Está en la página 1de 26

TAJO 4527 - BLANCA 2

PERFORACION P
VOLADURA V
DESATE Y SOSTENIMIENTO S
LIMPIEZA L
PREPARACION PR

MECANIZADO
160 MT
UNIDAD DE PRODUCCION 40 MT
TAJO 4527 40 MT 26-Oct 27-Oct 28-Oct 29-Oct 30-Oct 31-Oct 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov 11-Nov 12-Nov 13-Nov 14-Nov 15-Nov 16-Nov 17-Nov 18-Nov 19-Nov 20-Nov 21-Nov 22-Nov 23-Nov 24-Nov
DIA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Operación Unitaria UND cant. N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D

1. Perforación (P.P.) gdia 23.0 52 30 82 26 96 112 100 51 52 26 18 48 46 50 10 20 17 70 45 40 22 18 95 1126

2. Voladura gdia 15.0 50 30 80 18 80 200 135 30 80 50 100 60 40 20 18 991

3. Desate Y Sostenimiento gdia 29.0 8 10 6 10 8 8 12 23 4 15 18 3 10 12 28 8 14 6 14 12 14 16 8 6 8 14 12 10 3 320

4. Limpieza con Scoop gdia 0.0 L L L L L L L L L L L L L L L L L L L L L L L 0

Producción TMS 23.0 34.86 23.82 22.38 23.96 44.56 20.35 45.63 42.42 18.13 63 62.03 77.19 19.02 16.02 20.74 21.45 43.39 18.56 42.37 47.66 81.83 21.57 23.17 834.1

5. Crucero al OP gdia 0.0 0

6. Cambio de Piso gdia 0.0 0

7. Levant. Topográfico gdia 0.0 0

8. Voladura de Descaje gdia 0.0 0

9. Prep. Barreras Relleno gdia 0.0 0

10. Relleno (m3) gdia 0.0 0

11. Muestreo gdia 0.0 0

12. Marcado de Ore gdia 0.0 0

13. Disparo y Vol. Camino gdia 0.0 0

14. Insta. Sobre Camino gdia 0.0 0

15. Crecimiento de OP gdia 0.0 0

16. Instalación Winche Izaje gdia 0.0 0


TJ 4765 - AMPARO
PERFORACION P
VOLADURA V
DESATE Y SOSTENIMIENTO S
LIMPIEZA L
PREPARACION PR

MECANIZADO
160 MT
UNIDAD DE PRODUCCION 40 MT
TAJO 4765 40 MT 26-Oct 27-Oct 28-Oct 29-Oct 30-Oct 31-Oct 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov 11-Nov 12-Nov 13-Nov 14-Nov 15-Nov 16-Nov 17-Nov 18-Nov 19-Nov 20-Nov 21-Nov 22-Nov 23-Nov 24-Nov
DIA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Operación Unitaria UND cant. N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D

1. Perforación (P.P.) gdia 40.0 35 45 14 50 30 80 30 70 45 82 27 36 35 60 62 62 48 52 25 45 15 36 63 25 82 46 42 130 45 100 35 50 35 70 50 25 60 44 42 72 2000

2. Voladura gdia 26.0 35 44 100 70 60 25 20 75 100 60 70 50 50 50 50 25 40 100 120 60 35 60 50 60 40 70 1519

3. Desate Y Sostenimiento gdia 35.0 10 10 8 10 14 15 14 12 8 12 10 24 6 12 12 14 10 12 10 12 12 6 4 28 15 16 4 18 24 8 10 17 26 10 8 441

4. Limpieza con Scoop gdia 0.0 L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L 0

Producción TMS 34.0 41.22 18.46 44.61 21.47 71.83 34.17 77.4 14.43 18.7 36.76 50.9 38.15 59.76 36.74 53.58 48.94 81.61 43.39 19.8 42.31 38.75 43.76 19.96 35.24 33.51 42.33 40.31 78.48 93.77 18.91 39.31 37.8 80.62 38.51 1495

