HOJA DE METRADOS DE OBRA

PROYECTO: “CREACION DEL COMPLEJO POLIDEPORTIVO EN EL BARRIO PORVENIR, DISTRITO DE HUANCAN-HUANCAYO-JUNIN”


PROPIETARIO: MUNICIPALIDAD DISTRITAL DE HUANCAN
DISTRITO : HUANCAN
PROVINCIA : HUANCAYO
REGION : JUNIN FECHA : AGOSTO 2012
GRUPO: ACCESOS Y CERCO PERIMETRICO HECHO : MAVV
MEDIDAS
PARTIDA DESCRIPCION UNID. CANT. PARCIAL TOTAL
LARGO ANCHO ALTO
01.00.00 CERCO PERIMETRICO
01.01.00 ESTRUCTURAS
01.01.01 TRABAJOS PRELIMINARES
01.01.01.01 LIMPIEZA DE TERRENO MANUAL ML 313.46
CERCO TIPO I
TRAMO C-D 1.00 94.98 1.00 94.98
TRAMO D-E 1.00 67.22 1.00 67.22

CERCO TIPO II
TRAMO A-B 1.00 4.25 1.00 4.25
TRAMO B-B' 1.00 28.37 1.00 28.37
TRAMO B'-C 1.00 31.37 1.00 31.37
TRAMO A-E' 1.00 63.60 1.00 63.60
TRAMO E'-E 1.00 23.67 1.00 23.67

01.01.01.02 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR ML 313.46


CERCO TIPO I
TRAMO C-D 1.00 94.98 1.00 94.98
TRAMO D-E 1.00 67.22 1.00 67.22

CERCO TIPO II
TRAMO A-B 1.00 4.25 1.00 4.25
TRAMO B-B' 1.00 28.37 1.00 28.37
TRAMO B'-C 1.00 31.37 1.00 31.37
TRAMO A-E' 1.00 63.60 1.00 63.60
TRAMO E'-E 1.00 23.67 1.00 23.67

01.01.02 MOVIMIENTO DE TIERRAS


01.01.02.01 EXCAVACION PARA CIMIENTOS HASTA 1.00m DE PROFUNDIDAD EN TERRENO NORMAL M3 99.87
CERCO TIPO I
TRAMO C-D 1.00 94.98 0.40 0.70 26.59
TRAMO D-E 1.00 67.22 0.40 0.70 18.82

CERCO TIPO II
TRAMO A-B 1.00 4.25 0.40 0.90 1.53
TRAMO B-B' 1.00 28.37 0.40 0.90 10.21
TRAMO B'-C 1.00 31.37 0.40 0.90 11.29
TRAMO A-E' 1.00 63.60 0.40 0.90 22.90
TRAMO E'-E 1.00 23.67 0.40 0.90 8.52

01.01.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO A MANO M3 9.40


CERCO TIPO I
TRAMO C-D 1.00 94.98 0.30 0.10 2.85
TRAMO D-E 1.00 67.22 0.30 0.10 2.02

CERCO TIPO II
TRAMO A-B 1.00 4.25 0.30 0.10 0.13
TRAMO B-B' 1.00 28.37 0.30 0.10 0.85
TRAMO B'-C 1.00 31.37 0.30 0.10 0.94
TRAMO A-E' 1.00 63.60 0.30 0.10 1.91
TRAMO E'-E 1.00 23.67 0.30 0.10 0.71

01.01.02.03 ACARREO MATERIAL EXEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30.00 ML M3 113.08
Con 25% de Esponjamiento 1.25 90.47 113.08

01.01.02.04 ELIMINACION DE MATERIAL EXEDENTE CON EQUIPO PESADO M3 113.08


Con 25% de Esponjamiento 1.25 90.47 113.08

01.01.03 OBRAS DE CONCRETO SIMPLE


01.01.03.01 CONCRETO PARA CIMIENTOS CORRIDOS C:H 1:10 + 30% P.G. M3 87.33
CERCO TIPO I
TRAMO C-D 1.00 94.98 0.40 0.60 22.80
TRAMO D-E 1.00 67.22 0.40 0.60 16.13

CERCO TIPO II
TRAMO A-B 1.00 4.25 0.40 0.80 1.36
TRAMO B-B' 1.00 28.37 0.40 0.80 9.08
TRAMO B'-C 1.00 31.37 0.40 0.80 10.04
TRAMO A-E' 1.00 63.60 0.40 0.80 20.35
TRAMO E'-E 1.00 23.67 0.40 0.80 7.57

