Está en la página 1de 37

DESCRIPCION CANTIDAD

01.00.00 TRABAJOS PRELIMINARES


01.01.01 TRAZO, NIVELES Y REPLANTEO 1
02.00.00 MOVIMIENTO DE TIERRAS
02.01.00 EXCAVACION DE ZANJA PARA CIMIENTOS
EJE A-A ENTRE 1 Y 2 1
EJE A'-A' ENTRE 1' Y 2 1
EJE B-B ENTRE 1Y 1' 1
EJE B-B ENTRE 2' Y 3 1
EJE C-C ENTRE 2' Y 3 1
EJE 1-1 ENTRE A Y C 1
EJE 1'-1´ENTRE A Y B 1
EJE 2-2 ENTRE A Y B 1
EJE 2´-2´ ENTRE B Y C 1
EJE 3-3 ENTRE B Y C 2
EJE 4-4 ENTRE B Y C

03.00.00 OBRAS DE CONCRETO SIMPLE


03.01.00 CIMIENTO CORRIDO - MEZCLA C:H 1:10+30% PG
EJE A-A ENTRE 1 Y 2 1
EJE A'-A' ENTRE 1' Y 2 1
EJE B-B ENTRE 1Y 1' 1
EJE B-B ENTRE 2' Y 3 1
EJE C-C ENTRE 2' Y 3 1
EJE 1-1 ENTRE A Y C 1
EJE 1'-1´ENTRE A Y B 1
EJE 2-2 ENTRE A Y B 1
EJE 2´-2´ ENTRE B Y C 1
EJE 3-3 ENTRE B Y C 2
EJE 4-4 ENTRE B Y C

03.02.00 SOBRECIMIENTO - MEZCLA C:H 1:8+25% PM


EJE 1-1 ENTRE A Y C 1
EJE 1'-1' ENTRE A Y B 1
EJE 2'-2' ENTRE B Y C 1
EJE 2-2 ENTRE A Y B 1
EJE (3-3 Y 4-4) ENTRE B Y C 2
EJE A-A ENTRE 1 Y 2 1
EJE A'-A' ENTRE 1' Y 2 1
EJE B'-B' ENTRE 1Y 1' 1
EJE B-B ENTRE 2' Y 4 1
EJE C-C ENTRE 1 Y 4 1
03.03.00 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO DE 60 CM.
EJE 1-1 ENTRE A Y C 1
EJE 1'-1' ENTRE A Y B 1
EJE 2'-2' ENTRE B Y C 1
EJE 2-2 ENTRE A Y B 1
EJE (3-3 Y 4-4) ENTRE B Y C 2
EJE A-A ENTRE 1 Y 2 1
EJE A'-A' ENTRE 1' Y 2 1
EJE B'-B' ENTRE 1Y 1' 1
EJE B-B ENTRE 2' Y 4 1
EJE C-C ENTRE 1 Y 4 1

03.04.00 FALSO PISO DE 4" CEMENTO - HORMIGON 1:6


SALA-COMEDOR 1
COCINA 1
DORMITORIO 1 1
DORMITORIO 2 1
PASADIZO 1
LAVANDERIA 1
BAÑO 1

SALA-COMEDOR 1
COCINA 1
DORMITORIO 1 1
DORMITORIO 2 1
PASADIZO 1
LAVANDERIA 1
BAÑO 1

04.00.00 OBRAS DE CONCRETO ARMADO


04.01ZAPATAS
04.01.01 ZAPATAS- CONCRETO F'c= 210kg/cm2
Z-1 8
Z-2 2

04.02.00 COLUMNAS
04.02.01 COLUMNAS - CONCRETO F'c= 210 kg/cm2
C-1 3
C-2 2
C-3 1
C-4 4

04.02.02 COLUMNAS - ENCOFRADO Y DESENCOFRADO


C-1 3
C-2 2
C-3 1
C-4 4

04.03.00 LOSA ALIGERADA


04.03.01 LOSA ALIGERADA - CONCRETO f'c=210 kg/cm2
PAÑO 1 1
PAÑO 2 1
PAÑO 3 1
PAÑO 4 1

Factor de concreto por m2=(1x1x0.05)+(0.10x0.15x1x2.5)