5. Crucero al OP gdia 0.0 0

6. Cambio de Piso gdia 0.0 0

7. Levant. Topográfico gdia 0.0 0

8. Voladura de Descaje gdia 0.0 0

9. Prep. Barreras Relleno gdia 0.0 0

10. Relleno (m3) gdia 0.0 0

11. Muestreo gdia 0.0 0

12. Marcado de Ore gdia 0.0 0

13. Disparo y Vol. Camino gdia 0.0 0

14. Insta. Sobre Camino gdia 0.0 0

15. Crecimiento de OP gdia 0.0 0

16. Instalación Winche Izaje gdia 0.0 0


TJ 4164 - AMPARO
PERFORACION P
VOLADURA V
DESATE Y SOSTENIMIENTO S
LIMPIEZA L
PREPARACION PR

CONVENCIONAL
80 MT
UNIDAD DE PRODUCCION 40 MT
TAJO 4164 40 MT 26-Oct 27-Oct 28-Oct 29-Oct 30-Oct 31-Oct 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov
DIA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Operación Unitaria UND cant. N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D

1. Perforación (P.P.) gdia 16.0 43 53 50 7 36 20 34 50 48 65 65 32 4 50 72 60 689

2. Voladura gdia 6.0 15 120 38 20 20 115 328

3. Desate Y Sostenimiento gdia 9.0 10 10 12 12 4 10 12 15 12 97

4. Limpieza gdia 0.0 L L L L L L L L 0

Producción TMS 8.0 43 44 42 24 23 62 22 22 282

5. Prep. Barreras Relleno gdia 0.0 0

6. Relleno (m3) gdia 0.0 0

7. Disparo y Vol. Camino gdia 0.0 0

8. Insta. Sobre Camino gdia 0.0 0

0.0
9. Inst. Base Winche gdia 0

0.0
10. Crecimiento de OP gdia 0

0.0
11. Marcado de Ore gdia 0

0.0
12. Levant. Topográfico gdia 0

0.0
13. Muestreo gdia 0

0.0
14. Levantamiento Canales gdia 0

39
TAJO 4164 40 MT 10-Nov 11-Nov 12-Nov 13-Nov 14-Nov 15-Nov 16-Nov 17-Nov 18-Nov 19-Nov 20-Nov 21-Nov 22-Nov 23-Nov 24-Nov

DIA 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Operación Unitaria UND cant. N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D

1. Perforación (P.P.) gdia 9.0 40 35 30 71 40 24 30 22 25 317

2. Voladura gdia 9.0 20 60 55 25 100 50 50 32 20 412

3. Desate Y Sostenimiento gdia 8.0 14 8 18 20 12 8 6 8 94

4. Limpieza gdia 0.0 L L L L L L L L L L L L 0

Producción TMS 12.0 47 22 21 21 41 19 46 48 23 23 19 23 353.5

5. Prep. Barreras Relleno gdia 0.0 0

6. Relleno (m3) gdia 0.0 0

7. Disparo y Vol. Camino gdia 0.0 0

8. Insta. Sobre Camino gdia 0.0 0

0.0
9. Inst. Base Winche gdia 0

0.0
10. Crecimiento de OP gdia 0

0.0
11. Marcado de Ore gdia 0

0.0
12. Levant. Topográfico gdia 0

0.0
13. Muestreo gdia 0

0.0
14. Levantamiento Canales gdia 0

38
TJ 4364 - AMPARO
PERFORACION P
VOLADURA V
DESATE Y SOSTENIMIENTO S
LIMPIEZA L
PREPARACION PR

CONVENCIONAL
80 MT
UNIDAD DE PRODUCCION 40 MT
TAJO 4364 40 MT 26-Oct 27-Oct 28-Oct 29-Oct 30-Oct 31-Oct 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov 11-Nov 12-Nov 13-Nov 14-Nov 15-Nov 16-Nov 17-Nov 18-Nov 19-Nov 20-Nov 21-Nov 22-Nov 23-Nov 24-Nov
DIA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Operación Unitaria UND cant. N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D