01.01.03.02 CONCRETO PARA SOBRECIMIENTOS C:H 1:8 + 25% P.M. M3 18.81


CERCO TIPO I
TRAMO C-D 1.00 94.98 0.15 0.40 5.70
TRAMO D-E 1.00 67.22 0.15 0.40 4.03

CERCO TIPO II
TRAMO A-B 1.00 4.25 0.15 0.40 0.26
TRAMO B-B' 1.00 28.37 0.15 0.40 1.70
TRAMO B'-C 1.00 31.37 0.15 0.40 1.88
TRAMO A-E' 1.00 63.60 0.15 0.40 3.82
TRAMO E'-E 1.00 23.67 0.15 0.40 1.42
HOJA DE METRADOS DE ACERO
PROYECTO: “CREACION DEL COMPLEJO POLIDEPORTIVO EN EL BARRIO PORVENIR, DISTRITO DE HUANCAN-HUANCAYO-JUNIN”
PROPIETARIO: MUNICIPALIDAD DISTRITAL DE HUANCAN
DISTRITO : HUANCAN
PROVINCIA : HUANCAYO
REGION : JUNIN
GRUPO: ACCESOS Y CERCO PERIMETRICO

CANT
LONG Nº DE
ITEM PARTIDA DESCRIPCION TIPO Ø ELEMENT Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
PARCIAL VECES
OS
01.01.04.01.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 GRADO 60 P/COLUMNAS
C-1 (0.25x0.25)
TRAMO C-D
Acero Longitudinal Ø 3/8" 3.05 4.00 47.00 573.40
Estribos Ø 1/4" 0.80 25.00 47.00 940.00
TRAMO D-E
Acero Longitudinal Ø 3/8" 3.05 4.00 32.00 390.40
Estribos Ø 1/4" 0.80 25.00 32.00 640.00

TOTAL (ML) - - - 963.80 - ###


4.04 2.26 1.60 1.02 0.58 0.25
TOTAL (KG) - - - 983.08 - 395.00
1,378.08

CANT
LONG Nº DE
ITEM PARTIDA DESCRIPCION TIPO Ø ELEMENT Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
PARCIAL VECES
OS
01.01.04.02.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 GRADO 60 P/VIGAS
VP -100 (0.50 X 0.25) TRAMO C-D
Acero Longitudinal Ø 3/8" 6.45 2.00 15.00 193.50

Estribos Ø 1/4" 0.25 40.00 15.00 150.00

Acero Longitudinal Ø 3/8" 3.05 2.00 1.00 6.10

Estribos Ø 1/4" 0.25 18.00 1.00 4.50

TRAMO D-E
Acero Longitudinal Ø 3/8" 6.45 2.00 10.00 129.00

Estribos Ø 1/4" 0.25 40.00 10.00 100.00

Acero Longitudinal Ø 3/8" 6.02 2.00 1.00 12.04

Estribos Ø 1/4" 0.25 40.00 1.00 10.00

TOTAL (ML) - - - 340.64 - 264.50


4.04 2.26 1.60 1.02 0.58 0.25
TOTAL (KG) - - - 347.45 - 66.13
413.58

CANT
LONG Nº DE
ITEM PARTIDA DESCRIPCION TIPO Ø ELEMENT Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
PARCIAL VECES
OS
02.01.04.02.01 ACERO DE REFUERZO F'Y=4200 KG/CM2 GRADO 60 P/ZAPATAS
PORTICOS DE INGRESO P. INGRESO Nº 1
Z-1 Y Z-2
Acero Horizontal Ø 1/2" 1.10 6.00 4.00 26.40
Acero Vertical Ø 1/2" 1.20 5.00 4.00 24.00

TOTAL (ML) - - - 50.40 - -


4.04 2.26 1.60 1.02 0.58 0.25
TOTAL (KG) - - - 51.41 - -
51.41

CANT
LONG Nº DE
ITEM PARTIDA DESCRIPCION TIPO Ø ELEMENT Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
PARCIAL VECES
OS
02.01.04.02.03 ACERO FY=4,200KG/CM2, GRADO 60 P/COLUMNAS
PORTICOS DE INGRESO P. INGRESO Nº 1
C-1
Acero Longitudinal Ø 1/2" 5.25 6.00 4.00 126.00
Estribos Ø 3/8" 1.57 30.00 4.00 188.40