04.03.02 LOSA ALIGERADA - ENCOFRADO Y DESENCOFRADO


PAÑO 1 1
PAÑO 2 1
PAÑO 3 1
PAÑO 4 1

04.03.04 LADRILLO HUECO DE 15X30X30 cm


DE PARTIDA 04.03.02 (AREA) 1
Factor de ladrillo por m2 (2.5x3.33)

04.04.00 VIGAS
04.04.01 VIGAS DE CONCRETO F´c=210Kg/cm2
EJE A-A ENTRE 1 Y 2 1
EJE B-B ENTRE 1 Y 4 1
EJE C-C ENTRE 1 Y 4 1
EJE 1-1 ENTRE A Y C 2
EJE 2-2 ENTRE A Y C
EJE 3-3 ENTRE BY C 2
EJE 4-4 ENTRE BY C

04.04.02 VIGAS ENCOFRADO Y DESENCOFRADO


PERIMETRO 1
4
2
1
1
1

05.00.00 MUROS Y TABIQUES


05.01.00 MURO DE SOGA CON LADRILLO KING KONG
EJE 1-1 ENTRE A Y C 1
EJE 1'-1' ENTRE A Y B 1
EJE 2'-2' ENTRE B Y C 1
EJE 2-2 ENTRE A Y B 1
EJE (3-3 Y 4-4) ENTRE B Y C 2
EJE A-A ENTRE 1 Y 2 1
EJE A'-A' ENTRE 1' Y 2 1
EJE B'-B' ENTRE 1Y 1' 1
EJE B-B ENTRE 2' Y 4 1
EJE C-C ENTRE 1 Y 4 1
UND LONGITUD ANCHO ALTO SUB- TOTALDESCRIPCION UND .

m2 AREA IRREGULAR ……….. 35.00

m3 4.87 0.60 0.70 2.05 Z-1 m3


m3 2.25 0.60 0.70 0.95 Z-1 m3
m3 0.55 0.60 0.70 0.23
m3 6.55 0.60 0.70 2.75 Z-1;Z2 m3
m3 9.32 0.60 0.70 3.91 Z-1;Z2 m3
m3 5.15 0.60 0.70 2.16 Z-1 m3
m3 0.53 0.60 0.70 0.22
m3 3.30 0.60 0.70 1.39 Z-1;Z2 m3
m3 1.57 0.60 0.70 0.66
m3 2.65 0.60 0.70 2.23 Z-1;Z2 m3
16.54
9.82

m3 4.87 0.60 0.60 1.75 Z-1 m3


m3 2.25 0.60 0.60 0.81 Z-1 m3
m3 0.55 0.60 0.60 0.20
m3 6.55 0.60 0.60 2.36 Z-1;Z2 m3
m3 9.32 0.60 0.60 3.36 Z-1;Z2 m3
m3 5.15 0.60 0.60 1.85 Z-1 m3
m3 0.53 0.60 0.60 0.19
m3 3.30 0.60 0.60 1.19 Z-1;Z2 m3
m3 1.57 0.60 0.60 0.57
m3 2.65 0.60 0.60 1.91 Z-1;Z2 m3
14.18
8.42

m3 3.30 0.15 0.35 0.17


m3 1.35 0.15 0.35 0.07
m3 2.25 0.15 0.35 0.12
m3 1.60 0.15 0.35 0.08
m3 1.80 0.15 0.35 0.19
m3 4.10 0.15 0.35 0.22
m3 1.40 0.15 0.35 0.07
m3 0.80 0.15 0.35 0.04
m3 4.08 0.15 0.35 0.21
m3 8.27 0.15 0.35 0.43
1.61

m2 3.30 0.70 ……….. 2.31


m2 1.35 0.70 ……….. 0.95
m2 2.25
m2 1.60 0.70 ……….. 1.12
m2 1.80 0.70 ……….. 2.52
m2 4.10 0.70 ……….. 2.87
m2 1.40
m2 0.80 0.70 ……….. 0.56
m2 4.08 0.70 ……….. 2.86
m2 8.27 0.70 ……….. 5.79
18.97