1. Perforación (P.P.) gdia 18.0 16 33 45 33 58 43 25 15 28 25 30 45 25 61 35 25 50 49 641

2. Voladura gdia 7.0 15 100 70 48 24 8 135 400

3. Desate Y Sostenimiento gdia 11.0 2 6 2 8 8 7 10 10 4 4 1 62

4. Limpieza gdia 0.0 L L L L L L L L L L L L L L L L 0

Producción TMS 16.0 46 26 24 64.1 20.89 22.07 43.35 44.16 25.06 22.28 19.16 20.9 23.53 21.54 20.29 23.84 467.2

5. Prep. Barreras Relleno gdia 0.0 0

6. Relleno (m3) gdia 0.0 0

7. Disparo y Vol. Camino gdia 0.0 0

8. Insta. Sobre Camino gdia 0.0 0

9. Inst. Base Winche gdia 0.0 0

10. Crecimiento de OP gdia 0.0 0

11. Marcado de Ore gdia 0.0 0

12. Levant. Topográfico gdia 0.0 0

13. Muestreo gdia 0.0 0

14. Levantamiento Canales gdia 0.0 0

52
TJ 4764 - AMPARO
PERFORACION P
VOLADURA V
DESATE Y SOSTENIMIENTO S
LIMPIEZA L
PREPARACION PR

CONVENCIONAL
80 MT
UNIDAD DE PRODUCCION 40 MT
TAJO 4364 40 MT 26-Oct 27-Oct 28-Oct 29-Oct 30-Oct 31-Oct 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov 11-Nov 12-Nov 13-Nov 14-Nov 15-Nov 16-Nov 17-Nov 18-Nov 19-Nov 20-Nov 21-Nov 22-Nov 23-Nov 24-Nov
DIA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Operación Unitaria UND cant. N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D

1. Perforación (P.P.) gdia 19.0 35 60 64 46 44 32 40 26 28 32 43 16 30 22 51 52 56 68 32 777

2. Voladura gdia 12.0 200 64 50 40 26 20 70 30 10 100 80 40 730

3. Desate Y Sostenimiento gdia 18.0 12 18 8 33 10 3 8 10 8 4 8 8 13 3 8 12 14 10 190

4. Limpieza gdia 0.0 L L L L L L L L L L L L L L L 0

Producción TMS 15.0 70.61 60.59 23.8 22.38 49.71 40.97 26.18 22.47 22.39 38.01 16.63 22.49 44.15 52.87 74.66 587.9

5. Prep. Barreras Relleno gdia 0.0 0

6. Relleno (m3) gdia 0.0 0

7. Disparo y Vol. Camino gdia 0.0 0

8. Insta. Sobre Camino gdia 0.0 0

9. Inst. Base Winche gdia 0.0 0

10. Crecimiento de OP gdia 0.0 0

11. Marcado de Ore gdia 0.0 0

12. Levant. Topográfico gdia 0.0 0

13. Muestreo gdia 0.0 0

14. Levantamiento Canales gdia 0.0 0

64
TJ 4365 - AMPARO
PERFORACION P
VOLADURA V
DESATE Y SOSTENIMIENTO S
LIMPIEZA L
PREPARACION PR

CONVENCIONAL
80 MT
UNIDAD DE PRODUCCION 40 MT
TAJO 4365 40 MT 26-Oct 27-Oct 28-Oct 29-Oct 30-Oct 31-Oct
DIA 1 2 3 4 5 6
Operación Unitaria UND cant. N D N D N D N D N D N