TOTAL (ML) - - - 126.00 188.40 -


4.04 2.26 1.60 1.02 0.58 0.25
TOTAL (KG) - - - 128.52 109.27 -
237.79

CANT
LONG Nº DE
ITEM PARTIDA DESCRIPCION TIPO Ø ELEMENT Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
PARCIAL VECES
OS
02.01.04.03.03 ACERO FY=4,200KG/CM2, GRADO 60 P/VIGAS
PORTICOS DE INGRESO P. INGRESO Nº 1
V-1
Acero Longitudinal Ø 5/8" 6.04 4.00 1.00 24.16
Refuerzo Superior Ø 1/2" 2.55 4.00 1.00 10.20
Refuerzo Inferior Ø 5/8" 1.95 2.00 1.00 3.90

Estribos Ø 3/8" 1.90 40.00 1.00 76.00

P. INGRESO Nº 2
V-1
Acero Longitudinal Ø 5/8" 6.04 4.00 1.00 24.16
Refuerzo Superior Ø 1/2" 2.55 4.00 1.00 10.20
Refuerzo Inferior Ø 5/8" 1.95 2.00 1.00 3.90

Estribos Ø 3/8" 1.90 40.00 1.00 76.00

TOTAL (ML) - - 56.12 20.40 152.00 -


4.04 2.26 1.60 1.02 0.58 0.25
TOTAL (KG) - - 89.79 20.81 88.16 -
198.76
CANT
LONG Nº DE
ITEM PARTIDA DESCRIPCION TIPO Ø ELEMENT Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
PARCIAL VECES
OS
02.01.04.04.03 #REF!
PORTICOS DE INGRESO P. INGRESO Nº 1
V-1
Acero Longitudinal Ø 5/8" 6.04 4.00 1.00 24.16
Refuerzo Superior Ø 1/2" 2.55 4.00 1.00 10.20
Refuerzo Inferior Ø 5/8" 1.95 2.00 1.00 3.90

Estribos Ø 3/8" 1.90 40.00 1.00 76.00

TOTAL (ML) - - 28.06 10.20 76.00 -


4.04 2.26 1.60 1.02 0.58 0.25
TOTAL (KG) - - 44.90 10.40 44.08 -
99.38
03.01.03.03 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS DE H=0.40M M2
CERCO TIPO I
TRAMO C-D 1.00 94.98 0.15 0.40
TRAMO D-E 1.00 67.22 0.15 0.40

CERCO TIPO II
TRAMO A-B 1.00 4.25 0.15 0.40
TRAMO B-B' 1.00 28.37 0.15 0.40
TRAMO B'-C 1.00 31.37 0.15 0.40
TRAMO A-E' 1.00 63.60 0.15 0.40
TRAMO E'-E 1.00 23.67 0.15 0.40

01.01.04 OBRAS DE CONCRETO ARMADO


01.01.04.01 COLUMNAS
01.01.04.01.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3
CERCO TIPO I
TRAMO C-D 47.00 0.25 0.25 2.15
TRAMO D-E 32.00 0.25 0.25 2.15

01.01.04.01.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS M2


CERCO TIPO I
TRAMO C-D 47.00 1.00 2.05
TRAMO D-E 32.00 1.00 2.05

01.01.04.01.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 GRADO 60 P/COLUMNAS KG

01.01.04.02 VIGAS
01.01.04.02.01 CONCRETO EN VIGAS F'C=210 KG/CM2 M3
CERCO TIPO I
TRAMO C-D 1.00 94.98 0.15 0.15
TRAMO D-E 1.00 67.22 0.15 0.15

01.01.04.02.02 ENCOFRADO Y DESENCOFRADO DE VIGAS M2


CERCO TIPO I
TRAMO C-D 1.00 94.98 0.15
2.00 94.98 0.15
TRAMO D-E 1.00 67.22 0.15
2.00 67.22 0.15

01.01.04.02.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 GRADO 60 P/VIGAS KG

01.02.00 ARQUITECTURA
01.02.01 MUROS Y TABIQUES DE ALBAÑILERIA
01.02.01.01 MURO DE LADRILLO ARCILLA SOGA M2
CERCO TIPO I
TRAMO C-D 32.00 2.85 1.75
1.00 2.43 1.75

TRAMO D-E 21.00 2.85 1.75


1.00 2.43 1.75

01.02.02 REVOQUES ENLUCIDOS Y MOLDURAS


01.02.02.01 TARRAJEO EN SOBRECIMIENTOS CON C:A - 1:5 E=1.5 CM INCL. VESTI M2
CERCO TIPO II
TRAMO A-B 2.00 4.25 0.30
TRAMO B-B' 2.00 28.37 0.30
TRAMO B'-C 2.00 31.37 0.30
TRAMO A-E' 2.00 63.60 0.30
TRAMO E'-E 2.00 23.67 0.30