AREA 9.23
AREA 3.17
AREA 7.23
AREA 5.45
AREA 1.87
AREA 0.81
AREA 2.62
30.38

m3 9.23 0.10 0.92


m3 3.17 0.10 0.32
m3 7.23 0.10 0.72
m3 5.45 0.10 0.55
m3 1.87 0.10 0.19
m3 0.81 0.10 0.08
m2 2.62 0.10 0.26
3.04

m3 0.80 0.80 0.60 3.07


m3 0.80 0.80 0.60 0.77
3.84

m3 0.25 0.25 2.7 0.51


m3 0.25 0.3 2.7 0.41
m3 0.50 0.13 2.7 0.18
m3 0.13 0.3 2.7 0.42
1.51

m2 1.00 ….. 2.7 8.10


m2 1.10 ….. 2.7 5.94
m2 1.26 ….. 2.7 3.40
m2 0.86 ….. 2.7 9.29
26.73

m2 4.1 2.50 ……….. 10.25


m2 4.10 1.85 ……….. 7.59
m2 1.88 1.85 ……….. 3.48
m2 2.34 1.85 ……….. 4.33
25.64
m3 0.0875
2.24

m2 4.1 2.50 ……….. 10.25


m2 4.10 1.85 ……….. 7.59
m2 1.88 1.85 ……….. 3.48
m2 2.34 1.85 ……….. 4.33
25.64

und ……….. ……….. ……….. 25.64


8.325
213
224.143133

m3 4.60 0.25 0.20 0.23


m3 9.32 0.30 0.20 0.56
m3 9.32 0.25 0.20 0.47
m3 4.35 0.25 0.20 0.44

m3 1.85 0.25 0.20 0.19

1.88

m2 26.19 0.20 5.24


m2 1.85 0.25 1.85
m2 2.50 0.25 1.25
m2 4.10 0.30 1.23
m2 1.88 0.30 0.56
m2 2.34 0.30 0.70

10.83

m2 3.30 ……… 2.25 7.43 V-1 m2


m2 1.35 ……… 2.25 3.04
m2 2.25
m2 1.60 ……… 2.25 3.60 V-3 m2
m2 1.80 ……… 2.25 8.10
m2 4.10 ……… 2.25 9.23
m2 1.40
m2 0.80 ……… 2.25 1.80
m2 4.08 ……… 2.25 9.18 V-2 m2
m2 8.27 ……… 2.25 18.61
60.98
55.52
DESCUENTO
CANTIDAD LONGITUD ANCHO ALTO SUB- TOTAL
TOTAL UND