1. Perforación (P.P.) gdia 18.0 40 41 50

2. Voladura gdia 14.0

3. Desate Y Sostenimiento gdia 14.0

4. Limpieza gdia 0.0

Producción TMS 15.0

5. Prep. Barreras Relleno gdia 0.0

6. Relleno (m3) gdia 0.0

7. Disparo y Vol. Camino gdia 0.0

8. Insta. Sobre Camino gdia 0.0

9. Inst. Base Winche gdia 0.0

10. Crecimiento de OP gdia 0.0

11. Marcado de Ore gdia 0.0

12. Levant. Topográfico gdia 0.0

13. Muestreo gdia 0.0

14. Levantamiento Canales gdia 0.0

61
31-Oct 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov

6 7 8 9 10 11 12 13 14 15 16
D N D N D N D N D N D N D N D N D N D N

43 35 30 28 30 20 10 20

8 100 30 35 20 20 14 60 60 5

12 6 6 5 10 4 14

L L L L L L L L

38 16 21 18 35 8.57 39.62 39.08


10-Nov 11-Nov 12-Nov 13-Nov 14-Nov 15-Nov 16-Nov 17-Nov 18-Nov 19-Nov 20-Nov

16 17 18 19 20 21 22 23 24 25 26
D N D N D N D N D N D N D N D N D N D N

16 42 48 40 30

23 78 60

8 10 6

L L

31.94 17.6
20-Nov 21-Nov 22-Nov 23-Nov 24-Nov

26 27 28 29 30
D N D N D N D N D

36 30 589

20 533

10 6 14 5 116

L L L L L 0

46.09 20.63 42.47 39.35 47.4 460.8

0
TJ 0210 - ROSITA
PERFORACION P
VOLADURA V
DESATE Y SOSTENIMIENTO S
LIMPIEZA L
PREPARACION PR

CONVENCIONAL
80 MT
UNIDAD DE PRODUCCION 40 MT
TAJO 0210 40 MT 26-Oct 27-Oct 28-Oct 29-Oct 30-Oct 31-Oct
DIA 1 2 3 4 5 6
Operación Unitaria UND cant. N D N D N D N D N D N

1. Perforación (P.P.) gdia 5.0 40 36 57 58 10

2. Voladura gdia 2.0 12

3. Desate Y Sostenimiento gdia 7.0

4. Limpieza gdia 0.0

Producción TMS 6.0

5. Prep. Barreras Relleno gdia 0.0

6. Relleno (m3) gdia 0.0

7. Disparo y Vol. Camino gdia 0.0

8. Insta. Sobre Camino gdia 0.0

9. Inst. Base Winche gdia 0.0

10. Crecimiento de OP gdia 0.0

11. Marcado de Ore gdia 0.0

12. Levant. Topográfico gdia 0.0

13. Muestreo gdia 0.0

14. Levantamiento Canales gdia 0.0


20
31-Oct 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov

6 7 8 9 10 11 12 13 14 15 16
D N D N D N D N D N D N D N D N D N D N

164

11 4 10 12 6 10 8

L L L L L L

47.32 44.66 23.33 19.69 24.26 20.71


10-Nov 11-Nov 12-Nov 13-Nov 14-Nov 15-Nov 16-Nov 17-Nov 18-Nov 19-Nov 20-Nov

16 17 18 19 20 21 22 23 24 25 26
D N D N D N D N D N D N D N D N D N D N
20-Nov 21-Nov 22-Nov 23-Nov 24-Nov

26 27 28 29 30
D N D N D N D N D

201

176

61

180

0
TJ 4030 - PAMELA
PERFORACION P
VOLADURA V
DESATE Y SOSTENIMIENTO S
LIMPIEZA L
PREPARACION PR

BREASTING
80 MT
UNIDAD DE PRODUCCION 40 MT
TAJO 4030 40 MT 26-Oct 27-Oct 28-Oct 29-Oct 30-Oct 31-Oct
DIA 1 2 3 4 5 6
Operación Unitaria UND cant. N D N D N D N D N D N D

