Está en la página 1de 4

COSTO DE MATERIALES: NOTAS:

CEMENTO ARENA GRAVA AGUA 1 ESTA TABLA ES ÚTIL PARA OBRAS PEQUEÑ
PRECIO x TON: PRECIO x CAMIÓN PRECIO x CAMIÓN PRECIO x PIPA 2 LLENAR SÓLO LOS CAMPOS EN COLOR AM
20 Bultos de 50 Kg. DE 7M3 DE 7M3 DE 4000 LTS 3 LOS COSTOS OBTENIDOS SON SÓLO DE M
$2,893.00 $1,470.00 $1,470.00 $103.00 4 CADA QUIEN DEBERÁ AGREGAR SUS COST
PRECIO x BULTO: 5 ESTA TABLA DE COSTOS PUEDE USARSE P
DE 50 KG PRECIO x M3: PRECIO x M3: PRECIO x M3: 6 LAS PROPORCIONES DE LA TABLA FUERON
$144.65 $210.00 $210.00 $25.75 "COSTO Y TIEMPO EN EDIFICAC
DESPERDICIO: DESPERDICIO: DESPERDICIO: DESPERDICIO: CARLOS SUÁREZ SALAZAR
3% 8% 8% 30% LIMUSA - NORIEGA EDITORES M
1.03 1.08 1.08 1.30 TERCERA EDICIÓN
COSTO CON DESP. COSTO CON DESP. COSTO CON DESP. COSTO CON DESP.
$2,979.79 $226.80 $226.80 $33.48 ELABORÓ: ING. DANIEL RG

CLASIFICACIÓN AGREGADO CEMENTO BULTOS ARENA GRAVA


F´C= REVENIMIENTO MÁXIMO TONELADA DE 50 KG M3 M3
100 kg/cm 2
8 A 10 CM 3/4" 0.260 5.20 0.500 0.680
1 1/2" 0.254 5.08 0.470 0.700
FIRMES Y 12 A 15 CM 3/4" 0.286 5.72 0.500 0.680
PLANTILLAS 1 1/2" 0.280 5.60 0.470 0.700

150 kg/cm2 8 A 10 CM 3/4" 0.323 6.46 0.480 0.670


1 1/2" 0.308 6.16 0.450 0.700
FIRMES, DALAS 12 A 15 CM 3/4" 0.354 7.08 0.480 0.670
Y CASTILLOS 1 1/2" 0.338 6.76 0.450 0.700

200 kg/cm2 8 A 10 CM 3/4" 0.355 7.10 0.470 0.650


1 1/2" 0.337 6.74 0.440 0.680
LOSAS DE 12 A 15 CM 3/4" 0.391 7.82 0.470 0.650
ENTREPISO 1 1/2" 0.373 7.46 0.440 0.680

250 kg/cm2 8 A 10 CM 3/4" 0.423 8.46 0.465 0.640


PISOS ESTRUCTURALES, 1 1/2" 0.400 8.00 0.435 0.670
COLUMNAS, DADOS, 12 A 15 CM 3/4" 0.467 9.34 0.465 0.640
ZAPATAS Y TRABES 1 1/2" 0.445 8.90 0.435 0.670
LA ES ÚTIL PARA OBRAS PEQUEÑAS DONDE HAY QUE ELABORAR EL CONCRETO EN OBRA
ÓLO LOS CAMPOS EN COLOR AMARILLO
TOS OBTENIDOS SON SÓLO DE MATERIALES
EN DEBERÁ AGREGAR SUS COSTOS DE OPERACIÓN E INDIRECTOS
LA DE COSTOS PUEDE USARSE PARA FINES DE PLANEACIÓN DE COMPRA DE MATERIALES Y ANÁLISIS
ORCIONES DE LA TABLA FUERON TOMADAS DE:
"COSTO Y TIEMPO EN EDIFICACIÓN"
CARLOS SUÁREZ SALAZAR
LIMUSA - NORIEGA EDITORES MÉXICO 1997
TERCERA EDICIÓN

ING. DANIEL RG

AGUA $$$ x M3 CON M3 CONCRETO COSTO AL CANTIDAD DE CANTIDAD DE CEM CANTIDAD DE


M3 DESPERDICIO REQUERIDOS: CONSTRUCTOR CEMENTO TON. BULTOS DE 50 KG ARENA EN M3

0.195 $1,048.90 0.00 $0.00 0.00 0.00 0.00


0.190 $1,028.58 0.00 $0.00 0.00 0.00 0.00
0.215 $1,127.04 0.00 $0.00 0.00 0.00 0.00
0.210 $1,106.73 0.00 $0.00 0.00 0.00 0.00

0.210 $1,230.32 0.00 $0.00 0.00 0.00 0.00


0.200 $1,185.29 0.00 $0.00 0.00 0.00 0.00
0.230 $1,323.36 0.00 $0.00 0.00 0.00 0.00
0.220 $1,275.35 0.00 $0.00 0.00 0.00 0.00

0.195 $1,318.37 0.00 $0.00 0.00 0.00 0.00


0.185 $1,264.40 0.00 $0.00 0.00 0.00 0.00
0.215 $1,426.31 0.00 $0.00 0.00 0.00 0.00
0.205 $1,372.34 0.00 $0.00 0.00 0.00 0.00

0.190 $1,517.43 0.00 $0.00 0.00 0.00 0.00


0.180 $1,448.56 0.00 $0.00 0.00 0.00 0.00
0.210 $1,649.21 0.00 $0.00 0.00 0.00 0.00
0.200 $1,583.32 0.00 $0.00 0.00 0.00 0.00
CANTIDAD DE CANTIDAD DE
GRAVA EN M3 AGUA EN M3

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00 0.00


0.00 0.00
0.00 0.00
0.00 0.00

También podría gustarte