35.00 m2

2.00 0.80 0.60 0.70 0.67


2.00 0.80 0.60 0.70 0.67

3.00 0.80 0.60 0.70 1.01


4.00 0.80 0.60 0.70 1.34
3.00 0.80 0.60 0.70 1.01

2.00 0.80 0.60 0.70 0.67

4.00 0.80 0.60 0.70 1.34


6.72
9.82 m3

2.00 0.80 0.60 0.60 0.58


2.00 0.80 0.60 0.60 0.58

3.00 0.80 0.60 0.60 0.86


4.00 0.80 0.60 0.60 1.15
3.00 0.80 0.60 0.60 0.86
0.60
2.00 0.80 0.60 0.60 0.58

4.00 0.80 0.60 0.60 1.15


5.76
8.42 m3
1.61 m3

18.97 m2

30.38 m2

3.04 m3

3.84 m3
1.51 m3

26.73 m3

2.24 m3

25.64 m2

224 und

1.88 m3
10.83 m2

2.00 1.00 1.40 2.80

1.00 0.70 0.20 0.14

2.00 0.90 1.40 2.52

5.46
55.52 m2
ITEM DESCCRIPCION DISEÑO DEL ACERO

PAÑO A

ACERO LONGITUDINAL Rec: 0.04


5.15

BALANCIN Rec: 0
1.90

BASTON Rec: 0
0.61 0.15

BASTON Rec: 0
0.81 0.15

TEMPERATURA Rec:
4.35
PAÑO B

ACERO LONGITUDINAL Rec: 0.04


2.40
BALANCIN Rec: 0
2.32

TEMPERATURA Rec:
4.72

DESCCRIPCION DISEÑO DEL ACERO

VIGAS
VS
EJE A ÷ 1 Y 2 Rec: 0.04
ACERO LONGITUDINAL 0.15 4.60

ESTRIBOS Rec: 0.04


0.25

0.20

V CH
EJE B ÷ 1 Y 2 Rec: 0.04

ACERO LONGITUDINAL 0.15 4.60

ESTRIBOS Rec: 0.04


0.30

0.20

VS
EJE C ÷ 1 Y4 Rec: 0.04

ACERO LONGITUDINAL 0.15 9.32

ESTRIBOS Rec: 0.04


0.25

0.20

V CH100
EJE B ÷ 2 Y4 Rec: 0.04

ACERO LONGITUDINAL 0.15 4.97

ESTRIBOS Rec: 0.04


0.30

0.20
VA
EJE 1 ÷ A Y C
EJE 2÷ A Y C Rec: 0.04

ACERO LONGITUDINAL 0.15 5.15

ESTRIBOS Rec: 0.04


0.25

0.20

VA
EJE 3 ÷ B Y C
EJE 4 ÷ B Y C Rec: 0.04

ACERO LONGITUDINAL 0.15 2.40


DA
ESTRIBOS Rec: 0.04
0.25

0.20

DESCCRIPCION DISEÑO DEL ACERO

03.02.00 COLUMNAS

03.02.02 ACERO COLUMNAS


fy=2400 kg/cm2
C-1

ACERO LONGITUDINAL t= 0.4 3.45 0.2

ESTRIBOS Rec: 0.004


0.25

0.25
C-2

ACERO LONGITUDINAL t= 0.4 3.45 0.2

ESTRIBOS Rec: 0.004


0.25

0.30

C-3

ACERO LONGITUDINAL t= 0.4 3.45 0.2

ESTRIBOS Rec: 0.004


0.50

0.13

C-4

ACERO LONGITUDINAL t= 0.4 3.45 0.2

ESTRIBOS Rec: 0.004


0.13

0.30

DISEÑO
ITEM DESCRIPCION DEL
ACERO

ZAPATAS
ACERO ZAPATAS
fy=2400 kg/cm2

Z-1

ACERO LONGITUDINAL r= 0.075 0.8


Ø CANT. N° . DE ELEM LONG.
LONGITUD DE ø EN (m
1/4 12mm 3/8

1/2 1 10 5.07 - - -

1/2 1 10 1.90 - - -

3/8 1 10 0.76 - - 7.60

1/2 1 10 0.96 - - -

1/4 1 21.0 4.35 91.35 - -

0.15 3/8 1 9.0 2.62 - - 23.58

3/8 1 9.0 2.32 - - 20.88

1/4 1 10.0 4.72 47.20 - -


LONG. 138.55 52.06
PESO 34.49895 29.1536
VARILLAS 15.39 5.78

Ø CANT. N° . DE ELEM LONG.


LONGITUD DE ø EN (m
1/4 8mm 3/8
1/2
0.15 1 5 4.82 - - -

8mm 1 25 0.78 - 19.50 -

1/2
0.15 1 7 4.82 - - -

8mm 1 25 0.88 - 22.00 -

1/2
0.15 1 5 9.54 - - -

8mm 1 57 0.78 - 44.46 -

1/2
0.15 1 4 5.19 - - -

8mm 1 35 0.88 - 30.80 -


1/2
0.15 2 4 5.37 - - -

8mm 2 35 0.78 - 54.60 -

1/2
0.15 2 4 2.62 - - -

8mm 2 16 0.78 - 24.96 -

LONG. 196.32
PESO 77.55
VARILLAS 21.81

Ø CANT. N° . DE ELEM LONG.


LONGITUD DE ø EN (m
1/4 8mm 3/8

0.20
1/2 3 4 4.05 - - -

8mm 3 23 1.17 - 80.59 -


0.20
1/2 2 6 4.05 - - -

8mm 2 23 1.27 - 58.33 -

0.20
1/2 1 8 4.05 - - -

8mm 1 23 1.43 - 32.84 -

0.20
1/2 4 4 4.05 - - -

8mm 4 23 1.03 - 94.58 -

LONG. 266.34
PESO 105.2043
VARILLAS 29.5933333

N° ELEM.

LONGITU
Ø CANT LONG.
D POR Ø
(en m.)