1. Perforación (P.P.) gdia 16.0 16 16 16 13

2. Voladura gdia 16.0 16 16 16 13

3. Desate Y Sostenimiento gdia 13.0 7 6 6 6 6 10

4. Limpieza gdia 0.0 L L L L

Producción TMS 16.0 23 26.19 19.88 19.73

5. Prep. Barreras Relleno gdia 0.0

6. Relleno (m3) gdia 0.0

7. Disparo y Vol. Camino gdia 0.0

8. Insta. Sobre Camino gdia 0.0

9. Inst. Base Winche gdia 0.0

10. Crecimiento de OP gdia 0.0

11. Marcado de Ore gdia 0.0

12. Levant. Topográfico gdia 0.0

13. Muestreo gdia 0.0

14. Levantamiento Canales gdia 0.0

61
1-Nov 2-Nov 3-Nov 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov

7 8 9 10 11 12 13 14 15 16
N D N D N D N D N D N D N D N D N D N D

8 16 48 36 10

50 32 13 80

19 8 12 7 10

L L L L L L

17.96 23.15 24.49 23.11 90.42 23.24


11-Nov 12-Nov 13-Nov 14-Nov 15-Nov 16-Nov 17-Nov 18-Nov 19-Nov 20-Nov

17 18 19 20 21 22 23 24 25 26
N D N D N D N D N D N D N D N D N D N D

6 6 7 6 13 8 6

6 6 6 2 6 2 13 6

6 9

L L L L L L

19.58 19.38 19.02 20.79 19.73 23.49


21-Nov 22-Nov 23-Nov 24-Nov

27 28 29 30
N D N D N D N D

231

283

112

412.8

0
TJ 5030 - PAMELA
PERFORACION P
VOLADURA V
DESATE Y SOSTENIMIENTO S
LIMPIEZA L
PREPARACION PR

BREASTING
80 MT
UNIDAD DE PRODUCCION 40 MT
TAJO 5030 40 MT 26-Oct 27-Oct 28-Oct 29-Oct 30-Oct 31-Oct
DIA 1 2 3 4 5 6
Operación Unitaria UND cant. N D N D N D N D N D N

1. Perforación (P.P.) gdia 13.0 50 30 60

2. Voladura gdia 12.0 60 30 36

3. Desate Y Sostenimiento gdia 11.0 10

4. Limpieza gdia 0.0 L L L

Producción TMS 21.0 22.5 39.03 22.08

5. Prep. Barreras Relleno gdia 0.0

6. Relleno (m3) gdia 0.0

7. Disparo y Vol. Camino gdia 0.0

8. Insta. Sobre Camino gdia 0.0

9. Inst. Base Winche gdia 0.0

10. Crecimiento de OP gdia 0.0

11. Marcado de Ore gdia 0.0

12. Levant. Topográfico gdia 0.0

13. Muestreo gdia 0.0

14. Levantamiento Canales gdia 0.0

57
31-Oct 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov

6 7 8 9 10 11 12 13 14 15 16
D N D N D N D N D N D N D N D N D N D N

5 25

50 15 65

8 8 14 8 10

L L L L L L L L L

13.82 23.8 39.06 19.56 24.34 19.17 21.36 20.06 43.4


10-Nov 11-Nov 12-Nov 13-Nov 14-Nov 15-Nov 16-Nov 17-Nov 18-Nov 19-Nov 20-Nov

16 17 18 19 20 21 22 23 24 25 26
D N D N D N D N D N D N D N D N D N D N

38 40 25 32 40 40 40 10

65 32 40 60 2

6 8 10 8

L L L L L L L

38.64 40.5 44.9 19.27 19.29 22.53 16.12


20-Nov 21-Nov 22-Nov 23-Nov 24-Nov

26 27 28 29 30
D N D N D N D N D

435

25 480

8 98

L L 0

22 22.14 553.6

0
TJ 6030 - PAMELA
PERFORACION P
VOLADURA V
DESATE Y SOSTENIMIENTO S
LIMPIEZA L
PREPARACION PR

BREASTING
80 MT
UNIDAD DE PRODUCCION 40 MT
TAJO 6030 40 MT 26-Oct 27-Oct 28-Oct 29-Oct 30-Oct 31-Oct
DIA 1 2 3 4 5 6
Operación Unitaria UND cant. N D N D N D N D N D N

