSCO-CHAMACA

UNIDAD DE TRANSPORTE
UNIDAD QUE NO DA COMPROBANTE
CAPACIDAD DEL CAMION ( M3 )
COSTO POR VIAJE S/.
CAPACIDAD DEL CAMION (KG)
COSTO X KG DE UNA CAUDRILLA DE PERSONAL

FLETE POR PESO =Peso Total * Flete por peso


FLETE POR VOLUMEN=No viajes*costo por viaje

8 de 9
CALCULO FLETE
RESUMEN MATERIALES CLASIFICADO

CONSTRUCCION
Descripción UND TOTAL
DE CARRETERA

ACERO Y OTROS SIMILARES KG 77384.10 77384.10


CEMENTO PORTLAND TIPO IP (42.5KG) KG 365385.25 365385.25
MADERA KG 15637.37 15637.37
EXPLOSIVOS KG #REF! #REF!
OTROS MATERIALES KG 13781.76 13781.76
TOTAL #REF!