01.02.03 CARPINTERIA METALICA


01.02.03.01 CERCO METALICO ML
CERCO TIPO II
TRAMO A-B 1.00 4.25
TRAMO B-B' 1.00 28.37
TRAMO B'-C 1.00 31.37
TRAMO A-E' 1.00 63.60
TRAMO E'-E 1.00 23.67

01.02.04 PINTURA
01.02.04.01 PINTURA ESMALTE Y ANTICORROSIVO EN CARPINTERIA METALICA M2
CERCO TIPO II
TRAMO A-B 2.00 4.25
TRAMO B-B' 2.00 28.37
TRAMO B'-C 2.00 31.37
TRAMO A-E' 2.00 63.60
TRAMO E'-E 2.00 23.67

01.02.05 VARIOS
01.02.05.01 JUNTA DE CONSTRUCCION CON TEKNOPORT M2
CERCO TIPO I
TRAMO C-D 1.00 17.00 0.15 2.30
TRAMO D-E 1.00 12.00 0.15 2.30

CERCO TIPO II
TRAMO A-B 1.00 2.00 0.15 0.40
TRAMO B-B' 1.00 6.00 0.15 0.40
TRAMO B'-C 1.00 7.00 0.15 0.40
TRAMO A-E' 1.00 12.00 0.15 0.40
TRAMO E'-E 1.00 6.00 0.15 0.40

02.00.00 PORTICOS DE INGRESO


02.01.00 ESTRUCTURAS
02.01.01 TRABAJOS PRELIMINARES
02.01.01.01 LIMPIEZA DE TERENO MANUAL M2
P. INGRESO Nº 1 1.00 4.50 1.00
P. INGRESO Nº 2 1.00 4.50 1.00

02.01.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR M2


P. INGRESO Nº 1 1.00 4.50 1.00
P. INGRESO Nº 2 1.00 4.50 1.00

02.01.02 MOVIMIENTO DE TIERRAS


02.01.02.01 EXCAVACION PARA ZAPATAS HASTA 1.00M DE PROFUNDIDAD EN TE M3
P. INGRESO Nº 1
Z-1 1.00 1.10 1.20 1.10
1.00 1.10 1.20 1.10
P. INGRESO Nº 2
Z-1 1.00 1.10 1.20 1.10
1.00 1.10 1.20 1.10

02.01.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO M3


P. INGRESO Nº 1
Z-1 1.00 area 1.12 0.50
1.00 area 1.12 0.50
P. INGRESO Nº 2
Z-1 1.00 area 1.12 0.50
1.00 area 1.12 0.50

02.01.02.03 ACARREO DE MATERIAL EXCEDENTE HASTA UNA DISTANCIA PROMEDIM3


Idem a volumen de excavacion 1.25 5.81
Idem a volumen de relleno -1.25 2.24

02.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO PESADO CARG M3


Idem a volumen de excavacion 1.25 5.81
Idem a volumen de relleno -1.25 2.24

02.01.03 OBRAS DE CONCRETO SIMPLE


02.01.03.01 SOLADOS DE CONCRETO C:H 1:12 E=4" PARA ZAPATAS M2
P. INGRESO Nº 1
Z-1 1.00 1.10 1.20
1.00 1.10 1.20
P. INGRESO Nº 2
Z-1 1.00 1.10 1.20
1.00 1.10 1.20

02.01.04 OBRAS DE CONCRETO ARMADO


02.01.04.01 ZAPATAS
02.01.04.01.01 CONCRETO PARA ZAPATAS f'c=210 kg/cm2 M3
P. INGRESO Nº 1
Z-1 1.00 1.10 1.20 0.50
1.00 1.10 1.20 0.50
P. INGRESO Nº 2
Z-1 1.00 1.10 1.20 0.50
1.00 1.10 1.20 0.50

02.01.04.01.02 ACERO DE REFUERZO F'Y=4200 KG/CM2 GRADO 60 P/ZAPATAS KG

02.01.04.02 COLUMNAS
02.01.04.02.01 CONCRETO PARA COLUMNAS f'c=210 kg/cm2 M3
P. INGRESO Nº 1
C-1 1.00 0.20 3.60
1.00 0.20 3.60
P. INGRESO Nº 2
C-1 1.00 0.20 3.60
1.00 0.20 3.60