1. Perforación (P.P.) gdia 14.0 12 48 32

2. Voladura gdia 8.0

3. Desate Y Sostenimiento gdia 9.0

4. Limpieza gdia 0.0 L L L

Producción TMS 17.0 21.24 22.72 22.86

5. Prep. Barreras Relleno gdia 0.0

6. Relleno (m3) gdia 0.0

7. Disparo y Vol. Camino gdia 0.0

8. Insta. Sobre Camino gdia 0.0

9. Inst. Base Winche gdia 0.0

10. Crecimiento de OP gdia 0.0

11. Marcado de Ore gdia 0.0

12. Levant. Topográfico gdia 0.0

13. Muestreo gdia 0.0

14. Levantamiento Canales gdia 0.0

48
31-Oct 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov

6 7 8 9 10 11 12 13 14 15 16
D N D N D N D N D N D N D N D N D N D N

20 44 8

75 70 10

10 10 10 15 8

L L L L L L L L L

20.59 22.24 18.65 23.22 21.5 19.31 35.81 23.81 18.21


10-Nov 11-Nov 12-Nov 13-Nov 14-Nov 15-Nov 16-Nov 17-Nov 18-Nov 19-Nov 20-Nov

16 17 18 19 20 21 22 23 24 25 26
D N D N D N D N D N D N D N D N D N D N

42 14 41 34 44 46

60

10 18

L L L

42.71 20.57 21.26


20-Nov 21-Nov 22-Nov 23-Nov 24-Nov

26 27 28 29 30
D N D N D N D N D

62 56 503

15 100 50 60 440

14 13 108

L L 0

20.34 44.08 419.1

0
TAJO 4810 - SORPRESA 3

PERFORACION P
VOLADURA V
DESATE Y SOSTENIMIENTO S
LIMPIEZA L
PREPARACION PR

BREASTING
160 MT
UNIDAD DE PRODUCCION 40 MT
TAJO 4810 40 MT 26-Oct 27-Oct 28-Oct 29-Oct 30-Oct 31-Oct 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov 11-Nov 12-Nov 13-Nov 14-Nov 15-Nov 16-Nov 17-Nov 18-Nov 19-Nov 20-Nov 21-Nov 22-Nov 23-Nov 24-Nov
DIA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Operación Unitaria UND cant. N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D

30 20 35 20 40 49 50 40 24 85 40 20 20 38 30 44 60 30 45
1. Perforación (P.P.) gdia 19.0 720

85 9 85 50 35 25 60 80 40 25
2. Voladura gdia 10.0 494

16 16 8 12 6 6 8 2 8 6 10 16 8 6 6 6 8
3. Desate Y Sostenimiento gdia 17.0 148

4. Limpieza con Scoop gdia 0.0 L L L L L L L L L L L L L L L L L L 0

Producción TMS 18.0 46.08 41.56 26.3 59.65 22.41 20.62 19.44 61.06 17.13 35.99 40.25 44.13 22.17 22.72 21.53 18.91 16.4 20.72 557.1

5. Crucero al OP gdia 0.0 0

6. Cambio de Piso gdia 0.0 0

7. Levant. Topográfico gdia 0.0 0

8. Voladura de Descaje gdia 0.0 0

9. Prep. Barreras Relleno gdia 0.0 0

10. Relleno (m3) gdia 0.0 0

11. Muestreo gdia 0.0 0

12. Marcado de Ore gdia 0.0 0

13. Disparo y Vol. Camino gdia 0.0 0

14. Insta. Sobre Camino gdia 0.0 0

15. Crecimiento de OP gdia 0.0 0

16. Instalación Winche Izaje gdia 0.0 0

También podría gustarte