1/4" 12mm 3/8"


1/2 9 8 0.65 - - -

LONG
PESO
VARILLAS
ONGITUD DE ø EN (m) PESO de PESO de 1/4 PESO de PESO de
1/2 5/8 3/4 1/2 (Kg/m) (Kg/m) 3/8 (Kg/m) 8mm (Kg/m)
0.994 0.249 0.560 0.395

56.75 15.39 5.78


50.70 - -

19.00 - -

- - -

9.60 - -

- - -

- - -

- - -

- - -
79.30
78.8242 TOTAL 113.32 Kg
8.81

ONGITUD DE ø EN (m) PESO de 8mm


1/2 5/8 3/4 (Kg/m)
0.395
24.10 - -

- - -

33.74 - -

- - -

47.70 - -

- - -

20.76 - -

- - -
42.96 - -

- - -

20.96 - -

- - -

190.22
189.08
21.14 TOTAL 189.08 Kg

ONGITUD DE ø EN (m) PESO de PESO de 1/4 PESO de


1/2 5/8 3/4 1/2 (Kg/m) (Kg/m) 3/8 (Kg/m)
0.994 0.249 0.560

48.60 - -

- - -
48.60 - -

- - -

32.40 - -

- - -

64.80 - -

- - -

194.40
193.2336
21.6
TOTAL

1/2" 5/8" 3/4"


46.80 - -

46.80
46.52 KG
5.2
RES
OBRA :

UBICACIÓN :
PROPIETARIO : IVON CRUZ REYNA
ELABORADO : ISAAC PASCUAL CHALAN
ESPECIALISTA:

PARTIDA DESCRIPCION CEMENTO


TIPO I CEMENTO TIPO MS
BLS M3

VIVIENDA 01

TOTAL 138.53 0.00

* % DESPERDICIO (7%) 148.22 0.00

FACTOR DE LADRILLO
METRADO
CANT. DE LADRILLOS (m2)
0.015 jh
0.015 jv 38.87
55.52
0.09 h 40
0.23 L

CEMENTO TIPO I HORMIGON


CANTIDAD EN M3 BLS M3
CIMIENTOS CORRIDO 8.42
01:10+30%P.G 5.89 3.10 1.2
SOBRECIMIENTO 1.61
01:8+25%P.G 1.21 5.74 1.2
FALSO PISO 4"
1:06 3.04 0.51 0.13
ZAPATAS
210 Kg/cm2 3.84 9.73
COLUMNAS
210 Kg/cm2 1.51 9.73
LOSA ALIGERDA
210 Kg/cm2 2.24 9.73
VIGAS
210 Kg/cm2 1.88 9.73
MORTERO
C.A 1:5 1.36 7.00
RESUMEN DE MATERIALES

PIEDRA HORMIGON ARENA ARENA FINA AGUA


GRANDE 8" GRAVILLA 1/2" GRUESA
M3 M3 M3 M3 M3 M3

15.37 8.92 8.05 9.13 0.70 5.32

16.45 9.54 8.61 9.77 0.75 5.70

TOTAL UND
VOL.DE
LADRILLO
0.0025875
2220.80 UND

PIEDRA GRANDE GRAVILLA ARENA GRUESA ARENA FINA AGUA


M3 M3 M3 M3 M3

2.53 0.19

0.40 0.19

0.61

0.85 0.64 0.185

0.85 0.84 0.189

0.85 0.96 0.189


0.85 0.96 0.189

1.07 0.52 0.255

TOTAL
LADRILLO
LADRILLO KK TECHO
UND UND

2,220.80 243.00

2376.26 260.01

CALCULO DE VOLUMEN DE MORTERO


AREA DE MURO VOL. MORTERO
CANT. LADRILLOS/m2 VOL. MURO /m2 VOL. MORTERO /m2
TOTAL TOTAL
38.87 0.125 0.024416909620991 55.52 1.36

CEMENTO TIPO I HORMIGON PIEDRA GRANDE GRAVILLA ARENA GRUESA


BLS M3 M3 M3 M3

26.10 7.07 14.89

9.24 1.45 0.49

1.55 0.40

37.36 3.264 2.4576

14.69 1.2835 1.2684

21.80 1.904 2.1504


18.29 1.598 1.8048

9.49 0 1.45052069970845

138.53 8.92 15.37 8.05 9.13


ARENA FINA AGUA
M3 M3

1.12

0.23

1.85

0.71

0.29

0.42
0.36

0.704925947521866 0.35

0.70 5.32
ESTRIBOS TRAMOS ESTRIBOS PARCIAL
12 1.8 1.1 0.7 2.800 3 4 16
12 1.85 1.1 0.75 3 3 4 16
0
0
TOTAL 32
1 0.05
5 0.5
6 0.55