02.01.04.02.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS M2


P. INGRESO Nº 1
C-1 1.00 1.57 3.60
1.00 1.57 3.60
P. INGRESO Nº 2
C-1 1.00 1.57 3.60
1.00 1.57 3.60

02.01.04.02.03 ACERO FY=4,200KG/CM2, GRADO 60 P/COLUMNAS KG

02.01.04.03 VIGAS
02.01.04.03.01 CONCRETO PARA VIGAS f'c=210 kg/cm2 M3
P. INGRESO Nº 1
V-1 1.00 1.42 0.70
P. INGRESO Nº 2
V-1 1.00 1.42 0.70

02.01.04.03.02 ENCOFRADO Y DESENCOFRADO DE VIGAS M2


P. INGRESO Nº 1
V-1 1.00 1.42
2.00 5.64 0.70
2.00 0.25 0.70
P. INGRESO Nº 2
V-1 1.00 1.42
2.00 5.64 0.70
2.00 0.25 0.70

02.01.04.03.03 ACERO FY=4,200KG/CM2, GRADO 60 P/VIGAS KG

02.02.00 ARQUITECTURA
02.02.01 REVOQUES, ENLUCIDOS Y MOLDADURAS
02.02.01.01 TARRAJEO PRIMARIO, MORTERO C:A=1:5 M2
P. INGRESO Nº 1
C-1 1.00 1.57 3.00
1.00 1.57 3.00
V-1 1.00 1.42
2.00 5.64 0.70
2.00 0.25 0.70

P. INGRESO Nº 2
C-1 1.00 1.57 3.00
1.00 1.57 3.00
V-1 1.00 1.42
2.00 5.64 0.70
2.00 0.25 0.70

02.02.01.02 REVESTIMIENTO CON GRANITO PULIDO M2


P. INGRESO Nº 1
C-1 1.00 1.57 3.00
1.00 1.57 3.00
V-1 1.00 1.42
2.00 5.64 0.70
2.00 0.25 0.70
P. INGRESO Nº 2
C-1 1.00 1.57 3.00
1.00 1.57 3.00
V-1 1.00 1.42
2.00 5.64 0.70
2.00 0.25 0.70

02.02.02 CARPINTERIA METALICA Y HERRERIA


02.02.02.01 PUERTA METÁLICA TIPO 1 SEGÚN DISEÑO INCL. INSTALACION UND
P. INGRESO Nº 1 1.00 1.00
P. INGRESO Nº 2 1.00 1.00

02.02.03 CERRAJERIA
02.02.03.01 CHAPA DE PARCHE 3 GOLPES UND
P. INGRESO Nº 1 1.00 1.00
P. INGRESO Nº 2 1.00 1.00

02.02.04 PINTURA
02.02.04.01 PINTURA ESMALTE Y ANTICORROSIVOS EN CARPINTERIA METÁLICA ML
P. INGRESO Nº 1 2.00 3.50
P. INGRESO Nº 2 2.00 3.50
8.82

5.70
4.03

0.26
1.70
1.88
3.82
1.42

10.62

6.32
4.30

161.95

96.35
65.60

#REF!

3.65

2.14
1.51

72.99

14.25
28.49
10.08
20.17

#REF!

272.84

159.60
4.25

104.74
4.25

90.76
2.55
17.02
18.82
38.16
14.20

151.26

4.25
28.37
31.37
63.60
23.67

302.52

8.50
56.74
62.74
127.20
47.34

11.99

5.87
4.14

0.12
0.36
0.42
0.72
0.36

9.00
4.50
4.50

9.00
4.50
4.50

5.81

1.45
1.45

1.45
1.45

2.24

0.56
0.56

0.56
0.56

4.46
7.26
-2.80

4.46
7.26
-2.80

5.28

1.32
1.32

1.32
1.32

2.64

0.66
0.66

0.66
0.66

#REF!

2.83

0.71
0.71

0.71
0.71

22.61
5.65
5.65

5.65
5.65

#REF!

1.99

0.99

0.99

19.33

1.42
7.90
0.35

1.42
7.90
0.35

38.17

4.71
4.71
1.42
7.90
0.35

4.71
4.71
1.42
7.90
0.35

38.17

4.71
4.71
1.42
7.90
0.35
4.71
4.71
1.42
7.90
0.35

2.00
1.00
1.00

2.00
1.00
1.00

14.00
7.00
7.00