SUB-ESTACION

15-Aug
16-Aug
17-Aug
18-Aug
19-Aug
22-Aug
23-Aug
24-Aug
25-Aug
26-Aug
29-Aug
30-Aug
31-Aug

10-Sep
12-Sep
13-Sep
14-Sep
15-Sep
16-Sep
17-Sep
19-Sep
20-Sep
21-Sep
22-Sep
1-Sep
2-Sep
3-Sep
5-Sep
6-Sep
7-Sep
8-Sep
9-Sep
ACTIVIDAD FECHA INICIO FECHA FINAL
MARTELINADO DE PISO 15-Aug 15-Aug
ANCLAJE QUIMICO 15-Aug 15-Aug
CIMBRA 16-Aug 18-Aug
HABILITADO DE ACERO #3 18-Aug 22-Aug
HABILITADO DE ACERO #4 22-Aug 23-Aug
CONCRETO PREMESCRADO 24-Aug 24-Aug
CONFORMACION DE PLATAFORMA 25-Aug 31-Aug
DE MEMBRANA DE POLETILENO 1-Sep 1-Sep
HABILITADO DE ACERO #3 2-Sep 8-Sep
CIMBRA DE MADERA 3-Sep 8-Sep
JUNTA DE CONSTRUCCION 9-Sep 9-Sep
COLOCACION DE PASAJUNTAS 9-Sep 9-Sep
CONCRETO PREMESCRADO 9-Sep 10-Sep
JUNTA DE CONTRACCION 10-Sep 12-Sep
SUMINISTRO DE SIKAFLEX 13-Sep 13-Sep
PINTURA DE ESMALTE AMARILLO TRAFICO 14-Sep 14-Sep
CONCRETO EPOXINE 200 DE FESTER 14-Sep 14-Sep

BAÑO DE TRANSPORTES
ACTIVIDAD FECHA INICIO FECHA FINAL
TRAZO Y NIVELACION 15-Sep 15-Sep
REVICION DE LINEAS 15-Sep 15-Sep
CAMBIO DE UBICACIÓN DE LAVAMANOS 17-Sep 17-Sep
RED ELECTRICA 19-Sep 19-Sep
SUBMINISTRO DE LAMPARA 19-Sep 19-Sep
REPARACION DE TECHO DE LAMINA 20-Sep 21-Sep
RELLENO DE HUECO DE MURO 21-Sep 21-Sep
SUBMINISTRO DE CELOSIA 22-Sep 22-Sep

1 DIA
1D 1
3D 4
3D 6
2D 7
1D 8
5 D 13
1 D 14
5 D 19
4 D 19
1 D 20
1 D 20
2 DI21
2 D 22
1 D 23
1 D 24
1 DI24
1 D 25
1 D 25
1 D 26
1 D 27
1 D 27
2 DI29
1 D 29
1 D 30